SR NO DESCRIPTION NO
Clearing and grubbing road land including uprooting rank vegetation grass
bushes,shrubs,sapling and trees girth up to 300 mm removal of stumps of trees cut
1 1
earlier and disposal of unserviceable materials . Rate also includes disposal of
unserviceable materials from the site up to lead & lift as directed by EIC.
Excavation for foundation of structures in all soils including dewatering, shoring and
strutting as necessary and backfilling the trenches with suitable excavated material in
layers of 15 to 20 cms and disposing of remaining unsuitable material with all lifts and
lead, dewatering if required, as directed and preparation of bed for concreting of
foundations etc. complete as directed by Engineer and as per specification.
RAFT 1
2 RAFT 1
RAFT 1
RAFT 1
KEY 1
KEY 1
Total
Providing and laying in situ M-15 grade PCC in foundation / R.C.C Raft wall ,Retaining
wall, Toe wall and Guide wall including dewatering, shuttering, mixing in mechanised
batch mix plant, compacting, curing etc. complete true to level and position as
3 directed by Engineer and as per specification.
RAFT 1
Providing and laying M-30 grade Controlled Reinforced Cement Concrete for cast-in-
situ Foundation ,Rafts,. at any height or depth as per approved design and drawings,
with necessary centering, shuttering, mixing in mechanised weigh batcher,
scaffolding, transporting, placing, compacting by mechanical vibrators, finishing, curing
and casting, dewatering if necessary as per drawing etc. complete excluding
reinforcement as directed by Engineer and as per MORT&H Specification 1500, 1700
2100, 2200 & 2300.
RAFT 1
4
RAFT 1
RAFT 1
4
RAFT 1
RAFT 1
RAFT 1
RAFT 1
CREST 1
Total
Providing and laying M-30 grade Controlled Reinforced Cement Concrete for cast-in-
situ piers, abutments, return wall, etc. at any height or depth as per approved design
and drawings, with necessary centering, shuttering, mixing in mechanised weigh
batcher, scaffolding, transporting, placing, compacting by mechanical vibrators,
finishing, curing and casting, dewatering if necessary, finishing with decorative panel
as per drawing etc. complete excluding reinforcement as directed by Engineer and as
5 per MORT&H Specification 1500, 1700 2100, 2200 & 2300.
PIER 9
ABUTMENT 2
RETAINING WALL-1 4
RETAINING WALL-2 2
Total
Providing and placing in position FE 500 HYSD TMT Bar
Reinforcement as per I.S. Standard for R.C.C
Raft,Piers,Abutments,Retaining wall,Top Slab , Kerb,Approach
Slab,Cut off,Footpath including cutting bending hooking and
tying complete as per detailed drawing.
6
RAFT 1473.855
PIER 336.99
Total
70 30 1 0.21 Hectare
70 1 0.4 28 Cum
2028.43 Cum
30
1 1 44.21565 Mton
Kg/Cum
60
1 1 20.2194 Mton
Kg/Cum
64.43505 Mton
6 0.833 1.5 45 MT
WEIR ESTIMATE WITHOUT GATE
SR NO DESCRIPTION
QUANTITY
Clearing and grubbing road land including uprooting rank vegetation grass
bushes,shrubs,sapling and trees girth up to 300 mm removal of stumps of trees cut
1 earlier and disposal of unserviceable materials . Rate also includes disposal of
unserviceable materials from the site up to lead & lift as directed by EIC.
0.21
Excavation for foundation of structures in all soils including dewatering, shoring and
strutting as necessary and backfilling the trenches with suitable excavated material in
2 layers of 15 to 20 cms and disposing of remaining unsuitable material with all lifts and
lead, dewatering if required, as directed and preparation of bed for concreting of
foundations etc. complete as directed by Engineer and as per specification.
2028.43
Providing and laying in situ M-15 grade PCC in foundation / R.C.C Raft wall ,Retaining
wall, Toe wall and Guide wall including dewatering, shuttering, mixing in mechanised
3 batch mix plant, compacting, curing etc. complete true to level and position as
directed by Engineer and as per specification.
294.00
Providing and laying M-30 grade Controlled Reinforced Cement Concrete for cast-in-
situ Foundation ,Rafts,. at any height or depth as per approved design and drawings,
with necessary centering, shuttering, mixing in mechanised weigh batcher,
4 scaffolding, transporting, placing, compacting by mechanical vibrators, finishing, curing
and casting, dewatering if necessary as per drawing etc. complete excluding
reinforcement as directed by Engineer and as per MORT&H Specification 1500, 1700
2100, 2200 & 2300.
1473.855
Providing and laying M-30 grade Controlled Reinforced Cement Concrete for cast-in-
situ piers, abutments, return wall, etc. at any height or depth as per approved design
and drawings, with necessary centering, shuttering, mixing in mechanised weigh
5 batcher, scaffolding, transporting, placing, compacting by mechanical vibrators,
finishing, curing and casting, dewatering if necessary, finishing with decorative panel
as per drawing etc. complete excluding reinforcement as directed by Engineer and as
per MORT&H Specification 1500, 1700 2100, 2200 & 2300.
336.99
Providing and placing in position FE 500 HYSD TMT Bar Reinforcement as per I.S.
Standard for R.C.C Raft,Piers,Abutments,Retaining wall,Top Slab , Kerb,Approach
6 Slab,Cut off,Footpath including cutting bending hooking and tying complete as per
detailed drawing.
64.43505
Providing & fixing in position structural steel/ chequered plate including
7 fabrication by cutting, welding and one coat of red oxide both side etc.
complete. (for stoplog) Weight in Metric Tonne
45
TOTAL RATE
UT GATE
UNIT SOR
UNIT RATE TOTAL RATE
ROAD
CONSTRUCTION
DEPARTMENT SR
NO 2.3
Hectare 47510 9,977.10
ROAD
CONSTRUCTION
DEPARTMENT SR
NO 304 3.13(v)
ROAD
CONSTRUCTION
DEPARTMENT SR
NO 12.8
Cum 4109 1,208,046.00
ROAD
CONSTRUCTION
DEPARTMENT SR
NO 12.8G
ROAD
CONSTRUCTION
DEPARTMENT SR
NO 13.5 G
ROAD
CONSTRUCTION
DEPARTMENT SR
NO 12.4
MT 55695 3,588,710.11
Rate of South
Zone Circle Item-
35 Chapter-8
Page-160 of
SSNNL GUJARAT
MT 86000 3,870,000.00
17,900,805.19