You are on page 1of 252

AHMED LASHIN

A R C H I T E C T
CURRICULUM VITAE
PORTFOLIO SAMPLE
2018
Table of Contents :
1. Briefing.

2. Work Experience.

3. Construction Drawings Projects.

4. Fitout Projects.

5. Design Projects.
Briefing

Eager to gain experience and to apply my education, skills and short experience,
with the ambition to enhance my skills to be an effective employee inside work organization.

Personal information :
• Name: Ahmed Youssry Lashin .
• Nationality: Egyptian.
• Date of birth: 30 / 11 / 1986.
• Military status: Exempted.
• Resident: Heliopolis.
Contacts :
• Mobile: +2 0100 36 40 366
• E-mail: ayzlashin@hotmail.com
ayzlashin@yahoo.com
ayzlashin@gmail.com
Education :
• 1990 – 2003 El Nozha language schools in Heliopolis .
• 2003 – 2008 Bachelor of Architecture - faculty of engineering , Ain-Shams university , Architecture department.
• 2013 – 2016 Master of Science in Architecture Design and Research - faculty of engineering ,Ain-Shams university ,
Architecture department.
Briefing
Career Qualifications :
Master of Engineering, Architecture department, Faculty of Engineering, Ain-Shams University, Cairo, Egypt.
• Over-all grade: Very Good.
Bachelor of Engineering, Architecture department, Faculty of Engineering , Ain-Shams University, Cairo, Egypt.
• Over-all grade: Good.
• Graduation year: 2008.
• Graduation project : Virtual Reality Valley
• Graduation project grade: Very Good.

Personal skills & Competencies :


• Languages :
1- Arabic - mother tongue.
2- English - fluent.
3- German - fair.
• Professional Photographer for multiple companies & studios.
• Graphic Designer.
• Teacher Assistant at Arab Academy for Science, Technology & maritime transport.
Briefing

Social skills & Competencies :


• Living & working with other people in multicultural environments thanks to handiness in communicating & strong will to
share different experiences.
• Good relational abilities of insertion in new atmospheres of job.

Technical skills & Competencies :


1- Excellent competencies in AutoCAD .
2- Excellent competencies in 3d studio max .
3- Excellent competencies in Adobe Photoshop .
4- Good competencies in Revit Architecture.
5- Good competencies in Adobe illustrator.
6- Good competencies in Adobe in Design.

Organizational Skills & Competencies :


• Ability to coordinate between different disciplines & administrate architects and activities with an excellent use of time and
budget.
Other Skills :
• Excellent presentation skills.
Work Experience

Projects Participated in at EHAF Consulting Engineers :


Design Development & Working drawings and Details for Greater Cairo Metro Line 4.
Design Development & Working drawings for Ministry of Justice Building in Riyadh - K.S.A.
Design Development & Working drawings for City Gate & Mivida
Compounds In the 5th Settlement - New Cairo – Egypt.
Design Development & Working drawings for Armed Forces Club in Nasr City.
Design Development & Working drawings for Schlumberger Oil and gas services and products
Workshops in Egypt.
Architectural Design for the ministry of Interiors Tactic Village, Police Stations &
Administration buildings.

Projects Participated in at S.A. Architects :


Developing working drawings , Designing Construction Details & b.o.q. for several architectural
projects ( villas – administration buildings - retail stores ).

Projects Participated in at Cube Consultants :


Design the New master Plan for Greater Cairo Cairo 2050 urban Project.
Working Drawings For the Renovation of the National Theater in Attaba Square, Cairo, Egypt.
Design Development , Working drawings and Details & construction supervision for
the Railway Stations Development Project.
Construction Drawings Projects

Ministry of Electric and Water Resources P.008


Barwa Bank H.Q. P.020
Khrityat Masjid and Majlis P.029
Tactic Village for Combat Operations P.039
Schlumberger Egypt Workshops Project P.061
Greater Cairo Metro Line 4 Workshops Project P.080
Ministry of Finance in Saudi Arabia P.098
City Gate Residential Compound P.104
Egypt Railway Stations Project P.119
Teegan Residential Compound P.129
Ministry of Electric and Water Resources

Client : Qatary Ministry of Electric and water resources


Location : lusail - Doha - Qatar
Leed Consultant : EHAF
Scope of Work : Working drawings and coordination as a senior architect
A 01-10-2017 ISSUE FOR APPROVAL

REV. DATE DESCRIPTION BY

U.D.D STAMP MUNICIPALITY STAMP

Enquiry No. : --------------- Application No : N/2017/0002775


CONSULTANT REG. No : 99/M GRADE : A CONSULTANT REG. No : 000000 GRADE : A
CONSULTANT STAMP & SIGNATURE : SUB-CONSULTANT STAMP & SIGNATURE :

TECHNICAL MANAGER : Shereif Ahmed TECHNICAL MANAGER

REGISTRATION No. : 6120 REGISTRATION No :

57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
TEL : (974) 402037 77 / 88 /
99
FAX : (974) 402037 66
P.O. BOX1876, DOHA-QATAR
www.ehaf .com
CONSULTING ENGINEERS
PROJECT
QEWC TOWERS ( KAHRAB TOWER )
LUSAIL CITY - MARINA COM 53
LOCATION:
LUSAIL CITY - MARINA COM 53
CLIENT:
QATAR ELECTRICITY & WATER CO.
03/08/2017
DATE: JOB NO.:
0321
TITLE:

PERSPECTIVES
NIGHT PERSPECTIVE AERIAL PERSPECTIVE
GR-006-00
DRAWING NO.: SCALE:
@A1

DRAWN BY: DESIGNED BY: CHECKED BY:


M.S./S.M. H.O./M.A. O.M.
CAD FILE: REGISTRATION No. : REGISTRATION No. :
4265 3881
REVISION SIGNATURE SIGNATURE

9
N 402975.5278
E 230941.1565
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

C
Y1.2

B
Y1.1 Y.4

Y.3 N 403121.4988
E 230892.5049

5000
Planter Y.2 Planter

SHADE ABOVE Y.1


SHADE ABOVE

Q
AR-203-00

Planter 1 X.8

W.wall
BASEMENT PARKING
P ENTRANCE

42000
PL.
5000 X.7

47000
PL. DN
DN
PL.
N
W.FEATURE PL. Planter PL.
X.6
W.wall
PL. PL.
PL.

X.8 PL.

W.wall
PL.
Planter
PL. Planter PL.

M
PODIUM PARKING X.5
PL.
ENTRANCE
PL. X.7
TOWER-1 T1.3 PL.

T1.4
ENTRANCE
PL.

PL.

T1.2
L PL.
X.4

1.0m
PL.
W.wall
10000 T1.5
X.6
T1.1
TOWER-2
K
ENTRANCE T2.7
Planter T2.9
T1.6 X.5
15000 R2.3 T2.10

1.0m
Planter T2.6
R2.4 T2.7
J
T1.7 R2.2 NOTES:

TOWER-1
4
Planter
X.4
3
1 2

C1.1 T2.6
C2.1 T2.5
QND= +3.00 M ( + 0.00 M ROAD LEVEL )
T1.7 C1.1
T2.8
PL. R2.1
H T2.4
T1.6
3
4
T2.5
T2.3
2
1

C2.1
T2.7 T2.4
T1.1
G T2.3
T1.5
T2.6 T2.2

TOWER-2
1.0m

T1.2
F
1.0m

T1.4 T2.1
T1.3 T2.2

PODIUM ROOF
T2.5
1.0m

PL.

T2.4 T2.1
E C2.2 00 X.3
1 2
3
4
15 0
T2.3

R2.5
00
T2.10 10 0 A 01-10-2017 ISSUE FOR APPROVAL
X.2
D C2.2
T2.2
PL.
0 DESCRIPTION
50 0 REV. DATE BY

TURE
R2.6
T2.1 R2.8

W.FEA
X.1
T2.8 R2.7 U.D.D STAMP MUNICIPALITY STAMP
C Planter PL.
T2.9
X.3

PL.
W.FEATURE

B SHADE ABOVE
1.0m

PL. X.2 RE
TU
RETAIL ENTRANCE W
.F
EA

PL.

A
RETAIL PARKING DNDN X.1
ENTRANCE
Planter
AREA STATEMENT
10000

Planter Planter

A
Y.4
5000

Planter Planter
Planter
N 403036.6818
E 231073.3011 1 Y.3

D Y1.1
Y1.2 AR-201-00
-
MAIN ENTRANCE
Y.2 N 403219.8104
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Y.1 19 20 21 E 231012.2602
Enquiry No. : --------------- Application No : N/2017/0002775
99/M A 000000 A
SITE DEVELOPMENT PLAN
CONSULTANT REG. No : GRADE : CONSULTANT REG. No : GRADE :

1 CONSULTANT STAMP & SIGNATURE : SUB-CONSULTANT STAMP & SIGNATURE :


GR-001-00
1 : 500

TECHNICAL MANAGER : Shereif Ahmed TECHNICAL MANAGER

REGISTRATION No. : 6120 REGISTRATION No :

57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
TEL : (974) 402037 77 / 88 /
99
FAX : (974) 402037 66
P.O. BOX1876, DOHA-QATAR
www.ehaf .com
CONSULTING ENGINEERS
PROJECT
QEWC TOWERS ( KAHRAB TOWER )
LUSAIL CITY - MARINA COM 53
LOCATION:
LUSAIL CITY - MARINA COM 53
CLIENT:
QATAR ELECTRICITY & WATER CO.
03/08/2017
DATE: JOB NO.:
0321
TITLE:

SITE DEVELOPMENT PLAN / POLICY PLAN &


AREA STATEMENT
GR-001-00
DRAWING NO.: SCALE:
1 : 500 @A1

DRAWN BY: DESIGNED BY: CHECKED BY:


M.S./S.M. H.O./M.A. O.M.
CAD FILE: REGISTRATION No. : REGISTRATION No. :
4265 3881
POLICY PLAN REVISION SIGNATURE SIGNATURE

10
A
30

11
N 403121.4988
E 230892.5049

N 402975.5278 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
E 230941.1565 Y1.2
Y1.1

B
Y.4

C Y.3 9000

5000
9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000

9000
Y.2

VENT. 1800 6000 3500 3500 6000 1800 17525


STAIR-07 VENT.
SHAFT 9000
Y.1 EQUIPMENT SHAFT
MECH. VENT. VENT. MECH. STORE
VENT. STAIR-06 SHAFT SHAFT MECH. RM. VENT.
MECH. RM.
1795 PLENUM PLENUM

1800
SHAFT

4900
SHAFT
LOBBY LOBBY
Q VENT. MECH.

1800
2500

SHAFT PLENUM
7950 6300 2650 1050 7950 1050 7950 1050 7950 1050 5300 325 24175 5150 1050 7950 8625 5800 4345 14805 2650 5300

X.8
MECH. RM.

6300
9400

6000

7950

DRIVEWAY

7950
MECH. RM.

7950 1050 7950 1050 7950 1050 7950 1050 8900 7950 7950 7950
R
15 00

1425
R

00
MECH.
15

R
00

15

15
VENT. R PLENUM

21
00
3

R
P SHAFT

775

00

9000
42000
AR-508-01
5000 X.7

47000
7950

7950

7950
9000

5300
MECH. RM.

7950
3300
00

1050
15

1050

1050

9000
N R
ELECT.

545
7950 1050 7950 1050 7950 1050 7950 1050 7950 950 7950 7950 7950 RM. X.6

12400
DIESEL

5875
TANK

7950
UP

5310
7950

7950
7950
9000

DRIVEWAY
DRIVEWAY X.8

5400 5400 TOTAL NUMBER OF PARKING = 294 + 6 H.C =300


R

725
15
2

9000
00

375
1150
800

2650

1800
2200 9300 4000 1680 MECH.
VENT. VENT.

2275

2275
CONTROL PLENUM X.5
AR-302-00 SHAFT SHAFT

5055
EXHAUST RM.

11275
SHAFT VENT. VENT.

1800

1800
SHAFT SHAFT

7950
VENT. SHAFT

5945
7950

8825
MECH. RM.
9000

7950
SHAFT MECH. RM. VENT. VENT. X.7 SHAFT
EXHAUST

1800

1800
T1.3 SHAFT SHAFT SHAFT
4000 4700 8925 8775
-5.85 FFL GENERATOR

14300
T1.4 VENT. VENT. 4100
2650 1200

3650

MECH. RM. STORE STORE STORE ROOM

2230

2350

9000
1500 5700 2600 SHAFT 5400 5250 SHAFT

2500
VENT.

2650 800
1200

L T1.2 SHAFT
SHAFT
00

1
45
X.4

R3
6335 6535 10750 TELECOM 1000

1800
STORE

3150
STORE VENT.

3500

40
MECH. RM. 2775 ROOM-T1 SHAFT

0
AR-302-00

925
10000 STORE
6000

CORR.

2100
T1.5 VENT.
GSM X.6
7950

3335 SHAFT
9000

7950

3000

7950
SHAFT 2300 ROOM -T1

2790

1600
STORE ELECT.
RM. UP VENT.

13650
SHAFT

0
7950

1800
T1.1
3
6335 5025
00
CCTV VENT.

1050
1800
25
ROOM
STORE 5975 UP SHAFT

0
K
900

R 1200

2500
775
AR-303-00 7950
172.21°
3105

3050 700 VENT.

7675
50 STORE
MECH. RM. 3750 DRIVEWAY T2.7
23

35 STORE SHAFT
00

STORE MALE

10825

1575
4770
MECH. TOILET X.5 T2.9
14

50 8875
T1.6 STAIR-01
00

PLENUM 2650

5600
47 00
7950
9000

MECH. RM.

7925
24 A
R2.3 01-10-2017 ISSUE FOR APPROVAL
15000 T2.10
25

SERVICE
00

CORR.

5800
155.73° RACK

4650
LIFT T2.6
38

ROOM R2.4 T2.7

7950
SERVICE
00

MECH. RM. SMOKE


GARBAGE LIFT T1.7 DESCRIPTION
STOP R2.2 REV. DATE BY
1050

RM. 00
J LOBBY 39
11

00 GARBAGE
30
00

STORE

3575

3575
STORE STORE RM.
LIFT PIT 9400 8675 U.D.D STAMP MUNICIPALITY STAMP
11 00

1 °

5000
STORE X.4
00

.79
12

LIFT PIT MALE


142 ELECT. MALE 8875

9330
00
3000

VENT. PRAYER T2.6

8000
53 TOILET & C1.1 C2.1
29

3250
7950

SERVICES RM.
9000

SHAFT ROOM
00

AR-301-00 ABLUTIONC1.1
4
17

CORRIDOR ENTRANCE T2.5

775
T1.7
00

5300

5300
VENT. SERVICE IDF RM.
6045

LOBBY
1800

SHAFT LIFT MECH. RM.


19

-5.85 FFL T2.8

2650
12 -5.85 FFL AR-303-00
00

VENT. SMOKE 3.5


0° R2.1
2100

STOP
31250

SHAFT
1050

5
1199

1425
H T2.4

1350
LOBBY CORR.

7950

4100
STAIR-02 T1.6
14

3200
VENT. SECURITY
00

LOBBY
1800

RM. PRAYER

5400
52

SHAFT
T2.5
22

FEMALE
00

RM. LOBBY
00 85

5000
00

VENT. TOILET 23 47 6300


1800

SHAFT RETAIL 12 FIRE

2650
C2.1 T2.3
7950

4100
54

FIGHTING
9000

STAIR-03 SERVICE

1050
7950

7950
00
00

STORE

4395
VENT. 30 LOBBY LIFT 1100

3300
2650 1100
T2.7 2300

3000
3200
2500

LOADING T2.4
14

SHAFT GARBAGE
T1.1 97
00

SECURITY 2500
.7 RM. SERVICE
3100

9° RM. STORE JANITOR 4900 LIFT


FEMALE ELECT.
PRAYER 6900
1355

7950
3000
G RM.
R 2500

530

530
1
MECH. RM.

2800
2425
7375

ROOM JANITOR CORR.


T1.5 T2.3

8000
1835

STORE -5.85 FFL


6000

STORE PANORAMIC
UNPACKING 5520 3010 PRAYER ELEVATOR T2.6 6900 T2.2
AR-302-00
5475

5300

5300
STORE

6100
6000

ENTRANCE STORE
5300

RM. LOBBY
3000

LOBBY
3625

775
R 10 3900 CORR.
T1.2
1125

MECH. 00

2650
2255

LOADING
2000

F PLENUM

20080
975

975
--------------- N/2017/0002775
2650
195

RECEIVING T1.4 STORE Enquiry No. : Application No :


FEMALE CORR.
STORE

2650

5800
3460

TOILET & 2600 TOILET T2.1


T1.3 00

6000
T2.2
ABLUTION LOBBY JANITOR 69
99/M A 000000 A
6250

3000
LOADING MECH. CONSULTANT REG. No : GRADE : CONSULTANT REG. No : GRADE :
1800 1400

STORE SHAFT
AREA 4030 CORR. T2.5 PLENUM
7950
9000

7950

7950
RETAIL 13
2
7500

6900 2265 IDF RM. CONSULTANT STAMP & SIGNATURE : SUB-CONSULTANT STAMP & SIGNATURE :
3800

RECEIVING DISABLED SHAFT

4700
LOBBY
4

4800
TOILET SERVICE
8600
AR-302-00 T2.4 FIRE
LIFT
3200

2800
STORE

7700
-5.85 FFL T2.1
R 738 FIGHTING
SERVICE MECH. RM. AR-303-00 6300 5000

3300
LOBBY
3100

X.3
1250

E 00

1270

1270
1475

C2.2
150
6800

LIFT LIFT
STORE
LIFT

2650
STAIR-04
590 2650

T2.3 LOBBY
2215

R DRIVER
12 TOILET LIFT 00
00 28 9450
7950
9300

2650

7950
R2.5
3000 MECH. RM.
T2.10

9000
00
100

5400
2650
GSM
ROOM -T2 X.2

00

R2
R
1200

00

20

1060
D 1735 C2.2
12

00
10

T2.2
Shereif Ahmed

2981
R
00

0
TELECOM TECHNICAL MANAGER : TECHNICAL MANAGER
R

7950 1050 7950 1050 7950 2650 3030 2650 970 7950 1000 7950
ROOM-T2

0
ETS ROOM
REGISTRATION No. : 6120 REGISTRATION No :
0
500
7950
9000

7940
DRIVEWAY DRIVEWAY R2.6

9000
T2.1 R2.8
57 AL-JAZEERA ST.,
2650 775 4200 4200 21775 5300 750 7950 1045 7950 1050 7950 1875 6700
X.1 BIN-MAHMOUD / BEHZAD
00 T2.8 R2.7
R 10 BUILDING, 6th FLOOR
1300

C PR.S 00 TEL : (974) 402037 77 / 88 /


R 3000 5425 3100 STAIR-05 10 T2.9 99
FAX : (974) 402037 66
R
3
3200

3650

X.3 P.O. BOX1876, DOHA-QATAR


4700

POTABLE GARBAGE
MECH. RM. 2650 950 7950 1250 5300 3600 7950 775 5300 3410
RM. www.ehaf .com
CONSULTING ENGINEERS
WATER GARBAGE SMOKE 5175
TANK RM. STOP SERVICE
AR-303-00
7950
9300

LOBBY LIFT DRIVEWAY

6690
1500

5800
-5.85 FFL PROJECT
QEWC TOWERS ( KAHRAB TOWER )
2650

FIRE TANK FIRE TANK


P.W. PUMP
PUMP 4900
RM. ELECT. 8175 7950 1050 7950 1050 7950 1050 7950 3470 2650 3365 LOBBY
8300

5050

ROOM
7250
7100

RM.

LUSAIL CITY - MARINA COM 53


CORR.
1050

B
6000

3300 5025 STAIR-08


POTABLE FIRE TANK MECH. RM. X.2
00

WATER
-5.85 FFL
65

TANK
R

LOCATION:
LUSAIL CITY - MARINA COM 53
2000 31200
7950
9000

500MM HIGH BLOCK


0

MECH. RM.
4650
410

UPDSTAND
R1

LV ROOM
TRANSFORMER
CLIENT:
QATAR ELECTRICITY & WATER CO.
ROOM MV ROOM VENT. -5.85 FFL
A X.1
DN
UP VENT. VENT. SHAFT
2525

VENT. VENT. VENT. SHAFT


VENT. 1 SHAFT SHAFT SHAFT SHAFT SHAFT
-3.45 FFL
5600
1800

1800
03/08/2017
SHAFT
DATE: JOB NO.:
0321
AR-509-01 VENT. VENT.
VENT. 1800 1175 1900 5500 SHAFT 6700 SHAFT 1900 1800 VENT.
SHAFT 36100 17500 4000 SHAFT
10000

TITLE:
Y.4

BASEMENT-1 FLOOR OVERALL PLAN


5000

Y.3
N 403036.6818
E 231073.3011

AR-103-00
DRAWING NO.: SCALE:
Y1.2 Y.2 1 : 300 @A1
1 D 2
Y1.1
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Y.1
19 20 21 DRAWN BY: DESIGNED BY: CHECKED BY:

N 403220.0950
M.S./S.M. H.O./M.A. O.M.

1 BASEMENT-1 FLOOR OVERALL PLAN A E 231012.1653 CAD FILE: REGISTRATION No. :


4265
REGISTRATION No. :
3881
REVISION
AR-103-00
1 : 300 SIGNATURE SIGNATURE

12
N 403121.4988
E 230892.5049

N 402975.5278 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
E 230941.1565 Y1.2
Y1.1

B
Y.4

C Y.3

5000
Planter Planter
Y.2
PARKING

SHADE ABOVE Y.1


SHADE ABOVE
STEEL METAL GRATING

Q
AR-203-00
PARKING
1 X.8
Planter

W.wall 4
AR-508-01
P
PL.

42000
5000 X.7

47000
PL. PARKING
PARKING

DN
UP
PL.
N
W.FEATURE PL. PARKING
Planter PL.
X.6
RAMP TO BASEMENT W.wall
WATER FEATURE PL. PL.
PL.

X.8
PL. TOTAL NUMBER OF PARKING = 80
W.wall
PL.
Planter
PL. Planter PL.

M
X.5
PL. 2
PL. AR-302-00
STEEL METAL GRATING
X.7 PL.
T1.3 1 PL.
T1.4 AR-507-01 PL.

L T1.2 PL.
PL. PL.
X.4

10000
1 W.wall

T1.5 DN
UP
AR-302-00 X.6

EXIT W.FEATURE
CORR.
T1.1 3
K ? AR-303-00
RECEPTION
AREA STAIR-09 T2.7
Planter MALE
TOILET
X.5
RETAIL 10 T2.9
T1.6 A 01-10-2017 ISSUE FOR APPROVAL
CORR. FIRE
15000
FIGHTING SERVICE R2.3 TOWER-2 MAIN ENTRANCE T2.10
DISABLED
LOBBY
T1-ZA-06
STAIR-01 LIFT CORR. Planter T2.6
TOILET
SERVICE R2.4 DESCRIPTION
LIFT T1.7 REV. DATE BY
CORR.
R2.2
J STORE TOWER-1
RETAIL 09
T1-ZA-05 ?
T1-ZA-03 LIFT RETAIL 08 U.D.D STAMP MUNICIPALITY STAMP
1 2
3
4
Planter GARBAGE
RM.
LOBBY
STORE
X.4 TOWER-2 MAIN ENTRANCE
T1-ZA-04 ELECT. RECEPTION
T1-ZA-02
RM.
C1.1 & LOUNGE C2.1
SERVICE
C1.1 ? T2.5
4
LIFT
T1.7
FIRE T1-ZA-01 IDF RM. ENTRANCE
EXIT
FIGHTING LOBBY
CORR.
T2.8
STAIR-02
LOBBY AR-303-00
H PL. F&B 01 WATER
METER
R2.1 FCC.RM
T2.4
T1.6 RETAIL 07 RWS LO.PR
FEMALE CH.W
4
TOILET RETAIL 06
3
2
1

STAIR-03 T2.3

AR-202-00
STAIR-10
C2.1 PR.S FIRE

1
CORR. VENT. FIGHTING SERVICE
P.S CHUTE SHAFT
FROM P1 TO GF
T2.7 LOBBY LIFT
T1.1 GARBAGE ELECT. SERVICE
WATER RM. RM. LIFT
FROM GF TO B1
METER
T2-ZB-02
G
T1.5 CORR. T2-ZB-01
PANORAMIC
F&B 02 T2-ZA-03
AR-204-00

F&B 04 ELEVATOR FROM GF TO B1


T2.6 T2.2
1 FROM B1 TO GF
T2-ZA-01
T2-ZA-02

TOWER-2
T1.2 LIFT

F 1 T1.4
LOBBY
T2-ZB-03
Enquiry No. : --------------- Application No : N/2017/0002775
T2-ZB-04
AR-302-00
99/M A
FROM B1 TO GF
T1.3
STAIR-11
T2-ZA-04
CORR.
T2.1 CONSULTANT REG. No : GRADE : CONSULTANT REG. No : 000000 GRADE : A
DISABLED SHAFT

2
T2-ZA-05
T2.5
PL.
FROM GF TO P1 TOILET
T2-ZA-06
SHAFT CONSULTANT STAMP & SIGNATURE : SUB-CONSULTANT STAMP & SIGNATURE :
RETAIL 05
PR.S
AR-302-00 MALE FEMALE IDF RM.
SERVICE TOILET TOILET
RETAIL 04 FIRE
T2.4 FIGHTING
LIFT
LIFT LOBBY
E F&B 03 SERVICE C2.2 00 X.3
CORR. LIFT F.F STAIR-04
150
4
LO.PR
4
3
1 2

WATER
METER T2.3 SHAFT SHAFT
ENTRANCE
LOBBY
AR-303-00
STAIR-12 R2.5
MALE T2.10 00
TOILET 100
RETAIL 03
X.2
D T2.2 C2.2
F&B 05
TECHNICAL MANAGER : Shereif Ahmed TECHNICAL MANAGER

PL.
RETAIL 02
DISABLED
ENTRANCE
LOBBY
CORR. TOILET REGISTRATION No. : 6120 REGISTRATION No :
CORR.
RETAIL 01
0
500

TURE
FEMALE R2.6
TOILET
T2.1 R2.8 57 AL-JAZEERA ST.,
? PARKING BIN-MAHMOUD / BEHZAD

W.FEA
Planter T2.8 R2.7
X.1 BUILDING, 6th FLOOR
STAIR-05 TEL : (974) 402037 77 / 88 /
C
Planter PL. 99
FAX : (974) 402037 66
GARBAGE
RM.
W.FEATURE
X.3
T2.9
3 P.O. BOX1876, DOHA-QATAR
www.ehaf .com
AR-303-00 CONSULTING ENGINEERS
SERVICE
LOBBY LIFT
PL. PROJECT

W.FEATURE
STORE

SECURITY PLANTER
MAIN ENTRANCE LANDSCAPE
FEATURES QEWC TOWERS ( KAHRAB TOWER )
LUSAIL CITY - MARINA COM 53
RM.
B SHADE ABOVE
PL. Planter 3 2 1
X.2
R E
TU
EA LOCATION:
STEEL METAL GRATING

PL.
W
.F
LUSAIL CITY - MARINA COM 53
CLIENT:
A
DN
UP X.1
QATAR ELECTRICITY & WATER CO.
2
Planter
03/08/2017
DATE: JOB NO.:
0321
RAMP TO BASEMENT
AR-509-01 PARKING
10000

Planter Planter
TITLE:

GROUND FLOOR OVERALL PLAN


Y.4
Planter Planter
5000

Planter
Y.3
N 403036.6818
E 231073.3011
1
AR-104-00
DRAWING NO.: SCALE:
MAIN ENTRANCE
Y.2
1 : 300 @A1
Y1.2 AR-201-00

1 D 2
Y1.1
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Y.1
19 20 21
N 403220.0950 DRAWN BY:
E 231012.1653
M.S./S.M.
DESIGNED BY:
H.O./M.A.
CHECKED BY:
O.M.

A CAD FILE: REGISTRATION No. : REGISTRATION No. :

1 GROUND FLOOR OVERALL PLAN 4265 3881


REVISION SIGNATURE SIGNATURE
AR-104-00
1 : 300
A

13
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Y1.2
Y1.1 Y.4

Y.3

5000
Y.2

Y.1

Q
AR-203-00

1 X.8

5000 X.7

47000
N

X.6

X.8

M 2
X.5
AR-302-00

X.7
T1.3
T1.4

L T1.2
X.4
NURSING
FEMALE ROOM
TOILET

T1.5 JANITOR
DN DN
UP X.6
1
AR-302-00
3
T1.1
AR-303-00
K
OPEN TO
BELOW T2.7 A 01-10-2017 ISSUE FOR APPROVAL
STORE 2
X.5 T2.9
T1.6 DISABLED STAIR-01 AR-507-01
CORR. FIRE STAIR-09
TOILET
FIGHTING SHAFT RETAIL 11 +6.95 FFL REV. DATE DESCRIPTION BY
15000 R2.3 T2.10
LOBBY
SERVICE T2.6
CORR.
CORR.
SERVICE LIFT R2.4 U.D.D STAMP MUNICIPALITY STAMP
LIFT T1.7
GARBAGE R2.2
J PR.S
RM. TOWER-1 GARBAGE
MEP
LIFT RM. RETAIL 10
STORE

1
LOBBY
STORE X.4
+6.95 FFL ELECT.
RM. C1.1 C2.1
VOID
AR-301-00 C1.1 T2.5
T1.7 MALE
SERVICE
STAIR-02 IDF RM. TOILET
LIFT
RETAIL 09 T2.8
SHAFT STORE
WATER R2.1
H METER T2.4
CORR.
T1.6
FACILTY
STORE
?
MECH. RM. MANAGEMENT
4 T2.3

AR-202-00
C2.1 FIRE +6.95 FFL
AR-303-00
RETAIL 01
T2.7
CHUTE
STAIR-03
FIGHTING
LOBBY 1
T1.1 GARBAGE SERVICE
RM. LIFT
WATER ELECT.
STAIR-10
METER RM.
G
T1.5 CORR.
MAIN
AR-204-00

CORRIDOR
+6.95 FFL T2.6 T2.2
1 +6.95 FFL ATRIUM Enquiry No. : --------------- Application No : N/2017/0002775
TOWER-2
T1.2 LOBBY LIFT CONSULTANT REG. No : 99/M GRADE : A CONSULTANT REG. No : 000000 GRADE : A
F LOBBY
T1.4
+6.95 FFL CONSULTANT STAMP & SIGNATURE : SUB-CONSULTANT STAMP & SIGNATURE :
T1.3 T2.1
CORR.

T2.5 DISABLED
RETAIL 07
TOILET

2 IDF RM.

4
RETAIL 06 STAIR-11 SERVICE FEMALE
AR-302-00 T2.4 LIFT
MALE TOILET
TOILET

E STAIR-12 SERVICE AR-303-00 LIFT X.3


LIFT
C2.2 00
150
LIFT
LOBBY
STORE
T2.3 STAIR-04
LIFT
RETAIL 02 CORR. WATER
METER

R2.5
MALE

CORR.
TOILET RETAIL T2.10 TECHNICAL MANAGER : Shereif Ahmed TECHNICAL MANAGER

X.2
D
RETAIL 05
C2.2
REGISTRATION No. : 6120 REGISTRATION No :
T2.2
RETAIL 04
DISABLED
RETAIL 03 TOILET
57 AL-JAZEERA ST.,
NURSING 0 BIN-MAHMOUD / BEHZAD
ROOM R2.6 500 BUILDING, 6th FLOOR
FEMALE
R2.8 TEL : (974) 402037 77 / 88 /
TOILET T2.1
99
FAX : (974) 402037 66
X.1 P.O. BOX1876, DOHA-QATAR
T2.8 R2.7 www.ehaf .com
C
STAIR-05 T2.9
CONSULTING ENGINEERS
GARBAGE
X.3 3 PROJECT
RM.
SMOKE
STOP
LOBBY
SERVICE
LIFT
AR-303-00 QEWC TOWERS ( KAHRAB TOWER )
+6.95 FFL
LUSAIL CITY - MARINA COM 53
B LOCATION:
X.2
LUSAIL CITY - MARINA COM 53
CLIENT:
QATAR ELECTRICITY & WATER CO.
03/08/2017
DATE: JOB NO.:
A X.1 0321
TITLE:

PODIUM-1 FLOOR OVERALL PLAN


Y.4
5000

AR-105-00
DRAWING NO.: SCALE:
Y.3 1 : 300 @A1

1 DRAWN BY: DESIGNED BY: CHECKED BY:


Y1.2 Y.2
Y1.1
AR-201-00 M.S./S.M. H.O./M.A. O.M.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 CAD FILE: REGISTRATION No. : REGISTRATION No. :
Y.1
4265 3881
REVISION
PODIUM-1 FLOOR OVERALL PLAN
SIGNATURE SIGNATURE
1 A
AR-105-00
1 : 300

14
2
T1.5 AR-302-00 T1.4

T1.6 T1.3

DISABLED TOILET
T1.7 T1.2
MEP MEP

400
OFFICE-04 TOI.
VENT.

1050
SHAFT
+36.40 FFL CH.W
LOBBY

2140

2200
TOI.
CHUTE OFFICE-01

1050
1800 +36.40 FFL

MEP
CORR. PANTRY
GARBAGE RM. CORR.

1550

1400
2200 2500 3000 4200

1300 1600 PR.S 6


2200 2400 A 01-10-2017 ISSUE FOR APPROVAL
T.LOBBY AR-501-01

1200

1200
CORR. TOI.
6

2500
T1-ZA-04 T1-ZA-08 +36.40 FFL
REV. DATE DESCRIPTION BY
AR-501-01 PANTRY
TOI. SHAFT SMOKE STOP LOBBY STAIR-01
1600

2600
U.D.D STAMP MUNICIPALITY STAMP

PR.S
SERVICE LIFT

5700
STAIR-02 T1-ZA-03 TOWER-1 LIFT T1-ZA-07
LOBBY
5700

SHAFT
T1.1 T1.1

10100
SERVICE LIFT
1 SHAFT 1
AR-302-00 +36.40 FFL AR-302-00
2700
T1-ZA-02 T1-ZA-06 PR.S
+36.30 SSL 1200

SHAFT PANTRY

1600
1600 2200

1200
+36.40 FFL SMOKE STOP LOBBY
TOI.
2500

T1-ZA-01 T1-ZA-05
TOI. T.LOBBY

1100

1200
2400
PR.S 1300
CORR.

