You are on page 1of 2

Occupational Health & Safety Management System Doc No.

: OHS/D27
Format No: OHS/FT27
Safety Meeting Minutes Date: 12th August 2011
Page 1 of 2

Name of the Job Site: M/s. Tata Metaliks Limited, Kharagpur Sheet : 1 of 2 Ref:

Business unit: O&M Job No: Meeting No.


Date of meeting: 17.8.2018
Purpose of Meeting: Site Safety Meeting Location of Meeting: CPP#3 Control Room
MEMBERS PRESENT INVITIEES MEMBERS ABSENT
1. Manas Rakshit
2. Indrajit Kumar Dey
3. Sanjeev Kumar
4. Sudhir Walke
5. Deo shanker
6. Biswjit ghosh
7. Raj kumar
8. Narayan Bera
9. Shouvik Sahoo
10.Subhasis saha
11. Samir Samanta
12.Amitabh Jana
13.S.k Stapthy
14.Apu Bera
15.Pranab Ghosal
16.Prashant Dakur
17.Sumon chakraborty

REPORT SENT TO
No. of Name / Dept. No. of Name / Dept. No. of Name / Dept.
Copies Copies Copies

Prepared By: Location: CPP #3 Date: 20.08.2018


Sanjeev Kumar

Site Office:

Prepared by: Approved by: Issued On Page


th
Core Team Management Appointee 12 August 2011 1 of 2
Occupational Health & Safety Management System Doc No.: OHS/D27
Format No: OHS/FT27
Safety Meeting Minutes Date: 12th August 2011
Page 2 of 2

Name of the Job Site: Sheet 2 of 2

Business unit: CPP#3 Job No.: Meeting No:

Item Description of Discussion Action By Target Remarks


No.
1 Some persons during leaving the pump house, Electrical HOD 31/08/2018 Closed
Electricals switch do not put off.
2 ETP main drain door does not closed properly. ETP operator 02/09/2018 Under progress
3 Pickup round should be taken monthly basis and All 01/09/2018 Under progress
timely.
4 Tunnel damper discharge drain line should be Manas sir - After materials
extending. availability.
5 Super heater hopper insulation required. Also check Field engineer, - Under progress
the insulation where required checked in both boiler. shift in charge &
all concerns
department
6 Step required to operating the pressure gauge valve Mechanical 06/09/2018
near the boiler drum area WHRB#1. department
7 Locations should fixed all F-rod where required. Field engineer & 07/08/2018
Mechanical
department.
8 TG shutdown date fixed by the client third week of All concerns Shut down date All concerns
September. department department prepare
the shutdown
planning.
9 ETP roof shading work is not completed in various Manas sir - Required
places ETP area. communicate the
party.

Next meeting is scheduled on: 06.9.2018

Prepared by: Approved by: Issued On Page


th
Core Team Management Appointee 12 August 2011 2 of 2