You are on page 1of 52

DOCUMENT NO:

Mechanical - Calculation
(ATTACHMENT-1)
REFERENCE DRAWING NO:
HEAT BALANCE - COOLING LOAD OF
CONTROL ROOM BUILDING CP-0513NO-II-003
(IT CABINET ROOM)
Project : NDD Area 13
Location : North Quadrant

COOLING LOAD ESTIMATION

The Calculation is based on Manual Book by ASHRAE and Air Conditioning Contractors of America (ACCA)

I Site Condition
Environmental Data
Ambient Air Temperature = 100 ºF = 37.78 ºC
Relative Humidity = 60 %
Daily Range = 23 ºF
Room Condition Requirements
Room Temperature = 77 ºF = 25 ºC
(Temperature Design Point at Summer)
Relative Humidity = 60 to 100 %
Minimum Static Pressure = N/A Neutral Pressure
Maximum Static Pressure =

Basic Calculation
The peak cooling load occurs at noon due to peaking outside temperature and solar effects

Cooling Load (Btuh)


Sensible Notes
II Solar Radiation Heat Through Glass

Q  SHGF x SF x A
Exposure Sq.ft Solar Gat Gain Factor Shading and or Glass Factor

North 0 91 x 0.94 = 0
Q = 0 Btuh

Q  U x A x TD
III Heat Transmission Through Structural Components

Exposure Sq.Ft U Factor Equivalent or


db or Temperature Difference

Glass West 0 x 1.04 x 15 = 0

Wall West 262.47 x 0.184 x 12 = 579.53 Daily Range Correction


North 262.47 x 0.184 x 8 = 386.35 -3

Floors 1312.34 x 0.81 x 5 = 5314.98 121.9

Roof/Ceiling 1312.34 x 0.15 x 30 = 5905.53 Daily Range Correction


-3
Sub Total 2 = 12186 Btuh

Notes: 1312.34 80 262.467


1. Minimum Standard for U-value is 0.6 W/m2.ºC = 0.00937 Btu/ft2.h.ºF. The higher value is taken into calculation.
2. Air film resistance, the effect of air convection is assumed in 7.5 mph wind velocity

IV Internal Heat Gains


Factor Sensible Latent
NO HEAT GAIN FROM HEAT DISSIPATION Quantity Remarks
Convertion (Btuh) (Btuh)

5 Occupants
- IT Room 4 person 913.88 477.4

6 Heat Dissipation from


- Lighting 36 W 30 4.1 4428 - Flourescent type
- Other Panels 2610 Btuh 1 1 2610 -
Sub Total 3 7952 477.4

V Envelope Infiltration

V x ACH
I 
60
V Volume inside building = 17717 cu.ft = 501.68
ACH Air Change per Hour = 0.4 AC/H
I Infiltration = 118.11 CFM = 3.34

Door Infiltration

Average occupancy x 2  opening per person


TR 
no. of door x average length to stay

Occupancy = 1 person

Traffic Rate (opening door) = 4.00 ~ None


Based on Table 13B,
CFM for Single Door made of Metal = 10 CFM = 0.28
TOTAL infiltration (envelope infiltration + door infiltration) = 128 CFM = 3.63

Heat Ventilation
Sensible Load

QS  1.1 x CFM x TD
Latent Load

QL  0.68 x CFM x GR
1.1
Constant, the effect of the specific heat of air
0.68
CFM ventilation (CFM)
GR Difference in absolute humidity between the inside
and outside air = 56 grains
Absolute humidity outside room = 140 grains (100F,100%-Psychometric)
When : - outside temperature = 100 ºF = 38
- relative humidity = 100 % (Saturated air)
Humidity ratio for saturated air (ws)

ws  0.00080264  0.000024525T  2.542e  06T 2  2.5855e  08T 3  4.038e  10T 4


humidity ratio outside room = 0.043 lb/lb
Absolute humidity inside room = 84 grains
When : - inside temperature = 77 ºF = 25
- relative humidity = 60 %
Humidity ratio inside room = 0.020 lb/lb

Air Flow

Qa  Vr x ACH
Vr Volume Room = 17717 cu.ft
ACH Air Change per Hour = 2
Qa Ventilation = 590.55 cu.ft/min = 16.72
Ventilation - infiltration = 462.44 cu.ft/min = 13.09
QS Sensible Load = 14941 Btu/h 4381.5
QL Latent Load = 22488 Btu/h 6594.8

Total Sensible Load ( Q+SubTotal 2 + Sub Total 3+ Qs) = 35207 Btu/h 10324.7
Total Latent Load (QL) = 22966 Btu/h 6734.8
Sensible Load + Latent Load = 58173 Btu/h 17059.5
Overdesign coefficient (10%) = 5817 Btu/h 1706.0
Designed cooling load = 63990 Btu/h 18765.5
Considering at 101.5 F requires 17h, we choose factor 3 21330 Btu/h
Installed cooling load = 36000 Btu/h
Calculated Electric Power Consumed = 4.00 hp 2.98 kW
Q'ty of indoor unit (Caps. 1hp) 4 unit(s); (Qty on FEED is 1 @
Cooling load check (average, incl. back-up) = 295.27 Btu/(h.m2)
-Actual load = 174.95 Btu/(h.m2)
-Back-up = 120.32 Btu/(h.m2) 40.7%

Notes
1. 1 hp = 9000 btu/h (VENDOR to advice)
2. 1 ton refrigerant = 12000 Btu/h (VENDOR to advice)
3. The minimum ACH should be reached by installation of exhaust fan with air velocity max 0.45 m/s at elevation min 2 m from floor
and suface area 1.5 m2
References:
- Air Conditioning of America, 4th edition, "Load Calculation for Summer and Winter Air Conditioning"
- SP-ME-ME-013 rev 1, " AIR CONDITIONING AND VENTILATION"
- CP-0513NO-II-003, " Control Room Lay Out Area 13 North Quadrant, NDD Project"
- CP-0513SO-II-003, " Control Room Lay Out Area 13 South Quadrant, NDD Project"
NO: REV.