SHAFT 2200 4200


Enquiry No. : --------------- Application No : N/2017/0002775
ELECT. RM.
99/M A 000000 A
1400

1400

CORR. CONSULTANT REG. No : GRADE : CONSULTANT REG. No : GRADE :

1700
PANTRY 3800 2700

CONSULTANT STAMP & SIGNATURE : SUB-CONSULTANT STAMP & SIGNATURE :


1800
P.S
TOI.
1050

LOBBY 1200
IDF RM.
WATER METER
1900

1900
TOI.
1100
400

MEP MEP OFFICE-02


+36.40 FFL
T1.2 OFFICE-03 C1.1 T1.7
+36.40 FFL
TECHNICAL MANAGER : Shereif Ahmed TECHNICAL MANAGER

REGISTRATION No. : 6120 REGISTRATION No :

57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
TEL : (974) 402037 77 / 88 /
99
FAX : (974) 402037 66
P.O. BOX1876, DOHA-QATAR
www.ehaf .com
CONSULTING ENGINEERS
PROJECT
QEWC TOWERS ( KAHRAB TOWER )
LUSAIL CITY - MARINA COM 53
LOCATION:
LUSAIL CITY - MARINA COM 53
T1.3 T1.6
CLIENT:
QATAR ELECTRICITY & WATER CO.
09/07/2017
DATE: JOB NO.:
0321
TITLE:

TOWER-1 2ND FLOOR PLAN


1 TOWER-1 2ND FLOOR PLAN T1.4 T1.5
AR-T1-102-00
DRAWING NO.: SCALE:
1 : 100 @A1
AR-T1-102-00
1 : 100 2
AR-302-00 DRAWN BY: DESIGNED BY: CHECKED BY:
M.S./S.M. H.O./M.A. O.M.
CAD FILE: REGISTRATION No. : REGISTRATION No. :
4265 3881
REVISION SIGNATURE SIGNATURE

15
X.4 T2.7 T2.6 T2.5 T2.4 T2.3 T2.2 T2.1 X.3 PROJECT NAME AND LOCATION
18 19
QEWC TOWERS
LUSAIL CITY - MARINA COM 53
4
AR-303-00
( KAHRAB TOWER )
54000
NORTH PIN NO.
69060093
10500 5800 8000 4100 4100 8000 5800 7700
Kib PLANING
lah NO.

KEY PLAN

TOWER-2
TOWER-2 OFFSET LINE
OFFSET LINE
17
DN

DN

DN

DN

R2.5
DN

Y.3 R2.4
DN DN

16
°
.00

35
35

.0
F.H.C


WD13 WD13

100

ELEC.
WD05 WD04
AC01 0°
5.0
4400 1600 7600 3200 10

Y.2 3

810

810
SD07

1800
1800
3000 4000 3000
AR-303-00 MECH.

1200

1200
1600
BY 2000

R2.3

3050
TENANT F.H.C

1550

1550
AC01

650
650
K R2.6

1125

1125
700 800 150 1100 1000 1500 650

AC01 SD01 2000 2300

TOI.
BY BY

1200

1200
+101.85

2100
2100
F.F.L TENANT TENANT
PANTRY CORR. 1600 4500
TOI.

3200

1150

1150
WD04
AC01
+63.35
F.F.L
AC01
AC01
3
15 AR-303-00

1700
1700
1200

1200
1300
2800 800 2300
800
WASH TOI. AC01 AC01 TOI. WASH
30.00°

30.00°
1200

1200
PG

1100
WASH TOI. AC01
ELEC.
MECH. AC01 TOI. WASH

1200

1200
AC01 4900 AC01
Y.1

1175

1175
TOI. TOI.

3200
2100 1000 2800
PANTRY CORR. CORR. PANTRY
1350

1200

1200
TOI. AC01 TOI. JANUARY
Rev-00 DETAILED DESIGN H.O/M.A O.M M.I
2018

R2.2 R2.7
1400 1700 SD07
650 1500 650 3300

1125

1125

400
ISSUE DESCRIPTION DATE DRAWN CHECK. QA/QC
2100

SD07

1100
SD01
GARBAGE 9
2050 1050 OWNER
2850

1200

1200
CHUTE
BY
AR-504-01 BY
+63.35 AC01
TENANT
2050 TENANT
F.F.L

1300
AC01

750
815

810
SD06
4400 7600 4400
F.H.C AC01
WD04 WD05

14 ELEC.

WD13 WD13 PROJECT MANAGEMENT\ CONSTRUCTION MANAGEMENT

°
.00
35

35
.0

F.H.C

C2.1 C2.2 LEAD CONSULTANT

R2.8 57 AL-JAZEERA ST., BIN-


MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
TEL: (+974) 4020 37 77 / 88 /
99 FAX : (+974) 4020 37 66
P.O BOX1876, DOHA, QATAR.
W W W .EHAF.COM

R2.1 PROJECT DESCRIPTION

3 BASEMENTS+ GROUND + 6 PODIUM +


TOWER-1 ( 21 FLOORS + ROOF + MECH ) +
13 TOWER-2 ( 37 FLOORS + ROOF + MECH )

DRAWING TITLE

J 10500 5800 8000 4100 4100 8000 5800 7700


TOWER-2 9TH FLOOR PLAN

DRAWING NO.: PART


54000

AR-T2-109-00 --
DRAWN BY: CHECKED BY: STAGE: REVISION:
4 H.O/M.A/E.P/S.M/A.A O.M WD
Rev-00
AR-303-00
H G 9TH FLOOR PLAN
F E D C
VERIFIED BY: APPROVED BY: PLOT DATE:

1 TOWER-2 Designer H.H JAN.2018

@A1
PROJECT NO.:
1 : 100
SCALE:
AR-T2-109-00
1 : 100
FILE NAME:
321
AR-T2-109-00

16
13 14 15 16 17 18 19 HIGHEST POINT
+199.50 m SSL

MC1

7100
T2_PARAPET
+192.40 m SSL
190.15
T.O.P.
T2_UPPER ROOF

5250
22100
ELEVATION FINISHES +187.15 m SSL

CODE DESCRIPTION
ROOF
183.70 T2_MECH. FLOOR

4750
BELOW MECHANICAL
T.O.P.
MC1 METAL CLADDING PANEL
ROOM +182.40 m FFL

MC2 PERFORATED METAL SCREEN MECHANICAL MACHINE T2_ROOF FLOOR

5000
CORR. CORR.
MC3 PERFORATED METAL SCREEN ( MASHRABIYA ) ROOM RM
ROOF ROOF +177.40 m FFL
CW1 DOUBLE GLAZING UNITIZED PANEL TOWER-2 T2_37th FLOOR

4100
LIFT
OFFICE-01
CW2 SPANDREL PANEL UNITIZED CURTAIN WALL LOBBY OFFICE-03 +173.30 m FFL
SYSTEM T2_36th FLOOR

3850
CW3 DOUBLE GLAZED STICK SYSTEM OFFICE-01
LOUNGE OFFICE-03 +169.45 m FFL

ALV-1 POWDER COATED ALUMINUM LOUVERS. TOWER-2 T2_35th FLOOR

3850
OFFICE-01 LOUNGE LIFT
COLOUR PER ARCHITECT. LOBBY
OFFICE-03 +165.60 m FFL
T2_34th FLOOR

3850
MC1 OFFICE-01 LOUNGE OFFICE-03
? +161.75 m FFL
TOWER-2 T2_33rd FLOOR

3850
OFFICE-01 LIFT OFFICE-03
CW1 LOUNGE LOBBY +157.90 m FFL
TOWER-2 T2_32nd FLOOR

3850
OFFICE-01 LIFT OFFICE-03
LOUNGE LOBBY +154.05 m FFL
TOWER-2 T2_31st FLOOR

3850
OFFICE-01 LIFT OFFICE-03
LOUNGE LOBBY +150.20 m FFL

CW2 TOWER-2 T2_30th FLOOR

3850
OFFICE-01 LIFT OFFICE-03
LOUNGE LOBBY +146.35 m FFL
TOWER-2 T2_29th FLOOR

3850
OFFICE-01 LIFT OFFICE-03
LOUNGE LOBBY +142.50 m FFL
TOWER-2 T2_28th FLOOR

3850
OFFICE-01 LIFT OFFICE-03
LOUNGE LOBBY +138.65 m FFL
2 3 4 5 6 7 8 9 10 11 12 TOWER-2 T2_27th FLOOR

3850
OFFICE-01 LIFT OFFICE-03
LOUNGE LOBBY +134.80 m FFL
TOWER-2 T2_26th FLOOR

3850
OFFICE-01 LIFT OFFICE-03
LOUNGE LOBBY +130.95 m FFL
TOWER-2 T2_25th FLOOR

3850
OFFICE-01 LIFT OFFICE-03
126.40 LOUNGE LOBBY +127.10 m FFL
T.O.P.
T1_UPPER ROOF TOWER-2 T2_24th FLOOR

3850
OFFICE-01 LIFT OFFICE-03
+123.40 m SSL LOUNGE LOBBY +123.25 m FFL

MECHANICAL ELECT.
TOWER-2 T2_23rd FLOOR
T1_MECH. FLOOR

3850
LIFT
4750

STORE PR.S ROOM RM. OFFICE-01 OFFICE-03


LOUNGE LOBBY +119.40 m FFL
+118.65 m FFL
TOWER-2 T2_22nd FLOOR

3850
OFFICE-01 LIFT OFFICE-03
T1_ROOF FLOOR MACHINE ELECT. LOUNGE LOBBY +115.55 m FFL
5000

ROOM RM.
+113.65 m SSL 113.30 GSM PR.S 113.30 TOWER-2 T2_21st FLOOR
T.O.P. T.O.P.

3850
OFFICE-01 LIFT OFFICE-03 A 01-10-2017 ISSUE FOR APPROVAL
T1_21st FLOOR TOWER-1 ELECT.
LOUNGE LOBBY +111.70 m FFL
4100

CEO \ GM LIFT RM.


PR.S
+109.55 m FFL OFFICE LOBBY REFUGE LOUNGE T2_20th FLOOR

3850
AREA OFFICE-01
T1_20th FLOOR TOWER-1 IT +107.85 m FFL REV. DATE DESCRIPTION BY
ELECT.
3850

AUDITOR LIFT SECTION


PR.S RM.
+105.70 m FFL LOBBY HEAD TOWER-2 MECHANICAL
TOWER-1 LIFT ROOM U.D.D STAMP MUNICIPALITY STAMP

6000
T1_19th FLOOR SECRETARY LIFT FINANCIAL MECHANICAL LOBBY T2_19th FLOOR
3850

ELECT. MACHINE ETS ROOM


PR.S LOBBY ROOM
+101.85 m FFL RM. ACCOUNTS RM +101.85 m FFL
RECRUITMENT
T1_18th FLOOR ADMINSTRATOR TOWER-1
ELECT. SECTION
T2_18th FLOOR
3850

3850
\ LIFT
PR.S RM. OFFICE-01 OFFICE-03
+98.00 m FFL COORDINATOR LOBBY HEAD +98.00 m FFL
T1_17th FLOOR TOWER-1 TOWER-2 T2_17th FLOOR
3850

3850
LIFT ELECT. LIFT
PR.S OFFICE-02 OFFICE-01 OFFICE-03
+94.15 m FFL OFFICE-04 LOBBY RM. LOBBY +94.15 m FFL
T1_16th FLOOR TOWER-1 TOWER-2 T2_16th FLOOR
3850

3850
LIFT ELECT. LIFT
PR.S OFFICE-02 OFFICE-01 OFFICE-03
+90.30 m FFL OFFICE-04 LOBBY RM. LOBBY +90.30 m FFL

177400
T1_15th FLOOR TOWER-1 TOWER-2 T2_15th FLOOR.
3850

3850
LIFT ELECT. LIFT
PR.S OFFICE-02 OFFICE-01 OFFICE-03
+86.45 m FFL OFFICE-04 LOBBY RM. LOBBY +86.45 m FFL
T1_14th FLOOR TOWER-1 TOWER-2 T2_14th FLOOR
3850

3850
LIFT ELECT. LIFT OFFICE-03
PR.S OFFICE-02 OFFICE-01
+82.60 m FFL OFFICE-04 LOBBY RM. LOBBY +82.60 m FFL
T1_13th FLOOR TOWER-1 CW2 CW2 TOWER-2 T2_13th FLOOR
3850

3850
LIFT ELECT. OFFICE-01 LIFT OFFICE-03
PR.S OFFICE-02
+78.75 m FFL OFFICE-04 LOBBY RM. CW1 LOBBY +78.75 m FFL
T1_12th FLOOR TOWER-1 TOWER-2 T2_12th FLOOR
3850

3850
LIFT ELECT. LIFT
+74.90 m FFL OFFICE-04 PR.S
LOBBY RM.
OFFICE-02 CW1 OFFICE-01
LOBBY
OFFICE-03
+74.90 m FFL
Enquiry No. : --------------- Application No : N/2017/0002775
T1_11th FLOOR TOWER-1 TOWER-2 T2_11th FLOOR
MC1
3850

3850
99/M A
LIFT ELECT. LIFT
+71.05 m FFL OFFICE-04 PR.S
LOBBY RM.
OFFICE-02 OFFICE-01 LOBBY
OFFICE-03
+71.05 m FFL CONSULTANT REG. No : GRADE : CONSULTANT REG. No : 000000 GRADE : A
T1_10th FLOOR TOWER-1 TOWER-2 T2_10th FLOOR CONSULTANT STAMP & SIGNATURE : SUB-CONSULTANT STAMP & SIGNATURE :
3850

3850
LIFT ELECT. LIFT OFFICE-03
PR.S OFFICE-02 OFFICE-01
+67.20 m FFL OFFICE-04 LOBBY RM. LOBBY +67.20 m FFL
T1_9th FLOOR TOWER-1 TOWER-2 T2_9th FLOOR
3850

3850
PR.S LIFT ELECT. LIFT OFFICE-03
OFFICE-02 OFFICE-01
+63.35 m FFL OFFICE-04 LOBBY RM. LOBBY +63.35 m FFL
T1_8th FLOOR TOWER-1 TOWER-2 T2_8th FLOOR
3850

3850
PR.S LIFT ELECT. LIFT OFFICE-03
OFFICE-02 OFFICE-01
+59.50 m FFL OFFICE-04 LOBBY RM. LOBBY +59.50 m FFL
T1_7th FLOOR TOWER-1 TOWER-2 T2_7th FLOOR
LIFT
3850

3850
ELECT. LIFT OFFICE-03
PR.S OFFICE-02 OFFICE-01
+55.65 m FFL OFFICE-04 LOBBY RM. LOBBY +55.65 m FFL
MC1
T1_6th FLOOR TOWER-1
ELECT.
TOWER-2 T2_6th FLOOR
3850

3850
PR.S LIFT OFFICE-02 OFFICE-01 LIFT OFFICE-03
+51.80 m FFL OFFICE-04 LOBBY RM. LOBBY +51.80 m FFL
T1_5th FLOOR TOWER-1 TOWER-2 T2_5th FLOOR TECHNICAL MANAGER : Shereif Ahmed TECHNICAL MANAGER
3850

3850
PR.S LIFT ELECT. MC1 LIFT OFFICE-03
OFFICE-02 OFFICE-01
+47.95 m FFL OFFICE-04 LOBBY RM. LOBBY +47.95 m FFL
T1_4th FLOOR TOWER-1 TOWER-2 T2_4th FLOOR REGISTRATION No. : 6120 REGISTRATION No :
3850

LIFT

3850
PR.S ELECT. LIFT
OFFICE-02 OFFICE-01 OFFICE-03
+44.10 m FFL OFFICE-04 LOBBY RM. LOBBY +44.10 m FFL
TOWER-1
T1_3rd FLOOR LIFT
TOWER-2 T2_3rd FLOOR 57 AL-JAZEERA ST.,
3850

ELECT.

3850
PR.S OFFICE-02 LIFT BIN-MAHMOUD / BEHZAD
+40.25 m FFL OFFICE-04 LOBBY RM. OFFICE-01 LOBBY OFFICE-03 +40.25 m FFL BUILDING, 6th FLOOR
T1_2nd FLOOR TOWER-1 TOWER-2 T2_2nd FLOOR TEL : (974) 402037 77 / 88 /
3850

3850
PR.S
LIFT ELECT.
PANORAMIC
LIFT 99
FAX : (974) 402037 66
+36.40 m FFL OFFICE-04 RM. OFFICE-02 OFFICE-01 OFFICE-03 +36.40 m FFL
LOBBY ELEVATOR LOBBY P.O. BOX1876, DOHA-QATAR
www.ehaf .com
1st FLOOR 1st FLOOR
CONSULTING ENGINEERS
TOWER-2
ELECT. OFFICE-02
3850

3850
PR.S LIFT ?
+32.55 m FFL OFFICE-04 RM. ? +32.55 m FFL
OUTDOOR ? LOBBY
AREA
5520

PROJECT
QEWC TOWERS ( KAHRAB TOWER )
6th PODIUM TOWER-1 TOWER-2 BUSSINESS 6th PODIUM
29.55 MALE STORE PR.S LIFT LIFT ELECT. FOOD LIFT LOUNGE
3850

3850
GYMNASIUM LIFT COURT LOBBY LIFT CENTER
+28.70 m FFL T.O.P. LOBBY RM. LOBBY CORR. 03 +28.70 m FFL

LUSAIL CITY - MARINA COM 53


5th PODIUM LIFT TOWER-1 PODIUM-05 TOWER-2 5th PODIUM
PR.S LIFT ELECT. VOID PODIUM-04 LIFT
3470
3850

3850
STORE LIFT OFFICE & FEMALE LIFT OFFICE-03
RM. OFFICE & CORR. CORR.
+24.85 m FFL MECH. RM. LOBBY PARKING
PARKING
TOILET LOBBY +24.85 m FFL
4th PODIUM TOWER-1 PODIUM-04 TOWER-2 4th PODIUM
PR.S ELECT. VOID PODIUM-03
3450
3850

3850
LIFT OFFICE & FEMALE LIFT
+21.00 m FFL
STORE RM. OFFICE & CORR. OFFICE-03
+21.00 m FFL LOCATION:
LUSAIL CITY - MARINA COM 53
MECH. RM. LOBBY PARKING TOILET LOBBY
PARKING
3rd PODIUM TOWER-1 PODIUM-03 TOWER-2 3rd PODIUM
PR.S ELECT. PODIUM-02
3450

3450

3450
3850

3850
STORE LIFT OFFICE & VOID FEMALE LIFT
MECH. RM. OFFICE & CORR. OFFICE-03
+17.15 m FFL LOBBY RM. PARKING
PARKING
TOILET LOBBY +17.15 m FFL
2nd PODIUM TOWER-1 2nd PODIUM CLIENT:
QATAR ELECTRICITY & WATER CO.
PR.S PODIUM-02 TOWER-2
ELECT. FEMALE
3450

3450

3450
STORE
3850

3850
LIFT OFFICE & VOID LIFT OFFICE-03
MECH. RM. RM. TOILET CORR.
+13.30 m FFL LOBBY PARKING LOBBY +13.30 m FFL

01/10/17
ELECT.
DATE: JOB NO.:
0321
TOWER-1 TOWER-2
RM. LIFT
LIFT MAIN
5950

5950

5950
6350

6350
1st PODIUM RETAIL 01 STORE PR.S LOBBY RETAIL 11 CORRIDOR
ATRIUM MAIN LOBBY LOBBY RETAIL 1st PODIUM
CORRIDOR
+6.95 m FFL +6.95 m FFL
TITLE:

OVERALL SECTION
TOWER-1 TOWER-2
GARBAGE LIFT ELECT. RETAIL 10 PANORAMIC LIFT
6000

6000

6000
6350

6350
ELEVATOR
F&B 01 CORR. RM. LOBBY RM. VOID RECEPTION LOBBY F&B 05 GROUND FLOOR
& LOUNGE
+0.60 m FFL
ROAD LV (0.00)

AR-301-00
+0.00 m SSL DRAWING NO.: SCALE:
VENT. LIFT PIT ELECT. ENTRANCE 1 : 400 @A1
6030
6000

6000
6450

6450
SHAFT STORE STORE LIFT PIT SERVICES RM. PANORAMIC LOBBY CORR. STORE CORR. BASEMENT-1
CORRIDOR ELEVATOR -5.85 m FFL
DRAWN BY: DESIGNED BY: CHECKED BY:

OVERALL SECTION
CORR.
MANAGER ARCHIVE PR.S STORE
TOWER-1
STORE BASEMENT-2 M.S./S.M. H.O./M.A. O.M.
4100

4100

4100

ELECT.
4500

4500
LIFT CORR. STORE
1 LOBBY RM.
CORR. -10.35 m FFL
CAD FILE: REGISTRATION No. : REGISTRATION No. :
AR-301-00
1 : 400 PR.S STORE TOWER-1 STORE ELECT. BASEMENT-3
4265 3881
3600

3600

3600
4000

4000
LIFT RM. CORR. STORE
STORE
STORE LOBBY CORR. -14.35 m FFL
REVISION SIGNATURE SIGNATURE

17
13 14 15 16 17 18 19
HIGHEST POINT
+199.50 m SSL
1 ELEVATION-01
AR-201-00
1 : 300 T2_PARAPET
+192.40 m SSL

T2_UPPER ROOF
+187.15 m SSL

ELEVATION FINISHES
T2_MECH. FLOOR
CODE DESCRIPTION +182.40 m FFL
MC1 METAL CLADDING PANEL
MC2 PERFORATED METAL SCREEN
T2_ROOF FLOOR
MC3 PERFORATED METAL SCREEN ( MASHRABIYA )
+177.40 m FFL
CW1 DOUBLE GLAZING UNITIZED PANEL
CW2 SPANDREL PANEL UNITIZED CURTAIN WALL T2_37th FLOOR
SYSTEM +173.30 m FFL
CW3 DOUBLE GLAZED STICK SYSTEM
T2_36th FLOOR
ALV-1 POWDER COATED ALUMINUM LOUVERS. +169.45 m FFL
COLOUR PER ARCHITECT.
T2_35th FLOOR
+165.60 m FFL

T2_34th FLOOR
+161.75 m FFL

T2_33rd FLOOR
+157.90 m FFL

T2_32nd FLOOR
+154.05 m FFL
CW2
T2_31st FLOOR
+150.20 m FFL

T2_30th FLOOR
+146.35 m FFL

T2_29th FLOOR
+142.50 m FFL

T2_28th FLOOR
CW1
+138.65 m FFL

2 3 4 5 6 7 8 9 10 11 12 T2_27th FLOOR
+134.80 m FFL

T2_26th FLOOR
+130.95 m FFL

T2_25th FLOOR
+127.10 m FFL

T1_UPPER ROOF T2_24th FLOOR


+123.40 m SSL +123.25 m FFL

T2_23rd FLOOR
T1_MECH. FLOOR

4750
+119.40 m FFL
+118.65 m FFL

T2_22nd FLOOR
+115.55 m FFL

5000
T1_ROOF FLOOR
+113.65 m SSL CW2
T2_21st FLOOR
+111.70 m FFL
T1_21st FLOOR

4100
+109.55 m FFL
T2_20th FLOOR
+107.85 m FFL
T1_20th FLOOR

3850
+105.70 m FFL

T1_19th FLOOR ALV-1 T2_19th FLOOR

3850
+101.85 m FFL +101.85 m FFL
MC1
T1_18th FLOOR T2_18th FLOOR

3850
+98.00 m FFL MC1 +98.00 m FFL

T1_17th FLOOR T2_17th FLOOR

3850
+94.15 m FFL +94.15 m FFL

T1_16th FLOOR T2_16th FLOOR

3850
+90.30 m FFL +90.30 m FFL

T1_15th FLOOR T2_15th FLOOR.

3850
+86.45 m FFL +86.45 m FFL

T1_14th FLOOR MC1 T2_14th FLOOR

3850
+82.60 m FFL +82.60 m FFL

T1_13th FLOOR CW1 T2_13th FLOOR

3850
+78.75 m FFL +78.75 m FFL

T1_12th FLOOR T2_12th FLOOR

3850
+74.90 m FFL +74.90 m FFL

T1_11th FLOOR MC1 T2_11th FLOOR

3850
+71.05 m FFL +71.05 m FFL

T1_10th FLOOR T2_10th FLOOR

3850
+67.20 m FFL +67.20 m FFL

T1_9th FLOOR T2_9th FLOOR

3850
+63.35 m FFL +63.35 m FFL

T1_8th FLOOR T2_8th FLOOR

3850
+59.50 m FFL +59.50 m FFL

T1_7th FLOOR T2_7th FLOOR

3850
+55.65 m FFL +55.65 m FFL

T1_6th FLOOR T2_6th FLOOR

3850
+51.80 m FFL +51.80 m FFL

T1_5th FLOOR T2_5th FLOOR


3850
+47.95 m FFL +47.95 m FFL

T1_4th FLOOR T2_4th FLOOR


3850

+44.10 m FFL +44.10 m FFL

T1_3rd FLOOR MC3 T2_3rd FLOOR


3850

+40.25 m FFL +40.25 m FFL

MC3
T1_2nd FLOOR T2_2nd FLOOR
3850

+36.40 m FFL +36.40 m FFL


MC3

1st FLOOR
3850

+32.55 m FFL

6th PODIUM
3850

+28.70 m FFL

MC3
5th PODIUM
3850

+24.85 m FFL

4th PODIUM
3850

+21.00 m FFL

3rd PODIUM
3850

+17.15 m FFL

MC3
2nd PODIUM
3850

+13.30 m FFL
6350

1st PODIUM
+6.95 m FFL

CW3
GROUND FLOOR
6350

+0.60 m FFL
ROAD LV (0.00)
+0.00 m SSL
600
A

REV.

DATE:

TITLE:
99

CLIENT:
PROJECT

REVISION

A
CAD FILE:
LOCATION:

DRAWN BY:
Enquiry No. :
U.D.D STAMP

DRAWING NO.:
www.ehaf .com
DATE

REGISTRATION No. :

M.S./S.M.
01-10-2017

57 AL-JAZEERA ST.,

FAX : (974) 402037 66


TECHNICAL MANAGER :

BUILDING, 6th FLOOR


CONSULTANT REG. No :

BIN-MAHMOUD / BEHZAD

TEL : (974) 402037 77 / 88 /

09/07/2017
P.O. BOX1876, DOHA-QATAR
99/M
---------------

6120
CONSULTANT STAMP & SIGNATURE :

Shereif Ahmed

AR-201-00
AGRADE :

SIGNATURE
4265
DESIGNED BY:
H.O./M.A.
SCALE:

REGISTRATION No. :
MUNICIPALITY STAMP
ISSUE FOR APPROVAL

JOB NO.:
DESCRIPTION

Application No :

REGISTRATION No :
TECHNICAL MANAGER

ELEVATION-1 OVERALL
CONSULTANT REG. No :

1 : 300
QATAR ELECTRICITY & WATER CO.
CONSULTING ENGINEERS

SIGNATURE
LUSAIL CITY - MARINA COM 53

3881
O.M.
0321

CHECKED BY:
000000

@A1
LUSAIL CITY - MARINA COM 53
N/2017/0002775

REGISTRATION No. :
QEWC TOWERS ( KAHRAB TOWER )
BY

SUB-CONSULTANT STAMP & SIGNATURE :


AGRADE :

18
19 18 17 16 15 14 13
HIGHEST POINT
+199.50 m SSL 1 ELEVATION-03
MC1
AR-203-00 ELEVATION FINISHES
1 : 300
T2_PARAPET
+192.40 m SSL CODE DESCRIPTION
MC1 METAL CLADDING PANEL
MC2 PERFORATED METAL SCREEN
T2_UPPER ROOF MC3 PERFORATED METAL SCREEN ( MASHRABIYA )
+187.15 m SSL
CW1 DOUBLE GLAZING UNITIZED PANEL
CW2 SPANDREL PANEL UNITIZED CURTAIN WALL
T2_MECH. FLOOR SYSTEM
+182.40 m FFL
CW3 DOUBLE GLAZED STICK SYSTEM

ALV-1 POWDER COATED ALUMINUM LOUVERS.


T2_ROOF FLOOR COLOUR PER ARCHITECT.
+177.40 m FFL

T2_37th FLOOR
+173.30 m FFL

T2_36th FLOOR
+169.45 m FFL

T2_35th FLOOR
+165.60 m FFL

T2_34th FLOOR
+161.75 m FFL

T2_33rd FLOOR
+157.90 m FFL

T2_32nd FLOOR
+154.05 m FFL

T2_31st FLOOR
+150.20 m FFL

T2_30th FLOOR
+146.35 m FFL

T2_29th FLOOR
+142.50 m FFL

T2_28th FLOOR
+138.65 m FFL

T2_27th FLOOR 12 11 10 9 8 7 6 5 4 3 2
+134.80 m FFL

T2_26th FLOOR
+130.95 m FFL

T2_25th FLOOR
+127.10 m FFL

T2_24th FLOOR T1_UPPER ROOF


+123.25 m FFL +123.40 m SSL

T2_23rd FLOOR
T1_MECH. FLOOR
+119.40 m FFL MC2 +118.65 m FFL

T2_22nd FLOOR
+115.55 m FFL
T1_ROOF FLOOR
+113.65 m SSL
T2_21st FLOOR
+111.70 m FFL CW1
T1_21st FLOOR
+109.55 m FFL
T2_20th FLOOR MC1
+107.85 m FFL
CW1 T1_20th FLOOR
+105.70 m FFL
ALV-1
T2_19th FLOOR T1_19th FLOOR
+101.85 m FFL +101.85 m FFL

MC1
T2_18th FLOOR T1_18th FLOOR
+98.00 m FFL +98.00 m FFL

T2_17th FLOOR MC2 T1_17th FLOOR


+94.15 m FFL +94.15 m FFL

T2_16th FLOOR T1_16th FLOOR


+90.30 m FFL +90.30 m FFL

T2_15th FLOOR. T1_15th FLOOR


+86.45 m FFL +86.45 m FFL

T2_14th FLOOR T1_14th FLOOR


+82.60 m FFL +82.60 m FFL

T2_13th FLOOR T1_13th FLOOR


+78.75 m FFL +78.75 m FFL

T2_12th FLOOR T1_12th FLOOR


+74.90 m FFL +74.90 m FFL

T2_11th FLOOR T1_11th FLOOR


+71.05 m FFL +71.05 m FFL

T2_10th FLOOR T1_10th FLOOR


+67.20 m FFL +67.20 m FFL

T2_9th FLOOR T1_9th FLOOR


+63.35 m FFL +63.35 m FFL

T2_8th FLOOR T1_8th FLOOR


+59.50 m FFL +59.50 m FFL

T2_7th FLOOR T1_7th FLOOR


+55.65 m FFL MC2 +55.65 m FFL

T2_6th FLOOR T1_6th FLOOR


+51.80 m FFL +51.80 m FFL

T2_5th FLOOR CW1 T1_5th FLOOR


+47.95 m FFL +47.95 m FFL

T2_4th FLOOR T1_4th FLOOR


+44.10 m FFL MC1 ? MC1 +44.10 m FFL
CW1

T2_3rd FLOOR T1_3rd FLOOR


+40.25 m FFL +40.25 m FFL

T2_2nd FLOOR CW1 T1_2nd FLOOR


+36.40 m FFL +36.40 m FFL

1st FLOOR 1st FLOOR


+32.55 m FFL +32.55 m FFL

6th PODIUM
+28.70 m FFL

5th PODIUM
+24.85 m FFL

CW1 4th PODIUM


+21.00 m FFL

3rd PODIUM
+17.15 m FFL
MC1
2nd PODIUM
+13.30 m FFL

1st PODIUM
+6.95 m FFL

GROUND FLOOR
+0.60 m FFL
ROAD LV (0.00)
+0.00 m SSL
A

REV.

DATE:

TITLE:
99

CLIENT:
PROJECT

REVISION

A
CAD FILE:
LOCATION:

DRAWN BY:
Enquiry No. :
U.D.D STAMP

DRAWING NO.:
www.ehaf .com
DATE

REGISTRATION No. :

M.S./S.M.
01-10-2017

57 AL-JAZEERA ST.,

FAX : (974) 402037 66


TECHNICAL MANAGER :

BUILDING, 6th FLOOR


CONSULTANT REG. No :

BIN-MAHMOUD / BEHZAD

TEL : (974) 402037 77 / 88 /

09/07/2017
P.O. BOX1876, DOHA-QATAR
99/M
---------------

6120
CONSULTANT STAMP & SIGNATURE :

Shereif Ahmed

AR-203-00
AGRADE :

SIGNATURE
4265
DESIGNED BY:
H.O./M.A.
SCALE:

REGISTRATION No. :
MUNICIPALITY STAMP
ISSUE FOR APPROVAL

JOB NO.:
DESCRIPTION

Application No :

REGISTRATION No :
TECHNICAL MANAGER

ELEVATION-3 OVERALL
CONSULTANT REG. No :

1 : 300
QATAR ELECTRICITY & WATER CO.
CONSULTING ENGINEERS

SIGNATURE
LUSAIL CITY - MARINA COM 53

3881
O.M.
0321

CHECKED BY:
000000

@A1
LUSAIL CITY - MARINA COM 53
N/2017/0002775

REGISTRATION No. :
QEWC TOWERS ( KAHRAB TOWER )
BY

SUB-CONSULTANT STAMP & SIGNATURE :


AGRADE :

19
Barwa Bank H.Q.

Client : Barwa Group


Location : lusail - Doha - Qatar
Leed Consultant : EHAF
Scope of Work : Working drawings and
Coordination as a senior architect.
PROJECT NAME AND
LOCATION

BARWA BANK HQ TOWER


MARINA COM-02, LUSAIL CITY - QATAR

NORTH PIN NO.


69060005
PLANNING NO.
13-2015-00295
KEY PLAN

GENERAL NOTES :
-THESE DRAWINGS SHOULD BE USED IN COORDINATION WITH ALL OTHER
DRAWINGS PRESENTED BY THE ARCHITECT, ENGINEER AND
CONSULTANTS.
-IT IS FORBIDDEN TO ANY OF THE CONCERNED PERSONNEL TO MEASURE THE
DRAWING; IN CASE OF NECESSITY, REFER TO THE ARCHITECT OR ENGINEER.
-UNLESS OTHERWISE NOTED. DIMENSIONS ARE IN MM AND TO THE STRUCTURE
FACES AND LEVELS ARE IN METERS.
-ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH QCS (QATAR
CONSTRUCTION SPECIFICATION).
-FOR CURTAIN WALL DETAILS REFER TO CURTAIN WALL DRAWINGS.
-ALL EXTERNAL FINISHES TO BE WATER PROOF.
-FOR LANDSCAPE DETAILS REFER TO LANDSCAPE DRAWINGS.
-UNLESS OTHERWISE SHOWN ON DRAWINGS ALL FLOOR FINISHING SHALL BE
SLOPED MIN 0.05% AND MAX 1.0% TOWARDS FLOOR DRAIN.
-FOR LOCATION OF FLOOR DRAIN REFER TO MECHANICAL DRAWINGS.
-DOOR OPENING SHALL BE LOCATED EITHER MIDWAY IN WALL OR 100MM OFF
WALL END AS SHOWN ON DRAWINGS UNLESS OTHERWISE INDICATED.
-THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS
AFFECTING THE WORKS AT JOB SITE
-FOR EXACT LOCATION AND DIMENSIONS OF SLAB OPENINGS AND SLAB OPENING,
PLEASE REFER TO STRUCTURAL DRAWINGS.
-CONTRACTOR TO SUBMIT SHOP DRAWINGS DETAILS WITH APPROPRIATE
TESTS/SAMPLES/GURANTEES FOR ENGINEERS APPROVAL PRIOR TO
MANUFACTURING.
-ALL MECHANICAL ROOMS/ PUMPS ROOMS/ GENERATOR ROOMS/ ARE TO HAVE A
FLOATING MACHINE BASE TO ABSORB VIBRATION.
-FOR ALL DETAIL REFERENCES REFER TO OVERALL PLANS/ELEVATIONS/SECTIONS
RELATED TO THE SHEET
-ACCESS PANEL LOCATION AND SIZE TO BE COORDINATED WITH THE MECHANICAL
DRAWINGS.
-THE CONTRACTOR SHOULD SUBMIT SHOP DRAWING FOR APPROVAL BEFORE
START MANUFACTURING

O FOR DC1 APPROVAL 27 JUN. 2016


ISSUE DESCRIPTION DATE CHECKED QA / QC

ISSUED FOR DC1 APPROVAL


OWNER
P.O. BOX 2778,
DOHA - QATAR
TEL: 8008555
TEL: (974) 4410 0888
www.barwabank.com

LEAD CONSULTANT
MARINA PLAZA, LEVEL 10
OFFICE 1004-1006
DUBAI MARINA, DUBAI,
UAE
P.O. BOX 112955
TEL: 971 4382 5200
www.perkinswill.com

LOCAL CONSULTANT
57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
BUILDING, 6TH FLOOR
P.O. BOX 1876, DOHA-QATAR
TEL: (974) 402037 77 / 88 / 99
FAX: (974) 40203766
www.ehaf.com
MEP CONSULTANT
SUITE 1704, ABDULLA BIN
DARWISH BUILDING
AL SALAM STREET
P.O. BOX 109870
ABU DHABI, UAE
TEL: +971 (0)2 6774 220
FAX: +971 (0)2 6774 202
PROJECT DESCRIPTION

5 BASEMENTS + GROUND + 2 PODIUM + 20 FLOORS

OFFICE BUILDING

DRAWING TITLE

COVER SHEET
DRAWING. NO. PART:

G00-00
DRAWN BY: CHECKED BY: STAGE: REVISION:
AG GD DD
VERIFIED BY: APPROVED BY:

DL
PLOT DATE:
15/06/16 O
SCALE: PROJECT. NO:

390142
21
FILE NAME:
C:\Users\mahmoud.fathy\Documents\390142.000_Barwa
Bank_mahmoud.fathy.rvt
PROJECT NAME AND
LOCATION

1 2 3 4 5 6 7 8 9 1
10 11 12 13 14 BARWA BANK HQ TOWER
B MARINA COM-02, LUSAIL CITY - QATAR

NORTH PIN NO.


