INDEX
Sr. No. Particulars Page No.

1] Introduction of In plant training 1


2] Company profile 3
3] Introduction of Product 10
4] Thermex process 12
5] Purchase department 14
6] Stores Department 19
7] Production Department 26
8] Quality assurance department 36
9] Plant engineering department 42
10] Finance Department 45
11] Personnel/ HR Department 46
12] Marketing & sales Department 49
13] Swot Analysis 54
14] Conclusion 56
15] suggestion 57
16] Bibliography 58

2
Company Profile
Neelkanth Steel & Agro Industries’ produces High Strength Quenched Steel Bars
and Wires for concrete reinforcement. We are there in this sector for almost a
decade. And now to take advantage of the technological revolutions and to provide
all benefits to Indian customers that are available to global customers, we are
expanding our quality base by adopting a globally preferred cooling technology
from Thermex . This plant is equipped with all ultra modern manufacturing and
testing facilities and equipment.

3
Why Neelkanth Steel & Agro Industries

Spend Less Money

NEELKANTH STEEL & AGRO INDUSTRIES THERMEX


TMT-500 PROPERTIES

1. Bend Properties
Neelkanth Steel & Agro Industries Thermex TMT500 rebars have excellent bend
properties due to the unique ductility (elongation values) obtained when using the
German HSE Thermex Technology.
2. Corrosion Resistance properties
Controlled water-cooling prevents the formation of coarse carbides, which has
been cited as the main cause for the corrosive nature of common bar.
Another reason for better corrosion resistance is the absence of surface stresses
caused by the cold twisting (and Torsteel) process.

3. Weldability
Neelkanth Steel & Agro Industries Thermex TMT500 rebars with carbon content
less than 0.25% can be used for butt and other weld joints without reduction in
strength at the weld joints.

4. Fire Resistance
Unlike Torsteel and CTD Rebars, Thermex bars have high thermal stability. They
are the preferred choice when elevated temperatures of 400-600 C may be
encountered (Chimneys, fires).

4
5. Earthquake Resistance
Thermex rebars have high fatigue resistance to Dynamic/ Seismic loads due to its
higher ductility quality. This makes Thermex bars most suitable for use in
earthquake prone areas.

6. Formability
Due to very high elongation values and consistent properties throughout the length
of bar, Thermex rebars has excellent workability and bendability.

7. Strain Ageing
Due to unique and scientific manufacturing process and chemical composition,
Thermex rebars show no tendency of embrittlement either during welding or cold
deformation of welded joints.

8. Cost Effective
Thermex TMT rebars required 15-20% less usage than CTD bars for same work
with cost 5% more than CTD bars. This results in overall saving of 10-25%.

Quality Policy
'Neelkanth Steel & Agro Industries' has fully fledged testing and inspection
facilities to check both chemical and physical parameters. We have also got license
to use standard mark on our products as per IS 1786 and IS 13920.

5
Mill Details
“Neelkanth Steel & Agro Industries Steel” recently completed the mill up
gradation by introduction of Licensed “THERMEX COOLING TECHNOLOGY”
of HSE, Germany. HSE Thermex system has been successfully employed to
produce bars of all International Standards such as
 German BSt500 of DIN488
 British Gr.450 of BIS 444-1978
 Swiss Topar 500 s of SIA 162
 French Fe B50 of NF-A35-016, etc.

6
What TMT Rebars?
 Neelkanth Steel & Agro Industries Thermex TMT500 ensures greater safety due to
very high elongation values of 16-25%.
 The use of high strength Thermex TMT bars results in 15-20% in steel
consumption and overall cost saving upto 10-15%.
 CTD rebars are not used in construction in advanced countries but are used
 Extensively in India.
 Globalization has brought awareness about the deficiencies of CTD bars as the
demand for TMT rebars is increasing globally.
 In most developed countries, rebars with Yield Strength of minimum500N/mm2
(as against 415 N/mm2 in CTD bars) are specified for RCC work.
 Neelkanth Steel & Agro Industries steel is uniquely made to be stronger, more
bendable, and has a higher thermal stability.
 More efficient for Seismic and/or Fatigue Loads.
 Overall cost effective.

