                                                                              DMR Trunking System Coverage & Traffic Capacity Planning 

 
 
System Coverage & Traffic Capacity 
Planning 

Product Type Technical Description 

Version  Date  Author  Approved By  Remarks 

V1.00  2011‐5‐26    Hytera  Not open to the Third Party 

         
   

© 2011 Hytera Communications Co., Ltd. All rights reserved. 
Hytera  CONFIDENTIAL:  This  document  contains  proprietary  information  of  Hytera  and  is  not  to  be 
disclosed or used without the prior written permission of Hytera. 
Due to update and improvement of Hytera products and technologies, information in this document is 
subjected to change without notice. 

  1 / 6 
                                                                                Hytera Confidential Proprietary 
 
                                                                              DMR Trunking System Coverage & Traffic Capacity Planning 

System Coverage & Traffic Capacity Planning 
 

Coverage Planning 
 
The number of sites is based on the coverage requirement. 
 
We  here  at  Hytera  are  in  possession  of  computer  software  that  can  predict  the 
coverage from known sites. This method would be used in our evaluation to provide 
customer  with  a  reasonably  good  appreciation  of  coverage  of  proposed  sites, 
however,  the  result  of  coverage  prediction  is  for  reference purpose  and  a  coverage 
test  on  site  will  be  carried  out  after  completion  of  system  installation  as  per  the 
requirement of tender document. 
 
Take an example of coverage evaluation by software simulation. 
The map above is customers’ required coverage area for a multi‐site DMR trunking 
system. 
The base station is required to be 50W. The trunking terminal is 5W portable radio. 
 

 
 
 

  2 / 6 
                                                                                Hytera Confidential Proprietary 
 
                                                                              DMR Trunking System Coverage & Traffic Capacity Planning 

 
This is the related elevation map which is the theoretical foundation for the software 
simulation. In this case, the trunking system is for the Fire Brigade so that all the sites 
are located in high altitude which is very good for the RF coverage. 
 

 
   

  3 / 6 
                                                                                Hytera Confidential Proprietary 
 
                                                                              DMR Trunking System Coverage & Traffic Capacity Planning 

From all the available location of sites, we select necessary 7 sites for covering the 
required area. 
 
The MAX RF output power of DMR trunking base station is 50w, which is much larger 
than portable radios (MAX 5w). As a result, the limitation for the RF communication 
direction  is  up‐link.  In  order  to  ensure  reliable  communication  coverage,  the 
coverage simulation is for portable radio up‐link.     
 
The  simulated  coverage  is  assumed  to  be  at  street  level,  in  light  building  areas.  No 
guarantee is given for areas densely populated with building structures. 
The areas coloured Green in the coverage prediction plots indicate the portion of the 
mobile radio service area that is predicted to have a level of ‐95dBm or better at 95% 
area reliability, which is thought to be acceptable for voice communication. 
 

   

  4 / 6 
                                                                                Hytera Confidential Proprietary 
 
                                                                              DMR Trunking System Coverage & Traffic Capacity Planning 

Traffic Capacity Planning 
For  each  site  (base  station),  the  number  of  channel  is  configured  according  to  the 
traffic capacity. 
 
And the traffic capacity is related with the number and usage of customers. 
 
In order to calculate the traffic load, the following information is needed: 
 

Number  Item 
1  Acceptable subscriber queuing time 

2  Mean Talking Time For Each Call 

3  Max numbers of subscribers for each base station

4  How many calls per user per hour in the system 
 
After  knowing  of  these  information,  we  can  plan  the  number  of  channels  for  the 
users. 
 
For example, if the user number and usage is as below: 
 

Number  Item  Value 


1  Acceptable subscriber queuing time  7 seconds 

2  Mean Talking Time For Each Call  10 seconds 

3  Max numbers of subscribers for each base station 400 

4  How many calls per user per hour in the system  2 

5  Erl  3.33 
 
We could calculate that the total Erl for this base station is 3.33. 
 
In this case, for this base station, the figure which describes the relationship between 
the  call  rejection  rate  (queuing  time>7s)  and  Number  of  traffic  channels  shows  as 
below: 
   

  5 / 6 
                                                                                Hytera Confidential Proprietary 
 
                                                                              DMR Trunking System Coverage & Traffic Capacity Planning 

 
From  our  experience  of  communication  system,  5‐10%  of  call  rejection  rate  is 
normally acceptable. And the figure shows that the required traffic channel is about 
5 to 6 when 5% of call rejection rate. 
 
As a result,  for each base station,  we recommend to use  3‐carrier  system (5 traffic 
channels) for this base station. 