Input :

Dia = 600 mm Staad Output :


Unsupported Length of Pile = 2.25 m Maximum Bending moment = 17.816 t.m
Conc. Characteristic Strength, Fck = 25 MPa Maximum Shear Force = 47.639 t
Steel Characteristic Strength, Fy = 500 MPa

Check for Slendernees :


Le = (2/3)L = 1.5 m Le/r = 10.00 < 10 Short
r= (0.25*D) = 0.15 m

Main Reinforcemnt :
Min. Area of Longitudinal Reinforcement = 0.4% * Asc = 1130.973 mm2
Area of Steel Required = 1413.717 mm2
Provide Reinforcement ,
Dia 25 mm
Spacing 150 mm
No. Of Bars 13
Ast. Prov. 6381.36008 mm2 < 7068.5835 mm2 Hence OK

Lateral Reinforcement :
Volume of Ties Needed per metre Length of Pile,
0.2%*Cross-sectional Area = = 565486.7 mm2
Using 8mm Dia bar, the length of bar for tie = 1884.96 mm
Volume of One Tie = 94247.78
No. Of ties per m = 6.00
Spacing = 166.67 mm
Provide 8mm dia ties at 160 mm c/c for mid portion.
For bottom portion i.e. (3 * 600mm = 1800mm ), 0.6% volume of ties are required. Hence, provide 8 mm dia. Bar ties at 80mm c/c at bottom.
For top portion i.e. (3 * 600mm = 1800mm ), 0.6% volume of ties are required. 0.6% * pi()/4 * 600 * 600 * 1000 = 1696460 mm3/m
Volume of Spiral = 94247.780 mm3
No. Of Spiral = 18.000
Spacing = 55.556 mm
Provide 8 mm dia. Spiral @ 50mm pitch for top 1800mm length.
Input :
Dia = 900 mm Staad Output :
Unsupported Length of Pile = 3.35 m Maximum Bending moment = 38.976 t.m
Conc. Characteristic Strength, Fck = 25 MPa Maximum Shear Force = 70.111 t
Steel Characteristic Strength, Fy = 500 MPa

Check for Slendernees :


Le = (2/3)L = 2.23333333 m Le/r = 9.93 < 10 Short
r= (0.25*D) = 0.225 m

Main Reinforcemnt :
Min. Area of Longitudinal Reinforcement = 0.4% * Asc = 2544.69 mm2
Area of Steel Required = 3180.863 mm2
Provide Reinforcement ,
Dia 25 mm
Spacing 150 mm
No. Of Bars 13
Ast. Prov. 6381.36008 mm2 < 15904.313 mm2 Hence OK

Lateral Reinforcement :
Volume of Ties Needed per metre Length of Pile,
0.2%*Cross-sectional Area = = 1272345.0 mm2
Using 8mm Dia bar, the length of bar for tie = 2827.43 mm
Volume of One Tie = 141371.67
No. Of ties per m = 9.00
Spacing = 111.11 mm
Provide 8mm dia ties at 110 mm c/c for mid portion.
For bottom portion i.e. (3 * 900mm = 2700mm ), 0.6% volume of ties are required. Hence, provide 8 mm dia. Bar ties at 55mm c/c at bottom.
For top portion i.e. (3 * 900mm = 2700mm ), 0.6% volume of ties are required. 0.6% * pi()/4 * 900 * 900 * 1000 = 3817035 mm3/m
Volume of Spiral = 141371.669 mm3
No. Of Spiral = 27.000
Spacing = 37.037 mm
Provide 8 mm dia. Spiral @ 30mm pitch for top 1800mm length.
Input :
Dia = 1500 mm Staad Output :
Unsupported Length of Pile = 6 m Maximum Bending moment = 121.723 t.m
Conc. Characteristic Strength, Fck = 25 MPa Maximum Shear Force = 122.588 t
Steel Characteristic Strength, Fy = 500 MPa

Check for Slendernees :


Le = (2/3)L = 4m Le/r = 10.67 > 10 Slender
r= (0.25*D) = 0.375 m

Main Reinforcemnt :
Min. Area of Longitudinal Reinforcement = 0.4% * Asc = 7068.583 mm2
Area of Steel Required = 8835.729 mm2
Provide Reinforcement ,
Dia 25 mm
Spacing 110 mm
No. Of Bars 18
Ast. Prov. 8835.72934 mm2 < 44178.647 mm2 Hence OK

Lateral Reinforcement :
Volume of Ties Needed per metre Length of Pile,
0.2%*Cross-sectional Area = = 3534291.7 mm2
Using 8mm Dia bar, the length of bar for tie = 4712.39 mm
Volume of One Tie = 235619.45
No. Of ties per m = 15.00
Spacing = 66.67 mm
Provide 8mm dia ties at 60 mm c/c for mid portion.
For bottom portion i.e. (3 * 1500mm = 4500mm ), 0.6% volume of ties are required. Hence, provide 8 mm dia. Bar ties at 30mm c/c at bottom.
For top portion i.e. (3 * 1500mm = 4500mm ), 0.6% volume of ties are required. 0.6% * pi()/4 * 1500 * 1500 * 1000 = 10602875 mm3/m
Volume of Spiral = 235619.449 mm3
No. Of Spiral = 45.000
Spacing = 22.222 mm
Provide 8 mm dia. Spiral @ 20mm pitch for top 1800mm length.