123880
69060005
PLANNING NO.
4999 5500 9000 9000 9000 9000 9000 10250 6950 9000 18000 6950 17230 13-2015-00295
1 1 KEY PLAN
AR-303-00 AR-302-00

BASEMENT SETBACK

A B
A A
STORE
EXHAUST CARPARK B5-021
SHAFT EXTRACT FAN
UP TO A1257 ROOM
BASEMENT 4 B5-83 B5-84 B5-020 B5-85 B5-86 B5-87 B5-88 B5-89 B5-90 B5-91 B5-92 B5-93 B5-94 B5-95 -19.000 FFL FFL
-19.000 FFL FFL
-19.100 SSL SSL -19.100 SSL SSL

D C
B5-13 B5-14 B5-15 B5-16 B5-17

12800
17342

B5-18 B5-19

B B5-130 B
1
CARPARK
SUPPLY FAN AR-204-00
ROOM B5-131
B5-034 -19.100 FFL FFL/SSL

STAIR PRESS. STORE


A1278 1 B5-022 GENERAL NOTES :
-19.000 FFL FFL AR-401-00 -THESE DRAWINGS SHOULD BE USED IN COORDINATION WITH ALL OTHER
-19.100 SSL SSL -19.000 FFL FFL
DRAWINGS PRESENTED BY THE ARCHITECT, ENGINEER AND
C -19.000 FFL FFL
B5-82 B5-81 B5-80 B5-106 B5-105 B5-104 B5-103 B5-102 B5-101 B5-100 B5-99 B5-98 B5-97 B5-96
-19.100 SSL SSL
C CONSULTANTS.
ST-03

3.50
-19.100 SSL SSL -IT IS FORBIDDEN TO ANY OF THE CONCERNED PERSONNEL TO MEASURE THE
B5-028 B5-132
DRAWING; IN CASE OF NECESSITY, REFER TO THE ARCHITECT OR ENGINEER.
B5-12 -UNLESS OTHERWISE NOTED. DIMENSIONS ARE IN MM AND TO THE STRUCTURE
B5-20 B5-43 B5-44
DRAINAGE FACES AND LEVELS ARE IN METERS.
PUMP ROOM B5-133 -ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH QCS (QATAR
B5-107 B5-014 FM ROOM B5-129
B5-62 CONSTRUCTION SPECIFICATION).
B5-11 B5-21 B5-42 B5-45 ELECT. ROOM B5-011
B5-027 -FOR CURTAIN WALL DETAILS REFER TO CURTAIN WALL DRAWINGS.
6500
1 STAIR PRESS. -ALL EXTERNAL FINISHES TO BE WATER PROOF.
13950

STAIRCASE
LOBBY A1282 -FOR LANDSCAPE DETAILS REFER TO LANDSCAPE DRAWINGS.
B5-029
AR-503-01
-UNLESS OTHERWISE SHOWN ON DRAWINGS ALL FLOOR FINISHING SHALL BE

SUPPLY/ EXTRACT
B5-10 B5-22 B5-41 PARKING B5-46 B5-63 B5-79 ST-01A MEP RISER B5-134 SLOPED MIN 0.05% AND MAX 1.0% TOWARDS FLOOR DRAIN.
B5-001 LOBBY PRESS. AREA ELECT. ROOM 1500
A1281 1 B5-015
B5-010 B5-009 B5-128 -FOR LOCATION OF FLOOR DRAIN REFER TO MECHANICAL DRAWINGS.
AR-501-01 -DOOR OPENING SHALL BE LOCATED EITHER MIDWAY IN WALL OR 100MM OFF
-19.100 FFL FFL/SSL WALL END AS SHOWN ON DRAWINGS UNLESS OTHERWISE INDICATED.
B5-09 B5-23 B5-40 B5-47 B5-61 B5-64 B5-78
-THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS
FIRE CORRIDOR
B5-016 B5-127 B5-135 AFFECTING THE WORKS AT JOB SITE

D PARKING
D -FOR EXACT LOCATION AND DIMENSIONS OF SLAB OPENINGS AND SLAB OPENING,
PLEASE REFER TO STRUCTURAL DRAWINGS.
B5-08
SHUTTLE -CONTRACTOR TO SUBMIT SHOP DRAWINGS DETAILS WITH APPROPRIATE
B5-24 B5-39 B5-48 B5-60 B5-65
LOBBY TESTS/SAMPLES/GURANTEES FOR ENGINEERS APPROVAL PRIOR TO

PUBLIC_HEALTH_RISER
B5-77 RL-4 TL-4 TL-5 STORE B5-126 B5-136
-19.100 FFL FFL/SSL B5-002 B5-008 -19.100 FFL FFL/SSL MANUFACTURING.
FM ROOM
B5-007 -ALL MECHANICAL ROOMS/ PUMPS ROOMS/ GENERATOR ROOMS/ ARE TO HAVE A
STAIR PRESS.
B5-07 B5-25 B5-38 B5-49 B5-59 B5-66 B5-76 A1283 B5-125 B5-137 FLOATING MACHINE BASE TO ABSORB VIBRATION.
1 RL-3 TL-3 TL-6
-FOR ALL DETAIL REFERENCES REFER TO OVERALL PLANS/ELEVATIONS/SECTIONS
AR-301-00 LIFT LOBBY RELATED TO THE SHEET
75542

13000

-19.000 FFL FFL B5-017 ST-02


-19.100 SSL SSL B5-019 1 -ACCESS PANEL LOCATION AND SIZE TO BE COORDINATED WITH THE MECHANICAL
B5-06 B5-26 B5-37 B5-50 B5-58 B5-67 B5-75 RL-2 TL-2 TL-7 AR-502-01 B5-124 B5-138 DRAWINGS.
-THE CONTRACTOR SHOULD SUBMIT SHOP DRAWING FOR APPROVAL BEFORE
6550 4950 1250 2700 START MANUFACTURING

LOBBY PRESS.
B5-74 B5-123 B5-139
B5-05 B5-27 B5-36 B5-51 B5-57 B5-68 RL-1 TL-1 TL-8 O FOR DC1 APPROVAL 27 JUN. 2016
ISSUE DESCRIPTION DATE CHECKED QA / QC
6500

E SERVICE LOBBY LIFT LOBBY B5-122 B5-140


E ISSUED FOR DC1 APPROVAL
B5-003 B5-018 -19.000 FFL FFL OWNER
B5-04 B5-28 B5-35 B5-52 B5-56 B5-69 B5-73 -19.100 SSL SSL
P.O. BOX 2778,
MEP RISER DOHA - QATAR

EXTRACT
SUPPLY/
ELECT. ROOM AREA
B5-004 B5-005 FL-1 FL-2 TEL: 8008555
B5-70 B5-121
B5-03 B5-29 B5-34 B5-53 B5-72 B5-141 TEL: (974) 4410 0888
STAIRCASE LOBBY PRESS.
LOBBY A1280 1500 5800 6280 5800
B5-030
www.barwabank.com
13950

B5-71 SUMP PUMP


ROOM
B5-02 B5-30 B5-33 B5-54 ELECT. ROOM B5-006 LEAD CONSULTANT
B5-026 B5-120
B5-108 -19.000 FFL FFL B5-142
MARINA PLAZA, LEVEL 10
-19.100 SSL SSL OFFICE 1004-1006
B5-31 B5-32 B5-55 DUBAI MARINA, DUBAI,
B5-01
ST-04 UAE
B5-031
B5-143 P.O. BOX 112955
3.50

-19.000 FFL FFL 1 B5-161 B5-160 B5-159 B5-109 B5-110 B5-111 B5-112 B5-113 B5-114 B5-115 B5-116 B5-117 B5-118 B5-119 TEL: 971 4382 5200
www.perkinswill.com
F -19.100 SSL SSL
AR-503-01
STORE
F
B5-023 LOCAL CONSULTANT
57 AL-JAZEERA ST.,
STAIR PRESS. -19.000 FFL FFL
CARPARK A1279 -19.100 SSL SSL BIN-MAHMOUD / BEHZAD
SUPPLY FAN BUILDING, 6TH FLOOR
ROOM -19.100 FFL FFL/SSL
B5-144 P.O. BOX 1876, DOHA-QATAR
B5-033
FM TOILETS TEL: (974) 402037 77 / 88 / 99
B5-013 FAX: (974) 40203766
-19.000 FFL FFL www.ehaf.com
-19.100 SSL SSL
G G
B5-145
MEP CONSULTANT
17300

B5-163 B5-162
SUITE 1704, ABDULLA BIN
B5-168 B5-167 B5-166 B5-165 B5-164
DARWISH BUILDING
STORE
B5-024 AL SALAM STREET
CARPARK P.O. BOX 109870
B5-158 B5-157 INTAKE SHAFT SUPPLY FAN B5-156 B5-155 B5-154 B5-153 B5-152 B5-151 B5-150 B5-149 B5-148 B5-147 B5-146
A1250 ABU DHABI, UAE
DOWN FROM ROOM
-19.000 FFL FFL
STORE B5-025 -19.000 FFL FFL TEL: +971 (0)2 6774 220
BASEMENT 4 -19.100
-19.100FFL
SSLFFL
SSL -19.100 SSL SSL
B5-032
-20.600 SSL SSL FAX: +971 (0)2 6774 202
PROJECT DESCRIPTION
H H
5 BASEMENTS + GROUND + 2 PODIUM + 20 FLOORS

OFFICE BUILDING
10
DRAWING TITLE

1 2 3 4 5 6 7 8 9 11 12 13 14 BASEMENT 5 FLOOR PLAN


DRAWING. NO. PART:

AR-101-00
1 BASEMENT
1 : 200
LEVEL 5 PLAN
DRAWN BY:

AG
CHECKED BY:

GD
STAGE:
DD
REVISION:

VERIFIED BY: APPROVED BY:

DL
PLOT DATE:
15/06/16 O
SCALE: PROJECT. NO:

22
1 : 200
FILE NAME:
C:\Users\mahmoud.fathy\Documents\390142.000_Barwa
390142
Bank_mahmoud.fathy.rvt
PROJECT NAME AND
LOCATION

BARWA BANK HQ TOWER


1 2 3 4 5 6 7 8 9 10 11 12 13 14 MARINA COM-02, LUSAIL CITY - QATAR

NORTH PIN NO.


113880 69060005
PLANNING NO.
5500 9000 9000 9000
57299 9000 9000 10250 6950 9000
18000
18000 6950 12230 13-2015-00295
KEY PLAN

BASEMENT SETBACK

A A

5500
UP FROM BASEMENT 1
SLOPE 20%

A B
7400

1.200 FFL SL

3095
G-14 G-15 G-16 G-17 G-18

B PLINTH SETBACK B

SLOPE 2%
1
CARPARK EXHAUST
AR-204-00
LOUVERS

6700
7900

G-13
TOWER SETBACK
.

BUILDING LINE ABOVE STAIR PRESS. TERRACE GENERAL NOTES :


A1278
-THESE DRAWINGS SHOULD BE USED IN COORDINATION WITH ALL OTHER

246
G-12 DRAWINGS PRESENTED BY THE ARCHITECT, ENGINEER AND
C C CONSULTANTS.
VESTIBULE SL-1 -IT IS FORBIDDEN TO ANY OF THE CONCERNED PERSONNEL TO MEASURE THE
G-038 DRAWING; IN CASE OF NECESSITY, REFER TO THE ARCHITECT OR ENGINEER.
G-11

7050
-UNLESS OTHERWISE NOTED. DIMENSIONS ARE IN MM AND TO THE STRUCTURE
FACES AND LEVELS ARE IN METERS.
CORPORATE
G-10 CONSUMER -ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH QCS (QATAR
BANKING CONSTRUCTION SPECIFICATION).
G-015 STAIR PRESS. -FOR CURTAIN WALL DETAILS REFER TO CURTAIN WALL DRAWINGS.
A1282 0.000 FFL FFL
-0.100 SSL SSL -ALL EXTERNAL FINISHES TO BE WATER PROOF.
13950

G-09 -FOR LANDSCAPE DETAILS REFER TO LANDSCAPE DRAWINGS.


FIRST FINANCE -UNLESS OTHERWISE SHOWN ON DRAWINGS ALL FLOOR FINISHING SHALL BE
SUPPLY/ SLOPED MIN 0.05% AND MAX 1.0% TOWARDS FLOOR DRAIN.
COMPANY EXTRACT
G-013 FIRE A1286 -FOR LOCATION OF FLOOR DRAIN REFER TO MECHANICAL DRAWINGS.
G-08

8300
RECEPTION ALARM -DOOR OPENING SHALL BE LOCATED EITHER MIDWAY IN WALL OR 100MM OFF
G-014 RISER WALL END AS SHOWN ON DRAWINGS UNLESS OTHERWISE INDICATED.
-THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS
G-07
AFFECTING THE WORKS AT JOB SITE

D D -FOR EXACT LOCATION AND DIMENSIONS OF SLAB OPENINGS AND SLAB OPENING,
PLEASE REFER TO STRUCTURAL DRAWINGS.
0.000 FFL FFL
G-06 -0.100 SSL SSL -CONTRACTOR TO SUBMIT SHOP DRAWINGS DETAILS WITH APPROPRIATE
0.000 ARCHITECTURALFORFFLENGINEERS
IS EQUIVALENT TOPRIOR
3.08 QNDH LEVEL

200
RL-4 TL-4 TL-5 TESTS/SAMPLES/GURANTEES APPROVAL TO
(FLOOR FINISH BY MANUFACTURING.
G-05 INTERIOR DESIGN
5800 19000 4000 CONSULTANT) -ALL MECHANICAL ROOMS/ PUMPS ROOMS/ GENERATOR ROOMS/ ARE TO HAVE A
FLOATING MACHINE BASE TO ABSORB VIBRATION.
RL-3 TL-3 TL-6 -FOR ALL DETAIL REFERENCES REFER TO OVERALL PLANS/ELEVATIONS/SECTIONS
0.000 FFL FFL RELATED TO THE SHEET
71500

11400
13000

G-04 -0.100 SSL SSL

STAIR PRESS.
-ACCESS PANEL LOCATION AND SIZE TO BE COORDINATED WITH THE MECHANICAL
1 DRAWINGS.

MAIN ENTRY
MAIN RL-2 TL-2 TL-7 SLOPE 2%
1 AR-201-00 -THE CONTRACTOR SHOULD SUBMIT SHOP DRAWING FOR APPROVAL BEFORE
G-03 ENTRY

.
AR-202-00 START MANUFACTURING

LOBBY PRESS.
RL-1 PL-1 TL-8 4650 6700 4650 O FOR DC1 APPROVAL 27 JUN. 2016

200
ISSUE DESCRIPTION DATE CHECKED QA / QC
G-02

E 0.000 FFL FFL


E ISSUED FOR DC1 APPROVAL
G-01 OWNER
-0.100 SSL SSL
P.O. BOX 2778,
5900

-0.100 FFL FFL/SSL DOHA - QATAR

EXTRACT
SUPPLY/
FL-1 FL-2 TEL: 8008555
4500 TEL: (974) 4410 0888
RETAIL 1
G-007 www.barwabank.com
13950

-0.100 FFL FFL/SSL WASTE ROOM


G-008 LEAD CONSULTANT
MARINA PLAZA, LEVEL 10
OFFICE 1004-1006
PSL-1 DUBAI MARINA, DUBAI,
6750

SERVICE LIFT UAE


OUT LOBBY
G-009 PSL-2 P.O. BOX 112955
STAIR TEL: 971 4382 5200
www.perkinswill.com
F PRESS.
OUTDOOR CAFE F
LOCAL CONSULTANT
205

57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
IN .

BUILDING, 6TH FLOOR


7900

P.O. BOX 1876, DOHA-QATAR


6700

TEL: (974) 402037 77 / 88 / 99

SLOPE 2%
1
FAX: (974) 40203766
AR-203-00 www.ehaf.com

G G MEP CONSULTANT
G-19 G-20 G-21 G-22 G-23 SUITE 1704, ABDULLA BIN
CAPARK INTAKE
3095

DARWISH BUILDING
LOUVERS
AL SALAM STREET
P.O. BOX 109870
7400

KHAARAMA
DOWN TO BASEMENT 1 ACCESS STAIR -0.100
ABU DHABI, UAE
1.200 FFL SL
SLOPE 20%
G-027 TEL: +971 (0)2 6774 220
5500

FAX: +971 (0)2 6774 202


.

PROJECT DESCRIPTION
H H
5 BASEMENTS + GROUND + 2 PODIUM + 20 FLOORS

OFFICE BUILDING
1 2 3 4 5 6 7 8 9 10 11 12 13 14
DRAWING TITLE

GROUND FLOOR - LEVEL.00


PLAN
DRAWING. NO. PART:

AR-106-00
DRAWN BY: CHECKED BY: STAGE: REVISION:
AG GD DD

O
1 GROUND PLAN
VERIFIED BY: APPROVED BY: PLOT DATE:
DL 15/06/16

1 : 200 SCALE:
1 : 200
PROJECT. NO:

390142
23
FILE NAME:
C:\Users\mahmoud.fathy\Documents\390142.000_Barwa
Bank_mahmoud.fathy.rvt
PROJECT NAME AND
LOCATION

BARWA BANK HQ TOWER


8 9 10 11 12 13 MARINA COM-02, LUSAIL CITY - QATAR
42500
NORTH PIN NO.
69060005
800 6950 9000 9000 9000 6950 800
PLANNING NO.
13-2015-00295
9300 23900 9300
16 EQUAL PANELS KEY PLAN
TOWER SETBACK
4550 4750 4750 4550

3650 1100 1100 3650


CW-11

800

800

250 800

1050
C W-01 W-01 C

4550
W-01 BH01

BH01

W-01
9300

8000
4600 7 19800 2600
3650

AR-501-01 GENERAL NOTES :


40900
4750

400 5950 200 700 300 2700 200 900 200 1500 200 2400 200 1550 2200 200 -THESE DRAWINGS SHOULD BE USED IN COORDINATION WITH ALL OTHER
DRAWINGS PRESENTED BY THE ARCHITECT, ENGINEER AND
CONSULTANTS.
13950

BH01 -IT IS FORBIDDEN TO ANY OF THE CONCERNED PERSONNEL TO MEASURE THE


BH01 DRAWING; IN CASE OF NECESSITY, REFER TO THE ARCHITECT OR ENGINEER.
6950 9000 18000 6950
1100

BH01 -UNLESS OTHERWISE NOTED. DIMENSIONS ARE IN MM AND TO THE STRUCTURE

200
400
BH01
FACES AND LEVELS ARE IN METERS.
BF02
FFL/SSL = X -ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH QCS (QATAR
SD19 CONSTRUCTION SPECIFICATION).
800 ST-01A CHW BF02
RISER
T2-019

STAIR PRESS.
PANTRY -FOR CURTAIN WALL DETAILS REFER TO CURTAIN WALL DRAWINGS.

2900

3100
T2-014
SUPPLY/ ELECT. ROOM -ALL EXTERNAL FINISHES TO BE WATER PROOF.

3975
800 250 SUPPLY/
T2-017

4400
BH01 EXTRACT
EXTRACT BH01 -FOR LANDSCAPE DETAILS REFER TO LANDSCAPE DRAWINGS.
F.A.
BF02 A1286
BF02 RISER
BF02 -UNLESS OTHERWISE SHOWN ON DRAWINGS ALL FLOOR FINISHING SHALL BE
1050 FFL = X SLOPED MIN 0.05% AND MAX 1.0% TOWARDS FLOOR DRAIN.

400

200
SSL = X - 200 WD04 CW-11 -FOR LOCATION OF FLOOR DRAIN REFER TO MECHANICAL DRAWINGS.
BF02 SD37 SD10 BF02 BF02 BH01 -DOOR OPENING SHALL BE LOCATED EITHER MIDWAY IN WALL OR 100MM OFF
7450

FIRE CORRIDOR WALL END AS SHOWN ON DRAWINGS UNLESS OTHERWISE INDICATED.

1650
BF02 T2-018 SD16

200
BF02

1000 100
-THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS

1800
2750
1145 SD34 CORRIDOR FFL = X AFFECTING THE WORKS AT JOB SITE
FFL = X T2-015 SSL = X - 200 WD02

900 200
SD36 SD36

1650
BF02 SSL = X - 200 BH01 -FOR EXACT LOCATION AND DIMENSIONS OF SLAB OPENINGS AND SLAB OPENING,
D FHC
100 900 900 BF02 900 1000 400 1000 1350 1000 700 D PLEASE REFER TO STRUCTURAL DRAWINGS.
-CONTRACTOR TO SUBMIT SHOP DRAWINGS DETAILS WITH APPROPRIATE

200

200
200
WD03
W.M TELECOM TESTS/SAMPLES/GURANTEES FOR ENGINEERS APPROVAL PRIOR TO
SD10 WD02 WD02
T2-024 RISER BH01 MANUFACTURING.
A1302

3350
H.T.
2000
BF02 -ALL MECHANICAL ROOMS/ PUMPS ROOMS/ GENERATOR ROOMS/ ARE TO HAVE A
T2-013
SD15 F.T FLOATING MACHINE BASE TO ABSORB VIBRATION.
BH01
OFFICE T2-012 OFFICE -FOR ALL DETAIL REFERENCES REFER TO OVERALL PLANS/ELEVATIONS/SECTIONS
T2-001 T2-001
200

M.T RELATED TO THE SHEET


BH01

4800
SPR T2-011
T2-025 SD15 -ACCESS PANEL LOCATION AND SIZE TO BE COORDINATED WITH THE MECHANICAL
FFL = X FFL = X DRAWINGS.
6150

BH02
1950

SSL = X - 200 BH01 SSL = X - 200


BF02 200 2200 2500 300 2700 300 2500 300 1900 200 -THE CONTRACTOR SHOULD SUBMIT SHOP DRAWING FOR APPROVAL BEFORE
START MANUFACTURING
BF02 DRAINAGE
200

T.E RISER A1305


LOBBY BF02
T2-023
T2-007 ISSUE DESCRIPTION DATE CHECKED QA / QC

300 200
16 EQUAL PANELS

250
1800

CW-11 DRAINAGE BF02 ISSUED FOR DC1 APPROVAL

11300
42500

13000

23900

24900

A1306 FFL = X
9000

SSL = X - 200 950 200 2900 OWNER

13950
200 200

BF02 ST-02
300

T2-021 P.O. BOX 2778,


STAIR PRESS.
BH02 A1283 DOHA - QATAR
BF02
TEL: 8008555
2850

F.T M.T TEL: (974) 4410 0888


200 BH01 T2-002 T2-003 40000 200
www.barwabank.com

5950
FFL = X
SSL = X - 200
200
4750

BH01
BH02 LEAD CONSULTANT
H.T
T2-004 LOBBY PRESS. 7 MARINA PLAZA, LEVEL 10
A1284
2400

FFL/SSL = X
AR-502-01 OFFICE 1004-1006
WD04 WD04
BH01 BF02 DUBAI MARINA, DUBAI,
UAE

300
200

550200

TELECOM SD01 P.O. BOX 112955


CORRIDOR
BF02 BF02
E WD03
BF02
T2-005 RISER
A1301 FIRE LOBBY E TEL: 971 4382 5200
www.perkinswill.com
1650

SD26 BF02 T2-020 BF02


100 1000

WD02 SD36 SD36 BF02


BH01 FFL = X
SD34 LOCAL CONSULTANT

2750
SSL = X - 200 FHC BF02
BF02 FFL = X 57 AL-JAZEERA ST.,
200

900

SD15 SSL = X - 200 BIN-MAHMOUD / BEHZAD


7450

BH01 BF02 SD10 BF01 6550 600200 BUILDING, 6TH FLOOR

745
BF02 200
WD04 P.O. BOX 1876, DOHA-QATAR

300
PANTRY ELECT. ROOM WASTE SD12 TEL: (974) 402037 77 / 88 / 99
T2-006 T2-010
2475

SUPPLY/ T2-009 FAX: (974) 40203766


4200

EXTRACT
BF02 BF01 www.ehaf.com
A1285 BF02

3000
MEP CONSULTANT
1000 200

BF02 SUITE 1704, ABDULLA BIN


DARWISH BUILDING
AL SALAM STREET
400

400
P.O. BOX 109870
1100

BH01 BH01
BH01 SD19
ABU DHABI, UAE
BH01
TEL: +971 (0)2 6774 220
13950

FAX: +971 (0)2 6774 202


450 1800 450 PROJECT DESCRIPTION
4750

3650

2600 200 2200 1550 200 2400 200 2600 200 2700 300 6850 400
5 BASEMENTS + GROUND + 2 PODIUM + 20 FLOORS

OFFICE BUILDING
8000
9300

W-01 DRAWING TITLE

W-01 TYPICAL TOWER PLAN


4550

BH01 CW-11 BH01


200

(LEVELS 2-7)
F W-01
F DRAWING. NO. PART:
250
800

W-01 AR-110-00
DRAWN BY: CHECKED BY: STAGE: REVISION:
Author Checker DD

8 9 10 11 12 13 VERIFIED BY: APPROVED BY:

Approver
PLOT DATE:
12/07/16
LEVELS 2-7 FLOOR PLAN
1 1 : 100
SCALE:

FILE NAME:
1 : 100
PROJECT. NO:

390142
24
C:\Users\mahmoud.fathy\Documents\390142.000_Barwa
Bank_mahmoud.fathy.rvt
1 2 3 4 5 6 7 8 9 10 11 12 13 14

ROOF APEX
+111.80 m

UPPER MECHANICAL LEVEL

10000
+106.80 m
MID T21
+104.25 m
MECHANICAL LEVEL
+101.80 m
MID T20

4900
+99.35 m UNITIZED CURTAIN WALL
TOWER LEVEL 20 LAMINATED GLAZING
+96.90 m SYSTEM (BY FACADE
MAXIMUM ALLOWABLE CONSULTANT)
MID T19 CW-12

4900
+94.45 m BUILDING HEIGHT
+91.800 M
TOWER LEVEL 19
+92.00 m
CW-11 NATURAL STONE CLADDING
W-01 W-01 ON STRUCTURAL STEEL
TOWER LEVEL 18 SUPPORT
+88.00 m
CW-11
W-01 W-01
TOWER LEVEL 17
+84.00 m
CW-11
W-01 W-01 500 MM HIGH GLASS
TOWER LEVEL 16 CUTOUT (BY FACADE
+80.00 m CONSULTANT
CW-11
W-01 W-01
TOWER LEVEL 15
+76.00 m
CW-11
W-01 W-01
TOWER LEVEL 14
+72.00 m

W-01 W-01
TOWER LEVEL 13
+68.00 m
CW-11
W-01 W-01
TOWER LEVEL 12
+64.00 m
CW-11
W-01 W-01
TOWER LEVEL 11
+60.00 m
CW-11

TOTAL BUILDING HEIGHT


W-01 W-01
TOWER LEVEL 10

18 LEVELS AT 4000 MM EACH


+56.00 m
CW-11

76000
W-01 W-01
TOWER LEVEL 9
+52.00 m

101800
101800
CW-11
W-01 W-01
PLOT LIMIT

TOWER LEVEL 8

PLINTH SETBACK
PLINTH SETBACK

TOWER SETBACK
TOWER SETBACK
TOWER SETBACK

+48.00 m
CW-11
W-01 W-01

PLOT LIMIT
TOWER LEVEL 7
+44.00 m
CW-11
W-01 W-01
TOWER LEVEL 6
+40.00 m UNITIZED CURTAIN WALL
CW-11 LAMINATED GLAZING SYSTEM
W-01 W-01 (BY FACADE CONSULTANT)
TOWER LEVEL 5
+36.00 m
CW-11
NATURAL STONE CLADDING
W-01 W-01 ON STRUCTURAL STEEL
TOWER LEVEL 4 SUPPORT
+32.00 m
MAXIMUM ALLOWABLE
CW-11
PODIUM HEIGHT W-01 W-01 500 MM HIGH GLASS
TOWER LEVEL 3 +27.000 M CUTOUT (BY FACADE
+28.00 m CONSULTANT
CW-11
W-01 W-01
TOWER LEVEL 2
+24.00 m WOODEN TRELLIS (BY
LANDSCAPE CONSULTANT)
W-01 W-01

CW-09 CW-07

W-01 W-01
PODIUM ROOF DECK GLASS BALUSTRADE
+16.00 m
MID P-2 NATURAL STONE CLADDING
+13.50 m ON STRUCTURAL STEEL
SUPPORT
PODIUM LEVEL 2
10000

+11.00 m
MID P-1 CURTAIN WALL LAMINATED
CW-03 CW-02
+8.50 m GLAZING SYSTEM
PODIUM LEVEL 1
+6.00 m
6000

CW-04

GROUND LEVEL
+0.00 m
FIREMENS ACCES (CLEAR WALL
OPENING)

SOUTH ELEVATION
1 1 : 250
O
ISSUE

SCALE:
UAE

DRAWN BY:

FILE NAME:
VERIFIED BY:
NORTH

OWNER

DRAWING. NO.
LOCATION

TEL: 8008555

DRAWING TITLE
www.ehaf.com
P.O. BOX 2778,
DOHA - QATAR

AM
ABU DHABI, UAE
P.O. BOX 112955

P.O. BOX 109870


OFFICE 1004-1006

TEL: 971 4382 5200

AL SALAM STREET
MEP CONSULTANT
www.barwabank.com

FAX: (974) 40203766


57 AL-JAZEERA ST.,

DARWISH BUILDING
TEL: (974) 4410 0888

LEAD CONSULTANT
PROJECT NAME AND

www.perkinswill.com

LOCAL CONSULTANT

BUILDING, 6TH FLOOR


DUBAI MARINA, DUBAI,

TEL: +971 (0)2 6774 220


FAX: +971 (0)2 6774 202
PROJECT DESCRIPTION
BIN-MAHMOUD / BEHZAD
MARINA PLAZA, LEVEL 10

SUITE 1704, ABDULLA BIN


DESCRIPTION

TEL: (974) 402037 77 / 88 / 99

CHECKED BY:
P.O. BOX 1876, DOHA-QATAR

APPROVED BY:
FOR DC1 APPROVAL
PIN NO.

VISION PANEL

SPANDREL PANEL
KEY PLAN

C:\Users\mahmoud.fathy\Documents\390142.000_Barwa
Bank_mahmoud.fathy.rvt
As indicated
MB
AR
PLANNING NO.

