Professional Documents
Culture Documents
A R C H I T E C T
CURRICULUM VITAE
PORTFOLIO SAMPLE
2018
Table of Contents :
1. Briefing.
2. Work Experience.
4. Fitout Projects.
5. Design Projects.
Briefing
Eager to gain experience and to apply my education, skills and short experience,
with the ambition to enhance my skills to be an effective employee inside work organization.
Personal information :
• Name: Ahmed Youssry Lashin .
• Nationality: Egyptian.
• Date of birth: 30 / 11 / 1986.
• Military status: Exempted.
• Resident: Heliopolis.
Contacts :
• Mobile: +2 0100 36 40 366
• E-mail: ayzlashin@hotmail.com
ayzlashin@yahoo.com
ayzlashin@gmail.com
Education :
• 1990 – 2003 El Nozha language schools in Heliopolis .
• 2003 – 2008 Bachelor of Architecture - faculty of engineering , Ain-Shams university , Architecture department.
• 2013 – 2016 Master of Science in Architecture Design and Research - faculty of engineering ,Ain-Shams university ,
Architecture department.
Briefing
Career Qualifications :
Master of Engineering, Architecture department, Faculty of Engineering, Ain-Shams University, Cairo, Egypt.
• Over-all grade: Very Good.
Bachelor of Engineering, Architecture department, Faculty of Engineering , Ain-Shams University, Cairo, Egypt.
• Over-all grade: Good.
• Graduation year: 2008.
• Graduation project : Virtual Reality Valley
• Graduation project grade: Very Good.
57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
TEL : (974) 402037 77 / 88 /
99
FAX : (974) 402037 66
P.O. BOX1876, DOHA-QATAR
www.ehaf .com
CONSULTING ENGINEERS
PROJECT
QEWC TOWERS ( KAHRAB TOWER )
LUSAIL CITY - MARINA COM 53
LOCATION:
LUSAIL CITY - MARINA COM 53
CLIENT:
QATAR ELECTRICITY & WATER CO.
03/08/2017
DATE: JOB NO.:
0321
TITLE:
PERSPECTIVES
NIGHT PERSPECTIVE AERIAL PERSPECTIVE
GR-006-00
DRAWING NO.: SCALE:
@A1
9
N 402975.5278
E 230941.1565
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
C
Y1.2
B
Y1.1 Y.4
Y.3 N 403121.4988
E 230892.5049
5000
Planter Y.2 Planter
Q
AR-203-00
Planter 1 X.8
W.wall
BASEMENT PARKING
P ENTRANCE
42000
PL.
5000 X.7
47000
PL. DN
DN
PL.
N
W.FEATURE PL. Planter PL.
X.6
W.wall
PL. PL.
PL.
X.8 PL.
W.wall
PL.
Planter
PL. Planter PL.
M
PODIUM PARKING X.5
PL.
ENTRANCE
PL. X.7
TOWER-1 T1.3 PL.
T1.4
ENTRANCE
PL.
PL.
T1.2
L PL.
X.4
1.0m
PL.
W.wall
10000 T1.5
X.6
T1.1
TOWER-2
K
ENTRANCE T2.7
Planter T2.9
T1.6 X.5
15000 R2.3 T2.10
1.0m
Planter T2.6
R2.4 T2.7
J
T1.7 R2.2 NOTES:
TOWER-1
4
Planter
X.4
3
1 2
C1.1 T2.6
C2.1 T2.5
QND= +3.00 M ( + 0.00 M ROAD LEVEL )
T1.7 C1.1
T2.8
PL. R2.1
H T2.4
T1.6
3
4
T2.5
T2.3
2
1
C2.1
T2.7 T2.4
T1.1
G T2.3
T1.5
T2.6 T2.2
TOWER-2
1.0m
T1.2
F
1.0m
T1.4 T2.1
T1.3 T2.2
PODIUM ROOF
T2.5
1.0m
PL.
T2.4 T2.1
E C2.2 00 X.3
1 2
3
4
15 0
T2.3
R2.5
00
T2.10 10 0 A 01-10-2017 ISSUE FOR APPROVAL
X.2
D C2.2
T2.2
PL.
0 DESCRIPTION
50 0 REV. DATE BY
TURE
R2.6
T2.1 R2.8
W.FEA
X.1
T2.8 R2.7 U.D.D STAMP MUNICIPALITY STAMP
C Planter PL.
T2.9
X.3
PL.
W.FEATURE
B SHADE ABOVE
1.0m
PL. X.2 RE
TU
RETAIL ENTRANCE W
.F
EA
PL.
A
RETAIL PARKING DNDN X.1
ENTRANCE
Planter
AREA STATEMENT
10000
Planter Planter
A
Y.4
5000
Planter Planter
Planter
N 403036.6818
E 231073.3011 1 Y.3
D Y1.1
Y1.2 AR-201-00
-
MAIN ENTRANCE
Y.2 N 403219.8104
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Y.1 19 20 21 E 231012.2602
Enquiry No. : --------------- Application No : N/2017/0002775
99/M A 000000 A
SITE DEVELOPMENT PLAN
CONSULTANT REG. No : GRADE : CONSULTANT REG. No : GRADE :
57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
TEL : (974) 402037 77 / 88 /
99
FAX : (974) 402037 66
P.O. BOX1876, DOHA-QATAR
www.ehaf .com
CONSULTING ENGINEERS
PROJECT
QEWC TOWERS ( KAHRAB TOWER )
LUSAIL CITY - MARINA COM 53
LOCATION:
LUSAIL CITY - MARINA COM 53
CLIENT:
QATAR ELECTRICITY & WATER CO.
03/08/2017
DATE: JOB NO.:
0321
TITLE:
10
A
30
11
N 403121.4988
E 230892.5049
N 402975.5278 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
E 230941.1565 Y1.2
Y1.1
B
Y.4
C Y.3 9000
5000
9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000
9000
Y.2
1800
SHAFT
4900
SHAFT
LOBBY LOBBY
Q VENT. MECH.
1800
2500
SHAFT PLENUM
7950 6300 2650 1050 7950 1050 7950 1050 7950 1050 5300 325 24175 5150 1050 7950 8625 5800 4345 14805 2650 5300
X.8
MECH. RM.
6300
9400
6000
7950
DRIVEWAY
7950
MECH. RM.
7950 1050 7950 1050 7950 1050 7950 1050 8900 7950 7950 7950
R
15 00
1425
R
00
MECH.
15
R
00
15
15
VENT. R PLENUM
21
00
3
R
P SHAFT
775
00
9000
42000
AR-508-01
5000 X.7
47000
7950
7950
7950
9000
5300
MECH. RM.
7950
3300
00
1050
15
1050
1050
9000
N R
ELECT.
545
7950 1050 7950 1050 7950 1050 7950 1050 7950 950 7950 7950 7950 RM. X.6
12400
DIESEL
5875
TANK
7950
UP
5310
7950
7950
7950
9000
DRIVEWAY
DRIVEWAY X.8
725
15
2
9000
00
375
1150
800
2650
1800
2200 9300 4000 1680 MECH.
VENT. VENT.
2275
2275
CONTROL PLENUM X.5
AR-302-00 SHAFT SHAFT
5055
EXHAUST RM.
11275
SHAFT VENT. VENT.
1800
1800
SHAFT SHAFT
7950
VENT. SHAFT
5945
7950
8825
MECH. RM.
9000
7950
SHAFT MECH. RM. VENT. VENT. X.7 SHAFT
EXHAUST
1800
1800
T1.3 SHAFT SHAFT SHAFT
4000 4700 8925 8775
-5.85 FFL GENERATOR
14300
T1.4 VENT. VENT. 4100
2650 1200
3650
2230
2350
9000
1500 5700 2600 SHAFT 5400 5250 SHAFT
2500
VENT.
2650 800
1200
L T1.2 SHAFT
SHAFT
00
1
45
X.4
R3
6335 6535 10750 TELECOM 1000
1800
STORE
3150
STORE VENT.
3500
40
MECH. RM. 2775 ROOM-T1 SHAFT
0
AR-302-00
925
10000 STORE
6000
CORR.
2100
T1.5 VENT.
GSM X.6
7950
3335 SHAFT
9000
7950
3000
7950
SHAFT 2300 ROOM -T1
2790
1600
STORE ELECT.
RM. UP VENT.
13650
SHAFT
0
7950
1800
T1.1
3
6335 5025
00
CCTV VENT.
1050
1800
25
ROOM
STORE 5975 UP SHAFT
0
K
900
R 1200
2500
775
AR-303-00 7950
172.21°
3105
7675
50 STORE
MECH. RM. 3750 DRIVEWAY T2.7
23
35 STORE SHAFT
00
STORE MALE
10825
1575
4770
MECH. TOILET X.5 T2.9
14
50 8875
T1.6 STAIR-01
00
PLENUM 2650
5600
47 00
7950
9000
MECH. RM.
7925
24 A
R2.3 01-10-2017 ISSUE FOR APPROVAL
15000 T2.10
25
SERVICE
00
CORR.
5800
155.73° RACK
4650
LIFT T2.6
38
7950
SERVICE
00
RM. 00
J LOBBY 39
11
00 GARBAGE
30
00
STORE
3575
3575
STORE STORE RM.
LIFT PIT 9400 8675 U.D.D STAMP MUNICIPALITY STAMP
11 00
1 °
5000
STORE X.4
00
.79
12
9330
00
3000
8000
53 TOILET & C1.1 C2.1
29
3250
7950
SERVICES RM.
9000
SHAFT ROOM
00
AR-301-00 ABLUTIONC1.1
4
17
775
T1.7
00
5300
5300
VENT. SERVICE IDF RM.
6045
LOBBY
1800
2650
12 -5.85 FFL AR-303-00
00
STOP
31250
SHAFT
1050
5
1199
1425
H T2.4
1350
LOBBY CORR.
7950
4100
STAIR-02 T1.6
14
3200
VENT. SECURITY
00
LOBBY
1800
RM. PRAYER
5400
52
SHAFT
T2.5
22
FEMALE
00
RM. LOBBY
00 85
5000
00
2650
C2.1 T2.3
7950
4100
54
FIGHTING
9000
STAIR-03 SERVICE
1050
7950
7950
00
00
STORE
4395
VENT. 30 LOBBY LIFT 1100
3300
2650 1100
T2.7 2300
3000
3200
2500
LOADING T2.4
14
SHAFT GARBAGE
T1.1 97
00
SECURITY 2500
.7 RM. SERVICE
3100
7950
3000
G RM.
R 2500
530
530
1
MECH. RM.
2800
2425
7375
8000
1835
STORE PANORAMIC
UNPACKING 5520 3010 PRAYER ELEVATOR T2.6 6900 T2.2
AR-302-00
5475
5300
5300
STORE
6100
6000
ENTRANCE STORE
5300
RM. LOBBY
3000
LOBBY
3625
775
R 10 3900 CORR.
T1.2
1125
MECH. 00
2650
2255
LOADING
2000
F PLENUM
20080
975
975
--------------- N/2017/0002775
2650
195
2650
5800
3460
6000
T2.2
ABLUTION LOBBY JANITOR 69
99/M A 000000 A
6250
3000
LOADING MECH. CONSULTANT REG. No : GRADE : CONSULTANT REG. No : GRADE :
1800 1400
STORE SHAFT
AREA 4030 CORR. T2.5 PLENUM
7950
9000
7950
7950
RETAIL 13
2
7500
6900 2265 IDF RM. CONSULTANT STAMP & SIGNATURE : SUB-CONSULTANT STAMP & SIGNATURE :
3800
4700
LOBBY
4
4800
TOILET SERVICE
8600
AR-302-00 T2.4 FIRE
LIFT
3200
2800
STORE
7700
-5.85 FFL T2.1
R 738 FIGHTING
SERVICE MECH. RM. AR-303-00 6300 5000
3300
LOBBY
3100
X.3
1250
E 00
1270
1270
1475
C2.2
150
6800
LIFT LIFT
STORE
LIFT
2650
STAIR-04
590 2650
T2.3 LOBBY
2215
R DRIVER
12 TOILET LIFT 00
00 28 9450
7950
9300
2650
7950
R2.5
3000 MECH. RM.
T2.10
9000
00
100
5400
2650
GSM
ROOM -T2 X.2
00
R2
R
1200
00
20
1060
D 1735 C2.2
12
00
10
T2.2
Shereif Ahmed
2981
R
00
0
TELECOM TECHNICAL MANAGER : TECHNICAL MANAGER
R
7950 1050 7950 1050 7950 2650 3030 2650 970 7950 1000 7950
ROOM-T2
0
ETS ROOM
REGISTRATION No. : 6120 REGISTRATION No :
0
500
7950
9000
7940
DRIVEWAY DRIVEWAY R2.6
9000
T2.1 R2.8
57 AL-JAZEERA ST.,
2650 775 4200 4200 21775 5300 750 7950 1045 7950 1050 7950 1875 6700
X.1 BIN-MAHMOUD / BEHZAD
00 T2.8 R2.7
R 10 BUILDING, 6th FLOOR
1300
3650
POTABLE GARBAGE
MECH. RM. 2650 950 7950 1250 5300 3600 7950 775 5300 3410
RM. www.ehaf .com
CONSULTING ENGINEERS
WATER GARBAGE SMOKE 5175
TANK RM. STOP SERVICE
AR-303-00
7950
9300
6690
1500
5800
-5.85 FFL PROJECT
QEWC TOWERS ( KAHRAB TOWER )
2650
5050
ROOM
7250
7100
RM.
B
6000
WATER
-5.85 FFL
65
TANK
R
LOCATION:
LUSAIL CITY - MARINA COM 53
2000 31200
7950
9000
MECH. RM.
4650
410
UPDSTAND
R1
LV ROOM
TRANSFORMER
CLIENT:
QATAR ELECTRICITY & WATER CO.
ROOM MV ROOM VENT. -5.85 FFL
A X.1
DN
UP VENT. VENT. SHAFT
2525
1800
03/08/2017
SHAFT
DATE: JOB NO.:
0321
AR-509-01 VENT. VENT.
VENT. 1800 1175 1900 5500 SHAFT 6700 SHAFT 1900 1800 VENT.
SHAFT 36100 17500 4000 SHAFT
10000
TITLE:
Y.4
Y.3
N 403036.6818
E 231073.3011
AR-103-00
DRAWING NO.: SCALE:
Y1.2 Y.2 1 : 300 @A1
1 D 2
Y1.1
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Y.1
19 20 21 DRAWN BY: DESIGNED BY: CHECKED BY:
N 403220.0950
M.S./S.M. H.O./M.A. O.M.
12
N 403121.4988
E 230892.5049
N 402975.5278 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
E 230941.1565 Y1.2
Y1.1
B
Y.4
C Y.3
5000
Planter Planter
Y.2
PARKING
Q
AR-203-00
PARKING
1 X.8
Planter
W.wall 4
AR-508-01
P
PL.
42000
5000 X.7
47000
PL. PARKING
PARKING
DN
UP
PL.
N
W.FEATURE PL. PARKING
Planter PL.
X.6
RAMP TO BASEMENT W.wall
WATER FEATURE PL. PL.
PL.
X.8
PL. TOTAL NUMBER OF PARKING = 80
W.wall
PL.
Planter
PL. Planter PL.
M
X.5
PL. 2
PL. AR-302-00
STEEL METAL GRATING
X.7 PL.
T1.3 1 PL.
T1.4 AR-507-01 PL.
L T1.2 PL.
PL. PL.
X.4
10000
1 W.wall
T1.5 DN
UP
AR-302-00 X.6
EXIT W.FEATURE
CORR.
T1.1 3
K ? AR-303-00
RECEPTION
AREA STAIR-09 T2.7
Planter MALE
TOILET
X.5
RETAIL 10 T2.9
T1.6 A 01-10-2017 ISSUE FOR APPROVAL
CORR. FIRE
15000
FIGHTING SERVICE R2.3 TOWER-2 MAIN ENTRANCE T2.10
DISABLED
LOBBY
T1-ZA-06
STAIR-01 LIFT CORR. Planter T2.6
TOILET
SERVICE R2.4 DESCRIPTION
LIFT T1.7 REV. DATE BY
CORR.
R2.2
J STORE TOWER-1
RETAIL 09
T1-ZA-05 ?
T1-ZA-03 LIFT RETAIL 08 U.D.D STAMP MUNICIPALITY STAMP
1 2
3
4
Planter GARBAGE
RM.
LOBBY
STORE
X.4 TOWER-2 MAIN ENTRANCE
T1-ZA-04 ELECT. RECEPTION
T1-ZA-02
RM.
C1.1 & LOUNGE C2.1
SERVICE
C1.1 ? T2.5
4
LIFT
T1.7
FIRE T1-ZA-01 IDF RM. ENTRANCE
EXIT
FIGHTING LOBBY
CORR.
T2.8
STAIR-02
LOBBY AR-303-00
H PL. F&B 01 WATER
METER
R2.1 FCC.RM
T2.4
T1.6 RETAIL 07 RWS LO.PR
FEMALE CH.W
4
TOILET RETAIL 06
3
2
1
STAIR-03 T2.3
AR-202-00
STAIR-10
C2.1 PR.S FIRE
1
CORR. VENT. FIGHTING SERVICE
P.S CHUTE SHAFT
FROM P1 TO GF
T2.7 LOBBY LIFT
T1.1 GARBAGE ELECT. SERVICE
WATER RM. RM. LIFT
FROM GF TO B1
METER
T2-ZB-02
G
T1.5 CORR. T2-ZB-01
PANORAMIC
F&B 02 T2-ZA-03
AR-204-00
TOWER-2
T1.2 LIFT
F 1 T1.4
LOBBY
T2-ZB-03
Enquiry No. : --------------- Application No : N/2017/0002775
T2-ZB-04
AR-302-00
99/M A
FROM B1 TO GF
T1.3
STAIR-11
T2-ZA-04
CORR.
T2.1 CONSULTANT REG. No : GRADE : CONSULTANT REG. No : 000000 GRADE : A
DISABLED SHAFT
2
T2-ZA-05
T2.5
PL.
FROM GF TO P1 TOILET
T2-ZA-06
SHAFT CONSULTANT STAMP & SIGNATURE : SUB-CONSULTANT STAMP & SIGNATURE :
RETAIL 05
PR.S
AR-302-00 MALE FEMALE IDF RM.
SERVICE TOILET TOILET
RETAIL 04 FIRE
T2.4 FIGHTING
LIFT
LIFT LOBBY
E F&B 03 SERVICE C2.2 00 X.3
CORR. LIFT F.F STAIR-04
150
4
LO.PR
4
3
1 2
WATER
METER T2.3 SHAFT SHAFT
ENTRANCE
LOBBY
AR-303-00
STAIR-12 R2.5
MALE T2.10 00
TOILET 100
RETAIL 03
X.2
D T2.2 C2.2
F&B 05
TECHNICAL MANAGER : Shereif Ahmed TECHNICAL MANAGER
PL.
RETAIL 02
DISABLED
ENTRANCE
LOBBY
CORR. TOILET REGISTRATION No. : 6120 REGISTRATION No :
CORR.
RETAIL 01
0
500
TURE
FEMALE R2.6
TOILET
T2.1 R2.8 57 AL-JAZEERA ST.,
? PARKING BIN-MAHMOUD / BEHZAD
W.FEA
Planter T2.8 R2.7
X.1 BUILDING, 6th FLOOR
STAIR-05 TEL : (974) 402037 77 / 88 /
C
Planter PL. 99
FAX : (974) 402037 66
GARBAGE
RM.
W.FEATURE
X.3
T2.9
3 P.O. BOX1876, DOHA-QATAR
www.ehaf .com
AR-303-00 CONSULTING ENGINEERS
SERVICE
LOBBY LIFT
PL. PROJECT
W.FEATURE
STORE
SECURITY PLANTER
MAIN ENTRANCE LANDSCAPE
FEATURES QEWC TOWERS ( KAHRAB TOWER )
LUSAIL CITY - MARINA COM 53
RM.
B SHADE ABOVE
PL. Planter 3 2 1
X.2
R E
TU
EA LOCATION:
STEEL METAL GRATING
PL.
W
.F
LUSAIL CITY - MARINA COM 53
CLIENT:
A
DN
UP X.1
QATAR ELECTRICITY & WATER CO.
2
Planter
03/08/2017
DATE: JOB NO.:
0321
RAMP TO BASEMENT
AR-509-01 PARKING
10000
Planter Planter
TITLE:
Planter
Y.3
N 403036.6818
E 231073.3011
1
AR-104-00
DRAWING NO.: SCALE:
MAIN ENTRANCE
Y.2
1 : 300 @A1
Y1.2 AR-201-00
1 D 2
Y1.1
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Y.1
19 20 21
N 403220.0950 DRAWN BY:
E 231012.1653
M.S./S.M.
DESIGNED BY:
H.O./M.A.
CHECKED BY:
O.M.
13
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Y1.2
Y1.1 Y.4
Y.3
5000
Y.2
Y.1
Q
AR-203-00
1 X.8
5000 X.7
47000
N
X.6
X.8
M 2
X.5
AR-302-00
X.7
T1.3
T1.4
L T1.2
X.4
NURSING
FEMALE ROOM
TOILET
T1.5 JANITOR
DN DN
UP X.6
1
AR-302-00
3
T1.1
AR-303-00
K
OPEN TO
BELOW T2.7 A 01-10-2017 ISSUE FOR APPROVAL
STORE 2
X.5 T2.9
T1.6 DISABLED STAIR-01 AR-507-01
CORR. FIRE STAIR-09
TOILET
FIGHTING SHAFT RETAIL 11 +6.95 FFL REV. DATE DESCRIPTION BY
15000 R2.3 T2.10
LOBBY
SERVICE T2.6
CORR.
CORR.
SERVICE LIFT R2.4 U.D.D STAMP MUNICIPALITY STAMP
LIFT T1.7
GARBAGE R2.2
J PR.S
RM. TOWER-1 GARBAGE
MEP
LIFT RM. RETAIL 10
STORE
1
LOBBY
STORE X.4
+6.95 FFL ELECT.
RM. C1.1 C2.1
VOID
AR-301-00 C1.1 T2.5
T1.7 MALE
SERVICE
STAIR-02 IDF RM. TOILET
LIFT
RETAIL 09 T2.8
SHAFT STORE
WATER R2.1
H METER T2.4
CORR.
T1.6
FACILTY
STORE
?
MECH. RM. MANAGEMENT
4 T2.3
AR-202-00
C2.1 FIRE +6.95 FFL
AR-303-00
RETAIL 01
T2.7
CHUTE
STAIR-03
FIGHTING
LOBBY 1
T1.1 GARBAGE SERVICE
RM. LIFT
WATER ELECT.
STAIR-10
METER RM.
G
T1.5 CORR.
MAIN
AR-204-00
CORRIDOR
+6.95 FFL T2.6 T2.2
1 +6.95 FFL ATRIUM Enquiry No. : --------------- Application No : N/2017/0002775
TOWER-2
T1.2 LOBBY LIFT CONSULTANT REG. No : 99/M GRADE : A CONSULTANT REG. No : 000000 GRADE : A
F LOBBY
T1.4
+6.95 FFL CONSULTANT STAMP & SIGNATURE : SUB-CONSULTANT STAMP & SIGNATURE :
T1.3 T2.1
CORR.
T2.5 DISABLED
RETAIL 07
TOILET
2 IDF RM.
4
RETAIL 06 STAIR-11 SERVICE FEMALE
AR-302-00 T2.4 LIFT
MALE TOILET
TOILET
R2.5
MALE
CORR.
TOILET RETAIL T2.10 TECHNICAL MANAGER : Shereif Ahmed TECHNICAL MANAGER
X.2
D
RETAIL 05
C2.2
REGISTRATION No. : 6120 REGISTRATION No :
T2.2
RETAIL 04
DISABLED
RETAIL 03 TOILET
57 AL-JAZEERA ST.,
NURSING 0 BIN-MAHMOUD / BEHZAD
ROOM R2.6 500 BUILDING, 6th FLOOR
FEMALE
R2.8 TEL : (974) 402037 77 / 88 /
TOILET T2.1
99
FAX : (974) 402037 66
X.1 P.O. BOX1876, DOHA-QATAR
T2.8 R2.7 www.ehaf .com
C
STAIR-05 T2.9
CONSULTING ENGINEERS
GARBAGE
X.3 3 PROJECT
RM.
SMOKE
STOP
LOBBY
SERVICE
LIFT
AR-303-00 QEWC TOWERS ( KAHRAB TOWER )
+6.95 FFL
LUSAIL CITY - MARINA COM 53
B LOCATION:
X.2
LUSAIL CITY - MARINA COM 53
CLIENT:
QATAR ELECTRICITY & WATER CO.
03/08/2017
DATE: JOB NO.:
A X.1 0321
TITLE:
AR-105-00
DRAWING NO.: SCALE:
Y.3 1 : 300 @A1
14
2
T1.5 AR-302-00 T1.4
T1.6 T1.3
DISABLED TOILET
T1.7 T1.2
MEP MEP
400
OFFICE-04 TOI.
VENT.
1050
SHAFT
+36.40 FFL CH.W
LOBBY
2140
2200
TOI.
CHUTE OFFICE-01
1050
1800 +36.40 FFL
MEP
CORR. PANTRY
GARBAGE RM. CORR.
1550
1400
2200 2500 3000 4200
1200
1200
CORR. TOI.
6
2500
T1-ZA-04 T1-ZA-08 +36.40 FFL
REV. DATE DESCRIPTION BY
AR-501-01 PANTRY
TOI. SHAFT SMOKE STOP LOBBY STAIR-01
1600
2600
U.D.D STAMP MUNICIPALITY STAMP
PR.S
SERVICE LIFT
5700
STAIR-02 T1-ZA-03 TOWER-1 LIFT T1-ZA-07
LOBBY
5700
SHAFT
T1.1 T1.1
10100
SERVICE LIFT
1 SHAFT 1
AR-302-00 +36.40 FFL AR-302-00
2700
T1-ZA-02 T1-ZA-06 PR.S
+36.30 SSL 1200
SHAFT PANTRY
1600
1600 2200
1200
+36.40 FFL SMOKE STOP LOBBY
TOI.
2500
T1-ZA-01 T1-ZA-05
TOI. T.LOBBY
1100
1200
2400
PR.S 1300
CORR.
1400
1700
PANTRY 3800 2700
LOBBY 1200
IDF RM.
WATER METER
1900
1900
TOI.
1100
400
57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
TEL : (974) 402037 77 / 88 /
99
FAX : (974) 402037 66
P.O. BOX1876, DOHA-QATAR
www.ehaf .com
CONSULTING ENGINEERS
PROJECT
QEWC TOWERS ( KAHRAB TOWER )
LUSAIL CITY - MARINA COM 53
LOCATION:
LUSAIL CITY - MARINA COM 53
T1.3 T1.6
CLIENT:
QATAR ELECTRICITY & WATER CO.
09/07/2017
DATE: JOB NO.:
0321
TITLE:
15
X.4 T2.7 T2.6 T2.5 T2.4 T2.3 T2.2 T2.1 X.3 PROJECT NAME AND LOCATION
18 19
QEWC TOWERS
LUSAIL CITY - MARINA COM 53
4
AR-303-00
( KAHRAB TOWER )
54000
NORTH PIN NO.
69060093
10500 5800 8000 4100 4100 8000 5800 7700
Kib PLANING
lah NO.
KEY PLAN
TOWER-2
TOWER-2 OFFSET LINE
OFFSET LINE
17
DN
DN
DN
DN
R2.5
DN
Y.3 R2.4
DN DN
16
°
.00
35
35
.0
F.H.C
0°
WD13 WD13
100
ELEC.
WD05 WD04
AC01 0°
5.0
4400 1600 7600 3200 10
Y.2 3
810
810
SD07
1800
1800
3000 4000 3000
AR-303-00 MECH.
1200
1200
1600
BY 2000
R2.3
3050
TENANT F.H.C
1550
1550
AC01
650
650
K R2.6
1125
1125
700 800 150 1100 1000 1500 650
TOI.
BY BY
1200
1200
+101.85
2100
2100
F.F.L TENANT TENANT
PANTRY CORR. 1600 4500
TOI.
3200
1150
1150
WD04
AC01
+63.35
F.F.L
AC01
AC01
3
15 AR-303-00
1700
1700
1200
1200
1300
2800 800 2300
800
WASH TOI. AC01 AC01 TOI. WASH
30.00°
30.00°
1200
1200
PG
1100
WASH TOI. AC01
ELEC.
MECH. AC01 TOI. WASH
1200
1200
AC01 4900 AC01
Y.1
1175
1175
TOI. TOI.
3200
2100 1000 2800
PANTRY CORR. CORR. PANTRY
1350
1200
1200
TOI. AC01 TOI. JANUARY
Rev-00 DETAILED DESIGN H.O/M.A O.M M.I
2018
R2.2 R2.7
1400 1700 SD07
650 1500 650 3300
1125
1125
400
ISSUE DESCRIPTION DATE DRAWN CHECK. QA/QC
2100
SD07
1100
SD01
GARBAGE 9
2050 1050 OWNER
2850
1200
1200
CHUTE
BY
AR-504-01 BY
+63.35 AC01
TENANT
2050 TENANT
F.F.L
1300
AC01
750
815
810
SD06
4400 7600 4400
F.H.C AC01
WD04 WD05
14 ELEC.
°
.00
35
35
.0
F.H.C
0°
DRAWING TITLE
AR-T2-109-00 --
DRAWN BY: CHECKED BY: STAGE: REVISION:
4 H.O/M.A/E.P/S.M/A.A O.M WD
Rev-00
AR-303-00
H G 9TH FLOOR PLAN
F E D C
VERIFIED BY: APPROVED BY: PLOT DATE:
@A1
PROJECT NO.:
1 : 100
SCALE:
AR-T2-109-00
1 : 100
FILE NAME:
321
AR-T2-109-00
16
13 14 15 16 17 18 19 HIGHEST POINT
+199.50 m SSL
MC1
7100
T2_PARAPET
+192.40 m SSL
190.15
T.O.P.