0
TACHMENT-1)
E DRAWING NO:

CP-0513NO-II-003

ling Load (Btuh)

Daily Range Correction

m2

Daily Range Correction

Btuh
Remarks

Flourescent type

501.68 m3

3.34 m3/min

0.28 m3/min
3.63 m3/min

F,100%-Psychometric)
38 ºC

3
 4.038e  10T 4

25 ºC
16.72 m3/min
13.09 m3/min
4381.5 Watt
6594.8 Watt

10324.7 Watt
6734.8 Watt
17059.5 Watt
1706.0 Watt
18765.5 Watt

kW
(Qty on FEED is 1 @ 2PK)

(Approx.)

elevation min 2 m from floor


DOCUMENT NO:
Mechanical - Calculation
(ATTACHMENT-1)
REFERENCE DRAWING NO:
HEAT BALANCE - COOLING LOAD OF
CONTROL ROOM BUILDING CP-0513NO-II-003
(INSTRUMENT CONTROL ROOM)
Project : NDD Area 13
Location : North Quadrant

COOLING LOAD ESTIMATION

The Calculation is based on Manual Book by ASHRAE and Air Conditioning Contractors of America (ACCA)

I Site Condition
Environmental Data
Ambient Air Temperature = 100 ºF = 37.78 ºC
Relative Humidity = 60 %
Daily Range = 23 ºF
Room Condition Requirements
Room Temperature = 77 ºF = 25 ºC
(Temperature Design Point at Summer)
Relative Humidity = 60 to 100 %
Minimum Static Pressure = N/A Neutral Pressure
Maximum Static Pressure =

Basic Calculation
The peak cooling load occurs at noon due to peaking outside temperature and solar effects

Cooling Load (Btuh)


Sensible Notes
II Solar Radiation Heat Through Glass

Q  SHGF x SF x A
Exposure Sq.ft Solar Gat Gain Factor Shading and or Glass Factor

North 35 91 x 0.94 = 2987


Q = 2987 Btuh

Q  U x A x TD
III Heat Transmission Through Structural Components

Exposure Sq.Ft U Factor Equivalent or


db or Temperature Difference

Glass West 35 x 1.04 x 15 = 545

Wall South 0.00 x 0.184 x 10 = 0.00 Daily Range Correction


North 295.83 x 0.184 x 8 = 435.45 -3

Floors 332.79 x 0.81 x 5 = 1347.81 30.9

Roof/Ceiling 332.79 x 0.15 x 30 = 1497.56 Daily Range Correction


-3
Sub Total 2 = 3826 Btuh

Notes: 73.8189 80 262.467


1. Minimum Standard for U-value is 0.6 W/m2.ºC = 0.00937 Btu/ft2.h.ºF. The higher value is taken into calculation.
2. Air film resistance, the effect of air convection is assumed in 7.5 mph wind velocity

IV Internal Heat Gains


Factor Sensible Latent
NO HEAT GAIN FROM HEAT DISSIPATION Quantity Remarks
Convertion (Btuh) (Btuh)

5 Occupants
- Toilet Room 1 person 228.47 119.35

6 Heat Dissipation from


- Lighting 36 W 16 4.1 2362 - Flourescent type
- Other Panels 6803 Btuh 1 1 6803 -
Sub Total 3 9393 119.35

V Envelope Infiltration

V x ACH
I 
60
V Volume inside building = 4493 cu.ft = 127.22
ACH Air Change per Hour = 0.4 AC/H
I Infiltration = 29.95 CFM = 0.85

Door Infiltration

Average occupancy x 2  opening per person


TR 
no. of door x average length to stay

Occupancy = 1 person

Traffic Rate (opening door) = 2.00 ~ None


Based on Table 13B,
CFM for Single Door made of Metal = 20 CFM = 0.57
TOTAL infiltration (envelope infiltration + door infiltration) = 50 CFM = 1.41

Heat Ventilation
Sensible Load

QS  1.1 x CFM x TD
Latent Load

QL  0.68 x CFM x GR
1.1
Constant, the effect of the specific heat of air
0.68
CFM ventilation (CFM)
GR Difference in absolute humidity between the inside
and outside air = 56 grains
Absolute humidity outside room = 140 grains (100F,100%-Psychometric)
When : - outside temperature = 100 ºF = 38
- relative humidity = 100 % (Saturated air)
Humidity ratio for saturated air (ws)

ws  0.00080264  0.000024525T  2.542e  06T 2  2.5855e  08T 3  4.038e  10T 4


humidity ratio outside room = 0.043 lb/lb
Absolute humidity inside room = 84 grains
When : - inside temperature = 77 ºF = 25
- relative humidity = 60 %
Humidity ratio inside room = 0.020 lb/lb

Air Flow

Qa  Vr x ACH
Vr Volume Room = 4493 cu.ft
ACH Air Change per Hour = 2
Qa Ventilation = 149.76 cu.ft/min = 4.24
Ventilation - infiltration = 99.81 cu.ft/min = 2.83
QS Sensible Load = 3789 Btu/h 1111.1
QL Latent Load = 5703 Btu/h 1672.4

Total Sensible Load ( Q+SubTotal 2 + Sub Total 3+ Qs) = 20045 Btu/h 5878.3
Total Latent Load (QL) = 5822 Btu/h 1707.4
Sensible Load + Latent Load = 25867 Btu/h 7585.6
Overdesign coefficient (10%) = 2587 Btu/h 758.6
Designed cooling load = 28454 Btu/h 8344.2
Considering at 101.5 F requires 17h, we choose factor 3 9485 Btu/h
Installed cooling load = 36000 Btu/h
Calculated Electric Power Consumed = 4.00 hp 2.98 kW
Q'ty of indoor unit (Caps. 2hp) 2 unit(s); (Qty on FEED is 2 @
Cooling load check (average, incl. back-up) = 1164.39 Btu/(h.m2)
-Actual load = 836.65 Btu/(h.m2)
-Back-up = 327.74 Btu/(h.m2) 28.1% (Approx.)

Notes
1. 1 hp = 9000 btu/h (VENDOR to advice)
2. 1 ton refrigerant = 12000 Btu/h (VENDOR to advice)
3. The minimum ACH should be reached by installation of exhaust fan with air velocity max 0.45 m/s at elevation min 2 m from floor
and suface area 1.5 m2
References:
- Air Conditioning of America, 4th edition, "Load Calculation for Summer and Winter Air Conditioning"
- SP-ME-ME-013 rev 1, " AIR CONDITIONING AND VENTILATION"
- CP-0513NO-II-003, " Control Room Lay Out Area 13 North Quadrant, NDD Project"
- CP-0513SO-II-003, " Control Room Lay Out Area 13 South Quadrant, NDD Project"
NO: REV.

0
TACHMENT-1)
E DRAWING NO:

CP-0513NO-II-003

ling Load (Btuh)

Daily Range Correction

m2

Daily Range Correction

Btuh
Remarks

Flourescent type

127.22 m3

0.85 m3/min

0.57 m3/min
1.41 m3/min

F,100%-Psychometric)
38 ºC

3
 4.038e  10T 4

25 ºC
4.24 m3/min
2.83 m3/min
1111.1 Watt
1672.4 Watt

5878.3 Watt
1707.4 Watt
7585.6 Watt
758.6 Watt
8344.2 Watt

kW
(Qty on FEED is 2 @ 2PK)

(Approx.)

elevation min 2 m from floor


DOCUMENT NO:
Mechanical - Calculation
(ATTACHMENT-1)
REFERENCE DRAWING NO:
HEAT BALANCE - COOLING LOAD OF
CONTROL ROOM BUILDING CP-0513NO-II-003
(CORRIDOR ROOM)
Project : NDD Area 13
Location : North Quadrant

COOLING LOAD ESTIMATION

The Calculation is based on Manual Book by ASHRAE and Air Conditioning Contractors of America (ACCA)

