10/06 - “Investigation, Design & Formation of Mallemadugu Reservoir and Excavation of Kailasagiri
Canal from Km 0.000 to Km 65.500 including Construction of CM & CD works and distributory system including field channels to be feed an ayacut of 55000 acres in
Chittoor and Nellore Districts"
Name of the the Agency : M/S MAYTAS-NCC (J.V),
FORMATION OF MALLAMADUGU RESERVOIR
GENERAL ABSTRACT OF DEVIATION PROPOSAL
As per TBL is fixed 129.500 as per
As Per Approved I.B.M and Embankment slopes
Slno Descrption Of Item Deviation Amount Remarks
Drawing and other design criteria as per
approved drawing) / I.B.M
B B
1.2
1
C
2.5 C
mt
1
hic
0.5 0.5 H
k in
200 mm thick sand
1 1 omo
clin
5.000 Homogeneous soils gen 5.000
oils
ed
us s eou
With 2% extra moisture
s an
o Content over OMC ss 2
ne
oge oils 1
d fi
D
2.5 m
D
Ho
lter
1
1 m Ht Toe Protection
1.567 1.900
E E
GL Stripped Level-110.000 ( Varies) 1.0 m thick Horizontal sand Blanket GL
4.000 Cut-Off Trench 2. THE EARTH DAM HAS BEEN DESIGNED AS HOMOGENEOUS SECTION
WITH EMBANKMENT SOILS AND FOUNDATION SOILS ADOPTED IN
THE DESIGN AS INDICATED IN THE TABLE 1
FOS FOS AS PER APPROVED DRAWING-DWG NO-
CONDITION
G
OBTAINED REQUIRED Cross Section of Earthbund -Maximum Height-21.54 M G
J J
K K
G.N.S.S PROJECT:- PACKAGE-10
MALLIMADUGU RESERVOIR
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
FIRST ANGLE PROJECTION
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
B B
1.0
1
C
2 C
mt
1
hic
0.5 0.5 H
k in
200 mm thick sand
1 1 omo
clin
5.000 Homogeneous soils gen 5.000
oils
ed
us s eou
With 2% extra moisture
s an
o Content over OMC ss 2
ne
oge oils 1
d fi
D
2 m
D
Ho
lter
1
1 m Ht Toe Protection
1.567 1.900
E E
GL Stripped Level-110.000 ( Varies) 1.0 m thick Horizontal sand Blanket GL
4.000 Cut-Off Trench 2. THE EARTH DAM HAS BEEN DESIGNED AS HOMOGENEOUS SECTION
WITH EMBANKMENT SOILS AND FOUNDATION SOILS ADOPTED IN
THE DESIGN AS INDICATED IN THE TABLE 1
FOS FOS AS PER APPROVED DRAWING-DWG NO-
CONDITION
G
OBTAINED REQUIRED Cross Section of Earthbund -Maximum Height-13.5 M G
J J
K K
G.N.S.S PROJECT:- PACKAGE-10
MALLIMADUGU RESERVOIR
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Formation Mallamadugu Reservoir
BUND-1
Cross Section 0.025 Km
T.B.L = + 129.500 M Avg. G.L = + 126.750 M
Stripped.Level = + 126.450 M Stri.Lev = + 126.450 M
Height of Bund 3.050 M Depth of Stripping 0.300 M
MWL=+ 127.500 M FRL 127.500 M
1)Stripping
Bottom Width of Bund ( 129.500 - 126.450 )X 4+6+1.717+1.9= 21.82 M
Depth of Stripping ( 126.750 - 126.450 ) = 0.300 M
Area of Stripping ( 21.820 X 0.300 ) = 6.550 Sqm
2)Rock-Toe
Height of Rock-Toe ( 127.5-126.45 )X 20% 0.21 = 1.50 M (Minimum Height of Rock-
Bottom Width of Rock-Toe = 1.5 X 3 = 4.50 M Toe)
Area of Rock -Toe = 1/2X4.5X1.5 = 3.38 Sqm
a)Metal Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 1.500 = 2.12 M
Area = 2.12X0.2 = 0.42 Sqm
b)Sand Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 1.500 = 2.12 M
Area = 2.12X0.2 = 0.42 Sqm
3) Area of Herating Portion
Bottom Width ( 128.500 - 126.450 )X 0.5*2+3 = 5.05 M
Top Width = 3M
Arae of Hearting Soils = 3+5.05
X 2.050 = 8.25 Sqm
2
4) Area of horizontal Sand Filter (Sand Blanketn-1 M Thick)
Bottom Width of Sand ( 129.5-126.45)X2+3-0.57-4.5 - 5.05/2 = 1.50 M
Top Width = 1.5+1.5 = 3.00 M
Arae of Hearting Soils = 3+1.5
X 1.000 = 2.25 Sqm
2
5) Area of Inclined Sand Chimney
Top Level of Sand = 127.500
bottom level of sand = 127.450
thick ness of sand = 1M
Slan Length = sqrt (1*1+0.5*0.5) X 0.050 = 0.06 M
Area of Inclined Sand Chimney = 0.06 X 1 = 0.06 Sqm
6)Area of 450mm thk Rip Rap
Incliend length = Sqrt(2X2+1X1) X 3.050 = 6.82 M
Arae of 450thk Rip Rap = 6.82X0.45 = 3.07 Sqm
7)Area of 200 mm thk Metal
Incliend length = Sqrt(2X2+1X1) X 3.050 = 6.82 M
Arae of 200thk Sand = 6.82X0.2 = 1.36 Sqm
8) Area of Inclined Sand Chimney
Incliend length = Sqrt(2X2+1X1) X 3.050 = 6.82 M
Arae of 200thk Sand = 6.82X0.2 = 1.36 Sqm
9) Area of Bund
Bottom Width ( 129.500 - 126.450 )X 4+6 = 18.2 M
Top Width = 6M
Arae of Bund = 6+18.2
X 3.050 = 36.91 Sqm
2
12)Net casing Area = 36.91-3.38-0.42-0.42-8.25-2.25-0.06-3.07-1.36-1.36 = 16.34 Sqm
1 0.000 0 0 0 0 0 0 0 0 0 0 0
2 0.025 6.55 81.88 3.38 42.25 0.42 5.25 0.42 5.25 8.25 103.13 0.06 0.75 2.25 28.13 3.07 38.38 1.36 17.00 1.36 17.00 16.34 204.25
3 0.050 10.36 211.38 3.38 84.50 0.42 10.50 0.42 10.50 29.37 470.25 3.61 45.88 7.03 116.00 6.27 116.75 2.79 51.88 2.79 51.88 58.93 940.88
4 0.075 13.44 297.50 3.38 84.50 0.42 10.50 0.42 10.50 53.79 1039.50 6.48 126.13 10.87 223.75 8.85 189.00 3.93 84.00 3.93 84.00 115.40 2179.13
5 0.100 18.67 401.38 4.49 98.38 0.49 11.38 0.49 11.38 75.51 1616.25 8.55 187.88 17.97 360.50 12.96 272.63 5.76 121.13 5.76 121.13 178.27 3670.88
6 0.125 21.55 502.75 7.33 147.75 0.63 14.00 0.63 14.00 108.75 2303.25 11.24 247.38 20.13 476.25 15.38 354.25 6.84 157.50 6.84 157.50 284.64 5786.38
7 0.150 24.98 581.63 8.90 202.88 0.69 16.50 0.69 16.50 126.40 2939.38 15.00 328.00 21.14 515.88 19.43 435.13 8.64 193.50 8.64 193.50 382.76 8342.50
8 0.175 27.85 660.38 12.27 264.63 0.81 18.75 0.81 18.75 162.95 3616.88 17.84 410.55 23.05 552.38 22.00 517.88 9.78 230.25 9.78 230.25 512.31 11188.33
9 0.200 28.99 710.50 13.77 325.50 0.86 20.88 0.86 20.88 178.86 4272.63 18.98 460.35 23.82 585.88 23.03 562.88 10.24 250.25 10.24 250.25 568.53 13510.40
10 0.352 35.22 20.01 1.03 1.03 243.25 23.16 29.61 28.62 12.72 12.72 939.38
11 0.372 35.12 703.40 19.85 398.60 1.03 20.60 1.03 20.60 241.70 4849.50 23.06 462.24 29.56 591.70 28.53 571.50 12.68 254.00 12.68 254.00 933.47 18728.46
12 0.400 33.77 964.46 20.95 571.20 1.06 29.26 1.06 29.26 252.92 6924.68 23.74 655.20 27.01 791.98 27.32 781.90 12.14 347.48 12.14 347.48 828.90 24673.18
13 0.425 31.87 820.50 17.92 485.88 0.98 25.50 0.98 25.50 221.92 5935.50 21.84 569.70 25.73 659.25 25.61 661.63 11.38 294.00 11.38 294.00 720.10 19362.55
14 0.450 31.58 793.13 17.48 442.50 0.97 24.38 0.97 24.38 217.47 5492.38 21.56 542.55 25.55 641.00 25.36 637.13 11.27 283.13 11.27 283.13 704.49 17807.33
15 0.475 31.09 783.38 16.73 427.63 0.94 23.88 0.94 23.88 209.75 5340.25 21.06 532.80 25.21 634.50 24.91 628.38 11.07 279.25 11.07 279.25 677.32 17272.58
16 0.500 30.17 765.75 15.40 401.63 0.91 23.13 0.91 23.13 195.90 5070.63 20.15 515.10 24.60 622.63 24.08 612.38 10.70 272.13 10.70 272.13 628.59 16323.90
17 0.525 28.93 738.75 13.68 363.50 0.85 22.00 0.85 22.00 177.91 4672.63 18.91 488.25 23.77 604.63 22.97 588.13 10.21 261.38 10.21 261.38 565.16 14921.88
18 0.550 27.76 708.63 12.16 323.00 0.81 20.75 0.81 20.75 161.85 4247.00 17.76 458.40 23.00 584.63 21.93 561.25 9.75 249.50 9.75 249.50 508.43 13419.85
19 0.575 26.17 674.13 10.24 280.00 0.74 19.38 0.74 19.38 141.02 3785.88 16.18 424.20 21.93 561.63 20.50 530.38 9.11 235.75 9.11 235.75 434.70 11789.18
20 0.600 24.77 636.75 8.67 236.38 0.68 17.75 0.68 17.75 123.82 3310.50 14.78 387.00 21.00 536.63 19.24 496.75 8.55 220.75 8.55 220.75 373.61 10103.88
21 0.625 21.08 573.13 6.82 193.63 0.60 16.00 0.60 16.00 102.96 2834.75 12.96 346.80 19.77 509.63 14.99 427.88 6.66 190.13 6.66 190.13 264.09 7971.20
22 0.650 19.64 509.00 5.37 152.38 0.54 14.25 0.54 14.25 86.09 2363.13 9.46 280.25 18.69 480.75 13.78 359.63 6.13 159.88 6.13 159.88 212.29 5954.75
23 0.675 17.85 468.63 3.81 114.75 0.45 12.38 0.45 12.38 67.14 1915.38 7.79 215.63 17.36 450.63 12.28 325.75 5.46 144.88 5.46 144.88 151.12 4542.63
24 0.700 12.55 380.00 3.38 89.88 0.42 10.88 0.42 10.88 46.00 1414.25 5.65 168.00 9.75 338.88 8.10 254.75 3.60 113.25 3.60 113.25 96.99 3101.38
25 0.725 10.29 285.50 3.38 84.50 0.42 10.50 0.42 10.50 28.87 935.88 3.54 114.88 6.94 208.63 6.21 178.88 2.76 79.50 2.76 79.50 57.86 1935.63
26 0.750 6.68 212.13 3.38 84.50 0.42 10.50 0.42 10.50 8.81 471.00 0.18 46.50 2.42 117.00 3.18 117.38 1.41 52.13 1.41 52.13 17.30 939.50
27 0.775 4.21 136.13 3.38 84.50 0.42 10.50 0.42 10.50 0.31 114.00 0.00 2.25 0.00 30.25 1.11 53.63 0.49 23.75 0.49 23.75 2.40 246.25
28 0.800 5.66 123.38 3.38 84.50 0.42 10.50 0.42 10.50 4.79 63.75 0.00 0.00 1.15 14.38 2.33 43.00 1.03 19.00 1.03 19.00 9.98 154.75
29 0.825 8.23 173.63 3.38 84.50 0.42 10.50 0.42 10.50 16.30 263.63 1.62 20.25 4.36 68.88 4.48 85.13 1.99 37.75 1.99 37.75 31.35 516.63
30 0.850 10.13 229.50 3.38 84.50 0.42 10.50 0.42 10.50 27.82 551.50 3.40 62.75 6.74 138.75 6.08 132.00 2.70 58.63 2.70 58.63 55.54 1086.13
31 0.875 11.93 275.75 3.38 84.50 0.42 10.50 0.42 10.50 41.01 860.38 5.08 106.00 8.99 196.63 7.59 170.88 3.37 75.88 3.37 75.88 85.31 1760.63
32 0.900 11.93 298.25 3.38 84.50 0.42 10.50 0.42 10.50 41.01 1025.25 5.08 127.00 8.99 224.75 7.59 189.75 3.37 84.25 3.37 84.25 85.31 2132.75
33 0.925 17.93 373.25 3.88 90.75 0.45 10.88 0.45 10.88 67.98 1362.38 7.87 161.88 17.42 330.13 12.35 249.25 5.49 110.75 5.49 110.75 153.86 2989.63
34 0.950 18.85 459.75 4.65 106.63 0.50 11.88 0.50 11.88 77.42 1817.50 8.72 207.38 18.10 444.00 13.12 318.38 5.83 141.50 5.83 141.50 184.41 4228.38
35 0.975 19.78 482.88 5.51 127.00 0.54 13.00 0.54 13.00 87.71 2064.13 9.59 228.88 18.80 461.25 13.90 337.75 6.18 150.13 6.18 150.13 217.52 5024.13
36 1.000 20.47 503.12 6.18 146.12 0.57 13.88 0.57 13.88 95.61 2291.50 10.23 247.75 19.32 476.50 14.48 354.75 6.43 157.62 6.43 157.62 242.82 5754.25
37 1.025 20.93 517.50 6.66 160.50 0.60 14.62 0.60 14.62 101.21 2460.25 10.67 261.25 19.67 487.37 14.87 366.87 6.61 163.00 6.61 163.00 260.64 6293.25
38 1.050 20.98 523.87 6.72 167.25 0.60 15.00 0.60 15.00 101.79 2537.50 10.71 267.25 19.70 492.12 14.91 372.25 6.63 165.50 6.63 165.50 262.50 6539.25
39 1.075 20.66 520.50 6.02 159.25 0.57 14.62 0.57 14.62 93.64 2442.87 10.07 259.75 19.19 486.12 14.34 365.62 6.37 162.50 6.37 162.50 236.50 6237.50
40 1.100 20.49 514.37 6.20 152.75 0.58 14.37 0.58 14.37 95.89 2369.12 10.25 254.00 19.34 481.62 14.49 360.37 6.44 160.12 6.44 160.12 243.73 6002.87
41 1.125 20.23 509.00 5.94 151.75 0.56 14.25 0.56 14.25 92.80 2358.62 10.01 253.25 19.14 481.00 14.27 359.50 6.34 159.75 6.34 159.75 233.85 5969.75
Behind Metal Inclined Sand horizontal Sand 450mm thk Rip
Stripping Rock-toe Behind sand Filters Hearting 200mm thk Metal 200mm thk sand Net Casing Area
Filters Chimney Filter Rap
Chainge
Slno
in Km
Area in Quantity Area in Quantity Area in Quantity Area in Quantity Area in Quantity in Area in Quantity Area in Quantity Area in Quantity Area in Quantity Area in Quantity Area in Quantity
Sqm in Cum Sqm in Cum Sqm in Cum Sqm in Cum Sqm Cum Sqm in Cum Sqm in Cum Sqm in Cum Sqm in Cum Sqm in Cum Sqm in Cum
42 1.150 20.09 504.00 5.81 146.87 0.56 14.00 0.56 14.00 91.27 2300.87 9.88 248.62 19.04 477.25 14.17 355.50 6.30 158.00 6.30 158.00 228.92 5784.62
43 1.175 19.88 499.62 5.60 142.62 0.55 13.88 0.55 13.88 88.80 2250.87 9.68 244.50 18.87 473.87 13.98 351.87 6.21 156.37 6.21 156.37 221.02 5624.25
44 1.200 21.52 517.50 5.45 138.13 0.54 13.63 0.54 13.63 87.03 2197.87 9.54 240.25 21.76 507.87 15.36 366.75 6.83 163.00 6.83 163.00 292.16 6414.75
45 1.225 19.57 513.62 5.30 134.38 0.53 13.38 0.53 13.38 85.28 2153.87 9.39 236.62 18.64 505.00 13.72 363.50 6.10 161.62 6.10 161.62 209.73 6273.62
46 1.250 19.52 488.62 5.26 132.00 0.53 13.25 0.53 13.25 84.74 2125.25 9.35 234.25 18.60 465.50 13.68 342.50 6.08 152.25 6.08 152.25 208.01 5221.75
47 1.275 19.45 487.12 5.19 130.63 0.53 13.25 0.53 13.25 83.95 2108.62 9.28 232.87 18.55 464.37 13.62 341.25 6.05 151.62 6.05 151.62 205.43 5168.00
48 1.300 21.35 510.00 5.28 130.88 0.53 13.25 0.53 13.25 85.11 2113.25 9.37 233.12 21.63 502.25 15.21 360.37 6.76 160.12 6.76 160.12 285.03 6130.75
49 1.325 19.72 513.37 5.45 134.13 0.54 13.38 0.54 13.38 87.03 2151.75 9.54 236.37 18.76 504.87 13.85 363.25 6.16 161.50 6.16 161.50 215.33 6254.50
50 1.350 21.88 520.00 7.70 164.37 0.64 14.75 0.64 14.75 112.96 2499.87 11.54 263.50 20.37 489.12 15.66 368.87 6.96 164.00 6.96 164.00 297.88 6415.12
51 1.375 21.32 540.00 7.08 184.75 0.61 15.62 0.61 15.62 105.91 2735.87 11.02 282.00 19.95 504.00 15.19 385.62 6.75 171.37 6.75 171.37 275.65 7169.12
52 1.400 20.70 525.25 6.42 168.75 0.59 15.00 0.59 15.00 98.42 2554.12 10.45 268.37 19.49 493.00 14.67 373.25 6.52 165.87 6.52 165.87 251.65 6591.25
53 1.425 20.12 510.25 5.84 153.25 0.56 14.37 0.56 14.37 91.65 2375.87 9.91 254.50 19.06 481.87 14.19 360.75 6.31 160.37 6.31 160.37 230.01 6020.75
54 1.450 19.91 500.37 5.63 143.37 0.55 13.88 0.55 13.88 89.21 2260.75 9.72 245.37 18.91 474.62 14.01 352.50 6.23 156.75 6.23 156.75 222.31 5654.00
55 1.475 19.31 490.25 5.06 133.63 0.52 13.38 0.52 13.38 82.45 2145.75 9.15 235.87 18.45 467.00 13.50 343.87 6.00 152.87 6.00 152.87 200.52 5285.37
56 1.500 18.90 477.62 4.70 122.00 0.50 12.75 0.50 12.75 78.02 2005.87 8.77 224.00 18.14 457.37 13.16 333.25 5.85 148.12 5.85 148.12 186.26 4834.75
57 1.525 18.78 471.00 4.59 116.13 0.49 12.38 0.49 12.38 76.74 1934.50 8.66 217.87 18.05 452.37 13.06 327.75 5.81 145.75 5.81 145.75 182.13 4604.87
58 1.550 18.58 467.00 4.42 112.63 0.49 12.25 0.49 12.25 74.63 1892.12 8.47 214.12 17.90 449.37 12.90 324.50 5.73 144.25 5.73 144.25 175.39 4469.00
59 1.575 18.29 460.87 4.17 107.38 0.47 12.00 0.47 12.00 71.64 1828.37 8.21 208.50 17.69 444.87 12.65 319.37 5.62 141.87 5.62 141.87 165.73 4264.00
60 1.600 17.99 453.50 3.92 101.13 0.46 11.63 0.46 11.63 68.55 1752.37 7.92 201.62 17.46 439.37 12.40 313.12 5.51 139.12 5.51 139.12 155.58 4016.37
61 1.625 17.78 447.12 3.76 96.00 0.45 11.38 0.45 11.38 66.51 1688.25 7.73 195.62 17.30 434.50 12.23 307.87 5.43 136.75 5.43 136.75 148.96 3806.75
62 1.650 17.60 442.25 3.62 92.25 0.44 11.13 0.44 11.13 64.65 1639.50 7.56 191.12 17.16 430.75 12.07 303.75 5.36 134.88 5.36 134.88 143.02 3649.75
63 1.675 17.57 439.62 3.59 90.12 0.44 11.00 0.44 11.00 64.41 1613.25 7.54 188.75 17.15 428.87 12.05 301.50 5.36 134.00 5.36 134.00 142.24 3565.75
64 1.700 14.09 395.75 3.38 87.12 0.42 10.75 0.42 10.75 59.80 1552.62 7.09 182.87 11.69 360.50 9.40 268.12 4.18 119.25 4.18 119.25 129.95 3402.37
65 1.725 13.90 349.87 3.38 84.50 0.42 10.50 0.42 10.50 58.00 1472.50 6.91 175.00 11.45 289.25 9.24 233.00 4.11 103.63 4.11 103.63 125.58 3194.12
66 1.750 13.52 342.75 3.38 84.50 0.42 10.50 0.42 10.50 54.47 1405.87 6.55 168.25 10.97 280.25 8.91 226.87 3.96 100.88 3.96 100.88 117.12 3033.75