T2_UPPER ROOF
5250
22100
ELEVATION FINISHES +187.15 m SSL
CODE DESCRIPTION
ROOF
183.70 T2_MECH. FLOOR
4750
BELOW MECHANICAL
T.O.P.
MC1 METAL CLADDING PANEL
ROOM +182.40 m FFL
5000
CORR. CORR.
MC3 PERFORATED METAL SCREEN ( MASHRABIYA ) ROOM RM
ROOF ROOF +177.40 m FFL
CW1 DOUBLE GLAZING UNITIZED PANEL TOWER-2 T2_37th FLOOR
4100
LIFT
OFFICE-01
CW2 SPANDREL PANEL UNITIZED CURTAIN WALL LOBBY OFFICE-03 +173.30 m FFL
SYSTEM T2_36th FLOOR
3850
CW3 DOUBLE GLAZED STICK SYSTEM OFFICE-01
LOUNGE OFFICE-03 +169.45 m FFL
3850
OFFICE-01 LOUNGE LIFT
COLOUR PER ARCHITECT. LOBBY
OFFICE-03 +165.60 m FFL
T2_34th FLOOR
3850
MC1 OFFICE-01 LOUNGE OFFICE-03
? +161.75 m FFL
TOWER-2 T2_33rd FLOOR
3850
OFFICE-01 LIFT OFFICE-03
CW1 LOUNGE LOBBY +157.90 m FFL
TOWER-2 T2_32nd FLOOR
3850
OFFICE-01 LIFT OFFICE-03
LOUNGE LOBBY +154.05 m FFL
TOWER-2 T2_31st FLOOR
3850
OFFICE-01 LIFT OFFICE-03
LOUNGE LOBBY +150.20 m FFL
3850
OFFICE-01 LIFT OFFICE-03
LOUNGE LOBBY +146.35 m FFL
TOWER-2 T2_29th FLOOR
3850
OFFICE-01 LIFT OFFICE-03
LOUNGE LOBBY +142.50 m FFL
TOWER-2 T2_28th FLOOR
3850
OFFICE-01 LIFT OFFICE-03
LOUNGE LOBBY +138.65 m FFL
2 3 4 5 6 7 8 9 10 11 12 TOWER-2 T2_27th FLOOR
3850
OFFICE-01 LIFT OFFICE-03
LOUNGE LOBBY +134.80 m FFL
TOWER-2 T2_26th FLOOR
3850
OFFICE-01 LIFT OFFICE-03
LOUNGE LOBBY +130.95 m FFL
TOWER-2 T2_25th FLOOR
3850
OFFICE-01 LIFT OFFICE-03
126.40 LOUNGE LOBBY +127.10 m FFL
T.O.P.
T1_UPPER ROOF TOWER-2 T2_24th FLOOR
3850
OFFICE-01 LIFT OFFICE-03
+123.40 m SSL LOUNGE LOBBY +123.25 m FFL
MECHANICAL ELECT.
TOWER-2 T2_23rd FLOOR
T1_MECH. FLOOR
3850
LIFT
4750
3850
OFFICE-01 LIFT OFFICE-03
T1_ROOF FLOOR MACHINE ELECT. LOUNGE LOBBY +115.55 m FFL
5000
ROOM RM.
+113.65 m SSL 113.30 GSM PR.S 113.30 TOWER-2 T2_21st FLOOR
T.O.P. T.O.P.
3850
OFFICE-01 LIFT OFFICE-03 A 01-10-2017 ISSUE FOR APPROVAL
T1_21st FLOOR TOWER-1 ELECT.
LOUNGE LOBBY +111.70 m FFL
4100
3850
AREA OFFICE-01
T1_20th FLOOR TOWER-1 IT +107.85 m FFL REV. DATE DESCRIPTION BY
ELECT.
3850
6000
T1_19th FLOOR SECRETARY LIFT FINANCIAL MECHANICAL LOBBY T2_19th FLOOR
3850
3850
\ LIFT
PR.S RM. OFFICE-01 OFFICE-03
+98.00 m FFL COORDINATOR LOBBY HEAD +98.00 m FFL
T1_17th FLOOR TOWER-1 TOWER-2 T2_17th FLOOR
3850
3850
LIFT ELECT. LIFT
PR.S OFFICE-02 OFFICE-01 OFFICE-03
+94.15 m FFL OFFICE-04 LOBBY RM. LOBBY +94.15 m FFL
T1_16th FLOOR TOWER-1 TOWER-2 T2_16th FLOOR
3850
3850
LIFT ELECT. LIFT
PR.S OFFICE-02 OFFICE-01 OFFICE-03
+90.30 m FFL OFFICE-04 LOBBY RM. LOBBY +90.30 m FFL
177400
T1_15th FLOOR TOWER-1 TOWER-2 T2_15th FLOOR.
3850
3850
LIFT ELECT. LIFT
PR.S OFFICE-02 OFFICE-01 OFFICE-03
+86.45 m FFL OFFICE-04 LOBBY RM. LOBBY +86.45 m FFL
T1_14th FLOOR TOWER-1 TOWER-2 T2_14th FLOOR
3850
3850
LIFT ELECT. LIFT OFFICE-03
PR.S OFFICE-02 OFFICE-01
+82.60 m FFL OFFICE-04 LOBBY RM. LOBBY +82.60 m FFL
T1_13th FLOOR TOWER-1 CW2 CW2 TOWER-2 T2_13th FLOOR
3850
3850
LIFT ELECT. OFFICE-01 LIFT OFFICE-03
PR.S OFFICE-02
+78.75 m FFL OFFICE-04 LOBBY RM. CW1 LOBBY +78.75 m FFL
T1_12th FLOOR TOWER-1 TOWER-2 T2_12th FLOOR
3850
3850
LIFT ELECT. LIFT
+74.90 m FFL OFFICE-04 PR.S
LOBBY RM.
OFFICE-02 CW1 OFFICE-01
LOBBY
OFFICE-03
+74.90 m FFL
Enquiry No. : --------------- Application No : N/2017/0002775
T1_11th FLOOR TOWER-1 TOWER-2 T2_11th FLOOR
MC1
3850
3850
99/M A
LIFT ELECT. LIFT
+71.05 m FFL OFFICE-04 PR.S
LOBBY RM.
OFFICE-02 OFFICE-01 LOBBY
OFFICE-03
+71.05 m FFL CONSULTANT REG. No : GRADE : CONSULTANT REG. No : 000000 GRADE : A
T1_10th FLOOR TOWER-1 TOWER-2 T2_10th FLOOR CONSULTANT STAMP & SIGNATURE : SUB-CONSULTANT STAMP & SIGNATURE :
3850
3850
LIFT ELECT. LIFT OFFICE-03
PR.S OFFICE-02 OFFICE-01
+67.20 m FFL OFFICE-04 LOBBY RM. LOBBY +67.20 m FFL
T1_9th FLOOR TOWER-1 TOWER-2 T2_9th FLOOR
3850
3850
PR.S LIFT ELECT. LIFT OFFICE-03
OFFICE-02 OFFICE-01
+63.35 m FFL OFFICE-04 LOBBY RM. LOBBY +63.35 m FFL
T1_8th FLOOR TOWER-1 TOWER-2 T2_8th FLOOR
3850
3850
PR.S LIFT ELECT. LIFT OFFICE-03
OFFICE-02 OFFICE-01
+59.50 m FFL OFFICE-04 LOBBY RM. LOBBY +59.50 m FFL
T1_7th FLOOR TOWER-1 TOWER-2 T2_7th FLOOR
LIFT
3850
3850
ELECT. LIFT OFFICE-03
PR.S OFFICE-02 OFFICE-01
+55.65 m FFL OFFICE-04 LOBBY RM. LOBBY +55.65 m FFL
MC1
T1_6th FLOOR TOWER-1
ELECT.
TOWER-2 T2_6th FLOOR
3850
3850
PR.S LIFT OFFICE-02 OFFICE-01 LIFT OFFICE-03
+51.80 m FFL OFFICE-04 LOBBY RM. LOBBY +51.80 m FFL
T1_5th FLOOR TOWER-1 TOWER-2 T2_5th FLOOR TECHNICAL MANAGER : Shereif Ahmed TECHNICAL MANAGER
3850
3850
PR.S LIFT ELECT. MC1 LIFT OFFICE-03
OFFICE-02 OFFICE-01
+47.95 m FFL OFFICE-04 LOBBY RM. LOBBY +47.95 m FFL
T1_4th FLOOR TOWER-1 TOWER-2 T2_4th FLOOR REGISTRATION No. : 6120 REGISTRATION No :
3850
LIFT
3850
PR.S ELECT. LIFT
OFFICE-02 OFFICE-01 OFFICE-03
+44.10 m FFL OFFICE-04 LOBBY RM. LOBBY +44.10 m FFL
TOWER-1
T1_3rd FLOOR LIFT
TOWER-2 T2_3rd FLOOR 57 AL-JAZEERA ST.,
3850
ELECT.
3850
PR.S OFFICE-02 LIFT BIN-MAHMOUD / BEHZAD
+40.25 m FFL OFFICE-04 LOBBY RM. OFFICE-01 LOBBY OFFICE-03 +40.25 m FFL BUILDING, 6th FLOOR
T1_2nd FLOOR TOWER-1 TOWER-2 T2_2nd FLOOR TEL : (974) 402037 77 / 88 /
3850
3850
PR.S
LIFT ELECT.
PANORAMIC
LIFT 99
FAX : (974) 402037 66
+36.40 m FFL OFFICE-04 RM. OFFICE-02 OFFICE-01 OFFICE-03 +36.40 m FFL
LOBBY ELEVATOR LOBBY P.O. BOX1876, DOHA-QATAR
www.ehaf .com
1st FLOOR 1st FLOOR
CONSULTING ENGINEERS
TOWER-2
ELECT. OFFICE-02
3850
3850
PR.S LIFT ?
+32.55 m FFL OFFICE-04 RM. ? +32.55 m FFL
OUTDOOR ? LOBBY
AREA
5520
PROJECT
QEWC TOWERS ( KAHRAB TOWER )
6th PODIUM TOWER-1 TOWER-2 BUSSINESS 6th PODIUM
29.55 MALE STORE PR.S LIFT LIFT ELECT. FOOD LIFT LOUNGE
3850
3850
GYMNASIUM LIFT COURT LOBBY LIFT CENTER
+28.70 m FFL T.O.P. LOBBY RM. LOBBY CORR. 03 +28.70 m FFL
3850
STORE LIFT OFFICE & FEMALE LIFT OFFICE-03
RM. OFFICE & CORR. CORR.
+24.85 m FFL MECH. RM. LOBBY PARKING
PARKING
TOILET LOBBY +24.85 m FFL
4th PODIUM TOWER-1 PODIUM-04 TOWER-2 4th PODIUM
PR.S ELECT. VOID PODIUM-03
3450
3850
3850
LIFT OFFICE & FEMALE LIFT
+21.00 m FFL
STORE RM. OFFICE & CORR. OFFICE-03
+21.00 m FFL LOCATION:
LUSAIL CITY - MARINA COM 53
MECH. RM. LOBBY PARKING TOILET LOBBY
PARKING
3rd PODIUM TOWER-1 PODIUM-03 TOWER-2 3rd PODIUM
PR.S ELECT. PODIUM-02
3450
3450
3450
3850
3850
STORE LIFT OFFICE & VOID FEMALE LIFT
MECH. RM. OFFICE & CORR. OFFICE-03
+17.15 m FFL LOBBY RM. PARKING
PARKING
TOILET LOBBY +17.15 m FFL
2nd PODIUM TOWER-1 2nd PODIUM CLIENT:
QATAR ELECTRICITY & WATER CO.
PR.S PODIUM-02 TOWER-2
ELECT. FEMALE
3450
3450
3450
STORE
3850
3850
LIFT OFFICE & VOID LIFT OFFICE-03
MECH. RM. RM. TOILET CORR.
+13.30 m FFL LOBBY PARKING LOBBY +13.30 m FFL
01/10/17
ELECT.
DATE: JOB NO.:
0321
TOWER-1 TOWER-2
RM. LIFT
LIFT MAIN
5950
5950
5950
6350
6350
1st PODIUM RETAIL 01 STORE PR.S LOBBY RETAIL 11 CORRIDOR
ATRIUM MAIN LOBBY LOBBY RETAIL 1st PODIUM
CORRIDOR
+6.95 m FFL +6.95 m FFL
TITLE:
OVERALL SECTION
TOWER-1 TOWER-2
GARBAGE LIFT ELECT. RETAIL 10 PANORAMIC LIFT
6000
6000
6000
6350
6350
ELEVATOR
F&B 01 CORR. RM. LOBBY RM. VOID RECEPTION LOBBY F&B 05 GROUND FLOOR
& LOUNGE
+0.60 m FFL
ROAD LV (0.00)
AR-301-00
+0.00 m SSL DRAWING NO.: SCALE:
VENT. LIFT PIT ELECT. ENTRANCE 1 : 400 @A1
6030
6000
6000
6450
6450
SHAFT STORE STORE LIFT PIT SERVICES RM. PANORAMIC LOBBY CORR. STORE CORR. BASEMENT-1
CORRIDOR ELEVATOR -5.85 m FFL
DRAWN BY: DESIGNED BY: CHECKED BY:
OVERALL SECTION
CORR.
MANAGER ARCHIVE PR.S STORE
TOWER-1
STORE BASEMENT-2 M.S./S.M. H.O./M.A. O.M.
4100
4100
4100
ELECT.
4500
4500
LIFT CORR. STORE
1 LOBBY RM.
CORR. -10.35 m FFL
CAD FILE: REGISTRATION No. : REGISTRATION No. :
AR-301-00
1 : 400 PR.S STORE TOWER-1 STORE ELECT. BASEMENT-3
4265 3881
3600
3600
3600
4000
4000
LIFT RM. CORR. STORE
STORE
STORE LOBBY CORR. -14.35 m FFL
REVISION SIGNATURE SIGNATURE
17
13 14 15 16 17 18 19
HIGHEST POINT
+199.50 m SSL
1 ELEVATION-01
AR-201-00
1 : 300 T2_PARAPET
+192.40 m SSL
T2_UPPER ROOF
+187.15 m SSL
ELEVATION FINISHES
T2_MECH. FLOOR
CODE DESCRIPTION +182.40 m FFL
MC1 METAL CLADDING PANEL
MC2 PERFORATED METAL SCREEN
T2_ROOF FLOOR
MC3 PERFORATED METAL SCREEN ( MASHRABIYA )
+177.40 m FFL
CW1 DOUBLE GLAZING UNITIZED PANEL
CW2 SPANDREL PANEL UNITIZED CURTAIN WALL T2_37th FLOOR
SYSTEM +173.30 m FFL
CW3 DOUBLE GLAZED STICK SYSTEM
T2_36th FLOOR
ALV-1 POWDER COATED ALUMINUM LOUVERS. +169.45 m FFL
COLOUR PER ARCHITECT.
T2_35th FLOOR
+165.60 m FFL
T2_34th FLOOR
+161.75 m FFL
T2_33rd FLOOR
+157.90 m FFL
T2_32nd FLOOR
+154.05 m FFL
CW2
T2_31st FLOOR
+150.20 m FFL
T2_30th FLOOR
+146.35 m FFL
T2_29th FLOOR
+142.50 m FFL
T2_28th FLOOR
CW1
+138.65 m FFL
2 3 4 5 6 7 8 9 10 11 12 T2_27th FLOOR
+134.80 m FFL
T2_26th FLOOR
+130.95 m FFL
T2_25th FLOOR
+127.10 m FFL
T2_23rd FLOOR
T1_MECH. FLOOR
4750
+119.40 m FFL
+118.65 m FFL
T2_22nd FLOOR
+115.55 m FFL
5000
T1_ROOF FLOOR
+113.65 m SSL CW2
T2_21st FLOOR
+111.70 m FFL
T1_21st FLOOR
4100
+109.55 m FFL
T2_20th FLOOR
+107.85 m FFL
T1_20th FLOOR
3850
+105.70 m FFL
3850
+101.85 m FFL +101.85 m FFL
MC1
T1_18th FLOOR T2_18th FLOOR
3850
+98.00 m FFL MC1 +98.00 m FFL
3850
+94.15 m FFL +94.15 m FFL
3850
+90.30 m FFL +90.30 m FFL
3850
+86.45 m FFL +86.45 m FFL
3850
+82.60 m FFL +82.60 m FFL
3850
+78.75 m FFL +78.75 m FFL
3850
+74.90 m FFL +74.90 m FFL
3850
+71.05 m FFL +71.05 m FFL
3850
+67.20 m FFL +67.20 m FFL
3850
+63.35 m FFL +63.35 m FFL
3850
+59.50 m FFL +59.50 m FFL
3850
+55.65 m FFL +55.65 m FFL
3850
+51.80 m FFL +51.80 m FFL
MC3
T1_2nd FLOOR T2_2nd FLOOR
3850
1st FLOOR
3850
+32.55 m FFL
6th PODIUM
3850
+28.70 m FFL
MC3
5th PODIUM
3850
+24.85 m FFL
4th PODIUM
3850
+21.00 m FFL
3rd PODIUM
3850
+17.15 m FFL
MC3
2nd PODIUM
3850
+13.30 m FFL
6350
1st PODIUM
+6.95 m FFL
CW3
GROUND FLOOR
6350
+0.60 m FFL
ROAD LV (0.00)
+0.00 m SSL
600
A
REV.
DATE:
TITLE:
99
CLIENT:
PROJECT
REVISION
A
CAD FILE:
LOCATION:
DRAWN BY:
Enquiry No. :
U.D.D STAMP
DRAWING NO.:
www.ehaf .com
DATE
REGISTRATION No. :
M.S./S.M.
01-10-2017
57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
09/07/2017
P.O. BOX1876, DOHA-QATAR
99/M
---------------
6120
CONSULTANT STAMP & SIGNATURE :
Shereif Ahmed
AR-201-00
AGRADE :
SIGNATURE
4265
DESIGNED BY:
H.O./M.A.
SCALE:
REGISTRATION No. :
MUNICIPALITY STAMP
ISSUE FOR APPROVAL
JOB NO.:
DESCRIPTION
Application No :
REGISTRATION No :
TECHNICAL MANAGER
ELEVATION-1 OVERALL
CONSULTANT REG. No :
1 : 300
QATAR ELECTRICITY & WATER CO.
CONSULTING ENGINEERS
SIGNATURE
LUSAIL CITY - MARINA COM 53
3881
O.M.
0321
CHECKED BY:
000000
@A1
LUSAIL CITY - MARINA COM 53
N/2017/0002775
REGISTRATION No. :
QEWC TOWERS ( KAHRAB TOWER )
BY
18
19 18 17 16 15 14 13
HIGHEST POINT
+199.50 m SSL 1 ELEVATION-03
MC1
AR-203-00 ELEVATION FINISHES
1 : 300
T2_PARAPET
+192.40 m SSL CODE DESCRIPTION
MC1 METAL CLADDING PANEL
MC2 PERFORATED METAL SCREEN
T2_UPPER ROOF MC3 PERFORATED METAL SCREEN ( MASHRABIYA )
+187.15 m SSL
CW1 DOUBLE GLAZING UNITIZED PANEL
CW2 SPANDREL PANEL UNITIZED CURTAIN WALL
T2_MECH. FLOOR SYSTEM
+182.40 m FFL
CW3 DOUBLE GLAZED STICK SYSTEM
T2_37th FLOOR
+173.30 m FFL
T2_36th FLOOR
+169.45 m FFL
T2_35th FLOOR
+165.60 m FFL
T2_34th FLOOR
+161.75 m FFL
T2_33rd FLOOR
+157.90 m FFL
T2_32nd FLOOR
+154.05 m FFL
T2_31st FLOOR
+150.20 m FFL
T2_30th FLOOR
+146.35 m FFL
T2_29th FLOOR
+142.50 m FFL
T2_28th FLOOR
+138.65 m FFL
T2_27th FLOOR 12 11 10 9 8 7 6 5 4 3 2
+134.80 m FFL
T2_26th FLOOR
+130.95 m FFL
T2_25th FLOOR
+127.10 m FFL
T2_23rd FLOOR
T1_MECH. FLOOR
+119.40 m FFL MC2 +118.65 m FFL
T2_22nd FLOOR
+115.55 m FFL
T1_ROOF FLOOR
+113.65 m SSL
T2_21st FLOOR
+111.70 m FFL CW1
T1_21st FLOOR
+109.55 m FFL
T2_20th FLOOR MC1
+107.85 m FFL
CW1 T1_20th FLOOR
+105.70 m FFL
ALV-1
T2_19th FLOOR T1_19th FLOOR
+101.85 m FFL +101.85 m FFL
MC1
T2_18th FLOOR T1_18th FLOOR
+98.00 m FFL +98.00 m FFL
6th PODIUM
+28.70 m FFL
5th PODIUM
+24.85 m FFL
3rd PODIUM
+17.15 m FFL
MC1
2nd PODIUM
+13.30 m FFL
1st PODIUM
+6.95 m FFL
GROUND FLOOR
+0.60 m FFL
ROAD LV (0.00)
+0.00 m SSL
A
REV.
DATE:
TITLE:
99
CLIENT:
PROJECT
REVISION
A
CAD FILE:
LOCATION:
DRAWN BY:
Enquiry No. :
U.D.D STAMP
DRAWING NO.:
www.ehaf .com
DATE
REGISTRATION No. :
M.S./S.M.
01-10-2017
57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
09/07/2017
P.O. BOX1876, DOHA-QATAR
99/M
---------------
6120
CONSULTANT STAMP & SIGNATURE :
Shereif Ahmed
AR-203-00
AGRADE :
SIGNATURE
4265
DESIGNED BY:
H.O./M.A.
SCALE:
REGISTRATION No. :
MUNICIPALITY STAMP
ISSUE FOR APPROVAL
JOB NO.:
DESCRIPTION
Application No :
REGISTRATION No :
TECHNICAL MANAGER
ELEVATION-3 OVERALL
CONSULTANT REG. No :
1 : 300
QATAR ELECTRICITY & WATER CO.
CONSULTING ENGINEERS
SIGNATURE
LUSAIL CITY - MARINA COM 53
3881
O.M.
0321
CHECKED BY:
000000
@A1
LUSAIL CITY - MARINA COM 53
N/2017/0002775
REGISTRATION No. :
QEWC TOWERS ( KAHRAB TOWER )
BY
19
Barwa Bank H.Q.
GENERAL NOTES :
-THESE DRAWINGS SHOULD BE USED IN COORDINATION WITH ALL OTHER
DRAWINGS PRESENTED BY THE ARCHITECT, ENGINEER AND
CONSULTANTS.
-IT IS FORBIDDEN TO ANY OF THE CONCERNED PERSONNEL TO MEASURE THE
DRAWING; IN CASE OF NECESSITY, REFER TO THE ARCHITECT OR ENGINEER.
-UNLESS OTHERWISE NOTED. DIMENSIONS ARE IN MM AND TO THE STRUCTURE
FACES AND LEVELS ARE IN METERS.
-ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH QCS (QATAR
CONSTRUCTION SPECIFICATION).
-FOR CURTAIN WALL DETAILS REFER TO CURTAIN WALL DRAWINGS.
-ALL EXTERNAL FINISHES TO BE WATER PROOF.
-FOR LANDSCAPE DETAILS REFER TO LANDSCAPE DRAWINGS.
-UNLESS OTHERWISE SHOWN ON DRAWINGS ALL FLOOR FINISHING SHALL BE
SLOPED MIN 0.05% AND MAX 1.0% TOWARDS FLOOR DRAIN.
-FOR LOCATION OF FLOOR DRAIN REFER TO MECHANICAL DRAWINGS.
-DOOR OPENING SHALL BE LOCATED EITHER MIDWAY IN WALL OR 100MM OFF
WALL END AS SHOWN ON DRAWINGS UNLESS OTHERWISE INDICATED.
-THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS
AFFECTING THE WORKS AT JOB SITE
-FOR EXACT LOCATION AND DIMENSIONS OF SLAB OPENINGS AND SLAB OPENING,
PLEASE REFER TO STRUCTURAL DRAWINGS.
-CONTRACTOR TO SUBMIT SHOP DRAWINGS DETAILS WITH APPROPRIATE
TESTS/SAMPLES/GURANTEES FOR ENGINEERS APPROVAL PRIOR TO
MANUFACTURING.
-ALL MECHANICAL ROOMS/ PUMPS ROOMS/ GENERATOR ROOMS/ ARE TO HAVE A
FLOATING MACHINE BASE TO ABSORB VIBRATION.
-FOR ALL DETAIL REFERENCES REFER TO OVERALL PLANS/ELEVATIONS/SECTIONS
RELATED TO THE SHEET
-ACCESS PANEL LOCATION AND SIZE TO BE COORDINATED WITH THE MECHANICAL
DRAWINGS.
-THE CONTRACTOR SHOULD SUBMIT SHOP DRAWING FOR APPROVAL BEFORE
START MANUFACTURING
LEAD CONSULTANT
MARINA PLAZA, LEVEL 10
OFFICE 1004-1006
DUBAI MARINA, DUBAI,
UAE
P.O. BOX 112955
TEL: 971 4382 5200
www.perkinswill.com
LOCAL CONSULTANT
57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
BUILDING, 6TH FLOOR
P.O. BOX 1876, DOHA-QATAR
TEL: (974) 402037 77 / 88 / 99
FAX: (974) 40203766
www.ehaf.com
MEP CONSULTANT
SUITE 1704, ABDULLA BIN
DARWISH BUILDING
AL SALAM STREET
P.O. BOX 109870
ABU DHABI, UAE
TEL: +971 (0)2 6774 220
FAX: +971 (0)2 6774 202
PROJECT DESCRIPTION
OFFICE BUILDING
DRAWING TITLE
COVER SHEET
DRAWING. NO. PART:
G00-00
DRAWN BY: CHECKED BY: STAGE: REVISION:
AG GD DD
VERIFIED BY: APPROVED BY:
DL
PLOT DATE:
15/06/16 O
SCALE: PROJECT. NO:
390142
21
FILE NAME:
C:\Users\mahmoud.fathy\Documents\390142.000_Barwa
Bank_mahmoud.fathy.rvt
PROJECT NAME AND
LOCATION
1 2 3 4 5 6 7 8 9 1
10 11 12 13 14 BARWA BANK HQ TOWER
B MARINA COM-02, LUSAIL CITY - QATAR
BASEMENT SETBACK
A B
A A
STORE
EXHAUST CARPARK B5-021
SHAFT EXTRACT FAN
UP TO A1257 ROOM
BASEMENT 4 B5-83 B5-84 B5-020 B5-85 B5-86 B5-87 B5-88 B5-89 B5-90 B5-91 B5-92 B5-93 B5-94 B5-95 -19.000 FFL FFL
-19.000 FFL FFL
-19.100 SSL SSL -19.100 SSL SSL
D C
B5-13 B5-14 B5-15 B5-16 B5-17
12800
17342
B5-18 B5-19
B B5-130 B
1
CARPARK
SUPPLY FAN AR-204-00
ROOM B5-131
B5-034 -19.100 FFL FFL/SSL
3.50
-19.100 SSL SSL -IT IS FORBIDDEN TO ANY OF THE CONCERNED PERSONNEL TO MEASURE THE
B5-028 B5-132
DRAWING; IN CASE OF NECESSITY, REFER TO THE ARCHITECT OR ENGINEER.
B5-12 -UNLESS OTHERWISE NOTED. DIMENSIONS ARE IN MM AND TO THE STRUCTURE
B5-20 B5-43 B5-44
DRAINAGE FACES AND LEVELS ARE IN METERS.
PUMP ROOM B5-133 -ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH QCS (QATAR
B5-107 B5-014 FM ROOM B5-129
B5-62 CONSTRUCTION SPECIFICATION).
B5-11 B5-21 B5-42 B5-45 ELECT. ROOM B5-011
B5-027 -FOR CURTAIN WALL DETAILS REFER TO CURTAIN WALL DRAWINGS.
6500
1 STAIR PRESS. -ALL EXTERNAL FINISHES TO BE WATER PROOF.
13950
STAIRCASE
LOBBY A1282 -FOR LANDSCAPE DETAILS REFER TO LANDSCAPE DRAWINGS.
B5-029
AR-503-01
-UNLESS OTHERWISE SHOWN ON DRAWINGS ALL FLOOR FINISHING SHALL BE
SUPPLY/ EXTRACT
B5-10 B5-22 B5-41 PARKING B5-46 B5-63 B5-79 ST-01A MEP RISER B5-134 SLOPED MIN 0.05% AND MAX 1.0% TOWARDS FLOOR DRAIN.
