You are on page 1of 4
ARKITEK MAA SENDIRIAN BERHAD (24316-H) www.arkitekmaa.com Our ref KL 2a70rece/14 Penthouse 3A-21 Love 21 Tower 3 lo se Bice! feral oka sen Senclts Date 9 July 2018 Pro wax toass 50714" Kuna Lumpue Matayeus Tels903-22628888 Fskous-a2030028 mama cielo com CADANGAN PEMBANGUNAN 1 BLOK PEJABAT 25 TINGKAT YANG MENGANDUNGI RUANG PERNIAGAAN DAN RUANG SERBAGUNA BESERTA 4 TINGKAT BESMEN TEMPAT LETAK KERETA DI ATAS PT50817 (Lots no. 67329 & 67330) JALAN PJU 7/6 DAN JALAN PJU 7/5, MUTIARA DAMANSARA, MUKIM SUNGAI BULOH, DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK TETUAN NAM SENG BEE HOON SDN BHD NUCLEUS TOWER MINUTES OF CCC MEETING No. 11 DATE: 9" July 2018 VENUE: Nuclous Tower, Ground Floor, Lobby PRESENT: 1) En. Md. Zaki Abd Rahman Nam Seng Bee Hoon Sdn Bhd ~—_(NSBH) 2) En. Muhammad Nazeef Muhamad Nor Nam Seng Bee Hoon Sdn Bhd (NSBH) 3) En. Muhamad Khairul Faiz Nam Seng Bee Hoon Sdn Bhd (NSBH) 4) Ar Alice Leong ‘Arkitek MAA Sdn Bhd (MAA) 5) En. Firdaus B. Noh ‘ASani & Associates Sdn Bhd (ASA) 6) En. Mohammad Nasiruddin Ahmad Yatim A.Sani & Associates Sdn Bhd (ASA) | 7) En.M.Faizal b. Mat Nur ASani & Associates Sdn Bhd (ASA) | 8) Engku Muhammad Engku Indong Perunding Hashim & NEH SIB_ (PHNEH) | 9) En. Zulkarnian Dahalan Perunding Hashim & NEH SIB_ (PHNEH) | 10) Mr. ET. Lee Boustead Building Materials S/B_ (BEM) | 11) En. Md Faizan Madris Boustead Building Materials S/B_ (BEM) ABSENT 1) En. Ahmad Masyhur Jahaya Perunding Hashim & NEH SIB_ (PHNEH) 2) En. Afifah Mohd Tajudin Yong Dan Mohamad Faiz S/B_ (YMF) | 3) Tengku Alduosri Fathi Skala Design Consult S/B (Skala) 4) Mr. Lee Kam Keong Boustead Building Materials S/B_ (BBM) 5) ik Siti Nuratikah Radin Ehsan Boustead Building Materials SB (BEM) 2. | | gine Atta leng Baud in ADMD AE oe | Kwzavocce ARKITEK MAA Continuation... Nuclous Tower SENDIRIAN BERHAD (24316-4) NO MATTERS DISCUSSED ACTION | DATE 10 14 20 24 22 24 0 PREVIOUS MINUTES OF MEETING ‘The previous minutes was read and confirmed as correct. AUTHORITIES MATTERS ‘SYABAS 1) Meter application : BBM nad obtained the amount of deposit and meter fee/meter depositinumber of meter required. ‘a. Total Domestic Meter RMS7,887.00 b. Hydrant : RM328.20 BBM had submitted the document and cheque to Syabas. All meters installed on 3 July 2018, Io IS Ia “| MAA has distributed Form Gs (G1-G21) to all respective parties who are required to fill up the forms and retun to MAA together with all the ‘credential supporting certificates/documents. All noted. (@) as of current, WD! had returned complete Form G21 to MAA; (0) BBM informed Form G1-G3 have been forwarded to MAA. MAA commented incomplete. BBM had resubmitted all outstanding document, (©) Balance of form Gs and supporting documents are all forwarded to MAA (@) MAA had issued Form F (CCC) together with G1-G21 to all respective parties on 5/7116. ji, MAA has forwarded further requirements and OSC-CCC procedure to all consultants on 16” April 2018 for futher prepartion. All consultants are to compile the documents required and forward to MAA to proceed with “Process 3-6" of OSC. PHNEH, WD! and ASA have forwarded the document to MAA. MAA urge BBM to forward / provide documents required for OSC 3.0. MBPJ revert to use OSC 2.0. MAA had submitted Part 1 OSC 2.0 to MBPJ. The latest part will submit later after all clearance + Form Gs complete. MAA informed MBP. agreed and allowed this project to use OSC 20. ii, MAA had submitted Stage 1 document to OSC. The last stage submitted on, 5I7I18 to OSC. MAA reported on 5 July 