EXISTING
01 Executive Summary
02 Location
03 Site
04 Site History
05 Existing Plan
06 Existing Elevations
07 Surrounding Area
08 Opportunity and Constraints
09 Urban Analysis
10 Urban Street Views
11 Urban Analysis Diagrams
12 Existing Height Massing
13 Evolution Analysis
PART TWO
PROPOSAL
01 Proposal Brief
02 Form, Character & Materials
03 Building Use and Amount
04 Street Scene Massing
05 Long Distance Massing
06 Layout, Access & Circulation
07 Scale
08 Sunpath Analysis
09 External Precedents
10 Internal Precedents
11 Proposed Plans
12 Proposed Elevations
13 Detailed Design
14 Visual
15 Conclusion
PART THREE
SUPPORTING INFORMATION
01 The Architects
02 Supporting Information
03 Planning Policy Guidance
00
PART ONE
EXISTING
EXECUTIVE SUMMARY.
PART ONE
01
LOCATION.
PART ONE
KIRKDALE RAIL
STATION
LN N
WALTO
BANK HALL RAIL
STATION
SPELL
OW LN
D
ER
N L
OS
LOW
LR
ME
BAR
PR
N
NL
IO
RY
LTO
RD
WA
COMMERCIAL RD
SLEEPE
Y
LE
R
L
VA
S HILL
N
TO
ER
EV
Everton is an inner City District of Liverpool. Everton Football Club within Goodison Park is situated two miles north of Liverpool City Centre, with Vauxhall to the
west, Kirkdale to the North and Anfield to the north east.
Liverpool has good transport links with Lime Street Railway Station being the nearest mainline station. Goodison Park itself is well placed for access via public
transport, be it by bus or train. The nearest Station to the stadium is the Kirkdale railway station which is located just over half a mile away. A number of local
bus services run to Goodison Park from Liverpool as well as Hackney carriage services. There are also on-site parking facilities for supporters travelling by car.
02
SITE.
PART ONE
03
SITE HISTORY.
PART ONE
Goodison Park as we know it today started to take shape Goodison Park Facts;
when Archibald Leach services were enlisted to design
a stadium that was to become famous the world over. • Was the first league ground visited by Royalty
In 1907 the first side to be completed was the Park End
double-decker stand, at a cost of £13,000. Two years • Was the first ground in England to have dug-outs.
later the large Main Stand on Goodison Road was built
for a cost of £28,000 and housed all the club offices and • Was the first to have double-decker stands on four
player facilities. Around the same time £12,000 was sides.
spent on concreting the terracing and constructing a
new cinder running track. • Was the first to have underground heating.
During the Second World War, Goodison Park suffered • Was the first to have a three tier stand.
quite bad damage due to it’s close proximity to the
docks at Liverpool and the club was awarded £5,000 for • Has staged more top fight games than any other.
repairs from the War Damage Commission. After the
War football enjoyed an era of immense popularity and • Is the only league ground to host a world cup semi
soon after Everton had completed the repairs to the final.
ground they had their highest ever attendance, 78,299 on
18th September 1948 for the Division One game against • It has staged FA Cup Semi Finals and Finals.
Liverpool.
• It has staged numerous England games.
England were awarded the World Cup in 1966 and in
acknowledgement as the prominent league ground, • It is the only football stadium in the World to have a
Goodison Park staged more games than any ground church at one corner, St Luke the Evangelist.
outside of Wembley Stadium. Five games were played
including the epic quarter final between Portugal and
North Korea and the forgettable semi final between West
Germany and Russia. In preparation for the World Cup,
Everton had bought and demolished some of the houses
which stood behind the Park End Stand in order to make
way for a new entrance from Stanley Park.
04
SITE HISTORY.
PART ONE
04
EXISTING PLAN.
PART ONE
05
EXISTING ELEVATIONS.
PART ONE
06
SURROUNDING AREA.
PART ONE
ANFIELD CEMETRY & CREMATORIUM GLADYS STREET COMMUNITY PRIMARY SCHOOL WALTON LANE
07
OPPORTUNITY AND CONSTRAINTS.
PART ONE
Opportunity 6. Continuity
1. Local Opportunity for Business A great opportunity to create a scheme which responds
The site occupied by Everton Football Club is a well and reinforces the unique history of Everton football
established and thriving football club and business. club.