B5-001 LOBBY PRESS. AREA ELECT. ROOM 1500
A1281 1 B5-015
B5-010 B5-009 B5-128 -FOR LOCATION OF FLOOR DRAIN REFER TO MECHANICAL DRAWINGS.
AR-501-01 -DOOR OPENING SHALL BE LOCATED EITHER MIDWAY IN WALL OR 100MM OFF
-19.100 FFL FFL/SSL WALL END AS SHOWN ON DRAWINGS UNLESS OTHERWISE INDICATED.
B5-09 B5-23 B5-40 B5-47 B5-61 B5-64 B5-78
-THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS
FIRE CORRIDOR
B5-016 B5-127 B5-135 AFFECTING THE WORKS AT JOB SITE
D PARKING
D -FOR EXACT LOCATION AND DIMENSIONS OF SLAB OPENINGS AND SLAB OPENING,
PLEASE REFER TO STRUCTURAL DRAWINGS.
B5-08
SHUTTLE -CONTRACTOR TO SUBMIT SHOP DRAWINGS DETAILS WITH APPROPRIATE
B5-24 B5-39 B5-48 B5-60 B5-65
LOBBY TESTS/SAMPLES/GURANTEES FOR ENGINEERS APPROVAL PRIOR TO
PUBLIC_HEALTH_RISER
B5-77 RL-4 TL-4 TL-5 STORE B5-126 B5-136
-19.100 FFL FFL/SSL B5-002 B5-008 -19.100 FFL FFL/SSL MANUFACTURING.
FM ROOM
B5-007 -ALL MECHANICAL ROOMS/ PUMPS ROOMS/ GENERATOR ROOMS/ ARE TO HAVE A
STAIR PRESS.
B5-07 B5-25 B5-38 B5-49 B5-59 B5-66 B5-76 A1283 B5-125 B5-137 FLOATING MACHINE BASE TO ABSORB VIBRATION.
1 RL-3 TL-3 TL-6
-FOR ALL DETAIL REFERENCES REFER TO OVERALL PLANS/ELEVATIONS/SECTIONS
AR-301-00 LIFT LOBBY RELATED TO THE SHEET
75542
13000
LOBBY PRESS.
B5-74 B5-123 B5-139
B5-05 B5-27 B5-36 B5-51 B5-57 B5-68 RL-1 TL-1 TL-8 O FOR DC1 APPROVAL 27 JUN. 2016
ISSUE DESCRIPTION DATE CHECKED QA / QC
6500
EXTRACT
SUPPLY/
ELECT. ROOM AREA
B5-004 B5-005 FL-1 FL-2 TEL: 8008555
B5-70 B5-121
B5-03 B5-29 B5-34 B5-53 B5-72 B5-141 TEL: (974) 4410 0888
STAIRCASE LOBBY PRESS.
LOBBY A1280 1500 5800 6280 5800
B5-030
www.barwabank.com
13950
-19.000 FFL FFL 1 B5-161 B5-160 B5-159 B5-109 B5-110 B5-111 B5-112 B5-113 B5-114 B5-115 B5-116 B5-117 B5-118 B5-119 TEL: 971 4382 5200
www.perkinswill.com
F -19.100 SSL SSL
AR-503-01
STORE
F
B5-023 LOCAL CONSULTANT
57 AL-JAZEERA ST.,
STAIR PRESS. -19.000 FFL FFL
CARPARK A1279 -19.100 SSL SSL BIN-MAHMOUD / BEHZAD
SUPPLY FAN BUILDING, 6TH FLOOR
ROOM -19.100 FFL FFL/SSL
B5-144 P.O. BOX 1876, DOHA-QATAR
B5-033
FM TOILETS TEL: (974) 402037 77 / 88 / 99
B5-013 FAX: (974) 40203766
-19.000 FFL FFL www.ehaf.com
-19.100 SSL SSL
G G
B5-145
MEP CONSULTANT
17300
B5-163 B5-162
SUITE 1704, ABDULLA BIN
B5-168 B5-167 B5-166 B5-165 B5-164
DARWISH BUILDING
STORE
B5-024 AL SALAM STREET
CARPARK P.O. BOX 109870
B5-158 B5-157 INTAKE SHAFT SUPPLY FAN B5-156 B5-155 B5-154 B5-153 B5-152 B5-151 B5-150 B5-149 B5-148 B5-147 B5-146
A1250 ABU DHABI, UAE
DOWN FROM ROOM
-19.000 FFL FFL
STORE B5-025 -19.000 FFL FFL TEL: +971 (0)2 6774 220
BASEMENT 4 -19.100
-19.100FFL
SSLFFL
SSL -19.100 SSL SSL
B5-032
-20.600 SSL SSL FAX: +971 (0)2 6774 202
PROJECT DESCRIPTION
H H
5 BASEMENTS + GROUND + 2 PODIUM + 20 FLOORS
OFFICE BUILDING
10
DRAWING TITLE
AR-101-00
1 BASEMENT
1 : 200
LEVEL 5 PLAN
DRAWN BY:
AG
CHECKED BY:
GD
STAGE:
DD
REVISION:
DL
PLOT DATE:
15/06/16 O
SCALE: PROJECT. NO:
22
1 : 200
FILE NAME:
C:\Users\mahmoud.fathy\Documents\390142.000_Barwa
390142
Bank_mahmoud.fathy.rvt
PROJECT NAME AND
LOCATION
BASEMENT SETBACK
A A
5500
UP FROM BASEMENT 1
SLOPE 20%
A B
7400
1.200 FFL SL
3095
G-14 G-15 G-16 G-17 G-18
B PLINTH SETBACK B
SLOPE 2%
1
CARPARK EXHAUST
AR-204-00
LOUVERS
6700
7900
G-13
TOWER SETBACK
.
246
G-12 DRAWINGS PRESENTED BY THE ARCHITECT, ENGINEER AND
C C CONSULTANTS.
VESTIBULE SL-1 -IT IS FORBIDDEN TO ANY OF THE CONCERNED PERSONNEL TO MEASURE THE
G-038 DRAWING; IN CASE OF NECESSITY, REFER TO THE ARCHITECT OR ENGINEER.
G-11
7050
-UNLESS OTHERWISE NOTED. DIMENSIONS ARE IN MM AND TO THE STRUCTURE
FACES AND LEVELS ARE IN METERS.
CORPORATE
G-10 CONSUMER -ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH QCS (QATAR
BANKING CONSTRUCTION SPECIFICATION).
G-015 STAIR PRESS. -FOR CURTAIN WALL DETAILS REFER TO CURTAIN WALL DRAWINGS.
A1282 0.000 FFL FFL
-0.100 SSL SSL -ALL EXTERNAL FINISHES TO BE WATER PROOF.
13950
8300
RECEPTION ALARM -DOOR OPENING SHALL BE LOCATED EITHER MIDWAY IN WALL OR 100MM OFF
G-014 RISER WALL END AS SHOWN ON DRAWINGS UNLESS OTHERWISE INDICATED.
-THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS
G-07
AFFECTING THE WORKS AT JOB SITE
D D -FOR EXACT LOCATION AND DIMENSIONS OF SLAB OPENINGS AND SLAB OPENING,
PLEASE REFER TO STRUCTURAL DRAWINGS.
0.000 FFL FFL
G-06 -0.100 SSL SSL -CONTRACTOR TO SUBMIT SHOP DRAWINGS DETAILS WITH APPROPRIATE
0.000 ARCHITECTURALFORFFLENGINEERS
IS EQUIVALENT TOPRIOR
3.08 QNDH LEVEL
200
RL-4 TL-4 TL-5 TESTS/SAMPLES/GURANTEES APPROVAL TO
(FLOOR FINISH BY MANUFACTURING.
G-05 INTERIOR DESIGN
5800 19000 4000 CONSULTANT) -ALL MECHANICAL ROOMS/ PUMPS ROOMS/ GENERATOR ROOMS/ ARE TO HAVE A
FLOATING MACHINE BASE TO ABSORB VIBRATION.
RL-3 TL-3 TL-6 -FOR ALL DETAIL REFERENCES REFER TO OVERALL PLANS/ELEVATIONS/SECTIONS
0.000 FFL FFL RELATED TO THE SHEET
71500
11400
13000
STAIR PRESS.
-ACCESS PANEL LOCATION AND SIZE TO BE COORDINATED WITH THE MECHANICAL
1 DRAWINGS.
MAIN ENTRY
MAIN RL-2 TL-2 TL-7 SLOPE 2%
1 AR-201-00 -THE CONTRACTOR SHOULD SUBMIT SHOP DRAWING FOR APPROVAL BEFORE
G-03 ENTRY
.
AR-202-00 START MANUFACTURING
LOBBY PRESS.
RL-1 PL-1 TL-8 4650 6700 4650 O FOR DC1 APPROVAL 27 JUN. 2016
200
ISSUE DESCRIPTION DATE CHECKED QA / QC
G-02
EXTRACT
SUPPLY/
FL-1 FL-2 TEL: 8008555
4500 TEL: (974) 4410 0888
RETAIL 1
G-007 www.barwabank.com
13950
57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
IN .
SLOPE 2%
1
FAX: (974) 40203766
AR-203-00 www.ehaf.com
G G MEP CONSULTANT
G-19 G-20 G-21 G-22 G-23 SUITE 1704, ABDULLA BIN
CAPARK INTAKE
3095
DARWISH BUILDING
LOUVERS
AL SALAM STREET
P.O. BOX 109870
7400
KHAARAMA
DOWN TO BASEMENT 1 ACCESS STAIR -0.100
ABU DHABI, UAE
1.200 FFL SL
SLOPE 20%
G-027 TEL: +971 (0)2 6774 220
5500
PROJECT DESCRIPTION
H H
5 BASEMENTS + GROUND + 2 PODIUM + 20 FLOORS
OFFICE BUILDING
1 2 3 4 5 6 7 8 9 10 11 12 13 14
DRAWING TITLE
AR-106-00
DRAWN BY: CHECKED BY: STAGE: REVISION:
AG GD DD
O
1 GROUND PLAN
VERIFIED BY: APPROVED BY: PLOT DATE:
DL 15/06/16
1 : 200 SCALE:
1 : 200
PROJECT. NO:
390142
23
FILE NAME:
C:\Users\mahmoud.fathy\Documents\390142.000_Barwa
Bank_mahmoud.fathy.rvt
PROJECT NAME AND
LOCATION
800
800
250 800
1050
C W-01 W-01 C
4550
W-01 BH01
BH01
W-01
9300
8000
4600 7 19800 2600
3650
400 5950 200 700 300 2700 200 900 200 1500 200 2400 200 1550 2200 200 -THESE DRAWINGS SHOULD BE USED IN COORDINATION WITH ALL OTHER
DRAWINGS PRESENTED BY THE ARCHITECT, ENGINEER AND
CONSULTANTS.
13950
200
400
BH01
FACES AND LEVELS ARE IN METERS.
BF02
FFL/SSL = X -ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH QCS (QATAR
SD19 CONSTRUCTION SPECIFICATION).
800 ST-01A CHW BF02
RISER
T2-019
STAIR PRESS.
PANTRY -FOR CURTAIN WALL DETAILS REFER TO CURTAIN WALL DRAWINGS.
2900
3100
T2-014
SUPPLY/ ELECT. ROOM -ALL EXTERNAL FINISHES TO BE WATER PROOF.
3975
800 250 SUPPLY/
T2-017
4400
BH01 EXTRACT
EXTRACT BH01 -FOR LANDSCAPE DETAILS REFER TO LANDSCAPE DRAWINGS.
F.A.
BF02 A1286
BF02 RISER
BF02 -UNLESS OTHERWISE SHOWN ON DRAWINGS ALL FLOOR FINISHING SHALL BE
1050 FFL = X SLOPED MIN 0.05% AND MAX 1.0% TOWARDS FLOOR DRAIN.
400
200
SSL = X - 200 WD04 CW-11 -FOR LOCATION OF FLOOR DRAIN REFER TO MECHANICAL DRAWINGS.
BF02 SD37 SD10 BF02 BF02 BH01 -DOOR OPENING SHALL BE LOCATED EITHER MIDWAY IN WALL OR 100MM OFF
7450
1650
BF02 T2-018 SD16
200
BF02
1000 100
-THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS
1800
2750
1145 SD34 CORRIDOR FFL = X AFFECTING THE WORKS AT JOB SITE
FFL = X T2-015 SSL = X - 200 WD02
900 200
SD36 SD36
1650
BF02 SSL = X - 200 BH01 -FOR EXACT LOCATION AND DIMENSIONS OF SLAB OPENINGS AND SLAB OPENING,
D FHC
100 900 900 BF02 900 1000 400 1000 1350 1000 700 D PLEASE REFER TO STRUCTURAL DRAWINGS.
-CONTRACTOR TO SUBMIT SHOP DRAWINGS DETAILS WITH APPROPRIATE
200
200
200
WD03
W.M TELECOM TESTS/SAMPLES/GURANTEES FOR ENGINEERS APPROVAL PRIOR TO
SD10 WD02 WD02
T2-024 RISER BH01 MANUFACTURING.
A1302
3350
H.T.
2000
BF02 -ALL MECHANICAL ROOMS/ PUMPS ROOMS/ GENERATOR ROOMS/ ARE TO HAVE A
T2-013
SD15 F.T FLOATING MACHINE BASE TO ABSORB VIBRATION.
BH01
OFFICE T2-012 OFFICE -FOR ALL DETAIL REFERENCES REFER TO OVERALL PLANS/ELEVATIONS/SECTIONS
T2-001 T2-001
200
4800
SPR T2-011
T2-025 SD15 -ACCESS PANEL LOCATION AND SIZE TO BE COORDINATED WITH THE MECHANICAL
FFL = X FFL = X DRAWINGS.
6150
BH02
1950
300 200
16 EQUAL PANELS
250
1800
11300
42500
13000
23900
24900
A1306 FFL = X
9000
13950
200 200
BF02 ST-02
300
5950
FFL = X
SSL = X - 200
200
4750
BH01
BH02 LEAD CONSULTANT
H.T
T2-004 LOBBY PRESS. 7 MARINA PLAZA, LEVEL 10
A1284
2400
FFL/SSL = X
AR-502-01 OFFICE 1004-1006
WD04 WD04
BH01 BF02 DUBAI MARINA, DUBAI,
UAE
300
200
550200
2750
SSL = X - 200 FHC BF02
BF02 FFL = X 57 AL-JAZEERA ST.,
200
900
745
BF02 200
WD04 P.O. BOX 1876, DOHA-QATAR
300
PANTRY ELECT. ROOM WASTE SD12 TEL: (974) 402037 77 / 88 / 99
T2-006 T2-010
2475
EXTRACT
BF02 BF01 www.ehaf.com
A1285 BF02
3000
MEP CONSULTANT
1000 200
400
P.O. BOX 109870
1100
BH01 BH01
BH01 SD19
ABU DHABI, UAE
BH01
TEL: +971 (0)2 6774 220
13950
3650
2600 200 2200 1550 200 2400 200 2600 200 2700 300 6850 400
5 BASEMENTS + GROUND + 2 PODIUM + 20 FLOORS
OFFICE BUILDING
8000
9300
(LEVELS 2-7)
F W-01
F DRAWING. NO. PART:
250
800
W-01 AR-110-00
DRAWN BY: CHECKED BY: STAGE: REVISION:
Author Checker DD
Approver
PLOT DATE:
12/07/16
LEVELS 2-7 FLOOR PLAN
1 1 : 100
SCALE:
FILE NAME:
1 : 100
PROJECT. NO:
390142
24
C:\Users\mahmoud.fathy\Documents\390142.000_Barwa
Bank_mahmoud.fathy.rvt
1 2 3 4 5 6 7 8 9 10 11 12 13 14
ROOF APEX
+111.80 m
10000
+106.80 m
MID T21
+104.25 m
MECHANICAL LEVEL
+101.80 m
MID T20
4900
+99.35 m UNITIZED CURTAIN WALL
TOWER LEVEL 20 LAMINATED GLAZING
+96.90 m SYSTEM (BY FACADE
MAXIMUM ALLOWABLE CONSULTANT)
MID T19 CW-12
4900
+94.45 m BUILDING HEIGHT
+91.800 M
TOWER LEVEL 19
+92.00 m
CW-11 NATURAL STONE CLADDING
W-01 W-01 ON STRUCTURAL STEEL
TOWER LEVEL 18 SUPPORT
+88.00 m
CW-11
W-01 W-01
TOWER LEVEL 17
+84.00 m
CW-11
W-01 W-01 500 MM HIGH GLASS
TOWER LEVEL 16 CUTOUT (BY FACADE
+80.00 m CONSULTANT
CW-11
W-01 W-01
TOWER LEVEL 15
+76.00 m
CW-11
W-01 W-01
TOWER LEVEL 14
+72.00 m
W-01 W-01
TOWER LEVEL 13
+68.00 m
CW-11
W-01 W-01
TOWER LEVEL 12
+64.00 m
CW-11
W-01 W-01
TOWER LEVEL 11
+60.00 m
CW-11
76000
W-01 W-01
TOWER LEVEL 9
+52.00 m
101800
101800
CW-11
W-01 W-01
PLOT LIMIT
TOWER LEVEL 8
PLINTH SETBACK
PLINTH SETBACK
TOWER SETBACK
TOWER SETBACK
TOWER SETBACK
+48.00 m
CW-11
W-01 W-01
PLOT LIMIT
TOWER LEVEL 7
+44.00 m
CW-11
W-01 W-01
TOWER LEVEL 6
+40.00 m UNITIZED CURTAIN WALL
CW-11 LAMINATED GLAZING SYSTEM
W-01 W-01 (BY FACADE CONSULTANT)
TOWER LEVEL 5
+36.00 m
CW-11
NATURAL STONE CLADDING
W-01 W-01 ON STRUCTURAL STEEL
TOWER LEVEL 4 SUPPORT
+32.00 m
MAXIMUM ALLOWABLE
CW-11
PODIUM HEIGHT W-01 W-01 500 MM HIGH GLASS
TOWER LEVEL 3 +27.000 M CUTOUT (BY FACADE
+28.00 m CONSULTANT
CW-11
W-01 W-01
TOWER LEVEL 2
+24.00 m WOODEN TRELLIS (BY
LANDSCAPE CONSULTANT)
W-01 W-01
CW-09 CW-07
W-01 W-01
PODIUM ROOF DECK GLASS BALUSTRADE
+16.00 m
MID P-2 NATURAL STONE CLADDING
+13.50 m ON STRUCTURAL STEEL
SUPPORT
PODIUM LEVEL 2
10000
+11.00 m
MID P-1 CURTAIN WALL LAMINATED
CW-03 CW-02
+8.50 m GLAZING SYSTEM
PODIUM LEVEL 1
+6.00 m
6000
CW-04
GROUND LEVEL
+0.00 m
FIREMENS ACCES (CLEAR WALL
OPENING)
SOUTH ELEVATION
1 1 : 250
O
ISSUE
SCALE:
UAE
DRAWN BY:
FILE NAME:
VERIFIED BY:
NORTH
OWNER
DRAWING. NO.
LOCATION
TEL: 8008555
DRAWING TITLE
www.ehaf.com
P.O. BOX 2778,
DOHA - QATAR
AM
ABU DHABI, UAE
P.O. BOX 112955
AL SALAM STREET
MEP CONSULTANT
www.barwabank.com
DARWISH BUILDING
TEL: (974) 4410 0888
LEAD CONSULTANT
PROJECT NAME AND
www.perkinswill.com
LOCAL CONSULTANT
CHECKED BY:
P.O. BOX 1876, DOHA-QATAR
APPROVED BY:
FOR DC1 APPROVAL
PIN NO.
VISION PANEL
SPANDREL PANEL
KEY PLAN
C:\Users\mahmoud.fathy\Documents\390142.000_Barwa
Bank_mahmoud.fathy.rvt
As indicated
MB
AR
PLANNING NO.
AR-203-00
STAGE:
NATURAL STONE CLADDING
DATE
PLOT DATE:
PROJECT. NO:
OFFICE BUILDING
27 JUN. 2016
69060005
DD
15/06/16
MARINA COM-02, LUSAIL CITY - QATAR
SOUTH ELEVATION
BARWA BANK HQ TOWER
PART:
390142
O
REVISION:
CHECKED QA / QC
25
1 2 3 4 5 6 7 8 9 10 11 12 13
5500 9000 9000 9000 9000 9000 10250 6950 9000 18000 6950
MECHANICAL BULK
HEAD
+111.800 M
ROOF APEX
DECK LEVEL
+111.70
+111.80 m
MEP MEP
M2-001 M2-001
10000
MID T21
MECHANICAL ZONE
4900
+99.35 m VP OFFICES T.E RISER LOBBY CEO OFFICES
T20-001 T20-024 T20-008 T20-002
TOWER LEVEL 20
+96.90 m
VIP OFFICES
MAXIMUM ALLOWABLE
MID T19 BUILDING HEIGHT VIP OFFICES T.E RISER LOBBY
4900
+94.45 m T19-001 T19-023 T19-007 VIP OFFICES
+91.800 M T19-001
TOWER LEVEL 19
+92.00 m
M.T F.T
UNIT 1 T.E RISER LOBBY A1215 A1214 UNIT 2
A1212 A1230 A1227 A1226
TOWER LEVEL 18
EXECUTIVE OFFICES
+88.00 m
UNIT 1 T.E RISER LOBBY UNIT 2
A1186 A1204 A1201 A1200
TOWER LEVEL 17
+84.00 m
UNIT 1 T.E RISER LOBBY UNIT 2
A1160 A1178 A1175 A1174
TOWER LEVEL 16
+80.00 m
UNIT 1 T.E RISER LOBBY UNIT 2
A1134 A1152 A1149 A1148
TOWER LEVEL 15
+76.00 m
UNIT 1 T.E RISER LOBBY UNIT 2
A1108 A1126 A1123 A1122
TOWER LEVEL 14
+72.00 m
UNIT 1 T.E RISER LOBBY UNIT 2
A1082 A1100 A1097 A1096
TOWER LEVEL 13
+68.00 m
UNIT 1 T.E RISER LOBBY UNIT 2
A1056 A1074 A1071 A1070
THIRD PARTY TENANTS
TOWER LEVEL 12
+64.00 m
UNIT 1 T.E RISER LOBBY UNIT 2
A1030 A1048 A1045 A1044
TOWER LEVEL 11
+60.00 m
UNIT 1 T.E RISER LOBBY UNIT 2
A1004 A1022 A1019 A1018
TOWER LEVEL 10
76000
A978 A996 A993 A992
101800
UNIT 1 T.E RISER LOBBY UNIT 2
T8-001 T8-024 T8-008 T8-002
TOWER LEVEL 8
+48.00 m
OFFICE T.E RISER LOBBY OFFICE
130900
A953 A969 A970 A953
TOWER LEVEL 7
+44.00 m
OFFICE T.E RISER LOBBY OFFICE
A928 A944 A945 A928
120900
TOWER LEVEL 6
+40.00 m
OFFICE T.E RISER LOBBY OFFICE
A903 A919 A920 A903
TOWER LEVEL 5
+36.00 m
OFFICE T.E RISER LOBBY OFFICE
A878 A894 A895 A878
TOWER LEVEL 4
BARWA BANK HEADQUARTERS
+32.00 m
MAXIMUM ALLOWABLE
OFFICE T.E RISER LOBBY OFFICE
PODIUM HEIGHT A853 A869 A870 A853
SETBACK
+27.000 M
PLOT LIMIT
TOWER LEVEL 3
PLOT LIMIT
BASEMENT
+28.00 m
TOWER SETBACK
TOWER SETBACK
PODIUM SETBACK
PODIUM SETBACK
BASEMENT SETBACK
TOWER LEVEL 2
+24.00 m
PODIUM DECK
MAJILIS CORRIDOR LOBBY LOUNGE STORE
PODIUM ROOF LANDSCAPE P3-007 P3-006 P3-001 P3-018
PODIUM ROOF DECK
+16.00 m
MEETING ROOM
MID P-2 2 LIFT LOBBY LIFT LOBBY LIFT LOBBY BMS ROOM
5000
+8.50 m W-02 F&B W-03 LIFT LOBBY LIFT LOBBY BMS ROOM
P1-006 P1-001 P1-012 P1-020
MEETING ROOMS, MOSQUE, GYM
PODIUM LEVEL 1
+6.00 m
G-06
EXTRACT
6000
AREA
GROUND LEVEL
+0.00 m
RETAIL LOBBY SOLID WASTE PARKING
5100
SHUTTLE STORE
PARKING
3500
B4-012 PARKING
B3-001 B3-001
BASEMENT LEVEL 3
-12.10 m
3500
-15.60 m
PARKING
3500
PARKING
B5-001 B5-001
BASEMENT LEVEL 5
-19.10 m LIFT LIFT LIFT
PIT PIT PIT
SECTION A-A
1 1 : 250
O
ISSUE
SCALE:
UAE
TEL:
DRAWN BY:
FILE NAME:
VERIFIED BY:
NORTH
DRAWINGS.
OWNER
DRAWING. NO.
LOCATION
CONSULTANTS.
MANUFACTURING.
TEL: 8008555
DRAWING TITLE
www.ehaf.com
P.O. BOX 2778,
DOHA - QATAR
AM
ABU DHABI, UAE
P.O. BOX 112955
START MANUFACTURING
AL SALAM STREET
MEP CONSULTANT
www.barwabank.com
DARWISH BUILDING
TEL: (974) 4410 0888
LEAD CONSULTANT
GENERAL NOTES :
PROJECT NAME AND
www.perkinswill.com
LOCAL CONSULTANT
CHECKED BY:
P.O. BOX 1876, DOHA-QATAR
APPROVED BY:
FOR DC1 APPROVAL
PIN NO.
C:\Users\mahmoud.fathy\Documents\390142.000_Barwa
Bank_mahmoud.fathy.rvt
As indicated
MB
AR
PLANNING NO.
AR-301-00
STAGE:
SLOPED MIN 0.05% AND MAX 1.0% TOWARDS FLOOR DRAIN.
DRAWINGS PRESENTED BY THE ARCHITECT, ENGINEER AND
SECTION A-A
DATE
-FOR LANDSCAPE DETAILS REFER TO LANDSCAPE DRAWINGS.
PLOT DATE:
PROJECT. NO:
OFFICE BUILDING
27 JUN. 2016
69060005
DD
15/06/16
-FOR CURTAIN WALL DETAILS REFER TO CURTAIN WALL DRAWINGS.
-ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH QCS (QATAR
MARINA COM-02, LUSAIL CITY - QATAR
PART:
-THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS
390142
DRAWING; IN CASE OF NECESSITY, REFER TO THE ARCHITECT OR ENGINEER.
O
-THE CONTRACTOR SHOULD SUBMIT SHOP DRAWING FOR APPROVAL BEFORE
-IT IS FORBIDDEN TO ANY OF THE CONCERNED PERSONNEL TO MEASURE THE
REVISION:
-UNLESS OTHERWISE NOTED. DIMENSIONS ARE IN MM AND TO THE STRUCTURE
CHECKED QA / QC
26
PROJECT NAME AND
LOCATION
MECHANICAL ZONE VP OFFICES EXECUTIVE OFFICES THIRD PARTY TENANTS BARWA BANK HEADQUARTERS CAFETERIA MEETING ROOMS, MOSQUE, GYM PARKING (RETAIL) PARKING (COMMERCIAL)
MEGABRANCH RETAIL
MAXIMUM ALLOWABLE
BUILDING HEIGHT
MAXIMUM ALLOWABLE
DISPENSATION
SUPPLY
3 STAR GSAS
MECHANICAL
BULKHEAD
+111.800 M
+101.800 M
PODIUM HEIGHT
+91.800 M
PLOT LIMIT
+27.000 M
SETBACK
BASEMENT
H
INTAKE SHAFT
A1246
7400
PARKING
PARKING
PARKING
PARKING
G
B2-001
B3-001
B4-001
B5-001
GENERAL NOTES :
FIRE PUMP
PODIUM SETBACK
-THESE DRAWINGS SHOULD BE USED IN COORDINATION WITH ALL OTHER
B1-010
ROOM
DRAWINGS PRESENTED BY THE ARCHITECT, ENGINEER AND
CONSULTANTS.
7900
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
CONSTRUCTION SPECIFICATION).
-FOR CURTAIN WALL DETAILS REFER TO CURTAIN WALL DRAWINGS.
-ALL EXTERNAL FINISHES TO BE WATER PROOF.
-FOR LANDSCAPE DETAILS REFER TO LANDSCAPE DRAWINGS.
-UNLESS OTHERWISE SHOWN ON DRAWINGS ALL FLOOR FINISHING SHALL BE
SLOPED MIN 0.05% AND MAX 1.0% TOWARDS FLOOR DRAIN.
13950
B1-011
BOH
-FOR LOCATION OF FLOOR DRAIN REFER TO MECHANICAL DRAWINGS.
-DOOR OPENING SHALL BE LOCATED EITHER MIDWAY IN WALL OR 100MM OFF
WALL END AS SHOWN ON DRAWINGS UNLESS OTHERWISE INDICATED.
-THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS
AFFECTING THE WORKS AT JOB SITE
-FOR EXACT LOCATION AND DIMENSIONS OF SLAB OPENINGS AND SLAB OPENING,
PLEASE REFER TO STRUCTURAL DRAWINGS.
