You are on page 1of 15

PRESUPUESTO

Peso Area pintura


Cod Presup Cant Descripcion Long. lbs/ft (m²)
736 143.52 1.0000 1.00 Tubo 150x150x2,38 6 7.29 3.60
752 281.62 1.0000 1.00 Tubo 150x150x4.76 6 14.31 3.60
751 2,279.40 12.0000 12.00 Tubo 150x150x3.17 6 9.65 43.20
854 1,962.64 13.0000 13.00 Tubo rect 200x100x2,38 6 7.67 46.80
737 470.25 5.0000 5.00 Tubo 100x100x2,38 6 4.78 12.00
796 189.95 1.0000 1.00 Tubo rect 200x100x3.17 6 9.65 3.60
746 124.08 1.0000 1.00 Tubo 100x100x3.17 6 6.30 2.40
797 281.62 1.0000 1.00 Tubo rect 200x100x4.76 6 14.31 3.60
741 34.26 1.0000 1.00 Tubo 50x50x1.80 6 1.74 1.20
745 4,731.83 66.0000 66.00 Tubo 100x100x1.80 6 3.64 158.40
4 1,048.82 24.0000 24.00 RT 3#16 6 2.22 84.12
1 274.02 8.0000 8.00 RT 1#16 6 1.74 23.16
86 292.32 9.0000 9.00 Ang 2x2x1/8 6 1.65 10.97
396.66

12,114.32 TOTAL 396.66


Porcentaje desperdicio 0.00%

66.0000

m²/gls Pintura Area


2 Mils 26.676 Anticorrosivo Lanco 396.66 m²
2 Mils 18.772 Esmalte Lanco 396.66 m²
Soldadura
Sol. Por vol. Base 54.00 %
Sol. Por vol. Acabado 38.00 %
Eficiencia 65.00 %

DESCRIPCION CANTIDAD COSTO TOTAL


Placas de apoyo 14.00 8,500.00 119,000.00
Pernos var#5 6.00 5,500.00 33,000.00
Discos de corte, felpas, etc 1.00 50,000.00 50,000.00
0.00
202,000.00
Prov. Precio Col/# Precio Peso
Neto Total Calc.
46,454.30 323.68 ₡46,454.30 143.52
86,733.15 307.98 ₡86,733.15 281.62
62,082.20 326.83 ₡744,986.40 2,279.40
46,454.30 307.70 ₡603,905.90 1,962.64
30,238.80 321.52 ₡151,194.00 470.25
62,082.20 326.83 ₡62,082.20 189.95
40,324.75 325.00 ₡40,324.75 124.08
86,733.15 307.98 ₡86,733.15 281.62
11,477.04 335.00 ₡11,477.04 34.26
22,984.20 320.59 ₡1,516,957.20 4,731.83
11,362.20 260.00 ₡272,692.91 1,048.82
8,847.90 258.32 ₡70,783.20 274.02
7,480.60 230.31 ₡67,325.40 292.32
310.51 ₡3,761,649.61 12,114.32

310.51 ₡3,761,649.61 12,114.32

Galones Precio/gls Costo


14.87 15,000.00 ₡223,044.53
21.13 ₡0.00
8 ₡96,914.56 Col/#
Total ₡319,959.09 26.41

Costo por libra 336.92

ACERO Y PINTURA ₡4,081,609


VARIOS ₡202,000
TOTAL ₡4,283,609

353.60
Placas de fundacion

Proyecto:
Actividad: Cimientos

Volumenes
ÍTEM DESPLANTE ANCHO LONGITUD CANTIDAD
Escavacion
PF1 1 1 1 5
PF1 1 0.75 0.75 2

sello de concreto 0.05 1 1 5


0.05 0.75 0.75 2
Cimiento 0.2 1 1 5
0.2 0.75 0.75 2
Pedestales 1 0.3 0.3 14
Relleno lastre 0.2 1.1 1.1 7

DOSIFICACION

Sello (105kgr/cm2)
ÍTEM % Dosificación % m3 CANTIDAD UNIDAD
CEMENTO 4.37 0.32 1 sacos
ARENA 0.486 0.26 0.1 m3
PIEDRA 0.972 0.26 0.3 m3

Cimientos y pedestales (210kgr/cm2)


ÍTEM % Dosificación % m3 CANTIDAD UNIDAD
CEMENTO 7.65 2.73 21 sacos
ARENA 0.427 2.73 1.2 m3
PIEDRA 0.854 2.73 2.3 m3