I Site Condition
Environmental Data
Ambient Air Temperature = 100 ºF = 37.78 ºC
Relative Humidity = 60 %
Daily Range = 23 ºF
Room Condition Requirements
Room Temperature = 77 ºF = 25 ºC
(Temperature Design Point at Summer)
Relative Humidity = 60 to 100 %
Minimum Static Pressure = N/A Neutral Pressure
Maximum Static Pressure =

Basic Calculation
The peak cooling load occurs at noon due to peaking outside temperature and solar effects

Cooling Load (Btuh)


Sensible Notes
II Solar Radiation Heat Through Glass

Q  SHGF x SF x A
Exposure Sq.ft Solar Gat Gain Factor Shading and or Glass Factor

West 0 91 x 0.94 = 0
Q = 0 Btuh

Q  U x A x TD
III Heat Transmission Through Structural Components

Exposure Sq.Ft U Factor Equivalent or


db or Temperature Difference

Glass West 0 x 1.04 x 15 = 0

Wall South 68.24 x 0.184 x 11 = 138.11 Daily Range Correction


North 92.14 x 0.184 x 9 = 152.58 -3

Floors 370.46 x 0.81 x 5 = 1500.36 34.4

Roof/Ceiling 370.46 x 0.15 x 30 = 1667.07 Daily Range Correction


-3
Sub Total 2 = 3458 Btuh

Notes:
1. Minimum Standard for U-value is 0.6 W/m2.ºC = 0.00937 Btu/ft2.h.ºF. The higher value is taken into calculation.
2. Air film resistance, the effect of air convection is assumed in 7.5 mph wind velocity

IV Internal Heat Gains


Factor Sensible Latent
NO HEAT GAIN FROM HEAT DISSIPATION Quantity Remarks
Convertion (Btuh) (Btuh)

5 Occupants
- Toilet Room 1 person 228.47 119.35

6 Heat Dissipation from


- Lighting 36 W 6 4.1 886 - Flourescent type
- Other Panels 199 Btuh 1 1 199 -
Sub Total 3 1313 119.35

V Envelope Infiltration

V x ACH
I 
60
V Volume inside building = 5001 cu.ft = 141.62
ACH Air Change per Hour = 0.4 AC/H
I Infiltration = 33.34 CFM = 0.94

Door Infiltration

Average occupancy x 2  opening per person


TR 
no. of door x average length to stay

Occupancy = 1 person

Traffic Rate (opening door) = 2.00 ~ None


Based on Table 13B,
CFM per door for Single Door made of Metal = 10 CFM = 0.28
CFM per door for Double Door made of Metal = 90 CFM = 2.55
TOTAL infiltration (envelope infiltration + door infiltration) = 133 CFM = 3.78

Heat Ventilation
Sensible Load

QS  1.1 x CFM x TD
Latent Load

QL  0.68 x CFM x GR
1.1
Constant, the effect of the specific heat of air
0.68
CFM ventilation (CFM)
GR Difference in absolute humidity between the inside
and outside air = 56 grains
Absolute humidity outside room = 140 grains (100F,100%-Psychometric)
When : - outside temperature = 100 ºF = 38
- relative humidity = 100 % (Saturated air)
Humidity ratio for saturated air (ws)

ws  0.00080264  0.000024525T  2.542e  06T 2  2.5855e  08T 3  4.038e  10T 4


humidity ratio outside room = 0.043 lb/lb
Absolute humidity inside room = 84 grains
When : - inside temperature = 77 ºF = 25
- relative humidity = 60 %
Humidity ratio inside room = 0.020 lb/lb

Air Flow

Qa  Vr x ACH
Qa  Vr x ACH
Vr Volume Room = 5001 cu.ft
ACH Air Change per Hour = 2
Qa Ventilation = 166.71 cu.ft/min = 4.72
Ventilation - infiltration = 33.37 cu.ft/min = 0.94
QS Sensible Load = 4218 Btu/h 1236.9
QL Latent Load = 6348 Btu/h 1861.6

Total Sensible Load ( Q+SubTotal 2 + Sub Total 3+ Qs) = 9122 Btu/h 2675.1
Total Latent Load (QL) = 6468 Btu/h 1896.6
Sensible Load + Latent Load = 15590 Btu/h 4571.8
Overdesign coefficient (10%) = 1559 Btu/h 457.2
Designed cooling load = 17149 Btu/h 5029.0
Considering at 101.5 F requires 32h, we choose factor 3 5716 Btu/h
Installed cooling load = 18000 Btu/h
Calculated Electric Power Consumed = 2.00 hp 1.49 kW
Q'ty of indoor unit (Caps. 1hp) 2 unit(s); (Qty on FEED is 0)
Cooling load check (average, incl. back-up) = 523.00 Btu/(h.m2)
-Actual load = 166.09 Btu/(h.m2)
-Back-up = 356.91 Btu/(h.m2) 68.2% (Approx.)

Notes
1. 1 hp = 9000 btu/h (VENDOR to advice)
2. 1 ton refrigerant = 12000 Btu/h (VENDOR to advice)
3. The minimum ACH should be reached by installation of exhaust fan with air velocity max 0.45 m/s at elevation min 2 m from floor
and suface area 1.5 m2
References:
- Air Conditioning of America, 4th edition, "Load Calculation for Summer and Winter Air Conditioning"
- SP-ME-ME-013 rev 1, " AIR CONDITIONING AND VENTILATION"
- CP-0513NO-II-003, " Control Room Lay Out Area 13 North Quadrant, NDD Project"
- CP-0513SO-II-003, " Control Room Lay Out Area 13 South Quadrant, NDD Project"
NO: REV.

0
TACHMENT-1)
E DRAWING NO:

CP-0513NO-II-003

ling Load (Btuh)

Daily Range Correction

m2

Daily Range Correction

Btuh
Remarks

Flourescent type

141.62 m3

0.94 m3/min

0.28 m3/min
2.55 m3/min
3.78 m3/min

F,100%-Psychometric)
38 ºC

3
 4.038e  10T 4

25 ºC
4.72 m3/min
0.94 m3/min
1236.9 Watt
1861.6 Watt

2675.1 Watt
1896.6 Watt
4571.8 Watt
457.2 Watt
5029.0 Watt

kW
(Qty on FEED is 0)

(Approx.)

elevation min 2 m from floor


DOCUMENT NO:
Mechanical - Calculation
(ATTACHMENT-1)
REFERENCE DRAWING NO:
HEAT BALANCE - COOLING LOAD OF
CONTROL ROOM BUILDING CP-0513NO-II-003
(INSTRUMENT RACK ROOM)
Project : NDD Area 13
Location : North Quadrant

COOLING LOAD ESTIMATION

The Calculation is based on Manual Book by ASHRAE and Air Conditioning Contractors of America (ACCA)

I Site Condition
Environmental Data
Ambient Air Temperature = 100 ºF = 37.78 ºC
Relative Humidity = 60 %
Daily Range = 23 ºF
Room Condition Requirements
Room Temperature = 77 ºF = 25 ºC
(Temperature Design Point at Summer)
Relative Humidity = 60 to 100 %
Minimum Static Pressure = N/A Neutral Pressure
Maximum Static Pressure =