7
8
WHY THERMEX TMT REBARS?
 Neelkanth Steel & Agro Industries steel chose the German ‘Thermex Cooling
Technology’, as it is the globally preferred choice. They are among very few
companies who are successful in producing right TMT rebars with proper
specifications.

 The consumers of TMT rebars must ensure that they are using correct TMT rebars.
This is essential today as many rolling mills in India are merely spraying water on
the bars in an unscientific way and selling them as ‘TMT’ rebars.

 Their strength is even less then CTD bars. The process is simple and effective. It is
‘Worker Friendly’ due to its unique process and proprietary hardware.

 Thermex TMT rebars are preferred choice of civil and structural designers
worldwide.

View of Platform during rainy season which clearly shows the difference between qualities
of CTD & TMT Bars.

9
THERMEX PROCESS
Introduction
Directly after the last rolling mill stand, the steel bar receives a short, intensive
cooling as it passes through the THERMEX Water Cooling System. The reduction
in temperature converts the surface layer of steel bar to a hardened structure. This
phase of intensive cooling is followed by further cooling in atmosphere, so that the
temperature between core (which is still hot) and the cooled surface layer is
equalized and the surface layer gets tempered from the heat of the core. The
resultant structure is a tempered Martensite zone at theperiphery & a fine grain
ferrite-pearlite structure in the central zone. So the Neelkanth Steel & Agro
Industries Thermex rebars have all the desired properties without the need of costly
alloying elements.

Thermex Process
Thermex® is world class German Technology of ‘Quenching & Self-Tempering’
an important stage in the manufacturing of Steel Rebars. The license to use this
technology was granted to Neelkanth Steel & Agro Industries steel by H & K
Rolling Mills Engineers Pvt. Ltd., Mumbai, the exclusive collaborators for Indian
Territory, of Hennigs Dorfer Steel Engineering GmbH, Germany, the developer
and patent holders of the coveted Thermex® Technology.

1. Quenching Stage
The red hot MS Billets are passed through the rolling mill to manufacture Steel
Rebars. At the last stage of manufacturing, while the bars are still red hot, the outer
surface of these bars is subjected to rapid water cooling. This makes the outer
surface harder and obtains a surface layer of crude marten site. This provides the

10
surface hardness and thus strength to Steel Rebars. The efficiency of the water
cooling equipment used at this stage is pretty important in order to produce exact
results.
2. Self-Tempering Stage
In the Second Stage the bar leaves the water quenching line and is exposed to
atmosphere, thus allowing it to be cooled. The heat flux, from the still hot core of
the bars, reheats the quenched surface by conduction and the marten site formed in
the first stage is thus subjected to self-tempering, which ensures adequate ductility
while maintaining high Yield Strength levels. This physical property of ductility is
nothing but the capability of the Steel Rebars to bend and Re-bend and has
tremendous significance in the process of construction.
3. Final Cooling Stage
The Third Stage occurs on the cooling bed and it consists of a semi-isothermal
transformation of the still untransformed austenite in the core of the bar. At the end
of the Quenching process the structure is obtained consisting of a peripheral layer
of tempered marten site, an inner annular area of mixed bainite products and the
core presenting a structure of perrite-ferrite (plus bainite in small diameters).

