LARSEN & TOUBRO LIMITED

ECC Division – EDRC


PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW) O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT/CW CHANNELS CBR SU

CONTENTS
1. INTRODUCTION

2. TECHNICAL DATA
3. ANALYSIS OF CT CHANNELS
4. DESIGN OF CT CHANNELS

5. CHECK FOR STABILITY


6. CHECK FOR CRACK WIDTH
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW) O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT/CW CHANNELS CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW) O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT/CW CHANNELS CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW) O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT/CW CHANNELS CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW) O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT/CW CHANNELS CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW) O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT/CW CHANNELS CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW) O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT/CW CHANNELS CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW) O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT/CW CHANNELS CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW) O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT/CW CHANNELS CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW) O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT/CW CHANNELS CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW) O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT/CW CHANNELS CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW) O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT/CW CHANNELS CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW) O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT/CW CHANNELS CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW) O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT/CW CHANNELS CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW) O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT/CW CHANNELS CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW)
O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT / CW CHANNELS
CBR SU

1 INTRODUCTION :
In this document design of CT channels and CW channels

has been carried out.The layout plan of CT & CW channels is given in


page 3 of this document.Typical crosssectional details of CW & CT
channels are given in page No .4.

Pressure Release valves (flap valves) with under drainage is provided


in channels to prevent uplift.

The Base slab & side walls of channels are designed as per working
stress method with limiting crack width of 0.2mm on water face.
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW)
O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT / CW CHANNELS
CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: RIHAND STPP STAGE - II (2X500MW) DOCUMENT NO. DATE
O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : CT / CW CHANNELS DESIGNED CHECKED PAGE
CBR SU

2) TECHNICAL DATA :

From DBR FGL of site = RL+275.000m

Ground Water level considered = RL+275.000m (i.e.at FGL)

Submerged unit weight of soil = 8 KN/cum

Angle of internal friction of soil = 30 Degrees 0.5236 radians

Surcharge load acting on the soil outside(q) = 20 KN/sqm

Unit weight of soil (Dry density) (gs) = 18 KN/cum

Unit weight of water (gw) = 10 KN/cum

Max. water level inside the sump = RL+275.000m

Free board above the max.water level = 300 mm

Bottom Width of the channel B = 4.5 m

Invert level of channel = RL+271.520m

Side slope of the channel wall = 8V : 1 H

Coefficient of active earth pressure(Ka) = (1-SIN(0.5236))/(1+SIN(0.5236))

= 0.333

Materails

Grade of concrete = M 25

Grade of steel = Fe 415

Cover to reinforcement

For side walls Water face = 30 mm

Soil face = 45 mm

For base slab = 25 mm

Minimum Thickness:

For side walls = 200 mm

For base slab = 200 mm


19 of 40
LARSEN & TOUBRO LIMITED
ECC Division – EDRC

PROJECT: CW PUMPS PACKAGE FOR RIHAND STPP DOCUMENT NO. DATE


STAGE - II (2X500MW) O2054-C-CW-02-DC-0004 R0 26-Aug-2018
DESIGNED CHECKED PAGE
STRUCTURE: CT CHANNEL CBR SU

ANALYSIS OF CHANNELS:
A) CALCULATION OF PRESSURE ON WALLS.

The Channel wall is in contact with soil from outside and

water from inside.The design ground water table is at FGL.

The total Height of wall is 3.8 m and height of soil in contact

with the wall is 3.5 m. The max. height of water inside of wall

is 3.5 m. The wall is designed as Cantilever wall which is fixed

at base slab and free at top. The wall is designed by working

stress method as per IS:456 - 2000 with limiting crack width

of 0.2mm on water face.

Side wall sloping outward

Slope

0.2 m 5.37 m 0.2 m

RL+275.300m
0.3 m RL+275.00m RL+275.00m

1
8

3.48 m

4.5 m

RL+271.520m

SECTION A-A
20 of 40
LARSEN & TOUBRO LIMITED
ECC Division – EDRC

PROJECT: CW PUMPS PACKAGE FOR RIHAND STPP DOCUMENT NO. DATE


STAGE - II (2X500MW) O2054-C-CW-02-DC-0004 R0 26-Aug-2018
DESIGNED CHECKED PAGE
STRUCTURE: CT CHANNEL CBR SU
DATA:

1) Height of wall (H) 3.78 m


=
2) Height of soil retained by the wall (H1) 3.48 m
=
3) Height of ground water table acting on the wall (H2) 3.48 m
=
4) Max. water depth inside the channel (H3) 3.48 m
=
5) Surcharge load acting on the soil outside (q) 20 kN/m2
=
6) Coefficient of active earth pressure Ka 0.333
=
8) Unit weight of soil (g s) 18 kN/m3
=
9) Submerged unit weight of soil (g s') 8 kN/m3
=

The wall is designed for two load cases:

1.No water inside the channel,with earth pressure of soil up to FGL,

GWT up to FGL and surcharge load of 20KN/Sqm from outside.


