Professional Documents
Culture Documents
Dear Sir,
RE: CADANGAN MEMBINA 4 BLOK 5 TINGKAT YANG MENGANDUNGI 275
BILIK HOTEL DAN KEMUDAHAN PERKHIDMATAN BERSERTA TEMPAT
LETAK KERETA DI LANTAI ARAS BAWAH 2, DI ATAS PT 8364 (NO. PTD
LAMA IAITU DI ATAS SEBAHAGIAN PTD 2491 & PTD 2492), MUKIM
PANTAI TIMUR, DAERAH KOTA TINGGI, JOHOR DARUL TAKZIM UNTUK
TETUAN DESARU DEVELOPMENT CORPORATION SDN BHD
Reference to matter above, we would like to advise that the mechanical and electrical
works undertaken in MRCB’s Interim Payment Certificate No. 30 has been satisfactorily
completed in accordance to the contract drawings and specifications.
Your kind attention to this matters are highly appreciated. We trust all is in order.
Thank you.
Yours faithfully,
M C Kwang
Project Director
For WSP Ng Pte Ltd
MCK/lch
Enc
T+ 65 6533-7333
F+ 65 6533-7707
www.wsp.com
WSP Consultancy Pte. Ltd.
Co. Reg. No.198403250N
300 Beach Road
#05-00 The Concourse
Singapore 199555
T+ 65 6533-7333
F+ 65 6533-7707
www.wsp.com
Notice of Valuation
Statement of MRCB – Contractor Interim Claim No.30 (No.25 - M&E) as of 31 Jan 2018
Extract from Prime Cost and Provisional Sums – Interim Claim No. 25
Contract Amount Work Previous Current Total Claim
(RM) Done % (RM)
2 Main Summary of M&E Works 35,043,800.00 89.14% 29,665,187.65 1,572 ,406.69 31,237,594.34
3 Material on Site
MC Kwang 07/FEB/2018
Project Leader’s Name Signature Date
This document may contain confidential and legally privileged information, neither of which are intended to be waived, and must be used only for its intended purpose. Any
unauthorised copying, dissemination or use in any form or by any means other than by the addressee, is strictly prohibited. If you have received this document in error or by any
means other than as authorised addressee, please notify us immediately and we will arrange for its return to us.
WSP Ng Assessment of Work Completed as at 31 Jan 2018
Under Prime Cost and Provisional Sums – Interim Claim No. 25
Contract Amount Work Previous Current Total Claim
(RM) Done % (RM)
Notes:
1. WSP Assessment excludes GST.
MC Kwang 07/FEB/2018
Project Leader’s Name Signature Date
This document may contain confidential and legally privileged information, neither of which are intended to be waived, and must be used only for its intended purpose. Any
unauthorised copying, dissemination or use in any form or by any means other than by the addressee, is strictly prohibited. If you have received this document in error or by any
means other than as authorised addressee, please notify us immediately and we will arrange for its return to us.