E
CW-13
RETAIL LOBBY
-FOR ALL DETAIL REFERENCES REFER TO OVERALL PLANS/ELEVATIONS/SECTIONS
CW-11
CW-11
CW-11
CW-11
CW-11
CW-11
CW-11
CW-11
CW-11
CW-11
CW-11
CW-11
CW-11
CW-11
CW-11
CW-11
CW-11
CW-08
B1-002
71500
13000
LOBBY
RECEPTION
LIFT
LIFT LOBBY
ISSUED FOR DC1 APPROVAL
LOADING
P1-001
G-014
B4-039
OWNER
P.O. BOX 2778,
DOHA - QATAR
TEL: 8008555
13950
B4-038
ATM
www.barwabank.com
PARKING
PARKING
PARKING
PARKING
B2-001
B3-001
B4-001
B5-001
LEAD CONSULTANT
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
W-01
OFFICE
B4-037
MARINA PLAZA, LEVEL 10
C
OFFICE 1004-1006
DUBAI MARINA, DUBAI,
UAE
FIRE PUMP
TOWER SETBACK
P.O. BOX 112955
B1-010
ROOM
7900
LOCAL CONSULTANT
PODIUM SETBACK 57 AL-JAZEERA ST.,
B
BIN-MAHMOUD / BEHZAD
BUILDING, 6TH FLOOR
P.O. BOX 1876, DOHA-QATAR
7400
EXHAUST
TEL: (974) 402037 77 / 88 / 99
SHAFT
A168
FAX: (974) 40203766
www.ehaf.com
MEP CONSULTANT
A
SETBACK
SUITE 1704, ABDULLA BIN
EXTRACT
BASEMENT
DARWISH BUILDING
AL SALAM STREET
SECTION C-C
P.O. BOX 109870
ABU DHABI, UAE
PLOT LIMIT
TEL: +971 (0)2 6774 220
4900 4900 18 LEVELS AT 4000 MM EACH 76000 5000 5000 6000 5100 3500 3500 3500 3500
FAX: +971 (0)2 6774 202
TOTAL BUILDING HEIGHT 101800 19100 PROJECT DESCRIPTION
10000 120900
5 BASEMENTS + GROUND + 2 PODIUM + 20 FLOORS
UPPER MECHANICAL LEVEL
OFFICE BUILDING
1 : 250
PODIUM ROOF DECK
MECHANICAL LEVEL
BASEMENT LEVEL 1
BASEMENT LEVEL 2
BASEMENT LEVEL 3
BASEMENT LEVEL 4
BASEMENT LEVEL 5
DECK LEVEL
TOWER LEVEL 20
TOWER LEVEL 19
TOWER LEVEL 18
TOWER LEVEL 17
TOWER LEVEL 16
TOWER LEVEL 15
TOWER LEVEL 14
TOWER LEVEL 13
TOWER LEVEL 12
TOWER LEVEL 11
TOWER LEVEL 10
PODIUM LEVEL 2
PODIUM LEVEL 1
TOWER LEVEL 9
TOWER LEVEL 8
TOWER LEVEL 7
TOWER LEVEL 6
TOWER LEVEL 5
TOWER LEVEL 4
TOWER LEVEL 3
TOWER LEVEL 2
GROUND LEVEL
1
ROOF APEX
DRAWING TITLE
+111.70 m
+106.80 m
+104.25 m
+101.80 m
+99.35 m
+96.90 m
+94.45 m
+92.00 m
+88.00 m
+84.00 m
+80.00 m
+76.00 m
+72.00 m
+68.00 m
+64.00 m
+60.00 m
+56.00 m
+52.00 m
+48.00 m
+44.00 m
+40.00 m
+36.00 m
+32.00 m
+28.00 m
+24.00 m
+16.00 m
+13.50 m
+11.00 m
-12.10 m
-15.60 m
-19.10 m
MID T21
MID T20
MID T19
MID P-2
MID P-1
+6.00 m
+0.00 m
+111.80
+8.50 m
-5.10 m
-8.60 m
SECTION C-C
DRAWING. NO. PART:
AR-303-00
DRAWN BY: CHECKED BY: STAGE: REVISION:
AG GD DD
VERIFIED BY: APPROVED BY:
DL
PLOT DATE:
15/06/16 O
SCALE: PROJECT. NO:
As indicated
FILE NAME: 390142
27
C:\Users\mahmoud.fathy\Documents\390142.000_Barwa
Bank_mahmoud.fathy.rvt
PROJECT NAME AND
D LOCATION
MANUFACTURER'S DETAIL
CENTERLINE
STAINLESS STEEL SPLICE WITH 4 WAY
SPIDER BRACKET SYSTEM BY
APPROVED MANUFACTURER'S DETAIL
CONCRETE SLAB, REFER LAMINATED GLASS FIN SUPPORT IN
TO STRUCTURAL ELEVATION BY APPROVED MANUFACTURER'S
DRAWINGS GENERAL NOTES :
SPECS & DETAIL -THESE DRAWINGS SHOULD BE USED IN COORDINATION WITH ALL OTHER
FINISHED FLOOR, BY SLOPED CURTAIN WALL ON LAMINATED DRAWINGS PRESENTED BY THE ARCHITECT, ENGINEER AND
INTERIOR DESIGNER GLASS FRAME ASSEMBLY BY APPROVED CONSULTANTS.
GLASS RAILING
MANUFACTURER'S SPECS & DETAIL
1200
-IT IS FORBIDDEN TO ANY OF THE CONCERNED PERSONNEL TO MEASURE THE
DRAWING; IN CASE OF NECESSITY, REFER TO THE ARCHITECT OR ENGINEER.
STAINLESS STEEL FIN STAINLESS STEEL CORNER SPLICE
CORRIDOR SHOE BY APPROVED 5 WITH 4 WAY SPIDER BRACKET SYSTEM -UNLESS OTHERWISE NOTED. DIMENSIONS ARE IN MM AND TO THE STRUCTURE
FACES AND LEVELS ARE IN METERS.
P3-006 MANUFACTURER'S AR-306-03 BY APPROVED MANUFACTURER'S
SLOPE 1.5% -ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH QCS (QATAR
DETAIL DETAIL CONSTRUCTION SPECIFICATION).
PODIUM ROOF DECK
-FOR CURTAIN WALL DETAILS REFER TO CURTAIN WALL DRAWINGS.
+16.00 m
6 -ALL EXTERNAL FINISHES TO BE WATER PROOF.
AR-306-03 -FOR LANDSCAPE DETAILS REFER TO LANDSCAPE DRAWINGS.
-UNLESS OTHERWISE SHOWN ON DRAWINGS ALL FLOOR FINISHING SHALL BE
SLOPED MIN 0.05% AND MAX 1.0% TOWARDS FLOOR DRAIN.
-FOR LOCATION OF FLOOR DRAIN REFER TO MECHANICAL DRAWINGS.
-DOOR OPENING SHALL BE LOCATED EITHER MIDWAY IN WALL OR 100MM OFF
WALL END AS SHOWN ON DRAWINGS UNLESS OTHERWISE INDICATED.
5
2700 2500 AFFECTING THE WORKS AT JOB SITE
5000 -FOR EXACT LOCATION AND DIMENSIONS OF SLAB OPENINGS AND SLAB OPENING,
PLEASE REFER TO STRUCTURAL DRAWINGS.
1 : 25
-CONTRACTOR TO SUBMIT SHOP DRAWINGS DETAILS WITH APPROPRIATE
TESTS/SAMPLES/GURANTEES FOR ENGINEERS APPROVAL PRIOR TO
6 8 F
MANUFACTURING.
CW-08
ASSEMBLY
NATURAL STONE CLADDING, NATURAL STONE
300
PODIUM DECK MEZZANINE MECHANICALLY FIXED PODIUM DECK MEZZANINE CLADDING, PODIUM DECK MEZZANINE NATURAL STONE ISSUE DESCRIPTION DATE CHECKED QA / QC
450
+20.00 m +20.00 m MECHANICALLY FIXED +20.00 m CLADDING
200 250 ISSUED FOR DC1 APPROVAL
240
455
GLASS FRAME ASSEMBLY
200 50
NATURAL STONE P.O. BOX 2778,
CLADDING, DOHA - QATAR
1100
250
860
820
LAMINATED GLASS
850
525
200mm UAE
BLOCKWORK P.O. BOX 112955
TEL: 971 4382 5200
www.perkinswill.com
2200
LOCAL CONSULTANT
4000
4000
4000
57 AL-JAZEERA ST.,
CW-10 G-13
BIN-MAHMOUD / BEHZAD
SUNDRY INSULATION BUILDING, 6TH FLOOR
P.O. BOX 1876, DOHA-QATAR
LAMINATED GLASS DOOR, LAMINATED GLASS TEL: (974) 402037 77 / 88 / 99
LAMINATED GLASS CURTAIN
2900
2900
WALL, ON ALUMINUM
2700
2200
PODIUM ROOF DECK
+16.00 m SUITE 1704, ABDULLA BIN
100
PODIUM DECK
LANDSCAPE DARWISH BUILDING
MAJILIS AREA AL SALAM STREET
300
P3-007 A579
P.O. BOX 109870
CONCRETE BEAM, ABU DHABI, UAE
REFER TO TEL: +971 (0)2 6774 220
FINISHED FLOOR, REFER STRUCTURAL FAX: +971 (0)2 6774 202
TO LANDSCAPE DRAWINGS DRAWINGS PROJECT DESCRIPTION
OFFICE BUILDING
DRAWING TITLE
AR-304-04
DRAWN BY: CHECKED BY: STAGE: REVISION:
AM AR DD
VERIFIED BY: APPROVED BY: PLOT DATE:
MB 10/26/16
Podium Wall Section 09 Podium Wall Section 10 Podium Wall Section 10A Podium Wall Section 11
1 2 3 4
SCALE: PROJECT. NO:
1 : 25
1 : 25 1 : 25 1 : 25 1 : 25 FILE NAME: 390142
28
C:\Users\mahmoud.fathy\Documents\390142.000_Barwa
Bank_mahmoud.fathy.rvt
Khrityat Masjid and Majlis
Client : P.E.O.
Location : lusail - Doha - Qatar
Leed Consultant : EHAF
Scope of Work : Working drawings and Coordination as a senior architect
PROJECT
MOSQUE, MAJLIS,
EID PRAYER AND PARKING
DESIGN TEAM
MAIN CONSULTANT EHAF CONSULTING
ENGINEERS
STRUCTURAL DESIGNER EHAF CONSULTING
CONSULTANT ENGINEERS
ARCHITECTURE
DETAILED DESIGN PACKAGE
15/10/17
30
PROJECT NAME AND LOCATION
B1 B24
BG
4 BG
3 2
4
3
1 1
BA BA
3 2 4
03 02 04 1
AR-201-00 B1 B24
B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21 B22 B23 B24
145400
REF TO 1 @ AR-102-02
REF TO 1 @ AR-102-03
REF TO 1 @ AR-102-01
REF TO 1 @ AR-102-02
300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 200
6300 50400 13200 49900 6700 10100 7750 1050
1300
1300
BI BI
0.40
8860
6300
6300
F.F.L. 0.50
0.40 F.F.L.
F.F.L.
15300
BH BH
6300
6300
4740
BG BG
1575
3150
3150
BF BF
AR-202-00
AR-202-00
1
4700
4700
39400
2
BE BE
39400
3200
17925
17800
F.F.L. F.F.L. F.F.L. F.F.L.
BD BD
4700
4700
01 01
AR-301-00
BC BC AR-301-00
3150
3150
BB BB
0.60 0.60 0.60 01 DETAIL DESIGN OCT 2017 AH AD -----
6300
6300
0.60
6300
6300
F.F.L. F.F.L. F.F.L. 00 SCHEMATIC DESIGN JUNE 2017 AH AD -----
F.F.L.
ISSUE DESCRIPTION DATE DRAWN CHECKED QA/QC
300
OWNER
01
6300 47850 2550 13200 AR-201-00 2550 47750 25200
300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 200
145400
MAIN CONSULTANT
PROJECT DESCRIPTION
DRAWING TITLE
AR-102-00
DRAWN BY: CHECKED BY: STAGE: REVISION:
FILE NAME:
327
AR-102-00
31
PROJECT NAME AND LOCATION
REF TO 2 @ AR-201-01
KHRITYIAT - UM SLAL
DOHA - QATAR
0.80
MJ T.O.P GRC TYPE 12 MJ T.O.P
1.30
T.O.P. T.O.P.
+8.90 m +8.90 m KEY PLAN
2.40
1.95
UPPER ROOF PLAN LEVEL S.S.L 7.00 7.00 UPPER ROOF PLAN LEVEL S.S.L
6.85 GRC TYPE 04 GRC TYPE 04
+6.95 m T.O.P. T.O.P. +6.95 m
0.051.03 0.15
1.50 T.O.P.
+5.45 m +5.45 m 2
0.05
4
10.20
BG BG
4
3
GRC TYPE 03 1 1
GLASS
PANEL
4.85
4.85
PAINT
BA BA
3 2 4
1
B1 B24
1 ELEVATION 01 - PART 01
AR-201-01
SCALE 1 : 100
REF TO 3 @ AR-201-01
REF TO 01 @ AR-201-00
APEX APEX
GRC TYPE 11 10.20
+10.20 m +10.20 m
T.O.P. PAINT
PAINT GRC TYPE 12 9.40
1.25
MJ T.O.P T.O.P. MJ T.O.P
0.05
+8.90 m +8.90 m
GRC TYPE 02
UPPER ROOF PLAN LEVEL S.S.L 7.00 UPPER ROOF PLAN LEVEL S.S.L
GRC TYPE 04 6.95 GRC TYPE 04
0.65
0.25
+6.95 m
6.85 +6.95 m
T.O.P. T.O.P. T.O.P.
0.65
MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L
+5.45 m +5.45 m
0.10
10.20
GRC TYPE 05 GRC
7.65
3.45
PANEL
5.35
3.43
4.05
GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L
+0.60 m +0.60 m
0.75 01 DETAIL DESIGN OCT 2017 AH AD -----
0.60 0.60
0.60 0.62
PAVEMENT LEVEL F.F.L.
T.O.P.
F.F.L. PAVEMENT LEVEL 00 SCHEMATIC DESIGN JUNE 2017 AH AD -----
1.20
0.60
+0.15 m +0.15 m
0.45
0.45
OWNER
2 ELEVATION 01 - PART 02
AR-201-01
SCALE 1 : 100 MAIN CONSULTANT
APEX APEX
DESIGN AND BUILD CONTRACTOR
+10.20 m +10.20 m
PAINT PAINT
9.40 -
0.80
MJ T.O.P MJ T.O.P
1.30
T.O.P. ---
+8.90 m +8.90 m
2.42
1.95
UPPER ROOF PLAN LEVEL S.S.L 7.00 PAINT PAINT UPPER ROOF PLAN LEVEL S.S.L
6.85 7.00
0.28
0.28
+6.95 m T.O.P. T.O.P.
+6.95 m PROJECT DESCRIPTION
T.O.P.
0.05 1.16
0.05 1.16
0.65
0.65
MAJLIS BUILDING
1.50
0.32
MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L
PT
+5.45 m +5.45 m
0.05
0.05
1.12
10.20
0.32
GRC TYPE 05
GRC TYPE 10
GRC TYPE 03 GLASS
PT
PANEL DRAWING TITLE
ELEVATION 01 - PARTIALS
4.85
PAINT
3.45
3.45
GLASS
5.40
5.40
OPENING
4.65
1.20
+0.15 m +0.15 m
0.45
0.60
0.15
ROAD LEVEL ROAD LEVEL
+0.00 m +0.00 m
DRAWN BY: CHECKED BY: STAGE: REVISION:
ELEVATION 01 - PART 03
PROJECT NO.:
1 : 100@A1
SCALE:
3
FILE NAME:
327
AR-201-01
SCALE 1 : 100 AR-201-01
32
- GRAVEL MULCH / 500*500*50mm PROJECT NAME AND LOCATION
THK. CONCRETE TILES LOOSE LAID AS
REF TO 2 @ AR-301-01
APEX - GRAVEL MULCH / 500*500*50mm - FILTER LAYER OF GEOTEXTILE. APEX KHRITYIAT - UM SLAL
+10.20 m THK. CONCRETE TILES LOOSE LAID AS - WATER PROOFING MEMBRANE. +10.20 m
SHOWN IN ROOF PLAN DOHA - QATAR
- SCREED SLOPED TO DRAIN.
0.80
- FILTER LAYER OF GEOTEXTILE. GRC
MJ T.O.P - RC SLAB (REF. TO STRUCTURAL DRW.) MJ T.O.P 7118035
1.30
-THERMAL INSULATION. GRC Kiblah PIN NO.
+8.90 m - FILTER LAYER OF GEOTEXTILE. +8.90 m
- WATER PROOFING MEMBRANE.
- SCREED SLOPED TO DRAIN. PLASTER PLASTER
PLANING NO. N/2017/0003729
2.40
2.45
1.95
- RC SLAB (REF. TO STRUCTURAL DRW.) KEY PLAN
UPPER ROOF PLAN LEVEL S.S.L 7.00 UPPER ROOF PLAN LEVEL S.S.L
GRC 6.95 6.95
+6.95 m T.O.P. +6.95 m
T.O.S. T.O.S.
0.051.03 0.15
5.77
1.50
MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L
0.32
T.O.S.
+5.45 m +5.45 m
0.05
10.20
B1 B24
BG
4 BG
3 2
4
4.85
3
1 1
3 2 4
0.63
PAVEMENT LEVEL F.F.L. F.F.L. PAVEMENT LEVEL
+0.15 m +0.15 m
0.45
- GRANITE 30mm.
- SCREED SLAB 70mm.
- STRUCTURE SLAB 200mm.
- 12:20mm GEOTETILE PROTECTION LAYER.
- 4mm WATERPROOFING MEMBERANE.
- 100mm SMOUTH PLAIN CONCRETE.
- POLYETHYLENE SHEET 1000 GAUGE.
- COMPACTED SOIL.
REF TO 3 @ AR-301-01
APEX - RC SLAB (REF. TO STRUCTURAL DRW.) - FILTER LAYER OF GEOTEXTILE. APEX
10.20 GRC
+10.20 m - WATER PROOFING MEMBRANE. +10.20 m
T.O.P.
- SCREED SLOPED TO DRAIN.
GRC PLASTER GRC - RC SLAB (REF. TO STRUCTURAL DRW.)
MJ T.O.P MJ T.O.P
8.90
+8.90 m +8.90 m
T.O.S.
PLASTER
UPPER ROOF PLAN LEVEL S.S.L
UPPER ROOF PLAN LEVEL S.S.L +6.95 m
+6.95 m
5.95
MJ LOWER ROOF LEVEL S.S.L T.O.S. MJ LOWER ROOF LEVEL S.S.L
+5.45 m +5.45 m
-THERMAL INSULATION.
APEX - FILTER LAYER OF GEOTEXTILE. APEX
+10.20 m - WATER PROOFING MEMBRANE. +10.20 m DESIGN AND BUILD CONTRACTOR
- SCREED SLOPED TO DRAIN.
- RC SLAB (REF. TO STRUCTURAL DRW.) - GRAVEL MULCH / 500*500*50mm
1.25
MJ T.O.P MJ T.O.P
1.30
GRC
+8.90 m THK. CONCRETE TILES LOOSE LAID AS +8.90 m
SHOWN IN ROOF PLAN
- FILTER LAYER OF GEOTEXTILE.
PLASTER
-THERMAL INSULATION.
2.00
1.95
UPPER ROOF PLAN LEVEL S.S.L - FILTER LAYER OF GEOTEXTILE. UPPER ROOF PLAN LEVEL S.S.L
6.95 7.00
+6.95 m - WATER PROOFING MEMBRANE. +6.95 m
T.O.S. T.O.P. PROJECT DESCRIPTION
- SCREED SLOPED TO DRAIN.
- RC SLAB (REF. TO STRUCTURAL DRW.)
1.50
1.50
MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L
+5.45 m
5.45
T.O.S.
+5.45 m MAJLIS BUILDING
10.20
0.65
6.35
DRAWING TITLE
4.85
SECTION 01 - PARTIALS
3.43
2.50
+0.60 m +0.60 m
0.45
0.60 0.60 DRAWING NO.: PART
0.63
0.60
0.15
ROAD LEVEL ROAD LEVEL
+0.00 m +0.00 m
DRAWN BY: CHECKED BY: STAGE: REVISION:
33
PROJECT NAME AND LOCATION
1.95
1.95
- RC SLAB (REF. TO STRUCTURAL DRW.)
UPPER ROOF PLAN LEVEL S.S.L UPPER ROOF PLAN LEVEL S.S.L
+6.95 m +6.95 m
1.42 0.13
1.50
1.50
MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L
5.45
+5.45 m +5.45 m
T.O.S.
0.80
B1 B24
8.75
8.90
BG
4 BG
3 2
6.80
4
3
4.85
1 1
5.30
3.90
BA BA
3 2 4
+0.60 m +0.60 m
0.15
B1 B24
0.45
0.60 0.60 0.60
PAVEMENT LEVEL F.F.L. F.F.L. F.F.L. PAVEMENT LEVEL
+0.15 m +0.15 m
0.45
0.15
0.15
ROAD LEVEL ROAD LEVEL
+0.00 m +0.00 m
MJ T.O.P MJ T.O.P
1.30
1.30
8.90 - FILTER LAYER OF GEOTEXTILE.
+8.90 m - WATER PROOFING MEMBRANE. +8.90 m
T.O.S.
- SCREED SLOPED TO DRAIN.
3.22
- RC SLAB (REF. TO STRUCTURAL DRW.)
BA
1.95
1.95
UPPER ROOF PLAN LEVEL S.S.L UPPER ROOF PLAN LEVEL S.S.L
7.00
+6.95 m PLASTER +6.95 m
T.O.P.
5.95
1.50
1.50
MJ LOWER ROOF LEVEL S.S.L T.O.S. MJ LOWER ROOF LEVEL S.S.L
+5.45 m +5.45 m
10.05
10.05
4.16
7.45
4.85
4.85
4.15
2.22
+0.60 m +0.60 m
0.45
0.45
00 SCHEMATIC DESIGN JUNE 2017
0.60
0.15
ROAD LEVEL ROAD LEVEL
ISSUE DESCRIPTION DATE DRAWN CHECKED QA/QC
+0.00 m +0.00 m
ISSUED FOR SCHEMATIC DESIGN
- GRANITE 30mm. - GRANITE 30mm. - EPOXY PAINT. OWNER
- SCREED SLAB 70mm. - SCREED SLAB 70mm. - SCREED SLAB 70mm.
- STRUCTURE SLAB 200mm. - STRUCTURE SLAB 200mm. - STRUCTURE SLAB 200mm.
- 12:20mm GEOTETILE PROTECTION LAYER. - 12:20mm GEOTETILE PROTECTION LAYER. - 12:20mm GEOTETILE PROTECTION LAYER.
MAIN CONSULTANT
1.30
1.30
+8.90 m - GRAVEL MULCH / 500*500*50mm - FILTER LAYER OF GEOTEXTILE. +8.90 m
THK. CONCRETE TILES LOOSE LAID AS -THERMAL INSULATION.
3.25
SHOWN IN ROOF PLAN - FILTER LAYER OF GEOTEXTILE.
1.95
2.05
3.95
UPPER ROOF PLAN LEVEL S.S.L -THERMAL INSULATION. - SCREED SLOPED TO DRAIN. UPPER ROOF PLAN LEVEL S.S.L
6.95
3.95
1.50
1.50
1.40
MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L PROJECT DESCRIPTION
0.20
10.05
MAJLIS BUILDING
0.80
0.80
2.45
2.45
0.29
6.80
5.15
4.85
4.85
4.65
4.65
4.85
4.85
4.05
DRAWING TITLE
3.76
2.20
PAVEMENT LEVEL
0.60 0.60
0.40 PAVEMENT LEVEL
SECTION 04
F.F.L. F.F.L.
+0.15 m F.F.L. +0.15 m
0.45
0.45
0.45
DRAWING NO.: PART
ROAD LEVEL ROAD LEVEL
+0.00 m +0.00 m
AR-302-00
1.80
- NONSLIP CERAMIC TILES 300X300mm.
- CEMENT SCREED 20mm. - GRANITE 30mm.
- SCREED SLAB 70mm. - SCREED SLAB 70mm.
DRAWN BY: CHECKED BY: STAGE: REVISION:
- STRUCTURE SLAB 200mm. - STRUCTURE SLAB 200mm.
- 12:20mm GEOTETILE PROTECTION LAYER. - 12:20mm GEOTETILE PROTECTION LAYER. --------- AD. -----
- 4mm WATERPROOFING MEMBERANE. - 4mm WATERPROOFING MEMBERANE. - STRUCTURE SLAB 200mm.
R01
SECTION 04
VERIFIED BY: APPROVED BY: PLOT DATE:
- 100mm SMOUTH PLAIN CONCRETE. - WATERPROOFING MEMBERANE 20mm.
- 100mm SMOUTH PLAIN CONCRETE.
3 - POLYETHYLENE SHEET 1000 GAUGE. - SLAB ON GRADE. HH. MI. 15/10/17
- POLYETHYLENE SHEET 1000 GAUGE.
- COMPACTED SOIL. - 12:20mm GEOTETILE PROTECTION LAYER. PROJECT NO.:
- COMPACTED SOIL.
1 : 100@A1
SCALE:
AR-302-00
SCALE 1 : 100 - 4mm WATERPROOFING MEMBERANE.
- 100mm SMOUTH PLAIN CONCRETE.
- POLYETHYLENE SHEET 1000 GAUGE. FILE NAME:
327
- COMPACTED SOIL. AR-302-00
34
PROJECT NAME AND LOCATION
9.40 9.40
T.O.P. T.O.P.
MJ T.O.P
B1 B24
+8.90 m BG
4 BG
3 2
4
3
1 1
3 2 4
CONCRETE BEAM
SHOWN IN ROOF PLAN 1
BB
-THERMAL INSULATION.
- FILTER LAYER OF GEOTEXTILE.
- WATER PROOFING MEMBRANE. - GRAVEL MULCH / 500*500*50mm
- SCREED SLOPED TO DRAIN. THK. CONCRETE TILES LOOSE LAID AS
- RC SLAB (REF. TO STRUCTURAL DRW.) SHOWN IN ROOF PLAN
- FILTER LAYER OF GEOTEXTILE.
-THERMAL INSULATION.
- FILTER LAYER OF GEOTEXTILE.
- WATER PROOFING MEMBRANE.
- SCREED SLOPED TO DRAIN.
0.75
0.28
- GRAVEL MULCH / 500*500*50mm
THK. CONCRETE TILES LOOSE LAID AS SHOWN IN
1.00
ROOF PLAN
1.13
0.65
- FILTER LAYER OF GEOTEXTILE.
-THERMAL INSULATION.
1.27
1.50
- FILTER LAYER OF GEOTEXTILE.
- WATER PROOFING MEMBRANE.
1.57
MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L
5.45 5.45
+5.45 m +5.45 m +5.45 m
0.55
T.O.S. T.O.S.
0.30
GYPSUM
GYPSUM BOARD
BOARD
THK.12mm
THK.12mm
0.75
CEMENT PLASTER
0.65
+PAINTS
0.55
CEMENT
0.88
PLASTER+PAINTS
GRC ARCH
0.28
1.45
STAINED GLASS
1.50
PANEL
1.23
1.22
6.27
6.27
6.80
01 DETAIL DESIGN OCT 2017 AH AD -----
0.40
00 SCHEMATIC DESIGN JUNE 2017 AH AD -----
5.22
5.15
07 ENTRANCE
02
4.70
OWNER
4.65
W02
0.80
0.80
MAJLIS
DOUBLE HINGED 01
WOODEN DOOR FIXED WINDOW
WITH FRAME SERVICES
1.95
1.73
MAIN CONSULTANT
W01 D03
2.55
1.20
TOILET MAHMOUD / BEHZAD
09 BUILDING, 6th FLOOR
TEL: (+974) 4020 37 77 / 88 /
99 FAX : (+974) 4020 37 66
1.80
P.O BOX1876, DOHA, QATAR.
W W W .EHAF.COM
0.60
0.60
-INTERLOCK
GROUND FLOOR PLAN F.F.L 0.60 0.60 GROUND FLOOR PLAN F.F.L PAVEMENT TILES. GROUND FLOOR PLAN F.F.L
0.60 0.60 0.60
+0.60 m F.F.L. F.F.L. +0.60 m -CLEAN SAND. +0.60 m
F.F.L. F.F.L. F.F.L.
