Introduction
This is method statement for present the bored pile works of PREK HO Bridge.
The following articles describe the work items concerning the work procedure, quality control.
1. Scope of Work
3. Construction Process
4. Main Machinery
Take out temporary Inspect the concrete level Vibro service Crane,
casing Measuring tape, DM, or
Theodolite
6. Cycle time
PREK HO Bridge