This is a department contain 2 purchase


officers & 4 helpers purchase of materials to
the manufacturing concern like Neelkanth

11
Steel & Agro Industries steel is extremely important because it has its bearing on
every internal factor concerning to the paint production i.e. quantity, quality, cost
efficiency, prompt delivery, volume of production etc.
Purchasing is the procurement of materials, supplies, machines, tools & service
required for the equipments maintenance & operation of the business. Purchase
must be of the right quantity in proper quality for the delivery at the correct time &
at most favorable price from the outside.
The principle of the company for the purchase department is the procurement of
goods of the right quality in the right quantity at the right time from the right
source & at right price.
This is a department in the company as it directly deals with raw material needed
for the production of product that is Blades.
This department gets the production planning from the marketing department. The
next step of material dept is to contact with respective vendor to fulfil the needs.
According to requirement, the dept will search the vendor.
The vendors have to make the quotation and allow submitting in company
including the price list of raw material. The proper vendor is selected who is
eligible from point of view of price, quality and who clarifies every teams and
condition the transaction. The purchase order is given to vendor. The PO includes
the list of raw material, quantity etc. The PO is very important part of transaction
as it the legal proof between the company and the vendor. But before giving the PO
to vendor, material dept checks the stock in stock dept and then accordingly gives
order.
The raw materials used in company
 SCRAP
 SPONGE IRON
 ALUMINIUM BLADES
12
 MAGNIZE
 CILICO MAGNIZE

FUNCTIONS OF PURCHASE DEPARTMENT


 To produce the scrap, screws, helmet, spong iron & other products as per the
requirement.
 To call the quotations for fixing of the rate of the items.
 To negotiate the rate & to finalize the commercial terms clearly for preparing the
orders.
 To prepare the purchase order & distribute to the concerned person & departments.
 To develop sufficient vendors so that the supply of the material to the paint is
continued in the case of strike or lockouts with some of the vendors.

Purchase procedure of Neelkanth Steel & Agro Industries

steel

 The purchase department starts functioning with the formal request i.e. purchase
requisition (PR) from various departments to order goods or services.
 With purchase requisition, the purchase department is authorized for procuring the
goods as per the specification given in the PR slip by the date mentioned on it. The
requisitions are made triplicate. The purchase department retains original copy,
second copy is sent to stores department and the third one to accounts department.
 Having selected the vendor or the supplier, a purchase order (PO) is prepared in the
prescribed from by purchase department. Generally, 3 copies of PO are prepared.

13
Original copy is given to the supplier. Second one is retained by the purchase
department, which placed the PR & accounts department
 As soon as goods arrive, they are taken to quality control personals for checking
purpose. The purchase department has the right to reject any articles.
Thus, purchase department is responsible for efficient planning of work, effective
feedback/systematic co-ordination & combination of efforts which would result in
optimum efficiency with minimum cost.

STORE DEPARTMENT

14
This department contains of 8 peoples 1 HOD, 1 supervisor, 4 store keepers 2
helpers. Store keeping is an important function of material management.
It is a primarily services function in which the storekeeping act as a custodian of all
the items kept in the store. Store is the connecting link between the shops as work
place &the production control department. Raw material is usually referred to as
stares & the place where they kept is known as storeroom.
It contains mainly 3 types of material in store department
1. Direct raw material
2. Indirect raw material
3. Material required for maintenance department
Items of indirect raw material
 Raming mass
 Sodiumsilicate
 Boric acidmixture
 Asbeseaus sheet
 Furma drum
 Net cock
 Alluminium
 Siliicon
 Rape seed oil
 Casting powder
 Nfc(nosel filling compound)
 Collector nosel
 Fix nosel
15
 Tun board sets (there are 11 types of Tun boards)
 Laddle bricks
 Salt
Items useful for maintenance department
 Contactor
 Kits
 Coils
 Bearings
 Loose tools
 Hand griander
 Helmet
 Limit switch
 Relay
 MCB(mediator circuit braker)
 SFU(switch fuse unit)
 Emmery paper
 Bearing flew
 Star rubber
 Gland rope
 Hydrolic gear pump
 V belt
 Colors

16
 Welding rods
 Stainless steel rods
 Welding cable
 Welding holder
 White glass
 Welding screen

Functions of store department


 Receiving incoming material from receiving section.
 Classification of goods
 Identification of materials
 Placing of goods & materials in appropriate place or section
 Storing Issuing materials
 Requesting from purchasing department economical quantity of material for
delivery at the most appropriate time.
 Exercising control and quality of material received.
 Storing &protection of material against hazards, condition, weather & pilferage
 Issuing material against properly authorized material requisition.
 Maintaining adequate records or receipt & expenditure.
 Maintaining adequate stocks of material to serve production need.