67 1.775 13.60 339.00 3.38 84.50 0.42 10.50 0.42 10.50 55.23 1371.25 6.63 164.75 11.08 275.62 8.99 223.75 3.99 99.37 3.99 99.37 118.94 2950.75
68 1.800 13.42 337.75 3.38 84.50 0.42 10.50 0.42 10.50 53.60 1360.38 6.46 163.62 10.85 274.12 8.83 222.75 3.93 99.00 3.93 99.00 115.04 2924.75
69 1.825 13.39 335.12 3.38 84.50 0.42 10.50 0.42 10.50 53.28 1336.00 6.43 161.12 10.81 270.75 8.81 220.50 3.91 98.00 3.91 98.00 114.26 2866.25
70 1.850 12.51 323.75 3.38 84.50 0.42 10.50 0.42 10.50 45.70 1237.25 5.61 150.50 9.71 256.50 8.07 211.00 3.59 93.75 3.59 93.75 96.27 2631.62
71 1.875 12.56 313.37 3.38 84.50 0.42 10.50 0.42 10.50 46.10 1147.50 5.66 140.87 9.77 243.50 8.11 202.25 3.60 89.87 3.60 89.87 97.23 2418.75
72 1.900 12.29 310.62 3.38 84.50 0.42 10.50 0.42 10.50 43.85 1124.38 5.41 138.37 9.43 240.00 7.88 199.87 3.50 88.75 3.50 88.75 91.99 2365.25
Total 32932.49 11307.80 978.61 978.61 156843.56 17017.27 28845.18 23548.78 10465.73 10465.73 432613.44
``
Formation Mallamadugu Reservoir
BUND-1
Detail Estimate of Profile Wall
0.3
Profile wall
450 thk Rip Rap
200 thk Metal
200 thk Sand
0.3 Casing Soils
Area of Earthwork Excavation = 0.3 X 0.3 0.09 Sqm
Area of Concrete = (0.45 +0.2+0.2+0.3) X 0.3 0.35 Sqm
Concrete with
Top of U/S Face Slant Length EWE of Profile Wall
Stripped Height of grade of Mix CC
Slno Chainage the Area Quantity Area Quantity Remarks
Level Bund Details Length
Profile (Sqm) (Cum) (Sqm) (Cum)
1 0.000
2 0.030 124.860 129.500 4.640 sqrt(2.0X2.0+1X1) X4.64 = 10.375 0.09 0.930 0.35 3.630
3 0.060 121.988 129.500 7.512 sqrt(2.0X2.0+1X1) X7.512 = 16.797 0.09 1.510 0.35 5.880
4 0.090 119.778 129.500 9.722 sqrt(2.0X2.0+1X1) +5 X9.722 = 26.739 0.09 2.410 0.35 9.360
5 0.120 117.650 129.500 11.850 sqrt(2.0X2.0+1X1) +5 X11.85 = 31.497 0.09 2.830 0.35 11.020
6 0.150 115.320 129.500 14.180 sqrt(2.5X2.5+1X1) +5 X14.18 = 43.181 0.09 3.890 0.35 15.110
7 0.180 112.775 129.500 16.725 sqrt(2.5X2.5+1X1) +5 X16.725 = 50.033 0.09 4.500 0.35 17.510
8 0.200 112.350 129.500 17.150 sqrt(2.5X2.5+1X1) +5 X17.15 = 51.178 0.09 4.610 0.35 17.910
9 0.352 109.240 129.500 20.260 sqrt(2.5X2.5+1X1) +5 X20.26 = 59.552 0.09 5.360 0.35 20.840
10 0.375 109.310 129.500 20.190 sqrt(2.5X2.5+1X1) +5 X20.19 = 59.363 0.09 5.340 0.35 20.780
11 0.400 108.810 129.500 20.690 sqrt(2.5X2.5+1X1) +5 X20.69 = 60.710 0.09 5.460 0.35 21.250
12 0.430 110.325 129.500 19.175 sqrt(2.5X2.5+1X1) +5 X19.175 = 56.630 0.09 5.100 0.35 19.820
13 0.460 110.615 129.500 18.885 sqrt(2.5X2.5+1X1) +5 X18.885 = 55.849 0.09 5.030 0.35 19.550
14 0.490 111.140 129.500 18.360 sqrt(2.5X2.5+1X1) +5 X18.36 = 54.436 0.09 4.900 0.35 19.050
15 0.520 111.940 129.500 17.560 sqrt(2.5X2.5+1X1) +5 X17.56 = 52.282 0.09 4.710 0.35 18.300
16 0.550 113.260 129.500 16.240 sqrt(2.5X2.5+1X1) +5 X16.24 = 48.728 0.09 4.390 0.35 17.050
17 0.580 114.960 129.500 14.540 sqrt(2.5X2.5+1X1) +5 X14.54 = 44.150 0.09 3.970 0.35 15.450
18 0.610 116.160 129.500 13.340 sqrt(2.0X2.0+1X1) +5 X13.34 = 34.829 0.09 3.130 0.35 12.190
19 0.640 117.440 129.500 12.060 sqrt(2.0X2.0+1X1) +5 X12.06 = 31.967 0.09 2.880 0.35 11.190
20 0.670 118.785 129.500 10.715 sqrt(2.0X2.0+1X1) +5 X10.715 = 28.959 0.09 2.610 0.35 10.140
21 0.700 121.450 129.500 8.050 sqrt(2.0X2.0+1X1) X8.05 = 18.000 0.09 1.620 0.35 6.300
22 0.730 124.835 129.500 4.665 sqrt(2.0X2.0+1X1) X4.665 = 10.431 0.09 0.940 0.35 3.650
23 0.760 127.370 129.500 2.130 sqrt(2.0X2.0+1X1) X2.13 = 4.763 0.09 0.430 0.35 1.670
24 0.790 127.795 129.500 1.705 sqrt(2.0X2.0+1X1) X1.705 = 3.812 0.09 0.340 0.35 1.330
25 0.820 126.120 129.500 3.380 sqrt(2.0X2.0+1X1) X3.38 = 7.558 0.09 0.680 0.35 2.650
26 0.850 123.460 129.500 6.040 sqrt(2.0X2.0+1X1) X6.04 = 13.506 0.09 1.220 0.35 4.730
Concrete with
Top of U/S Face Slant Length EWE of Profile Wall
Stripped Height of grade of Mix CC
Slno Chainage the Area Quantity Area Quantity Remarks
Level Bund Details Length
Profile (Sqm) (Cum) (Sqm) (Cum)
27 0.880 121.960 129.500 7.540 sqrt(2.0X2.0+1X1) X7.54 = 16.860 0.09 1.520 0.35 5.900
28 0.910 120.710 129.500 8.790 sqrt(2.0X2.0+1X1) X8.79 = 19.655 0.09 1.770 0.35 6.880
29 0.940 119.080 129.500 10.420 sqrt(2.0X2.0+1X1) +5 X10.42 = 28.300 0.09 2.550 0.35 9.910
30 0.970 118.310 129.500 11.190 sqrt(2.0X2.0+1X1) +5 X11.19 = 30.022 0.09 2.700 0.35 10.510
31 1.000 117.350 129.500 12.150 sqrt(2.5X2.5+1X1) +5 X12.15 = 32.168 0.09 2.900 0.35 11.260
32 1.030 116.940 129.500 12.560 sqrt(2.5X2.5+1X1) +5 X12.56 = 33.085 0.09 2.980 0.35 11.580
33 1.060 117.055 129.500 12.445 sqrt(2.5X2.5+1X1) +5 X12.445 = 32.828 0.09 2.950 0.35 11.490
34 1.090 117.260 129.500 12.240 sqrt(2.5X2.5+1X1) +5 X12.24 = 32.369 0.09 2.910 0.35 11.330
35 1.120 117.440 129.500 12.060 sqrt(2.5X2.5+1X1) +5 X12.06 = 31.967 0.09 2.880 0.35 11.190
36 1.150 117.660 129.500 11.840 sqrt(2.0X2.0+1X1) +5 X11.84 = 31.475 0.09 2.830 0.35 11.020
37 1.180 117.905 129.500 11.595 sqrt(2.0X2.0+1X1) +5 X11.595 = 30.927 0.09 2.780 0.35 10.820
38 1.210 118.035 129.500 11.465 sqrt(2.0X2.0+1X1) +5 X11.465 = 30.637 0.09 2.760 0.35 10.720
39 1.240 118.120 129.500 11.380 sqrt(2.0X2.0+1X1) +5 X11.38 = 30.446 0.09 2.740 0.35 10.660
40 1.270 118.170 129.500 11.330 sqrt(2.0X2.0+1X1) +5 X11.33 = 30.335 0.09 2.730 0.35 10.620
41 1.300 118.115 129.500 11.385 sqrt(2.0X2.0+1X1) +5 X11.385 = 30.458 0.09 2.740 0.35 10.660
42 1.330 117.073 129.500 12.427 sqrt(2.0X2.0+1X1) +5 X12.427 = 32.788 0.09 2.950 0.35 11.480
43 1.360 116.408 129.500 13.092 sqrt(2.0X2.0+1X1) +5 X13.092 = 34.275 0.09 3.080 0.35 12.000
44 1.390 116.898 129.500 12.602 sqrt(2.0X2.0+1X1) +5 X12.602 = 33.179 0.09 2.990 0.35 11.610
45 1.420 117.395 129.500 12.105 sqrt(2.0X2.0+1X1) +5 X12.105 = 32.068 0.09 2.890 0.35 11.220
46 1.450 117.810 129.500 11.690 sqrt(2.0X2.0+1X1) +5 X11.69 = 31.140 0.09 2.800 0.35 10.900
47 1.480 118.485 129.500 11.015 sqrt(2.0X2.0+1X1) +5 X11.015 = 29.630 0.09 2.670 0.35 10.370
48 1.510 118.705 129.500 10.795 sqrt(2.0X2.0+1X1) +5 X10.795 = 29.138 0.09 2.620 0.35 10.200
49 1.540 118.838 129.500 10.662 sqrt(2.0X2.0+1X1) +5 X10.662 = 28.841 0.09 2.600 0.35 10.090
50 1.570 119.040 129.500 10.460 sqrt(2.0X2.0+1X1) +5 X10.46 = 28.389 0.09 2.560 0.35 9.940
51 1.600 119.415 129.500 10.085 sqrt(2.0X2.0+1X1) +5 X10.085 = 27.551 0.09 2.480 0.35 9.640
52 1.630 119.663 129.500 9.837 sqrt(2.0X2.0+1X1) +5 X9.837 = 26.996 0.09 2.430 0.35 9.450
53 1.660 119.750 129.500 9.750 sqrt(2.0X2.0+1X1) +5 X9.75 = 26.802 0.09 2.410 0.35 9.380
54 1.690 119.960 129.500 9.540 sqrt(2.0X2.0+1X1) +5 X9.54 = 26.332 0.09 2.370 0.35 9.220
55 1.720 120.240 129.500 9.260 sqrt(2.0X2.0+1X1) +5 X9.26 = 25.706 0.09 2.310 0.35 9.000
56 1.750 120.640 129.500 8.860 sqrt(2.0X2.0+1X1) +5 X8.86 = 24.812 0.09 2.230 0.35 8.680
57 1.780 120.645 129.500 8.855 sqrt(2.0X2.0+1X1) +5 X8.855 = 24.800 0.09 2.230 0.35 8.680
58 1.810 120.735 129.500 8.765 sqrt(2.0X2.0+1X1) +5 X8.765 = 24.599 0.09 2.210 0.35 8.610
59 1.840 121.115 129.500 8.385 sqrt(2.0X2.0+1X1) X8.385 = 18.749 0.09 1.690 0.35 6.560
60 1.870 121.460 129.500 8.040 sqrt(2.0X2.0+1X1) X8.04 = 17.978 0.09 1.620 0.35 6.290
61 1.900 121.665 129.500 7.835 sqrt(2.0X2.0+1X1) X7.835 = 17.520 0.09 1.580 0.35 6.130
Total length of the Drilling holes into the rock from the
6840 meters
bottom of cut off trench
Cement consumption 0.75 Bag for one RMT
Total Cement Consumption 5130 Bags
Total Cement Consumption 257 MT
Formation Mallamadugu Reservoir
BUND-1
Detailed Es mate for 'Parpet wall' on U/S
150
CC M15-40 MSA
600
T BL .+131.000
1000
CC M 15 40 MSA 200
600
Details of Parapet
750
TBL-131.000
2
450
1
Height Slope length of Chute Drain Earth work Excavation CC M15 Quantity
Rock of Bund
Chainag Stripped
S.No. Toe Top above
e Level Length Quantity Quantity
level rock toe Details Details Details
in m in m in Cum in Cum
1 2 5 6 7 8
1 0.000
2 0.045 124.860 126.360 3.14 (3.14x2.236) 7.02 0.5X(0.855+0.583)/2+(7.02-0.5)X0.583 4.16 0.5X(0.585+0.403)/2+(7.02-0.5)X0.403 2.87
3 0.090 119.778 121.322 8.18 (8.18x2.236) 18.29 0.5X(0.855+0.583)/2+(18.29-0.5)X0.583 10.73 0.5X(0.585+0.403)/2+(18.29-0.5)X0.403 7.42
4 0.135 115.885 118.208 11.29 (11.29x2.236) 25.25 0.5X(0.855+0.583)/2+(25.25-0.5)X0.583 14.79 0.5X(0.585+0.403)/2+(25.25-0.5)X0.403 10.22
5 0.180 112.775 115.720 13.78 (13.78x2.236) 30.81 0.5X(0.855+0.583)/2+(30.81-0.5)X0.583 18.03 0.5X(0.585+0.403)/2+(30.81-0.5)X0.403 12.46
6 0.200 112.350 115.380 14.12 (14.12x2.236) 31.57 0.5X(0.855+0.583)/2+(31.57-0.5)X0.583 18.47 0.5X(0.585+0.403)/2+(31.57-0.5)X0.403 12.77
7 0.352 109.240 112.892 16.61 (16.61x2.236) 37.14 0.5X(0.855+0.583)/2+(37.14-0.5)X0.583 21.72 0.5X(0.585+0.403)/2+(37.14-0.5)X0.403 15.01
8 0.377 109.310 112.948 16.55 (16.55x2.236) 37.01 0.5X(0.855+0.583)/2+(37.01-0.5)X0.583 21.64 0.5X(0.585+0.403)/2+(37.01-0.5)X0.403 14.96
9 0.400 108.810 112.548 16.95 (16.95x2.236) 37.90 0.5X(0.855+0.583)/2+(37.9-0.5)X0.583 22.16 0.5X(0.585+0.403)/2+(37.9-0.5)X0.403 15.32
10 0.445 110.325 113.760 15.74 (15.74x2.236) 35.19 0.5X(0.855+0.583)/2+(35.19-0.5)X0.583 20.58 0.5X(0.585+0.403)/2+(35.19-0.5)X0.403 14.23
11 0.490 111.140 114.412 15.09 (15.09x2.236) 33.74 0.5X(0.855+0.583)/2+(33.74-0.5)X0.583 19.74 0.5X(0.585+0.403)/2+(33.74-0.5)X0.403 13.64
12 0.535 112.830 115.764 13.74 (13.74x2.236) 30.71 0.5X(0.855+0.583)/2+(30.71-0.5)X0.583 17.97 0.5X(0.585+0.403)/2+(30.71-0.5)X0.403 12.42
13 0.580 114.960 117.468 12.03 (12.03x2.236) 26.90 0.5X(0.855+0.583)/2+(26.9-0.5)X0.583 15.75 0.5X(0.585+0.403)/2+(26.9-0.5)X0.403 10.89
14 0.625 116.840 118.972 10.53 (10.53x2.236) 23.54 0.5X(0.855+0.583)/2+(23.54-0.5)X0.583 13.79 0.5X(0.585+0.403)/2+(23.54-0.5)X0.403 9.53
15 0.670 118.785 120.528 8.97 (8.97x2.236) 20.06 0.5X(0.855+0.583)/2+(20.06-0.5)X0.583 11.76 0.5X(0.585+0.403)/2+(20.06-0.5)X0.403 8.13
16 0.715 122.390 123.890 5.61 (5.61x2.236) 12.54 0.5X(0.855+0.583)/2+(12.54-0.5)X0.583 7.38 0.5X(0.585+0.403)/2+(12.54-0.5)X0.403 5.10
17 0.760 127.370 128.870 0.63 (0.63x2.236) 1.41 0.5X(0.855+0.583)/2+(1.41-0.5)X0.583 0.89 0.5X(0.585+0.403)/2+(1.41-0.5)X0.403 0.61
18 0.805 126.120 127.620 1.88 (1.88x2.236) 4.20 0.5X(0.855+0.583)/2+(4.2-0.5)X0.583 2.52 0.5X(0.585+0.403)/2+(4.2-0.5)X0.403 1.74
Height Slope length of Chute Drain Earth work Excavation CC M15 Quantity
Rock of Bund
Chainag Stripped
S.No. Toe Top above
e Level Length Quantity Quantity
level rock toe Details Details Details
in m in m in Cum in Cum
19 0.850 123.460 124.960 4.54 (4.54x2.236) 10.15 0.5X(0.855+0.583)/2+(10.15-0.5)X0.583 5.99 0.5X(0.585+0.403)/2+(10.15-0.5)X0.403 4.14
20 0.895 121.960 123.460 6.04 (6.04x2.236) 13.51 0.5X(0.855+0.583)/2+(13.51-0.5)X0.583 7.94 0.5X(0.585+0.403)/2+(13.51-0.5)X0.403 5.49
21 0.940 119.080 120.764 8.74 (8.74x2.236) 19.53 0.5X(0.855+0.583)/2+(19.53-0.5)X0.583 11.45 0.5X(0.585+0.403)/2+(19.53-0.5)X0.403 7.92
22 0.985 117.635 119.608 9.89 (9.89x2.236) 22.12 0.5X(0.855+0.583)/2+(22.12-0.5)X0.583 12.96 0.5X(0.585+0.403)/2+(22.12-0.5)X0.403 8.96
23 1.030 116.940 119.052 10.45 (10.45x2.236) 23.36 0.5X(0.855+0.583)/2+(23.36-0.5)X0.583 13.69 0.5X(0.585+0.403)/2+(23.36-0.5)X0.403 9.46
24 1.075 117.190 119.252 10.25 (10.25x2.236) 22.91 0.5X(0.855+0.583)/2+(22.91-0.5)X0.583 13.42 0.5X(0.585+0.403)/2+(22.91-0.5)X0.403 9.28
25 1.120 117.440 119.452 10.05 (10.05x2.236) 22.47 0.5X(0.855+0.583)/2+(22.47-0.5)X0.583 13.17 0.5X(0.585+0.403)/2+(22.47-0.5)X0.403 9.10
26 1.165 117.750 119.700 9.80 (9.8x2.236) 21.91 0.5X(0.855+0.583)/2+(21.91-0.5)X0.583 12.84 0.5X(0.585+0.403)/2+(21.91-0.5)X0.403 8.88
27 1.210 118.035 119.928 9.57 (9.57x2.236) 21.40 0.5X(0.855+0.583)/2+(21.4-0.5)X0.583 12.54 0.5X(0.585+0.403)/2+(21.4-0.5)X0.403 8.67
28 1.255 118.170 120.036 9.46 (9.46x2.236) 21.16 0.5X(0.855+0.583)/2+(21.16-0.5)X0.583 12.40 0.5X(0.585+0.403)/2+(21.16-0.5)X0.403 8.57
29 1.300 118.115 119.992 9.51 (9.51x2.236) 21.26 0.5X(0.855+0.583)/2+(21.26-0.5)X0.583 12.46 0.5X(0.585+0.403)/2+(21.26-0.5)X0.403 8.61
30 1.345 117.073 119.158 10.34 (10.34x2.236) 23.12 0.5X(0.855+0.583)/2+(23.12-0.5)X0.583 13.55 0.5X(0.585+0.403)/2+(23.12-0.5)X0.403 9.36
31 1.390 116.898 119.018 10.48 (10.48x2.236) 23.44 0.5X(0.855+0.583)/2+(23.44-0.5)X0.583 13.73 0.5X(0.585+0.403)/2+(23.44-0.5)X0.403 9.49
32 1.435 117.723 119.678 9.82 (9.82x2.236) 21.96 0.5X(0.855+0.583)/2+(21.96-0.5)X0.583 12.87 0.5X(0.585+0.403)/2+(21.96-0.5)X0.403 8.90
33 1.480 118.485 120.288 9.21 (9.21x2.236) 20.60 0.5X(0.855+0.583)/2+(20.6-0.5)X0.583 12.08 0.5X(0.585+0.403)/2+(20.6-0.5)X0.403 8.35
34 1.525 118.755 120.504 9.00 (9x2.236) 20.12 0.5X(0.855+0.583)/2+(20.12-0.5)X0.583 11.80 0.5X(0.585+0.403)/2+(20.12-0.5)X0.403 8.15
35 1.570 119.040 120.732 8.77 (8.77x2.236) 19.61 0.5X(0.855+0.583)/2+(19.61-0.5)X0.583 11.50 0.5X(0.585+0.403)/2+(19.61-0.5)X0.403 7.95
36 1.615 119.500 121.100 8.40 (8.4x2.236) 18.78 0.5X(0.855+0.583)/2+(18.78-0.5)X0.583 11.02 0.5X(0.585+0.403)/2+(18.78-0.5)X0.403 7.61
37 1.660 119.750 121.300 8.20 (8.2x2.236) 18.34 0.5X(0.855+0.583)/2+(18.34-0.5)X0.583 10.76 0.5X(0.585+0.403)/2+(18.34-0.5)X0.403 7.44
38 1.705 120.240 121.740 7.76 (7.76x2.236) 17.35 0.5X(0.855+0.583)/2+(17.35-0.5)X0.583 10.18 0.5X(0.585+0.403)/2+(17.35-0.5)X0.403 7.04
Height Slope length of Chute Drain Earth work Excavation CC M15 Quantity
Rock of Bund
Chainag Stripped
S.No. Toe Top above
e Level Length Quantity Quantity
level rock toe Details Details Details
in m in m in Cum in Cum
39 1.750 120.640 122.140 7.36 (7.36x2.236) 16.46 0.5X(0.855+0.583)/2+(16.46-0.5)X0.583 9.66 0.5X(0.585+0.403)/2+(16.46-0.5)X0.403 6.68
40 1.795 120.645 122.145 7.36 (7.36x2.236) 16.45 0.5X(0.855+0.583)/2+(16.45-0.5)X0.583 9.66 0.5X(0.585+0.403)/2+(16.45-0.5)X0.403 6.67
41 1.840 121.115 122.615 6.89 (6.89x2.236) 15.39 0.5X(0.855+0.583)/2+(15.39-0.5)X0.583 9.04 0.5X(0.585+0.403)/2+(15.39-0.5)X0.403 6.25
42 1.885 121.553 123.053 6.45 (6.45x2.236) 14.42 0.5X(0.855+0.583)/2+(14.42-0.5)X0.583 8.47 0.5X(0.585+0.403)/2+(14.42-0.5)X0.403 5.86
43 1.900 122.000 123.500 6.00 (6x2.236) 13.42 0.5X(0.855+0.583)/2+(13.42-0.5)X0.583 7.89 0.5X(0.585+0.403)/2+(13.42-0.5)X0.403 5.45
Length = 1.748 Km
Cross sectional Area at EWE= 0.583 Sqm
0.6
1 in 1 0.722 2.5 in 1
0.843
Rip Rap
4.085
3.355
2.625
0.675
0.875
1.075
0.6
1 in 1 0.730 2 in 1
0.860
Remarks
Cum
Cum
Cum
Remarks
Cum
Cum
Cum
Cum
Formation of Mallamadugu Reservoir
BUND-1
Detail Estimate D/S Toe Drain
0.5 M GL
2 in 1 1 in 1 300 mm Thk Rip Rap.