FILE NAME:
327
AR-304-00
35
PROJECT NAME AND LOCATION
B20 B21 B20 B21
KHRITYIAT MAJLIS AND MOSQUE
KHRITYIAT - UM SLAL
WASH SOAP
DISPENSER DOHA - QATAR
LAVATORY
0.23
KEY PLAN
0.26
0.26 1.20 0.30 0.18 0.60 0.18
1.80 1.00
0.56
0.63
0.48 0.30 0.62 0.30 0.62 0.30 0.18
0.73
0.26
1.13
TOILET 0.48 0.92 0.92 0.48
0.80
TOILET+WASH TOILET+WASH
RM RM
0.32
0.90
0.90
22 22
BI SECTION
AR-402-03 0.73 1.07
BI SECTION
AR-402-03
0.140.10
3 3
FLEXIBLE
0.10
SPRAY
HOSE
2.35
0.90
2.35
MARBLE
0.23
THRESHOLD
0.24
1.80 TOILET WASH ROOM
0.56 23 22
TOILET+WASH TOILET+WASH
0.90
0.90
RM RM
0.30
START POINT
SECTION SECTION
1.13
2
AR-402-02 2.80 2
AR-402-02
0.80
0.65 0.30 0.90 0.30 0.65 0.18 1.20 1.20 0.18
0.30
0.32
0.73
0.73 1.07
0.140.10
0.26
0.26
0.24
PAPER
0.10
HOLDER
(0.3*0.3*9)=2.7
W W W .EHAF.COM
TOILET
23 DESIGN AND BUILD CONTRACTOR
PAPER TOWEL
DISPENSER
HAND DRYER
2.20
2.20
CERAMIC SKIRTING
PAPER HOLDER PAPER HOLDER (300*300*100mm)
1.26
1.18
MAJLIS BUILDING
CERAMIC SKIRTING
(300*300*100mm) CERAMIC SKIRTING CERAMIC SKIRTING
0.50
0.50
0.50
(300*300*100mm) (300*300*100mm) HAND SPRAY
0.40
0.10 0.20
0.40
0.10 0.20
0.10 0.20
0.10 0.20
0.40
GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L
0.60
0.26
0.26
0.60
0.24
+0.60 m +0.60 m +0.60 m +0.60 m
F.F.L. F.F.L.
DRAWING TITLE
- 100mm SMOUTH PLAIN CONCRETE. - 100mm SMOUTH PLAIN CONCRETE. --------- AD. -----
- POLYETHYLENE SHEET 1000 GAUGE. - POLYETHYLENE SHEET 1000 GAUGE. VERIFIED BY: APPROVED BY: PLOT DATE: R01
- COMPACTED SOIL. - COMPACTED SOIL. HH. MI. 15/10/17
4 TOILET+WASH RM -SECTION 1 3 TOILET+WASH RM SECTION 2 SCALE:
1 : 25 @A1
PROJECT NO.:
AR-402-02
SCALE 1 : 25 AR-402-02
SCALE 1 : 25 FILE NAME:
327
AR-402-02
36
TOILETS , JANITOR , LOCKERS
D01 MAIN ENTRANCE D02 ENTRANCES D03 MAJLIS & DINING D04 LOBBY & CORRIDOR D05 TOILETS , ABLUTION & WASHING ROOM D06 RECEIVING AREA D07 D08 TOILETS PROJECT NAME AND LOCATION
&GARBAGE ROOM
2.55
2.60
STRUC. OPEN.
KHRITYIAT MAJLIS AND MOSQUE
STRUC. OPEN. KHRITYIAT - UM SLAL
DOHA - QATAR
1.40
2.55 Kiblah PIN NO. 7118035
STRUC. OPEN.
2.00 1.50 2.50 1.00 0.80
STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN.
PLANING NO. N/2017/0003729
KEY PLAN
3.50
2.55
2.55
2.20
2.20
2.20
2.20
2.20
HANDLE H.
HANDLE H.
HANDLE H.
HANDLE H.
HANDLE H.
HANDLE H.
B1 B24
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2
BG
4 BG
3 2
4
3
1 1
BA BA
3 2 4
1
B1 B24
WOODEN HINGED DOUBLE WOODEN HINGED DOUBLE HINGED DOUBLE WITH UPPER FRAME WOODEN HINGED DOUBLE WOODEN HINGED DOUBLE WOODEN HINGED DOUBLE WOODEN HINGED SINGLE WOODEN HINGED SINGLE
DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING
SWING @90° SWING @90° SWING @90° SWING @90° SWING @90° SWING @90° SWING @90° SWING @90°
STRUCTURAL OPENING 2600 X 3500mm STRUCTURAL OPENING 2550 X 2550mm STRUCTURAL OPENING 2550 X 2550mm STRUCTURAL OPENING 2000 X 2200mm STRUCTURAL OPENING 1500 X 2200mm STRUCTURAL OPENING 2500 X 2200mm STRUCTURAL OPENING 1000 X 2200mm STRUCTURAL OPENING 800 X 2200mm
FIRE RATING 1.0 HR FIRE RATING 1.0 HR FIRE RATING 1.0 HR FIRE RATING - FIRE RATING - FIRE RATING - FIRE RATING - FIRE RATING -
NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER
D09 FOOD PREPARATION D10 TX ROOM & LVP ROOM D11 MV. ROOM D12 FM 200 ROOM D13 MV. ROOM D14 STORE, ELEC. ROOM & LC. ROOM D15 LOADING DOCK
2.50
STRUC. OPEN.
2.20
2.20
2.20
2.20
2.20
2.20
HANDLE H.
HANDLE H.
HANDLE H.
HANDLE H.
HANDLE H.
HANDLE H.
1.00
1.00
1.00
1.00
0.90
0.90
01 DETAIL DESIGN OCT 2017 AH AD -----
00 SCHEMATIC DESIGN JUNE 2017 AH AD -----
ISSUE DESCRIPTION DATE DRAWN CHECKED QA/QC
OUT IN IN IN IN IN IN
2.40 1.50 0.90 1.10 1.00
STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN.
2.50
STRUC. OPEN.
2.50 MAIN CONSULTANT
STRUC. OPEN.
57 AL-JAZEERA ST., BIN-
WOOD DOUBLE WITH VISION PANEL METAL HINGED DOUBLE LOUVERED METAL HINGED DOUBLE WITH LOUVERS STEEL DOUBLE LOUVERED DOOR METAL HINGED SINGLE METAL HINGED SINGLE OVERHEAD ROLLING DOOR MAHMOUD / BEHZAD
DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING BUILDING, 6th FLOOR
TEL: (+974) 4020 37 77 / 88 /
SWING @90° SWING @90° SWING @90° SWING @90° SWING @90° SWING @90° ROLL UP
99 FAX : (+974) 4020 37 66
P.O BOX1876, DOHA, QATAR.
STRUCTURAL OPENING 2500 X 2200mm STRUCTURAL OPENING 2400 X 2200mm STRUCTURAL OPENING 1500 X 2200mm STRUCTURAL OPENING 900 X 2200mm STRUCTURAL OPENING 1100 X 2200mm STRUCTURAL OPENING 1000 X 2200mm STRUCTURAL OPENING 2500 X 2200mm W W W .EHAF.COM
Door Types
FIRE RATING 0.75 HR FIRE RATING 3.0 HR FIRE RATING 3.0 HR FIRE RATING 3.0 HR FIRE RATING 3.0 HR FIRE RATING 1.5 HR FIRE RATING -
QUANTITY - QUANTITY - QUANTITY - QUANTITY - QUANTITY - QUANTITY - QUANTITY - DESIGN AND BUILD CONTRACTOR
NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER SCALE 1 : 50
W01 MAJLIS & DINING W02 TOILETS SLV1 TX ROOM SLV2 MV ROOM
2.50
STRUC. OPEN. 1.50
STRUC. OPEN. PROJECT DESCRIPTION
0.50
MAJLIS BUILDING
1.23
0.60
STRUC. OPEN.
0.50
0.20
STRUC. OPEN.
0.80
3.15
F
DRAWING TITLE
2.20
SILL HT.
1.80
AR-601-00
SILL HT.
0.60
37
236 VARIES 239
PROJECT NAME AND LOCATION
7
2
:
VARIES WATER PROOFING
MEMBRANE PRE-CAST SLAB KHRITYIAT - UM SLAL
20MM THK. COVER REF TO STRUC.
MARINE PLY DRAWINGS DOHA - QATAR
BASE & EQUIPMENT
DRIP MOLD
1000 GAUGE PADDING
Kiblah
Kiblah PIN NO. 7118035
MIN. 500mm
POLYETHYLENE SHEET (TO MEP SPEC'S)
SPRING SHOCK BLOCK WORK CONCRETE LINTEL
SEALANT WITH ABSORBER
BACKING ROD
MACHINE / EQUIPMENT
25MM THK. CORK
DENSITY= 48 KG/m³ FIRE STOP SEALANT
FIRE STOP SEALANT
(AS REQUIRED)
PLANING NO. N/2017/0003729
(REFER TO MEP (AS REQUIRED)
REQUIREMENTS) KEY PLAN
REFRIGERANT PIPE
ALUMINUM 150 VARIES REFER TO MACHINE SPEC'S VARIES 150 50 GRAVEL MULCH
`50
WITH INSULATION
FLASHING DUCT INSULATION
`50
THERMAL INSULATION BLOCK WORK
WATER PROOFING
MIN. 500mm
MEMBRANE GALVANIZED SHEET
FLASHING
100
FILTER GEOTEXTILE
ROOF SSL
SEPARATION LAYER
(100g/m²)
LIGHT WEIGHT
50 50
CONCRETE TO LEVEL 50mm EXTRUDED
POLYSTYRENE
CONCRETE SLAB THERMAL INSULATION
(REFER TO STRUCTURAL)
0.10
ROOF SSL
NOTES:
5MM THK. MINERALIZED NOTE:-
THE ABOVE DETAIL EXPLAINS THE SYSTEM INDICATIVELY. THE CONTRACTOR SHALL WATER PROOFING
CO-ORDINATE WITH SPECIALIZED SUB-CONTRACTOR AND SUBMIT DETAILED MEMBRANE
150 SLAB OPENING 150
CALCULATIONS TO ENSURE THAT THE SPACING OF NEOPRENE MOUNTS IS
LIGHT WEIGHT
• 200 mm WIDE STRIP OF MEMBRANE OVER ALL
ADEQUATE FOR THE LOADING AND THAT THE ACOUSTICAL LINING IS ADEQUATE TO
ACHIEVE DESIRED TOTAL SOUND REDUCTION. PLAIN CONCRETE VERTICAL AND HORIZONTAL JOINTS
CEMENT TO LEVEL
ALL AS PER MANUFACTURER'S RECOMMENDATION AND ENGINEER'S APPROVAL
• A MIN. OF 200 OVERLAPPING AT MEMBRANE
JOINTS
STRUCTURAL SLAB
• USE A REINFORCING MEMBRANE STRIP AT
HORIZONTAL AND VERTICAL JOINTS
1 MACHINE BASE FLOATING FLOOR TILES 2 TYP. ROOF OPENING PIPE/HVAC PENETRATION • ROOF U-VALUE 0.15 w/m2K
SCALE 1 : 10 SCALE 1 : 10
AR-904-00 AR-904-00 ROOF DRAIN
50
THERMAL INSULATION
THERMAL INSULATION
0.05
100
50
ROOF SSL
0.05
50
VARIES
0.20 01 DETAIL DESIGN OCT 2017 AH AD -----
MIN OVERLAPPING
0.10
100
50 50
P.O BOX1876, DOHA, QATAR.
50MM EXTRUDED POLYSTYRENE
W W W .EHAF.COM
THERMAL INSULATION
LIGHT WEIGHT
PLAIN CONCRETE TO LEVEL
100
ROOF SSL DESIGN AND BUILD CONTRACTOR
BASE & EQUIPMENT CONCRETE WALL
PADDING
(TO MEP SPEC'S) CONCRETE SLAB
ROOF EQUIPMENT
(REFER TO MEP (REFER TO STRUCTURAL)
ISOLATOR FOR SHOCK LOOSE GRAVEL MULCH
REQUIREMENTS) PLASTER ON PAINT
ABSORBER
FINISH
10MM THK. NEOPRENE FILTER GEOTEXTILE
RUBBER PAD SEPARATION LAYER
50mm EXTRUDED POLYSTYRENE SEALANT
PRE-CAST CONC. UPSTAND FOR GALVANIZED SHEET THERMAL INSULATION (AS REQ'D SPECS)
MEP EQUIPMENT FLASHING PROJECT DESCRIPTION
TYP. ROOF PENETRATION DETAIL
GRAVEL MULCH
4MM WATER PROOFING
8
HT. VARIES
50
BACKING ROD
ROOF DETAILS
50 50
ROOF SSL PROOFING
CONCRETE CANT FILLER MEMBRANE
THERMAL INSULATION
100
FIXATION DETAIL
(REFER TO STRUCTURAL)
PLAIN CONCRETE TO LEVEL ROOF SSL
CONCRETE SLAB
(REFER TO STRUCTURAL)
AR-904-00
CONCRETE SLAB
(REFER TO STRUCTURAL) DRAWN BY: CHECKED BY: STAGE: REVISION:
AR-904-00
38
Tactic Village for Combat Operations
NOTES:
REVISIONS:
NO DATE MODIFICATIONS
R0 DEC. 2014 ISSUED FOR TENDER
00
77
MAIN CONSULTANT:
00
77
ACTION TARGET
DRAWING TITLE:
1:1000 A0 R1
00.A.0100.01
40
41
PROJECT
87950
2500 6000 6000 6000 6000 4000 250 7200 4800 3000 3000 6000 6000 6000 3000 3000 7500 7500
2500 1350 1400 1000 1400 2000 1400 1000 1400 2000 1400 1000 1400 2000 1400 1000 1400 1650 4050 2200 3000 3000 3000 2000 1400 1000 1400 1000 18200 500 1900 1000 1400 2600 4500 3000 4500 1600
+0.30 D07
-1.20
D08
F.F.L F.F.L
+2.10 2450 1350 1350 1350 1350 1350 6150
4000
4000
F.F.L
1350
W03 650 650 650 650 650 650 650 650 650 650 650
W01 W01 W02 W02 W02 W06 W06
02 D02 02
1000
NOTES:
800
09 D08
11800 5800
9800
3000
W03 0-11
D02
0-20
0-16
0-09
11600
03
4000
1000
W05
03 A0400.00 03
6000
4600
+2.90 W06
F.F.L
+0.30
1400
15800
15800
W03
1650 1001000 50 1000 F.F.L
8800
8800
3000
9000 2800 0-18 0-14 2000
4400
+2.10
04 F.F.L 04
2950
11800
1400
0-10
3600
0-13
15200 5800
3000
D08
1400
W03 D04
0-15
05 0-17 05
6000
4600
1200 2500 D10 W06
1000
18800
D02
4200
0-31
3000
8600
D02
2100
11800
D06
06 06
1950
D03
1400
1700
02
D04 200 2000 1900 3000 3100 3000 3100 3000 1900 2000 200
3000
3000
1150 450
A0500.00
0-19
0-21 D02
D04
07 07
600
1100
4500
3000
11300 2800 11600 W06
+0.30
CW2 F.F.L
04 02
4000
4000
3000
2500
A0300.00 A0300.00
ST-01 D03 D03 0-08
0-30
D02
2100
1600
08 08
1000
1000
14800
0.00 +0.30
F.F.L F.F.L 11400
3000
50200
50200
11800
11400
17400
4000
4000
3000
3000
3800
3800
D01 0-22 W01
01 0-23
A0400.00
09 09
1000
1000
1000
+0.30
0-33
2100
D04 F.F.L
D02
ST-02 D03
2500
3000
D02
4000
4000
3000
W01
+0.30
F.F.L
3000
0-29
REVISIONS:
1100
10 10
600
1350
200
0-04 0-05
9800
750
W05
05
3000
3000
D03 0-37 0-07
R1 FEB.2015 ISSUED FOR TENDER
1700
A0500.00
1150
D04 2100
1100
0-34 D04
1400
750
D05 W05
900
07
1050
4300
D04
A0500.00 0-03
2800 5550 6050 0-06
900
3100
0-32
8800
2800
3000
D04 D04
4800
1400
3750
ST-03 0-40
1150
D04 D04
0-27
12 12
650
6000
D04 D04
6000
D08 D04
+0.30 17800
1400
W03 20800
F.F.L
3000
0-35 0-36 D02 D02
0-39 01
8800 A0800.00
17800
3000
13 W04 13
6050
OWNER:
2950
9000 2800
3000
8800
3000
8750
800
D02 D02
0-02 0-01 0-28
15800
1400
W03 3600
14 0-26 14
3000
12800
1000
W04
W07
0-25
3000
3000
W03 D02 D02
1400
W03
9800
9600
15 15 MAIN CONSULTANT:
1000
3200
W03 W04 W04 W04 W04 W04 W04 W04
1400
W03
4000
4000
2350
11800
2000
11800
16 16
D01 D01
W03 W03 W03 W03 W03 W03 W03 W03 CW1
85450
-0.87
F.F.L
A B C D E F G H J K L M 01 N P Q R S T U
A0300.00
01 SCALE 1:100
1:100 A0 R1
01.A.0200.00
42
PROJECT
A B C D F G H J K L M N O P Q R S T U
1.00
DRAWING KEY: NORTH
+11.20
500
1.00
ROOF T.O.P
500
1500
+9.70
2731
3.00 ROOF T.O.S
3.00
500 1000
1.00
1500
8.20 +8.50
500
500
500
1000
4400
ROOF T.O.S ROOF T.O.S
2.00 2.00
2000
1450
1600
2360
3.00 1.00 1.00
2500
500
+5.70
3900
2000
FIRST T.O.S
680
2400
2200
2200
3.00 3.00
1700
3.00
3.00
2000
12070
BL01
3700
4.30 1.00 1.00
9200
FIRST F.F.L
800 200
8700
1000
3320
1.00 1.00
2000
1500
1.00
6000
8120
5400
4000
4000
2400
2400
680
5570
3870
3500
4570
3839
0.30 +0.30
GROUND F.F.L GROUND F.F.L NOTES:
2530
300
1670
1670
-0.87
1170
1170
1170
700
G.L.
01 SCALE 1:100
REVISIONS:
U T S R Q P N M L K J H G F E D C B A NO DATE MODIFICATIONS
+12.20
ROOF T.O.P R0 DEC.2014 ISSUED FOR TENDER
2000
+11.20
500
3000
ROOF T.O.P
1500
3000
500 1000
1000
1.00
4000
8.50 +8.20
500
500
500
500
500
1000
ROOF T.O.S ROOF T.O.S
3.00
1600
1.00 1.00 2.00 2.00
2000
2050
2360
2500
500
500
500
+ 5.70
3900
750
12200
5200
FIRST T.O.S
680
2400
2700
2900
2200
3.00 3.00
2400
1.00 1.00
+4.30
FIRST T.O.S OWNER:
13500
3250
3.00
3320
1600
9900
6200
5400
7900
3500
3500
4000
750
2800
680
2400
5700
6800
+0.30 +0.30
GROUND F.F.L GROUND F.F.L 0.00
3100
700
G.L.
2860
300
2000
2000
1900
1700
MAIN CONSULTANT:
2600
-2.30
03 SCALE 1:100
DRAWING TITLE:
1:100 A0 R1
01.A.0300.00
43
44
PROJECT
B B' D A B B' D
BL 09 BL 09 BL 09 BL 09 BL 09 BL 09 BL 09
DRAWING KEY: NORTH
70848
12500
1000
P01
1 1
BL 09 BL 09
3500 1700 4000
BL09
00 - 07
4000
00 - 05
D2
300
7200
4300
1000
7200
D2 00 - 06
2300 D2 2800
2500
D3 D3
00 - 04 00 - 03
400
D4
14700
14700
2800
NOTES:
00 - 08
P02
6700
7050
7050
00 - 02
00 - 01
6.30 0.30
T.O.C
F.F.L
1700 (DRY MIX) 1
3 3
400
D1 (DRY MIX) 2
BL 09 BL 09
3850 1400 1150 800 3050 0.30 1400 850
1000
6.90 F.F.L (DRY MIX) 3
T.O.P
490
490 11900 58008 490 5950 5950 20X40 CM 4
12500
70848 20CM 5
02 SCALE 1:100
-1.20
Partition
G.F.L Partition Description
code
P01 Aluminum Partition provided by Supplier
B B' D A B B' D
BL 09 BL 09 BL 09 BL 09 BL 09 BL 09 BL 09 P02 Bulletproof Sicorite Partition
01 SCALE 1:100
01 02 03 A B B' C D
BL 09 BL 09 BL 09 BL 09 BL 09 BL 09 BL 09 BL 09
6.90 3.00
6.90 6.90 6.90
3.00
T.O.P T.O.P T.O.P T.O.P
600
600
600
6.30 6.30 6.30 6.30
T.O.C T.O.C T.O.C T.O.C
3700
6900
6900
6900
3.00 3.00
6000
6000
2300
F.F.L F.F.L
4.00 4.00
0.00 0.00 0.00 0.00
REVISIONS:
G.L. G.L. G.L. G.L.
NO DATE MODIFICATIONS
300
300
1500
R0 DEC.2014 ISSUED FOR TENDER
D C B' B A
03 02 01 BL 09 BL 09 BL 09 BL 09 BL 09
BL 09 BL 09 BL 09
6.90 3.00
6.90
6.90 3.00
6.90 T.O.P T.O.P
T.O.P T.O.P
OWNER:
600
600
600
600
6.30 6.30
6.30 6.30 T.O.C T.O.C
T.O.C T.O.C
4300
4300
3700
6900
6900
3.00
6000
6900
3.00
6000
6000
8100
800
0.30 0.30
1700
1700
900
300
G.L. G.L.
300
06 SCALE 1:100
04 SCALE 1:100
EHAF
CONSULTING ENGINEERS
DR.EZZ ELDIN FAHMY&DR.HUSSEIN ABBAS
5Abd ELRAHMAN HUSSEIN STREET TEL:7601099
A B B' C D
BL 09 BL 09 BL 09 BL 09 BL 09 DRAWING TITLE:
6.90 6.90
T.O.P T.O.P
600
600
6.30 6.30
1500
T.O.C T.O.C
3540
6900
6900
P01
6000
6000
0.30 0.30
2300
F.F.L F.F.L
300
350
450
1000
400 4392 300
-1.20
2652 250 400
F.F.L
MAY 2016 MAY 2016 1023.1
06 SCALE 1:100
AS SHOWN A0 R1
09.A.0200.00
45
PROJECT
A B C 02 D E F G A B C D 02 E F G
BL13.4 BL13.4 BL13.4 13.A.0000.04 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 0.00 BL13.4 13.A.0000.04 BL13.4 BL13.4 BL13.4
G.F.L
33200
33800
100 7150 4400 4900 6350 5500 4700 100
400 7150 4400 4900 6350 5500 4700 400
400
400
1
100
100
BL13.4 BL13.4 BL13.4 D07 BL13.4
600
11300 850 3000 850 6100 2800 2300 4500
650
11
1400
D06
A.1000.00
DISH WASHING AREA 1750 D01
2600
3000
1700
D06
BL13.4
2400
32800 L0-21
4600
4600
4600
4600
4400
1000 1000 L0-01
L0-19
650
D04 D04 D04
0.00
G.F.L
4050
4500
7700
7700
W06
2 2
2850
2 BEVERAGE AREA
2
BL13.4 BL13.4 BL13.4 D01 BL13.4
3350
HOT KITCHEN AREA D01
1000 1000 200L0-20 2450 1000 350 1650 1000 150 W06
4500
W06 L0-02
L0-17
D04
3250
3250
3250
3150
3250
D04 D04 CHiaf
D04 L0-03 W06
L0-16 Office O.3
0.30
2050
O.2
1850
L0-18
F.F.L
1000
1450 3450
3 3 3
O.2
W06
3
BL13.4 BL13.4 BL13.4
5650 5500
3000 BL13.4
4500
3550
1050
O.3
VEGETABLE PREP.
POULTRY PREP.
01 Pack Up
+4.50 L0-24 L0-04
3550
01 13.A.0000.04 FISH PREP. MEAT PREP. D08 03
T.O.S L0-23 NOTES:
4850
4850
4750
4750
4750
GARBAGE
4850
4850
03
4800
13.A.0000.04 D04 L0-22 13.A.0000.04
22250
2000
COLD ROOM
22550
21550
1700
21950
21950
13.A.0000.04
L0-14 L0-15
5650 5500
1000 3000
4 4 4 D04 4
D04
BL13.4 BL13.4 BL13.4 D04 O.3
24900
O.3
BL13.4
800
1600
0.30 D04 D04
01 (DRY MIX) 1.00
4750
F.F.L
3150
3150
D01
2950
3150
3150
L0-05
1700
13.A.0000.04
0.00 0.30 7750
(DRY MIX)
O.3
F.F.L 2.00
G.F.L
5 5 5 14750
450
D01 D04 D04
D01
1000 3200
5
BL13.4 BL13.4 BL13.4 1000 1000 1000
4550 1700 2250 BL13.4
650
O.2
3.00
01 0.30
2450
1800
13.A.0000.04 F.F.L 7250
L0-12 L0-08 L0-07
L0-11 750 1600 650
7000
L0-06
COLD FREEZING L0-09 FREEZING 5000 1000
5850
5850
W03
5850
5650
5650
5650
5850
L0-13 ROOM ROOM ROOM
Receiving Area
3550
3150
Vegetables
3000
3000
pre Wash
1350
5550 2800 2800 3000
L0-10 3700 3800 6100
6 6 6 6
100
100
100
400
A B C 04 D E F G A B C 04 D E F G
BL13.4 BL13.4 BL13.4 13.A.0000.04 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 13.A.0000.04 BL13.4 BL13.4 BL13.4 BL13.4
BL13.4
02 SCALE 1:100
01 SCALE 1:100
6 1 A B C D E F G
5 4 3 2 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4
BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 +5.40
ROOF T.O.P
+5.40
ROOF T.O.P +4.50
900
1100
1100
1.00 1.00 ROOF T.O.S
+4.50
900
1100
1100
1500
1800
1450
1800
5400
4200
800
5400
4200
800
REVISIONS:
2200
2.00 2.00
1600
+0.30 NO DATE MODIFICATIONS
2200
1600
400
3.00 3.00
300
300
GROUND F.F.L R1 FEB.2015 ISSUED FOR TENDER
400
300
300
3.00
05 SCALE 1:100
06 SCALE 1:100
1 2 3 4 5 6
A B C D E F G
BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4
+5.40
ROOF T.O.P
+5.40
ROOF T.O.P
+4.50
+4.50
900
1100
900
1100
1.00 ROOF T.O.S
900
900
900
5400
1100
5400
4200
OWNER:
4200
2100
2.00
1900
+0.30 2.00
GROUND F.F.L
+0.30
GROUND F.F.L
400
300
3.00
400
3.00
300
04 SCALE 1:100 07 SCALE 1:100
MAIN CONSULTANT:
A B C D E F G
BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4
EHAF
+5.40
ROOF T.O.P
+4.50
900
ROOF T.O.S
CONSULTING ENGINEERS
1800
DR.EZZ ELDIN FAHMY&DR.HUSSEIN ABBAS
5400
4200
4000
4000
5Abd ELRAHMAN HUSSEIN STREET TEL:7601099
2200
+0.30
GROUND F.F.L DRAWING TITLE:
300
03 SCALE 1:100
1 2 3 4 5 6
BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4
+5.40
ROOF T.O.P
+4.50
900
900
ROOF T.O.S
1000
1900
5400
1350
4200
4100
4100
2200
1750
+0.30 FEB. 2015 FEB. 2015 1023.1
GROUND F.F.L
300
1-100 A0 R1
46
PROJECT
A B 02 C D 02
BL13.5 BL13.5 13.A.0000.05 BL13.5 BL13.5 A B 13.A.0000.05 C 01 D
BL13.5 BL13.5 BL13.5 13.A.0000.05 BL13.5
22100
22100
+0.30
2000
F.F.L
+0.30
W04 W04 F.F.L
W04
100
1 1 1 D01 1
100
100
100
BL13.5 BL13.5 BL13.5 BL13.5
900 1700 800 750 1700 1850 200 1700 200 850 1500 1150
7700 3400 4300
2700
4050
4050
3800
3800
4050
4050
+0.30
4950
F.F.L
D04 1000 D04
L0-08 L0-073150 L0-01
3500
2 2 2 D04 2
8100
BL13.5 D06
BL13.5 BL13.5 2450 BL13.5
L0-09
1100
W03
L0-02
3500
4000
4000
4000
2000
4000
03 13.A.0000.05 L0-04
13.A.0000.05 D06 13.A.0000.05
13.A.0000.05
+0.30
W03
F.F.L
3700
D04
15550
15150
15550
15150
15150
3 3 3 3 NOTES:
15550
2000
15550
BL13.5 BL13.5 BL13.5 L0-03 BL13.5
+0.30
+4.50 F.F.L
T.O.S. D04
01 01
4000
4000
4000
2000
4000
13.A.0000.05
13.A.0000.05
2750
W04
D04 18100
+0.30
L0-06 F.F.L
7050
4 4 4 4
6100
BL13.5 BL13.5 BL13.5 BL13.5
900 2400 (DRY MIX) 1.00
+0.30 L0-05
L0-10
4200
21700 F.F.L
(DRY MIX)
3300
3300
3150
3300
3300
W04 2.00
+4.50 18100 3400
T.O.S. 5650 1500 850 1500 850 1500 800 1500 3950
5 5 5 5 3.00
100
100
BL13.5 BL13.5 BL13.5 BL13.5
W05 W05 W05 W05
A B 04 C D
BL13.5 BL13.5 13.A.0000.05 BL13.5 BL13.5
A B 04 C D
BL13.5 BL13.5 13.A.0000.05 BL13.5 BL13.5
01 SCALE 1:100
02 SCALE 1:100
5 4 3 2 1
BL13.5 BL13.5 BL13.5 1 2 3 4 5
BL13.5 BL13.5
BL13.5 BL13.5 BL13.5 BL13.5 BL13.5
5.40 5.40
ROOF T.O.P ROOF T.O.P
+4.50 +4.50
1100
1100
1100
1.00 ROOF T.O.S 1.00 ROOF T.O.S
1200
1200
1500
2.00
5400
5400
800
800
2.00
3900
3900
800
1900
1600
2300
2.00 2.00
2.00 +0.30 +0.30
GROUND F.F.L GROUND F.F.L A B C D
BL13.5 BL13.5 BL13.5 BL13.5
400
400
400
400
3.00 3.00
+5.40
ROOF T.O.S
04 06 SCALE 1:100
SCALE 1:100 +4.50
900
ROOF T.O.S
REVISIONS:
NO DATE MODIFICATIONS
5400
R1 FEB.2015 ISSUED FOR TENDER
4200
4100
2800
A B C D
BL13.5 BL13.5 BL13.5 BL13.5 D C B A +0.30 ++0.30
BL13.5 BL13.5 BL13.5 BL13.5 0.00
GROUND F.F.L GROUND F.F.L
G.L
300
5.40 5.40
ROOF T.O.P ROOF T.O.P
+4.50 +4.50
1100
1100
1100
1100
1100
1.00 ROOF T.O.S 1.00 1.00 ROOF T.O.S
03
1500
2.00
1800
1800
SCALE 1:100
2.00 2.00 2.00
5400
5400
3900
3900
800
1100
2200
2200
1600
400
400
3.00 3.00
MAIN CONSULTANT:
EHAF
CONSULTING ENGINEERS
DR.EZZ ELDIN FAHMY&DR.HUSSEIN ABBAS
5Abd ELRAHMAN HUSSEIN STREET TEL:7601099
1 2 3 4 5
BL13.5 BL13.5 BL13.5 BL13.5 BL13.5
DRAWING TITLE:
+5.40
ROOF T.O.S
+4.50
900
900
ROOF T.O.S
5400
4200
4050
+0.30
GROUND F.F.L
300
03 SCALE 1:100
1-100 A0 R1
13.A.0000.05
47
PROJECT
PART 1
PART 2
A B C D E 03 F G H H' J K L 01
BL 10 BL 10 BL 10 BL 10 BL 10 A0300.00 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 A0400.00
01
BL 10 13
A0500.00
1000
3400
02
BL 10
1000
3500
2300
4750
2000 1800 8000
03
1500
13400 3200 18500
1350
1400
BL 10 BL10
900
04 1600 10000 1800 3200 1800 6550 1800 6550 1800
BL 10
1400
3650
ST-03
6400
6400
6400
05 ST-04
BL 10
5800 11600
04
NOTES:
3000
A0300.00 3900
6300
06
BL 10
21300
2300
2300
2300
A01
3400
W05
BL 10
13200 3200
D03
2500
3600
07
4800
BL 10
3400
R-01
7200
08
BL 10
2350
4000 6000 6000 6000 6000 6000 5000 250 4000 2500 5000 5000
101700
PART 1
PART 2
A B C D E 01 F G H H' J K L
BL 10 BL 10 BL 10 BL 10 BL 10 A0300.00 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10
01 SCALE 1:100
REVISIONS:
PART 1
PART 2
L 01 M N P P' Q 02 R 03 S T U V W
BL 10 A0400.00 BL 10 BL 10 BL 10 BL 10 BL 10 A0400.00 BL 10 A0300.00 BL 10 BL 10 BL 10 BL 10 BL 10 NO DATE MODIFICATIONS
R0 DEC.2014 ISSUED FOR TENDER
5000 5000 2500 4000 250 5000 6000 6000 6000 6000 6000 4000
01
03 BL 10
A0500.00
1000
3400
02
BL 10
1000
3500
2500
03
1500
1500
18500 3200 13400
1350
1400
BL 10
OWNER:
3700
900
04
9600
1400
3650
1400
ST-02
6400
6400
6400
ST-01
05
4500
BL 10
11600 5800
02
3000
A0300.00
MAIN CONSULTANT:
7750
06
EHAF
BL 10
21300
2300
2300
2300
A01
3400
W05
BL 10
13200
D03
CONSULTING ENGINEERS
DR.EZZ ELDIN FAHMY&DR.HUSSEIN ABBAS
3600
07
4800
3400
R-02
7200
DRAWING TITLE:
08
BL 10
2350
5000 5000 2500 4000 250 5000 6000 6000 6000 6000 6000 4000
101700
PART 1
PART 2
02 SCALE 1:100
10.A.0203.00
48
PROJECT
W V U T S R Q P' P N M L K J H H' G F E D C B A
PART 1
PART 2
BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10
6.00
F F F F F F F F
3300
BL10
8650
2400
2900
5.00
1200
1200
PART 1
PART 2
W V U T S R Q P' P N M L
4000
21650
21650
1950
2000
300 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10
5.00
+8.90
800
LEVEL 02 T.O.S
6400
(DRY MIX) 1
4.00
4450
300 6.00
(DRY MIX) 2
3600
3600
3600
5.00
20X40 CM 4
1600
1600
300
5750
2700
300 300
50 mm 5
5000
5400
6
3000
3000
0.00
12750
800
G.L.