NEELKANTH STEEL & AGRO INDUSTRIES STEELS follows


ABC Principal for Maintaining Stock

17
A. Item: - it is usually founds that 5 to 10% of item cost for 70-75% of the total
money. These items are stocked in smaller quantities due to high cost those they
can procure frequently.
B. Item: - these items are generally of 10 to 15% of the total items & represent 10 to
15 % of total expenditure. To control of these items is not very rigid.
C. Item: - these items are 70 to 80% of total items & 5 to 10& expenditures. These
items procured in bulks hence helps in price discount & reduce workload dose not
requires close control.
The ABC analysis helps to storage all items into above three categories

Production Department
The raw material and various components required for production comes from
store dept. There are various means through which raw material is transferred from
store dept to production dept.

There are two steps in the production

1. Production of steel blades


2. Production of TMT bars
1. Production of steel blades

18
Blades are the raw material for TMT BAR so production of blades is very
important for the company. Blades produced in mainly two categories
1) Three meter blade
2) Six mtr blade
There are various sub department just like,
1) Scrap Yard Department
2) Furnace Department
3) CCM Department
All these departments are explained as follows

19
1. Scrap Yard Department
Scrap yard department means department where trucks of raw material are
unloaded and all (scrap) raw materials is keep for operation. All material is keep
here grade wise as per their types and contains scrap yard supplies material to
furnace department as per their requirement.
There are 14 people working in Scrap yard department including, 1 HOD, 3
supervisors& 10 workers
List of installed machines in scrap yard department
1) Press machine

2) Cutting machine

3) Crain

Functions of scrap yard department


1) unload raw material trucks

2) note down the type of scrap

3) check quantity & quality of material

4) sort material as per their types & grades

5) give material to furnace department as per their requirement

20
2. Furnace Department

In common words furnace means an enclosed structure for instance heating by fire
especially for metal. There are 15-20 people are working in that department. In
furnace department all raw material is melt by heating it at 1650 degree
temperature. Furnace contains two tanks, copper coils for increase temperature,
Hydrolic system. The capacity of one tank is of 25 tons.
All that melt material is kept in furnace the quality of steel is maintain here by
adding Required contain in material & it also removes impurities from melt
material like carbon & add sponge iron, aluminum, magnize.
Furnace department supplies pure &required qualities melt steel to CCM
department for further process

21
3. CCM Department
CCM is an abbreviation of continuous casting machine they called it as cone cast

machine it produces the blades by melt steel it takes melt material with the help of

ladle it works as a transporter it carries melt iron from furnace to CCM machine.

The temperature of melt iron is near about 1590 & above

Process of CCM machine

First of all the ladle is fill from furnace then it carry with the help of Crain then it

placed at the top of CCM machine ,the ladle has a nosel at bottom that nosel is

open in teddies , All material is fill in teddies then nosel is opened the tendis has 2