0.5 M 200 mm thk Metal
0.5 M 200 mm thk Sand
0.695
2 in1 0.825 1in1
0.955
1M
1 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 0.025 10.30 128.75 3.38 42.25 0.42 5.25 0.42 5.25 28.93 361.63 3.55 44.38 6.94 86.75 6.21 77.63 2.76 34.50 2.76 34.50 57.94 724.25
3 0.050 20.80 388.75 6.53 123.88 0.59 12.63 0.59 12.63 99.61 1606.75 10.54 176.13 19.57 331.38 14.76 262.13 6.56 116.50 6.56 116.50 255.58 3919.00
4 0.075 28.09 611.13 12.59 239.00 0.82 17.63 0.82 17.63 166.39 3325.00 18.10 357.95 23.22 534.88 22.23 462.38 9.88 205.50 9.88 205.50 524.27 9748.18
5 0.100 27.60 696.13 11.96 306.88 0.80 20.25 0.80 20.25 159.67 4075.75 17.60 446.25 22.89 576.38 21.78 550.13 9.68 244.50 9.68 244.50 500.73 12812.50
6 0.125 28.28 698.50 12.82 309.75 0.83 20.38 0.83 20.38 168.85 4106.50 18.28 448.50 23.34 577.88 22.39 552.13 9.95 245.38 9.95 245.38 533.18 12923.88
7 0.150 28.28 707.00 12.82 320.50 0.83 20.75 0.83 20.75 168.85 4221.25 18.28 456.90 23.34 583.50 22.39 559.75 9.95 248.75 9.95 248.75 533.18 13329.60
8 0.175 30.19 730.88 12.67 318.63 0.82 20.63 0.82 20.63 167.31 4202.00 18.16 455.40 26.26 620.00 24.10 581.13 10.71 258.25 10.71 258.25 646.85 14750.48
9 0.200 28.13 729.00 12.64 316.38 0.82 20.50 0.82 20.50 166.81 4176.50 18.12 453.45 23.24 618.75 22.25 579.38 9.89 257.50 9.89 257.50 526.00 14660.68
10 0.225 27.82 699.38 12.24 311.00 0.81 20.38 0.81 20.38 162.58 4117.38 17.82 449.25 23.03 578.38 21.98 552.88 9.77 245.75 9.77 245.75 511.00 12962.50
11 0.250 27.71 694.13 12.10 304.25 0.80 20.13 0.80 20.13 161.12 4046.25 17.71 444.15 22.96 574.88 21.88 548.25 9.72 243.63 9.72 243.63 505.88 12710.98
12 0.275 27.66 692.13 12.04 301.75 0.80 20.00 0.80 20.00 160.52 4020.50 17.66 442.20 22.93 573.63 21.84 546.50 9.71 242.88 9.71 242.88 503.56 12617.93
13 0.300 27.24 686.25 11.51 294.38 0.78 19.75 0.78 19.75 154.94 3943.25 17.24 436.35 22.65 569.75 21.46 541.25 9.54 240.63 9.54 240.63 483.85 12342.53
14 0.325 27.05 678.63 11.28 284.88 0.78 19.50 0.78 19.50 152.32 3840.75 17.05 428.70 22.52 564.63 21.29 534.38 9.46 237.50 9.46 237.50 474.74 11982.30
15 0.350 26.93 674.75 11.13 280.13 0.77 19.38 0.77 19.38 150.73 3788.13 16.93 424.80 22.44 562.00 21.18 530.88 9.41 235.88 9.41 235.88 469.11 11798.08
16 0.375 26.94 673.38 11.15 278.50 0.77 19.25 0.77 19.25 150.91 3770.50 16.94 423.45 22.45 561.13 21.19 529.63 9.42 235.38 9.42 235.38 469.74 11735.55
17 0.400 26.89 672.88 11.09 278.00 0.77 19.25 0.77 19.25 150.33 3765.50 16.90 423.00 22.41 560.75 21.15 529.25 9.40 235.25 9.40 235.25 467.52 11715.75
18 0.425 26.83 671.50 11.02 276.38 0.77 19.25 0.77 19.25 149.50 3747.88 16.84 421.65 22.38 559.88 21.09 528.00 9.37 234.63 9.37 234.63 464.76 11653.60
19 0.450 26.86 671.13 11.06 276.00 0.77 19.25 0.77 19.25 149.98 3743.50 16.87 421.35 22.39 559.63 21.12 527.63 9.39 234.50 9.39 234.50 466.27 11637.90
20 0.475 26.96 672.75 11.18 278.00 0.77 19.25 0.77 19.25 151.21 3764.88 16.97 423.00 22.46 560.63 21.21 529.13 9.43 235.25 9.43 235.25 470.60 11710.88
21 0.500 27.10 675.75 11.34 281.50 0.78 19.38 0.78 19.38 152.98 3802.37 17.10 425.85 22.55 562.62 21.33 531.75 9.48 236.38 9.48 236.38 476.87 11843.40
22 0.525 27.20 678.75 11.46 285.00 0.78 19.50 0.78 19.50 154.28 3840.75 17.20 428.70 22.62 564.63 21.42 534.38 9.52 237.50 9.52 237.50 481.65 11981.55
23 0.550 27.29 681.13 11.57 287.88 0.79 19.63 0.79 19.63 155.53 3872.63 17.29 431.10 22.69 566.38 21.51 536.63 9.56 238.50 9.56 238.50 486.07 12096.53
24 0.575 27.38 683.38 11.68 290.63 0.79 19.75 0.79 19.75 156.73 3903.25 17.38 433.35 22.74 567.88 21.58 538.63 9.59 239.38 9.59 239.38 490.18 12203.15
25 0.600 27.38 684.50 11.68 292.00 0.79 19.75 0.79 19.75 156.73 3918.25 17.38 434.40 22.74 568.50 21.58 539.50 9.59 239.75 9.59 239.75 490.18 12254.60
26 0.625 27.52 686.25 11.87 294.38 0.80 19.88 0.80 19.88 158.58 3941.38 17.52 436.20 22.83 569.63 21.71 541.13 9.65 240.50 9.65 240.50 496.88 12338.30
27 0.650 27.58 688.75 11.93 297.50 0.80 20.00 0.80 20.00 159.31 3973.63 17.58 438.75 22.87 571.25 21.76 543.38 9.67 241.50 9.67 241.50 499.43 12453.88
28 0.675 27.58 689.50 11.93 298.25 0.80 20.00 0.80 20.00 159.43 3984.25 17.58 439.50 22.88 571.88 21.76 544.00 9.67 241.75 9.67 241.75 499.73 12489.50
29 0.700 27.79 692.13 12.21 301.75 0.81 20.13 0.81 20.13 162.21 4020.50 17.80 442.20 23.01 573.63 21.95 546.38 9.76 242.88 9.76 242.88 509.71 12618.05
30 0.725 27.88 695.88 12.32 306.63 0.81 20.25 0.81 20.25 163.44 4070.63 17.88 445.95 23.07 576.00 22.03 549.75 9.79 244.38 9.79 244.38 513.89 12795.05
31 0.750 28.01 698.63 12.47 309.88 0.82 20.38 0.82 20.38 165.15 4107.38 18.00 448.50 23.16 577.88 22.14 552.13 9.84 245.38 9.84 245.38 520.11 12925.00
32 0.775 28.06 700.88 12.55 312.75 0.82 20.50 0.82 20.50 165.89 4138.00 18.06 450.75 23.19 579.38 22.19 554.13 9.86 246.25 9.86 246.25 522.71 13035.25
33 0.800 28.44 706.25 13.03 319.75 0.83 20.63 0.83 20.63 171.09 4212.25 18.43 456.15 23.45 583.00 22.53 559.00 10.01 248.38 10.01 248.38 541.14 13298.10
34 0.825 30.61 738.13 13.23 328.25 0.84 20.88 0.84 20.88 173.11 4302.50 18.58 462.60 26.54 624.88 24.48 587.63 10.88 261.13 10.88 261.13 669.34 15131.03
35 0.850 28.92 744.13 13.68 336.38 0.85 21.13 0.85 21.13 177.85 4387.00 18.91 468.60 23.76 628.75 22.96 593.00 10.21 263.63 10.21 263.63 564.79 15426.65
36 0.875 30.98 748.75 13.73 342.63 0.86 21.38 0.86 21.38 178.42 4453.38 18.95 473.25 26.79 631.88 24.82 597.25 11.03 265.50 11.03 265.50 690.00 15684.88
37 0.900 31.60 782.25 14.57 353.75 0.88 21.75 0.88 21.75 187.19 4570.13 19.56 481.35 27.20 674.88 25.37 627.38 11.27 278.75 11.27 278.75 724.19 17677.40
38 0.925 29.87 768.38 14.98 369.38 0.89 22.13 0.89 22.13 191.52 4733.88 19.86 492.75 24.40 645.00 23.82 614.88 10.59 273.25 10.59 273.25 613.15 16716.75
39 0.950 30.25 751.50 15.52 381.25 0.91 22.50 0.91 22.50 197.10 4857.75 20.23 501.15 24.65 613.13 24.16 599.75 10.74 266.63 10.74 266.63 632.81 15574.48
40 0.975 30.66 761.38 16.11 395.38 0.93 23.00 0.93 23.00 203.32 5005.25 20.64 510.90 24.93 619.75 24.53 608.63 10.90 270.50 10.90 270.50 654.47 16090.98
41 1.000 30.86 769.00 16.40 406.37 0.94 23.37 0.94 23.37 206.39 5121.37 20.84 518.55 25.06 624.87 24.71 615.50 10.98 273.50 10.98 273.50 665.31 16497.20
42 1.025 32.98 798.00 16.54 411.75 0.94 23.50 0.94 23.50 207.83 5177.75 20.94 522.30 28.13 664.87 26.61 641.50 11.83 285.12 11.83 285.12 803.55 18360.70
43 1.050 31.36 804.25 17.14 421.00 0.96 23.75 0.96 23.75 214.05 5273.50 21.34 528.45 25.40 669.12 25.16 647.12 11.18 287.62 11.18 287.62 692.24 18697.42
Behind Metal Inclined Sand horizontal Sand 450mm thk Rip
Stripping Rock-toe Behind sand Filters Hearting 200mm thk Metal 200mm thk sand Net Casing Area
Filters Chimney Filter Rap
Chainge
Slno
in Km
Area in Quantity Area in Quantity Area in Quantity Area in Quantity Area in Quantity in Area in Quantity in Area in Quantity in Area in Quantity Area in Quantity in Area in Quantity Area in Quantity
Sqm in Cum Sqm in Cum Sqm in Cum Sqm in Cum Sqm Cum Sqm Cum Sqm Cum Sqm in Cum Sqm Cum Sqm in Cum Sqm in Cum
44 1.075 30.92 778.50 16.50 420.50 0.94 23.75 0.94 23.75 207.27 5266.50 20.90 528.00 25.10 631.25 24.76 624.00 11.01 277.37 11.01 277.37 668.58 17010.25
45 1.100 31.87 784.87 17.92 430.25 0.98 24.00 0.98 24.00 221.92 5364.87 21.84 534.30 25.73 635.37 25.61 629.62 11.38 279.87 11.38 279.87 720.10 17358.45
46 1.125 34.55 830.25 18.94 460.75 1.01 24.87 1.01 24.87 232.47 5679.87 22.50 554.25 29.18 686.37 28.02 670.37 12.45 297.87 12.45 297.87 898.25 20229.37
47 1.143 32.04 599.31 15.17 306.99 0.90 17.19 0.90 17.19 193.65 3835.08 19.99 382.43 27.50 510.12 25.76 484.02 11.45 215.10 11.45 215.10 748.95 14824.78
Total 31797.44 14382.99 926.31 926.31 188437.96 20247.13 26447.62 25133.77 11170.48 11170.48 613349.21
Formation Mallamadugu Reservoir
BUND-2
Cross Section 0.025 Km
T.B.L = + 129.500 M Avg. G.L = + 123.625 M
Stripped.Level = + 123.325 M Stri.Lev = + 123.325 M
Height of Bund 6.175 M Depth of Stripping 0.300 M
MWL=+ 127.500 M FRL 127.500 M
1)Stripping
Bottom Width of Bund ( 129.500 - 123.325 )X 4+6+1.717+1.9= 34.32 M
Depth of Stripping ( 123.625 - 123.325 ) = 0.300 M
Area of Stripping ( 34.320 X 0.300 ) = 10.300 Sqm
2)Rock-Toe
Height of Rock-Toe ( 127.5-123.325 )X 20% 0.835 = 1.50 M (Minimum Height of Rock-
Bottom Width of Rock-Toe = 1.5 X 3 = 4.50 M Toe)
Area of Rock -Toe = 1/2X4.5X1.5 = 3.38 Sqm
a)Metal Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 1.500 = 2.12 M
Area = 2.12X0.2 = 0.42 Sqm
b)Sand Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 1.500 = 2.12 M
Area = 2.12X0.2 = 0.42 Sqm
3) Area of Herating Portion
Bottom Width ( 128.500 - 123.325 )X 0.5*2+3 = 8.18 M
Top Width = 3M
Arae of Hearting Soils = 3+8.18
X 5.175 = 28.93 Sqm
2
4) Area of horizontal Sand Filter (Sand Blanketn-1 M Thick)
Bottom Width of Sand ( 129.5-123.325)X2+3-0.57-4.5 - 8.18/2 = 6.19 M
Top Width = 6.19+1.5 = 7.69 M
Arae of Hearting Soils = 7.69+6.19
X 1.000 = 6.94 Sqm
2
5) Area of Inclined Sand Chimney
Top Level of Sand = 127.500
bottom level of sand = 124.325
thick ness of sand = 1M
Slan Length = sqrt (1*1+0.5*0.5) X 3.175 = 3.55 M
Area of Inclined Sand Chimney = 3.55 X 1 = 3.55 Sqm
6)Area of 450mm thk Rip Rap
Incliend length = Sqrt(2X2+1X1) X 6.175 = 13.81 M
Arae of 450thk Rip Rap = 13.81X0.45 = 6.21 Sqm
7)Area of 200 mm thk Metal
Incliend length = Sqrt(2X2+1X1) X 6.175 = 13.81 M
Arae of 200thk Sand = 13.81X0.2 = 2.76 Sqm
8) Area of Inclined Sand Chimney
Incliend length = Sqrt(2X2+1X1) X 6.175 = 13.81 M
Arae of 200thk Sand = 13.81X0.2 = 2.76 Sqm
9) Area of Bund
Bottom Width ( 129.500 - 123.325 )X 4+6 = 30.7 M
Top Width = 6M
Arae of Bund = 6+30.7
X 6.175 = 113.31 Sqm
2
12)Net casing Area = 113.31-3.38-0.42-0.42-28.93-6.94-3.55-6.21-2.76-2.76 = 57.94 Sqm
Profile wall
450 thk Rip Rap
200 thk Metal
200 thk Sand
0.3 Casing Soils
Area of Earthwork Excavation = 0.3 X 0.3 0.09 Sqm
Area of Concrete = (0.45 +0.2+0.2+0.3) X 0.3 0.35 Sqm
Concrete with
Top of U/S Face Slant Length EWE of Profile Wall
Stripped Height of grade of Mix CC
Slno Chainage the Area Quantity Area Quantity Remarks
Level Bund Details Length
Profile (Sqm) (Cum) (Sqm) (Cum)
1 0.000
2 0.030 120.198 129.500 9.302 sqrt(2.0X2.0+1X1) +5 X9.302 = 25.800 0.09 2.320 0.35 9.030
3 0.060 115.043 129.500 14.457 sqrt(2.5X2.5+1X1) +5 X14.457 = 43.927 0.09 3.950 0.35 15.370
4 0.090 113.198 129.500 16.302 sqrt(2.5X2.5+1X1) +5 X16.302 = 48.894 0.09 4.400 0.35 17.110
5 0.120 113.130 129.500 16.370 sqrt(2.5X2.5+1X1) +5 X16.37 = 49.078 0.09 4.420 0.35 17.180
6 0.150 112.880 129.500 16.620 sqrt(2.5X2.5+1X1) +5 X16.62 = 49.751 0.09 4.480 0.35 17.410
7 0.180 112.978 129.500 16.522 sqrt(2.5X2.5+1X1) +5 X16.522 = 49.487 0.09 4.450 0.35 17.320
8 0.210 113.105 129.500 16.395 sqrt(2.5X2.5+1X1) +5 X16.395 = 49.145 0.09 4.420 0.35 17.200
9 0.240 113.260 129.500 16.240 sqrt(2.5X2.5+1X1) +5 X16.24 = 48.728 0.09 4.390 0.35 17.050
10 0.270 113.318 129.500 16.182 sqrt(2.5X2.5+1X1) +5 X16.182 = 48.571 0.09 4.370 0.35 17.000
11 0.300 113.645 129.500 15.855 sqrt(2.5X2.5+1X1) +5 X15.855 = 47.691 0.09 4.290 0.35 16.690
12 0.330 113.835 129.500 15.665 sqrt(2.5X2.5+1X1) +5 X15.665 = 47.179 0.09 4.250 0.35 16.510
13 0.360 113.875 129.500 15.625 sqrt(2.5X2.5+1X1) +5 X15.625 = 47.072 0.09 4.240 0.35 16.480
14 0.390 113.888 129.500 15.612 sqrt(2.5X2.5+1X1) +5 X15.612 = 47.037 0.09 4.230 0.35 16.460
15 0.420 113.928 129.500 15.572 sqrt(2.5X2.5+1X1) +5 X15.572 = 46.929 0.09 4.220 0.35 16.430
16 0.450 113.925 129.500 15.575 sqrt(2.5X2.5+1X1) +5 X15.575 = 46.937 0.09 4.220 0.35 16.430
17 0.480 113.805 129.500 15.695 sqrt(2.5X2.5+1X1) +5 X15.695 = 47.260 0.09 4.250 0.35 16.540
18 0.510 113.718 129.500 15.782 sqrt(2.5X2.5+1X1) +5 X15.782 = 47.494 0.09 4.270 0.35 16.620
19 0.540 113.645 129.500 15.855 sqrt(2.5X2.5+1X1) +5 X15.855 = 47.691 0.09 4.290 0.35 16.690
20 0.570 113.578 129.500 15.922 sqrt(2.5X2.5+1X1) +5 X15.922 = 47.871 0.09 4.310 0.35 16.750
21 0.600 113.545 129.500 15.955 sqrt(2.5X2.5+1X1) +5 X15.955 = 47.960 0.09 4.320 0.35 16.790
22 0.630 113.420 129.500 16.080 sqrt(2.5X2.5+1X1) +5 X16.08 = 48.297 0.09 4.350 0.35 16.900
23 0.660 113.398 129.500 16.102 sqrt(2.5X2.5+1X1) +5 X16.102 = 48.356 0.09 4.350 0.35 16.920
24 0.690 113.318 129.500 16.182 sqrt(2.5X2.5+1X1) +5 X16.182 = 48.571 0.09 4.370 0.35 17.000
25 0.720 113.208 129.500 16.292 sqrt(2.5X2.5+1X1) +5 X16.292 = 48.868 0.09 4.400 0.35 17.100
26 0.750 113.080 129.500 16.420 sqrt(2.5X2.5+1X1) +5 X16.42 = 49.212 0.09 4.430 0.35 17.220
27 0.780 112.900 129.500 16.600 sqrt(2.5X2.5+1X1) +5 X16.6 = 49.697 0.09 4.470 0.35 17.390
Concrete with
Top of U/S Face Slant Length EWE of Profile Wall
Stripped Height of grade of Mix CC
Slno Chainage the Area Quantity Area Quantity Remarks
Level Bund Details Length
Profile (Sqm) (Cum) (Sqm) (Cum)
28 0.810 112.708 129.500 16.792 sqrt(2.5X2.5+1X1) +5 X16.792 = 50.214 0.09 4.520 0.35 17.570
29 0.840 112.530 129.500 16.970 sqrt(2.5X2.5+1X1) +5 X16.97 = 50.693 0.09 4.560 0.35 17.740
30 0.870 112.390 129.500 17.110 sqrt(2.5X2.5+1X1) +5 X17.11 = 51.070 0.09 4.600 0.35 17.870
31 0.900 111.920 129.500 17.580 sqrt(2.5X2.5+1X1) +5 X17.58 = 52.336 0.09 4.710 0.35 18.320
32 0.930 111.560 129.500 17.940 sqrt(2.5X2.5+1X1) +5 X17.94 = 53.305 0.09 4.800 0.35 18.660
33 0.960 111.268 129.500 18.232 sqrt(2.5X2.5+1X1) +5 X18.232 = 54.091 0.09 4.870 0.35 18.930
34 0.990 111.040 129.500 18.460 sqrt(2.5X2.5+1X1) +5 X18.46 = 54.705 0.09 4.920 0.35 19.150
35 1.020 110.930 129.500 18.570 sqrt(2.5X2.5+1X1) +5 X18.57 = 55.001 0.09 4.950 0.35 19.250
36 1.050 110.595 129.500 18.905 sqrt(2.5X2.5+1X1) +5 X18.905 = 55.903 0.09 5.030 0.35 19.570
37 1.080 110.570 129.500 18.930 sqrt(2.5X2.5+1X1) +5 X18.93 = 55.971 0.09 5.040 0.35 19.590
38 1.110 109.975 129.500 19.525 sqrt(2.5X2.5+1X1) +5 X19.525 = 57.573 0.09 5.180 0.35 20.150
39 1.143 110.663 129.500 18.837 sqrt(2.5X2.5+1X1) +5 X18.837 = 55.720 0.09 5.010 0.35 19.500
Total length of the Drilling holes into the rock from the
4584 meters
bottom of cut off trench
Cement consumption 0.75 Bag for one RMT
Total Cement Consumption 3438 Bags
Total Cement Consumption 172 MT
Formation Mallamadugu Reservoir
BUND-2
Detailed Es mate for 'Parpet wall' on U/S
150
CC M15-40 MSA
600
T BL .+131.000
1000
CC M 15 40 MSA 200
600
Details of Parapet
750
TBL-131.000
2
450
1
Height of Slope length of Chute Drain Earth work Excavation CC M15 Quantity
Rock Bund
Stripped
S.No. Chainage Toe Top above Length Quantity Quantity in
Level Details Details Details
level rock toe in m in Cum Cum
in m
1 2 5 6 7 8
1 0.000
2 0.045 120.198 121.698 7.80 (7.8x2.236) 17.45 0.5X(0.855+0.583)/2+(17.45-0.5)X0.583 10.24 0.5X(0.585+0.403)/2+(17.45-0.5)X0.403 7.08
3 0.090 113.198 116.058 13.44 (13.44x2.236) 30.06 0.5X(0.855+0.583)/2+(30.06-0.5)X0.583 17.59 0.5X(0.585+0.403)/2+(30.06-0.5)X0.403 12.16
4 0.135 112.880 115.804 13.70 (13.7x2.236) 30.62 0.5X(0.855+0.583)/2+(30.62-0.5)X0.583 17.92 0.5X(0.585+0.403)/2+(30.62-0.5)X0.403 12.39
5 0.180 112.978 115.882 13.62 (13.62x2.236) 30.45 0.5X(0.855+0.583)/2+(30.45-0.5)X0.583 17.82 0.5X(0.585+0.403)/2+(30.45-0.5)X0.403 12.32
6 0.225 113.220 116.076 13.42 (13.42x2.236) 30.02 0.5X(0.855+0.583)/2+(30.02-0.5)X0.583 17.57 0.5X(0.585+0.403)/2+(30.02-0.5)X0.403 12.14
7 0.270 113.318 116.154 13.35 (13.35x2.236) 29.84 0.5X(0.855+0.583)/2+(29.84-0.5)X0.583 17.46 0.5X(0.585+0.403)/2+(29.84-0.5)X0.403 12.07
8 0.315 113.718 116.474 13.03 (13.03x2.236) 29.13 0.5X(0.855+0.583)/2+(29.13-0.5)X0.583 17.05 0.5X(0.585+0.403)/2+(29.13-0.5)X0.403 11.78
9 0.360 113.875 116.600 12.90 (12.9x2.236) 28.84 0.5X(0.855+0.583)/2+(28.84-0.5)X0.583 16.88 0.5X(0.585+0.403)/2+(28.84-0.5)X0.403 11.67
10 0.405 113.928 116.642 12.86 (12.86x2.236) 28.75 0.5X(0.855+0.583)/2+(28.75-0.5)X0.583 16.83 0.5X(0.585+0.403)/2+(28.75-0.5)X0.403 11.63
11 0.450 113.925 116.640 12.86 (12.86x2.236) 28.75 0.5X(0.855+0.583)/2+(28.75-0.5)X0.583 16.83 0.5X(0.585+0.403)/2+(28.75-0.5)X0.403 11.63
12 0.495 113.805 116.544 12.96 (12.96x2.236) 28.97 0.5X(0.855+0.583)/2+(28.97-0.5)X0.583 16.96 0.5X(0.585+0.403)/2+(28.97-0.5)X0.403 11.72
13 0.540 113.645 116.416 13.08 (13.08x2.236) 29.26 0.5X(0.855+0.583)/2+(29.26-0.5)X0.583 17.13 0.5X(0.585+0.403)/2+(29.26-0.5)X0.403 11.84
14 0.585 113.545 116.336 13.16 (13.16x2.236) 29.43 0.5X(0.855+0.583)/2+(29.43-0.5)X0.583 17.23 0.5X(0.585+0.403)/2+(29.43-0.5)X0.403 11.91
15 0.630 113.420 116.236 13.26 (13.26x2.236) 29.66 0.5X(0.855+0.583)/2+(29.66-0.5)X0.583 17.36 0.5X(0.585+0.403)/2+(29.66-0.5)X0.403 12.00
16 0.675 113.395 116.216 13.28 (13.28x2.236) 29.70 0.5X(0.855+0.583)/2+(29.7-0.5)X0.583 17.38 0.5X(0.585+0.403)/2+(29.7-0.5)X0.403 12.01
17 0.720 113.208 116.066 13.43 (13.43x2.236) 30.04 0.5X(0.855+0.583)/2+(30.04-0.5)X0.583 17.58 0.5X(0.585+0.403)/2+(30.04-0.5)X0.403 12.15
18 0.765 113.060 115.948 13.55 (13.55x2.236) 30.30 0.5X(0.855+0.583)/2+(30.3-0.5)X0.583 17.73 0.5X(0.585+0.403)/2+(30.3-0.5)X0.403 12.26
19 0.810 112.708 115.666 13.83 (13.83x2.236) 30.93 0.5X(0.855+0.583)/2+(30.93-0.5)X0.583 18.10 0.5X(0.585+0.403)/2+(30.93-0.5)X0.403 12.51
Height of Slope length of Chute Drain Earth work Excavation CC M15 Quantity
Rock Bund
Stripped
S.No. Chainage Toe Top above Length Quantity Quantity in
Level Details Details Details
level rock toe in m in Cum Cum
in m
20 0.855 112.390 115.412 14.09 (14.09x2.236) 31.50 0.5X(0.855+0.583)/2+(31.5-0.5)X0.583 18.43 0.5X(0.585+0.403)/2+(31.5-0.5)X0.403 12.74
21 0.900 111.920 115.036 14.46 (14.46x2.236) 32.34 0.5X(0.855+0.583)/2+(32.34-0.5)X0.583 18.92 0.5X(0.585+0.403)/2+(32.34-0.5)X0.403 13.08
22 0.945 111.560 114.748 14.75 (14.75x2.236) 32.99 0.5X(0.855+0.583)/2+(32.99-0.5)X0.583 19.30 0.5X(0.585+0.403)/2+(32.99-0.5)X0.403 13.34
23 0.990 111.040 114.332 15.17 (15.17x2.236) 33.92 0.5X(0.855+0.583)/2+(33.92-0.5)X0.583 19.84 0.5X(0.585+0.403)/2+(33.92-0.5)X0.403 13.72
24 1.035 110.745 114.096 15.40 (15.4x2.236) 34.44 0.5X(0.855+0.583)/2+(34.44-0.5)X0.583 20.15 0.5X(0.585+0.403)/2+(34.44-0.5)X0.403 13.92
25 1.080 110.570 113.956 15.54 (15.54x2.236) 34.76 0.5X(0.855+0.583)/2+(34.76-0.5)X0.583 20.33 0.5X(0.585+0.403)/2+(34.76-0.5)X0.403 14.05
26 1.125 109.730 113.284 16.22 (16.22x2.236) 36.26 0.5X(0.855+0.583)/2+(36.26-0.5)X0.583 21.21 0.5X(0.585+0.403)/2+(36.26-0.5)X0.403 14.66
27 1.143 111.508 114.706 14.79 (14.79x2.236) 33.08 0.5X(0.855+0.583)/2+(33.08-0.5)X0.583 19.35 0.5X(0.585+0.403)/2+(33.08-0.5)X0.403 13.38
Length = 1.143 Km
Cross sectional Area at EWE= 0.583 Sqm
0.6
1 in 1 0.722 2.5 in 1
0.843
Rip Rap
4.085
3.355
2.625
0.675
0.875
1.075
0.6
1 in 1 0.730 2 in 1
0.860
Remarks
Cum
Cum
Cum
Remarks
Cum
Cum
Cum
Cum
Formation of Mallamadugu Reservoir
BUND-2
Detail Estimate D/S Toe Drain
0.5 M GL
2 in 1 1 in 1 300 mm Thk Rip Rap.