300
300
5.00
4200
+12.90
5.00 ROOF T.O.S
6100
+12.00
7000
+11.70
04 SCALE 1:100 ROOF T.O.S
F F F F
2800
5.00
+8.70 +8.70
800
LEVEL 02 T.O.S LEVEL 03 T.O.S
1600
4.00
3.00
3500
3500
3600
2.00
9000
2100
2100
2100
3.00 3.00 3.00
1600
1000 300 1000
5000
REVISIONS:
0.30
3000
3000
3300
GROUND F.F.L NO DATE MODIFICATIONS
0.00 R0 DEC.2014 ISSUED FOR TENDER
1200
01 02 03 04 05 06 07 08 G.L.
300
300
BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 R1 FEB.2015 ISSUED FOR TENDER
02 SCALE 1:100
1300
6.00
PART 1
PART 2
L K J H H' G F E D C B A
BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10
OWNER:
2450
12750
6.00
10550
3000
5.00
+12.90
LEVEL 03 T.O.S
1200
MAIN CONSULTANT:
4000
2000
EHAF
8750
5.00 3.00
3.00
9950
+8.90 +8.90
800
800
4.00
3.00 5.00 CONSULTING ENGINEERS
3700
3800
3600
3600
5.00 +12.90
13200
800
700
3.00
1600
3.00 F F F F
4100
2700
4000
3.00
1900
1500
2800
5.00
5000
5000
+8.70
5700
1000
5600
800
3000
LEVEL 02 T.O.S
+0.30 0.30
GROUND F.F.L GROUND F.F.L
2400
1600
4.00
3500
3500
3600
1100
600
600
+5.30
LEVEL 01 F.F.L
05 SCALE 1:100
900
2.00
2100
1600
2900
5000
3600
800
0.30
3000
GROUND F.F.L
1700
0.00 FEB. 2015 FEB. 2015 1023.1
1200
900
G.L.
300
300
1/100 -1/200 A0 R1
03 SCALE 1:100
10.A.0302.00
49
PROJECT
A B C D E F G H H' J K L M N P P' Q R S T U V W
PART 1
PART 2
BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10
BL10
A B C D E F G H H' J K L
PART 1
PART 2
BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10
(DRY MIX) 1
(DRY MIX) 3
20X40 CM 4
50 mm 5
5750
5750
(POLYCARBONATE SHEETS) 6
5.00
3800
6100
+12.00
+11.70
ROOF T.O.S 3.00
+10.10 3.00
3200
ROOF T.O.S
+8.90
800
900
LEVEL 03 T.O.S
1.00
800
4.00
1.00
3600
2700
5.00
+5.30
LEVEL 02 T.O.S
9800
3.00
3.00 3.00
1600
9000
1.00
4.00
REVISIONS:
5000
3000
G.L.
300
L M N P P' Q R S T U V W
PART 1
PART 2
BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10
OWNER:
6.00
MAIN CONSULTANT:
5750
5750
EHAF
CONSULTING ENGINEERS
DR.EZZ ELDIN FAHMY&DR.HUSSEIN ABBAS
2900
5.00
4100
ROOF T.O.S
3.00
1950
+10.10
ROOF T.O.S
2150
+8.90
900
LEVEL 03 T.O.S
1.00
4850
800
4450
1.00
4.00
3600
2700
+5.30
800
LEVEL 02 T.O.S
800
9800
3.00
3.00 3.00
1600
9000
3100
1800
1.00
4.00
5000
3000
0.30
800 500 1000
2500
GROUND F.F.L
FEB. 2015 JULY. 2016 1023.1
0.00
800
G.L.
300
300
1/100 - 1/200 A0 R1
10.A.0301.00
50
03 SCALE 1:100
PROJECT
01 02 03 04 05 06 07 08
BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10
BL10
POLYCARBONATE
SHEETS
NOTES:
3000
+12.90 +12.90
ROOF T.O.S ROOF T.O.S
4000
4000
21650
+8.90 +8.90
18350
LEVEL 03 T.O.S LEVEL 03 T.O.S
3600
3600
12900
800
+5.30 +5.30
LEVEL 01 F.F.L LEVEL 02 T.O.S
400
5000
5000
+0.30 0.30
0.00 GROUND F.F.L GROUND F.F.L 0.00
G.L G.L
300
300
01 SCALE 1:100
REVISIONS:
NO DATE MODIFICATIONS
R0 DEC.2014 ISSUED FOR TENDER
01 02 03 04 05 06 07 08
BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10
POLYCARBONATE
SHEETS
OWNER:
5450
6800
REF .TO SE DWG'S
MAIN CONSULTANT:
4500
EHAF
+12.00
+11.70 +11.70
ROOF T.O.S ROOF T.O.S
21650
3100
2800
2800
+8.90 +8.90
CONSULTING ENGINEERS
LEVEL 02 T.O.S LEVEL 02 T.O.S DR.EZZ ELDIN FAHMY&DR.HUSSEIN ABBAS
5Abd ELRAHMAN HUSSEIN STREET TEL:7601099
DRAWING TITLE:
3600
3600
3600
3600
800
+5.30 +5.30
11700
2000
2000
2000
800
5000
5000
+0.30 0.30
3000
3000
0.00 0.00
G.L G.L
300
300
02 SCALE 1:100
1/100 A0 R1
51
10.A.0400.00
52
PROJECT
0.15
02 G.F.L
A.0500.00
1100 200 3600 200 1000 1100 1000 3650 6300
01 D4
7800
200 1200
UP
1200
5900
W03
ST1
BL05
3850
3850
0.30
4100
GR-01
2000
F.F.L 500 2000 1150 W03
1950
1950
6250
D1 D1
1200 200
200650
02
200
1700
D2
800
W04
1800
2700
2700
02
750
A.0800.00
GR-03
NOTES:
4800
D2
5000
1500
800
W04
5850
2000
2000
W03 GR-02
750
D1 D1
D2
1500
800
W04
800
03
1400
200
650
3000
2350
1800
200
4800
4800
5000
2000
2000
2000
W03 W03
200
800
04
8600
8600
8600
400
400
3050
2800
0.30
F.F.L
2150
17750
200
4600
4600
5000
04
2000
2400
W03
2000
W03 A.300.00
200
400 600 400
19250
450
05
1400
1400
1100
400
400
2400
600
2400
2000
W03
01
24800
5000
4600
4600
A.400.00
24350
2400
W03
2000
3050
1100
06
8600
8600
8600
400
400
800
17750
2400
W03
52200
2000
2000
W03
4600
4600
5000
GR-04
1800
2750
3000
1400
1400
800 400
400
600 400
200
200
5500 2500 1750 2500 5500 200 1850 300
300 0.15
D5 G.F.L
05
2000
2000
02 W03
0.30 A.300.00
3200
3200
4800
5200
A.300.00 F.F.L 04
4350
4350
4350
4350
GR-5 A.401.00
03 4000 2000 200 2600 2400 1100 2400 4100 200 2000 200 1000 200 2000 200 1250
REVISIONS:
2000
2000
A.0500.00 200
NO DATE MODIFICATIONS
200
17750 W03 W03 W03 W03 W03
200
200 800
850
400
3650 3550 3850 2500
08 08 R0 DEC.2014 ISSUED FOR TENDER
200
200
1100 200
450
200 1100
700
200 1500 150 2200 2000 450 2150 2000 2150 2000 450 2150 2000 650 550 2000 1050
R1 FEB.2015 ISSUED FOR TENDER
2950
0.30
2750
F.F.L
D3
2650
GR-11
3700
3700
3700
W01 GR-06
2100
25200 3800
5350
ST3
5500
5150
3600
6300
9850 UP 6600
09 09
850
2950
2100
1950
1500
450 800 300 800 350 800 350 800 350 800
1100
W04 D2
1850
1850
1200 200
10 GR-11 10
1100
3450
W04 D2
D1
650
2500
2100
2100
5650
1100
W04 D2
GR-09
11 11
4200
4200
OWNER:
2400
3650
3650
3650
D1
1100
06
18150
2050
2050
1750
8050 2200 5200 1400 8600 1400 4200 2150 200
17550
1800
W04
1100
D2 GR-07 A.300.00
600
12 12
200
200
1100
D1
0.30
2100
2100
2500
4200 1400 8600 1400 8600 400 600 400 8600 400 600 400 4200
2300
2300
F.F.L
1100
D4
13 13
5900
5850
-0.85
G.F.L MAIN CONSULTANT:
7800
7800
8200
3350
7950
GR-10
5550
5550
15400 24200 3800
6000
5500
5500
1100
D1
1100
1100
D4
2000 2000 600 400 2150 2000 650 400250 2000 2150 200 200 4000 4600 4600 4600 4800
1050
14 600 ST2 14
800
1000
2150 4800 3050 2150 2400 2400 2800 2200 5000 5000 5000 5200 3800 DRAWING TITLE:
46250
A` A B D E F` G H H` 01 J K L M N
A.300.00
02 05 03
A.401.00 A.401.00 A.401.00
01 SCALE 1:100
1/100 A0 R1
53
05.A.0200.00
PROJECT
A` A B C D E F G H H` J K L M N
15.80
N M L K J H` 15.80 T.O.P
T.O.P
4.00
15.10
15.10 DRAWING KEY:
700
UPPER ROOF T.O.S
NORTH
700
UPPER ROOF T.O.S
2600
2600
12.50
12.50 13.20 13.20
2600
2.00 T.O.P
13.20
2600
T.O.P T.O.P T.O.P
T.O.P 12.50 12.50
12.50 2.00
700
700
T.O.P T.O.P
T.O.P 11.80
200
200
11.80
700
ROOF T.O.S
200 800
200 800
800
700
ROOF T.O.S
200
1600
1.00
800
10800
3300
1100
1100
3300
8.50
8.50
6800
SECOND F.F.L
SECOND F.F.L
2300
2300
2.00 1.00 1.00 2.00 1.00
1.00
2.00 2.00 2.00 BL05
16700
16700
3400
1100
1100
5.00
3400
10900
10900
GR-03
5.10
200700
300 700
5.00
5.10
450 200
FIRST F.F.L
200
4.00
FIRST F.F.L
5.00 5.00 1.00 5.00
1.00 4.00 2.00
1.00 5.00
1800
1800
1.00
1050
NOTES:
3700
4800
2100
2100
2100
4800
GR-01
1.00 1.00
4.00 4.00
4.00
300
300
1100 300
0.30
0.30 GROUND F.F.L
200
200
GROUND F.F.L
2200
400
400
2000
2000
300
1200
0.00 3.00 3.00 3.00
900
900
900
G.F.L
-1.00 -1.00
G.F.L G.F.L
05 SCALE 1:100 01 SCALE 1:100
(DRY MIX) 1
(DRY MIX) 2
(DRY MIX) 5
14 13 12 11 10 09 08 15.80
T.O.P
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15.80
T.O.P
4.00
15.10
UPPER ROOF T.O.S
15.10
700
UPPER ROOF T.O.S
12.50
1.00 2.00
T.O.P
3300
3300
12.50
13.20
2600
2.00 T.O.P
T.O.P
11.80 12.50 12.50
5.00 5.00 ROOF T.O.S T.O.P T.O.P 5.00
11.80
700
ROOF T.O.S
4.00
3300
8.50
SECOND F.F.L
4.00 8.50
2.00 2.00 SECOND F.F.L
15650
2.00 2.00 2.00 1.00 2.00 2.00 2.00 1.00 2.00 1.00
1.00
4.00
3400
5.10 2.00
12350
12350
12350
FIRST F.F.L
4.00 5.10
1.00 FIRST F.F.L
1.00
REVISIONS:
NO DATE MODIFICATIONS
4800
1.00 1.00
4.00
1.00 R0 DEC.2014 ISSUED FOR TENDER
0.30 4.00 4.00
GROUND F.F.L R1 FEB.2015 ISSUED FOR TENDER
0.30 3.00 3.00 3.00 0.30
3.00 0.00 GROUND F.F.L GROUND F.F.L
450
150
3.00 G.F.L
0.15
-1.00 G.F.L
G.F.L
06 02 SCALE 1:100
SCALE 1:100
OWNER:
07 06 05 04 03 02 01
H G F E D C A 15.80
T.O.P
15.10
700
UPPER ROOF T.O.S
3300
13.20 12.50
2600
T.O.P 1.00 T.O.P
12.50
T.O.P
4.00
11.80 MAIN CONSULTANT:
700
ROOF T.O.S
3300
4.00
4.00
8.50
SECOND F.F.L
2.00 2.00 2.00 2.00 1.00
1.00 1.00 1.00 1.00
2.00 2.00
2.00
3400
4.00
4.00
12350
12350
5.10 DRAWING TITLE:
FIRST F.F.L
1.00
4800
4.00 4.00
4.00
3.00 3.00 0.30
GROUND F.F.L 3.00 3.00 0.30
GROUND F.F.L
150
150
0.00
G.F.L 0.15
G.F.L
04 SCALE 1:100
03 SCALE 1:100
1:100 A0 R1
05.A.0300.00
54
A C D 14 13 12 C D PROJECT
A` A
08 63 62 61 60 59 58 57 56 55 54 53
64 65 66 67 68 69 70 71 72 73 74 64 65 66 67 68 69 70 71 72 73 74
1650 3000 5200
675
1500
1700 3100 3000
1700 3000 3100 DRAWING KEY: NORTH
30 x 10
01 SCALE 1:50
+11.80
2000
3700
11
700
T.O.S
3800
600
SCALE 1:50
+11.80
+11.80 10.20 T.O.S
10.20 F.F.L
T.O.S 06
F.F.L SCALE 1:50
03 02 01
1500
-- -- --
1600
1700 3000 3100
1700 3000 3100
675
10.20
F.F.L 64 65 66 67 68 69 70 71 72 73 74
09 63 62 61 60 59 58 57 56 55 54 53
63 62 61 60 59 58 57 56 55 54 53
A` A C D
14 13 12 A C D BL05
08
42 43 44 45 46 47 48 49 50 51 52
42 43 45 46 47 48 49 50 51 52 63 62 61 60 59 58 57 56 55 54 53
1650 3000 5400 44
675
1500 UP
1600
+6.80 30 x 10 1700 3000 3100
F.F.L 1700 3000 3100 NOTES:
1600
2000
3700
8.50
700
8.50 8.50
3800
F.F.L
3800
600
12 F.F.L F.F.L
SCALE 1:50
02 SCALE 1:50
07
03 6.80 SCALE 1:50
6.80
-- 02 F.F.L
1500
F.F.L
01
--
1600
675
1750 3000 UP --
1700 3000 3100
09 63 62 61 60 59 58 57 56 55 54 53 1700 3000 3100
42 43 44 45 46 47 48 49 50 51 52
63 62 61 60 59 58 57 56 55 54 53
A` A C D
14 13 12 A C D
08
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
41 40 39 38 37 36 35 34 33 32 31
1650 4200
625
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
1500
1600
1700 3000 3100
1700 4200 1900
03
2000
3700
SCALE 1:50
700
2.70 13
3850
5.10 SCALE 1:50
F.F.L
3800
600
F.F.L
03 08 SCALE 1:50
2.70 5.10 5.10
1500
--
02 F.F.L F.F.L F.F.L
01
675
1750 3000 --
1600
--
1700 4201
09 41 40 39 38 37 36 35 34 33 32 31 1700 3000 3100
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
41 40 39 38 37 36 35 34 33 32 31
A` A C D
14 13 12 A C D
08 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 15 14 13 12 11 10 09 08 07 06 05 04 03 02 01
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
300
1600
UP
1500
3800
3850
600
2650
3700
700
04 SCALE 1:50
14 SCALE 1:50 0.30 0.30
02 F.F.L 09 SCALE 1:50 F.F.L
14 x 30 01
03 --
1600
--
1500
--
1700 4250 1700 4200 2327 1700 4200 REVISIONS:
350
15 14 13 12 11 10 09 08 07 06 05 04 03 02 01
09 15 14 13 12 11 10 09 08 07 06 05 04 03 02 01 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 NO DATE MODIFICATIONS
R0 DEC.2014 ISSUED FOR TENDER
700
700
700
700
700
700
UPPER ROOF T.O.S UPPER ROOF T.O.S UPPER ROOF T.O.S
140
140
140
2200
3200
3200
2960
3060
3060
4000
4000
OWNER:
4900
4900
4900
1000
250
1700
1700
2400
900
900
+10.20 10.20 +10.20
F.F.L T.O.S T.O.S
3400
3400
3250
MAIN CONSULTANT:
1700
1700
1000
2500
2500
8.50 8.50 8.50
SECOND F.F.L T.O.S SECOND FLOOR T.O.S SECOND FLOOR
3400
3400
3400
250
350
1700
1700
2400
900
900
6.80 6.80 6.80
F.F.L T.O.S T.O.S
3400
DRAWING TITLE:
3150
3050
1700
1700
1000
3200
350
4100
4100
4100
2400
2400
2400
15 10 05
900
900
SCALE 1:50 SCALE 1:50 SCALE 1:50
2.70 2.70 2.70
F.F.L T.O.S T.O.S
4800
4800
4450
2400
2400
2400
2400
2400
2400
2400
2400
FEB.2015 FEB.2015 1023.1
0.30 0.30
T.O.S T.O.S 1:50 A0 R1
05.A.0500.00
55
56
A B C D E F ELEV 3 G H J PROJECT
BL11 - A0100.00 A B C D E F S1
G H J
+10.60 m A0402.00 +10.60 m
28930 T.O.P T.O.P
205 3090 4495 3750 3175 1175 4000 4075 3175 1790
3
2500
2500
2500
3090 4400 4440 800 700 800 3115 800 800 800 800 800 3110 800 700 800 585395800395
4
4600
4600
W02 W02 W02 W02 W02 W02 W02 DRAWING KEY: NORTH
01 01
200
1600
1600
1440
3
3600 400 15350 +6.00 m +6.00 m
T.O.S. T.O.S.
800 600
600
640
3175
3175
D03
3075
800
W01
3425
1400
1400
4500
+5.00 m +5.00 m
1000
1000
L0-01
800
2 2 3
10600
10600
T.O.S. T.O.S.
4950
1700
1435
+4.20 m +4.20 m
2460
02 02
800
800
T.O.S. 3 1 1 3 T.O.S.
1650
1800
4
6500
0.00 1
2975
5900
5900
5900
G.F.L. 3
5100
5100
3425
1900
3750
3750
4200
1000
2600
3000
3300
2850
6075
6075
5575
1330
+0.30 m +0.30 m
1500
+0.00 m F.F.L F.F.L
F.F.L F.F.L
300150
300150
G.F.L
450
450
L0-09 +0.45
7000
15500
1200
2000
2650
940
F.F.L
+0.45
D01 01
F.F.L SCALE 1:100
01 02 03 04 05 06 07 08 09
R47
03 03 +10.60 m
12025
0
+1.20
T.O.P
BL11
2700
L0-06 F.F.L
01 +0.45 400250 1340
3175
3
3650
2975
4150
BL11 - A0100.00 F.F.L
NOTES:
2500
2500
2690 23600
5100
W01 4
7280
4600
4600
4700
04 04
D02
S4
1600
1600
A0402.00
2200
4500
8955 2025 2735 2000 2490 2000 3675 4
+0.45 +6.00 m
2730
3175
1 3
2000
2955
29100
29100
F.F.L T.O.S.
600
600
+0.45 (DRY MIX) 1
D01
1400
F.F.L +5.00 m
1250
1000
1000
4
10600
10600
T.O.S.
450
05 D01 D01 05 +4.20 m 20X40 CM 2
D01 3
1220 250
250
800
800
T.O.S. 3
4
1800
750
W02
1720
(DRY MIX) 3
2450
3
2500 L0-06 3
ELEV 2 ELEV 4
5900
5900
5900
5900
D04 D04 D04 D04
1000
D03 3 (DRY MIX) 4
4000
BL11 - A0100.00
4500
4500
BL11 - A0100.00
4000
5100
5100
960
3750
3750
3
3
5575
5820
2800
3000
+0.30
2200
F.F.L
3855
+0.45 m
L0-05 +0.30 m
F.F.L
2825
3575
3140
+0.00 m
06 06 F.F.L
300150
300150
400
G.F.L
450
1300 6580
300
1175
1175
+0.30
07 F.F.L
07 02 SCALE 1:100
1600 120
4600
3800
+10.60 m +10.60 m
1600
11850
2825
2825
02 T.O.P T.O.P
BL11 - A0100.00 0.00 +0.30
G.F.L F.F.L L0-03
1160
4600
4600
1160
3
08 08
2500
2500
400
4100
4
1600
4600
4600
1600
L0-04
1000 600
1600
1600
4350
4350
4000
4250
1200
+0.30
1695
+6.00 m +6.00 m
F.F.L
2445
T.O.S. T.O.S.
800 600
640
12600
+5.00 m +5.00 m
1000
1000
750 2100 6900 2100 750
10600
10600
2501000
T.O.S. 3 T.O.S.
09 09 4
3150
+4.20 m +4.20 m
450
450
250
800
800
T.O.S. 3 T.O.S.
3210
0.00
3690 8250 1000 2100 1110 4760 1035 2100 1000325 1185 800 585395 800 395 3
G.F.L
3
6500
5900
805 3090 4495 3750 3175 1175 4000 4075 3175 1790
5100
3750
3750
2600
1900
29530
+0.45 m 4 +0.45 m
+0.30 m +0.30 m
+0.00 m F.F.L F.F.L
F.F.L F.F.L
300150
300150
01
750
750
SCALE 1:100 G.F.L
A B C D E F ELEV 1 G H J
BL11 - A0100.00
03 SCALE 1:100
A B C D ELEV 3 J 09 08 08 06 05 04 03 02 01
+10.60 m +10.60 m
BL11 - A0100.00
T.O.P T.O.P
29530
3
805 3090 4495 3750 3175 1175 4000 4075 3175 1790
2500
2500
REVISIONS:
600 3090 4400 3850 16000 1590 4 NO DATE MODIFICATIONS
4600
4600
ISSUED FOR TENDER
900
900
R0 DEC.2014
01 01
1600
200
200
1300
3
T.O.S. T.O.S.
600
3325
+5.00 m S3 +5.00 m
2925
3175
3175
1000
1000
2100
10600
10600
T.O.S. T.O.S.
1500
4500
A0402.00 1
+4.20 m +4.20 m
800
800
T.O.S. T.O.S.
02 02
1000
3
7200
3 3
3 3
5900
5900
5900
1
3750
3900
4400
2800
5925
+0.45 m 4 +0.45 m
6075
6075
+0.30 m +0.30 m
+5.00 +0.00 m F.F.L F.F.L
F.F.L F.F.L
300150
T.O.S. G.F.L
600
300
2925 9650 2925 1340
OWNER:
04
7000
15500
9650
6500
SCALE 1:100
A B C D E F G H J
+10.60 m
T.O.P
12030
2835 7995
+5.00
01 T.O.S.
21175
3175
2500
2500
2500
3650
BL11 - A0100.00
2500
+4.20
5100
4600
4600
T.O.S.
1000 400
1000 400
1600
1600
15500 MAIN CONSULTANT:
4500
+6.00 m
+6.00 T.O.S.
3175
500
600
640
640
2925
2955
T.O.S.
29100
29100
1500
1500
1500
+5.00 m
1000
1000
9950
900
10600
10600
880
860
T.O.S.
1250
+4.20 m
05 05
2480
800
800
T.O.S.
500
1650
1500
650
3700
5900
5860
ELEV 2
4250
ELEV 4
1300
4550
3000
3200
4300
4000
BL11 - A0100.00
3935
4500
4500
BL11 - A0100.00
3750
2200
2600
2850
+1.20 m
5820
900
F.F.L
+0.45 m
750
+0.30 m
3855
750
600
+0.00 m F.F.L +0.00 m
300
300
F.F.L
150
DRAWING TITLE:
300150
G.F.L G.F.L
300
1175
1175
A B C D E F G H J
4600
3935
+10.60 m +10.60 m
2825
2825
2500
2500
7175
4100
4600
4600
4350
4350
1600
1600
3935
4250
+6.00 m +6.00 m
T.O.S. T.O.S.
800 600
600
640
1400
+5.00 m +5.00 m
1000
800 1000
09 09
10600
10600
2300
2300
T.O.S. T.O.S.
450
450
250
250
+4.20 m +4.20 m
2460
800
T.O.S. T.O.S.
