Encana

Deep
Panuke

Working for Encana Corporation, on


this project Offshore Nova Scotia, we
Client:
demonstrated our capabilities in project
Encana Corporation delivery and innovations.
Location: We have been contracted to perform the Engineering,
44km West of Sable Island Procurement, Commissioning and Installation (EPIC) of the
Infield Flowlines and Umbilicals between the subsea trees and
and 250km south east of
the Production Field Centre (PFC). Additionally, a 22-inch SSIV,
Halifax, Nova Scotia
including protection structure, will also be installed between
the PFC and the gas export pipeline.
Project Type:
SURF Demonstrating our commitment to continual innovation, we
developed a new solution to install metallurgically bonded clad
pipe and solid CRA pipe from the Acergy Falcon - a new first
for us.

seabed-to-surface
Encana Deep Panuke

January 2011
Project Overview
Encana Deep Panuke The Encana Development consists of subsea wells delivering
fluids to a PFC. Topside facility will then deliver gas via a
Client gas export pipeline to Goldboro, Nova Scotia. This is then
Encana Corporation connected to the M&NP main transmission pipeline.

Location Our scope of work on this project includes the engineering,


44km West of Sable procurement, installation and commissioning of four
Island and 250km production flowlines, one acid gas injection flowline, and five
south east of Halifax, control umbilicals between the subsea trees and the PFC.
Nova Scotia This includes insulating and burying the production flowlines.

Project Type The four production flowlines are 8-inch in diameter with
SURF lengths varying between 5.9km to 0.6km. The total length of
the four production flowlines is approximately 14.7km.
Aerial of the strait of Canso superport
Date Awarded
The acid gas injection flowline is 3-inch diameter and
2008
approximately 1.7km in length. This flowline transports acid
gas from the PFC to the injection well for disposal and is solid
Date Completed
CRA material.
-
Due to the corrosive nature of the produced fluids, the
Vessels/Spoolbases flowlines transporting them from the subsea trees to the PFC
Utilised will be clad in CRA material. We will also use an austenitic
Acergy Falcon weld consumable to prevent pipe cracking.
Acergy Discovery