LINDE ENGINEERING
Unit(s): ASU
PCWBS: Z
QATAR SHELL GTL PROJECT (PEARL)
C2 AIR SEPARATION UNITS CONSTRUCTION
Document Title:
LINDE ENGINEERING
ITP FOR FENCE AND GATE INSTALLATION
AG
Project Drawings
1.0 Survey and setting out Location As per drawing GAM-QCR-QAC-GTL-134 I W S
a. Distance
Excavate/drill holes
between posts Project Drawings
2.0 for foundation of As per drawings GAM-QCR-QAC-GTL-134 I S S
b. Dimensions
fence/gate posts
(size/depth)
a. Materials b. Distance
GAM-QCR-QAC-GTL-134
Install fence/gate posts between posts
3.0 As per drawings & Material Approval I S S
prior to concreting c. Elevation of posts/fence
Requests
foundation