Basic Calculation
The peak cooling load occurs at noon due to peaking outside temperature and solar effects

Cooling Load (Btuh)


Sensible Notes
II Solar Radiation Heat Through Glass

Q  SHGF x SF x A
Exposure Sq.ft Solar Gat Gain Factor Shading and or Glass Factor

West 18 91 x 0.94 = 1547


Q = 1547 Btuh

Q  U x A x TD
III Heat Transmission Through Structural Components

Exposure Sq.Ft U Factor Equivalent or


db or Temperature Difference

Glass West 18 x 1.04 x 15 = 282

Wall South 0.00 x 0.184 x 10 = 0.00 Daily Range Correction


West 270.00 x 0.184 x 12 = 596.16 -3

Floors 650.00 x 0.81 x 5 = 2632.50 60.4

Roof/Ceiling 650.00 x 0.15 x 30 = 2925.00 Daily Range Correction


-3
Sub Total 2 = 6436 Btuh

Notes:
1. Minimum Standard for U-value is 0.6 W/m2.ºC = 0.00937 Btu/ft2.h.ºF. The higher value is taken into calculation.
2. Air film resistance, the effect of air convection is assumed in 7.5 mph wind velocity
IV Internal Heat Gains

Factor Sensible Latent


NO HEAT GAIN FROM HEAT DISSIPATION Quantity Remarks
Convertion (Btuh) (Btuh)

5 Occupants
- Toilet Room 1 person 228.47 119.35

6 Heat Dissipation from


- Lighting 36 W 24 4.1 3542 - Flourescent type
- Other Panels 100000 Btuh 1 1 100000 -
Sub Total 3 103771 119.35

V Envelope Infiltration

V x ACH
I 
60
V Volume inside building = 8775 cu.ft = 248.48
ACH Air Change per Hour = 0.4 AC/H
I Infiltration = 58.50 CFM = 1.66

Door Infiltration

Average occupancy x 2  opening per person


TR 
no. of door x average length to stay

Occupancy = 1 person

Traffic Rate (opening door) = 2.00 ~ None


Based on Table 13B,
CFM per door for Double Door made of Wood,Metal,Glas= 90 CFM = 27.43
TOTAL infiltration (envelope infiltration + door infiltration) = 149 CFM = 45.26

Heat Ventilation
Sensible Load

QS  1.1 x CFM x TD
Latent Load

QL  0.68 x CFM x GR
1.1
Constant, the effect of the specific heat of air
0.68
CFM ventilation (CFM)
GR Difference in absolute humidity between the inside
and outside air = 56 grains
Absolute humidity outside room = 140 grains (100F,100%-Psychometric)
When : - outside temperature = 100 ºF = 38
- relative humidity = 100 % (Saturated air)
Humidity ratio for saturated air (ws)

ws  0.00080264  0.000024525T  2.542e  06T 2  2.5855e  08T 3  4.038e  10T 4


humidity ratio outside room = 0.043 lb/lb
Absolute humidity inside room = 84 grains
When : - inside temperature = 77 ºF = 25
- relative humidity = 60 %
Humidity ratio inside room = 0.020 lb/lb

Air Flow

Qa  Vr x ACH
Qa  Vr x ACH
Vr Volume Room = 8775 cu.ft
ACH Air Change per Hour = 2
Qa Ventilation = 292.50 cu.ft/min = 8.28
Ventilation - infiltration = 144.00 cu.ft/min = 4.08
QS Sensible Load = 7400 Btu/h 2170.2
QL Latent Load = 11138 Btu/h 3266.4

Total Sensible Load ( Q+SubTotal 2 + Sub Total 3+ Qs) = 119303 Btu/h 34986.2
Total Latent Load (QL) = 11258 Btu/h 3301.4
Sensible Load + Latent Load = 130561 Btu/h 38287.6
Overdesign coefficient (10%) = 13056 Btu/h 3828.8
Designed cooling load = 143617 Btu/h
Considering at 101.5 F requires 7h, we choose factor 3 47872 Btu/h
Installed cooling load = 72000 Btu/h
Calculated Electric Power Consumed = 8.00 hp 5.96 kW
Q'ty of indoor unit (Caps. 2hp) 4 unit(s); (Qty on FEED is 2 @
Cooling load check (average, incl. back-up) = 1192.31 Btu/(h.m2)
-Actual load = 792.76 Btu/(h.m2)
-Back-up = 399.55 Btu/(h.m2) 33.5% (Approx.)

Notes
1. 1 hp = 9000 btu/h (VENDOR to advice)
2. 1 ton refrigerant = 12000 Btu/h (VENDOR to advice)
3. The minimum ACH should be reached by installation of exhaust fan with air velocity max 0.45 m/s at elevation min 2 m from floor
and suface area 1.5 m2
References:
- Air Conditioning of America, 4th edition, "Load Calculation for Summer and Winter Air Conditioning"
- SP-ME-ME-013 rev 1, " AIR CONDITIONING AND VENTILATION"
- CP-0513NO-II-003, " Control Room Lay Out Area 13 North Quadrant, NDD Project"
- CP-0513SO-II-003, " Control Room Lay Out Area 13 South Quadrant, NDD Project"
NO: REV.

0
TACHMENT-1)
E DRAWING NO:

CP-0513NO-II-003

ling Load (Btuh)

Daily Range Correction

m2

Daily Range Correction

Btuh
Remarks

Flourescent type

248.48 m3

1.66 m3/min

27.43 m3/min
45.26 m3/min

F,100%-Psychometric)
38 ºC

3
 4.038e  10T 4

25 ºC
8.28 m3/min
4.08 m3/min
2170.2 Watt
3266.4 Watt

34986.2 Watt
3301.4 Watt
38287.6 Watt
3828.8 Watt
Watt

kW
(Qty on FEED is 2 @ 2PK)

(Approx.)

elevation min 2 m from floor


DOCUMENT NO:
Mechanical - Calculation
(ATTACHMENT-1)
REFERENCE DRAWING NO:
HEAT BALANCE - COOLING LOAD OF
SUB-STATION BUILDING CP-0513NO-II-003
(MCC ROOM)
Project : NDD Area 13
Location : North Quadrant

COOLING LOAD ESTIMATION

The Calculation is based on Manual Book by ASHRAE and Air Conditioning Contractors of America (ACCA)

I Site Condition
Environmental Data
Ambient Air Temperature = 100 ºF = 37.78 ºC
Relative Humidity = 60 %
Daily Range = 28 ºF
Room Condition Requirements
Room Temperature = 72 ºF = 22.22 ºC
(Temperature Design Point at Summer)
Relative Humidity = 60 to 100 %
Minimum Static Pressure = N/A Neutral Pressure
Maximum Static Pressure =

Basic Calculation
The peak cooling load occurs at noon due to peaking outside temperature and solar effects

Cooling Load (Btuh)


