ANALYSIS OF THE ELECTRICAL SYSTEM OF B-MIRK TAURUS 09 PLANT IN INDUSTRIAL SUBDIVISION MEYCAUYAN, BULACAN

0.068171
ZPU-UTILITY
+j0.287000017

0.685
ZPU-TRANSFORMER
+j4.10998

ZPU-LINE CABLE
0.835
+j4.34998
LVSB BUS 001

0.18652 6.37523
+j4.38297
+j0.29843
SMDP-B BUS 003
SMDP-FP BUS 005
CSMDP-B1 CSMDP-B2
0.99693 1.14276 CPB-FP
+j2.27869 +j2.61203 8.129 102.51600
+j3.726 +j714.90300
BUS 010 BUS 011
BUS 013
Z15A//9A//14A//17A//16A Z21A//20A
1587.90422 1005.49628 ZPB-FP
+j3904.22301 +j2603.46263 130.84290
+j1186.66890

0.05071 0.08737
+j0.08114 +j0.14977
SMDP-A BUS 002 SMDP-C BUS 004
CSMDP-A1 CSMDP-A2 CSMDP-A3 CSMDP-C1 CSMDP-C2
0.47593 0.43002 0.47954 0.40643 0.46968
+j0.64779 +j0.71175 +j0.79372 +j0.56899 +j0.65755
BUS 006 BUS 007 BUS 009 BUS 010 BUS 012
Z22A//3A//19A//8A Z4A//1A//6A Z7A//2A//18A//5A Z10//25A Z12A//11A//13A
370.66315 929.7455 484.45632 1492.95655 873.20303
+j1064.67188 +j2342.71327 +j1342.28974 +j3749.32756 +j2228.25754

Figure 3.10.3 Impedance Diagram of 2nd Reduction of the Electrical System of B-MIRK TAURUS 09 PLANT 101