Everton Football Club has occupied the site for
numerous years and has naturally outgrown the need for Constraints aren’t necessarily negative things, but a list
the space in their current location. The site is in a prime of criteria we must satisfy in order to engineer a robust
location to allow for new bespoke scheme. It will create design. A detailed site analysis was undertaken as part
a new, fresh and exciting building for the local area, of the design development process for the application
which in turn will continue to bring people to the heart of and the following constraints and opportunities
Everton and bring business to the community identified:
2. Improved Physical Environment Constraints
The existing location currently permits a temporary 1. Open urban site
marquee and can be seen as far from ideal. The new The site is positioned in such a way that its proportions
addition would resolve the need for a better environment are exposed to the elements which result in the
for the employees of Everton and will bring the existence of a large open space towards the edge of the
community and businesses alike together. This intern site. A successful proposal will aim to tackle such future
would make the area a lot more desirable place to work issues and create a more dynamic appeal to the existing
and live. site.
3. Community Enhancement 2. Space Restrictions
The new proposal with the addition of a cafe, retail unit, The corner space and neighbouring streets and existing
museum, and hospitality suite will improve and enhance car park will have to be acknowledged. Buildings in
the area of Everton. A successful proposal would similar situations have often been resolved poorly due to
almost guarantee the continued prosperity that the lack of consideration. The new scheme will be sensible
local economy brings as well as the additional benefits resolved, crating the best possible solution to the
brought about by the reuse of the existing Everton One space available with a duty of care to the neighbouring
building by use of the Everton Foundation. environment.
4. Site Specific Design 3. Potential noise intrusion from Walton Lane
The opportunity to deliver a design that is clearly Walton Lane may at times be noisy, especially in rush
of Everton’s progression, rather than the generic hour. We will have to take this into consideration when
‘anywhere, anyplace’ architecture of the existing regarding the internal locations and material selection
building. The opportunity to create an excellent to help reduce the passage of sound.
development and vibrant, secure mixed use scheme,
with well-planned and orientated office space that 4. Mixed Use Character
reinforces the local community with passive observation The building truly is mixed use in character with four
of Everton. different uses occupying a single building. The desires
and motivations of the differing occupants all need to be
5. Active Frontage considered for access ease of circulation, security and
The opportunity to reinstate Walton Lane, with an active safety as well as aspirational wishes.
frontage will complement and reinforce the area giving a
connection back to the streetscape,
08
URBAN ANALYSIS.
PART ONE
N N N
OUTWARD VIEWS FROM GOODISON PARK VIEWS FROM STANLEY PARK FOCAL HUB
09
URBAN ANALYSIS.
PART ONE
N N N
09
A B C URBAN STREET VIEWS.
PART ONE
D E
H
E I
D
B
F G
C
G
F
H I J
10
URBAN ANALYSIS DIAGRAMS.
PART ONE
STANLEY LAKE PARK EVERTON FC STORE CAR PARK EVERTON FOOTBALL STADIUM CHAPEL HOT WOK
11
EXISTING HEIGHT MASSING.
PART ONE
12
EVOLUTION ANALYSIS.
PART ONE
13
PART TWO
PROPOSAL
PROPOSAL BRIEF.
PART TWO
01
FORM, CHARACTER & MATERIALS.
PART TWO
Schedule of Accommodation:
03
STREET SCENE MASSING.
PART TWO
04
STREET SCENE MASSING.
PART TWO
AXO 1
AXO 2
04
LONG DISTANCE MASSING.
PART TWO
A B
B
LN N
WALTO
C D
SPELL
OW LN
N L
D
LOW
BAR
PR
LN
IO
C A
N
RY
LTO
R D
WA
05
LAYOUT, ACCESS AND CIRCULATION.
PART TWO
Layout
The layout and size of the proposed development has
been influenced by the surrounding area. Firstly the
shape of the building is a basic and efficient rectangle
which is effective in terms of construction and simplicity,
thus creating clean lines and a simple form.
Secondly, the orientation of the building, dictated mainly
by the shape of the existing site, has been sited so
that the southern façade runs parallel to Walton Lane
allowing maximum exposure to the existing landscape
and views of Stanley Park. And thirdly the structure has
been kept to a maximum of four storeys as to not over
shadow or intimidate the existing buildings in the area.