2) Max water level in side the channel and no earth pressure on outside.

I) LOAD CASE -1

Earth Pressure Surcharge Pressure Total pressure

0.3 m 6.66 kN/m2

3.5 m

+ =

44.07kN/sqm 6.66 kN/sqm 50.73 kN/sqm

i) Soil pressure acting at the base of the wall (p1) =


Kaxgx(H1-H2) + Kaxg'xH2 + gwxH2 =
21 of 40
LARSEN & TOUBRO LIMITED
ECC Division – EDRC

PROJECT: CW PUMPS PACKAGE FOR RIHAND STPP DOCUMENT NO. DATE


STAGE - II (2X500MW) O2054-C-CW-02-DC-0004 R0 26-Aug-2018
DESIGNED CHECKED PAGE
STRUCTURE: CT CHANNEL CBR SU
0.333x18x(3.48-3.48)+0.333x8x3.48+10x3.48 = 44.07 kN/m2

ii) Pressure acting on the wall due to surcharge (p2)= Kaxq = 6.66 kN/m2

Total earth pressure acting at the base of the wall (p1+p2) =

= 44.07+6.66 = 50.73 kN/m2

II LOAD CASE -2

Water Pressure

0.3 m

3.48 m

34.80 kN/sqm

i) Water pressure acting at the base of the wall (p1)= gwxH3 = 10*3.48

= 35 kN/sqm

PRESSURE IN LOAD CASE 1 IS GOVERNING

Hence design the wall for load case 1 i.e. 1.No water inside the

channel,with earth pressure of soil up to FGL, GWT at FGL and

surcharge load of 20KN/Sqm from outside.

B) CALCULATION OF BENDING MOMENT & SHEAR FORCE

Maximum pressure force (P) = (6.66+50.73)*3.48/2

= 99.86 KN

Point of application of pressure force from


22 of 40
LARSEN & TOUBRO LIMITED
ECC Division – EDRC

PROJECT: CW PUMPS PACKAGE FOR RIHAND STPP DOCUMENT NO. DATE


STAGE - II (2X500MW) O2054-C-CW-02-DC-0004 R0 26-Aug-2018
DESIGNED CHECKED PAGE
STRUCTURE: CT CHANNEL CBR SU
the base of the wall (h) = (3.48/3)*(50.73+2*6.66)/(50.73+6.66)

= 1.295 m

Moment at the base of the wall (M) = 99.86*1.295

= 129.32 kNm

Shear at the base of the wall (V) = 99.86 kN


LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW)
O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT / CW CHANNELS
CBR SU

1 DESIGN OF CT CHANNEL (TYP)

a) Design of wall:
Moment at the base of the wall (M) = 129.32 kNm

Shear at the base of the wall (V) = 99.86 kNm

Grade of concrete Grade of steel

M 25 Fe 415

Allowable stresses in material Design constants

scbc sst m 11

N/mm2 N/mm2 k 0.289

8.5 230 j 0.904

Q 1.11

Width of the wall (b) = 1000 mm

Effective depth required (deff) = M/Qb

= SQRT((129.32*10^6)/(1.11*1000))

= 341.3 mm

Overall thickness of wall provided = 400 mm

Clear cover to main reinforcement = 45 mm

Diameter of the vertical reinf. Provided = 16 mm

Effective depth provided = 400-45-16/2

= 347 mm

Calculation of reinforcement:

Vertical reinforcement:

Area of steel required = M/(sst*j*d)

= 129.32*10^6/(230*0.904*347)

= 1792 mm2

No. of 16 bars required = 8.91


LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW)
O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT / CW CHANNELS
CBR SU

Spacing of 16 dia bars required = 1000/8.91

= 112 mm

Spacing provided = 100 mm

Area of steel provided = (1000/100)*(201.06)

= 2011 mm2

% of steel provided = (2011/(1000*347))*100

= 0.58
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW)
O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT / CW CHANNELS
CBR SU

Therefore Provide16mm dia bars at 100mm c/c on both faces of the wall

Horizontal reinforcement:(Temperature reinforcement)

Area of temp. steel required = 0.12 % total sectional area of wall

Total cross sectional area of wall/m length =


LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW)
O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT / CW CHANNELS
CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW)
O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT / CW CHANNELS
CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW)
O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT / CW CHANNELS
CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW)
O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT / CW CHANNELS
CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW)
O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT / CW CHANNELS
CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW)
O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT / CW CHANNELS
CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW)
O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT / CW CHANNELS
CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW)
O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT / CW CHANNELS
CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW)
O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT / CW CHANNELS
CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW)
O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT / CW CHANNELS
CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW)
O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT / CW CHANNELS
CBR SU
LARSEN & TOUBRO LIMITED
ECC Division – EDRC
PROJECT: DOCUMENT NO. DATE
RIHAND STPP STAGE - II (2X500MW)
O2054-C-CW-03-DC-0005 R0 26-Aug-18
TITLE : DESIGNED CHECKED PAGE
CT / CW CHANNELS
CBR SU
38
LARSEN & TOUBRO LIMITED
ECC Division – EDRC