0.5 M 200 mm thk Metal
0.5 M 200 mm thk Sand
0.695
2 in1 0.825 1in1
0.955
1M
1 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 0.025 18.70 233.75 3.09 38.63 0.41 5.13 0.41 5.13 57.96 724.50 6.90 86.25 19.63 245.38 12.99 162.38 5.77 72.13 5.77 72.13 183.78 2297.25
3 0.050 29.51 602.63 14.48 219.63 0.88 16.13 0.88 16.13 186.35 3053.88 19.50 330.00 24.16 547.38 23.49 456.00 10.44 202.63 10.44 202.63 594.77 9731.88
4 0.075 33.25 784.50 20.09 432.13 1.04 24.00 1.04 24.00 244.15 5381.25 23.21 533.85 26.65 635.13 26.85 629.25 11.93 279.63 11.93 279.63 798.11 17411.03
5 0.100 32.99 828.00 19.69 497.25 1.02 25.75 1.02 25.75 240.08 6052.88 22.97 577.20 26.48 664.13 26.62 668.38 11.83 297.00 11.83 297.00 783.69 19772.55
6 0.125 32.65 820.50 19.15 485.50 1.01 25.38 1.01 25.38 234.43 5931.38 22.62 569.85 26.25 659.13 26.31 661.63 11.69 294.00 11.69 294.00 764.04 19346.65
7 0.150 32.29 811.75 18.58 471.63 1.00 25.13 1.00 25.13 228.72 5789.38 22.26 561.00 26.01 653.25 25.99 653.75 11.55 290.50 11.55 290.50 743.79 18847.88
8 0.175 32.04 804.13 18.19 459.63 0.98 24.75 0.98 24.75 224.69 5667.63 22.02 553.50 25.85 648.25 25.77 647.00 11.45 287.50 11.45 287.50 729.89 18421.00
9 0.200 31.79 797.88 17.81 450.00 0.97 24.38 0.97 24.38 220.80 5568.63 21.77 547.35 25.68 644.13 25.54 641.38 11.35 285.00 11.35 285.00 715.95 18073.03
10 0.225 31.52 791.38 17.38 439.88 0.96 24.13 0.96 24.13 216.42 5465.25 21.49 540.75 25.50 639.75 25.29 635.38 11.24 282.38 11.24 282.38 700.80 17709.38
11 0.250 31.50 787.75 17.35 434.13 0.96 24.00 0.96 24.00 216.15 5407.13 21.47 537.00 25.49 637.38 25.28 632.13 11.23 280.88 11.23 280.88 699.62 17505.25
12 0.270 30.69 621.90 16.16 335.10 0.93 18.90 0.93 18.90 203.78 4199.30 20.68 421.44 24.95 504.40 24.56 498.40 10.91 221.40 10.91 221.40 656.36 13559.86
Total 7884.15 4263.48 237.65 237.65 53241.18 5258.19 6478.28 6285.65 2793.03 2793.03 172675.74
Formation Mallamadugu Reservoir
BUND-3
Cross Section 0.025 Km
T.B.L = + 131.000 M Avg. G.L = + 120.625 M
Stripped.Level = + 120.325 M Stri.Lev = + 120.325 M
Height of Bund 10.675 M Depth of Stripping 0.300 M
MWL=+ 127.500 M FRL 127.500 M
1)Stripping
Bottom Width of Bund ( 131.000 - 120.325 )X 4+6+10+1.717+1.9= 62.32 M
Depth of Stripping ( 120.625 - 120.325 ) = 0.300 M
Area of Stripping ( 62.320 X 0.300 ) = 18.700 Sqm
2)Rock-Toe
Height of Rock-Toe ( 127.5-120.325 )X 20% 1.435 = 1.44 M
Bottom Width of Rock-Toe = 1.435 X 3 = 4.31 M
Area of Rock -Toe =1/2X4.31X1.435 = 3.09 Sqm
a)Metal Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 1.435 = 2.03 M
Area = 2.03X0.2 = 0.41 Sqm
b)Sand Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 1.435 = 2.03 M
Area = 2.03X0.2 = 0.41 Sqm
3) Area of Herating Portion
Bottom Width ( 128.500 - 120.325 )X 0.5*2+3 = 11.18 M
Top Width = 3M
Arae of Hearting Soils = 3+11.18
X 8.175 = 57.96 Sqm
2
4) Area of horizontal Sand Filter (Sand Blanketn-1 M Thick)
Bottom Width of Sand ( 131-120.325)X2+3+5-0.57-4.31- 11.18/2 = 18.88 M
Top Width = 18.88+1.5 = 20.38 M
Arae of Hearting Soils = 20.38+18.88
X 1.000 = 19.63 Sqm
2
5) Area of Inclined Sand Chimney
Top Level of Sand = 127.500
bottom level of sand = 121.325
thick ness of sand = 1M
Slan Length = sqrt (1*1+0.5*0.5) X 6.175 = 6.9 M
Area of Inclined Sand Chimney = 6.9 X 1 = 6.9 Sqm
6)Area of 450mm thk Rip Rap
Incliend length = Sqrt(2X2+1X1) X 10.675 + 5 = 28.87 M
Arae of 450thk Rip Rap = 28.87X0.45 = 12.99 Sqm
7)Area of 200 mm thk Metal
Incliend length = Sqrt(2X2+1X1) X 10.675 + 5 = 28.87 M
Arae of 200thk Sand = 28.87X0.2 = 5.77 Sqm
8) Area of Inclined Sand Chimney
Incliend length = Sqrt(2X2+1X1) X 10.675 + 5 = 28.87 M
Arae of 200thk Sand = 28.87X0.2 = 5.77 Sqm
9) Area of Bund
Bottom Width ( 131.000 - 120.325 )X 4+6+10 = 58.7 M
At 120.8 Incl Berm ( 131.000 - 120.800 )X 4+6+10 56.8 M
Top Width = 6M
Arae of Bund up to Berm = 56.8+58.7
X 0.475 = 27.43 Sqm
2
Arae of Bund Berm to TBL = 6+46.8
X 10.200 = 269.28 Sqm
2
Total 296.71 Sqm
12)Net casing Area = 296.71-3.09-0.41-0.41-57.96-19.63-6.9-12.99-5.77-5.77 = 183.78 Sqm
Slno Descrption Area
1 Stripping = 18.700 Sqm
8 Rock-toe = 3.09 Sqm
9 Behind sand Filters = 0.41 Sqm
10 Behind Metal Filters = 0.41 Sqm
11 Hearting = 57.96 Sqm
12 Inclined Sand Chimney = 6.9 Sqm
13 horizontal Sand Filter = 19.63 Sqm
14 450mm thk Rip Rap = 12.99 Sqm
15 200mm thk Metal = 5.77 Sqm
16 200mm thk sand = 5.77 Sqm
17 Net Casing Area = 183.78 Sqm
Formation Mallamadugu Reservoir
BUND-1
Cross Section 0.050 Km
T.B.L = + 129.500 M Avg. G.L = + 112.265 M
Stripped.Level = + 111.965 M Stri.Lev = + 111.965 M
Height of Bund 17.535 M Depth of Stripping 0.300 M
MWL=+ 127.500 M FRL 127.500 M
1)Stripping
Bottom Width of Bund ( 129.500 - 111.965 )X 4.5+6+10+1.567+2.5= 98.37 M
Depth of Stripping ( 112.265 - 111.965 ) = 0.300 M
Area of Stripping ( 98.370 X 0.300 ) = 29.510 Sqm
2)Rock-Toe
Height of Rock-Toe ( 127.5-111.965 )X 20% 3.107 = 3.11 M
Bottom Width of Rock-Toe = 3.107 X 3 = 9.32 M
Area of Rock -Toe = 1/2X9.32X3.107 = 14.48 Sqm
a)Metal Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 3.107 = 4.39 M
Area = 4.39X0.2 = 0.88 Sqm
b)Sand Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 3.107 = 4.39 M
Area = 4.39X0.2 = 0.88 Sqm
3) Area of Herating Portion
Bottom Width ( 128.500 - 111.965 )X 0.5*2+3 = 19.54 M
Top Width = 3 M
Arae of Hearting Soils = 3+19.54
X 16.535 = 186.35 Sqm
2
4) Area of horizontal Sand Filter (Sand Blanketn-1 M Thick)
Bottom Width of Sand ( 129.5-111.965)X2+3+5-0.57-9.32- 19.54/2 = 23.41 M
Top Width = 23.41+1.5 = 24.91 M
Arae of Hearting Soils = 24.91+23.41
X 1.000 = 24.16 Sqm
2
5) Area of Inclined Sand Chimney
Top Level of Sand = 127.500
bottom level of sand = 112.965
thick ness of sand = 1.2 M
Slan Length = sqrt (1*1+0.5*0.5) X 14.535 = 16.25 M
Area of Inclined Sand Chimney = 16.25 X 1.2 = 19.5 Sqm
6)Area of 450mm thk Rip Rap
Incliend length = Sqrt(2.5X2.5+1X1) X 17.535 + 5 = 52.21 M
Arae of 450thk Rip Rap = 52.21X0.45 = 23.49 Sqm
7)Area of 200 mm thk Metal
Incliend length = Sqrt(2.5X2.5+1X1) X 17.535 + 5 = 52.21 M
Arae of 200thk Sand = 52.21X0.2 = 10.44 Sqm
8) Area of Inclined Sand Chimney
Incliend length = Sqrt(2.5X2.5+1X1) X 17.535 + 5 = 52.21 M
Arae of 200thk Sand = 52.21X0.2 = 10.44 Sqm
9) Area of Bund
Bottom Width ( 129.500 - 111.965 )X 4.5+6+10 = 94.91 M
At 120.8 Incl Berm ( 129.500 - 120.800 )X 4.5+6+10 55.15 M
Top Width = 6 M
Arae of Bund up to Berm = 55.15+94.91
X 8.835 = 662.89 Sqm
2
Arae of Bund Berm to TBL = 6+45.15
X 8.700 = 222.50 Sqm
2
Total 885.39 Sqm
12)Net casing Area = 885.39-14.48-0.88-0.88-186.35-24.16-19.5-23.49-10.44-10.44 = 594.77 Sqm
Slno Descrption Area
1 Stripping = 29.510 Sqm
8 Rock-toe = 14.48 Sqm
9 Behind sand Filters = 0.88 Sqm
10 Behind Metal Filters = 0.88 Sqm
11 Hearting = 186.35 Sqm
12 Inclined Sand Chimney = 19.5 Sqm
13 horizontal Sand Filter = 24.16 Sqm
14 450mm thk Rip Rap = 23.49 Sqm
15 200mm thk Metal = 10.44 Sqm
16 200mm thk sand = 10.44 Sqm
17 Net Casing Area = 594.77 Sqm
Formation Mallamadugu Reservoir
BUND-1
Cross Section 0.075 Km
T.B.L = + 129.500 M Avg. G.L = + 109.500 M
Stripped.Level = + 109.200 M Stri.Lev = + 109.200 M
Height of Bund 20.300 M Depth of Stripping 0.300 M
MWL=+ 127.500 M FRL 127.500 M
1)Stripping
Bottom Width of Bund ( 129.500 - 109.200 )X 4.5+6+10+1.567+2.5= 110.8 M
Depth of Stripping ( 109.500 - 109.200 ) = 0.300 M
Area of Stripping ( 110.820 X 0.300 ) = 33.250 Sqm
2)Rock-Toe
Height of Rock-Toe ( 127.5-109.2 )X 20% 3.66 = 3.66 M
Bottom Width of Rock-Toe = 3.66 X 3 = 10.98 M
Area of Rock -Toe = 1/2X10.98X3.66 = 20.09 Sqm
a)Metal Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 3.660 = 5.18 M
Area = 5.18X0.2 = 1.04 Sqm
b)Sand Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 3.660 = 5.18 M
Area = 5.18X0.2 = 1.04 Sqm
3) Area of Herating Portion
Bottom Width ( 128.500 - 109.200 )X 0.5*2+3 = 22.3 M
Top Width = 3 M
Arae of Hearting Soils = 3+22.3
X 19.300 = 244.15 Sqm
2
4) Area of horizontal Sand Filter (Sand Blanketn-1 M Thick)
Bottom Width of Sand ( 129.5-109.2)X2+3+5-0.57-10.98 - 22.3/2 = 25.90 M
Top Width = 25.9+1.5 = 27.40 M
Arae of Hearting Soils = 27.4+25.9
X 1.000 = 26.65 Sqm
2
5) Area of Inclined Sand Chimney
Top Level of Sand = 127.500
bottom level of sand = 110.200
thick ness of sand = 1.2 M
Slan Length = sqrt (1*1+0.5*0.5) X 17.300 = 19.34 M
Area of Inclined Sand Chimney = 19.34 X 1.2 = 23.208 Sqm
6)Area of 450mm thk Rip Rap
Incliend length = Sqrt(2.5X2.5+1X1) X 20.300 + 5 = 59.66 M
Arae of 450thk Rip Rap = 59.66X0.45 = 26.85 Sqm
7)Area of 200 mm thk Metal
Incliend length = Sqrt(2.5X2.5+1X1) X 20.300 + 5 = 59.66 M
Arae of 200thk Sand = 59.66X0.2 = 11.93 Sqm
8) Area of Inclined Sand Chimney
Incliend length = Sqrt(2.5X2.5+1X1) X 20.300 + 5 = 59.66 M
Arae of 200thk Sand = 59.66X0.2 = 11.93 Sqm
9) Area of Bund
Bottom Width ( 129.500 - 109.200 )X 4.5+6+10 = 107.35 M
At 120.8 Incl Berm ( 129.500 - 120.800 )X 4.5+6+10 55.15 M
Top Width = 6 M
Arae of Bund up to Berm = 55.15+107.35
X 11.600 = 942.50 Sqm
2
Arae of Bund Berm to TBL = 6+45.15
X 8.700 = 222.50 Sqm
2
Total 1165.00 Sqm
12)Net casing Area = 1165-20.09-1.04-1.04-244.15-26.65-23.208-26.85-11.93-11.93 = 798.11 Sqm
Slno Descrption Area
1 Stripping = 33.250 Sqm
8 Rock-toe = 20.09 Sqm
9 Behind sand Filters = 1.04 Sqm
10 Behind Metal Filters = 1.04 Sqm
11 Hearting = 244.15 Sqm
12 Inclined Sand Chimney = 23.208 Sqm
13 horizontal Sand Filter = 26.65 Sqm
14 450mm thk Rip Rap = 26.85 Sqm
15 200mm thk Metal = 11.93 Sqm
16 200mm thk sand = 11.93 Sqm
17 Net Casing Area = 798.11 Sqm
Formation Mallamadugu Reservoir
BUND-1
Cross Section 0.100 Km
T.B.L = + 129.500 M Avg. G.L = + 109.685 M
Stripped.Level = + 109.385 M Stri.Lev = + 109.385 M
Height of Bund 20.115 M Depth of Stripping 0.300 M
MWL=+ 127.500 M FRL 127.500 M
1)Stripping
Bottom Width of Bund ( 129.500 - 109.385 )X 4.5+6+10+1.567+2.5= 110 M
Depth of Stripping ( 109.685 - 109.385 ) = 0.300 M
Area of Stripping ( 109.980 X 0.300 ) = 32.990 Sqm
2)Rock-Toe
Height of Rock-Toe ( 127.5-109.385 )X 20% 3.623 = 3.62 M
Bottom Width of Rock-Toe = 3.623 X 3 = 10.87 M
Area of Rock -Toe = 1/2X10.87X3.623 = 19.69 Sqm
a)Metal Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 3.623 = 5.12 M
Area = 5.12X0.2 = 1.02 Sqm
b)Sand Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 3.623 = 5.12 M
Area = 5.12X0.2 = 1.02 Sqm
3) Area of Herating Portion
Bottom Width ( 128.500 - 109.385 )X 0.5*2+3 = 22.12 M
Top Width = 3 M
Arae of Hearting Soils = 3+22.12
X 19.115 = 240.08 Sqm
2
4) Area of horizontal Sand Filter (Sand Blanketn-1 M Thick)
Bottom Width of Sand ( 129.5-109.385)X2+3+5-0.57-10.87 - 22.12/2 = 25.73 M
Top Width = 25.73+1.5 = 27.23 M
Arae of Hearting Soils = 27.23+25.73
X 1.000 = 26.48 Sqm
2
5) Area of Inclined Sand Chimney
Top Level of Sand = 127.500
bottom level of sand = 110.385
thick ness of sand = 1.2 M
Slan Length = sqrt (1*1+0.5*0.5) X 17.115 = 19.14 M
Area of Inclined Sand Chimney = 19.14 X 1.2 = 22.968 Sqm
6)Area of 450mm thk Rip Rap
Incliend length = Sqrt(2.5X2.5+1X1) X 20.115 + 5 = 59.16 M
Arae of 450thk Rip Rap = 59.16X0.45 = 26.62 Sqm
7)Area of 200 mm thk Metal
Incliend length = Sqrt(2.5X2.5+1X1) X 20.115 + 5 = 59.16 M
Arae of 200thk Sand = 59.16X0.2 = 11.83 Sqm
8) Area of Inclined Sand Chimney
Incliend length = Sqrt(2.5X2.5+1X1) X 20.115 + 5 = 59.16 M
Arae of 200thk Sand = 59.16X0.2 = 11.83 Sqm
9) Area of Bund
Bottom Width ( 129.500 - 109.385 )X 4.5+6+10 = 106.52 M
At 120.8 Incl Berm ( 129.500 - 120.800 )X 4.5+6+10 55.15 M
Top Width = 6 M
Arae of Bund up to Berm = 55.15+106.52
X 11.415 = 922.73 Sqm
2
Arae of Bund Berm to TBL = 6+45.15
X 8.700 = 222.50 Sqm
2
Total 1145.23 Sqm
12)Net casing Area = 1145.23-19.69-1.02-1.02-240.08-26.48-22.968-26.62-11.83-11.83 = 783.69 Sqm
Slno Descrption Area
1 Stripping = 32.990 Sqm
8 Rock-toe = 19.69 Sqm
9 Behind sand Filters = 1.02 Sqm
10 Behind Metal Filters = 1.02 Sqm
11 Hearting = 240.08 Sqm
12 Inclined Sand Chimney = 22.968 Sqm
13 horizontal Sand Filter = 26.48 Sqm
14 450mm thk Rip Rap = 26.62 Sqm
15 200mm thk Metal = 11.83 Sqm
16 200mm thk sand = 11.83 Sqm
17 Net Casing Area = 783.69 Sqm
Formation Mallamadugu Reservoir
BUND-1
Cross Section 0.125 Km
T.B.L = + 129.500 M Avg. G.L = + 109.940 M
Stripped.Level = + 109.640 M Stri.Lev = + 109.640 M
Height of Bund 19.860 M Depth of Stripping 0.300 M
MWL=+ 127.500 M FRL 127.500 M
1)Stripping
Bottom Width of Bund ( 129.500 - 109.640 )X 4.5+6+10+1.567+2.5= 108.8 M
Depth of Stripping ( 109.940 - 109.640 ) = 0.300 M
Area of Stripping ( 108.840 X 0.300 ) = 32.650 Sqm
2)Rock-Toe
Height of Rock-Toe ( 127.5-109.64 )X 20% 3.572 = 3.57 M
Bottom Width of Rock-Toe = 3.572 X 3 = 10.72 M
Area of Rock -Toe = 1/2X10.72X3.572 = 19.15 Sqm
a)Metal Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 3.572 = 5.05 M
Area = 5.05X0.2 = 1.01 Sqm
b)Sand Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 3.572 = 5.05 M
Area = 5.05X0.2 = 1.01 Sqm
3) Area of Herating Portion
Bottom Width ( 128.500 - 109.640 )X 0.5*2+3 = 21.86 M
Top Width = 3 M
Arae of Hearting Soils = 3+21.86
X 18.860 = 234.43 Sqm
2
4) Area of horizontal Sand Filter (Sand Blanketn-1 M Thick)
Bottom Width of Sand ( 129.5-109.64)X2+3+5-0.57-10.72- 21.86/2 = 25.50 M
Top Width = 25.5+1.5 = 27.00 M
Arae of Hearting Soils = 27+25.5
X 1.000 = 26.25 Sqm
2
5) Area of Inclined Sand Chimney
Top Level of Sand = 127.500
bottom level of sand = 110.640
thick ness of sand = 1.2 M
Slan Length = sqrt (1*1+0.5*0.5) X 16.860 = 18.85 M
Area of Inclined Sand Chimney = 18.85 X 1.2 = 22.62 Sqm
6)Area of 450mm thk Rip Rap
Incliend length = Sqrt(2.5X2.5+1X1) X 19.860 + 5 = 58.47 M
Arae of 450thk Rip Rap = 58.47X0.45 = 26.31 Sqm
7)Area of 200 mm thk Metal
Incliend length = Sqrt(2.5X2.5+1X1) X 19.860 + 5 = 58.47 M
Arae of 200thk Sand = 58.47X0.2 = 11.69 Sqm
8) Area of Inclined Sand Chimney
Incliend length = Sqrt(2.5X2.5+1X1) X 19.860 + 5 = 58.47 M
Arae of 200thk Sand = 58.47X0.2 = 11.69 Sqm
9) Area of Bund
Bottom Width ( 129.500 - 109.640 )X 4.5+6+10 = 105.37 M
At 120.8 Incl Berm ( 129.500 - 120.800 )X 4.5+6+10 55.15 M
Top Width = 6 M
Arae of Bund up to Berm = 55.15+105.37
X 11.160 = 895.70 Sqm
2
Arae of Bund Berm to TBL = 6+45.15
X 8.700 = 222.50 Sqm
2
Total 1118.20 Sqm
12)Net casing Area = 1118.2-19.15-1.01-1.01-234.43-26.25-22.62-26.31-11.69-11.69 = 764.04 Sqm
Slno Descrption Area
1 Stripping = 32.650 Sqm
8 Rock-toe = 19.15 Sqm
9 Behind sand Filters = 1.01 Sqm
10 Behind Metal Filters = 1.01 Sqm
11 Hearting = 234.43 Sqm
12 Inclined Sand Chimney = 22.62 Sqm
13 horizontal Sand Filter = 26.25 Sqm
14 450mm thk Rip Rap = 26.31 Sqm
15 200mm thk Metal = 11.69 Sqm
16 200mm thk sand = 11.69 Sqm
17 Net Casing Area = 764.04 Sqm
Formation Mallamadugu Reservoir
BUND-1
Cross Section 0.150 Km
T.B.L = + 129.500 M Avg. G.L = + 110.205 M
Stripped.Level = + 109.905 M Stri.Lev = + 109.905 M
Height of Bund 19.595 M Depth of Stripping 0.300 M
MWL=+ 127.500 M FRL 127.500 M
1)Stripping
Bottom Width of Bund ( 129.500 - 109.905 )X 4.5+6+10+1.567+2.5= 107.6 M
Depth of Stripping ( 110.205 - 109.905 ) = 0.300 M
Area of Stripping ( 107.640 X 0.300 ) = 32.290 Sqm
2)Rock-Toe
Height of Rock-Toe ( 127.5-109.905 )X 20% 3.519 = 3.52 M
Bottom Width of Rock-Toe = 3.519 X 3 = 10.56 M
Area of Rock -Toe = 1/2X10.56X3.519 = 18.58 Sqm
a)Metal Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 3.519 = 4.98 M
Area = 4.98X0.2 = 1 Sqm
b)Sand Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 3.519 = 4.98 M
Area = 4.98X0.2 = 1 Sqm
3) Area of Herating Portion
Bottom Width ( 128.500 - 109.905 )X 0.5*2+3 = 21.6 M
Top Width = 3M
Arae of Hearting Soils = 3+21.6
X 18.595 = 228.72 Sqm
2
4) Area of horizontal Sand Filter (Sand Blanketn-1 M Thick)
Bottom Width of Sand ( 129.5-109.905)X2+3+5-0.57-10.56 - 21.6/2 = 25.26 M
Top Width = 25.26+1.5 = 26.76 M
Arae of Hearting Soils = 26.76+25.26
X 1.000 = 26.01 Sqm
2
5) Area of Inclined Sand Chimney
Top Level of Sand = 127.500
bottom level of sand = 110.905
