Chapter 5 STRATEGY FORMULATION

Capacity refers to an upper limit or ceiling on the load that an Three Primary Strategies:
operating unit can handle.
 Leading capacity strategy builds capacity in anticipation of
The goal of strategic capacity planning is to achieve a match between future demand increases.
 Following strategy builds capacity when demand exceeds
the long-term supply capabilities of an organization and the predicted
current capacity.
level of long-term demand.
 Tracking strategy is similar to a following strategy, but it adds

Design capacity: The maximum designed service capacity or output capacity in relatively small increments to keep pace with

rate. increasing demand.

Effective capacity: Design capacity minus personal and other Capacity cushion - is an amount of capacity in excess of expected

allowances. demand when there is some uncertainty about demand.

( Actual output  Design capacity)  100 Capacity Planning Decisions:

Utilization =
Long-term considerations relate to overall level of capacity.

(Actual output  Effective capacity)  100 Short-term considerations relate to probable variations in capacity
Efficiency =
requirements created by such things as seasonal, random, and

DETERMINANTS OF EFFECTIVE CAPACITY irregular fluctuations in demand.

A. Facilities Long-term capacity needs require forecasting demand over a time


horizon and then converting those forecasts into capacity
1. Design 2. Location
requirements.

3. Layout 4. Environment
Fundamental issues when trends are identified:

B. Product/service
(1) How long the trend might persist, because few things last forever

1. Design 2. Product or service mix


(2) The slope of the trend.

C. Process
If cycles are identified, interest focuses on:

1. Quantity capabilities 2. Quality capabilities


(1) The approximate length of the cycles

D. Human factors
(2) The amplitude of the cycles (i.e., deviation from average).

1. Job content 2. Job design


Short-term capacity needs are less concerned with cycles or trends

3. Training and experience 4. Motivation than with seasonal variations and other variations from average. These
deviations are particularly important because they can place a severe
5. Compensation 6. Learning rates strain on a system’s ability to satisfy demand at some times and yet
result in idle capacity at other times.
7. Absenteeism and labor turnover

Three very important factors in planning service capacity:


E. Policy

(1) There may be a need to be near customers – convenience for


F. Operational
customers
1. Scheduling 2. Materials management
(2) The inability to store services - capacity must be matched with the
3. Quality assurance 4. Maintenance policies timing of demand (capacity = demand)

5. Equipment breakdowns (3) The degree of volatility of demand.

G. Supply chain Demand Management Strategies - can be used to offset capacity


limitations.
H. External factors

In-House or Outsource
1. Product standards 2. Safety regulations

- The decision will be based on the ff:


3. Unions 4. Pollution control standards

1. Available capacity 2. Expertise


3. Quality considerations 4. The nature of demand Material: Too little of one or more materials.

5. Cost 6. Risks Financial: Insufficient funds.

Supplier: Unreliable, long lead time, substandard quality.


Development of Capacity Strategies
Knowledge or competency: Needed knowledge or skills missing or
1. Design flexibility into systems – modification of existing incomplete.

structures rather than building a new one. Policy: Laws or regulations interfere.
2. Take stage of life cycle into account
3. Take a “big-picture” (i.e., systems) approach to capacity Evaluating Alternatives
changes - consider how parts of the system interrelate. a. Cost–volume analysis focuses on relationships between cost,
revenue, and volume of output. The purpose of cost–volume
Bottleneck Operation - is an operation in a sequence of analysis is to estimate the income of an organization under
operations whose capacity is lower than the capacities of other different operating conditions. It is particularly useful as a
operations in the sequence. As a consequence, the capacity of the tool for comparing capacity alternatives.
bottleneck operation limits the system capacity; the capacity of the
system is reduced to the capacity of the bottleneck operation. FC = Fixed cost

4. Prepare to deal with capacity “chunks VC = Total variable cost


5. Attempt to smooth out capacity requirements
v = Variable cost per unit TC = Total cost
6. Identify the optimal operating level
TR = Total revenue R = Revenue per unit
Economies of scale - if the output rate is less than the optimal
level, increasing the output rate results in decreasing average unit Q = Quantity or volume of output
costs.
Q BEP = Break-even quantity
Diseconomies of scale - If the output rate is more than the optimal
level, increasing the output rate results in increasing average unit P = Profit
costs.
TC = FC + VC
Reasons for economies of scale include the following:
VC = Q * v
a. Fixed costs are spread over more units, reducing the fixed cost
per unit. TR = R * Q

b. Construction costs increase at a decreasing rate with respect to Break-even point (BEP) - The volume of output at which total cost
the size of the facility to be built. and total revenue are equal.

c. Processing costs decrease as output rates increase because When volume is less than the break-even point, there is a loss;
operations become more standardized, which reduces unit costs. when volume is greater than the break-even point, there is a profit.

Reasons for diseconomies of scale include the following: P = TR – TC = R * Q – (FC + v * Q)

a. Distribution costs increase due to traffic congestion and shipping Or P = Q(R – v) – FC


from one large centralized facility instead of several smaller,
decentralized facilities. The difference between revenue per unit and variable cost per unit
(R – v) is known as the contribution margin.
b. Complexity increases costs; control and communication become
more problematic. Q = (P + FC) / (R – v)

c. Inflexibility can be an issue. QBEP = FC / (R – v)

d. Additional levels of bureaucracy exist, slowing decision making Indifference point - The quantity that would make two alternatives
and approvals for changes. equivalent.

7. Choose a strategy if expansion is involved - consider whether Cost–volume analysis can be a valuable tool for comparing capacity
incremental expansion or single step is more appropriate. Factors alternatives if certain assumptions are satisfied:
include competitive pressures, market opportunities, costs and
1. One product is involved.
availability of funds, disruption of operations, and training
requirements. 2. Everything produced can be sold.
Constraint Management 3. The variable cost per unit is the same regardless of the volume.
Constraint - is something that limits the performance of a process 4. Fixed costs do not change with volume changes, or they are step
or system in achieving its goals. changes.
Constraint management is often based on the work of Eli Goldratt 5. The revenue per unit is the same regardless of volume.
(The Theory of Constraints), and Eli Schragenheim and H. William
Dettmer (Manufacturing at Warp Speed). 6. Revenue per unit exceeds variable cost per unit.

Seven Categories of Constraints: b. Financial Analysis

Market: Insufficient demand.  Cash flow refers to the difference between the cash received
from sales (of goods or services) and other sources (e.g., sale
Resource: Too little of one or more resources (e.g., workers, of old equipment) and the cash outflow for labor, materials,
equipment, and space). overhead, and taxes.
 Present value expresses in current value the sum of all
future cash flows of an investment proposal.

Methods of Financial Analysis

Payback - crude but widely used method that focuses on the


length of time it will take for an investment to return its original
cost.

present value (PV) method - summarizes the initial cost of an


investment, its estimated annual cash flows, and any expected
salvage value in a single value called the equivalent current value,
taking into account the time value of money (i.e., interest rates).

Internal Rate Of Return (IRR) - this method identifies the rate of


return that equates the estimated future returns and the initial
cost.

Decision Theory - involves identifying a set of possible future


conditions that could influence results, listing alternative courses of
action, and developing a financial outcome for each alternative–
future condition combination.

c. Waiting-Line Analysis

Two strategies for determining the timing and degree of


capacity expansion:
 Expand-early strategy - before demand materializes
 Wait-and-see strategy - to expand capacity only after
demand materializes, perhaps incrementally