Ground floor is naturally the most sensible place for
retail and is easily linked to the first floor café and
museum space. Hospitality was considered best placed
on the top floor to maximize views of both the park and
the water and hills beyond.
Access
The main access for the retail and museum attraction
into the building is situated on the prominent corner of
Spellow Lane and Walton Lane. This enables an easy
focal point which will draw visitors and supporters in
through a directed route. Visitors entering the building
are immediately positioned within a double height space
within the retail area. Routes up to the museum and café
are easily located and are controlled on match days.
A second more entrance, within the car park and on the
private side of the site will be located to the rear of the
building on the north façade. This is intended to be used
by staff members working in the second floor offices or
visitors to the top floor hospitality.
Circulation
The upper levels of the building are circulated by two
central cores. These cores are the main communal
routes to access all floors whilst also providing safe
fire escape. Lift access is provided to all departments
throughout the scheme.
Throughout the development all areas are designed to
comply with the requirements of the
Building Regulations approved Document
M ‘Access to and use of Buildings’
06
SCALE.
PART TWO
07
SCALE.
PART TWO
07
SUNPATH ANALYSIS.
PART TWO
08
SUNPATH ANALYSIS.
PART TWO
08
EXTERNAL PRECEDENTS.
PART TWO
09
INTERNAL PRECEDENTS.
PART TWO
10
PROPOSED PLANS.
PART TWO
LOCATION PLAN
11
PROPOSED PLANS.
PART TWO
APPLICATION BOUNDARY
11
PROPOSED PLANS.
PART TWO
11
PROPOSED PLANS.
PART TWO
11
PROPOSED PLANS.
PART TWO
11
PROPOSED PLANS.
PART TWO
11
PROPOSED ELEVATIONS.
PART TWO
EAST ELEVATION
WEST ELEVATION
12
PROPOSED ELEVATIONS.
PART TWO
SOUTH ELEVATION
NORTH ELEVATION
12
DETAILED DESIGN.
PART TWO
BLACK BRICK
13
VISUAL.
PART TWO
14
CONCLUSION.
PART TWO
15
PART THREE
SUPPORTING INFORMATION
THE ARCHITECTS.
A B PART THREE
B Baguley Street_Residential
C Century House_Office
(Listed Building in Conservation Area)
01
SUPPORTING INFORMATION.
PART THREE
Entrance housed near to the entrance and next to the stair programme, and giving particular consideration to
Entrance and exit doors and frames to blocks will be of core. This lift will comply with all required regulations planning negotiations and conditions. If an item is
robust and constructed from a vandal resistant material. regarding disabled access. considered necessary to the project that has not
Entrances will be well lit both internally and externally. previously been considered following review, detailing
Disabled WC (DPT) and approval it will be included within the scope of
All four corners of the building will have CCTV. Within the scheme there will be disabled wash rooms works document and added to the Design & Access
located on every level. The dimension of this should not statement for consideration in the whole scheme.
The main building entrance doors to the rear of the be less than 2200x1500mm. The access to the toilet will
building to access the offices and hospitality will include be level and sufficient space will be provided to allow General Guidance for Building Users Disability
video access and will slide. Electromagnetic sheer manoeuvring and opening all doors. Any added door Discrimination Act
locks or electrically operated dead bolts are also to be controls should be positioned at a suitable height to be This Access Statement should be kept on the premises
added. These main entrances will be controlled by a accessed by seated users, and additional grab rails to to assist in any check on access provision. It may
combination of a Proximity Access Control System and a be installed will be in accordance with the sizes stated in be particularly useful in relation to any queries by
door entry phone and video system on external doors. Part M of the building regulations. individuals as to whether there are aspects of the
building that cause difficulties in relation to the Disability
The lobby area is located immediately inside the Lighting Discrimination Act (DDA). The Access Statement refers
entrance with two lifts and a main stair. There are no The lighting levels are to be calculated by the services to the status of the building in relation to Building
external ramps or steps as access is level for the full engineer to ensure the levels are sufficient for the Regulations and the British Standard which tend to be
perimeter of the building. intended use. In communal area lights should be referred to in any question of reasonableness under the
positioned where they do not cause glare, reflection DDA.