RESUMEN
ITEM Cantidad Unidad
Escavacion 7.35 m3
Sello 0.26 m3
Cimientos y pedestales 2.49 m3
Relleno lastre 1.78 m3
Cemento 22.32 sacos
Arena 1.3 m3
Piedra 2.6 m3

MATERIALES
MATERIAL UN. CANT. C / UN Costo Total
Cemento sacos 23 ₡6,215.00 ₡142,945.00
Arena m3 2.0 ₡14,520.50 ₡29,041.00
Piedra m3 3.0 ₡15,029.00 ₡45,087.00
Lastre m3 2.0 ₡13,334.00 ₡26,668.00
Var #4 un 12 ₡3,360.00 ₡40,320.00
Var #3 un 36 ₡1,850.00 ₡66,600.00

Página 3
Placas de fundacion

Alambre kgr 2 ₡569.52 ₡1,139.04


Formaleta 12" varas 35 ₡1,350.00 ₡47,250.00
Formaleta 8" varas 35 ₡1,000.00 ₡35,000.00
Reglas 1"x3" varas 50 ₡400.00 ₡20,000.00
Reglas 1"x2" varas 100 ₡305.10 ₡30,510.00
Clavos 2" kgr 1 ₡706.25 ₡706.25
Desmoldante 1 ₡10,000.00 ₡10,000.00
Plastico negro kgr 3 ₡1,327.75 ₡3,983.25
Transportes 1 ₡35,000.00 ₡35,000.00
Batidora 1 ₡0.00 ₡0.00
Compactador 1 ₡50,000.00 ₡50,000.00
Varios 1 ₡75,000.00 ₡75,000.00
SUB-TOTAL ₡659,249.54

Página 4
Placas de fundacion

SUBTOTAL % correctivo TOTALES UNIDAD

5.00 20% 6.00 m3


1.13 20% 1.35 m3
Total 7.35 m3

0.25 5% 0.26 m3
0.06 5% 0.06 m4
1.00 10% 1.10 m3
0.23 10% 0.25 m3
1.26 10% 1.39 m3
1.69 5% 1.78 m3

Página 5
Lamina de techo y hojalateria
DESCRIPCION CANTIDAD UN. COSTO TOTAL
Lamina esmaltada HG #26 1.07x3.66 27.00 un ₡12,011.90 ₡324,321.30
Lamina esmaltada HG #26 1.07x1.83 3.00 un ₡6,005.95 ₡18,017.85
Tornillos punta broca 500.00 UN. ₡35.00 ₡17,500.00
Cumbrera HG 18" 3.00 UN. ₡3,729.00 ₡11,187.00
Botaguas HG 18" 24.00 UN. ₡3,729.00 ₡89,496.00
Canoa HG 18" 8.79 yardas ₡10,000.00 ₡87,912.09
Bajantes pvc 3" SCH50 sanitario 2.00 UN. ₡10,600.00 ₡21,200.00
Codo a 90 6.00 UN. ₡2,500.00 ₡15,000.00
Varios 1.00 UN. ₡25,000.00 ₡25,000.00
₡609,634.24

Lamina de pared y hojalateria


DESCRIPCION CANTIDAD UN. COSTO TOTAL
Lamina esmaltada HG #26 1.07x1.83 36.00 un ₡6,005.95 ₡216,214.20
Lamina esmaltada HG #26 1.07x3.05 41.00 un ₡10,237.80 ₡419,749.80
Botaguas HG 18" 24.00 UN. ₡3,729.00 ₡89,496.00
₡725,460.00
₡342,339.15

₡11,187.00
₡89,496.00

₡725,460.00
₡1,168,482.15
Ceramica
DESCRIPCION CANTIDAD UN. COSTO TOTAL
Ceramica 73.00 m2 ₡6,500.00 ₡474,500.00
Bondex 25.00 un ₡4,000.00 ₡100,000.00
Fragua 15.00 un ₡2,500.00 ₡37,500.00
₡612,000.00

Paredes livianas Area dur 30m2 Area gyp 178m2


DESCRIPCION CANTIDAD UN. COSTO TOTAL
Lámina gypsum para humedad 19.00 un ₡7,000.00 ₡133,000.00
Muro seco 18.00 un ₡3,600.00 ₡64,800.00
Lámina gypsum 68.00 un ₡3,600.00 ₡244,800.00
Canal L=3m 20.00 un ₡2,000.00 ₡40,000.00
Stud 4", L=3m 170.00 un ₡1,800.00 ₡306,000.00
Pintura 12.00 gls ₡13,000.00 ₡156,000.00
Sellador 12.00 gls ₡11,000.00 ₡132,000.00
Pasta easy finish 2 cubeta ₡12,500.00 ₡25,000.00
Tornillos, durethane, esquineros, cinta, etc 1 ₡75,000.00 ₡75,000.00
₡1,176,600.00