thick ness of sand = 1.2 M
Slan Length = sqrt (1*1+0.5*0.5) X 16.595 = 18.55 M
Area of Inclined Sand Chimney = 18.55 X 1.2 = 22.26 Sqm
6)Area of 450mm thk Rip Rap
Incliend length = Sqrt(2.5X2.5+1X1) X 19.595 + 5 = 57.76 M
Arae of 450thk Rip Rap = 57.76X0.45 = 25.99 Sqm
7)Area of 200 mm thk Metal
Incliend length = Sqrt(2.5X2.5+1X1) X 19.595 + 5 = 57.76 M
Arae of 200thk Sand = 57.76X0.2 = 11.55 Sqm
8) Area of Inclined Sand Chimney
Incliend length = Sqrt(2.5X2.5+1X1) X 19.595 + 5 = 57.76 M
Arae of 200thk Sand = 57.76X0.2 = 11.55 Sqm
9) Area of Bund
Bottom Width ( 129.500 - 109.905 )X 4.5+6+10 = 104.18 M
At 120.8 Incl Berm ( 129.500 - 120.800 )X 4.5+6+10 55.15 M
Top Width = 6M
Arae of Bund up to Berm = 55.15+104.18
X 10.895 = 867.95 Sqm
2
Arae of Bund Berm to TBL = 6+45.15
X 8.700 = 222.50 Sqm
2
Total 1090.45 Sqm
12)Net casing Area = 1090.45-18.58-1-1-228.72-26.01-22.26-25.99-11.55-11.55 = 743.79 Sqm
Slno Descrption Area
1 Stripping = 32.290 Sqm
8 Rock-toe = 18.58 Sqm
9 Behind sand Filters = 1 Sqm
10 Behind Metal Filters = 1 Sqm
11 Hearting = 228.72 Sqm
12 Inclined Sand Chimney = 22.26 Sqm
13 horizontal Sand Filter = 26.01 Sqm
14 450mm thk Rip Rap = 25.99 Sqm
15 200mm thk Metal = 11.55 Sqm
16 200mm thk sand = 11.55 Sqm
17 Net Casing Area = 743.79 Sqm
Formation Mallamadugu Reservoir
BUND-1
Cross Section 0.175 Km
T.B.L = + 129.500 M Avg. G.L = + 110.390 M
Stripped.Level = + 110.090 M Stri.Lev = + 110.090 M
Height of Bund 19.410 M Depth of Stripping 0.300 M
MWL=+ 127.500 M FRL 127.500 M
1)Stripping
Bottom Width of Bund ( 129.500 - 110.090 )X 4.5+6+10+1.567+2.5= 106.8 M
Depth of Stripping ( 110.390 - 110.090 ) = 0.300 M
Area of Stripping ( 106.810 X 0.300 ) = 32.040 Sqm
2)Rock-Toe
Height of Rock-Toe ( 127.5-110.09 )X 20% 3.482 = 3.48 M
Bottom Width of Rock-Toe = 3.482 X 3 = 10.45 M
Area of Rock -Toe = 1/2X10.45X3.482 = 18.19 Sqm
a)Metal Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 3.482 = 4.92 M
Area = 4.92X0.2 = 0.98 Sqm
b)Sand Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 3.482 = 4.92 M
Area = 4.92X0.2 = 0.98 Sqm
3) Area of Herating Portion
Bottom Width ( 128.500 - 110.090 )X 0.5*2+3 = 21.41 M
Top Width = 3 M
Arae of Hearting Soils = 3+21.41
X 18.410 = 224.69 Sqm
2
4) Area of horizontal Sand Filter (Sand Blanketn-1 M Thick)
Bottom Width of Sand ( 129.5-110.09)X2+3+5-0.57-10.45- 21.41/2 = 25.10 M
Top Width = 25.1+1.5 = 26.60 M
Arae of Hearting Soils = 26.6+25.1
X 1.000 = 25.85 Sqm
2
5) Area of Inclined Sand Chimney
Top Level of Sand = 127.500
bottom level of sand = 111.090
thick ness of sand = 1.2 M
Slan Length = sqrt (1*1+0.5*0.5) X 16.410 = 18.35 M
Area of Inclined Sand Chimney = 18.35 X 1.2 = 22.02 Sqm
6)Area of 450mm thk Rip Rap
Incliend length = Sqrt(2.5X2.5+1X1) X 19.410 + 5 = 57.26 M
Arae of 450thk Rip Rap = 57.26X0.45 = 25.77 Sqm
7)Area of 200 mm thk Metal
Incliend length = Sqrt(2.5X2.5+1X1) X 19.410 + 5 = 57.26 M
Arae of 200thk Sand = 57.26X0.2 = 11.45 Sqm
8) Area of Inclined Sand Chimney
Incliend length = Sqrt(2.5X2.5+1X1) X 19.410 + 5 = 57.26 M
Arae of 200thk Sand = 57.26X0.2 = 11.45 Sqm
9) Area of Bund
Bottom Width ( 129.500 - 110.090 )X 4.5+6+10 = 103.35 M
At 120.8 Incl Berm ( 129.500 - 120.800 )X 4.5+6+10 55.15 M
Top Width = 6 M
Arae of Bund up to Berm = 55.15+103.35
X 10.710 = 848.77 Sqm
2
Arae of Bund Berm to TBL = 6+45.15
X 8.700 = 222.50 Sqm
2
Total 1071.27 Sqm
12)Net casing Area = 1071.27-18.19-0.98-0.98-224.69-25.85-22.02-25.77-11.45-11.45 = 729.89 Sqm
Slno Descrption Area
1 Stripping = 32.040 Sqm
8 Rock-toe = 18.19 Sqm
9 Behind sand Filters = 0.98 Sqm
10 Behind Metal Filters = 0.98 Sqm
11 Hearting = 224.69 Sqm
12 Inclined Sand Chimney = 22.02 Sqm
13 horizontal Sand Filter = 25.85 Sqm
14 450mm thk Rip Rap = 25.77 Sqm
15 200mm thk Metal = 11.45 Sqm
16 200mm thk sand = 11.45 Sqm
17 Net Casing Area = 729.89 Sqm
Formation Mallamadugu Reservoir
BUND-1
Cross Section 0.200 Km
T.B.L = + 129.500 M Avg. G.L = + 110.575 M
Stripped.Level = + 110.275 M Stri.Lev = + 110.275 M
Height of Bund 19.225 M Depth of Stripping 0.300 M
MWL=+ 127.500 M FRL 127.500 M
1)Stripping
Bottom Width of Bund ( 129.500 - 110.275 )X 4.5+6+10+1.567+2.5= 106 M
Depth of Stripping ( 110.575 - 110.275 ) = 0.300 M
Area of Stripping ( 105.980 X 0.300 ) = 31.790 Sqm
2)Rock-Toe
Height of Rock-Toe ( 127.5-110.275 )X 20% 3.445 = 3.45 M
Bottom Width of Rock-Toe = 3.445 X 3 = 10.34 M
Area of Rock -Toe = 1/2X10.34X3.445 = 17.81 Sqm
a)Metal Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 3.445 = 4.87 M
Area = 4.87X0.2 = 0.97 Sqm
b)Sand Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 3.445 = 4.87 M
Area = 4.87X0.2 = 0.97 Sqm
3) Area of Herating Portion
Bottom Width ( 128.500 - 110.275 )X 0.5*2+3 = 21.23 M
Top Width = 3 M
Arae of Hearting Soils = 3+21.23
X 18.225 = 220.80 Sqm
2
4) Area of horizontal Sand Filter (Sand Blanketn-1 M Thick)
Bottom Width of Sand ( 129.5-110.275)X2+3+5-0.57-10.34 - 21.23/2 = 24.93 M
Top Width = 24.93+1.5 = 26.43 M
Arae of Hearting Soils = 26.43+24.93
X 1.000 = 25.68 Sqm
2
5) Area of Inclined Sand Chimney
Top Level of Sand = 127.500
bottom level of sand = 111.275
thick ness of sand = 1.2 M
Slan Length = sqrt (1*1+0.5*0.5) X 16.225 = 18.14 M
Area of Inclined Sand Chimney = 18.14 X 1.2 = 21.768 Sqm
6)Area of 450mm thk Rip Rap
Incliend length = Sqrt(2.5X2.5+1X1) X 19.225 + 5 = 56.76 M
Arae of 450thk Rip Rap = 56.76X0.45 = 25.54 Sqm
7)Area of 200 mm thk Metal
Incliend length = Sqrt(2.5X2.5+1X1) X 19.225 + 5 = 56.76 M
Arae of 200thk Sand = 56.76X0.2 = 11.35 Sqm
8) Area of Inclined Sand Chimney
Incliend length = Sqrt(2.5X2.5+1X1) X 19.225 + 5 = 56.76 M
Arae of 200thk Sand = 56.76X0.2 = 11.35 Sqm
9) Area of Bund
Bottom Width ( 129.500 - 110.275 )X 4.5+6+10 = 102.51 M
At 120.8 Incl Berm ( 129.500 - 120.800 )X 4.5+6+10 55.15 M
Top Width = 6 M
Arae of Bund up to Berm = 55.15+102.51
X 10.525 = 829.69 Sqm
2
Arae of Bund Berm to TBL = 6+45.15
X 8.700 = 222.50 Sqm
2
Total 1052.19 Sqm
12)Net casing Area = 1052.19-17.81-0.97-0.97-220.8-25.68-21.768-25.54-11.35-11.35 = 715.95 Sqm
Slno Descrption Area
1 Stripping = 31.790 Sqm
8 Rock-toe = 17.81 Sqm
9 Behind sand Filters = 0.97 Sqm
10 Behind Metal Filters = 0.97 Sqm
11 Hearting = 220.80 Sqm
12 Inclined Sand Chimney = 21.768 Sqm
13 horizontal Sand Filter = 25.68 Sqm
14 450mm thk Rip Rap = 25.54 Sqm
15 200mm thk Metal = 11.35 Sqm
16 200mm thk sand = 11.35 Sqm
17 Net Casing Area = 715.95 Sqm
Formation Mallamadugu Reservoir
BUND-1
Cross Section 0.225 Km
T.B.L = + 129.500 M Avg. G.L = + 110.780 M
Stripped.Level = + 110.480 M Stri.Lev = + 110.480 M
Height of Bund 19.020 M Depth of Stripping 0.300 M
MWL=+ 127.500 M FRL 127.500 M
1)Stripping
Bottom Width of Bund ( 129.500 - 110.480 )X 4.5+6+10+1.567+2.5= 105.1 M
Depth of Stripping ( 110.780 - 110.480 ) = 0.300 M
Area of Stripping ( 105.060 X 0.300 ) = 31.520 Sqm
2)Rock-Toe
Height of Rock-Toe ( 127.5-110.48 )X 20% 3.404 = 3.40 M
Bottom Width of Rock-Toe = 3.404 X 3 = 10.21 M
Area of Rock -Toe = 1/2X10.21X3.404 = 17.38 Sqm
a)Metal Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 3.404 = 4.81 M
Area = 4.81X0.2 = 0.96 Sqm
b)Sand Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 3.404 = 4.81 M
Area = 4.81X0.2 = 0.96 Sqm
3) Area of Herating Portion
Bottom Width ( 128.500 - 110.480 )X 0.5*2+3 = 21.02 M
Top Width = 3 M
Arae of Hearting Soils = 3+21.02
X 18.020 = 216.42 Sqm
2
4) Area of horizontal Sand Filter (Sand Blanketn-1 M Thick)
Bottom Width of Sand ( 129.5-110.48)X2+3+5-0.57-10.21- 21.02/2 = 24.75 M
Top Width = 24.75+1.5 = 26.25 M
Arae of Hearting Soils = 26.25+24.75
X 1.000 = 25.50 Sqm
2
5) Area of Inclined Sand Chimney
Top Level of Sand = 127.500
bottom level of sand = 111.480
thick ness of sand = 1.2 M
Slan Length = sqrt (1*1+0.5*0.5) X 16.020 = 17.91 M
Area of Inclined Sand Chimney = 17.91 X 1.2 = 21.492 Sqm
6)Area of 450mm thk Rip Rap
Incliend length = Sqrt(2.5X2.5+1X1) X 19.020 + 5 = 56.21 M
Arae of 450thk Rip Rap = 56.21X0.45 = 25.29 Sqm
7)Area of 200 mm thk Metal
Incliend length = Sqrt(2.5X2.5+1X1) X 19.020 + 5 = 56.21 M
Arae of 200thk Sand = 56.21X0.2 = 11.24 Sqm
8) Area of Inclined Sand Chimney
Incliend length = Sqrt(2.5X2.5+1X1) X 19.020 + 5 = 56.21 M
Arae of 200thk Sand = 56.21X0.2 = 11.24 Sqm
9) Area of Bund
Bottom Width ( 129.500 - 110.480 )X 4.5+6+10 = 101.59 M
At 120.8 Incl Berm ( 129.500 - 120.800 )X 4.5+6+10 55.15 M
Top Width = 6 M
Arae of Bund up to Berm = 55.15+101.59
X 10.320 = 808.78 Sqm
2
Arae of Bund Berm to TBL = 6+45.15
X 8.700 = 222.50 Sqm
2
Total 1031.28 Sqm
12)Net casing Area = 1031.28-17.38-0.96-0.96-216.42-25.5-21.492-25.29-11.24-11.24 = 700.80 Sqm
Slno Descrption Area
1 Stripping = 31.520 Sqm
8 Rock-toe = 17.38 Sqm
9 Behind sand Filters = 0.96 Sqm
10 Behind Metal Filters = 0.96 Sqm
11 Hearting = 216.42 Sqm
12 Inclined Sand Chimney = 21.492 Sqm
13 horizontal Sand Filter = 25.50 Sqm
14 450mm thk Rip Rap = 25.29 Sqm
15 200mm thk Metal = 11.24 Sqm
16 200mm thk sand = 11.24 Sqm
17 Net Casing Area = 700.80 Sqm
Formation Mallamadugu Reservoir
BUND-1
Cross Section 0.250 Km
T.B.L = + 129.500 M Avg. G.L = + 110.795 M
Stripped.Level = + 110.495 M Stri.Lev = + 110.495 M
Height of Bund 19.005 M Depth of Stripping 0.300 M
MWL=+ 127.500 M FRL 127.500 M
1)Stripping
Bottom Width of Bund ( 129.500 - 110.495 )X 4.5+6+10+1.567+2.5= 105 M
Depth of Stripping ( 110.795 - 110.495 ) = 0.300 M
Area of Stripping ( 104.990 X 0.300 ) = 31.500 Sqm
2)Rock-Toe
Height of Rock-Toe ( 127.5-110.495 )X 20% 3.401 = 3.40 M
Bottom Width of Rock-Toe = 3.401 X 3 = 10.20 M
Area of Rock -Toe = 1/2X10.2X3.401 = 17.35 Sqm
a)Metal Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 3.401 = 4.81 M
Area = 4.81X0.2 = 0.96 Sqm
b)Sand Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 3.401 = 4.81 M
Area = 4.81X0.2 = 0.96 Sqm
3) Area of Herating Portion
Bottom Width ( 128.500 - 110.495 )X 0.5*2+3 = 21.01 M
Top Width = 3 M
Arae of Hearting Soils = 3+21.01
X 18.005 = 216.15 Sqm
2
4) Area of horizontal Sand Filter (Sand Blanketn-1 M Thick)
Bottom Width of Sand ( 129.5-110.495)X2+3+5-0.57-10.2- 21.01/2 = 24.74 M
Top Width = 24.74+1.5 = 26.24 M
Arae of Hearting Soils = 26.24+24.74
X 1.000 = 25.49 Sqm
2
5) Area of Inclined Sand Chimney
Top Level of Sand = 127.500
bottom level of sand = 111.495
thick ness of sand = 1.2 M
Slan Length = sqrt (1*1+0.5*0.5) X 16.005 = 17.89 M
Area of Inclined Sand Chimney = 17.89 X 1.2 = 21.468 Sqm
6)Area of 450mm thk Rip Rap
Incliend length = Sqrt(2.5X2.5+1X1) X 19.005 + 5 = 56.17 M
Arae of 450thk Rip Rap = 56.17X0.45 = 25.28 Sqm
7)Area of 200 mm thk Metal
Incliend length = Sqrt(2.5X2.5+1X1) X 19.005 + 5 = 56.17 M
Arae of 200thk Sand = 56.17X0.2 = 11.23 Sqm
8) Area of Inclined Sand Chimney
Incliend length = Sqrt(2.5X2.5+1X1) X 19.005 + 5 = 56.17 M
Arae of 200thk Sand = 56.17X0.2 = 11.23 Sqm
9) Area of Bund
Bottom Width ( 129.500 - 110.495 )X 4.5+6+10 = 101.52 M
At 120.8 Incl Berm ( 129.500 - 120.800 )X 4.5+6+10 55.15 M
Top Width = 6 M
Arae of Bund up to Berm = 55.15+101.52
X 10.305 = 807.24 Sqm
2
Arae of Bund Berm to TBL = 6+45.15
X 8.700 = 222.50 Sqm
2
Total 1029.74 Sqm
12)Net casing Area = 1029.74-17.35-0.96-0.96-216.15-25.49-21.468-25.28-11.23-11.23 = 699.62 Sqm
Slno Descrption Area
1 Stripping = 31.500 Sqm
8 Rock-toe = 17.35 Sqm
9 Behind sand Filters = 0.96 Sqm
10 Behind Metal Filters = 0.96 Sqm
11 Hearting = 216.15 Sqm
12 Inclined Sand Chimney = 21.468 Sqm
13 horizontal Sand Filter = 25.49 Sqm
14 450mm thk Rip Rap = 25.28 Sqm
15 200mm thk Metal = 11.23 Sqm
16 200mm thk sand = 11.23 Sqm
17 Net Casing Area = 699.62 Sqm
Formation Mallamadugu Reservoir
BUND-1
Cross Section 0.275 Km
T.B.L = + 129.500 M Avg. G.L = + 111.390 M
Stripped.Level = + 111.090 M Stri.Lev = + 111.090 M
Height of Bund 18.410 M Depth of Stripping 0.300 M
MWL=+ 127.500 M FRL 127.500 M
1)Stripping
Bottom Width of Bund ( 129.500 - 111.090 )X 4.5+6+10+1.567+2.5= 102.3 M
Depth of Stripping ( 111.390 - 111.090 ) = 0.300 M
Area of Stripping ( 102.310 X 0.300 ) = 30.690 Sqm
2)Rock-Toe
Height of Rock-Toe ( 127.5-111.09 )X 20% 3.282 = 3.28 M
Bottom Width of Rock-Toe = 3.282 X 3 = 9.85 M
Area of Rock -Toe = 1/2X9.85X3.282 = 16.16 Sqm
a)Metal Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 3.282 = 4.64 M
Area = 4.64X0.2 = 0.93 Sqm
b)Sand Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 3.282 = 4.64 M
Area = 4.64X0.2 = 0.93 Sqm
3) Area of Herating Portion
Bottom Width ( 128.500 - 111.090 )X 0.5*2+3 = 20.41 M
Top Width = 3 M
Arae of Hearting Soils = 3+20.41
X 17.410 = 203.78 Sqm
2
4) Area of horizontal Sand Filter (Sand Blanketn-1 M Thick)
Bottom Width of Sand ( 129.5-111.09)X2+3+5-0.57-9.85 - 20.41/2 = 24.20 M
Top Width = 24.2+1.5 = 25.70 M
Arae of Hearting Soils = 25.7+24.2
X 1.000 = 24.95 Sqm
2
5) Area of Inclined Sand Chimney
Top Level of Sand = 127.500
bottom level of sand = 112.090
thick ness of sand = 1.2 M
Slan Length = sqrt (1*1+0.5*0.5) X 15.410 = 17.23 M
Area of Inclined Sand Chimney = 17.23 X 1.2 = 20.676 Sqm
6)Area of 450mm thk Rip Rap
Incliend length = Sqrt(2.5X2.5+1X1) X 18.410 + 5 = 54.57 M
Arae of 450thk Rip Rap = 54.57X0.45 = 24.56 Sqm
7)Area of 200 mm thk Metal
Incliend length = Sqrt(2.5X2.5+1X1) X 18.410 + 5 = 54.57 M
Arae of 200thk Sand = 54.57X0.2 = 10.91 Sqm
8) Area of Inclined Sand Chimney
Incliend length = Sqrt(2.5X2.5+1X1) X 18.410 + 5 = 54.57 M
Arae of 200thk Sand = 54.57X0.2 = 10.91 Sqm
9) Area of Bund
Bottom Width ( 129.500 - 111.090 )X 4.5+6+10 = 98.85 M
At 120.8 Incl Berm ( 129.500 - 120.800 )X 4.5+6+10 55.15 M
Top Width = 6 M
Arae of Bund up to Berm = 55.15+98.85
X 9.710 = 747.67 Sqm
2
Arae of Bund Berm to TBL = 6+45.15
X 8.700 = 222.50 Sqm
2
Total 970.17 Sqm
12)Net casing Area = 970.17-16.16-0.93-0.93-203.78-24.95-20.676-24.56-10.91-10.91 = 656.36 Sqm
Slno Descrption Area
1 Stripping = 30.690 Sqm
8 Rock-toe = 16.16 Sqm
9 Behind sand Filters = 0.93 Sqm
10 Behind Metal Filters = 0.93 Sqm
11 Hearting = 203.78 Sqm
12 Inclined Sand Chimney = 20.676 Sqm
13 horizontal Sand Filter = 24.95 Sqm
14 450mm thk Rip Rap = 24.56 Sqm
15 200mm thk Metal = 10.91 Sqm
16 200mm thk sand = 10.91 Sqm
17 Net Casing Area = 656.36 Sqm
Formation Mallamadugu Reservoir
BUND-3
Detail Estimate of Profile Wall
0.3
Profile wall
200 thk Metal
200 thk Sand
0.3
Casing Soils
Area of Earthwork Excavation = 0.3 X 0.3 0.09 Sqm
Area of Concrete = (0.45 +0.2+0.2+0.3) X 0.3 0.35 Sqm
Total length of the Drilling holes into the rock from the
1092 meters
bottom of cut off trench
Cement consumption 0.75 Bag for one RMT
Total Cement Consumption 819 Bags
Total Cement Consumption 41 MT
Formation Mallamadugu Reservoir
BUND-3
Detailed Estimate for 'Parpet wall' on U/S
150
CC M15-40 MSA
600
T BL .+131.000
1000
CC M 15 40 MSA 200
600
Details of Parapet
750
TBL-131.000
2
450
1
2 0.045 116.145 118.416 11.08 (11.08x2.236) 24.78 0.5X(0.855+0.583)/2+(24.78-0.5)X0.583 14.51 0.5X(0.585+0.403)/2+(24.78-0.5)X0.403 10.03
3 0.090 109.293 112.934 16.57 (16.57x2.236) 37.04 0.5X(0.855+0.583)/2+(37.04-0.5)X0.583 21.66 0.5X(0.585+0.403)/2+(37.04-0.5)X0.403 14.97
4 0.135 109.773 113.318 16.18 (16.18x2.236) 36.18 0.5X(0.855+0.583)/2+(36.18-0.5)X0.583 21.16 0.5X(0.585+0.403)/2+(36.18-0.5)X0.403 14.63
5 0.180 110.183 113.646 15.85 (15.85x2.236) 35.45 0.5X(0.855+0.583)/2+(35.45-0.5)X0.583 20.74 0.5X(0.585+0.403)/2+(35.45-0.5)X0.403 14.33
6 0.225 110.480 113.884 15.62 (15.62x2.236) 34.92 0.5X(0.855+0.583)/2+(34.92-0.5)X0.583 20.43 0.5X(0.585+0.403)/2+(34.92-0.5)X0.403 14.12
7 0.270 110.793 114.134 15.37 (15.37x2.236) 34.36 0.5X(0.855+0.583)/2+(34.36-0.5)X0.583 20.10 0.5X(0.585+0.403)/2+(34.36-0.5)X0.403 13.89
Length = 0.27 Km
Cross sectional Area at EWE= 0.583 Sqm
0.6
1 in 1 0.722 2.5 in 1
0.843
Rip Rap
4.085
3.355
2.625
0.675
0.875
1.075
0.6
1 in 1 0.730 2 in 1
0.860
Cum
Remarks
Cum
Remarks
Cum
Cum
Cum
Remarks
Cum
Cum
Cum
Cum
Formation of Mallamadugu Reservoir
BUND-3
Detail Estimate D/S Toe Drain
0.5 M GL
2 in 1 1 in 1 300 mm Thk Rip Rap.
