Professional Documents
Culture Documents
Satisfactory completion of task: when all relevant aspects of the tasks, governed by the
following principles, are demonstrated:
● adequate preparation of the patient and the tools for the procedure
OBSERVE STERILITY
3. Effective Hand washing
4. Put on sterile gloves
5. Open second layer of cloth covering catheter set aseptically
TECHNIQUE
6. Test balloon of catheter
Prepare/ check lignocaine gel
Fill syringe with 8 ml of water
Drape worksite (over penis and under buttock )
Place kidney dish containing soaked swabs in between patient’s legs
7. Clean surgical site with saline / chlorhexidine in water (NOT in alcohol)– retract prepuce
and clean meatus and glans of penis .
8. Squeeze local anaesthetic gel into urethra, squeeze of penis to prevent anaesthetic gel
from flowing out. Wait for 5 minutes
TIP ( If local anaesthetic gel is not available ,it may be prepared by mixing 2-3 ml 2%
lignocaine with 5 ml KY gel in the a gallipot . The mixture is then sucked up in a syringe .)
CONCLUSION
15. Retract foreskin
16. Clean patient – gel / urine etc
17. Remove drapes
18. Tape catheter to thigh
19. Clear equipment
20. Document procedure
REMOVAL
1 Inform patient
2 Wash hands
3 Wear clean gloves
4 Deflate balloon by syringing out the sterile water
5 Gently pull out the catheter
6 Dispose used items in clinical bag
7 Remove gloves and dispose in clinical bag
8 Wash hands
9 Document