Sensible Notes
II Solar Radiation Heat Through Glass

Q  SHGF x SF x A
Exposure Sq.ft Solar Gat Gain Factor Shading and or Glass Factor

0 x 91 x 0.94 = 0
Q = 0 Btuh

Q  U x A x TD
III Heat Transmission Through Structural Components

Exposure Sq.Ft U Factor Equivalent or


db or Temperature Difference

Glass 0 x 1.04 x 15 = 0

Wall South 790.88 x 0.184 x 9 = 1309.70 Daily Range Correction


West 373.08 x 0.184 x 11 = 755.11 -4
North 790.88 x 0.184 x 7 = 1018.65
East 373.08 x 0.184 x 21 = 1441.58

Floors 862.13 x 0.81 x 5 = 3491.63 80.1

Roof/Ceiling 862.13 x 0.15 x 30 = 3879.59 Daily Range Correction


-4
Sub Total 2 = 11896 Btuh

Notes:
1. Minimum Standard for U-value is 0.6 W/m2.ºC = 0.00937 Btu/ft2.h.ºF. The higher value is taken into calculation.
2. Air film resistance, the effect of air convection is assumed in 7.5 mph wind velocity
IV Internal Heat Gains

Factor Sensible Latent


NO HEAT GAIN FROM HEAT DISSIPATION Quantity Remarks
Convertion (Btuh) (Btuh)

5 Occupants
- Toilet Room 1 person 228.47 119.35

6 Heat Dissipation from


- Lighting 36 W 24 4.1 3542 - Flourescent type
- Other Panels 55000 Btuh 1 1 55000 -
Sub Total 3 58771 119.35

V Envelope Infiltration

V x ACH
I 
60
V Volume inside building = 11639 cu.ft = 329.57
ACH Air Change per Hour = 0.4 AC/H
I Infiltration = 77.59 CFM = 2.20

Door Infiltration

Average occupancy x 2  opening per person


TR 
no. of door x average length to stay

Occupancy = 1 person

Traffic Rate (opening door) = 3.00 ~ None


Based on Table 13B,
CFM per door for Single Door made of Wood = 10 CFM = 0.28
CFM per door for Single Door made of Wood = 90 CFM = 2.55
TOTAL infiltration (envelope infiltration + door infiltration) = 178 CFM = 5.03

Heat Ventilation
Sensible Load

QS  1.1 x CFM x TD
Latent Load

QL  0.68 x CFM x GR
1.1
Constant, the effect of the specific heat of air
0.68
CFM ventilation (CFM)
GR Difference in absolute humidity between the inside
and outside air = 50 grains
Absolute humidity outside room = 120 grains (100F,100%-Psychometric)
When : - outside temperature = 100 ºF = 38
- relative humidity = 100 % (Saturated air)
Humidity ratio for saturated air (ws)

ws  0.00080264  0.000024525T  2.542e  06T 2  2.5855e  08T 3  4.038e  10T 4


humidity ratio outside room = 0.043 lb/lb
Absolute humidity inside room = 70 grains
When : - inside temperature = 72 ºF = 22
- relative humidity = 60 %
Humidity ratio inside room = 0.017 lb/lb

Air Flow

Qa  Vr x ACH
Qa  Vr x ACH
Vr Volume Room = 11639 cu.ft
ACH Air Change per Hour = 2
Qa Ventilation = 387.96 cu.ft/min = 10.99
Ventilation - infiltration = 210.37 cu.ft/min = 5.96
QS Sensible Load = 11949 Btu/h 3504.1
QL Latent Load = 13191 Btu/h 3868.2

Total Sensible Load ( Q+SubTotal 2 + Sub Total 3+ Qs) = 82794 Btu/h 24279.7
Total Latent Load (QL) = 13310 Btu/h 3903.2
Sensible Load + Latent Load = 96104 Btu/h 28182.9
Overdesign coefficient (10%) = 9610 Btu/h 2818.3
Designed cooling load = 105714 Btu/h
Considering at 101.5 F requires 9h, we choose factor 3 35238 Btu/h
Installed cooling load = 90000 Btu/h
Calculated Electric Power Consumed = 10.00 hp 7.46 kW
Q'ty of indoor unit (Caps. 2hp) 5 unit(s); (Qty on FEED is 2 @
Cooling load check (average, incl. back-up) = 1123.67 Btu/(h.m2)
-Actual load = 439.96 Btu/(h.m2)
-Back-up = 683.72 Btu/(h.m2) 60.8% (Approx.)

Notes
1. 1 hp = 9000 btu/h (VENDOR to advice)
2. 1 ton refrigerant = 12000 Btu/h (VENDOR to advice)
3. The minimum ACH should be reached by installation of exhaust fan with air velocity max 0.45 m/s at elevation min 2 m from floor
and suface area 1.5 m2
References:
- Air Conditioning of America, 4th edition, "Load Calculation for Summer and Winter Air Conditioning"
- SP-ME-ME-013 rev 1, " AIR CONDITIONING AND VENTILATION"
- CP-0513NO-II-003, " Control Room Lay Out Area 13 North Quadrant, NDD Project"
- CP-0513SO-II-003, " Control Room Lay Out Area 13 South Quadrant, NDD Project"
NO: REV.

0
TACHMENT-1)
E DRAWING NO:

CP-0513NO-II-003

ling Load (Btuh)

Daily Range Correction

m2

Daily Range Correction

Btuh
Remarks

Flourescent type

329.57 m3

2.20 m3/min

0.28 m3/min
2.55 m3/min
5.03 m3/min

F,100%-Psychometric)
38 ºC

3
 4.038e  10T 4

22 ºC
10.99 m3/min
5.96 m3/min
3504.1 Watt
3868.2 Watt

24279.7 Watt
3903.2 Watt
28182.9 Watt
2818.3 Watt
Watt

kW
(Qty on FEED is 2 @ 2PK)

(Approx.)

elevation min 2 m from floor


DOCUMENT NO:
Mechanical - Calculation
(ATTACHMENT-1)
REFERENCE DRAWING NO:
HEAT BALANCE - COOLING LOAD OF
CONTROL ROOM BUILDING CP-0513NO-II-003
(ADMIN ROOM)
Project : NDD Area 13
Location : North Quadrant

COOLING LOAD ESTIMATION

The Calculation is based on Manual Book by ASHRAE and Air Conditioning Contractors of America (ACCA)

I Site Condition
Environmental Data
Ambient Air Temperature = 100 ºF = 37.78 ºC
Relative Humidity = 60 %
Daily Range = 23 ºF
Room Condition Requirements
Room Temperature = 77 ºF = 25 ºC
(Temperature Design Point at Summer)
Relative Humidity = 60 to 100 %
Minimum Static Pressure = N/A Neutral Pressure
Maximum Static Pressure =

Basic Calculation
The peak cooling load occurs at noon due to peaking outside temperature and solar effects

Cooling Load (Btuh)


Sensible Notes
II Solar Radiation Heat Through Glass

Q  SHGF x SF x A
Exposure Sq.ft Solar Gat Gain Factor Shading and or Glass Factor