PROJECT: CW PUMPS PACKAGE FOR RIHAND STPP DOCUMENT NO. DATE


STAGE - II (2X500MW) O2054-C-CW-01-DC-0002 R0 26-Aug-2018
DESIGNED CHECKED PAGE
STRUCTURE: CWSUMP CBR SU

Check for the Crack Width as per IS456-2000:

1) Maximum Bending moment causing tension in the wall face in contact

with liquid = 5.625 kN-m/m

2) Maximum Tension in the wall = 653.1 kN/m

3) Width of wall considered (b) = 1000 mm

4) Overall depth of considered (h) = 700 mm

5) Area of steel provided on the tension face of the wall (As) = 1470 mm2/m

6) Area of steel provided on the compression face of wall (A sc) = 1470 mm2/m

7) Clear cover to tension steel provided (c) = 50 mm

8) Clear cover to compression steel provided = 25 mm

9) Diameter of bar provided on the tension face of the wall (f) = 20 mm

10) Diameter of bar provided on the compression face of the wall = 20 mm

11) Effective depth of wall c/s (d) = 700-50-20/2 = 640 mm

12) Cover to the centre of compression steel (d') = 35 mm

13) spacing of tension steel (s) = 150 mm c/c

As per IS456-2000 Design Surface Crack Width

Wcr = 3acrem/(1+2(acr-Cmin)/(h-x))

Where

acr = distance from the point considered to the surface

of the nearest longitudinal bar,

Cmin = minimum cover to the longitudinal bar;

em = average steel strain at the level considered,

h= Overall depth of the member, and

x= depth from the compression face to the neutral axis.

To find out em = e1 - b(h-x)(a-x)/(3EsAs(d-x))

Where,
39
LARSEN & TOUBRO LIMITED
ECC Division – EDRC

PROJECT: CW PUMPS PACKAGE FOR RIHAND STPP DOCUMENT NO. DATE


STAGE - II (2X500MW) O2054-C-CW-01-DC-0002 R0 26-Aug-2018
DESIGNED CHECKED PAGE
STRUCTURE: CWSUMP CBR SU
As = area of tension Reinforcement

b= Width of the section at the centroid of the tension

steel,

e1 = Strain at the level considered, calculated ignoring

the stiffening of the concrete in the tension zone.

a= distance from the compression face to the point at

which crack width is being calculated, and

d= effective depth.

Es = modulus of elasticity of steel = 2x100000 N/mm2

Calculation of the Neutral axis depth:

The depth of neutral axis (x) from the comp face is found by

solving the equation = (mc-1)Asc(x-d') = (m-1)As(d-x)+bh2/2-xhb =

where,

mc = 1.5m-1 = 1.5x10.98-1 = 15.47

m= modular ratio = 280/3scbc = 280/(3x8.5) = 10.98

scbc = for M25 grade concrete = 8.5 N/mm2

solving the quadratic equation we get x = 293.37 mm

e 1 = (h-x)fs/Es(d-x)

Where,

fs = the tensile stress in the reinforcement.

= M/((d-x/3)As) + T/(As+Ac)

=5.625x1000000/((640-293.37/3)x1470)+653.1x1000/(1470+1470)= 229.2 N/mm2

Per. tensile stress in steel as per IS456-2000 by working stress = 230 N/mm2

OK

e1 = (700-293.37)x229.2/(200000x(640-293.37)) = 0.001344

e2 = b(h-x)(a-x)/(3EsAs(d-x)) =
40
LARSEN & TOUBRO LIMITED
ECC Division – EDRC

PROJECT: CW PUMPS PACKAGE FOR RIHAND STPP DOCUMENT NO. DATE


STAGE - II (2X500MW) O2054-C-CW-01-DC-0002 R0 26-Aug-2018
DESIGNED CHECKED PAGE
STRUCTURE: CWSUMP CBR SU
= 1000x(700-293.37)x(700-293.37)/(3x200000x1470x(640-293.37)) =

0.000541

e m = e1 - e2 = 0.001344-0.000541 = 0.000803

acr = (s/2)2+(c+f/2)2 - f/2 = 86.05 mm

Cmin = c = 50 mm

Design crack width =

= 3x86.05x0.000803/(1+2x(86.05-50)/(700-293.37)) = 0.176 mm

< 0.2 mm OK

Compressive stress in concrete = 2M/zbx =

= 2x5.625x1000000/((640-293.37/3)x1000x293.37) = 0.07 N/mm2

Permissible compressive stress in the concrte for M25 concrete = 7 N/mm2

OK