0.5 M 200 mm thk Metal
0.5 M 200 mm thk Sand
0.695
2 in1 0.825 1in1
0.955
1M
1 0.000
2 0.025 3.25 40.63 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.3 3.75 0.13 1.63 0.13 1.63 1.42 17.75
3 0.050 6.19 118.00 3.38 42.25 0.42 5.25 0.42 5.25 6.81 85.13 0 0.00 1.81 22.63 2.77 38.38 1.23 17.00 1.23 17.00 13.64 188.25
4 0.075 6.19 154.75 3.38 84.50 0.42 10.50 0.42 10.50 6.81 170.25 0 0.00 1.81 45.25 2.77 69.25 1.23 30.75 1.23 30.75 13.64 341.00
5 0.100 6.19 154.75 3.38 84.50 0.42 10.50 0.42 10.50 6.81 170.25 0 0.00 1.81 45.25 2.77 69.25 1.23 30.75 1.23 30.75 13.64 341.00
6 0.125 6.19 154.75 3.38 84.50 0.42 10.50 0.42 10.50 6.81 170.25 0 0.00 1.81 45.25 2.77 69.25 1.23 30.75 1.23 30.75 13.64 341.00
7 0.150 6.19 154.75 3.38 84.50 0.42 10.50 0.42 10.50 6.81 170.25 0 0.00 1.81 45.25 2.77 69.25 1.23 30.75 1.23 30.75 13.64 341.00
8 0.175 6.19 154.75 3.38 84.50 0.42 10.50 0.42 10.50 6.81 170.25 0 0.00 1.81 45.25 2.77 69.25 1.23 30.75 1.23 30.75 13.64 341.00
9 0.200 6.19 154.75 3.38 84.50 0.42 10.50 0.42 10.50 6.81 170.25 0 0.00 1.81 45.25 2.77 69.25 1.23 30.75 1.23 30.75 13.64 341.00
10 0.225 6.19 154.75 3.38 84.50 0.42 10.50 0.42 10.50 6.81 170.25 0 0.00 1.81 45.25 2.77 69.25 1.23 30.75 1.23 30.75 13.64 341.00
11 0.250 0 77.38 42.25 5.25 5.25 85.13 0.00 22.63 34.63 15.38 15.38 170.50
Total 1319.25 676.00 84.00 84.00 1362.00 0.00 362.00 561.50 249.25 249.25 2763.50
Formation Mallamadugu Reservoir
Saddle Portion
Cross Section 0.025 Km
T.B.L = + 129.500 M Avg. G.L = + 129.500 M
Stripped.Level = + 129.200 M Stri.Lev = + 129.200 M
Height of Bund 0.300 M Depth of Stripping 0.300 M
MWL=+ 127.500 M FRL 127.500 M
1)Stripping
Bottom Width of Bund ( 129.500 - 129.200 )X 4+6+1.717+1.9= 10.82 M
Depth of Stripping ( 129.500 - 129.200 ) = 0.300 M
Area of Stripping ( 10.820 X 0.300 ) = 3.250 Sqm
2)Rock-Toe
Height of Rock-Toe ( 127.5-129.2 )X 20% -0.34 = 1.50 M (Minimum Height of Rock-
Bottom Width of Rock-Toe = 1.5 X 3 = 4.50 M Toe)
Area of Rock -Toe = 1/2X4.5X1.5 = 0 Sqm
a)Metal Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 1.500 = 2.12 M
Area = 2.12X0.2 = 0 Sqm
b)Sand Filter Behind Rock-Toe (200 mm Thk)
Incliend length = Sqrt(1X1+1X1) X 1.500 = 2.12 M
Area = 2.12X0.2 = 0 Sqm
3) Area of Herating Portion
Bottom Width ( 128.500 - 129.200 )X 0.5*2+3 = 2.3 M
Top Width = 3M
Arae of Hearting Soils = 3+2.3
X -0.700 = 0.00 Sqm
2
4) Area of horizontal Sand Filter (Sand Blanketn-1 M Thick)
Bottom Width of Sand ( 129.5-129.2)X2+3-0.57-4.5 - 2.3/2 = -2.62 M
Top Width = -2.62+1.5 = -1.12 M
Arae of Hearting Soils = -1.12+-2.62
X 1.000 = 0.00 Sqm
2
5) Area of Inclined Sand Chimney
Top Level of Sand = 127.500
bottom level of sand = 130.200
thick ness of sand = 1M
Slan Length = sqrt (1*1+0.5*0.5) X -2.700 = -3.02 M
Area of Inclined Sand Chimney = -3.02 X 1 = 0 Sqm
6)Area of 450mm thk Rip Rap
Incliend length = Sqrt(2X2+1X1) X 0.300 = 0.67 M
Arae of 450thk Rip Rap = 0.67X0.45 = 0.3 Sqm
7)Area of 200 mm thk Metal
Incliend length = Sqrt(2X2+1X1) X 0.300 = 0.67 M
Arae of 200thk Sand = 0.67X0.2 = 0.13 Sqm
8) Area of Inclined Sand Chimney
Incliend length = Sqrt(2X2+1X1) X 0.300 = 0.67 M
Arae of 200thk Sand = 0.67X0.2 = 0.13 Sqm
9) Area of Bund
Bottom Width ( 129.500 - 129.200 )X 4+6 = 7.2 M
Top Width = 6M
Arae of Bund = 6+7.2
X 0.300 = 1.98 Sqm
2
12)Net casing Area = 1.98-0-0-0-0-0-0-0.3-0.13-0.13 = 1.42 Sqm
Profile wall
200 thk Metal
200 thk Sand
0.3
Casing Soils
Area of Earthwork Excavation = 0.3 X 0.3 0.09 Sqm
Area of Concrete = (0.45 +0.2+0.2+0.3) X 0.3 0.35 Sqm
Total length of the Drilling holes into the rock from the
1008 meters
bottom of cut off trench
Cement consumption 0.75 Bag for one RMT
Total Cement Consumption 756 Bags
Total Cement Consumption 38 MT
Formation Mallamadugu Reservoir
Saddle Portion
Detailed Estimate for 'Parpet wall' on U/S
150
CC M15-40 MSA
600
T BL .+131.000
1000
CC M 15 40 MSA 200
600
Details of Parapet
750
TBL-131.000
2
450
1
1 0.000
2 0.045 126.745 128.245 1.26 (1.26x2.236) 2.81 0.5X(0.855+0.583)/2+(2.81-0.5)X0.583 1.71 0.5X(0.585+0.403)/2+(2.81-0.5)X0.403 1.18
3 0.090 126.745 128.245 1.26 (1.26x2.236) 2.81 0.5X(0.855+0.583)/2+(2.81-0.5)X0.583 1.71 0.5X(0.585+0.403)/2+(2.81-0.5)X0.403 1.18
4 0.135 126.745 128.245 1.26 (1.26x2.236) 2.81 0.5X(0.855+0.583)/2+(2.81-0.5)X0.583 1.71 0.5X(0.585+0.403)/2+(2.81-0.5)X0.403 1.18
5 0.180 126.745 128.245 1.26 (1.26x2.236) 2.81 0.5X(0.855+0.583)/2+(2.81-0.5)X0.583 1.71 0.5X(0.585+0.403)/2+(2.81-0.5)X0.403 1.18
6 0.225 126.745 128.245 1.26 (1.26x2.236) 2.81 0.5X(0.855+0.583)/2+(2.81-0.5)X0.583 1.71 0.5X(0.585+0.403)/2+(2.81-0.5)X0.403 1.18
7 0.250
Length = 0.25 Km
Cross sectional Area at EWE= 0.583 Sqm
1 0.000
0.250
Total Quantity 114.00 Cum
Details Estimate of Rock Toe of Saddle Bund
T.B.L = + 131.000 M Height of Rock-Toe = 20 % of Hydraluical Head= (FRL-Stipped Levels) X 20%
F.R.L = + 127.500 M Minimum Height of Rock -Toe = 1.5 Meters
M.W.L = + 127.500 M Maximum Height of Rock -Toe = 6 Meters
Bottom
Height of Rock- Top Level of Mean Area Quantity
Slno Chainage Stripped Level Width of Area (Sqm) Remarks
Toe (M) Rock -Toe (Sqm) (Cum)
Rock-Toe (M)
0.675
0.875
1.075
0.6
1 in 1 0.722 2.5 in 1
0.843
Rip Rap
4.085
3.355
2.625
0.675
0.875
1.075
0.6
1 in 1 0.730 2 in 1
0.860
0.5 M GL
2 in 1 1 in 1 300 mm Thk Rip Rap.
0.5 M 200 mm thk Metal
0.5 M 200 mm thk Sand
0.695
2 in1 0.825 1in1
0.955
1M
a)all Soils with lead of 250 meters Cum 480 36.50 17,520
a)all Soils with lead of 250 meters Cum 250 36.50 9,125 2798.04 36.50 102,128
b) HDR with lead of 500 meters Cum 580 90.70 52,606 5.49 90.70 498
2 CC M.15 for Foundations Cum 224 2,204.00 493,696 226.77 2,204.00 499,801
3 CC M-15 for wIngs returns apron,head walls Cum 484 3,315.00 1,604,460 125.97 3,315.00 417,604
4 CC M-20 for Barral slab walls and Rft Cum 65 5,190.00 337,350 1222.85 5,190.00 6,346,592
a)all Soils with lead of 250 meters Cum 250 36.50 9,125 2561.79 36.50 93,505
b) HDR with lead of 500 meters Cum 580 90.70 52,606 886.43 90.70 80,399
2 CC M.15 for Foundations Cum 224 2,204.00 493,696 419.26 2,204.00 924,049
3 CC M-15 for wIngs returns apron,head walls Cum 484 3,315.00 1,604,460 377.46 3,315.00 1,251,280
4 CC M-20 for Barral slab walls and Rft Cum 65 5,190.00 337,350 1526.32 5,190.00 7,921,601
At Chinage 0.175 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 111.200 111.200 105.500 111.200 0.000 0.000
2 100 111.055 102.662 105.500 102.662 5.555 44.44 2.838 22.70
3 75 110.885 102.662 105.500 102.662 5.385 136.75 2.838 70.95
4 50 110.995 102.662 105.500 102.662 5.495 136 2.838 70.95
5 25 102.815 102.662 105.500 102.662 0.000 68.69 0.153 37.39
6 0 107.900 102.662 105.500 102.662 2.400 30 2.838 37.39
7 25 109.685 102.662 105.500 102.662 4.185 82.31 2.838 70.95
8 50 109.745 102.662 105.500 102.662 4.245 105.38 2.838 70.95
9 75 105.720 102.662 105.500 102.662 0.220 55.81 2.838 70.95
10 100 105.870 102.662 105.500 102.662 0.370 7.37 2.838 70.95
11 116 107.910 107.910 105.500 107.910 2.410 22.24 0.000 22.70
Total 688.99 545.88 Sqm
At Chinage 0.200 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 111.015 111.015 105.000 111.015 0.000 0.000
2 100 110.955 102.645 105.000 102.645 5.955 47.64 2.355 18.84
3 75 110.895 102.645 105.000 102.645 5.895 148.13 2.355 58.88
4 50 102.850 102.645 105.000 102.645 0.000 73.69 0.205 32.00
5 25 102.985 102.645 105.000 102.645 0.000 0.340 6.81
6 0 109.655 102.645 105.000 102.645 4.655 58.19 2.355 33.69
7 25 109.995 102.645 105.000 102.645 4.995 120.63 2.355 58.88
8 50 105.660 102.645 105.000 102.645 0.660 70.69 2.355 58.88
9 75 105.620 102.645 105.000 102.645 0.620 16 2.355 58.88
10 100 105.580 102.645 105.000 102.645 0.580 15 2.355 58.88
11 116 108.125 108.125 105.000 108.125 3.125 29.64 0.000 18.84
Total 579.61 404.58 Sqm
At Chinage 0.225 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 111.230 111.230 105.000 111.230 6.230 0.000
2 100 111.055 102.627 105.000 102.627 6.055 98.28 2.373 18.98
3 75 111.120 102.627 105.000 102.627 6.120 152.19 2.373 59.33
4 50 102.655 102.627 105.000 102.627 0.000 76.5 0.028 30.01
5 25 102.755 102.627 105.000 102.627 0.000 0.128 1.95
6 0 109.930 102.627 105.000 102.627 4.930 61.62 2.373 31.26
7 25 109.885 102.627 105.000 102.627 4.885 122.69 2.373 59.33
8 50 105.295 102.627 105.000 102.627 0.295 64.75 2.373 59.33
9 75 105.390 102.627 105.000 102.627 0.390 8.56 2.373 59.33
10 100 105.320 102.627 105.000 102.627 0.320 8.87 2.373 59.33
11 116 108.420 108.420 105.000 108.420 3.420 29.92 0.000 18.98
Total 623.38 397.83 Sqm
At Chinage 0.250 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 110.425 110.425 105.000 110.425 0.000 0.000
2 100 110.585 102.610 105.000 102.610 5.585 44.68 2.390 19.12
3 75 102.540 102.610 105.000 102.610 0.000 69.81 0.000 29.88
4 50 102.380 102.610 105.000 102.610 0.000 0.000 0.00
5 25 102.450 102.610 105.000 102.610 0.000 0.000 0.00
6 0 108.790 102.610 105.000 102.610 3.790 47.37 2.390 29.88
7 25 108.715 102.610 105.000 102.610 3.715 93.81 2.390 59.75
8 50 108.570 102.610 105.000 102.610 3.570 91.06 2.390 59.75
9 75 108.655 102.610 105.000 102.610 3.655 90.31 2.390 59.75
10 100 109.820 102.610 105.000 102.610 4.820 105.94 2.390 59.75
11 116 110.220 110.220 105.000 110.220 0.000 38.56 0.000 19.12
Total 581.54 337.00 Sqm
At Chinage 0.275 Km
Bottom Bottom Soils HDR
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 110.625 110.625 104.700 110.625 0.000 0.000
2 100 110.745 102.593 104.700 102.593 6.045 48.36 2.107 16.86
3 75 102.065 102.593 104.700 102.593 0.000 75.56 0.000 26.34
4 50 102.215 102.593 104.700 102.593 0.000 0.000 0.00
5 25 102.310 102.593 104.700 102.593 0.000 0.000 0.00
6 0 106.970 102.593 104.700 102.593 2.270 28.37 2.107 26.34
7 25 107.060 102.593 104.700 102.593 2.360 57.87 2.107 52.68
8 50 106.690 102.593 104.700 102.593 1.990 54.37 2.107 52.68
9 75 107.020 102.593 104.700 102.593 2.320 53.87 2.107 52.68
10 100 109.530 102.593 104.700 102.593 4.830 89.37 2.107 52.68
11 116 110.435 110.435 104.700 110.435 0.000 38.64 0.000 16.86
Total 446.41 297.12 Sqm
At Chinage 0.300 Km
Bottom Bottom Soils HDR
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 110.300 110.300 105.000 110.300 0.000 0.000
2 100 110.325 102.576 105.000 102.576 5.325 42.6 2.424 19.39
3 75 104.670 102.576 105.000 102.576 0.000 66.56 2.094 56.48
4 50 103.515 102.576 105.000 102.576 0.000 0.939 37.91
5 25 107.575 102.576 105.000 102.576 2.575 32.19 2.424 42.04
6 0 105.855 102.576 105.000 102.576 0.855 42.87 2.424 60.60
7 25 107.185 102.576 105.000 102.576 2.185 38 2.424 60.60
8 50 106.565 102.576 105.000 102.576 1.565 46.88 2.424 60.60
9 75 106.155 102.576 105.000 102.576 1.155 34 2.424 60.60
10 100 109.175 102.576 105.000 102.576 4.175 66.63 2.424 60.60
11 116 110.385 110.385 105.000 110.385 0.000 33.4 0.000 19.39
Total 403.13 478.21 Sqm
At Chinage 0.325 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 109.810 109.810 109.810 109.810 0.000 0.000
2 100 109.765 102.558 104.700 102.558 5.065 40.52 2.142 17.14
3 75 104.680 102.558 104.700 102.558 0.000 63.31 2.122 53.30
4 50 102.950 102.558 104.700 102.558 0.000 0 0.392 31.42
5 25 106.445 102.558 104.700 102.558 1.745 21.81 2.142 31.67
6 0 106.295 102.558 104.700 102.558 1.595 41.75 2.142 53.55
7 25 106.890 102.558 104.700 102.558 2.190 47.31 2.142 53.55
8 50 106.715 102.558 104.700 102.558 2.015 52.56 2.142 53.55
9 75 106.120 102.558 104.700 102.558 1.420 42.94 2.142 53.55
10 100 107.795 102.558 104.700 102.558 3.095 56.44 2.142 53.55
11 116 108.460 108.460 108.460 108.460 0.000 24.76 0.000 17.14
Total 391.40 418.42 Sqm
At Chinage 0.350 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 106.050 106.050 106.050 106.050 0.000 0.000
2 100 105.475 102.541 104.200 102.541 1.275 10.2 1.659 13.27
3 75 103.365 102.541 104.200 102.541 0.000 15.94 0.824 31.04
4 50 102.865 102.541 104.200 102.541 0.000 0 0.324 14.35
5 25 106.430 102.541 104.200 102.541 2.230 27.87 1.659 24.79
6 0 105.775 102.541 104.200 102.541 1.575 47.56 1.659 41.48
7 25 106.890 102.541 104.200 102.541 2.690 53.31 1.659 41.48
8 50 106.335 102.541 104.200 102.541 2.135 60.31 1.659 41.48
9 75 105.835 102.541 104.200 102.541 1.635 47.12 1.659 41.48
10 100 107.780 102.541 104.200 102.541 3.580 65.19 1.659 41.48
11 116 108.375 108.375 108.375 108.375 0.000 28.64 0.000 13.27
Total 356.14 304.12 Sqm
At Chinage 0.375 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 106.100 106.100 106.100 106.100 0.000 0.000
2 100 105.225 102.524 104.300 102.524 0.925 7.4 1.776 14.21
3 75 103.775 102.524 104.300 102.524 0.000 11.56 1.251 37.84
4 50 103.595 102.524 104.300 102.524 0.000 0 1.071 29.02
5 25 106.295 102.524 104.300 102.524 1.995 24.94 1.776 35.59
6 0 105.745 102.524 104.300 102.524 1.445 43 1.776 44.40
7 25 106.470 102.524 104.300 102.524 2.170 45.19 1.776 44.40
8 50 105.975 102.524 104.300 102.524 1.675 48.06 1.776 44.40
9 75 105.385 102.524 104.300 102.524 1.085 34.5 1.776 44.40
10 100 107.700 102.524 104.300 102.524 3.400 56.06 1.776 44.40
11 116 108.555 108.555 108.555 108.555 0.000 27.2 0.000 14.21
Total 297.91 352.87 Sqm
At Chinage 0.400 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 106.225 106.225 106.225 106.225 0.000 0.000
2 100 104.710 102.507 104.100 102.507 0.610 4.88 1.593 12.74
3 75 103.750 102.507 104.100 102.507 0.000 7.62 1.243 35.45
4 50 104.005 102.507 104.100 102.507 0.000 0 1.498 34.26
5 25 105.690 102.507 104.100 102.507 1.590 19.88 1.593 38.64
6 0 106.055 102.507 104.100 102.507 1.955 44.31 1.593 39.82
7 25 105.730 102.507 104.100 102.507 1.630 44.81 1.593 39.82
8 50 105.465 102.507 104.100 102.507 1.365 37.44 1.593 39.82
9 75 105.835 102.507 104.100 102.507 1.735 38.75 1.593 39.82
10 100 107.765 102.507 104.100 102.507 3.665 67.5 1.593 39.82
11 116 108.420 108.420 108.420 108.420 0.000 29.32 0.000 12.74
Total 294.51 332.93 Sqm
At Chinage 0.425 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 106.100 106.100 106.100 106.100 0.000 0.000
2 100 104.115 102.489 104.000 102.489 0.115 0.92 1.511 12.09
3 75 103.050 102.489 104.000 102.489 0.000 1.44 0.561 25.90
4 50 103.845 102.489 104.000 102.489 0.000 0 1.356 23.96
5 25 104.175 102.489 104.000 102.489 0.175 2.19 1.511 35.84
6 0 105.985 102.489 104.000 102.489 1.985 27 1.511 37.77
7 25 105.095 102.489 104.000 102.489 1.095 38.5 1.511 37.77
8 50 106.300 102.489 104.000 102.489 2.300 42.44 1.511 37.77
9 75 106.905 102.489 104.000 102.489 2.905 65.06 1.511 37.77
10 100 107.695 102.489 104.000 102.489 3.695 82.5 1.511 37.77
11 116 108.310 108.310 108.310 108.310 0.000 29.56 0.000 12.09
Total 289.61 298.73 Sqm
At Chinage 0.450 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 105.880 105.880 105.880 105.880 0.000 0.000
2 100 103.685 102.472 103.900 102.472 0.000 0 1.213 9.70
3 75 103.475 102.472 103.900 102.472 0.000 0 1.003 27.70
4 50 103.225 102.472 103.900 102.472 0.000 0 0.753 21.95
5 25 103.185 102.472 103.900 102.472 0.000 0 0.713 18.32
6 0 105.855 102.472 103.900 102.472 1.955 24.44 1.428 26.76
7 25 104.925 102.472 103.900 102.472 1.025 37.25 1.428 35.70
8 50 105.055 102.472 103.900 102.472 1.155 27.25 1.428 35.70
9 75 107.160 102.472 103.900 102.472 3.260 55.19 1.428 35.70
10 100 107.780 102.472 103.900 102.472 3.880 89.25 1.428 35.70
11 116 108.375 108.375 108.375 108.375 0.000 31.04 0.000 11.42
Total 264.42 258.65 Sqm
At Chinage 0.475 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 105.650 105.650 105.650 105.650 0.000 0.000
2 100 103.975 102.455 103.800 102.455 0.175 1.4 1.345 10.76
3 75 103.965 102.455 103.800 102.455 0.165 4.25 1.345 33.63
4 50 103.815 102.455 103.800 102.455 0.015 2.25 1.345 33.63
5 25 103.585 102.455 103.800 102.455 0.000 0.19 1.130 30.94
6 0 102.845 102.455 103.800 102.455 0.000 0 0.390 19.00
7 25 104.825 102.455 103.800 102.455 1.025 12.81 1.345 21.69
8 50 106.880 102.455 103.800 102.455 3.080 51.31 1.345 33.63
9 75 106.895 102.455 103.800 102.455 3.095 77.19 1.345 33.63
10 100 106.955 102.455 103.800 102.455 3.155 78.12 1.345 33.63
11 116 107.895 107.895 107.895 107.895 0.000 25.24 0.000 10.76
Total 252.76 261.30 Sqm
At Chinage 0.500 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 107.420 107.420 107.420 107.420 0.000 0.000
2 100 107.565 102.438 104.800 102.438 2.765 22.12 2.362 18.90
3 75 108.170 102.438 104.800 102.438 3.370 76.69 2.362 59.05
4 50 108.385 102.438 104.800 102.438 3.585 86.94 2.362 59.05
5 25 103.565 102.438 104.800 102.438 0.000 44.81 1.127 43.61
6 0 102.365 102.438 104.800 102.438 0.000 0 0.000 14.09
7 25 104.775 102.438 104.800 102.438 0.000 0 2.337 29.21
8 50 108.980 102.438 104.800 102.438 4.180 52.25 2.362 58.74
9 75 109.110 102.438 104.800 102.438 4.310 106.13 2.362 59.05
10 100 109.385 102.438 104.800 102.438 4.585 111.19 2.362 59.05
11 116 109.410 109.410 109.410 109.410 0.000 36.68 0.000 18.90
Total 536.81 419.65 Sqm
At Chinage 0.525 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 107.410 107.410 107.410 107.410 0.000 0.000
2 100 107.480 102.420 104.800 102.420 2.680 21.44 2.380 19.04
3 75 108.265 102.420 104.800 102.420 3.465 76.81 2.380 59.50
4 50 108.395 102.420 104.800 102.420 3.595 88.25 2.380 59.50
5 25 105.175 102.420 104.800 102.420 0.375 49.62 2.380 59.50
6 0 104.325 102.420 104.800 102.420 0.000 4.69 1.905 53.56
7 25 102.165 102.420 104.800 102.420 0.000 0 0.000 23.81
8 50 109.005 102.420 104.800 102.420 4.205 52.56 2.380 29.75
9 75 109.130 102.420 104.800 102.420 4.330 106.69 2.380 59.50
10 100 109.280 102.420 104.800 102.420 4.480 110.13 2.380 59.50
11 116 109.300 109.300 109.300 109.300 0.000 35.84 0.000 19.04
Total 546.03 442.70 Sqm
At Chinage 0.550 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 107.385 107.385 107.385 107.385 0.000 0.000
2 100 107.425 102.403 104.500 102.403 2.925 23.4 2.097 16.78
3 75 107.465 102.403 104.500 102.403 2.965 73.62 2.097 52.42
4 50 107.545 102.403 104.500 102.403 3.045 75.12 2.097 52.42
5 25 105.240 102.403 104.500 102.403 0.740 47.31 2.097 52.42
6 0 103.760 102.403 104.500 102.403 0.000 9.25 1.357 43.17
7 25 102.685 102.403 104.500 102.403 0.000 0 0.282 20.49
8 50 105.065 102.403 104.500 102.403 0.565 7.06 2.097 29.74
9 75 108.675 102.403 104.500 102.403 4.175 59.25 2.097 52.42
10 100 108.915 102.403 104.500 102.403 4.415 107.38 2.097 52.42
11 116 109.005 109.005 109.005 109.005 0.000 35.32 0.000 16.78
Total 437.71 389.06 Sqm
At Chinage 0.575 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 107.005 107.005 107.005 107.005 0.000 0.000
2 100 107.260 102.386 104.600 102.386 2.660 21.28 2.214 17.71
3 75 107.325 102.386 104.600 102.386 2.725 67.31 2.214 55.35
4 50 107.465 102.386 104.600 102.386 2.865 69.87 2.214 55.35
5 25 105.040 102.386 104.600 102.386 0.440 41.31 2.214 55.35