0 x 91 x 0.94 = 0
Q = 0 Btuh

Q  U x A x TD
III Heat Transmission Through Structural Components

Exposure Sq.Ft U Factor Equivalent or


db or Temperature Difference

Glass 0 x 1.04 x 15 = 0

Wall North 0.00 x 0.184 x 9 = 0.00 Daily Range Correction


East 189.00 x 0.184 x 23 = 799.85 -2

Floors 131.83 x 0.81 x 0 = 0.00 12.2

Roof/Ceiling 131.83 x 0.15 x 30 = 593.24 Daily Range Correction


-2
Sub Total 2 = 1393 Btuh

Notes:
1. Minimum Standard for U-value is 0.6 W/m2.ºC = 0.00937 Btu/ft2.h.ºF. The higher value is taken into calculation.
2. Air film resistance, the effect of air convection is assumed in 7.5 mph wind velocity

IV Internal Heat Gains


Factor Sensible Latent
NO HEAT GAIN FROM HEAT DISSIPATION Quantity Remarks
Convertion (Btuh) (Btuh)

5 Occupants
- Toilet Room 3 person 685.41 358.05

6 Heat Dissipation from


- Lighting 36 W 4 4.1 590 - Flourescent type
- Other Panels 200 W 1 3.4 680 -
Sub Total 3 1956 358.05

V Envelope Infiltration

V x ACH
I 
60
V Volume inside building = 1780 cu.ft = 50.40
ACH Air Change per Hour = 0.4 AC/H
I Infiltration = 11.86 CFM = 0.34

Door Infiltration

Average occupancy x 2  opening per person


TR 
no. of door x average length to stay

Occupancy = 3 person

Traffic Rate (opening door) = 9.00 ~ None


Based on Table 13B,
CFM per door for Single Door made of Metal = 10 CFM = 0.28
TOTAL infiltration (envelope infiltration + door infiltration) = 22 CFM = 0.62

Heat Ventilation
Sensible Load

QS  1.1 x CFM x TD
Latent Load

QL  0.68 x CFM x GR
1.1
Constant, the effect of the specific heat of air
0.68
CFM ventilation (CFM)
GR Difference in absolute humidity between the inside
and outside air = 56 grains
Absolute humidity outside room = 140 grains (100F,100%-Psychometric)
When : - outside temperature = 100 ºF = 38
- relative humidity = 100 % (Saturated air)
Humidity ratio for saturated air (ws)

ws  0.00080264  0.000024525T  2.542e  06T 2  2.5855e  08T 3  4.038e  10T 4


humidity ratio outside room = 0.043 lb/lb
Absolute humidity inside room = 84 grains
When : - inside temperature = 77 ºF = 25
- relative humidity = 60 %
Humidity ratio inside room = 0.020 lb/lb

Air Flow

Qa  Vr x ACH
Vr Volume Room = 1780 cu.ft
ACH Air Change per Hour = 2
Qa Ventilation = 59.32 cu.ft/min = 1.68
Ventilation - infiltration = 37.46 cu.ft/min = 1.06
QS Sensible Load = 1501 Btu/h 440.1
QL Latent Load = 2259 Btu/h 662.5

Total Sensible Load ( Q+SubTotal 2 + Sub Total 3+ Qs) = 4872 Btu/h 1428.6
Total Latent Load (QL) = 2617 Btu/h 767.5
Sensible Load + Latent Load = 7489 Btu/h 2196.1
Overdesign coefficient (10%) = 749 Btu/h 219.6
Designed cooling load = 8238 Btu/h 2415.7
Installed cooling load = 9000 Btu/h
Calculated Electric Power Consumed = 1.00 hp 0.75 kW
Q'ty of indoor unit (Caps. 1hp) 1 unit(s); (Qty on FEED is 0)
Cooling load check (average, incl. back-up) = 734.85 Btu/(h.m2)
-Actual load = 611.45 Btu/(h.m2)
-Back-up = 123.39 Btu/(h.m2) 16.8% (Approx.)

Notes
1. 1 hp = 9000 btu/h (VENDOR to advice)
2. 1 ton refrigerant = 12000 Btu/h (VENDOR to advice)
3. The minimum ACH should be reached by installation of exhaust fan with air velocity max 0.45 m/s at elevation min 2 m from floor
and suface area 1.5 m2
References:
- Air Conditioning of America, 4th edition, "Load Calculation for Summer and Winter Air Conditioning"
- SP-ME-ME-013 rev 1, " AIR CONDITIONING AND VENTILATION"
- CP-0513NO-II-003, " Control Room Lay Out Area 13 North Quadrant, NDD Project"
- CP-0513SO-II-003, " Control Room Lay Out Area 13 South Quadrant, NDD Project"
NO: REV.

0
TACHMENT-1)
E DRAWING NO:

CP-0513NO-II-003

ling Load (Btuh)

Daily Range Correction

m2

Daily Range Correction

Btuh
Remarks

Flourescent type

50.40 m3

0.34 m3/min

0.28 m3/min
0.62 m3/min

F,100%-Psychometric)
38 ºC

3
 4.038e  10T 4

25 ºC
1.68 m3/min
1.06 m3/min
440.1 Watt
662.5 Watt

1428.6 Watt
767.5 Watt
2196.1 Watt
219.6 Watt
2415.7 Watt

kW
(Qty on FEED is 0)

(Approx.)

elevation min 2 m from floor


DOCUMENT NO:
Mechanical - Calculation
(ATTACHMENT-1)
REFERENCE DRAWING NO:
HEAT BALANCE - COOLING LOAD OF
CONTROL ROOM BUILDING CP-0513NO-II-003
(UPS ROOM)
Project : NDD Area 13
Location : North Quadrant

COOLING LOAD ESTIMATION

The Calculation is based on Manual Book by ASHRAE and Air Conditioning Contractors of America (ACCA)

I Site Condition
Environmental Data
Ambient Air Temperature = 100 ºF = 37.78 ºC
Relative Humidity = 60 %
Daily Range = 23 ºF
Room Condition Requirements
Room Temperature = 77 ºF = 25 ºC
(Temperature Design Point at Summer)
Relative Humidity = 60 to 100 %
Minimum Static Pressure = N/A Neutral Pressure
Maximum Static Pressure =

Basic Calculation
The peak cooling load occurs at noon due to peaking outside temperature and solar effects

Cooling Load (Btuh)


Sensible Notes
II Solar Radiation Heat Through Glass

Q  SHGF x SF x A
Exposure Sq.ft Solar Gat Gain Factor Shading and or Glass Factor

0 x 91 x 0.94 = 0
Q = 0 Btuh

Q  U x A x TD
III Heat Transmission Through Structural Components

Exposure Sq.Ft U Factor Equivalent or


db or Temperature Difference

Glass 0 x 1.04 x 15 = 0

Wall South 228.38 x 0.184 x 11 = 462.24 Daily Range Correction


East 0.00 x 0.184 x 23 = 0.00 -2

Floors 169.17 x 0.81 x 5 = 685.14 15.7

Roof/Ceiling 169.17 x 0.15 x 30 = 761.27 Daily Range Correction


-2
Sub Total 2 = 1909 Btuh

Notes:
1. Minimum Standard for U-value is 0.6 W/m2.ºC = 0.00937 Btu/ft2.h.ºF. The higher value is taken into calculation.
2. Air film resistance, the effect of air convection is assumed in 7.5 mph wind velocity