AR-203-00
STAGE:
NATURAL STONE CLADDING

DATE

ISSUED FOR DC1 APPROVAL

PLOT DATE:

PROJECT. NO:
OFFICE BUILDING
27 JUN. 2016
69060005

DD

15/06/16
MARINA COM-02, LUSAIL CITY - QATAR

SOUTH ELEVATION
BARWA BANK HQ TOWER

5 BASEMENTS + GROUND + 2 PODIUM + 20 FLOORS


13-2015-00295

PART:

390142
O
REVISION:
CHECKED QA / QC

25
1 2 3 4 5 6 7 8 9 10 11 12 13
5500 9000 9000 9000 9000 9000 10250 6950 9000 18000 6950

MECHANICAL BULK
HEAD
+111.800 M
ROOF APEX
DECK LEVEL
+111.70
+111.80 m
MEP MEP
M2-001 M2-001

UPPER MECHANICAL LEVEL


+106.80 m
3 STAR GSAS MEP LMR LMR MEP MEP LANDSCAPED

10000
MID T21
MECHANICAL ZONE

DISPENSATION CAT B CHW M1-020 M1-002 A797 M1-005 M1-004 AREA


+104.25 m TOP OF +101.800 M PUMP ROOM M1-025
M1-012
MECHANICAL LEVEL SLAB
+101.80 m
MID T20

4900
+99.35 m VP OFFICES T.E RISER LOBBY CEO OFFICES
T20-001 T20-024 T20-008 T20-002
TOWER LEVEL 20
+96.90 m
VIP OFFICES

MAXIMUM ALLOWABLE
MID T19 BUILDING HEIGHT VIP OFFICES T.E RISER LOBBY

4900
+94.45 m T19-001 T19-023 T19-007 VIP OFFICES
+91.800 M T19-001
TOWER LEVEL 19
+92.00 m
M.T F.T
UNIT 1 T.E RISER LOBBY A1215 A1214 UNIT 2
A1212 A1230 A1227 A1226
TOWER LEVEL 18
EXECUTIVE OFFICES

+88.00 m
UNIT 1 T.E RISER LOBBY UNIT 2
A1186 A1204 A1201 A1200
TOWER LEVEL 17
+84.00 m
UNIT 1 T.E RISER LOBBY UNIT 2
A1160 A1178 A1175 A1174
TOWER LEVEL 16
+80.00 m
UNIT 1 T.E RISER LOBBY UNIT 2
A1134 A1152 A1149 A1148
TOWER LEVEL 15
+76.00 m
UNIT 1 T.E RISER LOBBY UNIT 2
A1108 A1126 A1123 A1122
TOWER LEVEL 14
+72.00 m
UNIT 1 T.E RISER LOBBY UNIT 2
A1082 A1100 A1097 A1096
TOWER LEVEL 13
+68.00 m
UNIT 1 T.E RISER LOBBY UNIT 2
A1056 A1074 A1071 A1070
THIRD PARTY TENANTS

TOWER LEVEL 12
+64.00 m
UNIT 1 T.E RISER LOBBY UNIT 2
A1030 A1048 A1045 A1044
TOWER LEVEL 11
+60.00 m
UNIT 1 T.E RISER LOBBY UNIT 2
A1004 A1022 A1019 A1018
TOWER LEVEL 10

18 LEVELS AT 4000 MM EACH


+56.00 m
UNIT 1 T.E RISER LOBBY UNIT 2

76000
A978 A996 A993 A992

TOTAL BUILDING HEIGHT


TOWER LEVEL 9
+52.00 m

101800
UNIT 1 T.E RISER LOBBY UNIT 2
T8-001 T8-024 T8-008 T8-002
TOWER LEVEL 8
+48.00 m
OFFICE T.E RISER LOBBY OFFICE

130900
A953 A969 A970 A953
TOWER LEVEL 7
+44.00 m
OFFICE T.E RISER LOBBY OFFICE
A928 A944 A945 A928

120900
TOWER LEVEL 6
+40.00 m
OFFICE T.E RISER LOBBY OFFICE
A903 A919 A920 A903
TOWER LEVEL 5
+36.00 m
OFFICE T.E RISER LOBBY OFFICE
A878 A894 A895 A878
TOWER LEVEL 4
BARWA BANK HEADQUARTERS

+32.00 m
MAXIMUM ALLOWABLE
OFFICE T.E RISER LOBBY OFFICE
PODIUM HEIGHT A853 A869 A870 A853
SETBACK

+27.000 M
PLOT LIMIT

TOWER LEVEL 3

PLOT LIMIT
BASEMENT

+28.00 m
TOWER SETBACK
TOWER SETBACK

OFFICE T.E RISER LOBBY OFFICE

PODIUM SETBACK
PODIUM SETBACK

T2-001 T2-023 T2-007 T2-001

BASEMENT SETBACK
TOWER LEVEL 2
+24.00 m

LIFT LOBBY CAFETERIA


P3-011 P3-002
CAFETERIA

PODIUM DECK
MAJILIS CORRIDOR LOBBY LOUNGE STORE
PODIUM ROOF LANDSCAPE P3-007 P3-006 P3-001 P3-018
PODIUM ROOF DECK
+16.00 m
MEETING ROOM
MID P-2 2 LIFT LOBBY LIFT LOBBY LIFT LOBBY BMS ROOM
5000

+13.50 m MULTI P2-007 P2-001 P2-001 P2-014 P2-022


PURPOSE AREA
PODIUM LEVEL 2 FL-03
+11.00 m
MID P-1
5000

+8.50 m W-02 F&B W-03 LIFT LOBBY LIFT LOBBY BMS ROOM
P1-006 P1-001 P1-012 P1-020
MEETING ROOMS, MOSQUE, GYM

PODIUM LEVEL 1
+6.00 m

G-06
EXTRACT
6000

LANDSCAPE G-08 G-07


4510
MEGABRANCH RETAIL

AREA
GROUND LEVEL
+0.00 m
RETAIL LOBBY SOLID WASTE PARKING
5100

B1-002 RETAIL LOBBY LIFT LOBBY FA ROOM STORAGE B1-001


B1-002 B2-014 B1-019 B1-007
BASEMENT LEVEL 1
-5.10 m PARKING
PARKING (RETAIL)

SHUTTLE STORE
PARKING
3500

LOBBY LIFT LOBBY B2-013 PARKING


B2-001 B3-012 MEP PLANT B2-001
BASEMENT LEVEL 2 B2-002 B2-008
-8.60 m
19100

PARKING LIFT LOBBY


3500

B4-012 PARKING
B3-001 B3-001
BASEMENT LEVEL 3
-12.10 m
3500

PARKING LIFT LOBBY PARKING


B4-001 B5-017 B4-001
BASEMENT LEVEL 4
PARKING (COMMERCIAL)

-15.60 m
PARKING
3500

PARKING
B5-001 B5-001
BASEMENT LEVEL 5
-19.10 m LIFT LIFT LIFT
PIT PIT PIT

SECTION A-A
1 1 : 250
O
ISSUE

SCALE:
UAE

TEL:

DRAWN BY:

FILE NAME:
VERIFIED BY:
NORTH

DRAWINGS.

OWNER

DRAWING. NO.
LOCATION

CONSULTANTS.

MANUFACTURING.

TEL: 8008555

DRAWING TITLE
www.ehaf.com
P.O. BOX 2778,
DOHA - QATAR

AM
ABU DHABI, UAE
P.O. BOX 112955

P.O. BOX 109870


OFFICE 1004-1006
RELATED TO THE SHEET

START MANUFACTURING

971 4382 5200

AL SALAM STREET
MEP CONSULTANT
www.barwabank.com

FAX: (974) 40203766


57 AL-JAZEERA ST.,

DARWISH BUILDING
TEL: (974) 4410 0888

LEAD CONSULTANT
GENERAL NOTES :
PROJECT NAME AND

www.perkinswill.com

LOCAL CONSULTANT

BUILDING, 6TH FLOOR


DUBAI MARINA, DUBAI,

TEL: +971 (0)2 6774 220


FAX: +971 (0)2 6774 202
PROJECT DESCRIPTION
BIN-MAHMOUD / BEHZAD
CONSTRUCTION SPECIFICATION).

MARINA PLAZA, LEVEL 10

SUITE 1704, ABDULLA BIN


DESCRIPTION

TEL: (974) 402037 77 / 88 / 99


FACES AND LEVELS ARE IN METERS.

AFFECTING THE WORKS AT JOB SITE

CHECKED BY:
P.O. BOX 1876, DOHA-QATAR

APPROVED BY:
FOR DC1 APPROVAL
PIN NO.

PLEASE REFER TO STRUCTURAL DRAWINGS.


KEY PLAN

-ALL EXTERNAL FINISHES TO BE WATER PROOF.

C:\Users\mahmoud.fathy\Documents\390142.000_Barwa
Bank_mahmoud.fathy.rvt
As indicated
MB
AR
PLANNING NO.

FLOATING MACHINE BASE TO ABSORB VIBRATION.

AR-301-00
STAGE:
SLOPED MIN 0.05% AND MAX 1.0% TOWARDS FLOOR DRAIN.
DRAWINGS PRESENTED BY THE ARCHITECT, ENGINEER AND

SECTION A-A
DATE
-FOR LANDSCAPE DETAILS REFER TO LANDSCAPE DRAWINGS.

ISSUED FOR DC1 APPROVAL

PLOT DATE:

PROJECT. NO:
OFFICE BUILDING
27 JUN. 2016
69060005

DD

15/06/16
-FOR CURTAIN WALL DETAILS REFER TO CURTAIN WALL DRAWINGS.
-ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH QCS (QATAR
MARINA COM-02, LUSAIL CITY - QATAR

TESTS/SAMPLES/GURANTEES FOR ENGINEERS APPROVAL PRIOR TO


-FOR LOCATION OF FLOOR DRAIN REFER TO MECHANICAL DRAWINGS.

WALL END AS SHOWN ON DRAWINGS UNLESS OTHERWISE INDICATED.


BARWA BANK HQ TOWER

5 BASEMENTS + GROUND + 2 PODIUM + 20 FLOORS


-THESE DRAWINGS SHOULD BE USED IN COORDINATION WITH ALL OTHER

-CONTRACTOR TO SUBMIT SHOP DRAWINGS DETAILS WITH APPROPRIATE


13-2015-00295

PART:
-THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS

390142
DRAWING; IN CASE OF NECESSITY, REFER TO THE ARCHITECT OR ENGINEER.

-UNLESS OTHERWISE SHOWN ON DRAWINGS ALL FLOOR FINISHING SHALL BE

-DOOR OPENING SHALL BE LOCATED EITHER MIDWAY IN WALL OR 100MM OFF

O
-THE CONTRACTOR SHOULD SUBMIT SHOP DRAWING FOR APPROVAL BEFORE
-IT IS FORBIDDEN TO ANY OF THE CONCERNED PERSONNEL TO MEASURE THE

REVISION:
-UNLESS OTHERWISE NOTED. DIMENSIONS ARE IN MM AND TO THE STRUCTURE

-ALL MECHANICAL ROOMS/ PUMPS ROOMS/ GENERATOR ROOMS/ ARE TO HAVE A


-FOR EXACT LOCATION AND DIMENSIONS OF SLAB OPENINGS AND SLAB OPENING,

-FOR ALL DETAIL REFERENCES REFER TO OVERALL PLANS/ELEVATIONS/SECTIONS

-ACCESS PANEL LOCATION AND SIZE TO BE COORDINATED WITH THE MECHANICAL

CHECKED QA / QC

26
PROJECT NAME AND
LOCATION

BARWA BANK HQ TOWER


MARINA COM-02, LUSAIL CITY - QATAR

NORTH PIN NO.


69060005
PLANNING NO.
13-2015-00295
KEY PLAN

MECHANICAL ZONE VP OFFICES EXECUTIVE OFFICES THIRD PARTY TENANTS BARWA BANK HEADQUARTERS CAFETERIA MEETING ROOMS, MOSQUE, GYM PARKING (RETAIL) PARKING (COMMERCIAL)

MEGABRANCH RETAIL

MAXIMUM ALLOWABLE
BUILDING HEIGHT

MAXIMUM ALLOWABLE
DISPENSATION

SUPPLY
3 STAR GSAS
MECHANICAL
BULKHEAD
+111.800 M

+101.800 M

PODIUM HEIGHT
+91.800 M
PLOT LIMIT

+27.000 M
SETBACK
BASEMENT
H

INTAKE SHAFT
A1246
7400

PARKING

PARKING

PARKING

PARKING
G

B2-001

B3-001

B4-001

B5-001
GENERAL NOTES :

FIRE PUMP
PODIUM SETBACK
-THESE DRAWINGS SHOULD BE USED IN COORDINATION WITH ALL OTHER

B1-010
ROOM
DRAWINGS PRESENTED BY THE ARCHITECT, ENGINEER AND
CONSULTANTS.
7900

-IT IS FORBIDDEN TO ANY OF THE CONCERNED PERSONNEL TO MEASURE THE


TOWER SETBACK DRAWING; IN CASE OF NECESSITY, REFER TO THE ARCHITECT OR ENGINEER.
-UNLESS OTHERWISE NOTED. DIMENSIONS ARE IN MM AND TO THE STRUCTURE
FACES AND LEVELS ARE IN METERS.
F

W-01 -ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH QCS (QATAR

W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01
CONSTRUCTION SPECIFICATION).
-FOR CURTAIN WALL DETAILS REFER TO CURTAIN WALL DRAWINGS.
-ALL EXTERNAL FINISHES TO BE WATER PROOF.
-FOR LANDSCAPE DETAILS REFER TO LANDSCAPE DRAWINGS.
-UNLESS OTHERWISE SHOWN ON DRAWINGS ALL FLOOR FINISHING SHALL BE
SLOPED MIN 0.05% AND MAX 1.0% TOWARDS FLOOR DRAIN.
13950

B1-011
BOH
-FOR LOCATION OF FLOOR DRAIN REFER TO MECHANICAL DRAWINGS.
-DOOR OPENING SHALL BE LOCATED EITHER MIDWAY IN WALL OR 100MM OFF
WALL END AS SHOWN ON DRAWINGS UNLESS OTHERWISE INDICATED.
-THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS
AFFECTING THE WORKS AT JOB SITE
-FOR EXACT LOCATION AND DIMENSIONS OF SLAB OPENINGS AND SLAB OPENING,
PLEASE REFER TO STRUCTURAL DRAWINGS.
E

-CONTRACTOR TO SUBMIT SHOP DRAWINGS DETAILS WITH APPROPRIATE


TESTS/SAMPLES/GURANTEES FOR ENGINEERS APPROVAL PRIOR TO
MANUFACTURING.
CW-13

CW-13

-ALL MECHANICAL ROOMS/ PUMPS ROOMS/ GENERATOR ROOMS/ ARE TO HAVE A


FLOATING MACHINE BASE TO ABSORB VIBRATION.

RETAIL LOBBY
-FOR ALL DETAIL REFERENCES REFER TO OVERALL PLANS/ELEVATIONS/SECTIONS
CW-11

CW-11

CW-11

CW-11

CW-11

CW-11

CW-11

CW-11

CW-11

CW-11

CW-11

CW-11

CW-11

CW-11

CW-11

CW-11

CW-11

CW-08

B1-002
71500

13000

RELATED TO THE SHEET


-ACCESS PANEL LOCATION AND SIZE TO BE COORDINATED WITH THE MECHANICAL
DRAWINGS.
-THE CONTRACTOR SHOULD SUBMIT SHOP DRAWING FOR APPROVAL BEFORE
START MANUFACTURING

O FOR DC1 APPROVAL 27 JUN. 2016


D

ISSUE DESCRIPTION DATE CHECKED QA / QC

LOBBY

RECEPTION
LIFT

LIFT LOBBY
ISSUED FOR DC1 APPROVAL

LOADING
P1-001

G-014

B4-039
OWNER
P.O. BOX 2778,
DOHA - QATAR
TEL: 8008555
13950

TEL: (974) 4410 0888

B4-038
ATM
www.barwabank.com

PARKING

PARKING

PARKING

PARKING
B2-001

B3-001

B4-001

B5-001
LEAD CONSULTANT
W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01

W-01

OFFICE
B4-037
MARINA PLAZA, LEVEL 10
C

OFFICE 1004-1006
DUBAI MARINA, DUBAI,
UAE

FIRE PUMP
TOWER SETBACK
P.O. BOX 112955

B1-010
ROOM
7900

TEL: 971 4382 5200


www.perkinswill.com

LOCAL CONSULTANT
PODIUM SETBACK 57 AL-JAZEERA ST.,
B

BIN-MAHMOUD / BEHZAD
BUILDING, 6TH FLOOR
P.O. BOX 1876, DOHA-QATAR
7400

EXHAUST
TEL: (974) 402037 77 / 88 / 99

SHAFT
A168
FAX: (974) 40203766
www.ehaf.com
MEP CONSULTANT
A

SETBACK
SUITE 1704, ABDULLA BIN

EXTRACT
BASEMENT
DARWISH BUILDING
AL SALAM STREET

SECTION C-C
P.O. BOX 109870
ABU DHABI, UAE
PLOT LIMIT
TEL: +971 (0)2 6774 220
4900 4900 18 LEVELS AT 4000 MM EACH 76000 5000 5000 6000 5100 3500 3500 3500 3500
FAX: +971 (0)2 6774 202
TOTAL BUILDING HEIGHT 101800 19100 PROJECT DESCRIPTION

10000 120900
5 BASEMENTS + GROUND + 2 PODIUM + 20 FLOORS
UPPER MECHANICAL LEVEL

OFFICE BUILDING

1 : 250
PODIUM ROOF DECK
MECHANICAL LEVEL

BASEMENT LEVEL 1

BASEMENT LEVEL 2

BASEMENT LEVEL 3

BASEMENT LEVEL 4

BASEMENT LEVEL 5
DECK LEVEL

TOWER LEVEL 20

TOWER LEVEL 19

TOWER LEVEL 18

TOWER LEVEL 17

TOWER LEVEL 16

TOWER LEVEL 15

TOWER LEVEL 14

TOWER LEVEL 13

TOWER LEVEL 12

TOWER LEVEL 11

TOWER LEVEL 10

PODIUM LEVEL 2

PODIUM LEVEL 1
TOWER LEVEL 9

TOWER LEVEL 8

TOWER LEVEL 7

TOWER LEVEL 6

TOWER LEVEL 5

TOWER LEVEL 4

TOWER LEVEL 3

TOWER LEVEL 2

GROUND LEVEL

1
ROOF APEX

DRAWING TITLE
+111.70 m

+106.80 m

+104.25 m

+101.80 m

+99.35 m

+96.90 m

+94.45 m

+92.00 m

+88.00 m

+84.00 m

+80.00 m

+76.00 m

+72.00 m

+68.00 m

+64.00 m

+60.00 m

+56.00 m

+52.00 m

+48.00 m

+44.00 m

+40.00 m

+36.00 m

+32.00 m

+28.00 m

+24.00 m

+16.00 m

+13.50 m

+11.00 m

-12.10 m

-15.60 m

-19.10 m
MID T21

MID T20

MID T19

MID P-2

MID P-1

+6.00 m

+0.00 m
+111.80

+8.50 m

-5.10 m

-8.60 m
SECTION C-C
DRAWING. NO. PART:

AR-303-00
DRAWN BY: CHECKED BY: STAGE: REVISION:
AG GD DD
VERIFIED BY: APPROVED BY:

DL
PLOT DATE:
15/06/16 O
SCALE: PROJECT. NO:
As indicated
FILE NAME: 390142
27
C:\Users\mahmoud.fathy\Documents\390142.000_Barwa
Bank_mahmoud.fathy.rvt
PROJECT NAME AND
D LOCATION

BARWA BANK HQ TOWER


SLOPED CURTAIN WALL ON
GLASS FRAME ASSEMBLY BY MARINA COM-02, LUSAIL CITY - QATAR
6200
APPROVED MANUFACTURER'S
3100 3100
SPECS & DETAIL NORTH PIN NO.

SLOPE 1.5% SLOPE 1.5%


69060005
PLANNING NO.
13-2015-00295
STAINLESS STEEL CORNER SPLICE
WITH 4 WAY SPIDER BRACKET KEY PLAN
6 SYSTEM BY APPROVED
AR-306-03 MANUFACTURER'S DETAIL

LAMINATED GLASS FIN SUPPORT IN


ELEVATION BY APPROVED MANUFACTURER'S
SPECS & DETAIL

CURTAIN WALL ON LAMINATED


GLASS FIN & SPIDER FRAMING
SYSTEM

STAINLESS STEEL SPLICE WITH 4 WAY


SPIDER BRACKET SYSTEM BY APPROVED
3550

MANUFACTURER'S DETAIL

CENTERLINE
STAINLESS STEEL SPLICE WITH 4 WAY
SPIDER BRACKET SYSTEM BY
APPROVED MANUFACTURER'S DETAIL
CONCRETE SLAB, REFER LAMINATED GLASS FIN SUPPORT IN
TO STRUCTURAL ELEVATION BY APPROVED MANUFACTURER'S
DRAWINGS GENERAL NOTES :
SPECS & DETAIL -THESE DRAWINGS SHOULD BE USED IN COORDINATION WITH ALL OTHER
FINISHED FLOOR, BY SLOPED CURTAIN WALL ON LAMINATED DRAWINGS PRESENTED BY THE ARCHITECT, ENGINEER AND
INTERIOR DESIGNER GLASS FRAME ASSEMBLY BY APPROVED CONSULTANTS.
GLASS RAILING
MANUFACTURER'S SPECS & DETAIL

1200
-IT IS FORBIDDEN TO ANY OF THE CONCERNED PERSONNEL TO MEASURE THE
DRAWING; IN CASE OF NECESSITY, REFER TO THE ARCHITECT OR ENGINEER.
STAINLESS STEEL FIN STAINLESS STEEL CORNER SPLICE
CORRIDOR SHOE BY APPROVED 5 WITH 4 WAY SPIDER BRACKET SYSTEM -UNLESS OTHERWISE NOTED. DIMENSIONS ARE IN MM AND TO THE STRUCTURE
FACES AND LEVELS ARE IN METERS.
P3-006 MANUFACTURER'S AR-306-03 BY APPROVED MANUFACTURER'S
SLOPE 1.5% -ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH QCS (QATAR
DETAIL DETAIL CONSTRUCTION SPECIFICATION).
PODIUM ROOF DECK
-FOR CURTAIN WALL DETAILS REFER TO CURTAIN WALL DRAWINGS.
+16.00 m
6 -ALL EXTERNAL FINISHES TO BE WATER PROOF.
AR-306-03 -FOR LANDSCAPE DETAILS REFER TO LANDSCAPE DRAWINGS.
-UNLESS OTHERWISE SHOWN ON DRAWINGS ALL FLOOR FINISHING SHALL BE
SLOPED MIN 0.05% AND MAX 1.0% TOWARDS FLOOR DRAIN.
-FOR LOCATION OF FLOOR DRAIN REFER TO MECHANICAL DRAWINGS.
-DOOR OPENING SHALL BE LOCATED EITHER MIDWAY IN WALL OR 100MM OFF
WALL END AS SHOWN ON DRAWINGS UNLESS OTHERWISE INDICATED.

Podium Wall Section 12


-THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS

5
2700 2500 AFFECTING THE WORKS AT JOB SITE
5000 -FOR EXACT LOCATION AND DIMENSIONS OF SLAB OPENINGS AND SLAB OPENING,
PLEASE REFER TO STRUCTURAL DRAWINGS.
1 : 25
-CONTRACTOR TO SUBMIT SHOP DRAWINGS DETAILS WITH APPROPRIATE
TESTS/SAMPLES/GURANTEES FOR ENGINEERS APPROVAL PRIOR TO

6 8 F
MANUFACTURING.

4 -ALL MECHANICAL ROOMS/ PUMPS ROOMS/ GENERATOR ROOMS/ ARE TO HAVE A


FLOATING MACHINE BASE TO ABSORB VIBRATION.
-FOR ALL DETAIL REFERENCES REFER TO OVERALL PLANS/ELEVATIONS/SECTIONS
NATURAL STONE CAPPING NATURAL STONE CAPPING RELATED TO THE SHEET

2 -ACCESS PANEL LOCATION AND SIZE TO BE COORDINATED WITH THE MECHANICAL


450 1500 450 DRAWINGS.
AR-306-06 200 250 200 250
CURTAIN WALL, ON -THE CONTRACTOR SHOULD SUBMIT SHOP DRAWING FOR APPROVAL BEFORE
ALUMINUM FRAMING START MANUFACTURING
ROOF BUILT -UP
200 100

CW-08
ASSEMBLY
NATURAL STONE CLADDING, NATURAL STONE
300

PODIUM DECK MEZZANINE MECHANICALLY FIXED PODIUM DECK MEZZANINE CLADDING, PODIUM DECK MEZZANINE NATURAL STONE ISSUE DESCRIPTION DATE CHECKED QA / QC
450
+20.00 m +20.00 m MECHANICALLY FIXED +20.00 m CLADDING
200 250 ISSUED FOR DC1 APPROVAL
240

SLOPED CURTAIN WALL ON OWNER


450

455
GLASS FRAME ASSEMBLY

200 50
NATURAL STONE P.O. BOX 2778,
CLADDING, DOHA - QATAR
1100

ALUMINUM LOUVER MECHANICALLY TEL: 8008555


1275

250
860

SUNSCREEN FIXED TEL: (974) 4410 0888


LAMINATED GLASS SPANDREL, ON www.barwabank.com

820
LAMINATED GLASS
850

ALUMINUM FRAMING ASSEMBLY SPANDREL, ON ALUMINUM CONCRETE SLAB,


SUNDRY INSULATION FRAMING ASSEMBLY CONCRETE CROSS REFER TO LEAD CONSULTANT
BRACING, REFER TO STRUCTURAL
STRUCTURAL DRAWINGS MARINA PLAZA, LEVEL 10
DRAWINGS OFFICE 1004-1006
CEILING BY INTERIOR DESIGNER
DUBAI MARINA, DUBAI,

525
200mm UAE
BLOCKWORK P.O. BOX 112955
TEL: 971 4382 5200
www.perkinswill.com

2200
LOCAL CONSULTANT
4000

4000

4000
57 AL-JAZEERA ST.,
CW-10 G-13
BIN-MAHMOUD / BEHZAD
SUNDRY INSULATION BUILDING, 6TH FLOOR
P.O. BOX 1876, DOHA-QATAR
LAMINATED GLASS DOOR, LAMINATED GLASS TEL: (974) 402037 77 / 88 / 99
LAMINATED GLASS CURTAIN
2900

2900

REFER TO SCHEDULE OF DOOR, REFER TO FAX: (974) 40203766


2725

WALL, ON ALUMINUM
2700

DOORS FOR DETAILS SCHEDULE OF DOORS www.ehaf.com


FRAMING ASSEMBLY
FOR DETAILS
MEP CONSULTANT

2200
PODIUM ROOF DECK
+16.00 m SUITE 1704, ABDULLA BIN

100
PODIUM DECK
LANDSCAPE DARWISH BUILDING
MAJILIS AREA AL SALAM STREET

300
P3-007 A579
P.O. BOX 109870
CONCRETE BEAM, ABU DHABI, UAE
REFER TO TEL: +971 (0)2 6774 220
FINISHED FLOOR, REFER STRUCTURAL FAX: +971 (0)2 6774 202
TO LANDSCAPE DRAWINGS DRAWINGS PROJECT DESCRIPTION

PODIUM ROOF DECK PODIUM ROOF DECK PODIUM ROOF DECK


+16.00 m +16.00 m +16.00 m 5 BASEMENTS + GROUND + 2 PODIUM + 20 FLOORS

OFFICE BUILDING

DRAWING TITLE

PODIUM WALL SECTIONS


SHEET 04
DRAWING. NO. PART:

AR-304-04
DRAWN BY: CHECKED BY: STAGE: REVISION:
AM AR DD
VERIFIED BY: APPROVED BY: PLOT DATE:
MB 10/26/16

Podium Wall Section 09 Podium Wall Section 10 Podium Wall Section 10A Podium Wall Section 11
1 2 3 4
SCALE: PROJECT. NO:
1 : 25
1 : 25 1 : 25 1 : 25 1 : 25 FILE NAME: 390142
28
C:\Users\mahmoud.fathy\Documents\390142.000_Barwa
Bank_mahmoud.fathy.rvt
Khrityat Masjid and Majlis

Client : P.E.O.
Location : lusail - Doha - Qatar
Leed Consultant : EHAF
Scope of Work : Working drawings and Coordination as a senior architect
PROJECT

KHRITYIAT MAJLIS AND MOSQUE

MOSQUE, MAJLIS,
EID PRAYER AND PARKING

KHRITIAT, UM SLAL, DOHA - QATAR

DESIGN TEAM
MAIN CONSULTANT EHAF CONSULTING
ENGINEERS
STRUCTURAL DESIGNER EHAF CONSULTING
CONSULTANT ENGINEERS

MEP DESIGNER / EHAF CONSULTING


CONSULTANT ENGINEERS
LANDSCAPE DESIGNER EHAF CONSULTING
ENGINEERS

ARCHITECTURE
DETAILED DESIGN PACKAGE

15/10/17

MAIN CONTRACTOR: OWNER: MAIN CONSULTANT:

30
PROJECT NAME AND LOCATION

KHRITYIAT MAJLIS AND MOSQUE


KHRITYIAT - UM SLAL
DOHA - QATAR

Kiblah PIN NO. 7118035


PLANING NO. N/2017/0003729
KEY PLAN

B1 B24

BG
4 BG

3 2

4
3
1 1

BA BA

3 2 4

03 02 04 1

AR-201-00 B1 B24

AR-302-00 AR-302-00 AR-302-00


2

B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21 B22 B23 B24
145400

REF TO 1 @ AR-102-02

REF TO 1 @ AR-102-03
REF TO 1 @ AR-102-01

REF TO 1 @ AR-102-02
300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 200
6300 50400 13200 49900 6700 10100 7750 1050
1300

1300
BI BI
0.40
8860
6300

6300
F.F.L. 0.50
0.40 F.F.L.
F.F.L.

15300
BH BH
6300

6300
4740

BG BG
1575
3150

3150
BF BF
AR-202-00

AR-202-00
1
4700

4700
39400
2
BE BE
39400

0.60 0.60 0.60 0.60


3200

3200
17925

17800
F.F.L. F.F.L. F.F.L. F.F.L.
BD BD
4700

4700
01 01
AR-301-00
BC BC AR-301-00
3150

3150
BB BB
0.60 0.60 0.60 01 DETAIL DESIGN OCT 2017 AH AD -----
6300

6300
0.60
6300

6300
F.F.L. F.F.L. F.F.L. 00 SCHEMATIC DESIGN JUNE 2017 AH AD -----
F.F.L.
ISSUE DESCRIPTION DATE DRAWN CHECKED QA/QC

BA BA ISSUED FOR SCHEMATIC DESIGN


300

300
OWNER

01
6300 47850 2550 13200 AR-201-00 2550 47750 25200
300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 200
145400
MAIN CONSULTANT

57 AL-JAZEERA ST., BIN-


MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
TEL: (+974) 4020 37 77 / 88 /
99 FAX : (+974) 4020 37 66
P.O BOX1876, DOHA, QATAR.
W W W .EHAF.COM
03 02 04
AR-302-00 AR-302-00 AR-302-00
DESIGN AND BUILD CONTRACTOR

PROJECT DESCRIPTION

1 GROUND MASTER FLOOR PLAN MAJLIS BUILDING


AR-102-00
SCALE1 : 250

DRAWING TITLE

GROUND MASTER FLOOR PLAN

DRAWING NO.: PART

AR-102-00
DRAWN BY: CHECKED BY: STAGE: REVISION:

--------- AD. -----


VERIFIED BY: APPROVED BY: PLOT DATE: R01
HH. MI. 15/10/17
PROJECT NO.:
1 : 250 @A1
SCALE:

FILE NAME:
327
AR-102-00

31
PROJECT NAME AND LOCATION

KHRITYIAT MAJLIS AND MOSQUE


B1 B2 B3 B4 B5 B6 B7 B8 B9

REF TO 2 @ AR-201-01
KHRITYIAT - UM SLAL
DOHA - QATAR

APEX APEX Kiblah PIN NO. 7118035


+10.20 m +10.20 m
9.40 9.40 PLANING NO. N/2017/0003729

0.80
MJ T.O.P GRC TYPE 12 MJ T.O.P

1.30
T.O.P. T.O.P.
+8.90 m +8.90 m KEY PLAN

2.40
1.95
UPPER ROOF PLAN LEVEL S.S.L 7.00 7.00 UPPER ROOF PLAN LEVEL S.S.L
6.85 GRC TYPE 04 GRC TYPE 04
+6.95 m T.O.P. T.O.P. +6.95 m

0.051.03 0.15
1.50 T.O.P.

MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L


0.32
B1 B24

+5.45 m +5.45 m 2
0.05

4
10.20

BG BG

GRC TYPE 05 GRC TYPE 09 GRC TYPE 05 3 2

4
3

GRC TYPE 03 1 1
GLASS
PANEL
4.85

4.85

PAINT
BA BA

3 2 4

1
B1 B24

GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L


+0.60 m +0.60 m
0.60 0.60 0.75
0.15 0.45

PAVEMENT LEVEL F.F.L. F.F.L.


T.O.P. PAVEMENT LEVEL
+0.15 m +0.15 m
0.55

ROAD LEVEL ROAD LEVEL


+0.00 m +0.00 m

1 ELEVATION 01 - PART 01
AR-201-01
SCALE 1 : 100

B8 B9 B10 B11 B12 B13 B14 B15 B16 B17


REF TO 1 @ AR-201-01

REF TO 3 @ AR-201-01
REF TO 01 @ AR-201-00
APEX APEX
GRC TYPE 11 10.20
+10.20 m +10.20 m
T.O.P. PAINT
PAINT GRC TYPE 12 9.40

1.25
MJ T.O.P T.O.P. MJ T.O.P

0.05
+8.90 m +8.90 m

GRC TYPE 02

UPPER ROOF PLAN LEVEL S.S.L 7.00 UPPER ROOF PLAN LEVEL S.S.L
GRC TYPE 04 6.95 GRC TYPE 04
0.65

0.25
+6.95 m
6.85 +6.95 m
T.O.P. T.O.P. T.O.P.

0.65
MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L
+5.45 m +5.45 m

0.10
10.20
GRC TYPE 05 GRC
7.65

GRC TYPE 03 GRC TYPE 03 GRC TYPE 03 GLASS

3.45
PANEL
5.35

PAINT PAINT PAINT

3.43
4.05
GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L
+0.60 m +0.60 m
0.75 01 DETAIL DESIGN OCT 2017 AH AD -----
0.60 0.60

0.60 0.62
PAVEMENT LEVEL F.F.L.
T.O.P.
F.F.L. PAVEMENT LEVEL 00 SCHEMATIC DESIGN JUNE 2017 AH AD -----

1.20

0.60
+0.15 m +0.15 m
0.45

0.45

ISSUE DESCRIPTION DATE DRAWN CHECKED QA/QC


ROAD LEVEL ROAD LEVEL
+0.00 m +0.00 m ISSUED FOR SCHEMATIC DESIGN
0.15

OWNER

2 ELEVATION 01 - PART 02
AR-201-01
SCALE 1 : 100 MAIN CONSULTANT

57 AL-JAZEERA ST., BIN-


MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
B16 B17 B18 B19 B20 B21 B22 B23 B24 TEL: (+974) 4020 37 77 / 88 /
REF TO 01 @ AR-201-00

99 FAX : (+974) 4020 37 66


P.O BOX1876, DOHA, QATAR.
W W W .EHAF.COM

APEX APEX
DESIGN AND BUILD CONTRACTOR
+10.20 m +10.20 m
PAINT PAINT
9.40 -

0.80
MJ T.O.P MJ T.O.P

1.30
T.O.P. ---
+8.90 m +8.90 m

2.42
1.95
UPPER ROOF PLAN LEVEL S.S.L 7.00 PAINT PAINT UPPER ROOF PLAN LEVEL S.S.L
6.85 7.00
0.28

0.28
+6.95 m T.O.P. T.O.P.
+6.95 m PROJECT DESCRIPTION
T.O.P.

0.05 1.16

0.05 1.16
0.65

0.65
MAJLIS BUILDING

1.50
0.32
MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L
PT
+5.45 m +5.45 m

0.05

0.05
1.12

10.20
0.32
GRC TYPE 05
GRC TYPE 10
GRC TYPE 03 GLASS
PT
PANEL DRAWING TITLE

ELEVATION 01 - PARTIALS

4.85
PAINT
3.45

3.45
GLASS

5.40

5.40
OPENING
4.65

GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L


+0.60 m +0.60 m
0.60 0.75 0.60
DRAWING NO.: PART

PAVEMENT LEVEL T.O.P. PAVEMENT LEVEL


AR-201-01
F.F.L. F.F.L.
1.20

1.20
+0.15 m +0.15 m

0.45
0.60

0.15
ROAD LEVEL ROAD LEVEL
+0.00 m +0.00 m
DRAWN BY: CHECKED BY: STAGE: REVISION:

--------- AD. -----


VERIFIED BY: APPROVED BY: PLOT DATE: R01
HH. MI. 15/10/17

ELEVATION 01 - PART 03
PROJECT NO.:
1 : 100@A1
SCALE:

3
FILE NAME:
327
AR-201-01
SCALE 1 : 100 AR-201-01

32
- GRAVEL MULCH / 500*500*50mm PROJECT NAME AND LOCATION
THK. CONCRETE TILES LOOSE LAID AS

B1 B2 B3 B4 B5 B6 SHOWN IN ROOF PLAN


- FILTER LAYER OF GEOTEXTILE.
B7 B8 B9 KHRITYIAT MAJLIS AND MOSQUE
-THERMAL INSULATION.

