MATERIAL QUOTATION

Ground Floor
Sl. Description of Work
No.
1 Earth work excavation in Loose Soil
Basement excavation-side trimming
2 Earth work excavation in Hard soil (manual)

3 PCC 1:5:10 mix for foundation using 1.5" metal

4 Labour charges for rcc1:1 1/2:3 mix


a) Column footing
b) Column
c) Plinth Beam
d) Lintel Beam
e)Sunshade
f) Roof Beam
g) Roof Slab-Sq ft

5 Fabrication of Reinforcement steel

6 Basement side filling with Well Gravel

7 Brick work in CM 1:6 mix - 9"tk


4 1/2'' brickwork
8 Brick steps / Plinth base with CM 1:5 mix incl. plastering

9 Flooring concrete PCC 1:4:8 - 4.5" thick

10 Inside wall plastering with CM 1:5 mix

11 Outside wall plastering with CM 1:5 mix

12 Ceiling plastering with CM 1:3 mix


including hacking
13 Granolithic floor finish

14 Staircase hand rails with MS pipes

15 Supplying & fixing of Aluminium Window with grill

16 Supplying & fixing of Rolling Shutter& Steel door with one coat primer

17 One coats of white wash for internal & external walls and ceiling
Door window fixing Sq ft
Lifting charge per floor
15.12.11
Rate Rate Rate afer
5%
per Rs. ps finalised 5%
6.50 6.50 7.50 0.375 7.125
on actual labour
8.00 8.00 9.00 0.450 8.550

15.00 90.00 16.50 0.825 15.675

60.00 170.00 23.00 1.150 21.850


110.00 250.00 23.00 1.150 21.850
110.00 250.00 23.00 1.150 21.850
120.00 250.00 25.00 1.250 23.750
55.00 180.00 28.00 Cf 1.400 26.600
120.00 275.00 nA
65.00 275.00 NA

7000.00 56000.00 6500.00 325.000 6175.000

5.00 14.00 6.00 0.300 5.700

25.00 138.00 23.00 1.150 21.850


14.00 0.700 13.300
13.00 150.00 26.00 Cf 1.300 24.700

8.50 45.00 8.50 9.00 0.425 8.075

10.00 24.50 10.00 0.500 9.500

12.00 26.00 10.00 0.500 9.500

12.00 26.00 11.00 0.550 10.450


2.00 0.00
22.00 57.00 24.00 1.200 22.800

280.00 280.00 0.00 0.000

425.00 425.00 0.00

200.00 200.00 0.00

1.50 4.50 1.75 0.088 1.663


27.5 25.00 1.250 23.750
10% 0.005 0.095
MATERIAL QUOTATION
Ground Floor
Sl. Description of Work
No.
1 Earth work excavation in Loose Soil

2 Earth work excavation in Hard soil (manual)

3 PCC 1:5:10 mix for foundation using 1.5" metal

4 RCC 1:1.5:3 mix, Using 3/4" tk. jelly including the cost of centering & concreting
a) Column footing
b) Column
c) Plinth Beam
d) Lintel Beam
e)Sunshade
f) Roof Beam
g) Roof Slab-Sq ft

5 Fabrication of Reinforcement steel

6 Basement side filling with Well Gravel

7 Brick work in CM 1:6 mix - 9"tk

8 Brick steps / Plinth base with CM 1:5 mix incl. plastering

9 Flooring concrete PCC 1:4:8 - 4.5" thick

10 Inside wall plastering with CM 1:5 mix

11 Outside wall plastering with CM 1:5 mix

12 Ceiling plastering with CM 1:3 mix


Hacking
13 Granolithic floor finish

14 Staircase hand rails with MS pipes

15 Supplying & fixing of Aluminium Window with grill

16 Supplying & fixing of Rolling Shutter& Steel door with one coat primer

17 One coats of white wash for internal & external walls and ceiling
Door window fixing Sq ft
Rate
per Rs. ps
6.50 6.50

8.00 8.00

15.00 90.00

60.00 170.00
110.00 250.00
110.00 250.00
120.00 250.00
55.00 180.00
120.00 275.00
65.00 275.00

7000.00

5.00 14.00

25.00 138.00

13.00 150.00

8.50 45.00

10.00 24.50

12.00 26.00

12.00 26.00
2.00
22.00 57.00

280.00 280.00

425.00 425.00

200.00 200.00

1.50 4.50
27.5