0.00
3690 8250 4250 4675 4250 250 2575 1590
600
600
G.F.L1
1000
5450
805 3090 4495 3750 3175 1175 4000 4075 3175 1790 FEB. 2015 FEB. 2015 1023.1
4800
5100
1900
3750
3750
3900
3150
3150
29530
2850
2900
A0 R1
+0.45 m +0.45 m
+0.30 m +0.30 m
1500
+0.00 m F.F.L F.F.L
F.F.L F.F.L
300150
300150
01 SCALE 1:100 A B C D ELEV 1
J G.F.L
57
300
BL11 - A0100.00
02
11.A.0100.00
SCALE 1:100
58
PROJECT
+5.80 +5.80
DRAWING KEY: NORTH
2.00 3.00
T.O.P. T.O.P.
200
200
+4.90 +5.00
4.00 4.00 ROOF T.O.S
700
T.O.P.
+4.30
ROOF T.O.S
2500
3.00
1800
1800
1800
3.00 01
BL12 - A0100.00
ELEV 3
6100
A B C D E F G H J
BL12 - A0100.00
F
2000
2000
2000
2000
F F F F F F F F F F F F F F
-0.30
2500
31700
G.F.L.
+0.30 +0.30
500
300
Ground F.F.L Ground F.F.L 6150 4800 2400 2900 1900 2400 4800 6150
1100
1400
1400
900
600
01 01 BL12
-0.30 3.00 -0.30
1000
1000
1000
G.F.L G.F.L D08 D08 D08
3250
03 SCALE 1:100
1000
1000
1000
2950
2950
2950
3150
L0-06 L0-05 L0-09 D08 D08 D08
L0-13
2850 3050 4550 3950 950 4600
4750
4950
4950
1000
1000
1000
1900 D08 D08 D08 850
D07 900 1400 4450
D07 D09
350
D07
1600 7250 1650 1450 1000 +0.30 7300
D07 F.F.L. L0-10 L0-11
1550
L0-07 D06 D07
1550
L0-08
1650
1550
1500 1000 NOTES:
600
02 02
350
10150
D05 D04
1900
1 2 3 4 D03 2900 2950 L0-04 17700 5550
1600
+0.30 L0-03
1800
ELEV 2 F.F.L.
3700
3600
3250
3600
+5.80 +5.80 BL12 - A0100.00 D01
T.O.P. 3.00 2.00 T.O.P.
L0-02 1450
1500
L0-03 (DRY MIX) 1
200
15600
+5.00
16100
16100
1250
+4.90 D04
900
900
T.O.P. ROOF T.O.S -0.30 350
+4.30 03 G.F.L. D02 03
ROOF T.O.S (DRY MIX) 2
600
600
R7
750 1400 4250 900 400
9
1800
00
L0-12 (DRY MIX) 3
36.3
9°
3.00
1500
36.3
01
9°
3.00 ELEV 4
10600
BL12 - A0100.00
1000
1000
W02 20X40 CM 4
6100
W02
4600
4100
4100
+0.30
F.F.L.
2000
F.F.L.
F F 3.00 29 °
+0.30
20CM 5
.74
2500
.9 F.F.L.
5° 35
7050
2300
2300
7350
7350
+0.30 20
L0-01 00 00
GROUND F.F.L 19 35.74°
600 600
1400
54
1200
00 50
53
18
00 00
1000
1000
W02 18 W02
-0.30
D01
4900
G.F.L 16
00 D01 00
04 4900 16 W03 W03 1600 600 2650
SCALE 1:100 +0.30 + 0.30
1650
F.F.L. F.F.L.
04 04
W01 W01 W01 W03 L0-14 W01 W01 W01
-0.30
-0.30
G.F.L.
G.F.L.
4 3 2 1
1150 600 600 1150 1150 600 600 1150
600 600 600 600 600 600
31700
2.00 3.00 +5.80
T.O.P. 31450
200 700
+4.90 +5.00
A A' B' C' D' J
900
3.00 3.00
6100
5200
2000
F F
+0.30
GROUND F.F.L
600 600
1400
1200
-0.30
3.00 F.F.L
05 SCALE 1:100
REVISIONS:
J H G F E D C B A
NO DATE MODIFICATIONS
R0 Jan. 2015 Issue For Approval
2.00 +5.80
3.00 T.O.P. R1 FEB.2015 ISSUED FOR TENDER
200 700
+4.90 +5.00
800
3.00
ELEV 3
A J
BL12 - A0100.00
6100
5300
5200
31700
-0.30 -0.30
06
OWNER:
G.F.L SCALE 1:100 G.F.L
4950
4950
16050
+5.80
A B C D E F G H J T.O.P.
02 02
+5.80
3700
3700
3600
3600
T.O.P.
+5.00
MAIN CONSULTANT:
+4.90
800
900
ROOF T.O.S
1200
T.O.P.
16100
16100
+4.30
ROOF T.O.S
600
1000
2100
900
900
1300
1300
1750
30.8
9°
36.3
700
6100
6100
ELEV 2
9°
4500
ELEV 4
3800
BL12 - A0100.00
3450
2000
2000
1100
BL12 - A0100.00
2900
2200
+0.30 +0.30
950
35
7350
7350
°
GROUND F.F.L GROUND F.F.L .74 .74
500
500
600 500
° 35
35.74° 52
50 50
-0.30 -0.30 52 DRAWING TITLE:
G.F.L G.F.L
0
75
R7
R7
07
80
SCALE 1:100
0
+4.90
T.O.P.
04 04
5300 5300
1 2 3 4
31450
+5.80
T.O.P.
+5.00
+4.90 A A' B' ELEV 1 C' D' J
800
3000
1000
2000
950
6100
4500
3850
3450
3450
4600
2000
2000
2900
1900
500
A0 R1
-0.30
F.F.L
08 SCALE 1:100
12.A.0100.00
59
60
Schlumberger Egypt Workshops Project
6000 6000 5900 100 6000 2100 4900 1900 3000 2100 12000 12000
LAYOUT
200 175
900 5000 1000 5000 1000 5000 1000 5000 1300 1000 225 4650 380 4390 380 1000 1800 10000 2000 10000 1475
10050
1 1
450
450
650
± 0.00
ROAD LEVEL WASTE OIL STORAGE NEW OIL BULK STORAGE
POLYURETHANE WITH HARDENER,
3750
3300
3100
3298
3750
L0-19 L0-20
3423
ANTI-SLIP ANTI-OIL ON CONCRETE RAMP
+ 0.15 + 0.15
F.F.L F.F.L
325
4795 200 4795
2 + 0.15
2
625
600
1360
D
1000
IT HUB
1500
1475
9973
1655
L0-17
+ 0.15 1360 780 1360 750 2050
L0-17 F.F.L
2700
750
800
800
BATTERY STORAGE & CHARGING L0-18B
2900
L0-16
8
MALE TOILET ± 0.00
1000
2045
6100
6100
1800
1800
RAIN LEADER
3050
7
5800
5800
5800
+ 0.15
1000
6 ROAD LEVEL
POLYURETHANE WITH HARDENER, ± 0.00 D
F.F.L 300 5 L0-18 BOLLARDS OF HEIGHT POLYURETHANE WITH HARDENER, RAIN LEADER
BOLLARDS OF HEIGHT BOLLARDS OF HEIGHT ROAD LEVEL FEMALE TOILET L0-16
4 150MM & DIAMETER 150MM
2000
ANTI-SLIP ANTI-OIL ON CONCRETE RAMP ANTI-SLIP ANTI-OIL ON CONCRETE RAMP
300
800
800
W
100
150MM & DIAMETER 150MM 150MM & DIAMETER 150MM 3
L0-18A
L0-15 2
300 700 1050
2900 1
1700
W
+ 0.15 25200 5475
1800
L0-15
26400 KEY PLAN
UP
1700
F.F.L 2800
1500
1500
1390
1100
D D D D D D
L0-01B L0-02B L0-03F L0-03E 205 1000 1595 L0-21F L0-21E
D D D D D
3 3
3
400
400
L0-03D L0-15 ST-02A L0-18 L0-21G
1000
+ 0.15 STAIRCASE A
1800
500
F.F.L
ST-02
700 5000 1000 5000 1000 5000 1000 5000 1300 1000 600 1000 4205 1000 600 1000 1995 1000
1000
26200 10000 D D
L0-14 L0-21D
D
4 2
820
+ 0.15 L0-22
W 100 + 0.15
F.F.L F.F.L
5300
L0-13
1200 420 1000 B B
900 1000 1665 1200 1665
3020
5750
1200
2520
W
100 PANTRY
2700
L0-14
2500
STORES
3950
ELECTRICAL 2000 L0-14
3600
OFS SERVICE PIT
900
L0-22 L0-13
+ 0.15 + 0.15
L0-01 F.H.C 2
F.F.L F.F.L + 0.15 A
1430
D
1250
1250
900
F.F.L
4 - 0.85 4 L0-13 350
6730 2370
4 4
1000
3 3 1
2 2 - 0.85
635
UP
OFFICE 1 OFFICE 2
L0-11 L0-12
3200
3200
3400
GENERAL NOTES:
Slope 1:100
Slope 1:100
W
REW WSV L0-11 + 0.15 + 0.15 W
L0-12
F.F.L F.F.L
L0-02 L0-03 4700 4700
5 5
530 530
530 530
1260
1260
40975
D D
TRENCH 20X1X1 TRENCH 20X1X1 L0-10A L0-10B
1800
1800
1800
1800
COVERED WITH DH COVERED WITH DH
CI COVES CI COVES
MECHANICS CLEAN ROOM
ELV 02
4900
5100
+ 0.15 + 0.15
BL05-A0300.01 F.F.L F.F.L L0-10
1070
1070
1070
1070
+ 0.15 ELV 04
F.F.L
W W BL05-A0300.02
SUMP PIT SUMP PIT WIS WORKSHOP
30000
1200
300 1200
1200
L0-10A L0-10B
1*1*1.5 M 1*1*1.5 M
COVERED WITH DH CI COVERED WITH DH CI L0-21
6 6
41041
20000
18000
COVES COVES
650
650
200
30600
1200 150
- 2.73
- 2.73
31000
30600
39000
BOTTOM LEVEL OF SUMP PIT + 0.15
1200
1200
BOTTOM LEVEL OF SUMP PIT W W
L0-09A F.F.L
B
L0-09B
10 TON CRANE B
29000
BL05-A0400.01 9600 7.5M HH BL05-A0400.01
ELECTRONICS LAB
1220
1220
1220
1220
+ 0.15
4900
5100
SLIDING SLIDING NO. DATE MODIFICATIONS
CHECHERED PLATE CHECHERED PLATE
L0-09 F.F.L
+ 0.15
1800
1800
1800
1800
F.F.L
D D
L0-09A L0-09B
7 7
1325 175 1000 200 530
930
9600
D
6 NOS HOTDESK D
1200 300 1000 400 1125 375 1000
1000
Slope 1:100
Slope 1:100
L0-08A L0-08B
L0-08
2700
2900
F.H.C 3
F.H.C 1 R0 MAR - 2015 ISSUED FOR CONTRACT
+ 0.15
375
1000
LEVEL OF TRENCH FROM LEVEL OF TRENCH FROM 350 F.F.L 8900 REVISIONS:
350
8 -1.15 TO -1.23 -1.15 TO -1.23
8
300 1200 300 1000 200
3000
3200
7.5M HH
UP
UP
UP
UP
1 1 + 0.15 + 0.15
F.F.L
1000
2 2 W F.F.L W
3 3 L0-06 4700 4700 L0-07
4 4
9 9
+ 0.15 + 0.15
1630
1130
1800
5300
L0-04 L0-05
5250
4550
4950
4750
D
L0-04 + 0.15 + 0.15
26200 F.F.L F.F.L
26275
1820
1171
700 5000 1000 5000 1000 5000 1000 5000 1000 33011330 4700 4700 245 1000 1755 10000 2000 10000
1820
2000
24100 15300
+ 0.15
22200 5475
FLOOR - OVER ALL
RAIN LEADER F.F.L RAIN LEADER
BOLLARDS OF HEIGHT ± 0.00 BOLLARDS OF HEIGHT BOLLARDS OF HEIGHT
150MM & DIAMETER 150MM 1m X 2.2m EMERGENCY DOOR
ROAD LEVEL 150MM & DIAMETER 150MM 1m X 2.2m EMERGENCY DOOR 150MM & DIAMETER 150MM
+ 0.15 DESIGNED BY:
POLYURETHANE WITH HARDENER, UP
POLYURETHANE WITH HARDENER,
ANTI-SLIP ANTI-OIL ON CONCRETE RAMP F.F.L ± 0.00
1 2 3 4 5 6 7
ROAD LEVEL ANTI-SLIP ANTI-OIL ON CONCRETE RAMP ENG. SHAIMAA FAHMY
STAIR
CHECKED BY:
ST-01
POLYURETHANE WITH HARDENER, POLYURETHANE WITH HARDENER, ENG. NERMINE ELBITAR
+ 0.15 ANTI-SLIP ANTI-OIL ON CONCRETE PLAT FORM ANTI-SLIP ANTI-OIL ON CONCRETE PLAT FORM
F.F.L APPROVED BY:
6000 6000 6000 6000 14000 12000 12000 JAN - 2014 MARCH - 2015 1011
SCALE: SIZE: REVISION:
62875
1:100 A1 R0
A B A C D' D E F G ELV 01 H I J GROUND FLOOR PLAN K
BL05-A0400.01 BL05-A0300.01 01 SCALE 1:100
DRAWING NUMBER:
74
BL05-A0200.00
PROJECT:
LAYOUT
A B C D' D E F G H I J K
150 1250
150 1250
150 1250
150 1250
1250
+10.60 +10.60
1400
1400
EAVE LEVEL EAVE LEVEL
+9.25
T.O.P
5200
2500
2500
2500
2500
2500
+8.25
3800
T.O.S
300 1000
300 1000
300 1000
300 1000
300 1000
02
11850
11850
STEEL HANDRAIL
6900
KEY PLAN
Painted with epoxy 03
10450
10600
+4.25
900
3
F.F.L
9250
4300
4300
03 03 STEEL STAIR 03
A
Painted with epoxy
RAIN RAIN
03
6500
6500
6500
6500
6500
6500
LEADER LEADER
04 +2.36
900
F.F.L
4 2
70
700
B B
+1.88
70
F.F.L
2200
2200
2200
400 960
04 04 04 04
+0.15 +0.15
F.F.L F.F.L
150
150
GROOVE IN A
±0.00 GROOVE IN BOLLARDS OF HEIGHT GROOVE IN PLASTER GROOVE IN ±0.00
F.F.L 03 PLASTER 75 MM & DIAMETER 150MM 05 PLASTER 05 70X10mm PLASTER 05 F.F.L
70X10mm 70X10mm BOLLARDS OF HEIGHT 70X10mm 1
75 MM & DIAMETER 150MM
To storm water net work To storm water net work
ELEVATION 01
01 SCALE 1:100
GENERAL NOTES:
1 2 3 4 5 6 7 8 9 10
ELEVATION FINISHES
1250
+10.60 +10.60 04
PAINT ON PLASTER (DARK COLOR)
EAVE LEVEL EAVE LEVEL
05 400 MM GRANITE SKIRTING
1350
03 +9.25
T.O.P
1000
1000
T.O.S
8700
REVISIONS:
OWNER:
4850
4000
11850
11850
6900
10450
5900
+4.25 +4.25
F.F.L 03 F.F.L
STEEL HANDRAIL
Painted with epoxy MAIN CONSULTANT:
1200
1200
+2.36
03 03 03 F.F.L
900
02
4250
700
3000
2900
2900
+1.88
03
2200
F.F.L
1905
04 04
1500
+0.15 +0.15
F.F.L F.F.L
DRAWING TITLE:
150
150
150
±0.00
GROOVE IN
PLASTER
GROOVE IN
PLASTER
GROOVE IN
PLASTER STEEL STAIR F.F.L
MECHANICS SHOP - BL05 -
F.F.L 05
To storm water net work
70X10mm 03 05 70X10mm
CMU WALLS 3m HEIGHT 05 70X10mm 03 Painted with epoxy
To storm water net work
±0.00 ARCHITECTURAL ELEVATIONS -
ELEVATION (01) AND (02)
ELEVATION 02
02 SCALE 1:100
DESIGNED BY:
BL05-A0300.01
75
PROJECT:
1 2 3 4 5 6 7 8 9 10 LAYOUT
CAPPING
+11.85 CORRUGATED SHEET +11.85 CORRUGATED SHEET +11.85
MID-SPAN LEVEL 0.5 mm THICKNESS MID-SPAN LEVEL WITH INSULATION MID-SPAN LEVEL
RAIN GUTTER RAIN GUTTER
SLOPE 0.05% SLOPE 0.05%
1250
1250
+10.60 +10.60
EAVE LEVEL EAVE LEVEL
2115
+9.25
4060
04
1850
T.O.P
2350
RAIN LEADER
5400
5400
5400
5400
5400
1485
+8.25
T.O.S
LATERAL CLADDING
LATERAL CLADDING
OF CORRUGATED
OF CORRUGATED
SHEET 0.5 MMTHICKNESS
SHEET 0.5 MMTHICKNESS
1340
10 TON CRANE
5000
5000
5000
7.5 M HOOK HEIGHT STEEL HANDRAIL
4500
4000
4000
1200
11850
11850
1200
1200
1200
1200
1200
6900
RAIN LEADER
+4.25 +4.25
900
F.F.L F.F.L
KEY PLAN
2900
2900
2900
2900
2900
2900
1445
1200
1200
1200
STEEL HANDRAIL
1900
CMU WALLS 3
CMU WALLS
700
+1.88
175 900
A
02
4100
4100
F.F.L
700
2500
1200
1200
1200
2900
2200
2200
2200
2200
2200
04
1730
1500
4 2
+0.15
1000
1000
1000
SLIDING
F.F.L
400
CHECHERED PLATE B B
150
150
150
1000
±0.00 -1.23
F.F.L
GROOVE IN F.F.L
300
05 -200mm skirting cement mortar base SLOPE 1:100 SLOPE 1:100 -200mm skirting cement mortar base
- 0.85 PLASTER
with epoxy paint with epoxy paint
70X10mm
-epoxy coating (with hardener) -epoxy coating (with hardener)
1500
-reinforced concrete - 2.73 A
-reinforced concrete
-50 mm screed for protection BOTTOM LEVEL OF SUMP PIT -50 mm screed for protection
-3 coats of hot oxidize bitumen. -3 coats of hot oxidize bitumen. 1
-plain concrete 100mm COVERED WITH DH COVERED WITH DH CI -plain concrete 100mm
CI COVES COVERS EPOXY PAINT WITH HARDENER,
-compacted sand. -compacted sand.
ANTI-SLIP ANTI-OIL
ON CONCRETE PIT
SECTION A-A SUMP PIT
01 SCALE 1:100
1*1*1.5 M
GENERAL NOTES:
A B C D E F G H I J k
1250
1250
1250
+10.60 +10.60
EAVE LEVEL EAVE LEVEL
R0 MAR - 2015 ISSUED FOR CONTRACT
REVISIONS:
3600
CORRUGATED CORRUGATED
5200
5200
5200
5200
SHEET 0.5 mm SHEET 0.5 mm OWNER:
THICKNESS +8.25 THICKNESS
T.O.S
LATERAL CLADDING LATERAL CLADDING
OF CORRUGATED OF CORRUGATED
1100
1100
SHEET 0.5 MMTHICKNESS SHEET 0.5 MMTHICKNESS
1800
1800
7450
7450
WSV OPEN PLAN OFFICE WIS
11700
11700
1200
1200
2900
2900
10450
L0-01 L0-02 L0-03 +4.25 L0-21
F.F.L
8100
1100 100
2900
2900
1200
6500
6500
6500
6500
700
1200
ELECTRONICS LAB
3000
3000
2900
2200
+0.15
SLIDING SLIDING L0-09
+0.15
ARCHITECTURAL PLANS -
1000
1000
750
750
F.F.L F.F.L
SECTION B-B
1000
1000
±0.00 ±0.00
300
300
F.F.L F.F.L
PIT COVER BOLLARDS OF HEIGHT -200mm skirting cement mortar base with BOLLARDS OF HEIGHT -200mm skirting cement mortar base with
80
1500
BL05-A0400.00
76
77
78
79
Greater Cairo Metro Line 4 Workshops Project
04 G.R.C Screen
05 GLASS BRICK
PART 1
PART 2
07
(Light Color)
14000
±0.00 ±0.00
GROUND F.F.L GROUND F.F.L
ELEVATION 4
01 SCALE 1:400
38 37 36 35 34 33 32 31 30' 30 29 28 27 26 25 24 23 22 21 20 19'
300
300
4400
4400
4400
3800
3800
3800
FAN 700 x700 mm FAN 700 x700 mm
300
300
300
1200
1200
900 1200
1200
1200
300
300
300
14000
4100
3800
2800
AIR LOUVER AIR LOUVER
300
7700
8400
6600
300
300
COMPRESSOR UNIT
4000
4000
4000
±0.00 F F F F F F F F F
500
GROUND F.F.L
400
400
03 01 03 02 01 03 03 01 01 03 02
02 07 05 05 01 01 03 01
COMPRESSOR UNIT
ELEVATION 4 (PART 1)
02 SCALE 1:200
19' 19 18 17 16 15 14 13 12 11 10' 10 09 08 07 06 05 04 03 02 01
07 08 07 08 07 06
05 + 14.00
06 06 06
T.O.P
300
300
300
300
4400
4400
3800
3800
3800
3800
FAN 700 x700 mm FAN 700 x700 mm
FAN 700 x700 mm
300
300
300
300
900 1200
1200
1200
1200
1200
1200
1200
300
300
300
300
14000
3800
3800
400 2800
AIR LOUVER AIR LOUVER
5300
5600
8400
300
300
COMPRESSOR UNIT COMPRESSOR UNIT
2100 300
4300
4000
4000
2500
F F F F F F F F F F
±0.00
F F F F F F F F F F GROUND F.F.L
- 0.10
400
02 01 03 03 01 07 02 01 F.F.L
01 07 02 01 07 07 07
COMPRESSOR UNIT
ELEVATION 4 (PART 2)
03 SCALE 1:200
82
83
CM4P1 - DD - DR - WED - S18 - WAR - 501101 - JDC - S01 DRAWING NUMBER
ROOM FLOOR SKIRTING Wall CEILING
1 2 3 4 5 6 7 8
GR 08 P.V.C .TILES 100mm P.V.C CEMENT PLASTER 20-25(mm) GYPSUM TILES
3 B WORKER ROOM 500*500mm COATED WITH PAINTS 600*600mm
501106 501107 GR 09 CARPET ON CERAMIC 100mm CEMENT PLASTER 20-25(mm) GYPSUM TILES
PRAY ROOM TILES 500*500MM CERAMIC COATED WITH PAINTS 600*600mm
500 1100 1800 1700 1800 1700 1800 1700 1800 1700 1800 1700 1800 2950 1000 1200 1000 6000 1850 1700 1800 1700 1800 1700 1800 1700 1800 1100 GR 13
REPLACEMENT SOIL CEMENT TILES GLASS PARTITION -----------
LIGHT COURT
300 300 300 300 300 300 300 300 300 300 300 300 300 300 GR 14 CERAMIC TILES 100mm CEMENT PLASTER 20-25(mm) GYPSUM TILES
800 5300 1100 5300 1100 5300 1100 5300 1100 5300 1100 5300 1100 5300 800 STORAGE 500*500mm CERAMIC COATED WITH PAINTS 600*600mm
600
300
300
300
300
ST01 Granite 40mm for Tread 100mm
300
GRANITE TREAD WITH CEMENT PLASTER 20-25(mm) -----------
250 200 GRANITE RISER STAIRCASE and 20mm for Riser GRANITE COATED WITH PAINTS
800 1800 1700 1800 750 550 1800 1700 1800 550 750 1800 1250 1800 650 2100 1000 500 1000 1700 1300 1850 750 550 1800 1700 1800 450 653 1800 1700 1800 800 ST02 200mm MORTAR BASE WITH CEMENT PLASTER 20-25(mm)
EPOXY COATING -----------
200 200
D
GR05B
200 200 200 400 16 EMERGENCY STAIRCASE EPOXY PAINT COATED WITH PAINTS
3800
500102
3500
Class Room Class Room Staff Locker Kitchen Ablution Worker Room Pray Room
5100
5700
GR01 GR02 GR03 GR04 GR07 GR08 GR09 FINISHING SCHEDULE
2
5900
6000
6000
5600
5800
5700
5700
5700
300 200 200 200 200 200 200 200 ±0.00 SCALE N.T.S
5400
5400
200 300
5000
F.F.L 13850 02 01
6850 6800 3800 2700 3600 3200 2600 3900
5700
Male Toilet Female Toilet ±0.00 ±0.00
1100
1100
D
1 GR05 GR06 F.F.L F.F.L GR09B
400 200 100
501109 1000 1000 400 400 1000 ±0.00
5450 5200 2400 900 400 1300 500 1000 1800 300 300 1400 1000 500 300 900 1400 2500 1000 400 4800 1600 200 7250