Cielos
DESCRIPCION CANTIDAD UN. COSTO TOTAL
Lamina gypsum 28.00 UN. ₡3,600.00 ₡100,800.00
Pintura 5.00 UN. ₡13,000.00 ₡65,000.00
Sellador 6.00 UN. ₡11,000.00 ₡66,000.00
Angular, largo=3.05 50.00 UN. ₡1,000.00 ₡50,000.00
canal, largo= 4.88m a cada 1.20 30.00 UN. ₡1,700.00 ₡51,000.00
mini furring, largo= 3.66m a cada 0.60 40.00 UN. ₡900.00 ₡36,000.00
₡368,800.00

Servicios sanitarios
DESCRIPCION CANTIDAD UN. COSTO TOTAL
Servicio sanitario, pedestal y lavatorio 1.00 UN. ₡85,000.00 ₡85,000.00
Duchas 1.00 UN. ₡20,000.00 ₡20,000.00
Azulejo 23.00 m2 ₡6,500.00 ₡149,500.00
₡254,500.00

Puertas
DESCRIPCION CANTIDAD UN. COSTO TOTAL
Puertas 5.00 UN. ₡45,000.00 ₡225,000.00
Marcos de puertas y batiente 5.00 UN. ₡10,000.00 ₡50,000.00
₡275,000.00
₡5,656.73 /m2

₡5,052.05 /m2
Estructura metálica
DESCRIPCION CANTIDAD UN. COSTO

Materiales 1.00 global

Placas de fundacion y pedestales


DESCRIPCION CANTIDAD UN. COSTO

Materiales 1.00 global

Lamina de entrepiso
DESCRIPCION CANTIDAD UN. COSTO
Lamina plycen 22mm 25.00 UN. ₡32,318.00
Tornillos 1.00 ₡10,000.00

Lamina de techo y hojalateria


DESCRIPCION CANTIDAD UN. COSTO

Materiales 1.00 global ₡609,634.24

Lamina de pared y hojalateria


DESCRIPCION CANTIDAD UN. COSTO

Materiales 1.00 global

Ceramica
DESCRIPCION CANTIDAD UN. COSTO

Materiales 73.00 m2 ₡8,383.56

Paredes livianas
DESCRIPCION CANTIDAD UN. COSTO

Paredes sencillas y doble forro 208.00 m2 ₡5,656.73

Cielos
DESCRIPCION CANTIDAD UN. COSTO

Materiales 28.00 m2 ₡13,171.43

Servicios sanitarios
DESCRIPCION CANTIDAD UN. COSTO
DESCRIPCION CANTIDAD UN. COSTO

Servicios sanitarios y ducha 1.00 UN. ₡254,500.00

Puertas
DESCRIPCION CANTIDAD UN. COSTO

Puertas principales e internas 5.00 UN. ₡55,000.00

Instalacion electrica 1.00 UN.

1.00 UN.

Materiales

Mano de obra

TOTAL
TOTAL
₡4,283,608.70
₡4,283,608.70

TOTAL
₡659,249.54
₡659,249.54

TOTAL
₡807,950.00
₡10,000.00
₡817,950.00

TOTAL
₡609,634.24

TOTAL
₡725,460.00

TOTAL
₡612,000.00

TOTAL
₡1,176,600.00

TOTAL
₡368,800.00

TOTAL
TOTAL
₡254,500.00

TOTAL
₡275,000.00

₡325,000.00

₡10,107,802.48

₡6,850,000.00

₡17,350,000.00
Actividades Cantidad Unidad Costo Unitario Sub-Total
Desmontaje de techo existente gl ₡0.00
Muro de mamposteria ml ₡0.00
Obras exteriores
Rampas de acceso vehicular

Fundaciones m3 ₡725,174.49
Obra gris
Entrepiso en concreto m2
Estructura metalica Estructura de entrepiso, techo y escalera gl
Lamina de techo y pared m2
Botaguas, cumbreras y bajantes
Lamina de techo, pared y Canos HG ml
hojalateria
Mano de obra m2

Ceramica m2
Mano de obra de pega de ceramica m2
Paredes livianas m2
Acabados Cielos m2
Servicios sanitarios gl
Puertas un
Ventanas un
Tanque septico un ₡0.00
Mano de obra tanque septico gl ₡0.00
Sistema electromecanico Sistema agua potable gl ₡0.00
Acometida electrica gl ₡0.00
Sistema electrico gl ₡0.00
TOTAL ₡725,174.49
₡5,179.82

You might also like