6 0 104.375 102.386 104.600 102.386 0.000 5.5 1.989 52.54
7 25 102.745 102.386 104.600 102.386 0.000 0 0.359 29.35
8 50 108.625 102.386 104.600 102.386 4.025 50.31 2.214 32.16
9 75 108.655 102.386 104.600 102.386 4.055 101 2.214 55.35
10 100 108.825 102.386 104.600 102.386 4.225 103.5 2.214 55.35
11 116 108.875 108.875 108.875 108.875 0.000 33.8 0.000 17.71
Total 493.88 426.22 Sqm
At Chinage 0.600 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 108.140 108.140 108.140 108.140 0.000 0.000
2 100 108.255 102.369 104.700 102.369 3.555 28.44 2.331 18.65
3 75 108.185 102.369 104.700 102.369 3.485 88 2.331 58.28
4 50 106.255 102.369 104.700 102.369 1.555 63 2.331 58.28
5 25 104.915 102.369 104.700 102.369 0.215 22.12 2.331 58.28
6 0 104.485 102.369 104.700 102.369 0.000 2.69 2.116 55.59
7 25 102.675 102.369 104.700 102.369 0.000 0 0.306 30.27
8 50 108.675 102.369 104.700 102.369 3.975 49.69 2.331 32.96
9 75 108.755 102.369 104.700 102.369 4.055 100.38 2.331 58.28
10 100 108.865 102.369 104.700 102.369 4.165 102.75 2.331 58.28
11 116 109.010 109.010 109.010 109.010 0.000 33.32 0.000 18.65
Total 490.39 447.52 Sqm
At Chinage 0.625 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 108.395 108.395 108.395 108.395 0.000 0.000
2 100 108.415 102.351 104.700 102.351 3.715 29.72 2.349 18.79
3 75 108.130 102.351 104.700 102.351 3.430 89.31 2.349 58.73
4 50 106.385 102.351 104.700 102.351 1.685 63.94 2.349 58.73
5 25 104.590 102.351 104.700 102.351 0.000 21.06 2.239 57.35
6 0 104.375 102.351 104.700 102.351 0.000 0 2.024 53.29
7 25 102.605 102.351 104.700 102.351 0.000 0 0.254 28.47
8 50 108.710 102.351 104.700 102.351 4.010 50.12 2.349 32.54
9 75 108.840 102.351 104.700 102.351 4.140 101.88 2.349 58.73
10 100 108.855 102.351 104.700 102.351 4.155 103.69 2.349 58.73
11 116 108.980 108.980 108.980 108.980 0.000 33.24 0.000 18.79
Total 492.96 444.15 Sqm
At Chinage 0.650 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 107.740 107.740 107.740 107.740 0.000 0.000
2 100 107.700 102.334 104.600 102.334 3.100 24.8 2.266 18.13
3 75 107.785 102.334 104.600 102.334 3.185 78.56 2.266 56.65
4 50 106.070 102.334 104.600 102.334 1.470 58.19 2.266 56.65
5 25 106.095 102.334 104.600 102.334 1.495 37.06 2.266 56.65
6 0 104.235 102.334 104.600 102.334 0.000 18.69 1.901 52.09
7 25 102.580 102.334 104.600 102.334 0.000 0 0.246 26.84
8 50 108.025 102.334 104.600 102.334 3.425 42.81 2.266 31.40
9 75 108.645 102.334 104.600 102.334 4.045 93.38 2.266 56.65
10 100 108.780 102.334 104.600 102.334 4.180 102.81 2.266 56.65
11 116 108.830 108.830 108.830 108.830 0.000 33.44 0.000 18.13
Total 489.74 429.84 Sqm
At Chinage 0.675 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 107.700 107.700 107.700 107.700 0.000 0.000
2 100 107.765 102.317 104.300 102.317 3.465 27.72 1.983 15.86
3 75 107.725 102.317 104.300 102.317 3.425 86.12 1.983 49.58
4 50 106.050 102.317 104.300 102.317 1.750 64.69 1.983 49.58
5 25 106.035 102.317 104.300 102.317 1.735 43.56 1.983 49.58
6 0 103.960 102.317 104.300 102.317 0.000 21.69 1.643 45.33
7 25 102.930 102.317 104.300 102.317 0.000 0 0.613 28.20
8 50 103.485 102.317 104.300 102.317 0.000 0 1.168 22.26
9 75 108.045 102.317 104.300 102.317 3.745 46.81 1.983 39.39
10 100 108.620 102.317 104.300 102.317 4.320 100.81 1.983 49.58
11 116 108.655 108.655 108.655 108.655 0.000 34.56 0.000 15.86
Total 425.96 365.22 Sqm
At Chinage 0.700 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 108.010 108.010 108.010 108.010 0.000 0.000
2 100 107.955 102.300 104.300 102.300 3.655 29.24 2.000 16.00
3 75 107.915 102.300 104.300 102.300 3.615 90.87 2.000 50.00
4 50 105.320 102.300 104.300 102.300 1.020 57.94 2.000 50.00
5 25 105.680 102.300 104.300 102.300 1.380 30 2.000 50.00
6 0 103.710 102.300 104.300 102.300 0.000 17.25 1.410 42.63
7 25 102.980 102.300 104.300 102.300 0.000 0 0.680 26.12
8 50 103.640 102.300 104.300 102.300 0.000 0 1.340 25.25
9 75 107.605 102.300 104.300 102.300 3.305 41.31 2.000 41.75
10 100 108.460 102.300 104.300 102.300 4.160 93.31 2.000 50.00
11 116 108.510 108.510 108.510 108.510 0.000 33.28 0.000 16.00
Total 393.20 367.75 Sqm
At Chinage 0.725 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 105.320 105.320 105.320 105.320 0.000 0.000
2 100 105.115 102.283 103.500 102.283 1.615 12.92 1.217 9.74
3 75 104.940 102.283 103.500 102.283 1.440 38.19 1.217 30.43
4 50 105.070 102.283 103.500 102.283 1.570 37.62 1.217 30.43
5 25 105.240 102.283 103.500 102.283 1.740 41.37 1.217 30.43
6 0 103.755 102.283 103.500 102.283 0.255 24.94 1.217 30.43
7 25 102.810 102.283 103.500 102.283 0.000 3.19 0.527 21.80
8 50 103.920 102.283 103.500 102.283 0.420 5.25 1.217 21.80
9 75 107.655 102.283 103.500 102.283 4.155 57.19 1.217 30.43
10 100 108.480 102.283 103.500 102.283 4.980 114.19 1.217 30.43
11 116 108.570 108.570 108.570 108.570 0.000 39.84 0.000 9.74
Total 374.70 245.66 Sqm
At Chinage 0.750 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 105.225 105.225 105.225 105.225 0.000 0.000
2 100 105.155 102.265 103.500 102.265 1.655 13.24 1.235 9.88
3 75 105.010 102.265 103.500 102.265 1.510 39.56 1.235 30.88
4 50 103.865 102.265 103.500 102.265 0.365 23.44 1.235 30.88
5 25 103.595 102.265 103.500 102.265 0.095 5.75 1.235 30.88
6 0 103.610 102.265 103.500 102.265 0.110 2.56 1.235 30.88
7 25 102.480 102.265 103.500 102.265 0.000 1.37 0.215 18.12
8 50 103.980 102.265 103.500 102.265 0.480 6 1.235 18.12
9 75 103.920 102.265 103.500 102.265 0.420 11.25 1.235 30.88
10 100 108.455 102.265 103.500 102.265 4.955 67.19 1.235 30.88
11 116 108.555 108.555 108.555 108.555 0.000 39.64 0.000 9.88
Total 210.00 241.28 Sqm
At Chinage 0.775 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 105.100 105.100 105.100 105.100 0.000 0.000
2 100 104.805 102.248 103.400 102.248 1.405 11.24 1.152 9.22
3 75 104.635 102.248 103.400 102.248 1.235 33 1.152 28.80
4 50 104.505 102.248 103.400 102.248 1.105 29.25 1.152 28.80
5 25 103.300 102.248 103.400 102.248 0.000 13.81 1.052 27.55
6 0 102.720 102.248 103.400 102.248 0.000 0 0.472 19.05
7 25 102.175 102.248 103.400 102.248 0.000 0 0.000 5.90
8 50 104.210 102.248 103.400 102.248 0.810 10.12 1.152 14.40
9 75 104.675 102.248 103.400 102.248 1.275 26.06 1.152 28.80
10 100 107.960 102.248 103.400 102.248 4.560 72.94 1.152 28.80
11 116 108.110 108.110 108.110 108.110 0.000 36.48 0.000 9.22
Total 232.90 200.54 Sqm
At Chinage 0.800 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 105.215 105.215 105.215 105.215 0.000 0.000
2 100 104.905 102.231 103.700 102.231 1.205 9.64 1.469 11.75
3 75 104.685 102.231 103.700 102.231 0.985 27.38 1.469 36.73
4 50 104.675 102.231 103.700 102.231 0.975 24.5 1.469 36.73
5 25 103.130 102.231 103.700 102.231 0.000 12.19 0.899 29.60
6 0 102.650 102.231 103.700 102.231 0.000 0 0.419 16.47
7 25 102.530 102.231 103.700 102.231 0.000 0 0.299 8.97
8 50 107.590 102.231 103.700 102.231 3.890 48.63 1.469 22.10
9 75 107.600 102.231 103.700 102.231 3.900 97.37 1.469 36.73
10 100 107.605 102.231 103.700 102.231 3.905 97.56 1.469 36.73
11 116 107.710 107.710 107.710 107.710 0.000 31.24 0.000 11.75
Total 348.51 247.56 Sqm
At Chinage 0.825 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 105.005 105.005 105.005 105.005 0.000 0.000
2 100 104.575 102.214 103.600 102.214 0.975 7.8 1.386 11.09
3 75 104.125 102.214 103.600 102.214 0.525 18.75 1.386 34.65
4 50 104.235 102.214 103.600 102.214 0.635 14.5 1.386 34.65
5 25 103.030 102.214 103.600 102.214 0.000 7.94 0.816 27.52
6 0 101.990 102.214 103.600 102.214 0.000 0 0.000 10.20
7 25 103.570 102.214 103.600 102.214 0.000 0 1.356 16.95
8 50 107.325 102.214 103.600 102.214 3.725 46.56 1.386 34.27
9 75 107.275 102.214 103.600 102.214 3.675 92.5 1.386 34.65
10 100 107.245 102.214 103.600 102.214 3.645 91.5 1.386 34.65
11 116 107.330 107.330 107.330 107.330 0.000 29.16 0.000 11.09
Total 308.71 249.72 Sqm
At Chinage 0.850 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 104.985 104.985 104.985 104.985 0.000 0.000
2 100 104.465 102.196 103.700 102.196 0.765 6.12 1.504 12.03
3 75 104.385 102.196 103.700 102.196 0.685 18.13 1.504 37.60
4 50 104.285 102.196 103.700 102.196 0.585 15.88 1.504 37.60
5 25 102.800 102.196 103.700 102.196 0.000 7.31 0.604 26.35
6 0 101.650 102.196 103.700 102.196 0.000 0 0.000 7.55
7 25 107.355 102.196 103.700 102.196 3.655 45.69 1.504 18.80
8 50 107.345 102.196 103.700 102.196 3.645 91.25 1.504 37.60
9 75 107.235 102.196 103.700 102.196 3.535 89.75 1.504 37.60
10 100 107.175 102.196 103.700 102.196 3.475 87.63 1.504 37.60
11 116 107.235 107.235 107.235 107.235 0.000 27.8 0.000 12.03
Total 389.56 264.76 Sqm
At Chinage 0.875 Km
Soils HDR
Bottom Bottom
Distance Ground Bottom
Slno Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level Level of Soils
Channel HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 104.600 104.600 104.600 104.600 0.000 0.000
2 100 104.555 102.179 103.700 102.179 0.855 6.84 1.521 12.17
3 75 104.325 102.179 103.700 102.179 0.625 18.5 1.521 38.03
4 50 104.535 102.179 103.700 102.179 0.835 18.25 1.521 38.03
5 25 102.810 102.179 103.700 102.179 0.000 10.44 0.631 26.90
6 0 101.930 102.179 103.700 102.179 0.000 0 0.000 7.89
7 25 107.450 102.179 103.700 102.179 3.750 46.88 1.521 19.01
8 50 107.235 102.179 103.700 102.179 3.535 91.06 1.521 38.03
9 75 107.270 102.179 103.700 102.179 3.570 88.81 1.521 38.03
10 100 107.125 102.179 103.700 102.179 3.425 87.44 1.521 38.03
11 116 107.410 107.410 107.410 107.410 0.000 27.4 0.000 12.17
Total 395.62 268.29 Sqm
At Chinage 0.900 Km
Soils HDR F&F
Bottom Bottom Bottom Bottom
Distance Ground
Slno Level of Level of Level of Level of Depth of Area of Soils Depth of Area of Soils Depth of Area of F&F Remarks
in Meters Level
Channel Soils HDR F&F Soils (M) (Sqm) HDR (M) HDR (Sqm) F&F (M) (Sqm)
1 116 106.620 106.620 106.620 106.620 0.000 0.000 0.00
2 100 106.755 102.162 103.800 103.500 102.162 2.955 23.64 0.300 2.40 1.338 10.7
3 75 106.775 102.162 103.800 103.500 102.162 2.975 74.12 0.300 7.50 1.338 33.45
4 50 106.735 102.162 103.800 103.500 102.162 2.935 73.88 0.300 7.50 1.338 33.45
5 25 101.790 102.162 103.800 103.500 102.162 0.000 36.69 0.000 3.75 0.000 16.72
6 0 102.080 102.162 103.800 102.162 0.000 0 0.000 0.00
7 25 106.085 102.162 103.800 102.162 2.285 28.56 1.638 20.47
8 50 106.175 102.162 103.800 102.162 2.375 58.25 1.638 40.95
9 75 106.185 102.162 103.800 102.162 2.385 59.5 1.638 40.95
10 100 106.145 102.162 103.800 102.162 2.345 59.13 1.638 40.95
11 116 106.210 106.210 106.210 106.210 0.000 18.76 0.000 13.10
Total 432.53 177.57 Sqm 94.32 Sqm
At Chinage 0.925 Km
Soils HDR F&F
Bottom Bottom Bottom Bottom
Distance Ground
Slno Level of Level of Level of Level of Depth of Area of Soils Depth of Area of Soils Depth of Area of F&F Remarks
in Meters Level
Channel Soils HDR F&F Soils (M) (Sqm) HDR (M) HDR (Sqm) F&F (M) (Sqm)
1 116 106.620 106.620 106.620 106.620 0.000 0.000 0
2 100 106.645 102.145 103.295 103.295 102.145 3.350 26.8 0.000 0.00 1.150 9.2
3 75 106.715 102.145 103.295 103.295 102.145 3.420 84.62 0.000 0.00 1.150 28.75
4 50 106.775 102.145 103.295 103.295 102.145 3.480 86.25 0.000 0.00 1.150 28.75
5 25 101.850 102.145 103.295 102.145 102.145 0.000 43.5 0.000 0.00 0.000 14.38
6 0 102.820 102.145 103.295 102.145 0.000 0 0.675 8.44
7 25 106.095 102.145 103.295 102.145 2.800 35 1.150 22.81
8 50 106.015 102.145 103.295 102.145 2.720 69 1.150 28.75
9 75 106.345 102.145 103.295 102.145 3.050 72.12 1.150 28.75
10 100 106.155 102.145 103.295 102.145 2.860 73.88 1.150 28.75
11 116 106.240 106.240 106.240 106.240 0.000 22.88 0.000 9.20
Total 514.05 126.70 Sqm 81.08 Sqm
At Chinage 0.950 Km
Soils HDR F&F
Bottom Bottom Bottom Bottom
Distance Ground
Slno Level of Level of Level of Level of Depth of Area of Soils Depth of Area of Soils Depth of Area of F&F Remarks
in Meters Level
Channel Soils HDR F&F Soils (M) (Sqm) HDR (M) HDR (Sqm) F&F (M) (Sqm)
1 116 106.690 106.690 106.690 106.690 0.000 0.000
2 100 106.620 102.127 103.800 102.127 2.820 22.56 1.673 13.38
3 75 106.720 102.127 103.800 102.127 2.920 71.75 1.673 41.83
4 50 106.770 102.127 103.800 102.127 2.970 73.62 1.673 41.83
5 25 101.830 102.127 103.800 102.127 0.000 37.13 0.000 20.91
6 0 103.140 102.127 103.800 102.127 0.000 0 1.013 12.66
7 25 105.690 102.127 103.800 102.127 1.890 23.62 1.673 33.57
8 50 106.095 102.127 103.800 102.127 2.295 52.31 1.673 41.83
9 75 106.100 102.127 103.800 102.127 2.300 57.44 1.673 41.83
10 100 106.180 102.127 103.800 102.127 2.380 58.5 1.673 41.83
11 116 106.310 106.310 106.310 106.310 0.000 19.04 0.000 13.38
Total 415.97 303.05 Sqm
At Chinage 0.975 Km
Soils HDR F&F
Bottom Bottom Bottom Bottom
Distance Ground
Slno Level of Level of Level of Level of Depth of Area of Soils Depth of Area of Soils Depth of Area of F&F Remarks
in Meters Level
Channel Soils HDR F&F Soils (M) (Sqm) HDR (M) HDR (Sqm) F&F (M) (Sqm)
1 116 106.590 106.590 106.590 106.590 0.000 0.000
2 100 106.670 102.110 103.800 102.110 2.870 22.96 1.690 13.52
3 75 106.660 102.110 103.800 102.110 2.860 71.62 1.690 42.25
4 50 106.835 102.110 103.800 102.110 3.035 73.69 1.690 42.25
5 25 102.110 102.110 103.800 102.110 0.000 37.94 0.000 21.12
6 0 102.940 102.110 103.800 102.110 0.000 0 0.830 10.37
7 25 105.645 102.110 103.800 102.110 1.845 23.06 1.690 31.50
8 50 106.100 102.110 103.800 102.110 2.300 51.81 1.690 42.25
9 75 106.175 102.110 103.800 102.110 2.375 58.44 1.690 42.25
10 100 106.160 102.110 103.800 102.110 2.360 59.19 1.690 42.25
11 116 106.285 106.285 106.285 106.285 0.000 18.88 0.000 13.52
Total 417.59 301.28 Sqm
At Chinage 1.000 Km
Soils HDR HR
Bottom Bottom Bottom Bottom
Distance Ground
Slno Level of Level of Level of Level of Depth of Area of Soils Depth of Area of Soils Depth of Area of HR Remarks
in Meters Level
Channel Soils HDR F&F Soils (M) (Sqm) HDR (M) HDR (Sqm) HR (M) (Sqm)
1 116 106.310 106.310 106.310 106.310 0.000 0.000
2 100 106.235 102.093 103.500 102.093 2.735 21.88 1.407 11.26
3 75 106.200 102.093 103.500 102.093 2.700 67.94 1.407 35.17
4 50 106.175 102.093 103.500 102.093 2.675 67.19 1.407 35.17
5 25 99.650 102.093 103.500 102.093 0.000 33.44 0.000 17.59
6 0 100.760 102.093 103.500 102.093 102.093 0.000 0 0.000 0.00 0.000
7 25 104.880 102.093 103.500 102.670 102.093 1.380 17.25 0.830 10.38 0.577 7.21
8 50 106.065 102.093 103.500 102.670 102.093 2.565 49.31 0.830 20.75 0.577 14.43
9 75 106.035 102.093 103.500 102.670 102.093 2.535 63.75 0.830 20.75 0.577 14.43
10 100 106.205 102.093 103.500 102.670 102.093 2.705 65.5 0.830 20.75 0.577 14.43
11 116 106.320 106.320 106.320 106.320 106.320 0.000 21.64 0.000 6.64 0.000 4.62
Total 407.90 178.46 Sqm 55.12 Sqm
At Chinage 1.025 Km
Soils HDR F&F
Bottom Bottom Bottom Bottom
Distance Ground
Slno Level of Level of Level of Level of Depth of Area of Soils Depth of Area of Soils Depth of Area of F&F Remarks
in Meters Level
Channel Soils HDR F&F Soils (M) (Sqm) HDR (M) HDR (Sqm) F&F (M) (Sqm)
1 116 106.635 106.635 106.635 106.635 106.635 0.000 0.000 0.000
2 100 105.720 102.076 103.700 103.120 102.076 2.020 16.16 0.580 4.64 1.044 8.35
3 75 105.660 102.076 103.700 103.120 102.076 1.960 49.75 0.580 14.50 1.044 26.1
4 50 105.685 102.076 103.700 103.120 102.076 1.985 49.31 0.580 14.50 1.044 26.1
5 25 105.735 102.076 103.700 103.120 102.076 2.035 50.25 0.580 14.50 1.044 26.1
6 0 100.250 102.076 103.700 102.076 102.076 0.000 25.44 0.000 7.25 0.000 13.05
7 25 105.380 102.076 103.700 102.076 1.680 21 1.624 20.30
8 50 105.330 102.076 103.700 102.076 1.630 41.38 1.624 40.60
9 75 106.505 102.076 103.700 102.076 2.805 55.44 1.624 40.60
10 100 106.560 102.076 103.700 102.076 2.860 70.81 1.624 40.60
11 116 106.675 106.675 106.675 106.675 0.000 22.88 0.000 12.99
Total 402.42 210.48 Sqm 99.70 Sqm
EWE Areas Calcuation Sheet
At Chinage 1.050 Km
Soils HDR
Bottom Bottom Bottom
Distance Ground
Slno Level of Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level
Channel Soils HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 105.770 105.770 105.770 105.770 0.000 0.000
2 100 105.690 102.058 103.700 102.058 1.990 15.92 1.642 13.14
3 75 105.595 102.058 103.700 102.058 1.895 48.56 1.642 41.05
4 50 105.855 102.058 103.700 102.058 2.155 50.63 1.642 41.05
5 25 105.710 102.058 103.700 102.058 2.010 52.06 1.642 41.05
6 0 100.050 102.058 103.700 102.058 0.000 25.13 0.000 20.52
7 25 105.420 102.058 103.700 102.058 1.720 21.5 1.642 20.52
8 50 105.405 102.058 103.700 102.058 1.705 42.81 1.642 41.05
9 75 106.530 102.058 103.700 102.058 2.830 56.69 1.642 41.05
10 100 106.550 102.058 103.700 102.058 2.850 71 1.642 41.05
11 116 106.710 106.710 106.710 106.710 0.000 22.8 0.000 13.14
Total 407.10 313.62 Sqm
At Chinage 1.075 Km
Soils HDR
Bottom Bottom Bottom
Distance Ground
Slno Level of Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level
Channel Soils HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 106.320 106.320 106.320 106.320 0.000 0.000
2 100 106.020 102.041 103.600 102.041 2.420 19.36 1.559 12.47
3 75 105.830 102.041 103.600 102.041 2.230 58.13 1.559 38.97
4 50 105.910 102.041 103.600 102.041 2.310 56.75 1.559 38.97
5 25 105.860 102.041 103.600 102.041 2.260 57.13 1.559 38.97
6 0 100.745 102.041 103.600 102.041 0.000 28.25 0.000 19.49
7 25 101.215 102.041 103.600 102.041 0.000 0 0.000 0.00
8 50 106.245 102.041 103.600 102.041 2.645 33.06 1.559 19.49
9 75 106.380 102.041 103.600 102.041 2.780 67.81 1.559 38.97
10 100 106.415 102.041 103.600 102.041 2.815 69.94 1.559 38.97
11 116 106.510 106.510 106.510 106.510 0.000 22.52 0.000 12.47
Total 412.95 258.77 Sqm
At Chinage 1.100 Km
Soils HDR
Bottom Bottom Bottom
Distance Ground
Slno Level of Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level
Channel Soils HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 105.785 105.785 105.785 105.785 0.000 0.000
2 100 105.530 102.024 103.500 102.024 2.030 16.24 1.476 11.81
3 75 105.660 102.024 103.500 102.024 2.160 52.38 1.476 36.90
4 50 105.880 102.024 103.500 102.024 2.380 56.75 1.476 36.90
5 25 105.745 102.024 103.500 102.024 2.245 57.81 1.476 36.90
6 0 100.500 102.024 103.500 102.024 0.000 28.06 0.000 18.45
7 25 101.610 102.024 103.500 102.024 0.000 0 0.000 0.00
8 50 106.190 102.024 103.500 102.024 2.690 33.63 1.476 18.45
9 75 106.325 102.024 103.500 102.024 2.825 68.94 1.476 36.90
10 100 106.395 102.024 103.500 102.024 2.895 71.5 1.476 36.90
11 116 106.485 106.485 106.485 106.485 0.000 23.16 0.000 11.81
Total 408.47 245.02 Sqm
At Chinage 1.125 Km
Soils HDR
Bottom Bottom Bottom
Distance Ground
Slno Level of Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level
