Hi Eugene,

Here are the comments for few adjustments:

The Geometric data plot is blank, I just don’t know to turn ons GIS data if you are using them. In those
plot it will show the new alignment of the waterway.

Since it is a new alignment our river bed elevation is a straight line by connecting the river bed elevation
downstream where we connect to the existing river bed to the start of the re-alignment river bed. Check
above for the start is a low elevation than the downstream end. Our bed elevation is more or less the
blue but check the start and end bed elevation and connect.
GreenCity Plan: planV1 01/07/2018
Legend

WS 50- yr Flood
WS 100 - yr Flood
Ground

Bank Sta
25.13 12.71
41
55.65
63.56
76.27

88.99
117 101.70
133
149.08
177.72
152.93

165.12

191.35

202.86

If above is corrected this will change also.

Missing station 0 the last station downstream. Round up stationing to the nearest one decimal say
above “12.7”
River Q Min W.S. Crit E.G. E.G. Vel Flow Top
Reach Sta Profile Total Ch El Elev W.S. Elev Slope Chnl Area Width
Froude
(m3/s) (m) (m) (m) (m) (m/m) (m/s) (m2) (m) # Chl
50- yr
ReachV1 202.86 Flood 312.5 50 57.35 57.38 0.000114 0.78 402.08 117.93 0.13
100 - yr
ReachV1 202.86 Flood 357.94 50 57.67 57.7 0.000115 0.81 439.88 120.5 0.14

50- yr
ReachV1 191.35 Flood 312.5 50.87 57.04 57.35 0.001416 2.49 125.55 41.28 0.46
100 - yr
ReachV1 191.35 Flood 357.94 50.87 57.33 57.67 0.001446 2.6 137.8 43.22 0.46

50- yr
ReachV1 177.72 Flood 312.5 51 56.93 57.32 0.001995 2.78 112.44 40.83 0.53
100 - yr
ReachV1 177.72 Flood 357.94 51 57.22 57.64 0.00199 2.87 124.67 43.11 0.54

50- yr
ReachV1 165.12 Flood 312.5 50.96 56.88 57.29 0.002054 2.86 109.12 38.51 0.54
100 - yr
ReachV1 165.12 Flood 357.94 50.96 57.16 57.61 0.002072 2.98 120.28 40.4 0.55

50- yr
ReachV1 152.93 Flood 312.5 51 56.73 57.26 0.00218 3.2 97.51 29.16 0.56
100 - yr
ReachV1 152.93 Flood 357.94 51 56.98 57.57 0.002647 3.39 105.49 33.98 0.61

50- yr
ReachV1 149.08 Flood 312.5 50 56.9 57.18 0.000895 2.35 133.14 32.69 0.37
100 - yr
ReachV1 149.08 Flood 357.94 50 57.16 57.48 0.001078 2.52 142.27 36.47 0.41

50- yr
ReachV1 133 Flood 312.5 50 56.88 57.17 0.000903 2.35 132.71 32.65 0.37
100 - yr
ReachV1 133 Flood 357.94 50 57.14 57.47 0.001186 2.52 142.16 39.43 0.42

50- yr
ReachV1 117 Flood 312.5 50 56.87 57.16 0.000912 2.36 132.26 32.61 0.37
100 - yr
ReachV1 117 Flood 357.94 50 57.13 57.45 0.001204 2.53 141.42 39.38 0.43

50- yr
ReachV1 101.7 Flood 312.5 50.5 56.68 57.12 0.001709 2.96 105.51 29.75 0.5
100 - yr
ReachV1 101.7 Flood 357.94 50.5 56.89 57.41 0.001894 3.2 112.03 30.4 0.53

50- yr
ReachV1 88.99 Flood 312.5 50.87 56.54 57.09 0.002552 3.27 95.52 31.87 0.6
100 - yr
ReachV1 88.99 Flood 357.94 50.87 56.76 57.37 0.002996 3.48 102.9 35.62 0.65

50- yr
ReachV1 76.27 Flood 312.5 50 56.71 56.98 0.001138 2.32 134.75 41.76 0.41
100 - yr
ReachV1 76.27 Flood 357.94 50 56.95 57.26 0.001228 2.47 144.8 43.21 0.43
50- yr
ReachV1 63.56 Flood 312.5 49.5 56.73 56.96 0.000922 2.1 148.9 45.67 0.37
100 - yr
ReachV1 63.56 Flood 357.94 49.5 56.97 57.23 0.001013 2.24 160.15 48.1 0.39

50- yr
ReachV1 55.65 Flood 312.5 50 56.6 56.94 0.00143 2.58 121.04 37.31 0.46
100 - yr
ReachV1 55.65 Flood 357.94 50 56.82 57.2 0.001709 2.76 129.87 41.85 0.5

50- yr
ReachV1 41 Flood 312.5 50 56.59 56.91 0.001636 2.53 123.34 43.95 0.48
100 - yr
ReachV1 41 Flood 357.94 50 56.81 57.18 0.001802 2.68 133.59 47.28 0.51

50- yr
ReachV1 25.13 Flood 312.5 50 56.62 56.87 0.001344 2.24 139.51 52.47 0.44
100 - yr
ReachV1 25.13 Flood 357.94 50 56.85 57.13 0.001448 2.36 151.93 56.19 0.46

50- yr
ReachV1 12.71 Flood 312.5 50 56.66 54.72 56.83 0.001001 1.86 168.03 68.24 0.38
100 - yr
ReachV1 12.71 Flood 357.94 50 56.9 55.09 57.09 0.001 1.94 184.65 70.33 0.38

Compare your velocity with the original HEC-Run, the difference should not be so noticeable to avoid
possible damage to properties downstream during flood season.

Just call me for verifications,

Regards,

Gilia