CASE STUDY

GYRODATA DELIVERS SUPERIOR PERFORMANCE


IN THE PERMIAN, SETS NEW DRILLING RECORD
▶ TECHNOLOGY INDUSTRY CHALLENGE + OBJECTIVE
- GyroDrill - Performance Motor

- MagGuide - Mud Pulse (MP) MWD A major operator had a 8 well campaig n in the Wolfcam p A zone
withi n the Permian Basin and was proactively seeking o p p ort unitie s
▶ APPLICATION to i mprove overall drilling performance.
- D rilling O ptimiza ti o n
T hi s fo rmation is characterized by thick undulating layers of vary ing
- One - Ru n S oluti o n
ro c k type, therefore the selected drilling equipment and p roce d ure s
▶ LOCATION mus t be optimized to extend tool life while maintaining a d if fe re ntial
- Pe rmian Basin ( We s t Texa s ) pres s ure that maximizes ROP.

TECHNOLOGY + SERVICE SOLUTION

Gyrodata enlisted one of its directional drilling teams with extensive experience in this basin and configured
a BHA featuring the 63/4" GyroDrill performance drilling motor, MagGuide MP MWD, and Ulterra U616 PDC bit
to deliver both superior performance and efficiency.

The GyroDrill motor was selected for this project as it has drilled over two million feet in the Permian Basin
and continues to raise the bar in reliability with a 99% successful run rate and 98.5% operating efficiency.

RESULT + VALUE DELIVERED


8 CONSECUTIVE ONE - RUN LATERALS

9,000
170
166
□ □ 8 horizontal sections were successfully drilled in one-
8,476
run with improved ROP as the campaign progressed. 8,323

7,940
□ □ The project was completed several days ahead of 8,000
7,733 7,742
7,778
7,704

schedule, saving the operator significant rig time 7,565

and associated costs.


124

□ □ The 81/2” lateral (7,704 ft) of the final well was 7,000
109

completed in less than 46.5 hours, and with an 101

average ROP of 166 ft/hr. This was the fastest


99
106
94

conventional lateral drilled to date in the Permian 89

Basin - setting a new record for performance in the 6,000


85
4
area. Well 1 2 3 5 6 7 8

Footage Drilled in Lateral (ft) Avg ROP (ft/hr)

CUSTOMER TESTIMONIAL

“Thank you for your outstanding performance on this (well and rig). This is the fastest conventional lateral
that I am aware of in the Permian Basin. I b elieve yo u r dire c tio n al to ols a n d dire c tio n al exp e r tise we re th e
co ntrib u tin g fa c to r s to o u r su cces s .”

- Drilling Supervisor

w w w. g y ro d a ta .c o m
Updated December 2016. Copyright © Gyrodata, Inc 2016