IV Internal Heat Gains


Factor Sensible Latent
NO HEAT GAIN FROM HEAT DISSIPATION Quantity Remarks
Convertion (Btuh) (Btuh)

5 Occupants
- Toilet Room 1 person 228.47 119.35

6 Heat Dissipation from


- Lighting 36 W 6 4.1 886 - Flourescent type
- Other Panels 60000 Btuh 1 1 60000 -
Sub Total 3 61114 119.35

V Envelope Infiltration

V x ACH
I 
60
V Volume inside building = 2284 cu.ft = 64.67
ACH Air Change per Hour = 0.4 AC/H
I Infiltration = 15.23 CFM = 4.64

Door Infiltration

Average occupancy x 2  opening per person


TR 
no. of door x average length to stay

Occupancy = 1 person

Traffic Rate (opening door) = 1.00 ~ None


Based on Table 13B,
CFM per door for Single Door made of Wood = 10 CFM = 0.28
TOTAL infiltration (envelope infiltration + door infiltration) = 25 CFM = 0.71

Heat Ventilation
Sensible Load

QS  1.1 x CFM x TD
Latent Load

QL  0.68 x CFM x GR
1.1
Constant, the effect of the specific heat of air
0.68
CFM ventilation (CFM)
GR Difference in absolute humidity between the inside
and outside air = 56 grains
Absolute humidity outside room = 140 grains (100F,100%-Psychometric)
When : - outside temperature = 100 ºF = 38
- relative humidity = 100 % (Saturated air)
Humidity ratio for saturated air (ws)

ws  0.00080264  0.000024525T  2.542e  06T 2  2.5855e  08T 3  4.038e  10T 4


humidity ratio outside room = 0.043 lb/lb
Absolute humidity inside room = 84 grains
When : - inside temperature = 77 ºF = 25
- relative humidity = 60 %
Humidity ratio inside room = 0.020 lb/lb

Air Flow

Qa  Vr x ACH
Qa  Vr x ACH
Vr Volume Room = 2284 cu.ft
ACH Air Change per Hour = 2
Qa Ventilation = 76.13 cu.ft/min = 2.16
Ventilation - infiltration = 50.90 cu.ft/min = 1.44
QS Sensible Load = 1926 Btu/h 564.8
QL Latent Load = 2899 Btu/h 850.1

Total Sensible Load ( Q+SubTotal 2 + Sub Total 3+ Qs) = 64974 Btu/h 19053.9
Total Latent Load (QL) = 3018 Btu/h 885.1
Sensible Load + Latent Load = 67992 Btu/h 19939.1
Overdesign coefficient (10%) = 6799 Btu/h 1993.9
Designed cooling load = 74791 Btu/h
Considering at 101.5 F requires 6h, we choose factor 3 24930 Btu/h
Installed cooling load = 36000 Btu/h
Calculated Electric Power Consumed = 4.00 hp 2.98 kW
Q'ty of indoor unit (Caps. 2hp) 2 unit(s); (Qty on FEED is 1 @
Cooling load check (average, incl. back-up) = 2290.60 Btu/(h.m2)
-Actual load = 1586.27 Btu/(h.m2)
-Back-up = 704.33 Btu/(h.m2) 30.7% (Approx.)

Notes
1. 1 hp = 9000 btu/h (VENDOR to advice)
2. 1 ton refrigerant = 12000 Btu/h (VENDOR to advice)
3. The minimum ACH should be reached by installation of exhaust fan with air velocity max 0.45 m/s at elevation min 2 m from floor
and suface area 1.5 m2
References:
- Air Conditioning of America, 4th edition, "Load Calculation for Summer and Winter Air Conditioning"
- SP-ME-ME-013 rev 1, " AIR CONDITIONING AND VENTILATION"
- CP-0513NO-II-003, " Control Room Lay Out Area 13 North Quadrant, NDD Project"
- CP-0513SO-II-003, " Control Room Lay Out Area 13 South Quadrant, NDD Project"
NO: REV.

0
TACHMENT-1)
E DRAWING NO:

CP-0513NO-II-003

ling Load (Btuh)

Daily Range Correction

m2

Daily Range Correction

Btuh
Remarks

Flourescent type

64.67 m3

4.64 m3/min

0.28 m3/min
0.71 m3/min

F,100%-Psychometric)
38 ºC

3
 4.038e  10T 4

25 ºC
2.16 m3/min
1.44 m3/min
564.8 Watt
850.1 Watt

19053.9 Watt
885.1 Watt
19939.1 Watt
1993.9 Watt
Watt

kW
(Qty on FEED is 1 @ 2PK)

(Approx.)

elevation min 2 m from floor


DOCUMENT NO:
Mechanical - Calculation
(ATTACHMENT-1)
REFERENCE DRAWING NO:
HEAT BALANCE - COOLING LOAD OF
CONTROL ROOM BUILDING CP-0513NO-II-003
(STORAGE ROOM)
Project : NDD Area 13
Location : North Quadrant

COOLING LOAD ESTIMATION

The Calculation is based on Manual Book by ASHRAE and Air Conditioning Contractors of America (ACCA)

I Site Condition
Environmental Data
Ambient Air Temperature = 100 ºF = 37.78 ºC
Relative Humidity = 50 %
Daily Range = 23 ºF
Room Condition Requirements
Room Temperature = 77 ºF = 25 ºC
(Temperature Design Point at Summer)
Relative Humidity = 60 to 100 %
Minimum Static Pressure = N/A Neutral Pressure
Maximum Static Pressure =

Basic Calculation
The peak cooling load occurs at noon due to peaking outside temperature and solar effects
Cooling Load (Btuh)
Sensible Notes
II Solar Radiation Heat Through Glass

Q  SHGF x SF x A
Exposure Sq.ft Solar Gat Gain Factor Shading and or Glass Factor

East 3 x 91 x 0.94 = 276


Q = 276 Btuh

Q  U x A x TD
III Heat Transmission Through Structural Components

Exposure Sq.Ft U Factor Equivalent or


db or Temperature Difference

Glass East 3 x 1.04 x 15 = 50

Wall North 0.00 x 0.184 x 9 = 0.00 Daily Range Correction


East 189.00 x 0.184 x 23 = 799.85 -2

Floors 131.83 x 0.81 x 0 = 0.00 3.7

Roof/Ceiling 131.83 x 0.15 x 30 = 593.24 Daily Range Correction


-2
Sub Total 2 = 1443 Btuh

Notes:
1. Minimum Standard for U-value is 0.6 W/m2.ºC = 0.00937 Btu/ft2.h.ºF. The higher value is taken into calculation.
2. Air film resistance, the effect of air convection is assumed in 7.5 mph wind velocity