2018. Borang F and G1 to G21 submitted/issued to all relevant parties (NSBH, LAM and MBPJ). LAM online submission submitted on 6 July 2018. ‘NB BBM reported that the Electrical Tenant's individual meter will be installed at every floor by BBM/SECM by next week. Matter will be further discussed in Defects Meeting. INFO. INFO. INFO. INFO. INFO. INFO. INFO. Page 2 of 4 ‘Continuation. Nucleus Tower Kiza7orecertt ARKITEK MAA SENDIRIAN BERHAD (24316-4) MATTERS DISCUSSED ACTION DATE 25 0 30 ‘STREET LIGHTING NSBH highlighted that 30” July 2018 is the date committed to MBP4 to install light. BBM targeted to complete installation of all 4 nos. of street lights by 15, August 2018. Matter to be discussed further in the Defects Meeting. ‘TESTING AND COMMISSIONING BEM reported the status of Testing and Commissioning as of 9/7/2018. ( —_ ACMV testing and commissioning yet to carry out due to pending ‘energising of TNB sub-station. - Cooling tower test carried out = Floor to floor test done. + TES tank not yet Stated TAC by tomorrow the TES wall will be fully charged. Once its charges ful test will be carried out. + Chiller ~ shall test togethe with TES. (i) Water leakage test for facade. MAA had approved the method and location for test. The test will be carried out on 22/6/2018 at 10:30a.m. Done. Report will submit in 2 weeks' time. Not yet, BBM to expedite. (i) Qlassic inspection : BBM to arrange with CIDB. BBM reported inspection form wil be send to MAA to fil up some information ()___BMU-gondola test : Postponed due to National GE holidays. BEM reported test carried out and approved. Approval letter obtained. BBM reported MHE refused to handover the keys due to outstanding Payment of RM10,000.00. BBM clarified payment s in process and stil within the 45-60 days. NSBH will liaise with MHE. (¥) MSC stage : internal audit afer permanent electricity supply ‘Audit report MyDEC will inspect affer CCC. A ist has been given to PHNEH to compile document. Target to inspect next week. PHNEH wil aise with Upnamic on the documents required. Not yet, target by Friday to tesUinspect. if ‘everything accepied, the process will proceed. Target by ‘August, Stage 2 clearance will obtain. Note : The above Testing and Commissioning will be further discussed in Defects, Meeting. BBM PHNEH BBM NSBHI BEM! PHNEH INFO. On-going Page 3 of 4 Kverocceit ARKITEK MAA Continuation .. Nucleus Tower SENDIRIAN BERHAD (24316-H) No | MATTERS DISCUSSED w ci) ACTION | DATE OTHER MATTERS NSBH commented the external cover walkway lightings are too bright. PHNEH to advise how to reduce the brightness. PHNEH will revert after checking the Lux level. PHNEH checked and proposed to remove one tube light from each light box to reduce the over brightness. As requested, PHNEH to provide actual Lux index and submit to NSBH, before 29/6/2018. Matter to be discussed in the Defects Meeting. MAA highlighted for typical office floor, especially the common pantry area must be separated by brickwall / wall from the Bomba's Lift Lobby. MAA reissued PHNEH the Bomba Red book (4 copies) - PHNEH to forward to \MAA for compiiation and send to respective parties. Matter to be discussed in the Defects Meeting NEXT MEETING The meeting adjourned at 12:00 noon. Today is the last CCC to be held, ‘The first Defects Liability Period meeting is scheduled as follows Date 23" July 2018 (Monday) Time 30 p.m. Venue _: Nucleus Tower, Ground Floor Lobby (Office Block) INFO. INFO. INFO. ALL Prepared by, y ware IKITEK MAA SDN BHD Enc ‘Alter Page 4 of

You might also like