nosel both are opened simultaneously then the melt iron is goes to molult tubes

hear the cooling process takes place then the blades comes out of machine on

rollers here we can cut it as per size required with the help of gas cutter

Now the blades are ready for production of TMT Bar

22
2. Production of TMT bar
In production of TMT Bar blades are used as a raw material. There are several
stages in production of TMT Bar these are as follows
23
 Blades are kept in furnace at 1200degree temp.
 Then these blades are goes through rolling stands by which blades become smaller
and smaller that process is done certain times
 Then it goes to Thermex process for instant cooling by which bars become more
harder & strong
Manufacturing Process
 Raw materials undergo visual examination and chemical analysis
 Once cleared, they are cut into the required sizes.
 Materials pass through the preheating and soaking zones in the furnace and non
attaining the required temperature
 Conveyors are used to feed the materials to Roughing Mill, specific to bar
diameter.
 After the exit, the materials are fed to the Finishing Mill for manufacturing small
diameter bars. Materials obtained from Finishing Mills then pass through the
cooling system with predetermined cooling parameters to produce TMT bars.
 The treated bars are left on the cooling bed to acquire the desirable mechanical
properties through tampering of the water quenched surface.
 The bars then pass through shearing machine to cut them into desired lengths.
 Quality testing is done as per the defined norms.
 Afterwards, the bars are bent, bunched, tagged and stored for dispatch.

24
Production Procedure
1. MELTING
At this stage the direct reduced iron (D.R.I.) is melted in a furnace and there after
refined to produce Steel Ingots/ billets of desired chemical composition to ensure
the quality and purity of Steel Ingots/ billets.
2. REHEATING AND ROLLING
The Billets are then heated in a micro processor based PLC controlled hearth
furnace and is rolled through a series of mill stands which progressively reduce the
billets to the final size and shape of reinforcing bars.
3. QUENCHING
As soon as the bar leaves the final mill stand, it is rapidly and vigorously cooled
from 1250°C to the optimal temperature. It is done in a completely automated
quenching box made with T & Q technology from GERMAN, where the product
undergoes a uniform surface hardening treatment to form a hardcore martensitic
layer, which provides the steel it strength along with adhesive layering.
4. SELF-TEMPERING
The rebar leaves the quenching box with the temperature gradient through its cross
section, the temperature of core being higher than that of the surface. This allows
heat to flow from core to the surface, resulting in tempering of surface, giving a
structure called Tempered Martensite, which is strong and tough. The core is still
austenitic at this stage.
5. ATMOSPHERIC COOLING
The last stage takes place while the product lies on the cooling bed where the bar is
subjected to normal air-cooling reduced to ambient temperature. The austenitic
core is then transformed to a ductile ferrite- pearlite core. Thus, the final structure
consists of a combination of strong outer layer of tempered Martensite and a
ductile core of ferrite-pearlite.
6. FINAL TESTING & INSPECTION
We do needful inspection and laboratory testing of the products.
7. DISPATCH
25
After the inspection of products, we dispatch according to customers requirements.

The Basic Function of Production department


 To prepare production planning according to marketing department’s requirement (
Order)
 To prepare material requisition plan.
 To control the shop floor activities.
 It forms co-ordination with services
 It prepares the plan for achieving the targets.
 It reduces the inventory cost.
 It follows the J.I.T. ( Just In Time ) Principle

26
Quality Check Department

Quality Assurance
Neelkanth Steel & Agro Industries Steels is committed to achieve excellence in its
entirety. The company has been certified with ISO 9001:2000 for its quality
management system at par with global standards. Besides, there is a well audited
quality system to ensure the international quality standards on continuing basis.
Quality Control
Neelkanth Steel & Agro Industries Steels is firmly determined to offer products,
which are in-compliance with international quality standards. To ensure the same,
stringent quality control measures are followed at entire business operation. There
is an in-house quality testing section equipped with highly advanced quality testing
equipment. Experienced professionals from in-house Quality Assurance and
Control (QA & C) department conduct testing for each product on different
parameters.
Quality Testing
Following quality testing steps are applied:

27
1. Chemical Analysis
Materials are tested for various constituents using sophisticated equipment like
optical emission spectrometers, all with different combination of bases. All the
spectrometers are standardized before application. It is ensured to use right metal is
used in process systems.
2. Mechanical Testing
A team of highly qualified and skilled personnel in combination with state-of-the-
art quality testing equipment undertakes complete testing like:
Impact Testing
Premium quality impact testing machines are capable to conduct impact test up to
minus 196 Degree C.
Tensile Testing
Universal Testing Machine is used to test the metals with strength up to 1000 kN.
TMT bars can be tested up to 30 mm capacity as per IS 1786 without machining.
Hardness Testing
There a host of Hardness testing equipment duly calibrated by internationally
known auditors.
Micro Structure Testing
Micro structure testing is done through Image Analyzer.
Corrosion Testing
IGCT tests are carried out as per ASTM standards. Corrosion test like salt spray is
also done.