IV Internal Heat Gains


Factor Sensible Latent
NO HEAT GAIN FROM HEAT DISSIPATION Quantity Remarks
Convertion (Btuh) (Btuh)

5 Occupants
- Toilet Room 1 person 228.47 119.35

6 Heat Dissipation from


- Lighting 36 W 4 4.1 590 - Flourescent type
- Other Panels 0 W 1 3.4 0 -
Sub Total 3 819 119.35

V Envelope Infiltration
V x ACH
I 
60

V Volume inside building = 1780 cu.ft = 50.40


ACH Air Change per Hour = 0.4 AC/H
I Infiltration = 11.86 CFM = 0.34

Door Infiltration

Av erage occupancy x 2  opening per person


TR 
no. of door x average length to stay

Occupancy = 1 person

Traffic Rate (opening door) = 2.00 ~ None


Based on Table 13B,
CFM per door for Double Door made of Wood,Metal,Glas= 90 CFM = 2.55
TOTAL infiltration (envelope infiltration + door infiltration) = 102 CFM = 2.88

Heat Ventilation
Sensible Load

QS  1.1 x CFM x TD
Latent Load

QL  0.68 x CFM x GR
1.1
Constant, the effect of the specific heat of air
0.68
CFM ventilation (CFM)
GR Difference in absolute humidity between the inside
and outside air = 56 grains
Absolute humidity outside room = 140 grains (100F,100%-Psychometric)
When : - outside temperature = 100 ºF = 38
- relative humidity = 100 % (Saturated air)
Humidity ratio for saturated air (ws)

ws  0.00080264  0.000024525T  2.542e  06T 2  2.5855e  08T 3  4.038e  10T 4


humidity ratio outside room = 0.043 lb/lb
Absolute humidity inside room = 84 grains
When : - inside temperature = 77 ºF = 25
- relative humidity = 60 %
Humidity ratio inside room = 0.020 lb/lb

Air Flow

Qa  Vr x ACH
Qa  Vr x ACH
Vr Volume Room = 1780 cu.ft
ACH Air Change per Hour = 2
Qa Ventilation = 59.32 cu.ft/min = 1.68
Ventilation - infiltration = -42.54 cu.ft/min = -1.20
QS Sensible Load = 1501 Btu/h 440.1
QL Latent Load = 2259 Btu/h 662.5

Total Sensible Load ( Q+SubTotal 2 + Sub Total 3+ Qs) = 4141 Btu/h 1214.5
Total Latent Load (QL) = 2378 Btu/h 697.5
Sensible Load + Latent Load = 6520 Btu/h 1912.0
Overdesign coefficient (10%) = 652 Btu/h 191.2
Designed cooling load = 7172 Btu/h
Considering at 101.5 F requires 27h, we choose factor 3 2391 Btu/h
Installed cooling load = 9000 Btu/h
Calculated Electric Power Consumed = 1.00 hp 0.75 kW
Q'ty of indoor unit (Caps.1/ 2 hp) 1 unit(s); (Qty on FEED is 0)
Cooling load check (average, incl. back-up) = 2410.92 Btu/(h.m2)
-Actual load = 640.39 Btu/(h.m2)
-Back-up 0 = 1770.53 Btu/(h.m2) 73.4% (Approx.)

Notes
1. 1 hp = 9000 btu/h (VENDOR to advice)
2. 1 ton refrigerant = 12000 Btu/h (VENDOR to advice)
3 The minimum ACH should be reached by installation of exhaust fan with air velocity max 0.45 m/s at elevation min 2 m from floor
and suface area 1.5 m2
References:
- Air Conditioning Contractors of America, 4th edition, "Load Calculation for Summer and Winter Air Conditioning"
- SP-ME-ME-013 rev 1, " AIR CONDITIONING AND VENTILATION"
- CP-0513NO-II-003, " Control Room Lay Out Area 13 North Quadrant, NDD Project"
- CP-0513SO-II-003, " Control Room Lay Out Area 13 South Quadrant, NDD Project"
NO: REV.

0
TACHMENT-1)
E DRAWING NO:

CP-0513NO-II-003

ling Load (Btuh)

Daily Range Correction

m2

Daily Range Correction

Btuh
Remarks

Flourescent type

50.40 m3

0.34 m3/min

2.55 m3/min
2.88 m3/min

F,100%-Psychometric)
38 ºC

3
 4.038e  10T 4

25 ºC
1.68 m3/min
-1.20 m3/min
440.1 Watt
662.5 Watt

1214.5 Watt
697.5 Watt
1912.0 Watt
191.2 Watt

kW
(Qty on FEED is 0)

(Approx.)

elevation min 2 m from floor


DOCUMENT NO:
Mechanical - Calculation
(ATTACHMENT-1)
REFERENCE DRAWING NO:
HEAT BALANCE - COOLING LOAD OF
CONTROL ROOM BUILDING CP-0513NO-II-003
(EXHAUST FAN FOR TOILET AND BATTERY ROOM)
Project : NDD Area 13
Location : North Quadrant

COOLING LOAD ESTIMATION

The Calculation is based on Manual Book by ASHRAE and Air Conditioning Contractors of America (ACCA)

I Site Condition
Environmental Data
Ambient Air Temperature = 100 ºF = 37.78 ºC
Relative Humidity = 50 %
Daily Range = 23 ºF
Room Condition Requirements
Room Temperature = 77 ºF = 25 ºC
(Temperature Design Point at Summer)
Relative Humidity = 60 to 100 %
Minimum Static Pressure = N/A Neutral Pressure
Maximum Static Pressure =

I Ventilation for Toilet

V x ACH
I 
60
V Volume inside building = 903 cu.ft = 25.58
ACH Air Change per Hour = 6 AC/H
I Ventilation = 90.34 CFM = 2.56

II Ventilation for Battery Room

V Volume inside building = 2103.705 cu.ft = 59.57


ACH Air Change per Hour = 6 AC/H
I Ventilation = 210.37 CFM = 5.96

Notes
1. 1 hp = 9000 btu/h (VENDOR to advice)
2. 1 ton refrigerant = 12000 Btu/h (VENDOR to advice)
3. The minimum ACH should be reached by installation of exhaust fan with air velocity max 0.45 m/s at elevation min 2 m from floor
and suface area 1.5 m2
References:
- Air Conditioning of America, 4th edition, "Load Calculation for Summer and Winter Air Conditioning"
- SP-ME-ME-013 rev 1, " AIR CONDITIONING AND VENTILATION"
- CP-0513NO-II-003, " Control Room Lay Out Area 13 North Quadrant, NDD Project"
- CP-0513SO-II-003, " Control Room Lay Out Area 13 South Quadrant, NDD Project"
NO: REV.

0
TACHMENT-1)
E DRAWING NO:

CP-0513NO-II-003

25.58 m3

2.56 m3/min

59.57 m3

5.96 m3/min

elevation min 2 m from floor