REF TO 2 @ AR-301-01
APEX - GRAVEL MULCH / 500*500*50mm - FILTER LAYER OF GEOTEXTILE. APEX KHRITYIAT - UM SLAL
+10.20 m THK. CONCRETE TILES LOOSE LAID AS - WATER PROOFING MEMBRANE. +10.20 m
SHOWN IN ROOF PLAN DOHA - QATAR
- SCREED SLOPED TO DRAIN.

0.80
- FILTER LAYER OF GEOTEXTILE. GRC
MJ T.O.P - RC SLAB (REF. TO STRUCTURAL DRW.) MJ T.O.P 7118035

1.30
-THERMAL INSULATION. GRC Kiblah PIN NO.
+8.90 m - FILTER LAYER OF GEOTEXTILE. +8.90 m
- WATER PROOFING MEMBRANE.
- SCREED SLOPED TO DRAIN. PLASTER PLASTER
PLANING NO. N/2017/0003729

2.40

2.45
1.95
- RC SLAB (REF. TO STRUCTURAL DRW.) KEY PLAN
UPPER ROOF PLAN LEVEL S.S.L 7.00 UPPER ROOF PLAN LEVEL S.S.L
GRC 6.95 6.95
+6.95 m T.O.P. +6.95 m
T.O.S. T.O.S.

0.051.03 0.15
5.77
1.50
MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L

0.32
T.O.S.
+5.45 m +5.45 m

0.05
10.20

B1 B24

BG
4 BG

3 2

4
4.85

3
1 1

GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L


+0.60 m +0.60 m
BA BA

3 2 4

0.60 0.60 B1 B24

0.63
PAVEMENT LEVEL F.F.L. F.F.L. PAVEMENT LEVEL
+0.15 m +0.15 m
0.45

ROAD LEVEL ROAD LEVEL


+0.00 m +0.00 m

- GRANITE 30mm.
- SCREED SLAB 70mm.
- STRUCTURE SLAB 200mm.
- 12:20mm GEOTETILE PROTECTION LAYER.
- 4mm WATERPROOFING MEMBERANE.
- 100mm SMOUTH PLAIN CONCRETE.
- POLYETHYLENE SHEET 1000 GAUGE.
- COMPACTED SOIL.

1 SECTION 01 - PART 01 - GRAVEL MULCH / 500*500*50mm


AR-301-01
SCALE 1 : 100 THK. CONCRETE TILES LOOSE LAID AS
SHOWN IN ROOF PLAN
- FILTER LAYER OF GEOTEXTILE. - GRAVEL MULCH / 500*500*50mm
-THERMAL INSULATION. THK. CONCRETE TILES LOOSE LAID AS
- FILTER LAYER OF GEOTEXTILE. SHOWN IN ROOF PLAN
B8 B9 B10 B11 - WATER PROOFING MEMBRANE.
B12 B13 - FILTER LAYER OF GEOTEXTILE. B14 B15 B16 B17
REF TO 1 @ AR-301-01

- SCREED SLOPED TO DRAIN. -THERMAL INSULATION.

REF TO 3 @ AR-301-01
APEX - RC SLAB (REF. TO STRUCTURAL DRW.) - FILTER LAYER OF GEOTEXTILE. APEX
10.20 GRC
+10.20 m - WATER PROOFING MEMBRANE. +10.20 m
T.O.P.
- SCREED SLOPED TO DRAIN.
GRC PLASTER GRC - RC SLAB (REF. TO STRUCTURAL DRW.)
MJ T.O.P MJ T.O.P
8.90
+8.90 m +8.90 m
T.O.S.

PLASTER
UPPER ROOF PLAN LEVEL S.S.L
UPPER ROOF PLAN LEVEL S.S.L +6.95 m
+6.95 m

5.95
MJ LOWER ROOF LEVEL S.S.L T.O.S. MJ LOWER ROOF LEVEL S.S.L
+5.45 m +5.45 m

GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L


+0.60 m +0.60 m

0.60 0.60 01 DETAIL DESIGN OCT 2017 AH AD -----


PAVEMENT LEVEL F.F.L. F.F.L. PAVEMENT LEVEL
+0.15 m +0.15 m 00 SCHEMATIC DESIGN JUNE 2017 AH AD -----
ROAD LEVEL ROAD LEVEL ISSUE DESCRIPTION DATE DRAWN CHECKED QA/QC

+0.00 m +0.00 m ISSUED FOR SCHEMATIC DESIGN


OWNER
- GRANITE 30mm. - GRANITE 30mm.
- SCREED SLAB 70mm. - SCREED SLAB 70mm.
- STRUCTURE SLAB 200mm. - STRUCTURE SLAB 200mm.
- 12:20mm GEOTETILE PROTECTION LAYER. - 12:20mm GEOTETILE PROTECTION LAYER.

2 SECTION 01 - PART 02 - 4mm WATERPROOFING MEMBERANE.


- 100mm SMOUTH PLAIN CONCRETE.
- 4mm WATERPROOFING MEMBERANE.
- 100mm SMOUTH PLAIN CONCRETE.
- POLYETHYLENE SHEET 1000 GAUGE. - POLYETHYLENE SHEET 1000 GAUGE.
AR-301-01
SCALE 1 : 100 - COMPACTED SOIL. - COMPACTED SOIL.
MAIN CONSULTANT

57 AL-JAZEERA ST., BIN-


MAHMOUD / BEHZAD
- GRAVEL MULCH / 500*500*50mm BUILDING, 6th FLOOR
THK. CONCRETE TILES LOOSE LAID AS TEL: (+974) 4020 37 77 / 88 /
99 FAX : (+974) 4020 37 66
SHOWN IN ROOF PLAN
B16 B17 B18 - FILTER LAYER OF GEOTEXTILE. B19 B20 B21 B22 B23 B24
P.O BOX1876, DOHA, QATAR.
W W W .EHAF.COM
REF TO 2 @ AR-301-01

-THERMAL INSULATION.
APEX - FILTER LAYER OF GEOTEXTILE. APEX
+10.20 m - WATER PROOFING MEMBRANE. +10.20 m DESIGN AND BUILD CONTRACTOR
- SCREED SLOPED TO DRAIN.
- RC SLAB (REF. TO STRUCTURAL DRW.) - GRAVEL MULCH / 500*500*50mm

1.25
MJ T.O.P MJ T.O.P

1.30
GRC
+8.90 m THK. CONCRETE TILES LOOSE LAID AS +8.90 m
SHOWN IN ROOF PLAN
- FILTER LAYER OF GEOTEXTILE.
PLASTER
-THERMAL INSULATION.

2.00
1.95
UPPER ROOF PLAN LEVEL S.S.L - FILTER LAYER OF GEOTEXTILE. UPPER ROOF PLAN LEVEL S.S.L
6.95 7.00
+6.95 m - WATER PROOFING MEMBRANE. +6.95 m
T.O.S. T.O.P. PROJECT DESCRIPTION
- SCREED SLOPED TO DRAIN.
- RC SLAB (REF. TO STRUCTURAL DRW.)

1.50

1.50
MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L
+5.45 m
5.45
T.O.S.
+5.45 m MAJLIS BUILDING

10.20
0.65

6.35
DRAWING TITLE

4.85
SECTION 01 - PARTIALS
3.43

GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L

2.50
+0.60 m +0.60 m

0.45
0.60 0.60 DRAWING NO.: PART
0.63

PAVEMENT LEVEL F.F.L. F.F.L. PAVEMENT LEVEL


+0.15 m +0.15 m
AR-301-01

0.60
0.15
ROAD LEVEL ROAD LEVEL
+0.00 m +0.00 m
DRAWN BY: CHECKED BY: STAGE: REVISION:

- GRANITE 30mm. - NONSLIP CERAMIC TILES 300X300mm. --------- AD. -----


- SCREED SLAB 70mm. SCREED SLAB 70mm. VERIFIED BY: APPROVED BY: PLOT DATE: R01
- STRUCTURE SLAB 200mm. - STRUCTURE SLAB 200mm.
- 12:20mm GEOTETILE PROTECTION LAYER.
HH. MI. 15/10/17
- 12:20mm GEOTETILE PROTECTION LAYER.

3 SECTION 01 - PART 03 - 4mm WATERPROOFING MEMBERANE.


- 100mm SMOUTH PLAIN CONCRETE.
- 4mm WATERPROOFING MEMBERANE.
- 100mm SMOUTH PLAIN CONCRETE.
SCALE:
1 : 100@A1
PROJECT NO.:

- POLYETHYLENE SHEET 1000 GAUGE. - POLYETHYLENE SHEET 1000 GAUGE. 327


AR-301-01
SCALE 1 : 100 - COMPACTED SOIL.
FILE NAME:
- COMPACTED SOIL.
AR-301-01

33
PROJECT NAME AND LOCATION

BI BH BG BF BE BD BC BB KHRITYIAT MAJLIS AND MOSQUE


KHRITYIAT - UM SLAL
APEX - GRAVEL MULCH / 500*500*50mm APEX
DOHA - QATAR
+10.20 m THK. CONCRETE TILES LOOSE LAID AS +10.20 m
SHOWN IN ROOF PLAN
- FILTER LAYER OF GEOTEXTILE. Kiblah PIN NO. 7118035
MJ T.O.P MJ T.O.P
-THERMAL INSULATION.
+8.90 m +8.90 m
- FILTER LAYER OF GEOTEXTILE. PLANING NO. N/2017/0003729
- WATER PROOFING MEMBRANE.
PLASTER - SCREED SLOPED TO DRAIN.
BA KEY PLAN

1.95

1.95
- RC SLAB (REF. TO STRUCTURAL DRW.)
UPPER ROOF PLAN LEVEL S.S.L UPPER ROOF PLAN LEVEL S.S.L
+6.95 m +6.95 m

1.42 0.13
1.50

1.50
MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L
5.45
+5.45 m +5.45 m
T.O.S.

0.80
B1 B24

8.75

8.90
BG
4 BG

3 2

6.80
4
3

4.85
1 1

5.30

3.90
BA BA

3 2 4

GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L 1

+0.60 m +0.60 m

0.15
B1 B24

0.45
0.60 0.60 0.60
PAVEMENT LEVEL F.F.L. F.F.L. F.F.L. PAVEMENT LEVEL
+0.15 m +0.15 m

0.45
0.15

0.15
ROAD LEVEL ROAD LEVEL
+0.00 m +0.00 m

- GRANITE 30mm. - GRANITE 30mm.


- SCREED SLAB 70mm. - SCREED SLAB 70mm.
- STRUCTURE SLAB 200mm. - STRUCTURE SLAB 200mm.
- 12:20mm GEOTETILE PROTECTION LAYER. - 12:20mm GEOTETILE PROTECTION LAYER.

1 SECTION 02 - 4mm WATERPROOFING MEMBERANE.


- 100mm SMOUTH PLAIN CONCRETE.
- 4mm WATERPROOFING MEMBERANE.
- 100mm SMOUTH PLAIN CONCRETE.
- POLYETHYLENE SHEET 1000 GAUGE. - POLYETHYLENE SHEET 1000 GAUGE.
AR-302-00
SCALE 1 : 100 - GRAVEL MULCH / 500*500*50mm - COMPACTED SOIL. - COMPACTED SOIL.
THK. CONCRETE TILES LOOSE LAID AS
SHOWN IN ROOF PLAN
- FILTER LAYER OF GEOTEXTILE.
1
-THERMAL INSULATION.
AR-303-00
- FILTER LAYER OF GEOTEXTILE.
- WATER PROOFING MEMBRANE. BB BC BD BE BF BG BH BI
- SCREED SLOPED TO DRAIN. - GRAVEL MULCH / 500*500*50mm
- RC SLAB (REF. TO STRUCTURAL DRW.) THK. CONCRETE TILES LOOSE LAID AS
APEX APEX
10.20 GRC 10.20 SHOWN IN ROOF PLAN
+10.20 m +10.20 m
T.O.P. T.O.P. - FILTER LAYER OF GEOTEXTILE.
-THERMAL INSULATION.
0.850.05 1.25

MJ T.O.P MJ T.O.P
1.30

1.30
8.90 - FILTER LAYER OF GEOTEXTILE.
+8.90 m - WATER PROOFING MEMBRANE. +8.90 m
T.O.S.
- SCREED SLOPED TO DRAIN.

3.22
- RC SLAB (REF. TO STRUCTURAL DRW.)
BA
1.95

1.95
UPPER ROOF PLAN LEVEL S.S.L UPPER ROOF PLAN LEVEL S.S.L
7.00
+6.95 m PLASTER +6.95 m
T.O.P.

5.95
1.50

1.50
MJ LOWER ROOF LEVEL S.S.L T.O.S. MJ LOWER ROOF LEVEL S.S.L
+5.45 m +5.45 m
10.05

10.05
4.16
7.45
4.85

4.85
4.15

GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L

2.22
+0.60 m +0.60 m
0.45

0.60 0.60 0.60 01 DETAIL DESIGN OCT 2017 AH AD -----


PAVEMENT LEVEL F.F.L. F.F.L. F.F.L. PAVEMENT LEVEL
+0.15 m +0.15 m AH AD -----

0.45
00 SCHEMATIC DESIGN JUNE 2017

0.60

0.15
ROAD LEVEL ROAD LEVEL
ISSUE DESCRIPTION DATE DRAWN CHECKED QA/QC
+0.00 m +0.00 m
ISSUED FOR SCHEMATIC DESIGN
- GRANITE 30mm. - GRANITE 30mm. - EPOXY PAINT. OWNER
- SCREED SLAB 70mm. - SCREED SLAB 70mm. - SCREED SLAB 70mm.
- STRUCTURE SLAB 200mm. - STRUCTURE SLAB 200mm. - STRUCTURE SLAB 200mm.
- 12:20mm GEOTETILE PROTECTION LAYER. - 12:20mm GEOTETILE PROTECTION LAYER. - 12:20mm GEOTETILE PROTECTION LAYER.

2 SECTION 03 - 4mm WATERPROOFING MEMBERANE.


- 100mm SMOUTH PLAIN CONCRETE.
- 4mm WATERPROOFING MEMBERANE.
- 100mm SMOUTH PLAIN CONCRETE.
- 4mm WATERPROOFING MEMBERANE.
- 100mm SMOUTH PLAIN CONCRETE.
- POLYETHYLENE SHEET 1000 GAUGE. - POLYETHYLENE SHEET 1000 GAUGE. - POLYETHYLENE SHEET 1000 GAUGE.
AR-302-00
SCALE 1 : 100 - COMPACTED SOIL. - COMPACTED SOIL. - COMPACTED SOIL.

MAIN CONSULTANT

BB BC BD BE BF BG BH BI 57 AL-JAZEERA ST., BIN-


MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
TEL: (+974) 4020 37 77 / 88 /
99 FAX : (+974) 4020 37 66
APEX APEX P.O BOX1876, DOHA, QATAR.
+10.20 m - GRAVEL MULCH / 500*500*50mm +10.20 m W W W .EHAF.COM

THK. CONCRETE TILES LOOSE LAID AS


MJ T.O.P SHOWN IN ROOF PLAN MJ T.O.P DESIGN AND BUILD CONTRACTOR
1.30

1.30

1.30
+8.90 m - GRAVEL MULCH / 500*500*50mm - FILTER LAYER OF GEOTEXTILE. +8.90 m
THK. CONCRETE TILES LOOSE LAID AS -THERMAL INSULATION.

3.25
SHOWN IN ROOF PLAN - FILTER LAYER OF GEOTEXTILE.

BA - FILTER LAYER OF GEOTEXTILE. - WATER PROOFING MEMBRANE.


1.95

1.95
2.05

3.95

UPPER ROOF PLAN LEVEL S.S.L -THERMAL INSULATION. - SCREED SLOPED TO DRAIN. UPPER ROOF PLAN LEVEL S.S.L
6.95
3.95

GRC - RC SLAB (REF. TO STRUCTURAL DRW.)


+6.95 m - FILTER LAYER OF GEOTEXTILE. +6.95 m
T.O.P.
- WATER PROOFING MEMBRANE.
- SCREED SLOPED TO DRAIN. PLASTER
1.10
0.32
1.50

1.50

1.50
1.40

MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L PROJECT DESCRIPTION
0.20

- RC SLAB (REF. TO STRUCTURAL DRW.) 5.45


+5.45 m +5.45 m
T.O.S.
10.05

10.05
MAJLIS BUILDING
0.80

0.80

2.45

2.45
0.29

6.80
5.15
4.85

4.85
4.65

4.65

4.85

4.85
4.05

DRAWING TITLE
3.76

GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L


SECTION 02 , SECTION 03 &
2.20

2.20

+0.60 m EPOXY PAINT +0.60 m

PAVEMENT LEVEL
0.60 0.60
0.40 PAVEMENT LEVEL
SECTION 04
F.F.L. F.F.L.
+0.15 m F.F.L. +0.15 m
0.45

0.45

0.45
DRAWING NO.: PART
ROAD LEVEL ROAD LEVEL
+0.00 m +0.00 m
AR-302-00

1.80
- NONSLIP CERAMIC TILES 300X300mm.
- CEMENT SCREED 20mm. - GRANITE 30mm.
- SCREED SLAB 70mm. - SCREED SLAB 70mm.
DRAWN BY: CHECKED BY: STAGE: REVISION:
- STRUCTURE SLAB 200mm. - STRUCTURE SLAB 200mm.
- 12:20mm GEOTETILE PROTECTION LAYER. - 12:20mm GEOTETILE PROTECTION LAYER. --------- AD. -----
- 4mm WATERPROOFING MEMBERANE. - 4mm WATERPROOFING MEMBERANE. - STRUCTURE SLAB 200mm.
R01
SECTION 04
VERIFIED BY: APPROVED BY: PLOT DATE:
- 100mm SMOUTH PLAIN CONCRETE. - WATERPROOFING MEMBERANE 20mm.
- 100mm SMOUTH PLAIN CONCRETE.
3 - POLYETHYLENE SHEET 1000 GAUGE. - SLAB ON GRADE. HH. MI. 15/10/17
- POLYETHYLENE SHEET 1000 GAUGE.
- COMPACTED SOIL. - 12:20mm GEOTETILE PROTECTION LAYER. PROJECT NO.:
- COMPACTED SOIL.
1 : 100@A1
SCALE:
AR-302-00
SCALE 1 : 100 - 4mm WATERPROOFING MEMBERANE.
- 100mm SMOUTH PLAIN CONCRETE.
- POLYETHYLENE SHEET 1000 GAUGE. FILE NAME:
327
- COMPACTED SOIL. AR-302-00

34
PROJECT NAME AND LOCATION

KHRITYIAT MAJLIS AND MOSQUE


KHRITYIAT - UM SLAL
DOHA - QATAR

Kiblah PIN NO. 7118035


B12 BB
PLANING NO. N/2017/0003729
KEY PLAN

9.40 9.40
T.O.P. T.O.P.

MJ T.O.P
B1 B24

+8.90 m BG
4 BG

3 2

4
3
1 1

- GRAVEL MULCH / 500*500*50mm


THK. CONCRETE TILES LOOSE LAID AS
BA BA

3 2 4
CONCRETE BEAM
SHOWN IN ROOF PLAN 1

- FILTER LAYER OF GEOTEXTILE.


B1 B24

BB
-THERMAL INSULATION.
- FILTER LAYER OF GEOTEXTILE.
- WATER PROOFING MEMBRANE. - GRAVEL MULCH / 500*500*50mm
- SCREED SLOPED TO DRAIN. THK. CONCRETE TILES LOOSE LAID AS
- RC SLAB (REF. TO STRUCTURAL DRW.) SHOWN IN ROOF PLAN
- FILTER LAYER OF GEOTEXTILE.
-THERMAL INSULATION.
- FILTER LAYER OF GEOTEXTILE.
- WATER PROOFING MEMBRANE.
- SCREED SLOPED TO DRAIN.
0.75

- RC SLAB (REF. TO STRUCTURAL


DRW.)
UPPER ROOF PLAN LEVEL S.S.L 7.00 UPPER ROOF PLAN LEVEL S.S.L UPPER ROOF PLAN LEVEL S.S.L
6.95 6.95 6.95 6.95
+6.95 m T.O.P. +6.95 m +6.95 m
T.O.S. T.O.P. T.O.S. T.O.P.

0.28
- GRAVEL MULCH / 500*500*50mm
THK. CONCRETE TILES LOOSE LAID AS SHOWN IN
1.00

ROOF PLAN

1.13

0.65
- FILTER LAYER OF GEOTEXTILE.
-THERMAL INSULATION.

1.27

1.50
- FILTER LAYER OF GEOTEXTILE.
- WATER PROOFING MEMBRANE.
1.57

5.95 - SCREED SLOPED TO DRAIN.


T.O.S.

0.05 0.32 0.05 0.21


- RC SLAB (REF. TO STRUCTURAL DRW.)

MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L
5.45 5.45
+5.45 m +5.45 m +5.45 m
0.55

T.O.S. T.O.S.

0.30
GYPSUM
GYPSUM BOARD
BOARD
THK.12mm
THK.12mm

0.75
CEMENT PLASTER
0.65

+PAINTS
0.55

CEMENT

0.88
PLASTER+PAINTS

GRC ARCH
0.28

GRC ARCH CONCRETE ARCH DECORATIVE


CONCRETE ARCH GRC
ARCH

1.45
STAINED GLASS
1.50

PANEL

1.23
1.22
6.27

6.27

6.80
01 DETAIL DESIGN OCT 2017 AH AD -----

0.40
00 SCHEMATIC DESIGN JUNE 2017 AH AD -----

5.22
5.15

ISSUE DESCRIPTION DATE DRAWN CHECKED QA/QC


LOBBY ARCHED WINDOW
DINING ISSUED FOR SCHEMATIC DESIGN
0.20

07 ENTRANCE
02
4.70

OWNER

4.65
W02

0.80

0.80
MAJLIS
DOUBLE HINGED 01
WOODEN DOOR FIXED WINDOW
WITH FRAME SERVICES
1.95
1.73

MAIN CONSULTANT
W01 D03
2.55

57 AL-JAZEERA ST., BIN-

1.20
TOILET MAHMOUD / BEHZAD
09 BUILDING, 6th FLOOR
TEL: (+974) 4020 37 77 / 88 /
99 FAX : (+974) 4020 37 66

1.80
P.O BOX1876, DOHA, QATAR.
W W W .EHAF.COM

LINTEL DESIGN AND BUILD CONTRACTOR


0.63

0.60

0.60
-INTERLOCK
GROUND FLOOR PLAN F.F.L 0.60 0.60 GROUND FLOOR PLAN F.F.L PAVEMENT TILES. GROUND FLOOR PLAN F.F.L
0.60 0.60 0.60
+0.60 m F.F.L. F.F.L. +0.60 m -CLEAN SAND. +0.60 m
F.F.L. F.F.L. F.F.L.

0.15 0.15 0.15


0.45
PAVEMENT LEVEL PAVEMENT LEVEL PAVEMENT LEVEL PROJECT DESCRIPTION
0.15
+0.15 m +0.15 m +0.15 m
ROAD LEVEL ROAD LEVEL F.F.L. ROAD LEVEL
- TILES AS PER FINISHES SCHEDULE
- TILES AS PER FINISHES SCHEDULE +0.00 m +0.00 m +0.00 m
MAJLIS BUILDING
- SCREED SLAB 70mm.
- SCREED SLAB 70mm.
- STRUCTURE SLAB150mm.
- STRUCTURE SLAB 150mm. - 12:20mm GEOTETILE PROTECTION LAYER.
- 12:20mm GEOTETILE PROTECTION LAYER.
- 4mm WATERPROOFING MEMBERANE.
- 4mm WATERPROOFING MEMBERANE. - 100mm SMOUTH PLAIN CONCRETE.
- 100mm SMOUTH PLAIN CONCRETE. - POLYETHYLENE SHEET 1000 GAUGE.
- POLYETHYLENE SHEET 1000 GAUGE.
- COMPACTED SOIL. - NONSLIP CERAMIC TILES 300X300mm.
- COMPACTED SOIL.
- CEMENT SCREED 20mm.
- SCREED SLAB 70mm. DRAWING TITLE
- 12:20mm GEOTETILE PROTECTION LAYER.
- 4mm WATERPROOFING MEMBERANE. WALL SECTION 3&4&5
- 100mm SMOUTH PLAIN CONCRETE.
- POLYETHYLENE SHEET 1000 GAUGE.
- COMPACTED SOIL.
DRAWING NO.: PART

1 WALL SECTION-03 2 WALL SECTION-04 3 WS05 AR-304-00


AR-304-00
SCALE 1 : 25 AR-304-00
SCALE 1 : 25 AR-304-00
SCALE 1 : 25 DRAWN BY: CHECKED BY: STAGE: REVISION:

--------- AD. -----


VERIFIED BY: APPROVED BY: PLOT DATE: R01
HH. MI. 15/10/17
PROJECT NO.:
1 : 25 @A1
SCALE:

FILE NAME:
327
AR-304-00

35
PROJECT NAME AND LOCATION
B20 B21 B20 B21
KHRITYIAT MAJLIS AND MOSQUE
KHRITYIAT - UM SLAL
WASH SOAP
DISPENSER DOHA - QATAR
LAVATORY

Kiblah PIN NO. 7118035


PLANING NO. N/2017/0003729
0.19 2.42 0.20

0.23
KEY PLAN

0.26
0.26 1.20 0.30 0.18 0.60 0.18
1.80 1.00

0.56

0.63
0.48 0.30 0.62 0.30 0.62 0.30 0.18

0.73

0.26
1.13
TOILET 0.48 0.92 0.92 0.48

0.80
TOILET+WASH TOILET+WASH
RM RM

0.32

0.90

0.90
22 22

BI SECTION
AR-402-03 0.73 1.07
BI SECTION
AR-402-03

0.140.10
3 3
FLEXIBLE

0.10
SPRAY
HOSE

2.35

0.90

2.35
MARBLE

0.23
THRESHOLD

0.24
1.80 TOILET WASH ROOM
0.56 23 22
TOILET+WASH TOILET+WASH

0.90

0.90
RM RM

0.30
START POINT
SECTION SECTION

1.13
2
AR-402-02 2.80 2
AR-402-02

0.80
0.65 0.30 0.90 0.30 0.65 0.18 1.20 1.20 0.18

0.30
0.32

0.73
0.73 1.07
0.140.10

0.26

0.26
0.24
PAPER

0.10
HOLDER

PAPER TOWEL HAND


DISPENSER DRYER
TOILET+WASH TOILET+WASH
RM RM
-SECTION -SECTION
1
AR-402-02 1
AR-402-02

1 TOILET + WASH RM PLAN B21 2 TOILET + WASH RM - FLOORING B20


- GRAVEL MULCH / 500*500*50mm
AR-402-02
SCALE 1 : 25 THK. CONCRETE TILES LOOSE LAID AS UPPER ROOF PLAN LEVEL S.S.L
AR-402-02
SCALE 1 : 25 UPPER ROOF PLAN LEVEL S.S.L
6.95
+6.95 m +6.95 m
BI SHOWN IN ROOF PLAN T.O.P.

- FILTER LAYER OF GEOTEXTILE. - GRAVEL MULCH / 500*500*50mm


-THERMAL INSULATION. THK. CONCRETE TILES LOOSE LAID AS
- FILTER LAYER OF GEOTEXTILE. SHOWN IN ROOF PLAN
- WATER PROOFING MEMBRANE. - FILTER LAYER OF GEOTEXTILE.
- SCREED SLOPED TO DRAIN. -THERMAL INSULATION.
- RC SLAB (REF. TO STRUCTURAL DRW.) - FILTER LAYER OF GEOTEXTILE.
- WATER PROOFING MEMBRANE.
- SCREED SLOPED TO DRAIN.
5.62 - RC SLAB (REF. TO STRUCTURAL DRW.) 5.62
F.F.L. MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L F.F.L. MJ LOWER ROOF LEVEL S.S.L
+5.45 m +5.45 m +5.45 m

01 DETAIL DESIGN OCT 2017 AH AD -----


00 SCHEMATIC DESIGN JUNE 2017 AH AD -----
ISSUE DESCRIPTION DATE DRAWN CHECKED QA/QC
MOISTURE MOISTURE MOISTURE MOISTURE
RESISTANT
ISSUED FOR SCHEMATIC DESIGN
RESISTANT RESISTANT RESISTANT
GYPSUM BOARD
OWNER
GYPSUM BOARD GYPSUM BOARD GYPSUM BOARD
(12mm THK.) (12mm THK.) (12mm THK.) (12mm THK.)

CEMENT PLASTER CEMENT PLASTER CEMENT PLASTER CEMENT PLASTER


(20mm) (20mm) (20mm) (20mm)
WASH ROOM TOILET
22 23
CERAMIC TILES CERAMIC TILES CERAMIC TILES CERAMIC TILES MAIN CONSULTANT
(300*300mm) (300*300mm) (300*300mm) (300*300mm)
57 AL-JAZEERA ST., BIN-
MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
TEL: (+974) 4020 37 77 / 88 /
99 FAX : (+974) 4020 37 66
P.O BOX1876, DOHA, QATAR.

(0.3*0.3*9)=2.7
W W W .EHAF.COM

TOILET
23 DESIGN AND BUILD CONTRACTOR
PAPER TOWEL
DISPENSER

HAND DRYER

2.20

2.20
CERAMIC SKIRTING
PAPER HOLDER PAPER HOLDER (300*300*100mm)

PAPER HOLDER PROJECT DESCRIPTION

1.26
1.18

HAND SPRAY HAND SPRAY

MAJLIS BUILDING
CERAMIC SKIRTING
(300*300*100mm) CERAMIC SKIRTING CERAMIC SKIRTING
0.50

0.50

0.50
(300*300*100mm) (300*300*100mm) HAND SPRAY
0.40
0.10 0.20

0.40
0.10 0.20

0.10 0.20

0.10 0.20

0.40
GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L
0.60
0.26

0.26

0.60

0.24
+0.60 m +0.60 m +0.60 m +0.60 m
F.F.L. F.F.L.

DRAWING TITLE

TOILET +WASH ROOM


- NONSLIP CERAMIC TILES 300X300mm. - NONSLIP CERAMIC TILES 300X300mm.
- CEMENT SCREED 20mm. - CEMENT SCREED 20mm.
DRAWING NO.: PART
- SCREED SLAB 70mm. - SCREED SLAB 70mm.
- STRUCTURE SLAB 150mm.
- 12:20mm GEOTETILE PROTECTION LAYER.
- STRUCTURE SLAB 150mm.
- 12:20mm GEOTETILE PROTECTION LAYER.
AR-402-02
- 4mm WATERPROOFING MEMBERANE. - 4mm WATERPROOFING MEMBERANE. DRAWN BY: CHECKED BY: STAGE: REVISION:

- 100mm SMOUTH PLAIN CONCRETE. - 100mm SMOUTH PLAIN CONCRETE. --------- AD. -----
- POLYETHYLENE SHEET 1000 GAUGE. - POLYETHYLENE SHEET 1000 GAUGE. VERIFIED BY: APPROVED BY: PLOT DATE: R01
- COMPACTED SOIL. - COMPACTED SOIL. HH. MI. 15/10/17
4 TOILET+WASH RM -SECTION 1 3 TOILET+WASH RM SECTION 2 SCALE:
1 : 25 @A1
PROJECT NO.:

AR-402-02
SCALE 1 : 25 AR-402-02
SCALE 1 : 25 FILE NAME:
327
AR-402-02

36
TOILETS , JANITOR , LOCKERS
D01 MAIN ENTRANCE D02 ENTRANCES D03 MAJLIS & DINING D04 LOBBY & CORRIDOR D05 TOILETS , ABLUTION & WASHING ROOM D06 RECEIVING AREA D07 D08 TOILETS PROJECT NAME AND LOCATION
&GARBAGE ROOM
2.55

2.60
STRUC. OPEN.
KHRITYIAT MAJLIS AND MOSQUE
STRUC. OPEN. KHRITYIAT - UM SLAL
DOHA - QATAR

1.40
2.55 Kiblah PIN NO. 7118035
STRUC. OPEN.
2.00 1.50 2.50 1.00 0.80
STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN.
PLANING NO. N/2017/0003729
KEY PLAN

3.50

2.55

2.55

2.20

2.20

2.20

2.20

2.20
HANDLE H.

HANDLE H.

HANDLE H.

HANDLE H.

HANDLE H.

HANDLE H.
B1 B24
1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00
2

BG
4 BG

3 2

4
3
1 1

BA BA

3 2 4

1
B1 B24

OUT IN OUT OUT IN IN IN IN

IN OUT IN IN OUT OUT OUT OUT


2.60 2.55 2.55 2.00 1.50 2.50 1.00 0.80
STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN.

WOODEN HINGED DOUBLE WOODEN HINGED DOUBLE HINGED DOUBLE WITH UPPER FRAME WOODEN HINGED DOUBLE WOODEN HINGED DOUBLE WOODEN HINGED DOUBLE WOODEN HINGED SINGLE WOODEN HINGED SINGLE
DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING
SWING @90° SWING @90° SWING @90° SWING @90° SWING @90° SWING @90° SWING @90° SWING @90°

STRUCTURAL OPENING 2600 X 3500mm STRUCTURAL OPENING 2550 X 2550mm STRUCTURAL OPENING 2550 X 2550mm STRUCTURAL OPENING 2000 X 2200mm STRUCTURAL OPENING 1500 X 2200mm STRUCTURAL OPENING 2500 X 2200mm STRUCTURAL OPENING 1000 X 2200mm STRUCTURAL OPENING 800 X 2200mm

FIRE RATING 1.0 HR FIRE RATING 1.0 HR FIRE RATING 1.0 HR FIRE RATING - FIRE RATING - FIRE RATING - FIRE RATING - FIRE RATING -

QUANTITY - QUANTITY - QUANTITY - QUANTITY - QUANTITY - QUANTITY - QUANTITY - QUANTITY -

NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER

D09 FOOD PREPARATION D10 TX ROOM & LVP ROOM D11 MV. ROOM D12 FM 200 ROOM D13 MV. ROOM D14 STORE, ELEC. ROOM & LC. ROOM D15 LOADING DOCK

2.50
STRUC. OPEN.

2.50 2.40 1.50 0.90 1.10 1.00


STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN.
2.20

2.20

2.20

2.20

2.20

2.20

2.20
HANDLE H.

HANDLE H.

HANDLE H.

HANDLE H.

HANDLE H.

HANDLE H.
1.00

1.00

1.00

1.00

0.90

0.90
01 DETAIL DESIGN OCT 2017 AH AD -----
00 SCHEMATIC DESIGN JUNE 2017 AH AD -----
ISSUE DESCRIPTION DATE DRAWN CHECKED QA/QC

ISSUED FOR SCHEMATIC DESIGN


OWNER
IN OUT OUT OUT OUT OUT OUT

OUT IN IN IN IN IN IN
2.40 1.50 0.90 1.10 1.00
STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN.

