You are on page 1of 1

EPC Controller EPC-100 EPC Controller EPC-100

Contents
5.6 Automatic rectification
1. Introduction:……………………………………………………………………………………
( 1)Close MC1 start switch and press the (3) Press button,make the “green”
1. 1 Overview ………………………………………………………………………………………… panel “SET” button once,the red indicator indicator above light to enter “automatic ”
light,so controller enter“normal ”working working state,start automatic rectification.
1. 2 Features………………………………………………………………… … … … … … … … … …
stage,LED displays “- -”. (4) Observation the automatic rectification ,
1. 3 Panel and button ………………………………………………………………………
( 2) Press button, make the red indicator if the edges of coil does not shake under
above light and controller enter “manual” light spod,but move to the other side,you
2.Shape and size of installation …………………………………………………………
working state,press 、 key to move can press button to change motor
3.Electric installation and wiring …………………………… … … … … … … … … … … promote institutions make coil edges under direction;According to the working situation ,
the light spot. you can enter “Setting” working state
3. 1 Installation of photoelectric eyes …………………………………………………………
adjust controller action sensitivity.
3. 2 Wiring ………………………………………………………………………………………………

3. 3 Wiring Precautions ………………………………………… … … … … … … … … … … … … …


Appendix
Connect middle Start control switch
4.Three kinds of working state introduction ………………… … … … … … … location switch

4. 1 ”Initial” working state …………………………………………………………………

4. 2 “Normal” working state ………………………………… … … … … … … … … … … …


Right limit switch Synchronous
Electric Electric motor GND POWER
4. 3 “Setting” working state………………………………………… … … … … … … … … … … Left limit switch
eye 1 eye 2

MC1~12V: Connect start control switch


4. 4 The conversion between work state diagram…………………………………………
LIML ~ 12V: Connect left limit switch
5.Operating steps ……………………………………………………………………………… LIMR ~ 12V: Connect right limit switch
CEN ~ 12V: Connect middle location switch
5.1 Left and right limit switch "cognitive judgment" ………………………………
IN1、12V、GND: Connect electric eye 1
5. 2 Correction the failure of “cognitive judgment”… ……… …… ……………… IN2、12V、GND: Connect electric eye 2
CW、L、CCW: Connect single-phase synchronous motor
5. 3 “Automatic return center” operation ……………………………………………
:Connect GND
5. 4 Photoelectric eyes sensor location and sensitivity adjustment ………… AC22OV: Connect power AC22OV、50HZ

5. 5 Setting controller ………………………………………… … … … … … … … … … … … … … * NOTE: T h e l e f t a n d r i g h t l i m i t s w i t c h a n d m i d d l e l o c a t i o n s w i t c h , t h e i r


connecting way all are touch switch connection, if use TE- 12P4C/ PR12- 4DP
5. 6 Automatic rectification ………………………………… … … … … … … … … … … … … …
type proximity switch, so the wire is brown wire connect 12V,blue wire connect
Appendix……………………………………………………………………………………………… GND,black wire connect single lines,respectivrly by LIML, LIMR, CEN port.

You might also like