28
Plant Engineering Department

This department mostly deals with maintenance, cleaning, and timely inspection
lubrication so as to provide provides proper & continuous working of machinery.
OBJECTIVES OF MAINTENANCE DEPARTMENT
 Minimize breakdown time
 Utilization of optimum capacity
 To keep the life of the equipment
 To ensure the highest availability
 To modify the machine tools and other production facility
 Economy in performing the maintenance activities
 Ensure safety
 Improve productivity

Types of maintenance
1. Preventive Maintenance
It consist of routine actions in a planned manner should prevent break down & to
ensure operation efficiency if this periodic inspection (weekly) is carried out. It is
based on principal.
“PREVENTION IS BETTER THAN CURE”
Objectives
a) To minimize the possibility of unanticipated production interruption.

29
b) To make plant equipment &machines always available & ready for use.
c) To ensure safety of life of employee.
d) To reduce the work content of maintenance job.
2. Predictive / Scheduled Maintenance
The aim of this is to minimize breakdown. This system provides for inspection,
overhaul, lubrication & servicing of certain machine, cleaning of tanks & white
washing if building is normally done in this manner. This type of maintenance
utilizes the ideal time of equipment without much disturbance schedule.
Objectives
1. Reduce the down time during repairs
2. Breakdown is minimized
3. Machine run at higher-level efficiency
4. Predetermination of date of commencement of work ensures to plan the work load
& distribution of maintenance work.
3. Breakdown maintenance
In this the request are made after the equipment fails to perform its normal
function.
Causes: -
1. Failure to replace worn out parts
2. Lack of lubrication
3. Neglected cooling system
4. In difference towards minor faults
5. External factors like wrong fuel
6. Indifference towards equipment mismanagement / handling

30
Accounts Department

“Money has time value”

Something must direct the how at economic activity and facilities its smooth
operation with accounts is the agent that produce this descent. The account section
basically deals with commercial details and problem in the factory. The account
section also has work or issuing payments. Supplying finance for the purchase of
raw materials has to collect the money form outward store and dispatch zone form
where the manufactured product had been sold.

As we know this department is depends upon the cash. Accounts department is the
department is Control Company’s financial transactions and it controls inventory
also

Functions
1. Maintaining cash & bank transaction.
2. Payment of salary & wages
3. Arrangement of proper working capital
4. Making stationary payments
5. Maintenance of all bank accounts and their recons illation
6. Deposit of checks receive from customer
7. Proper capital structure from customer
8. Proper utilization of resources
9. Wealth & profit maximization
10. Funds management & preparation of monthly forecast

31
Human Resource Department

“Utilization of manpower effectively “

Human needed desire, expectation etc. are changing constantly because of the
change in environment condition. This happens mainly because of the presence of
these factors of influence heart, brain & mind. Human beings needed to be
maintained at every cost. They are considered as through individuals which varied
characteristics, attitude etc
Management is to “MANAGE - MEN – TACTFULLY”. Through there are other
major organizational function such as financial management, production
management, material & marketing management etc. it is undoubtedly the
management of the human resources that provides all other organizational
function.

32
So summarized that human resources department is that part of the total
management of an organization which specifically deals with human resources in
respect of:

a) Their procurement
b) Their Development in terms of skills, knowledge & attitude
c) Their Motivation towards the attainment of organizational objective by creating
and maintaining an organizational limit conducive to such development.
Function of human resources department
Employment
 To cultivate & maintain adequate source of labor supply
 To get information regarding job requirements & prevailing wages rate
 To hire through the effective use of application blanks, tests, physical
Examinations, interviews & checking references, records, Supervisor’s approvals.
 To maintain words of prospective employers, present employers & former
employees.
 To introduce the new employee to company policies & his supervisor him up for
on early adjustment.