Channel Soils HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 105.660 105.660 105.660 105.660 0.000 0.000
2 100 105.565 102.007 103.200 102.007 2.365 18.92 1.193 9.54
3 75 105.540 102.007 103.200 102.007 2.340 58.81 1.193 29.82
4 50 105.605 102.007 103.200 102.007 2.405 59.31 1.193 29.82
5 25 104.375 102.007 103.200 102.007 1.175 44.75 1.193 29.82
6 0 100.905 102.007 103.200 102.007 0.000 14.69 0.000 14.91
7 25 100.205 102.007 103.200 102.007 0.000 0 0.000 0.00
8 50 105.510 102.007 103.200 102.007 2.310 28.88 1.193 14.91
9 75 105.540 102.007 103.200 102.007 2.340 58.13 1.193 29.82
10 100 105.555 102.007 103.200 102.007 2.355 58.69 1.193 29.82
11 116 105.615 105.615 105.615 105.615 0.000 18.84 0.000 9.54
Total 361.02 198.00 Sqm
At Chinage 1.150 Km
Soils HDR
Bottom Bottom Bottom
Distance Ground
Slno Level of Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level
Channel Soils HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 105.715 105.715 105.715 105.715 0.000 0.000
2 100 105.585 101.989 103.000 101.989 2.585 20.68 1.011 8.09
3 75 105.515 101.989 103.000 101.989 2.515 63.75 1.011 25.27
4 50 104.235 101.989 103.000 101.989 1.235 46.88 1.011 25.27
5 25 101.765 101.989 103.000 101.989 0.000 15.44 0.000 12.64
6 0 100.215 101.989 103.000 101.989 0.000 0 0.000 0.00
7 25 100.310 101.989 103.000 101.989 0.000 0 0.000 0.00
8 50 105.440 101.989 103.000 101.989 2.440 30.5 1.011 12.64
9 75 105.485 101.989 103.000 101.989 2.485 61.56 1.011 25.27
10 100 105.515 101.989 103.000 101.989 2.515 62.5 1.011 25.27
11 116 105.625 105.625 105.625 105.625 0.000 20.12 0.000 8.09
Total 321.43 142.54 Sqm
At Chinage 1.175 Km
Soils HDR
Bottom Bottom Bottom
Distance Ground
Slno Level of Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level
Channel Soils HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 106.110 106.110 106.110 106.110 0.000 0.000
2 100 105.905 101.972 103.000 101.972 2.905 23.24 1.028 8.22
3 75 104.840 101.972 103.000 101.972 1.840 59.31 1.028 25.70
4 50 104.890 101.972 103.000 101.972 1.890 46.63 1.028 25.70
5 25 100.765 101.972 103.000 101.972 0.000 23.63 0.000 12.85
6 0 100.140 101.972 103.000 101.972 0.000 0 0.000 0.00
7 25 99.925 101.972 103.000 101.972 0.000 0 0.000 0.00
8 50 105.250 101.972 103.000 101.972 2.250 28.13 1.028 12.85
9 75 105.555 101.972 103.000 101.972 2.555 60.06 1.028 25.70
10 100 105.695 101.972 103.000 101.972 2.695 65.63 1.028 25.70
11 116 105.805 105.805 105.805 105.805 0.000 21.56 0.000 8.22
Total 328.19 144.94 Sqm
At Chinage 1.200 Km
Soils HDR
Bottom Bottom Bottom
Distance Ground
Slno Level of Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level
Channel Soils HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 106.050 106.050 106.050 106.050 0.000 0.000
2 100 105.880 101.955 103.000 101.955 2.880 23.04 1.045 8.36
3 75 104.795 101.955 103.000 101.955 1.795 58.44 1.045 26.13
4 50 104.865 101.955 103.000 101.955 1.865 45.75 1.045 26.13
5 25 100.165 101.955 103.000 101.955 0.000 23.31 0.000 13.06
6 0 100.530 101.955 103.000 101.955 0.000 0 0.000 0.00
7 25 101.110 101.955 103.000 101.955 0.000 0 0.000 0.00
8 50 105.230 101.955 103.000 101.955 2.230 27.88 1.045 13.06
9 75 105.540 101.955 103.000 101.955 2.540 59.63 1.045 26.13
10 100 105.665 101.955 103.000 101.955 2.665 65.06 1.045 26.13
11 116 105.745 105.745 105.745 105.745 0.000 21.32 0.000 8.36
Total 324.43 147.36 Sqm
At Chinage 1.225 Km
Soils HDR
Bottom Bottom Bottom
Distance Ground
Slno Level of Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level
Channel Soils HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 106.145 106.145 106.145 106.145 0.000 0.000
2 100 105.995 101.938 103.000 101.938 2.995 23.96 1.062 8.50
3 75 105.055 101.938 103.000 101.938 2.055 63.13 1.062 26.55
4 50 105.185 101.938 103.000 101.938 2.185 53 1.062 26.55
5 25 99.995 101.938 103.000 101.938 0.000 27.31 0.000 13.28
6 0 100.735 101.938 103.000 101.938 0.000 0 0.000 0.00
7 25 101.085 101.938 103.000 101.938 0.000 0 0.000 0.00
8 50 105.240 101.938 103.000 101.938 2.240 28 1.062 13.28
9 75 105.530 101.938 103.000 101.938 2.530 59.63 1.062 26.55
10 100 105.635 101.938 103.000 101.938 2.635 64.56 1.062 26.55
11 116 105.660 105.660 105.660 105.660 0.000 21.08 0.000 8.50
Total 340.67 149.76 Sqm
At Chinage 1.250 Km
Soils HDR
Bottom Bottom Bottom
Distance Ground
Slno Level of Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level
Channel Soils HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 102.115 102.115 102.115 102.115 0.000 0.000
2 100 101.930 101.920 102.300 101.920 0.000 0 0.010 0.08
3 75 100.210 101.920 102.300 101.920 0.000 0 0.000 0.13
4 50 104.020 101.920 102.300 101.920 1.720 21.5 0.380 4.75
5 25 99.800 101.920 102.300 101.920 0.000 21.5 0.000 4.75
6 0 100.630 101.920 102.300 101.920 0.000 0 0.000 0.00
7 25 100.925 101.920 102.300 101.920 0.000 0 0.000 0.00
8 50 104.895 101.920 102.300 101.920 2.595 32.44 0.380 4.75
9 75 104.970 101.920 102.300 101.920 2.670 65.81 0.380 9.50
10 100 105.020 101.920 102.300 101.920 2.720 67.38 0.380 9.50
11 116 105.115 105.115 105.115 105.115 0.000 21.76 0.000 3.04
Total 230.39 36.50 Sqm
At Chinage 1.275 Km
Soils HDR
Bottom Bottom Bottom
Distance Ground
Slno Level of Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level
Channel Soils HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 102.140 102.140 102.140 102.140 0.000 0.000
2 100 101.960 101.903 102.200 101.903 0.000 0 0.057 0.46
3 75 102.035 101.903 102.200 101.903 0.000 0 0.000 0.71
4 50 99.395 101.903 102.200 101.903 0.000 0 0.000 0.00
5 25 100.395 101.903 102.200 101.903 0.000 0 0.000 0.00
6 0 101.110 101.903 102.200 101.903 0.000 0 0.000 0.00
7 25 101.415 101.903 102.200 101.903 0.000 0 0.000 0.00
8 50 104.180 101.903 102.200 101.903 1.980 24.75 0.297 3.71
9 75 104.955 101.903 102.200 101.903 2.755 59.19 0.297 7.42
10 100 105.005 101.903 102.200 101.903 2.805 69.5 0.297 7.42
11 116 105.190 105.190 105.190 105.190 0.000 22.44 0.000 2.38
Total 175.88 22.10 Sqm
At Chinage 1.300 Km
Soils HDR
Bottom Bottom Bottom
Distance Ground
Slno Level of Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level
Channel Soils HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 102.580 102.580 102.580 102.580 0.000 0.000
2 100 102.515 101.886 102.200 101.886 0.315 2.52 0.314 2.51
3 75 102.365 101.886 102.200 101.886 0.165 6 0.314 7.85
4 50 103.110 101.886 102.200 101.886 0.910 13.44 0.314 7.85
5 25 100.955 101.886 102.200 101.886 0.000 11.38 0.000 3.93
6 0 100.465 101.886 102.200 101.886 0.000 0 0.000 0.00
7 25 102.100 101.886 102.200 101.886 0.000 0 0.214 2.67
8 50 104.185 101.886 102.200 101.886 1.985 24.81 0.314 6.60
9 75 104.095 101.886 102.200 101.886 1.895 48.5 0.314 7.85
10 100 103.295 101.886 102.200 101.886 1.095 37.38 0.314 7.85
11 116 103.330 103.330 103.330 103.330 0.000 8.76 0.000 2.51
Total 152.79 49.62 Sqm
At Chinage 1.325 Km
Soils HDR
Bottom Bottom Bottom
Distance Ground
Slno Level of Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level
Channel Soils HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 103.585 103.585 103.585 103.585 0.000 0.000
2 100 103.505 101.869 102.300 101.869 1.205 9.64 0.431 3.45
3 75 103.410 101.869 102.300 101.869 1.110 28.94 0.431 10.77
4 50 102.685 101.869 102.300 101.869 0.385 18.69 0.431 10.77
5 25 101.525 101.869 102.300 101.869 0.000 4.81 0.000 5.39
6 0 100.845 101.869 102.300 101.869 0.000 0 0.000 0.00
7 25 102.235 101.869 102.300 101.869 0.000 0 0.366 4.58
8 50 103.135 101.869 102.300 101.869 0.835 10.44 0.431 9.96
9 75 103.025 101.869 102.300 101.869 0.725 19.5 0.431 10.77
10 100 103.045 101.869 102.300 101.869 0.745 18.38 0.431 10.77
11 116 103.285 103.285 103.285 103.285 0.000 5.96 0.000 3.45
Total 116.36 69.91 Sqm
At Chinage 1.350 Km
Soils HDR
Bottom Bottom Bottom
Distance Ground
Slno Level of Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level
Channel Soils HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 103.345 103.345 103.345 103.345 0.000 0.000
2 100 103.640 101.851 102.400 101.851 1.240 9.92 0.549 4.39
3 75 103.635 101.851 102.400 101.851 1.235 30.94 0.549 13.73
4 50 102.635 101.851 102.400 101.851 0.235 18.38 0.549 13.73
5 25 101.685 101.851 102.400 101.851 0.000 2.94 0.000 6.86
6 0 100.855 101.851 102.400 101.851 0.000 0 0.000 0.00
7 25 102.335 101.851 102.400 101.851 0.000 0 0.484 6.05
8 50 103.675 101.851 102.400 101.851 1.275 15.94 0.549 12.91
9 75 103.735 101.851 102.400 101.851 1.335 32.62 0.549 13.73
10 100 103.765 101.851 102.400 101.851 1.365 33.75 0.549 13.73
11 116 103.880 103.880 103.880 103.880 0.000 10.92 0.000 4.39
Total 155.41 89.52 Sqm
At Chinage 1.375 Km
Soils HDR
Bottom Bottom Bottom
Distance Ground
Slno Level of Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level
Channel Soils HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 103.190 103.190 103.190 103.190 0.000 0.000
2 100 102.915 101.834 102.300 101.834 0.615 4.92 0.466 3.73
3 75 103.260 101.834 102.300 101.834 0.960 19.69 0.466 11.65
4 50 102.540 101.834 102.300 101.834 0.240 15 0.466 11.65
5 25 101.810 101.834 102.300 101.834 0.000 3 0.000 5.82
6 0 101.145 101.834 102.300 101.834 0.000 0 0.000 0.00
7 25 102.195 101.834 102.300 101.834 0.000 0 0.361 4.51
8 50 102.135 101.834 102.300 101.834 0.000 0 0.301 8.28
9 75 103.740 101.834 102.300 101.834 1.440 18 0.466 9.59
10 100 103.785 101.834 102.300 101.834 1.485 36.56 0.466 11.65
11 116 104.100 104.100 104.100 104.100 0.000 11.88 0.000 3.73
Total 109.05 70.61 Sqm
At Chinage 1.400 Km
Soils HDR
Bottom Bottom Bottom
Distance Ground
Slno Level of Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level
Channel Soils HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 103.005 103.005 103.005 103.005 0.000 0.000
2 100 102.895 101.817 102.200 101.817 0.695 5.56 0.383 3.06
3 75 103.005 101.817 102.200 101.817 0.805 18.75 0.383 9.58
4 50 102.955 101.817 102.200 101.817 0.755 19.5 0.383 9.58
5 25 102.820 101.817 102.200 101.817 0.620 17.19 0.000 4.79
6 0 101.325 101.817 102.200 101.817 0.000 7.75 0.000 0.00
7 25 102.055 101.817 102.200 101.817 0.000 0 0.238 2.98
8 50 102.145 101.817 102.200 101.817 0.000 0 0.328 7.08
9 75 101.565 101.817 102.200 101.817 0.000 0 0.000 4.10
10 100 103.745 101.817 102.200 101.817 1.545 19.31 0.383 4.79
11 116 104.080 104.080 104.080 104.080 0.000 12.36 0.000 3.06
Total 100.42 49.02 Sqm
At Chinage 1.425 Km
Soils HDR
Bottom Bottom Bottom
Distance Ground
Slno Level of Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level
Channel Soils HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 102.980 102.980 102.980 102.980 0.000 0.000
2 100 102.740 101.800 102.000 101.800 0.740 5.92 0.200 1.60
3 75 103.800 101.800 102.000 101.800 1.800 31.75 0.200 5.00
4 50 102.790 101.800 102.000 101.800 0.790 32.38 0.200 5.00
5 25 101.945 101.800 102.000 101.800 0.000 9.88 0.000 2.50
6 0 101.455 101.800 102.000 101.800 0.000 0 0.000 0.00
7 25 102.055 101.800 102.000 101.800 0.055 0.69 0.200 2.50
8 50 102.305 101.800 102.000 101.800 0.305 4.5 0.200 5.00
9 75 102.205 101.800 102.000 101.800 0.205 6.38 0.000 2.50
10 100 101.265 101.800 102.000 101.800 0.000 2.56 0.000 0.00
11 116 101.350 101.350 101.350 101.350 0.000 0 0.000 0.00
Total 94.06 24.10 Sqm
At Chinage 1.450 Km
Soils HDR
Bottom Bottom Bottom
Distance Ground
Slno Level of Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level
Channel Soils HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 103.450 103.450 103.450 103.450 0.000 0.000
2 100 103.365 101.783 102.200 101.783 1.165 9.32 0.417 3.34
3 75 103.295 101.783 102.200 101.783 1.095 28.25 0.417 10.43
4 50 102.780 101.783 102.200 101.783 0.580 20.94 0.417 10.43
5 25 101.950 101.783 102.200 101.783 0.000 7.25 0.167 7.30
6 0 101.485 101.783 102.200 101.783 0.000 0 0.000 2.09
7 25 102.075 101.783 102.200 101.783 0.000 0 0.292 3.65
8 50 102.585 101.783 102.200 101.783 0.385 4.81 0.417 8.86
9 75 102.385 101.783 102.200 101.783 0.185 7.12 0.417 10.43
10 100 102.915 101.783 102.200 101.783 0.715 11.25 0.417 10.43
11 116 103.070 103.070 103.070 103.070 0.000 5.72 0.000 3.34
Total 94.66 70.30 Sqm
At Chinage 1.475 Km
Soils HDR
Bottom Bottom Bottom
Distance Ground
Slno Level of Level of Level of Depth of Area of Soils Depth of Area of Soils Remarks
in Meters Level
Channel Soils HDR Soils (M) (Sqm) HDR (M) HDR (Sqm)
1 116 103.220 103.220 103.220 103.220 0.000 0.000
2 100 103.035 101.765 102.000 101.765 1.035 8.28 0.235 1.88
3 75 102.895 101.765 102.000 101.765 0.895 24.12 0.235 5.87
4 50 103.005 101.765 102.000 101.765 1.005 23.75 0.235 5.87
5 25 102.075 101.765 102.000 101.765 0.075 13.5 0.235 5.87
6 0 101.505 101.765 102.000 101.765 0.000 0.94 0.000 2.94
7 25 101.890 101.765 102.000 101.765 0.000 0 0.125 1.56
8 50 102.630 101.765 102.000 101.765 0.630 7.87 0.235 4.50
9 75 102.675 101.765 102.000 101.765 0.675 16.31 0.235 5.87
10 100 101.515 101.765 102.000 101.765 0.000 8.44 0.000 2.94
11 116 101.880 101.880 101.880 101.880 0.000 0 0.000 0.00
Total 103.21 37.30 Sqm
Name of work: GNSS Phase-II – Package No.10/06 - “Investigation, Design & Formation of Mallemadugu Reservoir and Excavation of Kailasagiri Canal from Km
0.000 to Km 65.500 including Construction of CM & CD works and distributory system including field channels to be feed an ayacut of 55000 acres in Chittoor and
Nellore Districts.
Quantity Statement
Excavation of Surplus course -D/S of Spillway (From Apron End)
Soils HDR F&F HR With Control Blasting
Slno Chainage (Km) Distance (M) Area of Soils Area of Soils Area of F & F Area of HR
Quantity (Cum) Quantity (Cum) Quantity (Cum) Quantity (Cum)
(Sqm) (Sqm) (Sqm) (Sqm)
1 0.000 - 324.78 222.26
2 0.025 25 311.73 3,896.68 671.81 12,457.47 462.96 8,565.27
3 0.050 25 409.88 9,020.11 482.15 14,424.53 454.11 11,463.34
4 0.075 25 492.21 11,276.03 316.78 9,986.59 498.40 11,906.36
5 0.100 25 466.49 11,983.69 521.12 10,473.80 348.14 10,581.77
6 0.125 25 456.19 11,533.50 714.90 15,450.31 145.02 6,164.53
7 0.150 25 660.81 13,962.53 459.49
8 0.175 25 688.99 16,872.50 545.88 12,567.13
9 0.200 25 579.61 15,857.50 404.58 11,880.75
10 0.225 25 623.38 15,037.38 397.83 10,030.13
11 0.250 25 581.54 15,061.50 337.00 9,185.38
12 0.275 25 446.41 12,849.38 297.12 7,926.50
13 0.300 25 403.13 10,619.25 478.21 9,691.63
14 0.325 25 391.40 9,931.63 418.42 11,207.88
15 0.350 25 356.14 9,344.25 304.12 9,031.75
16 0.375 25 297.91 8,175.63 352.87 8,212.38
17 0.400 25 294.51 7,405.25 332.93 8,572.50
18 0.425 25 289.61 7,301.50 298.73 7,895.75
19 0.450 25 264.42 6,925.38 258.65 6,967.25
20 0.475 25 252.76 6,464.75 261.30 6,499.38
21 0.500 25 536.81 9,869.62 419.65 8,511.87
22 0.525 25 546.03 13,535.50 442.70 10,779.38
23 0.550 25 437.71 12,296.75 389.06 10,397.00
24 0.575 25 493.88 11,644.88 426.22 10,191.00
25 0.600 25 490.39 12,303.38 447.52 10,921.75
26 0.625 25 492.96 12,291.88 444.15 11,145.88
27 0.650 25 489.74 12,283.75 429.84 10,924.88
28 0.675 25 425.96 11,446.25 365.22 9,938.25
29 0.700 25 393.20 10,239.50 367.75 9,162.13
30 0.725 25 374.70 9,598.75 245.66 7,667.63
31 0.750 25 210.00 7,308.75 241.28 6,086.75
32 0.775 25 232.90 5,536.25 200.54 5,522.75
33 0.800 25 348.51 7,267.63 247.56 5,601.25
34 0.825 25 308.71 8,215.25 249.72 6,216.00
35 0.850 25 389.56 8,728.38 264.76 6,431.00
36 0.875 25 395.62 9,814.75 268.29 6,663.13
37 0.900 25 432.53 10,351.88 177.57 5,573.25 94.32 2,358.00
38 0.925 25 514.05 11,832.25 126.70 3,803.38 81.08 2,192.50
39 0.950 25 415.97 11,625.25 303.05 5,371.88 - 1,013.50
40 0.975 25 417.59 10,419.50 301.28 7,554.13 - - -
41 1.000 25 407.90 10,318.63 178.46 5,996.75 - 55.12 689.00
42 1.025 25 402.42 10,129.00 210.48 4,861.75 99.70 1,246.25 - 689.00
43 1.050 25 407.10 10,119.00 313.62 6,551.25 - 1,246.25
44 1.075 25 412.95 10,250.63 258.77 7,154.87
45 1.100 25 408.47 10,267.75 245.02 6,297.37
46 1.125 25 361.02 9,618.62 198.00 5,537.75
47 1.150 25 321.43 8,530.62 142.54 4,256.75
48 1.175 25 328.19 8,120.25 144.94 3,593.50
49 1.200 25 324.43 8,157.75 147.36 3,653.75
50 1.225 25 340.67 8,313.75 149.76 3,714.00
51 1.250 25 230.39 7,138.25 36.50 2,328.25
52 1.275 25 175.88 5,078.37 22.10 732.50
53 1.300 25 152.79 4,108.37 49.62 896.50
54 1.325 25 116.36 3,364.37 69.91 1,494.12
55 1.350 25 155.41 3,397.12 89.52 1,992.87
56 1.375 25 109.05 3,305.75 70.61 2,001.62
57 1.400 25 100.42 2,618.37 49.02 1,495.37
58 1.425 25 94.06 2,431.00 24.10 914.00
59 1.450 25 94.66 2,359.00 70.30 1,180.00
60 1.475 25 103.21 2,473.37 37.30 1,345.00
Total 540,228.56 344,129.67 70,849.20 50,059.27
ANNEXURE-III
Name of work: GNSS Phase-II – Package No.10/06 - “Investigation, Design & Formation of Mallemadugu Reservoir and Excavation
of Kailasagiri Canal from Km 0.000 to Km 65.500 including Construction of CM & CD works and distributory system including field
channels to be feed an ayacut of 55000 acres in Chittoor and Nellore Districts"
2(C) -Estimate of Surplus course -(D/S of Spillway 0 (Apron Ending) to 1.475 Km)
Rate as per SSR-
Slno Descrption of item Unit Quantity Amount (Rs/-) Remarks
2006-07
Total 93,589,931
Name of work: GNSS Phase-II – Package No.10/06 - “Investigation, Design & Formation of Mallemadugu Reservoir and
Excavation of Kailasagiri Canal from Km 0.000 to Km 65.500 including Construction of CM & CD works and distributory system
including field channels to be feed an ayacut of 55000 acres in Chittoor and Nellore Districts.
Data as per SSR 2006-07
Rate Analysis for Surplus Course items
Excavation in all soils up to SDR & Stone matrix with machinery within a Pg No 10 of
A cum 13.00
radius of 5 m i.e. cut and dump – Basic rate for SS 20B Item No11
CONVEYANCE OF EARTH,SAND&GRAVEL INCLUDING
B
LOADING, UNLOADING &STACKING ON METALLED ROAD
500 meters. cum 40.70 Pg No 198
Deduct loading ,unloading & stacking charges cum
Loading cum 7.90
Un Loading cum 6.50
Stacking charges cum 4.20
C Total Amount for loading ,unloading & stacking charges cum 18.60
D Rate per Cum (A+B-C) cum 35.10
E Add VAT 4% cum 1.40
F Rate per Cum (D+E) cum 36.50
Excavation in all soils up to SDR & Stone matrix with machinery
2
including conveyance with a lead of 500 Meters
Excavation in all soils up to SDR & Stone matrix with machinery within a Pg No 10 of
A cum 13.00
radius of 5 m i.e. cut and dump – Basic rate for SS 20B Item No11
CONVEYANCE OF EARTH,SAND&GRAVEL INCLUDING
B
LOADING, UNLOADING &STACKING ON METALLED ROAD
500 meters. cum 60.10 Pg No 198
Deduct loading ,unloading & stacking charges cum
Loading cum 7.90
Un Loading cum 6.50
Stacking charges cum 4.20
C Total Amount for loading ,unloading & stacking charges cum 18.60
D Rate per Cum (A+B-C) cum 54.50
E Add VAT 4% cum 2.18