Our ref: SIN1111500-13-3-25 06 February 2018

By email Themed Attractions Resorts & Hotels Sdn. Bhd


Level 8, Surian Tower
No. 1, Jaln PJU 7/3, Mutiara Damansara
47810 Petaling Jaya, Selangor Darul Ehsan
Malaysia

Attn: Mr. Mark Muhinder

Dear Sir,
RE: CADANGAN MEMBINA 4 BLOK 5 TINGKAT YANG MENGANDUNGI 275
BILIK HOTEL DAN KEMUDAHAN PERKHIDMATAN BERSERTA TEMPAT
LETAK KERETA DI LANTAI ARAS BAWAH 2, DI ATAS PT 8364 (NO. PTD
LAMA IAITU DI ATAS SEBAHAGIAN PTD 2491 & PTD 2492), MUKIM
PANTAI TIMUR, DAERAH KOTA TINGGI, JOHOR DARUL TAKZIM UNTUK
TETUAN DESARU DEVELOPMENT CORPORATION SDN BHD

RECOMMENDATION FOR CONTRACTOR’S INTERIM PAYMENT


CERTIFICATE NO. 30

Reference to matter above, we would like to advise that the mechanical and electrical
works undertaken in MRCB’s Interim Payment Certificate No. 30 has been satisfactorily
completed in accordance to the contract drawings and specifications.

Your kind attention to this matters are highly appreciated. We trust all is in order.

Thank you.

Yours faithfully,

M C Kwang
Project Director
For WSP Ng Pte Ltd

MCK/lch

Enc

Cc: Mr. Megat / Hakim - TARH


Mr. Ahmad Fauzi - AJM
Mr. Wong YF / Mr. Fadli - BES
Mr. Zazali / Mr. Tuan Ikram - KPK
Mr. Chan / Mr. Shamudin - MRCB

WSP NG Pte. Ltd.


Co. Reg. No.199600928H
300 Beach Road
#05-00 The Concourse
Singapore 199555

T+ 65 6533-7333
F+ 65 6533-7707
www.wsp.com
WSP Consultancy Pte. Ltd.
Co. Reg. No.198403250N
300 Beach Road
#05-00 The Concourse
Singapore 199555

T+ 65 6533-7333
F+ 65 6533-7707
www.wsp.com

Notice of Valuation

To KPK Quantity Surveyors Sdn Bhd NOV No 1111500-WD-NOV25

Attention Mr Zazali Date 02 January 2018

From Mr M.C. Kwang Subject Contractor’s Interim Claim No.25 - M&E


PRO

Project The Westin Desaru Project No SIN1111500


Contract Main Contract – M&E Services No. of pages 2
Copies TAR&H – Mr. Chew, Mr. Hakim, Mr. Megat

Statement of MRCB – Contractor Interim Claim No.30 (No.25 - M&E) as of 31 Jan 2018
Extract from Prime Cost and Provisional Sums – Interim Claim No. 25
Contract Amount Work Previous Current Total Claim
(RM) Done % (RM)

PRIME COST SUM


B Lift Services
2,478,465.00 62% 1,536,648.30 - 1,536,648.30
Profit 49,569.30 62% 30,732.97 - 30,732.97
Attendance 35,000.00 62% 21,700.00 - 21,700.00

Sub-Total for Item B 2,552,818.95 1,589,081.27 - 1,589,081.27

Interim Claim No. 25 – Summary


Contract Amount Work Done Previous Current Total Claim
(RM) % (RM)

1 PC and Provisional Sum 82,711,218.95 1.92% 1,589,081.27 - 1,589,081.27

2 Main Summary of M&E Works 35,043,800.00 89.14% 29,665,187.65 1,572 ,406.69 31,237,594.34

3 Material on Site

Total Claims for M&E 32,826,675.60

MC Kwang 07/FEB/2018
Project Leader’s Name Signature Date

This document may contain confidential and legally privileged information, neither of which are intended to be waived, and must be used only for its intended purpose. Any
unauthorised copying, dissemination or use in any form or by any means other than by the addressee, is strictly prohibited. If you have received this document in error or by any
means other than as authorised addressee, please notify us immediately and we will arrange for its return to us.
WSP Ng Assessment of Work Completed as at 31 Jan 2018
Under Prime Cost and Provisional Sums – Interim Claim No. 25
Contract Amount Work Previous Current Total Claim
(RM) Done % (RM)

PRIME COST SUM


B Lift Services
2,478,465.00 62% 1,536,648.30 - 1,536,648.30
Profit 49,569.30 62% 30,732.97 - 30,732.97
Attendance 35,000.00 62% 21,700.00 - 21,700.00

Sub-Total for Item B 2,563,034.30 1,589,081.27 - 1,589,081.27

Interim Claim No. 25 – Summary


Contract Amount Work Previous Current Total Claim
(RM) Done % (RM)

1 PC and Provisional Sum 82,711,218.95 1.92% 1,589,081.27 - 1,589,081.27


2 Main Summary M&E Works 35,043,800.00 87.54% 29,665,187.65 1,013,526.67 30,678,714.32
3 Material on Site

Total Claims for M&E 32,267,795.59

Notes:
1. WSP Assessment excludes GST.

MC Kwang 07/FEB/2018
Project Leader’s Name Signature Date

This document may contain confidential and legally privileged information, neither of which are intended to be waived, and must be used only for its intended purpose. Any
unauthorised copying, dissemination or use in any form or by any means other than by the addressee, is strictly prohibited. If you have received this document in error or by any
means other than as authorised addressee, please notify us immediately and we will arrange for its return to us.

You might also like