200 1100
F.F.L
B D D D D F.H.C D D D D B
300
200
D
GR01 GR02 GR03 GR04 GR05A GR06 GR08 GR09A
11300
GR07
1200 300 14500 1000 23650 300 2250 200 1950
STAIRCASE
+ 1.825 39150
1800
1800
GRANITE TREAD WITH ST02
2400
GRANITE RISER F.F.L ±0.00 ±0.00 -0.20
E.P.S. F.F.L F.F.L CURB LEVEL
1 E.P.S.
200
1
5060
W 501124 3300 W
4800
-0.20
7600
501124
300
GR13A GR11A
4 CURB LEVEL Storage Copy Room
Corridor
1950
4250
6130
3150
GR13 Edge Of Pavement F.F.L F.F.L 501105
20200
20200
2150 1300
±0.00
4200
4200
8000
8400
3800
7800
7800
8000
W GR11
UP
GR13B
-0.30 ±0.00 -0.45 F.F.L W STAIRCASE
D -0.45
4050
GR12
F.F.L
300
D 1 -0.30
100 1100
A D 200
UP
200 200
1100
5400
GRST02
300 3850 300 1500 1700
GR14
3200
W
3300 3300
W
5750 300 1200 1900 1200 300 501108 ROAD LEVEL
501107 ±0.00 10500 GR13C 10500 GR11C
300
300
1800 200
F.F.L
740
2700
UP
Elec. Panels Closet
1200
1100 170
W
A
1800
GRST01
±0.00 ±0.00
200 1370
1950
D
1100
1200
±0.00 501107
150 1200
F.F.L 44800 F.F.L
300
GR10 D D
C D
GR15A
D D D D D D D
GRST01A F.F.L
C
600
GR15B GR16 GR17B GR17A GR18B GR18A GR19B GR19A
300
01 02
100
2600
D
2300
4800 1000 850 600 2000 1000 1900 1000 400 400 1000 4100 900 400 400 900 4200 900 400 400 900 4100 1000 400
2300
GRST01B
100
±0.00 ±0.00
F.F.L F.F.L
Entrance Hall
Medical Affair G.Manager Office Room Office Room Office Room D
5000
RAMP
5400
5398
5400
5900
GR20
6300
5700
5700
5700 GR20
6000
6000
1200
1600
1600
R02 GR15 GR16 GR17 GR18 GR19 -0.20
5550
±0.00 CURB LEVEL
F.F.L
GRANITE TREAD
300 10350 200 3300 200 6800 200 6800 200 6800 200 6700 300 WITH
±0.00 GRANITE RISER
1900
800 1800 1700 1800 1700 1800 750 750 1800 750 750 1800 1700 1800 750 750 1800 1700 1800 750 750 1800 1700 1800 750 750 1800 1700 1800 650
2000
F.F.L
2300
300
600 200 200 450 450 200 200 450 450 200 200 450
02
D D
300
300
300
300
300
300
600
01
W W W W W W W W W W W W
concrete ramp X 622790.843 GR15C GR15B GR15A GR16 GR17B GR17A GR18B GR18A GR19B GR19A GR20B GR20A X 622770.145
with polyurethane coating Y 809149.784 RAMP Y 809194.197
R01
-0.30 concrete ramp -0.20
ROAD LEVEL with polyurethane coating CURB LEVEL WS3
-0.20
501107
CURB LEVEL
300 300 300 300 300 300 300 300 300 300 300 300 -0.30
800 5300 1100 5300 1100 5300 1100 5300 1100 5300 1100 5300 650 ROAD LEVEL 7150
500 1100 1800 1700 1800 1700 1800 1700 1795 1705 1800 1700 1800 1700 1800 1700 1800 1700 1800 1700 1800 1700 1800 1700 1800 6150 1200 750
49500
1 2 WS1 3 WS2 4 1 5 B 6 7 8
501107 501107 501105 501107
84
TD_CV_ST_***_***.dwg
CM4P1 - DD - DR - WED - S18 - WAR - 501105 - JDC - S01 DRAWING NUMBER
1 2 3 4 5 6 7 8
+ 14.00 07
T.O.P
+ 13.60
T.O.S
1200 400
+ 12.40 07 07 + 12.40
T.O.P T.O.P
1150 300
+ 10.85 02 02 02 05 02 01 02 02 05 02 + 10.85
T.O.S T.O.S
2370
2370
2370
3490
+ 7.30 06 + 7.30
160 1120
160 1120
160 1120
2nd F.F.L 01 01 01 05 01 01 05 2nd F.F.L
160
14300
7460
12400
12400
12600
2370
2370
2370
3490
+ 3.65 + 3.65
160 1120
160 1120
160 1120
1st F.F.L 02 02 02 05 05 02 02 02 05 02 1st F.F.L
160
02 08
2370
2370
2370
3390
3190
08
Stainless Steel Stainless Steel
Handrail Handrail
± 0.00
400 820
400 820
400 820
01 01 03 01 01 03 ± 0.00
Ground F.F.L Ground F.F.L
400
200
200
- 0.30 - 0.30
Road Level Road Level
Elevation 1
1 SCALE 1:100
D C B A
+ 14.00 07 + 14.00
T.O.P T.O.P
+ 13.60 + 13.60
T.O.S T.O.S
1200 400
1600
+ 12.40 07 07 + 12.40
T.O.P T.O.P
1150 300
300
2200
External Rough Paint on Plaster
01
(Dark Color)
01 External Smooth Paint on Plaster
1200
02
3490
3490
(Light Color)
+ 7.30 06 + 7.30
2nd F.F.L 01 05 02 2nd F.F.L 03 Granite Skirting (400 mm Height)
2450
160
160
14200
14200
7460
04 G.R.C Screen
12400
12600
1200
3490
3490
01
05 Groove 30 mm
+ 3.65 + 3.65
1st F.F.L 02 02 1st F.F.L
2450
06 Curtain Wall
160
400 160
490
02 08 02
07 Granite Capping
1200
3190
3390
08
Stainless Steel
2500
Handrail
08
400 1100
± 0.00
Ground F.F.L
03 ± 0.00
Ground F.F.L
08 Granite Cladding
400
200
300
- 0.30 - 0.30
Road Level Road Level
Elevation 2
2 SCALE 1:100
85
TD_CV_ST_***_***.dwg
CM4P1 - DD - DR - WED - S18 - WAR - 501107 - JDC - S01 DRAWING NUMBER
8 7 6 5 4 3 2 1
+ 14.00
T.O.P
850
1600
+ 12.40 Paint On Cement Paint On Cement + 13.60
T.O.P Plaster Plaster STAIRCASE T.O.S
1200
2290
ST02
1250
+ 11.15
1550
1550
1550
1550
1550
800
+ 10.85 T.O.S
T.O.S
2600
2450
640
740
700
1400
890
1190
1190
1150
Corridor Copy Room Corridor Storage Corridor
3390
STAIRCASE STAIRCASE
3850
1200
1200
3600
3550
3350
1200
1200
ST01 2ND11 2ND12 2ND11 2ND13 2ND11 ST02
2250
2250
2750
2200
2200
2200
Paint On Cement Paint On Cement
1300
+ 7.30 Plaster Plaster + 7.30
1000
2nd F.F.L 2nd F.F.L
400
400
2450
1190 260
2450
14000
640
740
700
890
1170
1200
1150
12400
3390
STAIRCASE Corridor Copy Room Corridor Server Room Corridor STAIRCASE
1200
1200
3650
3650
3400
3350
1200
1200
ST01 1ST11 1ST12 1ST11 1ST13 1ST11 ST02
2250
2250
2750
2220
2200
2200
Paint On Cement Paint On Cement
1300
1000
1st F.F.L 1st F.F.L
400
400
2450
2150
1190 260
GR11 GR13
640
740
700
900
890
890
1190
1150
STAIRCASE Corridor Copy Room Corridor Storage Corridor STAIRCASE
1200
1200
3650
3650
3400
3350
ST01 GR10 GR12 GR10 GR14 GR10 ST02
2400
2400
2750
2500
2500
2500
2200
2200
2200
1300
1300
±0.00 ±0.00
- 0.30 Ground F.F.L Ground F.F.L - 0.30
250
250
ROAD LEVEL Cement Tiles Cement Tiles ROAD LEVEL
200x200mm 200x200mm
SECTION A-A D D
1 SCALE 1:100 + 12.40 Granite Cladding + 12.40 Granite Cladding
T.O.P T.O.P
100
100
1250
1250
1550
1550
1550
1550
1450
1450
+ 10.85 +10.85 + 10.85 +10.85 + 10.85
T.O.S T.O.S. T.O.S T.O.S. T.O.S
Smooth Paint
(Light Color)
Smooth Paint
640
640
Smooth Paint (Light Color) Venetian Blind
Venetian Blind Venetian Blind
(Light Color)
D C B A
Gypsum Tiles Gypsum Tiles Gypsum Tiles
2340
2340
2340
2340
600x600 mm 600x600 mm 600x600 mm
+ 14.00 + 14.00
T.O.P T.O.P CURTAIN WALL
3550
3550
3550
3550
Secretary G.Manger Lounge
3490
3490
2ND15 2ND17 2ND21
2750
2750
Granite Sill Granite Sill
2750
+ 12.40 + 12.40
T.O.P T.O.P 370 mm 370 mm STAINLESS
STEEL HANDRAIL
Rough Paint Rough Paint
(Dark Color)
1100
(Dark Color)
1550
1550
1550
1550
1550
1550
1050
1050
160 1450
160 1450
1150
1150
+ 10.85 + 10.85
T.O.S T.O.S + 7.30 + 7.30 + 7.30
+7.20 +7.20
8110
2nd F.F.L 2nd F.F.L 2nd F.F.L
2nd T.O.S. 2nd T.O.S.
Exhaust Air
100
100
Smooth Paint
740
740
1190
(Light Color)
(Light Color)
2340
2340
2340
2340
640
640
Smooth Paint
Smooth Paint
3550
3550
Venetian Blind
3390
3390
2250
(Light Color)
2200
2200
+ 7.30 + 7.30
1050
1050
160 1150
Gypsum Tiles
2340
2340
2340
2340
2nd F.F.L 2nd F.F.L
11500
600x600 mm 600x600 mm
400
400
600x600 mm
3650
3650
3650
3650
Exhaust Air Office Room G.Manger Lounge
740
740
Louver
3490
3490
1190
1190
12520
2750
2750
2340
2340
2340
2340
2750
3650
3650
3390
1ST19 1ST08
2250
2250
STEEL HANDRAIL
Rough Paint Rough Paint
2200
2200
1100
1050
1050
1150
1150
+ 3.65 + 3.65
1050
1050
160 1150
160 1150
400
100
100
740
740
1190
(Light Color)
2340
2340
2340
2340
Office Room Light Court Worker Room Smooth Paint Smooth Paint
640
640
3650
3650
3390
2400
(Light Color)
Rough Paint
2200
2200
(Dark Color)
±0.00 ±0.00
1050
1050
2340
2340
2340
2340
1270
1270
250
3650
3650
3650
G.Manger Office Room
3390
3590
3590
GR16 GR17
2750
Granite Sill Granite Sill
2750
370 mm 370 mm
Rough Paint Rough Paint
(Dark Color) (Dark Color)
SECTION B-B
850
850
1050
1050
2 SCALE 1:100 ±0.00
Granite Skirting
(400 mm Height) ±0.00
Granite Skirting
(400 mm Height) ±0.00
Ground F.F.L Ground F.F.L Ground F.F.L
- 0.20 - 0.20 - 0.20
400
400
Curb Level Curb Level Curb Level
DRAWING
WS3
NOTES :
DATE REVISION DESCRIPTION DRAWN BY CHECKED BY APPROVED BY
WS1 WS2 B
86
TD_CV_ST_***_***.dwg
CM4P1 - DD - DR - WED - S18 - WAR - 503144- JDC - S01 DRAWING NUMBER
03
--
03 PAPER TOWEL DISPENSER
03 03 FIBER CEMENT BOARD 03
WITH V.P
HAND DRYER
FLOOR DRAIN
430
500
D-A90
D-A90 100
R18.A 1100 100 2480 700 700 700
1200
275
1600
-- -- TOILET PAPER HOLDER
3260
2400
Toilet(M)
100
D-A90 D-A90 MIRROR
3300
R18.B R18.C
A90.R18
± 00.00 800 800 500 CERAMIC TILES + 3.00
2100
F.F.L (200mmx200mm)
685 800 750 150 B.L
3600 100 1000 100 1000
1600
500 500
200 100
FLOOR DRAIN
600
600
430
160
160
200
200
260
260
480
600
600
200
100
MIRROR 750 750 150
1600
1600
2760
1800
Toilet(W) HOLDER (200mmx200mm) B.L
D-A90 D-A90
100
275
1200
4560
1100
D-A90 D-A90
R19.A R19.A
1100 100 4600 480 4800 480
FLOOR DRAIN
500
480
PAPER TOWEL DISPENSER
A90.R18,R19
03 03
800
830
HAND DRYER
PAPER TOWEL FIBER CEMENT BOARD WITH V.P
DISPENSER
1000
3000
3000
3000
MARBLE URINAL
Lighting Fixt. (Refer To Elec. Drawings)
2200
2200
2200
PARTITION
400
1500
1500
1500
705
570
± 00.00 ± 00.00 ± 00.00
650
600
600
400
400
F.F.L F.F.L
300
300
300
F.F.L
PRESENCE DETECTOR
PAPER TOWEL DISPENSER
MARBLE URINAL PAPER TOWEL DISPENSER
PARTITION
A90.R18,R19
13 SCALE 1:50
87
01- LEVEL ±0.00=(+ 81.00)
TD_CV_ST_***_***.dwg
CM4P1 - DD - DR - WED - S18 - WAR - 503145- JDC - S01 DRAWING NUMBER
STEEL DOOR WITH POLYVINYL CHLORIDE SELF-ADHESIVE SHEET STEEL DOOR WITH POLYVINYL CHLORIDE SELF-ADHESIVE SHEET
OUT IN
STRUCTURAL OPENING
4500
4500
4500
4500
F F F F F F F F
1450
1450
SECTION ELEVATION SECTION ELEVATION
5500 5000
STRUCTURAL OPENING STRUCTURAL OPENING
OUT OUT
IN IN
PLAN PLAN
DOOR TYPE A1 DOOR TYPE A2
01 02 SCALE 1:20
SCALE 1:20
88
NOTES : DRAWING CM4P1 - DD - DR - WED - S18 - WAR - 503145- JDC - S01
DATE REVISION DESCRIPTION DRAWN BY CHECKED BY APPROVED BY 01- LEVEL ±0.00=(+ 81.00) NUMBER
TD_CV_ST_***_***.dwg
CM4P1 - DD - DR - WED - S18 - WAR - 503147- JDC - S01 DRAWING NUMBER
IN IN IN OUT
OUT OUT IN OUT OUT IN OUT IN
OUT IN IN OUT
WOODEN DOOR
HANDLE
STRUCTURAL OPENING
HANDLE HANDLE HANDLE
2200
2200
2200
2200
2200
LOCK WITH KEY LOCK WITH KEY LOCK WITH KEY
1000
1000
1000
900
SECTION ELEVATION SECTION ELEVATION SECTION ELEVATION
SECTION ELEVATION
HANDLE
OUT OUT OUT
IN
IN
1000
1400 IN 1600 IN
1000
DOOR TYPE B9 DOOR TYPE B10 DOOR TYPE B11
STRUCTURAL OPENING STRUCTURAL OPENING
STRUCTURAL OPENING OUT DOOR TYPE E1 PLAN
01 SCALE 1:20
02 SCALE 1:20
03 SCALE 1:20 03 SCALE 1:20
PLAN PLAN PLAN
WOODEN DOOR
WOODEN DOOR WOODEN
DOOR
HANDLE
HANDLE HANDLE HANDLE
2200
2200
2200
2200
1000
900
900
900
250
SECTION ELEVATION
SECTION ELEVATION SECTION ELEVATION SECTION ELEVATION
WOODEN DOOR
IN IN IN IN
900 1600 900 1600
89
NOTES :
DATE REVISION DESCRIPTION DRAWN BY CHECKED BY APPROVED BY 01- LEVEL ±0.00=(+ 81.00) NUMBER
TD_CV_ST_***_***.dwg
CM4P1 - DD - DR - WED - S18 - WAR - 571101 - JDC - S01 DRAWING NUMBER
3
571102
2400
3500 1900 2950 4000 8500 4000 3350
- 0.15 - 0.15
2400
2400
2400
± 0.00 - 0.15
2100
INTAKE SHAFT
2850
Curb Level Curb Level Curb Level POLYURETHANE COATING
F.F.L
- 0.30 GR02 ON CONCRETE STAIRS
Road Level D D
D
GR01C GR01D
GR01B
1000
1000
900
700
800 800 4250 2500 10000 2500 1900
800
950 5850 2500 10000 2500 1900
850
± 0.00
F.F.L
2000
1900
± 0.00
1850
± 0.00
1900
1000
1000
D D Switch Room 1 W2
800
800
800
6 -1.45
2730
2730
115X140cm F.F.L
1300
GR01A GR01A
F.F.L F.F.L. GR01E
900
950 Exhaust Fan
4 Louvers 11505 571102 5000 6245 2 GR01
1700
571102 line of machine line of machine line of machine 571102
900
900
4800
4800
4800
5200
5000
5000
5200
5200
5000
5000
5200
1700 Edge of Slab Edge of Slab Edge of Slab
2000
Switch Room 1
line of machine line of machine
1000
1100
2000
3200
800
800
GR01
3400
3400
2800
3850
2050 1700 2300 3300 1800 2700
1270
1270
270 800
1100
1400
23800 2025 3000 13750 3000 2025
- 0.15 W1 W1
1000
1000
1000
GR01C GR01B
Curb Level
2225 3000 13750 3000 2225
- 0.30 LOOSE GRAVEL X 622853.034
X 622848.026 Y 809031.106 5500 5500 6500 6500
Y 808997.634 Road Level
5500 5500 6500 6500
24200
2000 24200 2000
1
571102
Ground Floor Plan Ground Floor Plan at Upper Window Level at 3.00m
1 SCALE 1:100 2 SCALE 1:100
3
3 571102
571102
24200
24000
24200
- 0.30 - 0.30
5500 5500 6500 6500 Road Level Road Level
2400
2850
2850
- 0.30
± 0.00 - 0.15 - 0.15
Road Level - 0.15
F.F.L Curb Level Curb Level
Curb Level
2350
1900
Culvert Room 6
1900
- 2.90 + 4.00
1100
+ 5.90 + 4.00
4 Culvert Level BS01 571102 -1.45
2 4 T.O.S T.O.S
2
F.F.L. 571102 T.O.S 571102
571102 Line of structure Line of structure Line of structure 571102
4600
4800
5200
5000
5000
5200
5200
5000
5000
5200
opening above opening above opening above 1250
- 0.15
Line of structure Line of structure Curb Level
2650
2650
A opening above opening above A A
571102 571102
3850
3850
571102 571102 + 4.60
23600 Granite capping
2000 T.O.P 23800 2000
- 0.15
1000
Curb Level
FINISHING SCHEDULE
GR01 EPOXY COATING 200mm MORTAR BASE CEMENT PLASTER 20-25mm PAINT ON CEMENT PLASTER
Switch Room 1 (WITH HARDENER) WITH EPOXY PAINT WITH PAINTS
GR02 EPOXY COATING 200mm MORTAR BASE CEMENT PLASTER 20-25mm CEMENT PLASTER 20-25mm
INTAKE SHAFT (WITH HARDENER) WITH EPOXY PAINT WITH PAINTS WITH PAINT
BS01 EPOXY COATING 200mm MORTAR BASE CEMENT PLASTER 20-25mm PAINT ON CEMENT PLASTER
Culvert Room (WITH HARDENER) WITH EPOXY PAINT WITH PAINTS
FINISHING SCHEDULE
5 SCALE N.T.S
1300
1300
+4.60 +4.60 + 4.60 + 4.60
T.O.P 02 06 02 T.O.P T.O.P 02 T.O.P
External Smooth Paint on Plaster
02
(Light Color)
600
600
600
600
1100
1100
1100
05 01 01 01 01 05
+4.00 +4.00 + 4.00 + 4.00
T.O.S. T.O.S. T.O.S. T.O.S.
01 03 Granite Skirting
900
900
300 900
01
6200
6200
01
3900
4900
4900
4000
4000
4000
4000
05 02
02 02 05 04 G.RC. screen (NOT USED)
2050
2050
01 01
01 01 Exhaust Fan with
2200
01 aluminum weather
+ 0.00 + 0.00 + 0.00 cover and insect net + 0.00
Ground F.F.L Ground F.F.L Ground F.F.L Ground F.F.L 05 Groove 30 mm
600
600
03 03 03
300
300
300
300
Elevation 1 Elevation 2
- 0.30 - 0.30 - 0.30 - 0.30
Road Level Road Level Road Level Road Level 06 Granite capping
1 SCALE 1:100
2 SCALE 1:100
+ 5.90 + 5.90
T.O.S T.O.S
1300
1300
+ 4.60 01 + 4.60 + 4.60 01 + 4.60
T.O.P 06 T.O.P T.O.P 06 T.O.P
300 1100 100
1100 100
950 150
600
600
600
600
920
01 02 05 02 01
02 02
+ 4.00 + 4.00 + 4.00 + 4.00
T.O.S. T.O.S. T.O.S. T.O.S.
05
1260
300 900
300 900
01 01
6200
6200
02 05
3900
4900
4900
4000
4000
4000
4000
05 05
3100
3100
01 01
1870
01 01
2200
2200
01
01
+ 0.00 + 0.00 + 0.00 + 0.00
Ground F.F.L Ground F.F.L Ground F.F.L Ground F.F.L
600
03 03 03
300
300
300
300
Elevation 4
- 0.30 - 0.30 - 0.30 - 0.30
Road Level
Elevation 3 Road Level Road Level
4
Road Level
600
±0.00 handrail handrail ±0.00 270 270 270 270 270 770 270 270 270 270 270 270 270 270 285 S1
Brick wall
900 450
1300
1300
+4.00 +4.00
900
900
T.O.S. Line of machine T.O.S. 7 F.F.L
1800
425
Line of machine Line of machine Line of machine Aluminum weather cover 571102
6200
04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 ± 00.00
at the exhaust fan
3100
F.F.L
4900
4000
4000
900
Epoxy coating
850
Switch Room 1
(with hardener)
GROUND FLOOR STAIRS
3100
18X161cm=2.90m
2650
F.F.L
425
2900
425
900
300
Epoxy coating
Steel
850
(with hardener)
- 0.30 - 0.30 - Epoxy coating
1450
on concrete handrail
1250
Road Level -Epoxy coating Road Level (with hardener)
Culvert Room
2900
2900
(with hardener) - S.O.G 270 270 270 270 270 270 270 270 EQ.
2600
2600
S1
425
-Re-inForced BS01 -2.90 -2.90
-1.45
F.F.L F.F.L 571102 Epoxy coating
1100
Concrete Slab.
1450
900
F.F.L EQ. EQ.
(with hardener)
-2.90 on concrete
01 02 03 04 05 06 07 08 09 EQ. EQ.
161
F.F.L
- 2.90 - 2.90 EQ. EQ.
Culvert Level Culvert Level
-Epoxy coating
SECTION S1 BASEMENT FLOOR STAIRS
(with hardener)
Section A-A HANDRAIL DETAILS
-Re-inForced
Concrete Slab. 5 SCALE 1:100
7 SCALE 1:20
STAIR DETAILS
6 SCALE 1:50
91
TD_CV_ST_***_***.dwg
CM4P1 - DD - DR - WED - S18 - WAR - 571103 - JDC - S01 DRAWING NUMBER
IN OUT IN
OUT
IN OUT OUT IN
3100
HANDLE HANDLE LOCK WITH KEY
STRUCTURAL OPENING
2200
2200
PUSH PLATE
1000
KICK PLATE KICK PLATE
HANDLE OUT
OUT
2500 IN
STRUCTURAL OPENING
800
STRUCTURAL OPENING IN PLAN
DOOR TYPE A1 DOOR TYPE A2 (Machine Door)
1 SCALE 1:20 PLAN 2 SCALE 1:20
PRE-CAST
CONCRETE
LINTEL
900
900
A
-
6mm THICK CLEAR GLASS
EXHAUST FAN WITH PVC
WEATHER COVER AND
INSECT NET
OUT
2500
2500
1800
1800
3000
PLAN
92
DATE REVISION DESCRIPTION DRAWN BY CHECKED BY APPROVED BY 01- LEVEL ±0.00=(+ 81.00) NUMBER
TD_CV_ST_***_***.dwg
CM4P1 - DD - DR - WED - S18 - WAR - 572101 - JDC - S01 DRAWING NUMBER
3 B
572103 572103
1850 1000 2850 150 1000 150 4800 150 1000 150 1150 2500 3600 2500 3600 2500 1150 150 1000 150 4800 150 1000 150 2850 1000 1850
POLYURETHANE COATING -0.30 POLYURETHANE COATING -0.30 -0.30 POLYURETHANE COATING POLYURETHANE COATING
LOOSE GRAVEL Road Level ON CONCRETE RAMP Road Level Road Level ON CONCRETE RAMP
ON CONCRETE STAIRS ON CONCRETE STAIRS
300
300
LOOSE GRAVEL
2900 2900 9700 4000 2100 4000 2100 4000 9700 2900 1900
2400
2400
2400
2400
X 622954.731 ±0.00 -0.15 ±0.00
2100
2100
-0.15 -0.15 -0.15
Y 809353.717 F.F.L Curb Level F.F.L
Curb Level Curb Level Curb Level
POLYURETHANE COATING X 622949.575
ON CONCRETE STAIRS D D D D D Y 809396.406
GR01A GR01B GR01C GR01D GR01E
1000
650
650
650
1050 500 1000 11400 2500 3600 2500 3600 2500 11400 1000 1650
INTAKE SHAFT 6055
2050
4 ±0.00 ±0.00 7 2
1900
D ±0.00
800
-1.45
1300
1300
1300
±0.00
900
2800
2800
2800
2800
2800
2920
572103
GR02 GR02 F.F.L F.F.L Switch Room 2 F.F.L 572103 F.F.L 572103
F.F.L
115X140cm line of machine line of machine line of machine GR01 line of machine line of machine line of machine
4800
5200
5000
5000
5200
300 1700 Louvers Edge of slab Edge of slab Edge of slab Edge of slab Edge of slab Edge of slab
1820
1820
A line of machine line of machine A
770
770
770
770
770
3400
660
2850
572103 Edge of slab Edge of slab 572103
2650
-0.15
Curb Level 1700 3700 1800 4600 2300 3300 2300 3300 2300 3300 2300 2700 1300 1600 2230 2560 1510
1230
1230
1230
1230
1230
1220
300 730
300 730
2000 42800 1000
1000
1000
1000
X 622959.695 Curb Level Curb Level 5x15cm Groove Curb Level Y 809397.006
Y 809354.315
LOOSE GRAVEL -0.30
LOOSE GRAVEL Road Level
5700 150 1000 150 10900 150 1000 150 4800 150 1000 150 10900 150 1000 150 5700
6250 6100 6100 6100 6100 6100 6250
2000 43200 1000
1 B
572103 572103
43200
1700 4000 150 1000 150 4800 150 1000 150 850 300 2500 300 850 1300 850 300 2500 300 850 1300 850 300 2500 300 850 150 1000 150 4800 150 1000 150 4850 850
W W W W W W W W W W
GR01A GR01B GR01C GR01D GR01E GR01F GR01G GR01H GR01I GR01J
700
900 500
350 4000 1300 4800 1300 850 3100 850 1300 850 3100 850 1300 850 3100 850 450 850 4800 1300 4000 1500
900
2600
Switch Room 2
GR01
4800
5200
5000
5000
5200
250
3000
3000
W
GR01K
2000
2000
W
GR01S
42800
500 5000 1300 5000 900 5000 1300 4800 1300 5000 900 5000 1300 5000 500
400
400
600
600
W W W W W W W
GR01R GR01Q GR01P GR01O GR01N GR01M GR01L
700 5000 150 1000 150 5000 900 5000 150 1000 150 4800 150 1000 150 5000 900 5000 150 1000 150 5000 700
43200
GR01 EPOXY COATING 200mm MORTAR BASE CEMENT PLASTER 20-25mm CEMENT PLASTER 20-25mm
Switch Room 2 (WITH HARDENER) WITH EPOXY PAINT WITH PAINTS WITH PAINT
GR02 EPOXY COATING 200mm MORTAR BASE CEMENT PLASTER 20-25mm CEMENT PLASTER 20-25mm
INTAKE SHAFT (WITH HARDENER) WITH EPOXY PAINT WITH PAINTS WITH PAINT
FINISHING SCHEDULE
3 SCALE N.T.S
93
DATE REVISION DESCRIPTION DRAWN BY CHECKED BY APPROVED BY 01- LEVEL ±0.00=(+ 81.00) NUMBER
TD_CV_ST_***_***.dwg
CM4P1 - DD - DR - WED - S18 - WAR - 572102 - JDC - S01 DRAWING NUMBER
3
572103 B
572103
43200
43000
300
300
2400
2400
±0.00 -0.15 -0.15 -0.15 -0.15 ±0.00
2100
2100
2850
POLYURETHANE F.F.L. Curb Level Curb Level Curb Level Curb Level F.F.L.
COATING TREAD
2900 2900 9700 4000 2100 4000 2100 4000 9700 2900 1900
+5.90
300 1700 T.O.S. +4.60
Granite capping +4.60
T.O.P.
2350
T.O.P. 2
4
1900
572103 ±0.00 572103
8600
PENT HOUSE
F.F.L.
4800
5200
5000
5000
5200
2000 1350 +4.00
Granite capping
A T.O.S. A
572103 572103
+4.60 +4.60 Granite capping
T.O.P.
3700
42800 T.O.P.
1 B
572103
572103
Roof Plan
1 SCALE 1:100
3 B
572103
572103
43200
650
4800
30625
4 -2.90 Culvert Room -2.90 7 2
1100
900
-1.45 572103
572103 F.F.L F.F.L 572103
BS01 F.F.L
Line of structure Line of structure Line of structure Line of structure Line of structure Line of structure
5200
5000
4600
5000
5200
opening above opening above opening above opening above opening above opening above
A A
Line of structure Line of structure
2850
572103 opening above 572103
opening above
42600
43200
1 B
572103 572103
Basement Plan
2 SCALE 1:100
FINISHING SCHEDULE
3 SCALE N.T.S
94
DATE REVISION DESCRIPTION DRAWN BY CHECKED BY APPROVED BY 01- LEVEL ±0.00=(+ 81.00) NUMBER
TD_CV_ST_***_***.dwg
CM4P1 - DD - DR - WED - S18 - WAR - 572103 - JDC - S01 DRAWING NUMBER
ELEVATION FINISHES
1400
1300
1300
+4.60 +4.60 +4.60 +4.60 03
T.O.P
01
04 02 04 5x15cm Groove 04 T.O.P T.O.P 04 T.O.P Granite Skirting
740 280
740 280
280
500
500
600
600
1020
1100
920
01
180
180
02 01 02 01 01 02 02 05 04 Granite Capping
+4.00 +4.00 +4.00 +4.00
180
T.O.S. T.O.S. T.O.S. T.O.S.
900
1260
1260
900
900
6200
6200
05 Groove 30 mm
3900
3900
180
4900
4900
4100
4100
4000
4000
02 02 05 05 02 01 Aluminum
180
180
05 05 02 5x15cm Groove 01
01 01 weather cover
2150
5x15cm Groove 5x15cm
1870
1870
1870
1870
01
01 01 01 05 Groove at the exhaust
01 01 fan & insect net
±0.00 ±0.00 ±0.00 ±0.00
Ground F.F.L Ground F.F.L Ground F.F.L Ground F.F.L
600
600
600
600
600
03 03
600
03 03
300
300
300
300
-0.30
Road Level Elevation 1
-0.30
Road Level
-0.30
Road Level Elevation 2 -0.30
Road Level
1 SCALE 1:100
2 SCALE 1:100
Epoxy coating
(with hardener)
on concrete 5000
S1
270 270 270 270 270 770 270 270 270 270 270 270 270 270 572103
-1.45
1300
1300
900
900
F.F.L ±0.00
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 F.F.L
STEEL
+5.90 +5.90
GROUND FLOOR STAIRS HANDRAIL
T.O.S. T.O.S.
04
1300
1300
1300
+4.60 01 +4.60 +4.60 01 +4.60 S1
T.O.P 04 02 04 02 04 T.O.P T.O.P 02 T.O.P
270 270 270 270 270 270 270 270 572103
300 740 100
280
600
600
600
600
-1.45
1100
900
-2.90
180
180
1100
02
740
740
01 02 01 5x15cm Groove 01 5x15cm Groove 01 05 01 02 05 01 F.F.L F.F.L
+4.00 +4.00 +4.00 +4.00 1 2 3 4 5 6 7 8
180
T.O.S. T.O.S. T.O.S. T.O.S.
900
900
900
01
6200
6200
BASEMENT FLOOR STAIRS
3900
3900
180
180
4900
4900
4000
4000
4000
4000
05 02 05 05
3400
3400
01 Paint on brick
3100
3100
3100
5x15cm Groove 5x15cm Groove 01 01 05
1870
1870
2500
2500
handrail
2500
01
2200
2200
01
2200
01 01
01 01
±0.00 ±0.00 ±0.00 ±0.00
Ground F.F.L Ground F.F.L Ground F.F.L Ground F.F.L Steel
600
600
900
03 03 03 03
±0.00 8 handrail ±0.00
300
300
300
300
F.F.L 572103 F.F.L
-0.30 -0.30 -0.30 -0.30
Road Level
Elevation 3 Road Level Road Level
Elevation 4
Road Level
3 SCALE 1:100 4 SCALE 1:100 Epoxy coating
(with hardener)
18X161cm=2.90m