2.50
STRUC. OPEN.
2.50 MAIN CONSULTANT
STRUC. OPEN.
57 AL-JAZEERA ST., BIN-
WOOD DOUBLE WITH VISION PANEL METAL HINGED DOUBLE LOUVERED METAL HINGED DOUBLE WITH LOUVERS STEEL DOUBLE LOUVERED DOOR METAL HINGED SINGLE METAL HINGED SINGLE OVERHEAD ROLLING DOOR MAHMOUD / BEHZAD
DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING BUILDING, 6th FLOOR
TEL: (+974) 4020 37 77 / 88 /
SWING @90° SWING @90° SWING @90° SWING @90° SWING @90° SWING @90° ROLL UP
99 FAX : (+974) 4020 37 66
P.O BOX1876, DOHA, QATAR.
STRUCTURAL OPENING 2500 X 2200mm STRUCTURAL OPENING 2400 X 2200mm STRUCTURAL OPENING 1500 X 2200mm STRUCTURAL OPENING 900 X 2200mm STRUCTURAL OPENING 1100 X 2200mm STRUCTURAL OPENING 1000 X 2200mm STRUCTURAL OPENING 2500 X 2200mm W W W .EHAF.COM

Door Types
FIRE RATING 0.75 HR FIRE RATING 3.0 HR FIRE RATING 3.0 HR FIRE RATING 3.0 HR FIRE RATING 3.0 HR FIRE RATING 1.5 HR FIRE RATING -

QUANTITY - QUANTITY - QUANTITY - QUANTITY - QUANTITY - QUANTITY - QUANTITY - DESIGN AND BUILD CONTRACTOR

NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER SCALE 1 : 50

W01 MAJLIS & DINING W02 TOILETS SLV1 TX ROOM SLV2 MV ROOM

2.50
STRUC. OPEN. 1.50
STRUC. OPEN. PROJECT DESCRIPTION
0.50

MAJLIS BUILDING
1.23

0.60
STRUC. OPEN.
0.50
0.20

STRUC. OPEN.
0.80
3.15

F
DRAWING TITLE

DOORS & WINDOWS SCHEDULE


3.00
1.73

2.20
SILL HT.
1.80

DRAWING NO.: PART

AR-601-00
SILL HT.
0.60

DRAWN BY: CHECKED BY: STAGE: REVISION:


0.10 0.70 0.10 0.70 0.10 0.70 0.10
--------- AD. -----
VERIFIED BY: APPROVED BY: R01
Window & Louvers Types
PLOT DATE:

2.50 0.60 0.50 1.50 HH. MI. 15/10/17


STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. PROJECT NO.:
1 : 50 @A1
SCALE:
SCALE 1 : 50
WINDOW TYPE ALUMINIUM DOUBLE GLAZED STAINED WINDOW TYPE ALUMINIUM FIXED SINGLE LOUVER TYPE STEEL VERTICAL SAND TRAP LOUVER LOUVER TYPE STEEL HORIZONTAL SAND TRAP LOUVER FILE NAME:
327
STRUCTURAL OPENING 2500 X 3150mm STRUCTURAL OPENING 600 X 800mm STRUCTURAL OPENING 500 X 2200mm STRUCTURAL OPENING 1500 X 500mm AR-601-00

37
236 VARIES 239
PROJECT NAME AND LOCATION

1% SLOPE 1% SLOPE 1% SLOPE


WATER PROOFING
MEMBRANE KHRITYIAT MAJLIS AND MOSQUE

7

2

:
VARIES WATER PROOFING
MEMBRANE PRE-CAST SLAB KHRITYIAT - UM SLAL
20MM THK. COVER REF TO STRUC.
MARINE PLY DRAWINGS DOHA - QATAR
BASE & EQUIPMENT
DRIP MOLD
1000 GAUGE PADDING
Kiblah
Kiblah PIN NO. 7118035

MIN. 500mm
POLYETHYLENE SHEET (TO MEP SPEC'S)
SPRING SHOCK BLOCK WORK CONCRETE LINTEL
SEALANT WITH ABSORBER
BACKING ROD
MACHINE / EQUIPMENT
25MM THK. CORK
DENSITY= 48 KG/m³ FIRE STOP SEALANT
FIRE STOP SEALANT
(AS REQUIRED)
PLANING NO. N/2017/0003729
(REFER TO MEP (AS REQUIRED)
REQUIREMENTS) KEY PLAN
REFRIGERANT PIPE
ALUMINUM 150 VARIES REFER TO MACHINE SPEC'S VARIES 150 50 GRAVEL MULCH

`50
WITH INSULATION
FLASHING DUCT INSULATION

REF TO MECH. DWG


(TO MEP DRAWINGS)

CONC. UPSTAND FOR FIRE STOP SEALANT


MEP EQUIPMENT (AS REQUIRED)
1% SLOPE 500x500x50 THK. CONCRETE
TILES LOOSE LAID
GROUT
MEP DUCT / AC
50 55 20 50

SAND LAYER FIRE STOP SEALANT


(AS REQUIRED) LOOSE GRAVEL MULCH

`50
THERMAL INSULATION BLOCK WORK
WATER PROOFING

MIN. 500mm
MEMBRANE GALVANIZED SHEET
FLASHING
100

FILTER GEOTEXTILE
ROOF SSL
SEPARATION LAYER
(100g/m²)
LIGHT WEIGHT

50 50
CONCRETE TO LEVEL 50mm EXTRUDED
POLYSTYRENE
CONCRETE SLAB THERMAL INSULATION
(REFER TO STRUCTURAL)

0.10
ROOF SSL

NOTES:
5MM THK. MINERALIZED NOTE:-
THE ABOVE DETAIL EXPLAINS THE SYSTEM INDICATIVELY. THE CONTRACTOR SHALL WATER PROOFING
CO-ORDINATE WITH SPECIALIZED SUB-CONTRACTOR AND SUBMIT DETAILED MEMBRANE
150 SLAB OPENING 150
CALCULATIONS TO ENSURE THAT THE SPACING OF NEOPRENE MOUNTS IS
LIGHT WEIGHT
• 200 mm WIDE STRIP OF MEMBRANE OVER ALL
ADEQUATE FOR THE LOADING AND THAT THE ACOUSTICAL LINING IS ADEQUATE TO
ACHIEVE DESIRED TOTAL SOUND REDUCTION. PLAIN CONCRETE VERTICAL AND HORIZONTAL JOINTS
CEMENT TO LEVEL
ALL AS PER MANUFACTURER'S RECOMMENDATION AND ENGINEER'S APPROVAL
• A MIN. OF 200 OVERLAPPING AT MEMBRANE
JOINTS
STRUCTURAL SLAB
• USE A REINFORCING MEMBRANE STRIP AT
HORIZONTAL AND VERTICAL JOINTS

1 MACHINE BASE FLOATING FLOOR TILES 2 TYP. ROOF OPENING PIPE/HVAC PENETRATION • ROOF U-VALUE 0.15 w/m2K

SCALE 1 : 10 SCALE 1 : 10
AR-904-00 AR-904-00 ROOF DRAIN

WATER PROOFING LOOSE GRAVEL MULCH


MEMBRANE
FILTER GEOTEXTILE
LIGHT WEIGHT SEPARATION LAYER
PLAIN CONCRETE TO
LEVEL 50MM EXTRUDED
CONCRETE SLAB POLYSTYRENE
(REFER TO STRUCTURAL) THERMAL INSULATION
FILTER LAYER OF GEOTEXTILE

WATER PROOFING MEMBRANE


WATER PROOFING
MEMBRANE
SCREED SLOPED TO DRAIN
LIGHT WEIGHT
PVC TILE PAD PLAIN CONCRETE TO
R.C. SLAB (REF. STRUCTURAL DRAWINGS ) LEVEL LOOSE GRAVEL MULCH
GRAVEL MULCH / 500x500x50mm THK.
CONCRETE TILES LOOSE LAID AS SHOWN IN CONCRETE SLAB
ROOF PLAN (REFER TO STRUCTURAL) FILTER GEOTEXTILE
SEPARATION LAYER
FILTER LAYER OF GEOTEXTILE

50
THERMAL INSULATION
THERMAL INSULATION
0.05

100
50

ROOF SSL
0.05

50

VARIES
0.20 01 DETAIL DESIGN OCT 2017 AH AD -----
MIN OVERLAPPING
0.10

100

00 SCHEMATIC DESIGN JUNE 2017 AH AD -----


ROOF SSL ROOF SSL
ISSUE DESCRIPTION DATE DRAWN CHECKED QA/QC

ISSUED FOR SCHEMATIC DESIGN


200 OWNER
OVERLAPPING

5 TYP. ROOF FLOOR DRAIN


AR-904-00
SCALE 1 : 5
3 CONCRETE TILE TYP. DETAIL 4 GRAVEL MULCH TYP. DETAIL
STAINLESS STEEL
AR-904-00
SCALE 1 : 5 AR-904-00
SCALE 1 : 5 JUBILEE CLIP
MAIN CONSULTANT
CONCRETE CANT FILLER
GRAVEL MULCH 57 AL-JAZEERA ST., BIN-
MAHMOUD / BEHZAD
WATER PROOFING MEMBRANE BUILDING, 6th FLOOR
TEL: (+974) 4020 37 77 / 88 /
FILTER GEOTEXTILE SEPARATION LAYER 99 FAX : (+974) 4020 37 66

50 50
P.O BOX1876, DOHA, QATAR.
50MM EXTRUDED POLYSTYRENE
W W W .EHAF.COM
THERMAL INSULATION
LIGHT WEIGHT
PLAIN CONCRETE TO LEVEL

100
ROOF SSL DESIGN AND BUILD CONTRACTOR
BASE & EQUIPMENT CONCRETE WALL
PADDING
(TO MEP SPEC'S) CONCRETE SLAB
ROOF EQUIPMENT
(REFER TO MEP (REFER TO STRUCTURAL)
ISOLATOR FOR SHOCK LOOSE GRAVEL MULCH
REQUIREMENTS) PLASTER ON PAINT
ABSORBER
FINISH
10MM THK. NEOPRENE FILTER GEOTEXTILE
RUBBER PAD SEPARATION LAYER
50mm EXTRUDED POLYSTYRENE SEALANT
PRE-CAST CONC. UPSTAND FOR GALVANIZED SHEET THERMAL INSULATION (AS REQ'D SPECS)
MEP EQUIPMENT FLASHING PROJECT DESCRIPTION
TYP. ROOF PENETRATION DETAIL
GRAVEL MULCH
4MM WATER PROOFING
8
HT. VARIES

50

BACKING ROD

MAJLIS & MOSQUE


MEMBRANE
500x500x50 THK. CONCRETE
TILES LOOSE LAID ALUMINUM FLASHING WITH
AR-904-00
SCALE 1 : 10
BUILDINGS
50

GROUT SUNKEN S/S SCREW TO PIPE


WATER PROOFING WALL @ 30MM C/C (TO MEP REQ'MTS)
MEMBRANE
50 55 20 50

METAL PLASTER STAINLESS STEEL CONCRETE CANT FILLER


LIGHT WEIGHT STOPPER JUBILEE CLIP
SAND LAYER PLAIN CONCRETE TO LEVEL GRAVEL MULCH
100

50mm EXTRUDED POLYSTYRENE


20x20MM REGLET CONCRETE UPSTAND WATER PROOFING MEMBRANE DRAWING TITLE
ROOF SSL (TO STRUCTURAL)
TYPICAL WATER PROOFING &
THERMAL INSULATION FILTER GEOTEXTILE
5MM WATER SEPARATION LAYER
100

ROOF DETAILS

50 50
ROOF SSL PROOFING
CONCRETE CANT FILLER MEMBRANE
THERMAL INSULATION

CONCRETE SLAB LIGHT WEIGHT


LIGHT WEIGHT PLAIN CONCRETE TO LEVEL DRAWING NO.: PART

100
FIXATION DETAIL
(REFER TO STRUCTURAL)
PLAIN CONCRETE TO LEVEL ROOF SSL

CONCRETE SLAB
(REFER TO STRUCTURAL)
AR-904-00
CONCRETE SLAB
(REFER TO STRUCTURAL) DRAWN BY: CHECKED BY: STAGE: REVISION:

--------- AD. -----


VERIFIED BY: APPROVED BY: PLOT DATE: R01
6 TYP. ROOF CONCRETE BASE FOR MEP EQUP'MT 7 ROOF CORNER WATER PROOFING & FLUSHING DETAIL 9 TYP. ROOF PENETRATION (UPSTAND) HH. MI. 15/10/17
PROJECT NO.:
@A1
SCALE:
As
AR-904-00
SCALE 1 : 10 AR-904-00
SCALE 1 : 5 AR-904-00
SCALE 1 : 10 indicated 327
FILE NAME:

AR-904-00

38
Tactic Village for Combat Operations

Client : Ministry of interior


Location : Cairo - Alexandria Desert road - Egypt
Leed Consultant : EHAF
Scope of Work : Design Development - Value Engineering -
Developing Working Drawings - Coordination - Respond to RFIs.
PROJECT

DRAWING KEY: NORTH

NOTES:

REVISIONS:
NO DATE MODIFICATIONS
R0 DEC. 2014 ISSUED FOR TENDER

R1 FEB. 2015 ISSUED FOR TENDER

ACTION TARGET OWNER:

00
77

MAIN CONSULTANT:
00
77

ACTION TARGET

DRAWING TITLE:

FEB. 2015 FEB. 2015 1023.1

1:1000 A0 R1

00.A.0100.01

40
41
PROJECT

A B C D E F G H J K L M 03 N P Q R S T U DRAWING KEY: NORTH


A0300.00 02
A0400.00

87950

2500 6000 6000 6000 6000 4000 250 7200 4800 3000 3000 6000 6000 6000 3000 3000 7500 7500

2500 1350 1400 1000 1400 2000 1400 1000 1400 2000 1400 1000 1400 2000 1400 1000 1400 1650 4050 2200 3000 3000 3000 2000 1400 1000 1400 1000 18200 500 1900 1000 1400 2600 4500 3000 4500 1600

W03 W03 W03 W03 W03 W03 W03 W03


01 01
BL01
11800 11800
2400

+0.30 D07
-1.20
D08
F.F.L F.F.L
+2.10 2450 1350 1350 1350 1350 1350 6150
4000

4000
F.F.L
1350

W03 650 650 650 650 650 650 650 650 650 650 650
W01 W01 W02 W02 W02 W06 W06
02 D02 02
1000

NOTES:

800
09 D08
11800 5800
9800

A0800.00 5800 14800


0-12
1400

3000
W03 0-11
D02
0-20
0-16
0-09

11600
03

4000
1000

W05
03 A0400.00 03
6000

4600
+2.90 W06
F.F.L
+0.30
1400

15800

15800
W03
1650 1001000 50 1000 F.F.L

8800

8800

3000
9000 2800 0-18 0-14 2000

4400
+2.10
04 F.F.L 04
2950

11800

1400
0-10

3600
0-13
15200 5800

3000
D08
1400

W03 D04
0-15
05 0-17 05
6000

4600
1200 2500 D10 W06
1000

18800
D02

4200
0-31

3000
8600

D02
2100

11800
D06
06 06

1950
D03
1400

W08 D03 D03


0-38 2800 23400 2800 14800

1700
02
D04 200 2000 1900 3000 3100 3000 3100 3000 1900 2000 200
3000

3000
1150 450

A0500.00
0-19
0-21 D02
D04
07 07
600
1100

4500
3000
11300 2800 11600 W06
+0.30
CW2 F.F.L
04 02
4000

4000
3000
2500

A0300.00 A0300.00
ST-01 D03 D03 0-08
0-30
D02

2100

1600
08 08
1000

1000

14800
0.00 +0.30
F.F.L F.F.L 11400

3000
50200

50200
11800

11400

17400
4000

4000
3000

3000

3800

3800
D01 0-22 W01
01 0-23
A0400.00

09 09

1000
1000

1000

+0.30
0-33

2100
D04 F.F.L
D02
ST-02 D03
2500

3000
D02
4000

4000
3000

W01

+0.30
F.F.L

3000
0-29
REVISIONS:
1100

10 10
600

1350
200

900 4600 6700 NO DATE MODIFICATIONS


D04
1600

0-04 0-05
9800

R0 DEC.2014 ISSUED FOR TENDER

750
W05
05
3000

3000
D03 0-37 0-07
R1 FEB.2015 ISSUED FOR TENDER

1700
A0500.00

1150
D04 2100

1100
0-34 D04
1400

W03 D03 D03


11 D03 11

750
D05 W05

900
07
1050

4300
D04
A0500.00 0-03
2800 5550 6050 0-06

900
3100
0-32
8800

2800

3000
D04 D04
4800
1400

0-24 3200 2700


W05

3750
ST-03 0-40

1150
D04 D04
0-27
12 12
650
6000

D04 D04
6000

D08 D04

+0.30 17800
1400

W03 20800
F.F.L

3000
0-35 0-36 D02 D02
0-39 01
8800 A0800.00
17800

3000
13 W04 13
6050

OWNER:
2950

9000 2800
3000

8800

3000
8750

800
D02 D02
0-02 0-01 0-28
15800
1400

W03 3600

14 0-26 14

3000
12800
1000

W04
W07
0-25
3000

3000
W03 D02 D02
1400

W03
9800

9600

15 15 MAIN CONSULTANT:
1000

3200
W03 W04 W04 W04 W04 W04 W04 W04
1400

W03
4000

4000
2350

11800

2000
11800

16 16
D01 D01
W03 W03 W03 W03 W03 W03 W03 W03 CW1

+0.30 DRAWING TITLE:


F.F.L

400 4000 9150 4000 400


2500 6000 6000 6000 6000 4000 250 7200 4800 3000 3000 6000 6000 6000 3000 3000 7500 7500

85450
-0.87
F.F.L
A B C D E F G H J K L M 01 N P Q R S T U
A0300.00

01 SCALE 1:100

FEB. 2015 FEB. 2015 1023.1

1:100 A0 R1

01.A.0200.00

42
PROJECT

A B C D F G H J K L M N O P Q R S T U

1.00
DRAWING KEY: NORTH
+11.20

500
1.00
ROOF T.O.P

500


1500
+9.70

2731
3.00 ROOF T.O.S
3.00

500 1000
1.00

1500
8.20 +8.50
500

500

500
1000

4400
ROOF T.O.S ROOF T.O.S
2.00 2.00

2000
1450

1600
2360
3.00 1.00 1.00

2500
500
+5.70
3900

2000
FIRST T.O.S

680

2400

2200

2200
3.00 3.00

1700
3.00
3.00

2000

12070
BL01

3700
4.30 1.00 1.00
9200

FIRST F.F.L

800 200
8700

1000
3320
1.00 1.00

2000
1500
1.00

6000
8120

5400
4000

4000
2400

2400
680

5570
3870
3500

4570
3839
0.30 +0.30
GROUND F.F.L GROUND F.F.L NOTES:

2530
300

1670

1670
-0.87

1170

1170

1170
700
G.L.

01 SCALE 1:100

REVISIONS:
U T S R Q P N M L K J H G F E D C B A NO DATE MODIFICATIONS
+12.20
ROOF T.O.P R0 DEC.2014 ISSUED FOR TENDER

R1 FEB.2015 ISSUED FOR TENDER

2000
+11.20
500

3000
ROOF T.O.P

1500
3000

500 1000

1000
1.00
4000

8.50 +8.20
500

500

500

500

500

1000
ROOF T.O.S ROOF T.O.S
3.00

1600
1.00 1.00 2.00 2.00
2000

2050

2360
2500

500

500

500

+ 5.70

3900
750

12200
5200
FIRST T.O.S

680
2400
2700

2900
2200

3.00 3.00
2400

1.00 1.00
+4.30
FIRST T.O.S OWNER:
13500

3250
3.00

3320
1600
9900

6200
5400

7900
3500

3500

4000
750

2800
680
2400
5700
6800

+0.30 +0.30
GROUND F.F.L GROUND F.F.L 0.00

3100

700
G.L.

2860

300
2000

2000

1900
1700

MAIN CONSULTANT:
2600

-2.30

03 SCALE 1:100

DRAWING TITLE:

FEB. 2015 FEB. 2015 1023.1

1:100 A0 R1

01.A.0300.00

43
44
PROJECT

B B' D A B B' D
BL 09 BL 09 BL 09 BL 09 BL 09 BL 09 BL 09
DRAWING KEY: NORTH
70848
12500

490 11900 58008 490 5950 5950


E.J. E.J.
3850 1400W01 1150 800
W02 3050 1400W01 850

1000
P01
1 1
BL 09 BL 09
3500 1700 4000
BL09
00 - 07

4000
00 - 05
D2
300

7200
4300

1000

7200
D2 00 - 06
2300 D2 2800

2500
D3 D3
00 - 04 00 - 03

400
D4

14700

14700
2800
NOTES:

00 - 08
P02

6700
7050

7050
00 - 02

00 - 01
6.30 0.30
T.O.C
F.F.L
1700 (DRY MIX) 1

3 3

400
D1 (DRY MIX) 2
BL 09 BL 09
3850 1400 1150 800 3050 0.30 1400 850

1000
6.90 F.F.L (DRY MIX) 3
T.O.P
490
490 11900 58008 490 5950 5950 20X40 CM 4
12500
70848 20CM 5

02 SCALE 1:100
-1.20
Partition
G.F.L Partition Description
code
P01 Aluminum Partition provided by Supplier
B B' D A B B' D
BL 09 BL 09 BL 09 BL 09 BL 09 BL 09 BL 09 P02 Bulletproof Sicorite Partition
01 SCALE 1:100

01 02 03 A B B' C D
BL 09 BL 09 BL 09 BL 09 BL 09 BL 09 BL 09 BL 09

6.90 3.00
6.90 6.90 6.90
3.00
T.O.P T.O.P T.O.P T.O.P
600

600

600
6.30 6.30 6.30 6.30
T.O.C T.O.C T.O.C T.O.C

3700
6900

6900

6900
3.00 3.00
6000

6000

0.30 0.30 0.30 0.30


F.F.L F.F.L

2300
F.F.L F.F.L
4.00 4.00
0.00 0.00 0.00 0.00
REVISIONS:
G.L. G.L. G.L. G.L.
NO DATE MODIFICATIONS
300

300

1500
R0 DEC.2014 ISSUED FOR TENDER

05 R1 MAY 2016 ISSUED FOR TENDER


SCALE 1:100 03 SCALE 1:100

D C B' B A
03 02 01 BL 09 BL 09 BL 09 BL 09 BL 09
BL 09 BL 09 BL 09

6.90 3.00
6.90
6.90 3.00
6.90 T.O.P T.O.P
T.O.P T.O.P
OWNER:
600

600
600

600

6.30 6.30
6.30 6.30 T.O.C T.O.C
T.O.C T.O.C
4300

4300
3700
6900

6900
3.00

6000
6900

3.00
6000

6000
8100

800

0.30 0.30
1700

1700

0.30 0.30 F.F.L F.F.L


F.F.L F.F.L 4.00
1800

4.00 0.00 0.00 MAIN CONSULTANT:


300600

900

0.00 0.00 G.L. G.L.


300

300
G.L. G.L.
300

06 SCALE 1:100
04 SCALE 1:100

EHAF
CONSULTING ENGINEERS
DR.EZZ ELDIN FAHMY&DR.HUSSEIN ABBAS
5Abd ELRAHMAN HUSSEIN STREET TEL:7601099

A B B' C D
BL 09 BL 09 BL 09 BL 09 BL 09 DRAWING TITLE:

6.90 6.90
T.O.P T.O.P
600

600
6.30 6.30

1500
T.O.C T.O.C

3540
6900

6900
P01
6000

6000
0.30 0.30

2300
F.F.L F.F.L

0.00 406 0.00


G.L. G.L.
200
300

300
350
450

1000
400 4392 300
-1.20
2652 250 400
F.F.L
MAY 2016 MAY 2016 1023.1

06 SCALE 1:100

AS SHOWN A0 R1

09.A.0200.00

45
PROJECT

A B C 02 D E F G A B C D 02 E F G
BL13.4 BL13.4 BL13.4 13.A.0000.04 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 0.00 BL13.4 13.A.0000.04 BL13.4 BL13.4 BL13.4
G.F.L
33200
33800
100 7150 4400 4900 6350 5500 4700 100
400 7150 4400 4900 6350 5500 4700 400

DRAWING KEY: NORTH


W03 W03
1 1 1

400

400
1

100

100
BL13.4 BL13.4 BL13.4 D07 BL13.4

600
11300 850 3000 850 6100 2800 2300 4500

650
11

1400
D06
A.1000.00
DISH WASHING AREA 1750 D01

2600

3000

1700
D06
BL13.4

2400
32800 L0-21

4600

4600

4600

4600
4400
1000 1000 L0-01
L0-19

650
D04 D04 D04
0.00
G.F.L

4050
4500

7700

7700
W06
2 2

2850
2 BEVERAGE AREA
2
BL13.4 BL13.4 BL13.4 D01 BL13.4

3350
HOT KITCHEN AREA D01
1000 1000 200L0-20 2450 1000 350 1650 1000 150 W06

4500
W06 L0-02
L0-17
D04
3250

3250

3250

3150

3250
D04 D04 CHiaf
D04 L0-03 W06
L0-16 Office O.3
0.30

2050
O.2

1850
L0-18
F.F.L

1000
1450 3450
3 3 3
O.2
W06
3
BL13.4 BL13.4 BL13.4
5650 5500
3000 BL13.4
4500
3550

1050
O.3

VEGETABLE PREP.

POULTRY PREP.
01 Pack Up
+4.50 L0-24 L0-04

3550
01 13.A.0000.04 FISH PREP. MEAT PREP. D08 03
T.O.S L0-23 NOTES:
4850

4850

4750

4750

4750
GARBAGE

4850

4850
03

4800
13.A.0000.04 D04 L0-22 13.A.0000.04

22250

2000
COLD ROOM
22550

21550

1700
21950

21950
13.A.0000.04
L0-14 L0-15

5650 5500
1000 3000
4 4 4 D04 4
D04
BL13.4 BL13.4 BL13.4 D04 O.3
24900
O.3
BL13.4

800

1600
0.30 D04 D04
01 (DRY MIX) 1.00

4750
F.F.L
3150

3150
D01

2950
3150

3150
L0-05

1700
13.A.0000.04
0.00 0.30 7750
(DRY MIX)

O.3
F.F.L 2.00
G.F.L
5 5 5 14750

450
D01 D04 D04
D01
1000 3200
5
BL13.4 BL13.4 BL13.4 1000 1000 1000
4550 1700 2250 BL13.4

650
O.2
3.00
01 0.30

2450
1800
13.A.0000.04 F.F.L 7250
L0-12 L0-08 L0-07
L0-11 750 1600 650

7000
L0-06
COLD FREEZING L0-09 FREEZING 5000 1000
5850

5850
W03

5850

5650

5650

5650

5850
L0-13 ROOM ROOM ROOM
Receiving Area

3550
3150
Vegetables

3000
3000
pre Wash

1350
5550 2800 2800 3000
L0-10 3700 3800 6100
6 6 6 6

100

100

100
400

BL13.4 BL13.4 BL13.4 BL13.4


W06
0.00
G.F.L

400 7150 4400 4900 6350 5500 4700 400


100 7150 4400 4900 6350 5500 4700 100
33800
33200

A B C 04 D E F G A B C 04 D E F G
BL13.4 BL13.4 BL13.4 13.A.0000.04 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 13.A.0000.04 BL13.4 BL13.4 BL13.4 BL13.4
BL13.4

02 SCALE 1:100
01 SCALE 1:100

6 1 A B C D E F G
5 4 3 2 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4
BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 +5.40
ROOF T.O.P
+5.40
ROOF T.O.P +4.50

900
1100

1100
1.00 1.00 ROOF T.O.S
+4.50

900
1100

1100

1.00 ROOF T.O.S

1500
1800
1450

1800

5400
4200
800
5400
4200
800

REVISIONS:

2200
2.00 2.00

1600
+0.30 NO DATE MODIFICATIONS
2200
1600

2.00 GROUND F.F.L


+0.30

400
3.00 3.00

300

300
GROUND F.F.L R1 FEB.2015 ISSUED FOR TENDER
400

300

300

3.00
05 SCALE 1:100

06 SCALE 1:100

1 2 3 4 5 6
A B C D E F G
BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4
+5.40
ROOF T.O.P
+5.40
ROOF T.O.P
+4.50
+4.50
900
1100

1.00 ROOF T.O.S

900
1100
1.00 ROOF T.O.S
900

900
900

5400

1100

5400
4200

OWNER:

4200
2100

2.00

1900
+0.30 2.00
GROUND F.F.L
+0.30
GROUND F.F.L
400

300

3.00

400
3.00

300
04 SCALE 1:100 07 SCALE 1:100

MAIN CONSULTANT:
A B C D E F G
BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4

EHAF
+5.40
ROOF T.O.P
+4.50

900
ROOF T.O.S

CONSULTING ENGINEERS

1800
DR.EZZ ELDIN FAHMY&DR.HUSSEIN ABBAS

5400
4200
4000

4000
5Abd ELRAHMAN HUSSEIN STREET TEL:7601099

2200
+0.30
GROUND F.F.L DRAWING TITLE:

300
03 SCALE 1:100

1 2 3 4 5 6
BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4
+5.40
ROOF T.O.P
+4.50

900

900
ROOF T.O.S

1000
1900

5400
1350

4200
4100

4100
2200

1750
+0.30 FEB. 2015 FEB. 2015 1023.1
GROUND F.F.L

300
1-100 A0 R1

03 SCALE 1:100 13.A.0000.04

46
PROJECT

A B 02 C D 02
BL13.5 BL13.5 13.A.0000.05 BL13.5 BL13.5 A B 13.A.0000.05 C 01 D
BL13.5 BL13.5 BL13.5 13.A.0000.05 BL13.5

22100
22100

100 7650 8350 5900 100


100 7650 8350 5900 100 DRAWING KEY: NORTH
0.00
G.F.L

+0.30

2000
F.F.L
+0.30
W04 W04 F.F.L
W04

100
1 1 1 D01 1

100

100

100
BL13.5 BL13.5 BL13.5 BL13.5
900 1700 800 750 1700 1850 200 1700 200 850 1500 1150
7700 3400 4300

2700
4050

4050

3800
3800
4050

4050
+0.30

4950
F.F.L
D04 1000 D04
L0-08 L0-073150 L0-01
3500
2 2 2 D04 2

8100
BL13.5 D06
BL13.5 BL13.5 2450 BL13.5
L0-09

1100
W03
L0-02
3500

W01 7900 2100 3500


01 01 D04 W03 03
4000

4000

4000

4000
2000

4000
03 13.A.0000.05 L0-04
13.A.0000.05 D06 13.A.0000.05
13.A.0000.05
+0.30
W03
F.F.L

3700
D04
15550

15150

15550

15150

15150
3 3 3 3 NOTES:

15550

2000

15550
BL13.5 BL13.5 BL13.5 L0-03 BL13.5
+0.30
+4.50 F.F.L
T.O.S. D04
01 01
4000

4000

4000

2000

4000
13.A.0000.05
13.A.0000.05

2750
W04
D04 18100
+0.30
L0-06 F.F.L

7050
4 4 4 4

6100
BL13.5 BL13.5 BL13.5 BL13.5
900 2400 (DRY MIX) 1.00
+0.30 L0-05
L0-10

4200
21700 F.F.L
(DRY MIX)
3300

3300

3150
3300

3300
W04 2.00
+4.50 18100 3400
T.O.S. 5650 1500 850 1500 850 1500 800 1500 3950
5 5 5 5 3.00
100

100
BL13.5 BL13.5 BL13.5 BL13.5
W05 W05 W05 W05

100 7650 8350 5900 100


100 7650 8350 5900 100
22050
22050

A B 04 C D
BL13.5 BL13.5 13.A.0000.05 BL13.5 BL13.5
A B 04 C D
BL13.5 BL13.5 13.A.0000.05 BL13.5 BL13.5

01 SCALE 1:100

02 SCALE 1:100

5 4 3 2 1
BL13.5 BL13.5 BL13.5 1 2 3 4 5
BL13.5 BL13.5
BL13.5 BL13.5 BL13.5 BL13.5 BL13.5

5.40 5.40
ROOF T.O.P ROOF T.O.P
+4.50 +4.50
1100

1100

1100
1.00 ROOF T.O.S 1.00 ROOF T.O.S

1200
1200
1500

2.00
5400

5400
800
800
2.00
3900

3900
800

1900
1600

2300
2.00 2.00
2.00 +0.30 +0.30
GROUND F.F.L GROUND F.F.L A B C D
BL13.5 BL13.5 BL13.5 BL13.5
400

400

400

400
3.00 3.00
+5.40
ROOF T.O.S
04 06 SCALE 1:100
SCALE 1:100 +4.50

900
ROOF T.O.S

REVISIONS:
NO DATE MODIFICATIONS

5400
R1 FEB.2015 ISSUED FOR TENDER

4200
4100

2800
A B C D
BL13.5 BL13.5 BL13.5 BL13.5 D C B A +0.30 ++0.30
BL13.5 BL13.5 BL13.5 BL13.5 0.00
GROUND F.F.L GROUND F.F.L
G.L

300
5.40 5.40
ROOF T.O.P ROOF T.O.P
+4.50 +4.50
1100

1100

1100

1100

1100
1.00 ROOF T.O.S 1.00 1.00 ROOF T.O.S

03
1500

2.00
1800

1800
SCALE 1:100
2.00 2.00 2.00
5400

5400
3900
3900
800

1100

2200

2200
1600

2.00 2.00 2.00


+0.30 2.00 ++0.30 OWNER:
400 1000

GROUND F.F.L GROUND F.F.L


400

400

400
3.00 3.00

07 SCALE 1:100 05 SCALE 1:100

MAIN CONSULTANT:

EHAF
CONSULTING ENGINEERS
DR.EZZ ELDIN FAHMY&DR.HUSSEIN ABBAS
5Abd ELRAHMAN HUSSEIN STREET TEL:7601099

1 2 3 4 5
BL13.5 BL13.5 BL13.5 BL13.5 BL13.5
DRAWING TITLE:

+5.40
ROOF T.O.S
+4.50

900
900
ROOF T.O.S

5400
4200
4050
+0.30
GROUND F.F.L

300
03 SCALE 1:100

FEB. 2015 FEB. 2015 1023.1

1-100 A0 R1

13.A.0000.05

47
PROJECT

PART 1

PART 2
A B C D E 03 F G H H' J K L 01
BL 10 BL 10 BL 10 BL 10 BL 10 A0300.00 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 A0400.00

106700 DRAWING KEY: NORTH


4000 6000 6000 6000 6000 6000 5000 250 4000 2500 5000 5000

01
BL 10 13
A0500.00

1000
3400
02
BL 10

1000

3500
2300

4750
2000 1800 8000
03

1500
13400 3200 18500

1350

1400
BL 10 BL10

900
04 1600 10000 1800 3200 1800 6550 1800 6550 1800
BL 10

1400
3650
ST-03

6400

6400

6400
05 ST-04
BL 10
5800 11600

04
NOTES:

3000
A0300.00 3900

6300
06
BL 10

21300

2300

2300

2300
A01

3400
W05
BL 10
13200 3200
D03

2500

3600
07

4800
BL 10

3400
R-01

7200
08
BL 10

2350
4000 6000 6000 6000 6000 6000 5000 250 4000 2500 5000 5000

101700

PART 1

PART 2
A B C D E 01 F G H H' J K L
BL 10 BL 10 BL 10 BL 10 BL 10 A0300.00 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10

01 SCALE 1:100

REVISIONS:
PART 1

PART 2

L 01 M N P P' Q 02 R 03 S T U V W
BL 10 A0400.00 BL 10 BL 10 BL 10 BL 10 BL 10 A0400.00 BL 10 A0300.00 BL 10 BL 10 BL 10 BL 10 BL 10 NO DATE MODIFICATIONS
R0 DEC.2014 ISSUED FOR TENDER

R1 FEB.2015 ISSUED FOR TENDER


106700

5000 5000 2500 4000 250 5000 6000 6000 6000 6000 6000 4000

01
03 BL 10
A0500.00

1000
3400
02
BL 10

1000
3500

2500

8000 1700 2100


4900

03

1500

1500
18500 3200 13400

1350
1400
BL 10
OWNER:

3700
900
04
9600

2200 6150 1800 6550 1800 3200 1800 10000 1600


BL 10

1400

3650
1400

ST-02
6400

6400

6400
ST-01
05
4500

BL 10
11600 5800

02

3000
A0300.00
MAIN CONSULTANT:

7750
06

EHAF
BL 10

21300
2300

2300

2300
A01

3400
W05
BL 10
13200
D03
CONSULTING ENGINEERS
DR.EZZ ELDIN FAHMY&DR.HUSSEIN ABBAS

3600
07
4800

BL 10 5Abd ELRAHMAN HUSSEIN STREET TEL:7601099

3400
R-02
7200

DRAWING TITLE:
08
BL 10
2350

5000 5000 2500 4000 250 5000 6000 6000 6000 6000 6000 4000

101700
PART 1

PART 2

FEB. 2015 FEB. 2015 1023.1


L M N P P' Q R 01 S T U V W
BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 A0300.00 BL 10 BL 10 BL 10 BL 10 BL 10
1/100 A0 R1

02 SCALE 1:100
10.A.0203.00

48
PROJECT

W V U T S R Q P' P N M L K J H H' G F E D C B A

PART 1

PART 2
BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10

DRAWING KEY: NORTH


08 07 06 05 04 03 02 01
BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10

6.00
F F F F F F F F
3300

BL10

8650
2400
2900

5.00

+12.90 01 SCALE 1:200 NOTES:


LEVEL 03 T.O.S
1200

1200

1200

PART 1

PART 2
W V U T S R Q P' P N M L
4000
21650

21650
1950

2000
300 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10
5.00

+8.90

800
LEVEL 02 T.O.S
6400

(DRY MIX) 1
4.00
4450

300 6.00
(DRY MIX) 2
3600

3600
3600

5.00

+5.30 (DRY MIX) 3


LEVEL 01 F.F.L

20X40 CM 4
1600

1600

300

5750
2700

300 300
50 mm 5
5000

5400
6
3000

3000

+0.30 (POLYCARBONATE SHEETS)


GROUND F.F.L
2400

0.00

12750
800

G.L.
300

300

5.00

4200
+12.90
5.00 ROOF T.O.S

6100
+12.00

7000
+11.70
04 SCALE 1:100 ROOF T.O.S

F F F F

2800
5.00

+8.70 +8.70

800
LEVEL 02 T.O.S LEVEL 03 T.O.S

1600
4.00
3.00

3500

3500
3600

1000 300 1000


+5.30
LEVEL 01 F.F.L

2.00

9000

2100

2100
2100
3.00 3.00 3.00

1600
1000 300 1000
5000

REVISIONS:
0.30

3000

3000
3300
GROUND F.F.L NO DATE MODIFICATIONS
0.00 R0 DEC.2014 ISSUED FOR TENDER

1200
01 02 03 04 05 06 07 08 G.L.