Training
 To aid in the formulation of policy governing training of new employees.
 To provide for training in safety & company policies.
 To co-operate in the preparation of a special annual report for employee.
Wages & Other Incentives
 To collaborate with others or be responsible for wage plan.

33
 To write job specification & evaluate all jobs.
 To participation in the formation of policies governing payment for suggestions,
pension plans profit-sharing programs, mutual saving program, insurance, loan to
employees.
1) Service Activities
 To supervise restaurant & recreation facilities.
 To provide counseling concerning personal affairs.
 To publish the plant magazine.

2) Collective Bargaining & Employees Representation


 To conduct union negotiation & to co-operate with union representatives.
 To co-operate neither with an employer’s job which is nor on union level.
 To participate actively in handling grievances.

34
MARKETING & SALES

At Neelkanth Steel & Agro Industries steel pvt ltd, the marketing & sales
department handles the sales coordination work for a product. There are no
separate personnel to handle sales coordination functions; they are handled by the
marketing executives. Head of sales controls the department.
The personnel handling the sales coordination shall coordinate with the production
houses, for the availability of the material on day-to-day basis.
Sales requirement & dispatches statement are prepared by the sales coordination
executives from the demand file given by the manager [Marketing & sales], after
planning for that particular month.
Sales requirement is updated or changed or added or reduced in the statement as
per the notification given by the general manager, this helps the production to be
flexible. Dispatches are updated in a statement on the basis of daily dispatch report
available with the stores section.
The core marketing team performs the following activities such as –
1. Order processing
2. Sales-coordination
3. Dispatch
4. Stock handling
5. Excise & invoicing
6. Production planning
7. Packing
8. Quality assurance
9. Complain handling
10. System walkthrough

35
A] MARKETING DEPARTMENT

1. To prepare the contract review


2. To prepare quality records
3. Appointments of dealers or agents
4. Order amendment
5. Quality plan & policies
6. Customer verification
7. Delivery of goods
8. Regulatory requirements
9. To look after factory items
10. To prepare procedure for acceptance& disposal of rejected goods.

36
SWOT Analysis

Strengths and Weaknesses


Strengths
 The company has strong Research and Development dept. for product and new
technology.
 The company has many Bank facilities like long credit time and other facilities.
 The company has qualified and experience Human Resource for selection and
recruitment.

Weaknesses
 The company has low production as compare to its demand in the Market
 The company has less man power according to the work.

Opportunities
 Large and growing market the available to the company is very large continuously
growing.
 The company has maintained growth from last many years.
 As the population increase the demand of product will increase.

Threats
 There are many competitors in the market.
 The Indian market is the main market of the company but it is very unstable.

There are so many other factors like environment, political and


regional.
37
Conclusion

 Neelkanth Steel & Agro Industries steel having the good human resource. The
entire employees in the company are well trained and qualified in to the work.
 All the departments are well established and fulfill the need of the employee. So
the work environment is very good.
 The company is doing well in the market but have to increase its production level.
The machinery used in production is updated.
 Neelkanth Steel & Agro Industries steel is produces TMT Bar in different sizes.
This company has the large share in the market. It is having more turn over
comparing then other companies.
 Neelkanth Steel & Agro Industries steel has the one major competitor TATA steel it
is also an Indian company.
 P.P.C. department makes the production plane for the month and gives to the
Production Department and TMT bars are made and distributed in the market.

38
Suggestions
Neelkanth Steel & Agro Industries steel should develop managerial skill
particularly to identify the weaker section to reach the benefits the social and
economic objects.
Neelkanth Steel & Agro Industries steel must play prominent role in financing
which may result in rising level of income and employment.
The present official staff of Neelkanth Steel & Agro Industries steel can be given a
suitable management training that modern management concept and management
technologies can be utilized in the day to day business of Neelkanth Steel & Agro
Industries steel for the further improvement.