Entrance to the shop is via two sets of doors with a or confusing shadows. A sensitive lighting scheme
staircase and lift providing access to the first floor cafe has been incorporated into the design to enhance the Vehicular
and museum attraction. overall aesthetic and provide a safe and easily navigable Visitors using the building and arriving by car will
environment. In any individual areas the lighting should be able to park within the current car park and walk
be adjustable by the user. Fluorescent lighting is to be unaided and without impairment or level change.
Doors installed only where it is unlikely to cause inconvenience
All doors should be noticeable from their surroundings, to people with hearing impairments. Cycles
with vision panels. Adequate space should be provided There will be new cycle racks provided on site.
alongside the leading edge of the door to allow a Signage
wheelchair user to open the door while clear of the All signage (including emergency) will be suitable
swing. displayed on the interior and exterior of the building.
This will be easy to read from distance and from nearby.
Lever handles should be provided to all doors to allow
them to be used easily with a closed fist, and at a height Building Management
suitable for standing and seated users. The doors will be All external routes, are to be kept clean, unobstructed
able to be opened with a force not exceeding 20N. and free of surface water at all times. All corridors are
to be kept clear to allow wheelchair manoeuvrability,
Internal Stairs and are not to be obstructed by deliveries, storage and
There will be two stair cores in the building. One forms furniture.
part of the lobby, which will be the main stair core, the
other being an emergency stair escape to the rear of the Appraisal and development
building. The treads on all the stair cores will be equal, The proposed development is to undergo detailed
and will be no less than 250mm deep with the risers not scrutiny and appraisal throughout the duration of the
exceeding 180mm. Nosing will be clearly identifiable and project. Regular client and design team meetings
slip resistant. are scheduled to take place on and offsite to ensure
the clients and publics needs are addressed and
Widths and handrails will comply with the current implemented with the scope of works. Every element
building regulations with regards to capacity and travel of work forming part of this proposal is subject to
distances. the review and comments of the consulting design
team and relevant specialists. The scheme is to
Lifts be reviewed in detail at the scheduled meetings in
The access to the passenger lift in the lobby will be terms of accessibility, sustainability, availability, cost,
02
PLANNING POLICY GUIDANCE.
PART THREE
This is not designed to be an exhaustive account of • Human Scale – The built and remodelled form is easy
the plans and policies affecting this site, but rather, for the human eye to read and provides a sense of scale
to highlight the key policies that have affected the and perspective that doesn’t overwhelm or intimidate.
design of this development. It is considered that this
proposal accords with all relevant design guidance. This • Security / Surveillance – Creating a place that is
assessment includes local, regional and national design properly overlooked, easily policed (passively and
policy guidance as well as best practice documents. actively) and which feels safe and welcoming to all.
PPS 4 Industrial, commercial development and small • Detailing and Interest – Promoting ornamentation,
firms: Well designed, high quality developments are rhythm, consistent vernacular and intrigue in the built
central to this document and this proposal clearly environment.
demonstrates a commitment to achieving that. It also
suggests that developments should be delivered to • Adaptability and Robustness – The layout and the
enhance economic growth and to deliver a high quality buildings should contribute towards sustainable design,
environment which are to be pursued collectively. adaptation and robustness in the design and materials to
ensure that they withstand the test of time.
The Environment White Paper “This Common
Inheritance” emphasised this relationship when it said
that “Economic growth is not an end in itself. It provides
us with the means to lead better and fuller lives. There
is no contradiction in arguing both for economic growth
and for environmental good sense. The challenge is to
integrate the two.”
This scheme follows advice contained in By Design:
Urban Design and the Planning System (2001), the Urban
Design Compendium (2000) and both the Urban White
Paper and Urban Task Force Report (both 1999). This
approach has been honed over the last decade and is
now standard practice. It is considered that this scheme
accords with the best practice approach outlined in
these documents and are best summarised by eight key
principles:
• Character – Somewhere with local distinctiveness.
• Legibility – Somewhere that is easy to understand and
navigate around.
• Permeability – Creating a form which makes for
efficient movement for all modes.
• An Articulated Townscape – creating an interesting and
contextually responsive townscape using height, scale
and massing.