300

300
BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 R1 FEB.2015 ISSUED FOR TENDER

02 SCALE 1:100
1300

6.00
PART 1

PART 2

L K J H H' G F E D C B A
BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10

OWNER:
2450
12750

6.00
10550

3000

5.00

+12.90
LEVEL 03 T.O.S
1200

MAIN CONSULTANT:
4000
2000

EHAF

8750
5.00 3.00
3.00

9950
+8.90 +8.90
800

800

LEVEL 02 T.O.S LEVEL 02 T.O.S


6300
900

4.00
3.00 5.00 CONSULTING ENGINEERS
3700

3800
3600

3600

DR.EZZ ELDIN FAHMY&DR.HUSSEIN ABBAS


2700

5.00 +12.90
13200

ROOF T.O.S 5.00 5Abd ELRAHMAN HUSSEIN STREET TEL:7601099


+5.30 +5.30 +12.00
12150

800

LEVEL 01 F.F.L LEVEL 01 F.F.L +11.70


ROOF T.O.S
DRAWING TITLE:

700
3.00
1600

3.00 F F F F
4100
2700

4000
3.00

1900
1500
2800
5.00
5000

5000

+8.70
5700

1000
5600

800
3000

LEVEL 02 T.O.S
+0.30 0.30
GROUND F.F.L GROUND F.F.L
2400

1600
4.00

-0.30 -0.30 3.00


3500

3500

3500

3600
1100

1000 300 1000


G.L. G.L.
600

600

600

+5.30
LEVEL 01 F.F.L
05 SCALE 1:100
900

2.00
2100

3.00 3.00 3.00

1600
2900

1000 300 1000

5000
3600

800
0.30
3000

GROUND F.F.L

1700
0.00 FEB. 2015 FEB. 2015 1023.1

1200
900

G.L.
300

300
1/100 -1/200 A0 R1
03 SCALE 1:100

10.A.0302.00

49
PROJECT

A B C D E F G H H' J K L M N P P' Q R S T U V W

PART 1

PART 2
BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10

DRAWING KEY: NORTH

BL10

01 SCALE 1:200 NOTES:

A B C D E F G H H' J K L

PART 1

PART 2
BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10

(DRY MIX) 1

6.00 (DRY MIX) 2

(DRY MIX) 3

20X40 CM 4

50 mm 5
5750

5750
(POLYCARBONATE SHEETS) 6

5.00

3800
6100

+12.00
+11.70
ROOF T.O.S 3.00

+10.10 3.00

3200
ROOF T.O.S

+8.90
800
900

LEVEL 03 T.O.S

1.00
800
4.00
1.00
3600

2700

5.00

+5.30
LEVEL 02 T.O.S
9800

3.00
3.00 3.00
1600
9000

1.00
4.00
REVISIONS:
5000

3000

0.30 NO DATE MODIFICATIONS


GROUND F.F.L
R0 DEC.2014 ISSUED FOR TENDER

0.00 R1 FEB.2015 ISSUED FOR TENDER


800

G.L.
300

L M N P P' Q R S T U V W
PART 1

PART 2

BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10

OWNER:

6.00

MAIN CONSULTANT:
5750

5750

EHAF
CONSULTING ENGINEERS
DR.EZZ ELDIN FAHMY&DR.HUSSEIN ABBAS
2900

5.00
4100

5Abd ELRAHMAN HUSSEIN STREET TEL:7601099


+12.90
ROOF T.O.S 5.00
+12.00
+11.70 DRAWING TITLE:
1950

ROOF T.O.S

3.00
1950

+10.10
ROOF T.O.S
2150

+8.90

900
LEVEL 03 T.O.S
1.00
4850
800

4450

1.00
4.00

3600
2700

+5.30
800

LEVEL 02 T.O.S
800

9800
3.00
3.00 3.00
1600

9000
3100
1800

1.00
4.00

5000
3000

0.30
800 500 1000
2500

GROUND F.F.L
FEB. 2015 JULY. 2016 1023.1
0.00
800

G.L.
300

300
1/100 - 1/200 A0 R1

10.A.0301.00

50
03 SCALE 1:100
PROJECT

DRAWING KEY: NORTH

01 02 03 04 05 06 07 08
BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10
BL10

POLYCARBONATE
SHEETS

NOTES:

3000
+12.90 +12.90
ROOF T.O.S ROOF T.O.S

4000

4000
21650
+8.90 +8.90

18350
LEVEL 03 T.O.S LEVEL 03 T.O.S

3600

3600
12900
800
+5.30 +5.30
LEVEL 01 F.F.L LEVEL 02 T.O.S

400
5000

5000
+0.30 0.30
0.00 GROUND F.F.L GROUND F.F.L 0.00
G.L G.L
300

300
01 SCALE 1:100

REVISIONS:
NO DATE MODIFICATIONS
R0 DEC.2014 ISSUED FOR TENDER

R1 FEB.2015 ISSUED FOR TENDER

01 02 03 04 05 06 07 08
BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10

POLYCARBONATE
SHEETS

OWNER:
5450

6800
REF .TO SE DWG'S

MAIN CONSULTANT:
4500

REF .TO SE DWG'S

EHAF
+12.00
+11.70 +11.70
ROOF T.O.S ROOF T.O.S
21650

3100
2800

2800
+8.90 +8.90
CONSULTING ENGINEERS
LEVEL 02 T.O.S LEVEL 02 T.O.S DR.EZZ ELDIN FAHMY&DR.HUSSEIN ABBAS
5Abd ELRAHMAN HUSSEIN STREET TEL:7601099

DRAWING TITLE:
3600

3600

3600

3600

800
+5.30 +5.30
11700

LEVEL 01 F.F.L LEVEL 01 F.F.L


400

2000

2000

2000
800
5000

5000

+0.30 0.30
3000

3000

GROUND F.F.L GROUND F.F.L


2200

0.00 0.00
G.L G.L
300

300

02 SCALE 1:100

FEB. 2015 JULY. 2016 1023.1

1/100 A0 R1

51
10.A.0400.00
52
PROJECT

DRAWING KEY: NORTH


03
A A.300.00 C D E F G H
18150
5750 2100 2150 2000 2800 2800

0.15
02 G.F.L
A.0500.00
1100 200 3600 200 1000 1100 1000 3650 6300

01 D4
7800

200 1200
UP

1200
5900
W03
ST1
BL05

3850

3850
0.30

4100
GR-01

2000
F.F.L 500 2000 1150 W03

1950

1950
6250
D1 D1

1200 200
200650
02

200

1700
D2

800
W04

1800

2700

2700
02

750
A.0800.00
GR-03
NOTES:

4800
D2

5000

1500

800
W04

5850
2000

2000
W03 GR-02

400 600 400450 1100


450 1100

750
D1 D1
D2

1500

800
W04

800
03

1400

200
650
3000

2350
1800

200
4800

4800
5000

2000
2000

2000
W03 W03

200
800
04

8600

8600

8600
400

400
3050

2800
0.30
F.F.L

2150
17750

200
4600

4600
5000
04

2000
2400
W03

2000
W03 A.300.00

200
400 600 400
19250
450
05

1400

1400
1100

400

400

2400
600
2400

2000
W03
01

24800
5000

4600

4600
A.400.00

24350

2400
W03

2000
3050

1100
06

8600

8600

8600
400

400
800

17750

2400
W03
52200

2000

2000

W03
4600

4600
5000

GR-04
1800

2750
3000

400 600 400


07
1400

1400

1400
800 400

400

600 400

200
200
5500 2500 1750 2500 5500 200 1850 300
300 0.15
D5 G.F.L
05
2000

2000

02 W03
0.30 A.300.00

3200

3200
4800
5200

A.300.00 F.F.L 04
4350

4350

4350

4350
GR-5 A.401.00
03 4000 2000 200 2600 2400 1100 2400 4100 200 2000 200 1000 200 2000 200 1250
REVISIONS:
2000

2000

A.0500.00 200
NO DATE MODIFICATIONS

200
17750 W03 W03 W03 W03 W03

200
200 800
850

400
3650 3550 3850 2500
08 08 R0 DEC.2014 ISSUED FOR TENDER
200

200

1100 200
450

200 1100
700

200 1500 150 2200 2000 450 2150 2000 2150 2000 450 2150 2000 650 550 2000 1050
R1 FEB.2015 ISSUED FOR TENDER
2950
0.30

2750
F.F.L
D3
2650

GR-11
3700
3700

3700
W01 GR-06

2100
25200 3800

5350
ST3

5500
5150

3600

6300
9850 UP 6600

09 09
850

2950
2100
1950

1500
450 800 300 800 350 800 350 800 350 800

1100

W04 D2
1850

1850
1200 200
10 GR-11 10
1100

3450

W04 D2
D1

650
2500
2100

2100
5650
1100

W04 D2
GR-09
11 11
4200

4200

OWNER:

2400
3650

3650

3650
D1
1100

W04 D2 GR-08 W03


2200

06

18150
2050

2050
1750
8050 2200 5200 1400 8600 1400 4200 2150 200
17550

1800
W04
1100

D2 GR-07 A.300.00

600
12 12
200

200

1100
D1
0.30
2100

2100
2500
4200 1400 8600 1400 8600 400 600 400 8600 400 600 400 4200
2300

2300

F.F.L

1100
D4
13 13
5900
5850

-0.85
G.F.L MAIN CONSULTANT:
7800

7800

8200
3350
7950

GR-10
5550

5550
15400 24200 3800

6000
5500

5500
1100

D1
1100

1100

D4
2000 2000 600 400 2150 2000 650 400250 2000 2150 200 200 4000 4600 4600 4600 4800
1050

14 600 ST2 14
800
1000

W03 W03 W03 W03 W03 W03 W03 W03


02
A.0500.00
1200 200 3600 200 1950 2400 900 2400 3350 200 3600 200 1000 200 3600 200 1950 2400 900 2400 4300 2400 4650

2150 4800 3050 2150 2400 2400 2800 2200 5000 5000 5000 5200 3800 DRAWING TITLE:
46250

A` A B D E F` G H H` 01 J K L M N
A.300.00
02 05 03
A.401.00 A.401.00 A.401.00

01 SCALE 1:100

FEB.2015 FEB.2015 1023.1

1/100 A0 R1

53
05.A.0200.00
PROJECT
A` A B C D E F G H H` J K L M N

15.80
N M L K J H` 15.80 T.O.P
T.O.P

4.00
15.10
15.10 DRAWING KEY:

700
UPPER ROOF T.O.S
NORTH

700
UPPER ROOF T.O.S

2600

2600
12.50
12.50 13.20 13.20

2600
2.00 T.O.P
13.20

2600
T.O.P T.O.P T.O.P
T.O.P 12.50 12.50
12.50 2.00

700

700
T.O.P T.O.P
T.O.P 11.80

200
200
11.80

700
ROOF T.O.S

200 800

200 800

800
700
ROOF T.O.S

200

1600
1.00

800

10800

3300
1100

1100
3300
8.50
8.50

6800
SECOND F.F.L
SECOND F.F.L

2300

2300
2.00 1.00 1.00 2.00 1.00
1.00
2.00 2.00 2.00 BL05

16700

16700

3400
1100

1100
5.00

3400

10900

10900
GR-03
5.10

200700

300 700
5.00
5.10

450 200
FIRST F.F.L

200
4.00
FIRST F.F.L
5.00 5.00 1.00 5.00
1.00 4.00 2.00
1.00 5.00

1800

1800
1.00

1050
NOTES:

3700

4800
2100

2100

2100
4800
GR-01
1.00 1.00
4.00 4.00
4.00

300

300

1100 300
0.30
0.30 GROUND F.F.L

200

200
GROUND F.F.L

2200
400

400
2000

2000
300

1200
0.00 3.00 3.00 3.00

900

900

900
G.F.L

-1.00 -1.00
G.F.L G.F.L
05 SCALE 1:100 01 SCALE 1:100

(DRY MIX) 1

(DRY MIX) 2

(DRY MIX) 5

14 13 12 11 10 09 08 15.80
T.O.P
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15.80
T.O.P
4.00
15.10
UPPER ROOF T.O.S
15.10

700
UPPER ROOF T.O.S

12.50
1.00 2.00
T.O.P

3300

3300
12.50
13.20

2600
2.00 T.O.P
T.O.P
11.80 12.50 12.50
5.00 5.00 ROOF T.O.S T.O.P T.O.P 5.00
11.80

700
ROOF T.O.S

5.00 5.00 5.00 5.00

4.00

3300
8.50
SECOND F.F.L
4.00 8.50
2.00 2.00 SECOND F.F.L

15650
2.00 2.00 2.00 1.00 2.00 2.00 2.00 1.00 2.00 1.00
1.00

4.00

3400
5.10 2.00

12350

12350

12350
FIRST F.F.L
4.00 5.10
1.00 FIRST F.F.L

1.00

REVISIONS:
NO DATE MODIFICATIONS

4800
1.00 1.00
4.00
1.00 R0 DEC.2014 ISSUED FOR TENDER
0.30 4.00 4.00
GROUND F.F.L R1 FEB.2015 ISSUED FOR TENDER
0.30 3.00 3.00 3.00 0.30
3.00 0.00 GROUND F.F.L GROUND F.F.L

450

150
3.00 G.F.L
0.15
-1.00 G.F.L
G.F.L

06 02 SCALE 1:100
SCALE 1:100

OWNER:
07 06 05 04 03 02 01
H G F E D C A 15.80
T.O.P

15.10

700
UPPER ROOF T.O.S

3300
13.20 12.50

2600
T.O.P 1.00 T.O.P
12.50
T.O.P
4.00
11.80 MAIN CONSULTANT:

700
ROOF T.O.S

5.00 5.00 5.00 5.00 5.00


5.00 5.00

3300
4.00
4.00

8.50
SECOND F.F.L
2.00 2.00 2.00 2.00 1.00
1.00 1.00 1.00 1.00
2.00 2.00

2.00

3400
4.00
4.00

12350

12350
5.10 DRAWING TITLE:
FIRST F.F.L

1.00

4800
4.00 4.00
4.00
3.00 3.00 0.30
GROUND F.F.L 3.00 3.00 0.30
GROUND F.F.L

150

150
0.00
G.F.L 0.15
G.F.L
04 SCALE 1:100
03 SCALE 1:100

FEB.2015 FEB.2015 1023.1

1:100 A0 R1

05.A.0300.00

54
A C D 14 13 12 C D PROJECT
A` A

08 63 62 61 60 59 58 57 56 55 54 53
64 65 66 67 68 69 70 71 72 73 74 64 65 66 67 68 69 70 71 72 73 74
1650 3000 5200

675

1500
1700 3100 3000
1700 3000 3100 DRAWING KEY: NORTH
30 x 10

01 SCALE 1:50
+11.80

2000

3700
11

700
T.O.S

3800
600
SCALE 1:50

+11.80
+11.80 10.20 T.O.S
10.20 F.F.L
T.O.S 06
F.F.L SCALE 1:50
03 02 01

1500
-- -- --

1600
1700 3000 3100
1700 3000 3100

675
10.20
F.F.L 64 65 66 67 68 69 70 71 72 73 74
09 63 62 61 60 59 58 57 56 55 54 53
63 62 61 60 59 58 57 56 55 54 53

A` A C D
14 13 12 A C D BL05
08
42 43 44 45 46 47 48 49 50 51 52
42 43 45 46 47 48 49 50 51 52 63 62 61 60 59 58 57 56 55 54 53
1650 3000 5400 44
675

1500 UP

1600
+6.80 30 x 10 1700 3000 3100
F.F.L 1700 3000 3100 NOTES:

1600
2000

3700

8.50
700

8.50 8.50

3800
F.F.L

3800
600
12 F.F.L F.F.L
SCALE 1:50
02 SCALE 1:50

07
03 6.80 SCALE 1:50
6.80
-- 02 F.F.L
1500

F.F.L
01
--

1600
675

1750 3000 UP --
1700 3000 3100
09 63 62 61 60 59 58 57 56 55 54 53 1700 3000 3100
42 43 44 45 46 47 48 49 50 51 52
63 62 61 60 59 58 57 56 55 54 53

A` A C D
14 13 12 A C D

08
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
41 40 39 38 37 36 35 34 33 32 31
1650 4200
625

16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
1500

1600
1700 3000 3100
1700 4200 1900

03
2000

3700

SCALE 1:50
700

2.70 13

3850
5.10 SCALE 1:50
F.F.L

3800
600
F.F.L

03 08 SCALE 1:50
2.70 5.10 5.10
1500

--
02 F.F.L F.F.L F.F.L
01
675

1750 3000 --

1600
--
1700 4201
09 41 40 39 38 37 36 35 34 33 32 31 1700 3000 3100
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
41 40 39 38 37 36 35 34 33 32 31

A` A C D
14 13 12 A C D

08 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 15 14 13 12 11 10 09 08 07 06 05 04 03 02 01
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
300

1600
UP
1500

2.70 0.30 1699 4201 1900 1700 4200 1900


F.F.L F.F.L

3800

3850
600
2650

3700

700

04 SCALE 1:50
14 SCALE 1:50 0.30 0.30
02 F.F.L 09 SCALE 1:50 F.F.L
14 x 30 01
03 --

1600
--
1500

--
1700 4250 1700 4200 2327 1700 4200 REVISIONS:
350

15 14 13 12 11 10 09 08 07 06 05 04 03 02 01
09 15 14 13 12 11 10 09 08 07 06 05 04 03 02 01 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 NO DATE MODIFICATIONS
R0 DEC.2014 ISSUED FOR TENDER

R1 FEB.2015 ISSUED FOR TENDER


A` A C D 14 13 12 A C D
15.80
T.O.P

15.10 15.10 15.10


700

700

700

700

700

700

700
UPPER ROOF T.O.S UPPER ROOF T.O.S UPPER ROOF T.O.S
140

140

140
2200

3200

3200

2960
3060

3060
4000

4000
OWNER:
4900

4900

4900
1000

+11.90 +11.90 +11.90


+11.80 T.O.S
F.F.L T.O.S T.O.S
ROOF FLOOR

250
1700

1700
2400

900

900
+10.20 10.20 +10.20
F.F.L T.O.S T.O.S
3400

3400

3250
MAIN CONSULTANT:
1700

1700
1000

2500

2500
8.50 8.50 8.50
SECOND F.F.L T.O.S SECOND FLOOR T.O.S SECOND FLOOR
3400

3400

3400

250
350

1700

1700
2400

900

900
6.80 6.80 6.80
F.F.L T.O.S T.O.S
3400

DRAWING TITLE:

3150
3050

1700

1700
1000

5.10 +5.10 5.10


FIRST F.F.L T.O.S FIRST FLOOR T.O.S FIRST FLOOR
3200

3200
350
4100

4100

4100
2400

2400

2400
15 10 05
900

900
SCALE 1:50 SCALE 1:50 SCALE 1:50
2.70 2.70 2.70
F.F.L T.O.S T.O.S
4800

4800
4450
2400

2400

2400

2400

2400

2400

2400

2400
FEB.2015 FEB.2015 1023.1

0.30 0.30
T.O.S T.O.S 1:50 A0 R1

05.A.0500.00

55
56
A B C D E F ELEV 3 G H J PROJECT
BL11 - A0100.00 A B C D E F S1
G H J
+10.60 m A0402.00 +10.60 m
28930 T.O.P T.O.P

205 3090 4495 3750 3175 1175 4000 4075 3175 1790
3

2500

2500

2500
3090 4400 4440 800 700 800 3115 800 800 800 800 800 3110 800 700 800 585395800395
4

4600

4600
W02 W02 W02 W02 W02 W02 W02 DRAWING KEY: NORTH
01 01

600 1000 600


200

200

1600

1600
1440
3
3600 400 15350 +6.00 m +6.00 m
T.O.S. T.O.S.

800 600

600

640
3175

3175
D03

3075
800
W01

3425

1400

1400
4500
+5.00 m +5.00 m

1000

1000
L0-01

800
2 2 3

10600

10600
T.O.S. T.O.S.

4950

1700
1435
+4.20 m +4.20 m

2460
02 02

800

800
T.O.S. 3 1 1 3 T.O.S.

1650
1800
4

8400 15350 W01

6500
0.00 1

2975

5900

5900

5900
G.F.L. 3

5100

5100
3425

1900
3750

3750
4200
1000

2600

3000

3300
2850
6075

6075
5575

L0-02 L0-08 +0.45 m 4 +0.45 m

1330
+0.30 m +0.30 m

1500
+0.00 m F.F.L F.F.L
F.F.L F.F.L

300150

300150
G.F.L

450

450
L0-09 +0.45

7000
15500

1200
2000
2650

940
F.F.L
+0.45
D01 01
F.F.L SCALE 1:100
01 02 03 04 05 06 07 08 09

R47
03 03 +10.60 m

12025

0
+1.20
T.O.P
BL11

2700
L0-06 F.F.L
01 +0.45 400250 1340
3175

3
3650

2975

4150
BL11 - A0100.00 F.F.L
NOTES:

2500

2500
2690 23600

5100
W01 4

7280

4600

4600
4700
04 04
D02
S4

1600

1600
A0402.00

2200
4500
8955 2025 2735 2000 2490 2000 3675 4
+0.45 +6.00 m
2730
3175

1 3
2000
2955
29100

29100
F.F.L T.O.S.

600

600
+0.45 (DRY MIX) 1
D01

1400
F.F.L +5.00 m

1250

1000

1000
4

10600

10600
T.O.S.

450
05 D01 D01 05 +4.20 m 20X40 CM 2
D01 3

1220 250

250

800

800
T.O.S. 3
4

1800
750
W02
1720

(DRY MIX) 3

2450
3
2500 L0-06 3
ELEV 2 ELEV 4

5900

5900

5900

5900
D04 D04 D04 D04

1000
D03 3 (DRY MIX) 4

4000
BL11 - A0100.00
4500

4500
BL11 - A0100.00

4000

5100

5100
960

W01 5250 2500 12600

3750

3750
3
3
5575
5820

2800

3000
+0.30

2200
F.F.L
3855

+0.45 m
L0-05 +0.30 m
F.F.L
2825

3575
3140

+0.00 m
06 06 F.F.L

300150

300150
400
G.F.L

450
1300 6580

300
1175

1175
+0.30
07 F.F.L
07 02 SCALE 1:100
1600 120

3800 250 4000 400 3800 400 4000


J H G F E D C B A

4600
3800
+10.60 m +10.60 m
1600

11850
2825

2825
02 T.O.P T.O.P
BL11 - A0100.00 0.00 +0.30
G.F.L F.F.L L0-03
1160

4600

4600

1160

3
08 08

2500

2500
400

4100
4
1600

4600

4600
1600

L0-04

1000 600
1600

1600
4350

4350
4000

4250
1200

+0.30
1695

+6.00 m +6.00 m
F.F.L
2445

T.O.S. T.O.S.

800 600
640
12600
+5.00 m +5.00 m

1000

1000
750 2100 6900 2100 750

10600

10600
2501000

T.O.S. 3 T.O.S.
09 09 4

3150
+4.20 m +4.20 m
450

450
250

800

800
T.O.S. 3 T.O.S.

3210
0.00
3690 8250 1000 2100 1110 4760 1035 2100 1000325 1185 800 585395 800 395 3
G.F.L
3

6500

5900
805 3090 4495 3750 3175 1175 4000 4075 3175 1790

5100
3750

3750
2600
1900
29530
+0.45 m 4 +0.45 m
+0.30 m +0.30 m
+0.00 m F.F.L F.F.L
F.F.L F.F.L

300150

300150
01

750

750
SCALE 1:100 G.F.L
A B C D E F ELEV 1 G H J
BL11 - A0100.00
03 SCALE 1:100

A B C D ELEV 3 J 09 08 08 06 05 04 03 02 01
+10.60 m +10.60 m
BL11 - A0100.00
T.O.P T.O.P
29530

3
805 3090 4495 3750 3175 1175 4000 4075 3175 1790

2500

2500
REVISIONS:
600 3090 4400 3850 16000 1590 4 NO DATE MODIFICATIONS

4600

4600
ISSUED FOR TENDER

900

900
R0 DEC.2014
01 01

1600
200

200

R1 FEB.2015 ISSUED FOR TENDER


3600 15500 +6.00 m +6.00 m

1300
3
T.O.S. T.O.S.

600
3325

+5.00 m S3 +5.00 m
2925
3175

3175

1000

1000
2100
10600

10600
T.O.S. T.O.S.

1500
4500

A0402.00 1
+4.20 m +4.20 m

800

800
T.O.S. T.O.S.
02 02

1000
3

7200
3 3
3 3

5900

5900

5900
1

3750
3900

4400

2800
5925

+0.45 m 4 +0.45 m
6075

6075

+0.30 m +0.30 m
+5.00 +0.00 m F.F.L F.F.L
F.F.L F.F.L

300150
T.O.S. G.F.L

600
300
2925 9650 2925 1340
OWNER:
04
7000
15500
9650

6500

SCALE 1:100

A B C D E F G H J
+10.60 m
T.O.P
12030

2835 7995
+5.00
01 T.O.S.
21175
3175

2500

2500

2500
3650

BL11 - A0100.00

2500
+4.20
5100

4600

4600
T.O.S.

500 1000 600

1000 400

1000 400
1600

1600
15500 MAIN CONSULTANT:
4500

+6.00 m
+6.00 T.O.S.
3175

500
600

640

640
2925
2955

T.O.S.
29100

29100

1500

1500

1500
+5.00 m

1000

1000
9950
900
10600

10600
880

860
T.O.S.
1250

+4.20 m
05 05

2480
800

800
T.O.S.

500

1650

1500
650

3700
5900

5860
ELEV 2

4250
ELEV 4

1300
4550

3000
3200
4300
4000

BL11 - A0100.00
3935
4500

4500

BL11 - A0100.00
3750

2200
2600
2850
+1.20 m
5820

900
F.F.L
+0.45 m

750
+0.30 m
3855

750
600
+0.00 m F.F.L +0.00 m

300

300
F.F.L

150
DRAWING TITLE:
300150

G.F.L G.F.L

300
1175

1175

8000 3960 3960 3960


07 07 01 SCALE 1:100

A B C D E F G H J
4600
3935

+10.60 m +10.60 m
2825

2825

02 0.00 +0.30 T.O.P T.O.P


BL11 - A0100.00 G.F.L1 G.F.L1

2500

2500
7175

4100
4600

4600
4350

4350

1600

1600
3935

4250

+6.00 m +6.00 m
T.O.S. T.O.S.
800 600

600

640
1400

+5.00 m +5.00 m
1000

800 1000
09 09
10600

10600
2300

2300
T.O.S. T.O.S.
450

450
250

250

+4.20 m +4.20 m

2460
800

T.O.S. T.O.S.
0.00
3690 8250 4250 4675 4250 250 2575 1590

600

600
G.F.L1
1000

5450
805 3090 4495 3750 3175 1175 4000 4075 3175 1790 FEB. 2015 FEB. 2015 1023.1
4800
5100

1900
3750

3750
3900

3150

3150
29530
2850

2900

A0 R1
+0.45 m +0.45 m
+0.30 m +0.30 m

1500
+0.00 m F.F.L F.F.L
F.F.L F.F.L
300150

300150
01 SCALE 1:100 A B C D ELEV 1
J G.F.L

57
300

BL11 - A0100.00
02
11.A.0100.00
SCALE 1:100
58
PROJECT

A A' B' C' D' J

+5.80 +5.80
DRAWING KEY: NORTH
2.00 3.00
T.O.P. T.O.P.

200

200
+4.90 +5.00
4.00 4.00 ROOF T.O.S

700
T.O.P.
+4.30
ROOF T.O.S

2500
3.00

1800

1800

1800
3.00 01
BL12 - A0100.00
ELEV 3

6100
A B C D E F G H J
BL12 - A0100.00
F

2000

2000

2000

2000
F F F F F F F F F F F F F F
-0.30

2500
31700
G.F.L.
+0.30 +0.30

500

300
Ground F.F.L Ground F.F.L 6150 4800 2400 2900 1900 2400 4800 6150

1100
1400

1400

900
600
01 01 BL12
-0.30 3.00 -0.30

1000

1000

1000
G.F.L G.F.L D08 D08 D08

3250
03 SCALE 1:100

1000

1000

1000
2950

2950

2950

3150
L0-06 L0-05 L0-09 D08 D08 D08
L0-13
2850 3050 4550 3950 950 4600

4750
4950

4950
1000

1000

1000
1900 D08 D08 D08 850
D07 900 1400 4450
D07 D09

350
D07
1600 7250 1650 1450 1000 +0.30 7300
D07 F.F.L. L0-10 L0-11

1550
L0-07 D06 D07

1550
L0-08

1650
1550
1500 1000 NOTES:

600
02 02

350
10150
D05 D04
1900
1 2 3 4 D03 2900 2950 L0-04 17700 5550

1600
+0.30 L0-03

1800
ELEV 2 F.F.L.

3700
3600

3250

3600
+5.80 +5.80 BL12 - A0100.00 D01
T.O.P. 3.00 2.00 T.O.P.
L0-02 1450

1500
L0-03 (DRY MIX) 1
200

15600
+5.00

16100

16100
1250
+4.90 D04
900

900
T.O.P. ROOF T.O.S -0.30 350
+4.30 03 G.F.L. D02 03
ROOF T.O.S (DRY MIX) 2
600

600

R7
750 1400 4250 900 400

9
1800

00
L0-12 (DRY MIX) 3

36.3


3.00
1500

36.3
01


3.00 ELEV 4

10600
BL12 - A0100.00

1000

1000
W02 20X40 CM 4
6100

W02
4600

+0.30 BL12 - A0100.00

4100
4100
+0.30
F.F.L.
2000

F.F.L.
F F 3.00 29 °
+0.30
20CM 5
.74
2500

.9 F.F.L.
5° 35

7050
2300

2300
7350

7350
+0.30 20
L0-01 00 00
GROUND F.F.L 19 35.74°

600 600
1400

54

1200
00 50
53
18
00 00

1000

1000
W02 18 W02
-0.30
D01
4900
G.F.L 16
00 D01 00
04 4900 16 W03 W03 1600 600 2650
SCALE 1:100 +0.30 + 0.30

1650
F.F.L. F.F.L.
04 04
W01 W01 W01 W03 L0-14 W01 W01 W01

-0.30
-0.30
G.F.L.
G.F.L.
4 3 2 1
1150 600 600 1150 1150 600 600 1150
600 600 600 600 600 600
31700
2.00 3.00 +5.80
T.O.P. 31450
200 700

+4.90 +5.00
A A' B' C' D' J
900

T.O.P. ROOF T.O.S


+4.30 01 SCALE 1:100 ELEV 1
ROOF T.O.S
BL12 - A0100.00
1800

3.00 3.00
6100
5200
2000

F F

+0.30
GROUND F.F.L
600 600

1400
1200

-0.30
3.00 F.F.L
05 SCALE 1:100

REVISIONS:
J H G F E D C B A
NO DATE MODIFICATIONS
R0 Jan. 2015 Issue For Approval
2.00 +5.80
3.00 T.O.P. R1 FEB.2015 ISSUED FOR TENDER
200 700

+4.90 +5.00
800

T.O.P. ROOF T.O.S


+4.30
ROOF T.O.S

3.00
ELEV 3
A J
BL12 - A0100.00
6100
5300
5200

31700

6150 4800 2400 2900 1900 2400 4800 6150

+0.30 +0.30 +4.90


T.O.P.
GROUND F.F.L GROUND F.F.L 01 01

-0.30 -0.30
06
OWNER:
G.F.L SCALE 1:100 G.F.L

4950

4950
16050
+5.80
A B C D E F G H J T.O.P.
02 02

+5.80

3700

3700
3600

3600
T.O.P.
+5.00
MAIN CONSULTANT:
+4.90
800

900

ROOF T.O.S
1200

T.O.P.

16100

16100
+4.30
ROOF T.O.S
600

1000

2100
900

900
1300

1300
1750

30.8


36.3
700
6100

6100

ELEV 2


4500

ELEV 4
3800

+4.90 +5.00 + 4.30


4900

BL12 - A0100.00
3450

T.O.P. T.O.S T.O.S


2000

2000

2000
1100

BL12 - A0100.00
2900

2200

+0.30 +0.30
950

35
7350

7350
°
GROUND F.F.L GROUND F.F.L .74 .74
500

500

600 500

° 35

35.74° 52
50 50
-0.30 -0.30 52 DRAWING TITLE:
G.F.L G.F.L

0
75
R7

R7
07

80
SCALE 1:100

0
+4.90
T.O.P.
04 04
5300 5300

1 2 3 4
31450

+5.80
T.O.P.
+5.00
+4.90 A A' B' ELEV 1 C' D' J
800

T.O.P. ROOF T.O.S 02 SCALE 1:100


1500

+4.30 BL12 - A0100.00


ROOF T.O.S
600

3000
1000

2000
950
6100

4500
3850

3450

3450
4600

2000

2000
2900
1900

FEB. 2015 FEB. 2015 1023.1


+0.30
GROUND F.F.L
500

500

A0 R1
-0.30
F.F.L

08 SCALE 1:100
12.A.0100.00

59
60
Schlumberger Egypt Workshops Project

Client : Schlumberger Egypt


Location : industrial zone - 6th of October city - Egypt
Leed Consultant : EHAF
Scope of Work : Design Development - Developing Working
Drawings - Coordination - Respond to RFIs.
62
63
64
65
66
67
68
69
70
71
72
73
PROJECT:
A B A C D' D E F G ELV 03 H I J K
BL05-A0400.01 BL05-A0300.02 EGYPT INTEGRATION PROJECT
62875

6000 6000 5900 100 6000 2100 4900 1900 3000 2100 12000 12000
LAYOUT
200 175
900 5000 1000 5000 1000 5000 1000 5000 1300 1000 225 4650 380 4390 380 1000 1800 10000 2000 10000 1475
10050
1 1
450

450
650
± 0.00
ROAD LEVEL WASTE OIL STORAGE NEW OIL BULK STORAGE
POLYURETHANE WITH HARDENER,
3750
3300

3100

3298
3750
L0-19 L0-20

3423
ANTI-SLIP ANTI-OIL ON CONCRETE RAMP

+ 0.15 + 0.15
F.F.L F.F.L

325
4795 200 4795
2 + 0.15
2
625

145 405 1000 200


F.F.L 2900 3500

600
1360
D
1000

IT HUB

1500

1475
9973
1655
L0-17
+ 0.15 1360 780 1360 750 2050
L0-17 F.F.L

2700
750

800

800
BATTERY STORAGE & CHARGING L0-18B
2900
L0-16
8
MALE TOILET ± 0.00

1000
2045
6100

6100
1800

1800
RAIN LEADER

3050
7

5800

5800

5800
+ 0.15

1000
6 ROAD LEVEL
POLYURETHANE WITH HARDENER, ± 0.00 D
F.F.L 300 5 L0-18 BOLLARDS OF HEIGHT POLYURETHANE WITH HARDENER, RAIN LEADER
BOLLARDS OF HEIGHT BOLLARDS OF HEIGHT ROAD LEVEL FEMALE TOILET L0-16
4 150MM & DIAMETER 150MM

2000
ANTI-SLIP ANTI-OIL ON CONCRETE RAMP ANTI-SLIP ANTI-OIL ON CONCRETE RAMP

300

800

800
W

100
150MM & DIAMETER 150MM 150MM & DIAMETER 150MM 3
L0-18A
L0-15 2
300 700 1050

2900 1

1700
W
+ 0.15 25200 5475

1800
L0-15
26400 KEY PLAN

UP

1700
F.F.L 2800
1500

1500
1390

1100
D D D D D D
L0-01B L0-02B L0-03F L0-03E 205 1000 1595 L0-21F L0-21E
D D D D D

3 3
3
400

400
L0-03D L0-15 ST-02A L0-18 L0-21G

1000
+ 0.15 STAIRCASE A

1800

500
F.F.L
ST-02
700 5000 1000 5000 1000 5000 1000 5000 1300 1000 600 1000 4205 1000 600 1000 1995 1000

1000
26200 10000 D D
L0-14 L0-21D
D
4 2

820
+ 0.15 L0-22
W 100 + 0.15
F.F.L F.F.L
5300

L0-13
1200 420 1000 B B
900 1000 1665 1200 1665

3020

5750
1200
2520
W
100 PANTRY

2700
L0-14

2500
STORES

3950
ELECTRICAL 2000 L0-14

3600
OFS SERVICE PIT

900
L0-22 L0-13
+ 0.15 + 0.15
L0-01 F.H.C 2
F.F.L F.F.L + 0.15 A

1430
D

1250

1250

1200 265 1000 405 1230


900

900
F.F.L
4 - 0.85 4 L0-13 350
6730 2370
4 4
1000

3 3 1
2 2 - 0.85

635

1200 265 1000 205

1200 265 1000 205


1 1
UP

UP

OFFICE 1 OFFICE 2

1200 265 1000


D D
L0-11 L0-12

L0-11 L0-12

3200

3200

3400
GENERAL NOTES:
Slope 1:100

Slope 1:100

W
REW WSV L0-11 + 0.15 + 0.15 W
L0-12
F.F.L F.F.L
L0-02 L0-03 4700 4700
5 5

530 530

530 530
1260

1260
40975

D D
TRENCH 20X1X1 TRENCH 20X1X1 L0-10A L0-10B

1800

1800

1800

1800
COVERED WITH DH COVERED WITH DH
CI COVES CI COVES
MECHANICS CLEAN ROOM
ELV 02

4900

5100
+ 0.15 + 0.15
BL05-A0300.01 F.F.L F.F.L L0-10

1070

1070

1070

1070
+ 0.15 ELV 04
F.F.L
W W BL05-A0300.02
SUMP PIT SUMP PIT WIS WORKSHOP
30000

1200

1200150 300 1200

300 1200

1200
L0-10A L0-10B

1*1*1.5 M 1*1*1.5 M
COVERED WITH DH CI COVERED WITH DH CI L0-21
6 6

41041
20000

18000

COVES COVES
650

650
200

30600
1200 150
- 2.73
- 2.73
31000

30600

39000
BOTTOM LEVEL OF SUMP PIT + 0.15
1200

1200
BOTTOM LEVEL OF SUMP PIT W W
L0-09A F.F.L
B
L0-09B
10 TON CRANE B

29000
BL05-A0400.01 9600 7.5M HH BL05-A0400.01
ELECTRONICS LAB
1220

1220

1220

1220
+ 0.15
4900

5100
SLIDING SLIDING NO. DATE MODIFICATIONS
CHECHERED PLATE CHECHERED PLATE
L0-09 F.F.L
+ 0.15
1800

1800

1800

1800
F.F.L
D D
L0-09A L0-09B

7 7
1325 175 1000 200 530

1325 175 1000 200 530


930

930
9600
D
6 NOS HOTDESK D
1200 300 1000 400 1125 375 1000

1000
Slope 1:100

Slope 1:100

L0-08A L0-08B

L0-08
2700

2900
F.H.C 3
F.H.C 1 R0 MAR - 2015 ISSUED FOR CONTRACT
+ 0.15

375
1000

1200 300 1000 400 1125


900

LEVEL OF TRENCH FROM LEVEL OF TRENCH FROM 350 F.F.L 8900 REVISIONS:
350
8 -1.15 TO -1.23 -1.15 TO -1.23
8
300 1200 300 1000 200

300 1200 300 1000 200


1000 1000 OWNER:
- 0.85 D WSV FOREMAN WIS FOREMAN D
- 0.85 L0-06 L0-07

10 TON CRANE L0-06 L0-07


3000

3000

3200
7.5M HH
UP

UP
UP

UP

1 1 + 0.15 + 0.15
F.F.L
1000

2 2 W F.F.L W
3 3 L0-06 4700 4700 L0-07
4 4

9 9
+ 0.15 + 0.15
1630

1130

F.F.L F.F.L MAIN CONSULTANT:

LUBRICANTS TIRE SHOP


1800

1800
5300

L0-04 L0-05
5250

4550
4950
4750

D
L0-04 + 0.15 + 0.15
26200 F.F.L F.F.L
26275
1820

1171
700 5000 1000 5000 1000 5000 1000 5000 1000 33011330 4700 4700 245 1000 1755 10000 2000 10000
1820

10 2550 1800 350 10 DRAWING TITLE:

MECHANICS SHOP - BL05 -


D
D D L0-21A
L0-03C D
ARCHITECTURAL PLANS GROUND
D D D D L0-05 D
L0-01A L0-02A L0-03A L0-03B L0-21B L0-21C
2000

2000

24100 15300
+ 0.15
22200 5475
FLOOR - OVER ALL
RAIN LEADER F.F.L RAIN LEADER
BOLLARDS OF HEIGHT ± 0.00 BOLLARDS OF HEIGHT BOLLARDS OF HEIGHT
150MM & DIAMETER 150MM 1m X 2.2m EMERGENCY DOOR
ROAD LEVEL 150MM & DIAMETER 150MM 1m X 2.2m EMERGENCY DOOR 150MM & DIAMETER 150MM
+ 0.15 DESIGNED BY:
POLYURETHANE WITH HARDENER, UP
POLYURETHANE WITH HARDENER,
ANTI-SLIP ANTI-OIL ON CONCRETE RAMP F.F.L ± 0.00
1 2 3 4 5 6 7
ROAD LEVEL ANTI-SLIP ANTI-OIL ON CONCRETE RAMP ENG. SHAIMAA FAHMY
STAIR
CHECKED BY:
ST-01
POLYURETHANE WITH HARDENER, POLYURETHANE WITH HARDENER, ENG. NERMINE ELBITAR
+ 0.15 ANTI-SLIP ANTI-OIL ON CONCRETE PLAT FORM ANTI-SLIP ANTI-OIL ON CONCRETE PLAT FORM
F.F.L APPROVED BY:

ENG. SHERIF ELABD


900 5000 1000 5000 1000 5000 1000 5000 1171 1000 7979 1800 795 1000 1755 10000 2000 11475 DATE DRAWN: PLOT DATE: PROJECT NO.

6000 6000 6000 6000 14000 12000 12000 JAN - 2014 MARCH - 2015 1011
SCALE: SIZE: REVISION:
62875
1:100 A1 R0
A B A C D' D E F G ELV 01 H I J GROUND FLOOR PLAN K
BL05-A0400.01 BL05-A0300.01 01 SCALE 1:100
DRAWING NUMBER:

74
BL05-A0200.00
PROJECT:

EGYPT INTEGRATION PROJECT

LAYOUT

A B C D' D E F G H I J K

TRANSLUCENT LATERAL TRANSLUCENT LATERAL


TRANSLUCENT LATERAL SKYLIGHT PANELS WITH SKYLIGHT PANELS WITH
SKYLIGHT PANELS HEIGHT OF 1000MM HEIGHT OF 1000MM
01 ROOF SKYLIGHT 02 03 EXPANSION JOINT ROOF SKYLIGHT 01 ROOF SKYLIGHT 03 02 01
+11.85 WITH HEIGHT OF 1000MM +11.85
MID-SPAN LEVEL MID-SPAN LEVEL
1250

150 1250

150 1250

1200 150 1250

1200 150 1250

150 1250

150 1250

1250
+10.60 +10.60

1400

1400
EAVE LEVEL EAVE LEVEL

+9.25
T.O.P

5200
2500

2500

2500

2500

2500
+8.25

3800
T.O.S
300 1000

300 1000

300 1000

300 1000

300 1000
02
11850

11850
STEEL HANDRAIL

6900
KEY PLAN
Painted with epoxy 03
10450

10600
+4.25

900
3
F.F.L

9250
4300

4300
03 03 STEEL STAIR 03
A
Painted with epoxy
RAIN RAIN
03
6500

6500

6500

6500

6500

6500
LEADER LEADER
04 +2.36

900
F.F.L
4 2

70
700
B B
+1.88

70
F.F.L

2200

2200

2200

400 960
04 04 04 04
+0.15 +0.15
F.F.L F.F.L
150

150
GROOVE IN A
±0.00 GROOVE IN BOLLARDS OF HEIGHT GROOVE IN PLASTER GROOVE IN ±0.00
F.F.L 03 PLASTER 75 MM & DIAMETER 150MM 05 PLASTER 05 70X10mm PLASTER 05 F.F.L
70X10mm 70X10mm BOLLARDS OF HEIGHT 70X10mm 1
75 MM & DIAMETER 150MM
To storm water net work To storm water net work
ELEVATION 01
01 SCALE 1:100
GENERAL NOTES:

1 2 3 4 5 6 7 8 9 10
ELEVATION FINISHES

01 CORRUGATED SHEET WITH INSULATION


NO. DATE MODIFICATIONS
CAPPING 02 LATERAL CLADDING OF CORRUGATED
+11.85 +11.85 SHEET 0.5 MM THICKNESS
MID-SPAN LEVEL 01 MID-SPAN LEVEL WASHABLE EMULSION PLASTIC
RAIN GUTTER RAIN GUTTER 03
02 01 02 PAINT ON PLASTER (LIGHT COLOR)
SLOPE 0.5% SLOPE 0.5%
WASHABLE EMULSION PLASTIC
1250

1250
+10.60 +10.60 04
PAINT ON PLASTER (DARK COLOR)
EAVE LEVEL EAVE LEVEL
05 400 MM GRANITE SKIRTING
1350

03 +9.25
T.O.P

+8.25 R0 MAR - 2015 ISSUED FOR CONTRACT


1000

1000

1000

T.O.S
8700
REVISIONS:

OWNER:
4850

RAIN LEADER RAIN LEADER


4000

4000
11850

11850
6900

10450
5900

+4.25 +4.25
F.F.L 03 F.F.L

STEEL HANDRAIL
Painted with epoxy MAIN CONSULTANT:
1200

1200

+2.36
03 03 03 F.F.L

900
02
4250

700

3000
2900

2900

+1.88
03
2200

F.F.L

1905
04 04
1500

+0.15 +0.15
F.F.L F.F.L
DRAWING TITLE:
150
150

150
±0.00
GROOVE IN
PLASTER
GROOVE IN
PLASTER
GROOVE IN
PLASTER STEEL STAIR F.F.L
MECHANICS SHOP - BL05 -
F.F.L 05
To storm water net work
70X10mm 03 05 70X10mm
CMU WALLS 3m HEIGHT 05 70X10mm 03 Painted with epoxy
To storm water net work
±0.00 ARCHITECTURAL ELEVATIONS -
ELEVATION (01) AND (02)
ELEVATION 02
02 SCALE 1:100

DESIGNED BY:

ENG. DOAA ABU BAKR


CHECKED BY:

ENG. NERMINE ELBITAR


APPROVED BY:

ENG. SHERIF ELABD


DATE DRAWN: PLOT DATE: PROJECT NO.
JAN - 2014 MARCH - 2015 1011
SCALE: SIZE: REVISION:
1:100 A1 R0
DRAWING NUMBER:

BL05-A0300.01
75
PROJECT:

EGYPT INTEGRATION PROJECT

1 2 3 4 5 6 7 8 9 10 LAYOUT

CAPPING
+11.85 CORRUGATED SHEET +11.85 CORRUGATED SHEET +11.85
MID-SPAN LEVEL 0.5 mm THICKNESS MID-SPAN LEVEL WITH INSULATION MID-SPAN LEVEL
RAIN GUTTER RAIN GUTTER
SLOPE 0.05% SLOPE 0.05%

1250

1250
+10.60 +10.60
EAVE LEVEL EAVE LEVEL

2115
+9.25

4060
04

1850
T.O.P

2350
RAIN LEADER

5400

5400

5400

5400

5400
1485
+8.25
T.O.S
LATERAL CLADDING
LATERAL CLADDING
OF CORRUGATED
OF CORRUGATED
SHEET 0.5 MMTHICKNESS
SHEET 0.5 MMTHICKNESS

1340
10 TON CRANE

5000

5000

5000
7.5 M HOOK HEIGHT STEEL HANDRAIL

4500
4000

4000
1200
11850

11850
1200

1200

1200

1200

1200
6900
RAIN LEADER
+4.25 +4.25

900
F.F.L F.F.L
KEY PLAN

2900

2900

2900

2900

2900

2900

1445
1200

1200

1200
STEEL HANDRAIL

1900
CMU WALLS 3
CMU WALLS

700
+1.88

175 900
A

02
4100

4100
F.F.L

700
2500

1200

1200

1200
2900

2200 STEEL STAIR

2200

2200

2200

2200

2200
04

1730
1500
4 2
+0.15

1000

1000

1000
SLIDING
F.F.L
400

CHECHERED PLATE B B
150
150

150
1000
±0.00 -1.23
F.F.L
GROOVE IN F.F.L

300
05 -200mm skirting cement mortar base SLOPE 1:100 SLOPE 1:100 -200mm skirting cement mortar base
- 0.85 PLASTER
with epoxy paint with epoxy paint
70X10mm
-epoxy coating (with hardener) -epoxy coating (with hardener)

1500
-reinforced concrete - 2.73 A
-reinforced concrete
-50 mm screed for protection BOTTOM LEVEL OF SUMP PIT -50 mm screed for protection
-3 coats of hot oxidize bitumen. -3 coats of hot oxidize bitumen. 1

-plain concrete 100mm COVERED WITH DH COVERED WITH DH CI -plain concrete 100mm
CI COVES COVERS EPOXY PAINT WITH HARDENER,
-compacted sand. -compacted sand.
ANTI-SLIP ANTI-OIL
ON CONCRETE PIT
SECTION A-A SUMP PIT

01 SCALE 1:100
1*1*1.5 M
GENERAL NOTES:

NO. DATE MODIFICATIONS

A B C D E F G H I J k

CORRUGATED SHEET WITH CORRUGATED SHEET WITH


INSULATION INSULATION
+11.85 +11.85 +11.85
MID-SPAN LEVEL MID-SPAN LEVEL MID-SPAN LEVEL
1250

1250

1250

1250
+10.60 +10.60
EAVE LEVEL EAVE LEVEL
R0 MAR - 2015 ISSUED FOR CONTRACT

REVISIONS:

3600
CORRUGATED CORRUGATED
5200

5200

5200

5200
SHEET 0.5 mm SHEET 0.5 mm OWNER:
THICKNESS +8.25 THICKNESS
T.O.S
LATERAL CLADDING LATERAL CLADDING
OF CORRUGATED OF CORRUGATED
1100

1100
SHEET 0.5 MMTHICKNESS SHEET 0.5 MMTHICKNESS
1800

1800
7450

7450
WSV OPEN PLAN OFFICE WIS
11700

11700
1200

1200
2900

2900

REW WSV L1-09 L1-01 L1-07 WIS WORKSHOP MAIN CONSULTANT:


OFS SERVICE PIT
10450

10450
L0-01 L0-02 L0-03 +4.25 L0-21
F.F.L
8100

1100 100
2900

2900
1200
6500

6500

6500

6500
700

CMU WALLS CMU WALLS


DRAWING TITLE:
MECHANICS WORKSHOP - BL05 -
1200

1200

ELECTRONICS LAB
3000

3000
2900

2200

+0.15
SLIDING SLIDING L0-09
+0.15
ARCHITECTURAL PLANS -
1000

1000

CHECHERED PLATE CHECHERED PLATE


SECTIONS - SECTION A-A &
750

750

750
F.F.L F.F.L

SECTION B-B
1000

1000

±0.00 ±0.00
300

300

F.F.L F.F.L
PIT COVER BOLLARDS OF HEIGHT -200mm skirting cement mortar base with BOLLARDS OF HEIGHT -200mm skirting cement mortar base with
80

-0.85 75 MM & DIAMETER 150MM 75 MM & DIAMETER 150MM BOLLARDS OF HEIGHT


epoxy paint epoxy paint DESIGNED BY:
80

F.F.L COVERED WITH DH CI COVERED WITH DH CI 75 MM & DIAMETER 150MM


-epoxy coating (with hardener) -epoxy coating (with hardener)
1500

1500

PIT COVER COVERS COVERS


-2.73
BOTTOM LEVEL OF SUMP PIT
-reinforced concrete -reinforced concrete ENG. DOAA ABU BAKR
-50 mm screed for protection -50 mm screed for protection
-3 coats of hot oxidize bitumen. -3 coats of hot oxidize bitumen. CHECKED BY:
SUMP PIT SUMP PIT -plain concrete 100mm -plain concrete 100mm
1*1*1.5 M 1*1*1.5 M -compacted sand. -compacted sand. ENG. NERMINE ELBITAR
APPROVED BY:

SECTION B-B ENG. SHERIF ELABD


02 SCALE 1:100 DATE DRAWN: PLOT DATE: PROJECT NO.
JAN - 2014 MARCH - 2015 1011
SCALE: SIZE: REVISION:
1:100 A1 R0
DRAWING NUMBER:

BL05-A0400.00

76
77
78
79
Greater Cairo Metro Line 4 Workshops Project

Client : NAT ( Nationla Authority for Tunnels )


Leed Consultant : EHAF
Scope of Work : Design Development - Developing Working
Drawings - Coordination - Respond to RFIs.
81
CM4P1 - DD - DR - WED - S18 - WAR - 503125- JDC - S01 DRAWING NUMBER
ELEVATION FINISHES

01 External Rough Paint on Plaster


(Dark Color)

External Smooth Paint on Plaster


02
(Light Color)

03 Granite Skirting (400 mm Height)

04 G.R.C Screen

05 GLASS BRICK

06 External Rough Paint on G.R.C


(Dark Color)

External Smooth Paint on G.R.C

PART 1
PART 2
07
(Light Color)

08 P.V.C. WINDOW CLEAR GLASS

38 37 36 35 34 33 32 31 30' 30 29 28 27 26 25 24 23 22 21 20 19' 19 18 17 16 15 14 13 12 11 10' 10 09 08 07 06 05 04 03 02 01

E.J E.J E.J


+ 14.00 + 14.00
T.O.P T.O.P
14000

14000
±0.00 ±0.00
GROUND F.F.L GROUND F.F.L

ELEVATION 4
01 SCALE 1:400

38 37 36 35 34 33 32 31 30' 30 29 28 27 26 25 24 23 22 21 20 19'

STEEL LADDER STEEL LADDER STEEL LADDER


E.J
07
06 08 06 07 06 08 07
+ 14.00 05 07 06
T.O.P
300

300

300
4400

4400

4400
3800

3800

3800
FAN 700 x700 mm FAN 700 x700 mm

300
300

300
1200

1200

900 1200

1200

1200
300

300
300
14000

4100

3800
2800
AIR LOUVER AIR LOUVER

300
7700
8400

6600

300
300

COMPRESSOR UNIT
4000

4000

4000
±0.00 F F F F F F F F F
500

GROUND F.F.L
400

400

03 01 03 02 01 03 03 01 01 03 02
02 07 05 05 01 01 03 01
COMPRESSOR UNIT

ELEVATION 4 (PART 1)
02 SCALE 1:200

19' 19 18 17 16 15 14 13 12 11 10' 10 09 08 07 06 05 04 03 02 01

STEEL LADDER STEEL LADDER


E.J E.J

07 08 07 08 07 06
05 + 14.00
06 06 06
T.O.P
300

300

300

300
4400

4400
3800

3800

3800

3800
FAN 700 x700 mm FAN 700 x700 mm
FAN 700 x700 mm
300

300

300

300
900 1200
1200

1200

1200

1200

1200

1200
300
300

300

300

14000
3800

3800
400 2800
AIR LOUVER AIR LOUVER
5300

5600

8400
300

300
COMPRESSOR UNIT COMPRESSOR UNIT
2100 300

4300
4000

4000
2500
F F F F F F F F F F
±0.00
F F F F F F F F F F GROUND F.F.L

- 0.10
400

02 01 03 03 01 07 02 01 F.F.L
01 07 02 01 07 07 07
COMPRESSOR UNIT

ELEVATION 4 (PART 2)
03 SCALE 1:200

KEY PLAN: LAYOUT:


NATIONAL AUTHORITY FOR TUNNELS
4
--

GREATER CAIRO METRO- LINE No. 4 PROJECT PHASE(1)


SCALE TITLE MAIN WORKSHOP
AS SHAWN BUILDING 03 - ARCHITECTURAL ELEVATIONS
(ALL LEVELS) SHEET-03
ELEVATION 4

NOTES : DRAWING CM4P1 - DD - DR - WED - S18 - WAR - 503125- JDC - S01


DATE REVISION DESCRIPTION DRAWN BY CHECKED BY APPROVED BY 01- LEVEL ±0.00=(+ 81.00) NUMBER
TD_CV_ST_***_***.dwg

82
83
CM4P1 - DD - DR - WED - S18 - WAR - 501101 - JDC - S01 DRAWING NUMBER
ROOM FLOOR SKIRTING Wall CEILING

GR 01 PORCELAIN TILES 100mm CEMENT PLASTER 20-25(mm) GYPSUM TILES


CLASS ROOM 500*500mm PORCELAIN COATED WITH PAINTS 600*600mm

GR 02 PORCELAIN TILES 100mm CEMENT PLASTER 20-25(mm) GYPSUM TILES


CLASS ROOM 500*500mm PORCELAIN COATED WITH PAINTS 600*600mm

GR 03 CERAMIC TILES 100mm CEMENT PLASTER 20-25(mm) GYPSUM TILES


STAFF LOCKER 500*500mm CERAMIC COATED WITH PAINTS 600*600mm

GR 04 CERAMIC TILES ----------- CERAMIC TILES FIBER CEMENT BOARD


KITCHEN 200*200mm 200*200mm WITH V.P

GR 05 CERAMIC TILES ----------- CERAMIC TILES FIBER CEMENT BOARD


MALE TOILETS 200*200mm 200*200mm WITH V.P

GR 06 CERAMIC TILES CERAMIC TILES FIBER CEMENT BOARD


-----------
FEMALE TOILETS 200*200mm 200*200mm WITH V.P

GR 07 CERAMIC TILES ----------- CERAMIC TILES FIBER CEMENT BOARD


ABLUTION 200*200mm 200*200mm WITH V.P

1 2 3 4 5 6 7 8
GR 08 P.V.C .TILES 100mm P.V.C CEMENT PLASTER 20-25(mm) GYPSUM TILES
3 B WORKER ROOM 500*500mm COATED WITH PAINTS 600*600mm

501106 501107 GR 09 CARPET ON CERAMIC 100mm CEMENT PLASTER 20-25(mm) GYPSUM TILES
PRAY ROOM TILES 500*500MM CERAMIC COATED WITH PAINTS 600*600mm

GR 10 GRANITE TILES 100mm CEMENT PLASTER 20-25(mm) GYPSUM TILES


50000 CORRIDOR 500*500mm GRANITE COATED WITH PAINTS 600*600mm

GR 11 GLASS PARTITION -----------


REPLACEMENT SOIL CEMENT TILES
LIGHT COURT
7000 7000 7000 7000 7000 7000 7000
GR 12 CERAMIC TILES 100mm CEMENT PLASTER 20-25(mm) GYPSUM TILES
COPY ROOM 500*500mm CERAMIC COATED WITH PAINTS 600*600mm

500 1100 1800 1700 1800 1700 1800 1700 1800 1700 1800 1700 1800 2950 1000 1200 1000 6000 1850 1700 1800 1700 1800 1700 1800 1700 1800 1100 GR 13
REPLACEMENT SOIL CEMENT TILES GLASS PARTITION -----------
LIGHT COURT
300 300 300 300 300 300 300 300 300 300 300 300 300 300 GR 14 CERAMIC TILES 100mm CEMENT PLASTER 20-25(mm) GYPSUM TILES
800 5300 1100 5300 1100 5300 1100 5300 1100 5300 1100 5300 1100 5300 800 STORAGE 500*500mm CERAMIC COATED WITH PAINTS 600*600mm

GR 15 PORCELAIN TILES 100mm CEMENT PLASTER 20-25(mm) GYPSUM TILES


INTERLOCK MEDICAL AFFAIR 500*500mm PORCELAIN COATED WITH PAINTS 600*600mm
INTERLOCK
GR 16 PORCELAIN TILES 100mm CEMENT PLASTER 20-25(mm) GYPSUM TILES
GENERAL MANAGER 500*500mm PORCELAIN COATED WITH PAINTS 600*600mm

GR 17 PORCELAIN TILES 100mm GYPSUM TILES


2 1 2 OFFICE ROOM 500*500mm PORCELAIN
CEMENT PLASTER 20-25(mm)
COATED WITH PAINTS 600*600mm
501117 501116 501116 GR 18 PORCELAIN TILES 100mm CEMENT PLASTER 20-25(mm) GYPSUM TILES
OFFICE ROOM 500*500mm PORCELAIN COATED WITH PAINTS 600*600mm

W W GR 19 PORCELAIN TILES 100mm CEMENT PLASTER 20-25(mm) GYPSUM TILES


X 622772.715 X 622752.016 OFFICE ROOM 500*500mm PORCELAIN COATED WITH PAINTS 600*600mm
W W W W GR05 GR06 W W W

A Y 809141.335 GR01A GR01B W


GR02B
W
GR02A
GR03 GR04 GR08 W
GR09A
W
GR09B
GR09C GR09D Y 809185.749
A GR 20
ENTRANCE HALL
GRANITE TILES
500*500mm
100mm
GRANITE
CEMENT PLASTER 20-25(mm)
COATED WITH PAINTS
GYPSUM TILES
600*600mm
600

600
300

300

300
300
ST01 Granite 40mm for Tread 100mm

300
GRANITE TREAD WITH CEMENT PLASTER 20-25(mm) -----------
250 200 GRANITE RISER STAIRCASE and 20mm for Riser GRANITE COATED WITH PAINTS
800 1800 1700 1800 750 550 1800 1700 1800 550 750 1800 1250 1800 650 2100 1000 500 1000 1700 1300 1850 750 550 1800 1700 1800 450 653 1800 1700 1800 800 ST02 200mm MORTAR BASE WITH CEMENT PLASTER 20-25(mm)
EPOXY COATING -----------
200 200
D
GR05B
200 200 200 400 16 EMERGENCY STAIRCASE EPOXY PAINT COATED WITH PAINTS

3800
500102

3500
Class Room Class Room Staff Locker Kitchen Ablution Worker Room Pray Room

5100

5700
GR01 GR02 GR03 GR04 GR07 GR08 GR09 FINISHING SCHEDULE
2
5900
6000

6000
5600

5800

5700

5700

5700
300 200 200 200 200 200 200 200 ±0.00 SCALE N.T.S

5400

5400
200 300
5000

F.F.L 13850 02 01
6850 6800 3800 2700 3600 3200 2600 3900

5700
Male Toilet Female Toilet ±0.00 ±0.00

1100

1100
D
1 GR05 GR06 F.F.L F.F.L GR09B
400 200 100
501109 1000 1000 400 400 1000 ±0.00
5450 5200 2400 900 400 1300 500 1000 1800 300 300 1400 1000 500 300 900 1400 2500 1000 400 4800 1600 200 7250

200 1100
F.F.L

B D D D D F.H.C D D D D B
300

200

D
GR01 GR02 GR03 GR04 GR05A GR06 GR08 GR09A

11300
GR07
1200 300 14500 1000 23650 300 2250 200 1950
STAIRCASE
+ 1.825 39150
1800

1800
GRANITE TREAD WITH ST02

2400
GRANITE RISER F.F.L ±0.00 ±0.00 -0.20
E.P.S. F.F.L F.F.L CURB LEVEL
1 E.P.S.
200

1
5060

W 501124 3300 W
4800

-0.20

7600
501124

300
GR13A GR11A
4 CURB LEVEL Storage Copy Room
Corridor

1950
4250
6130

501106 GR14 Light Court GR12 + 2.38 + 1.27


2600

GR10 Light Court Edge Of Pavement UP 2

3150
GR13 Edge Of Pavement F.F.L F.F.L 501105
20200

20200
2150 1300
±0.00
4200

4200
8000

8400

3800

7800

7800

8000
W GR11

UP
GR13B
-0.30 ±0.00 -0.45 F.F.L W STAIRCASE
D -0.45

650 100 1100


ROAD LEVEL F.F.L F.F.L GR11B ST01

4050
GR12
F.F.L
300

D 1 -0.30
100 1100

A D 200
UP

200 200
1100

5400
GRST02
300 3850 300 1500 1700
GR14
3200
W
3300 3300
W
5750 300 1200 1900 1200 300 501108 ROAD LEVEL
501107 ±0.00 10500 GR13C 10500 GR11C
300

300
1800 200

F.F.L
740

2700

UP
Elec. Panels Closet

1200
1100 170

W
A

1800
GRST01
±0.00 ±0.00
200 1370

1950
D
1100

1200
±0.00 501107

150 1200
F.F.L 44800 F.F.L

300
GR10 D D

C D
GR15A
D D D D D D D
GRST01A F.F.L
C

600
GR15B GR16 GR17B GR17A GR18B GR18A GR19B GR19A

300
01 02
100

2600
D

2300
4800 1000 850 600 2000 1000 1900 1000 400 400 1000 4100 900 400 400 900 4200 900 400 400 900 4100 1000 400

2300
GRST01B

100
±0.00 ±0.00
F.F.L F.F.L
Entrance Hall
Medical Affair G.Manager Office Room Office Room Office Room D
5000

RAMP
5400

5398

5400

5900
GR20
6300

5700

5700

5700 GR20
6000

6000
1200

1600

1600
R02 GR15 GR16 GR17 GR18 GR19 -0.20

5550
±0.00 CURB LEVEL
F.F.L
GRANITE TREAD
300 10350 200 3300 200 6800 200 6800 200 6800 200 6700 300 WITH
±0.00 GRANITE RISER

1900
800 1800 1700 1800 1700 1800 750 750 1800 750 750 1800 1700 1800 750 750 1800 1700 1800 750 750 1800 1700 1800 750 750 1800 1700 1800 650

2000
F.F.L

2300
300

600 200 200 450 450 200 200 450 450 200 200 450
02

D D
300

300

300

300
300

300
600

01
W W W W W W W W W W W W
concrete ramp X 622790.843 GR15C GR15B GR15A GR16 GR17B GR17A GR18B GR18A GR19B GR19A GR20B GR20A X 622770.145
with polyurethane coating Y 809149.784 RAMP Y 809194.197
R01
-0.30 concrete ramp -0.20
ROAD LEVEL with polyurethane coating CURB LEVEL WS3
-0.20
501107
CURB LEVEL

300 300 300 300 300 300 300 300 300 300 300 300 -0.30
800 5300 1100 5300 1100 5300 1100 5300 1100 5300 1100 5300 650 ROAD LEVEL 7150

500 1100 1800 1700 1800 1700 1800 1700 1795 1705 1800 1700 1800 1700 1800 1700 1800 1700 1800 1700 1800 1700 1800 1700 1800 6150 1200 750

7000 7000 7000 7000 7000 7000 7000

49500

1 2 WS1 3 WS2 4 1 5 B 6 7 8
501107 501107 501105 501107

GROUND FLOOR PLAN


1 SCALE 1:100

KEY PLAN: LAYOUT:


NATIONAL AUTHORITY FOR TUNNELS
GREATER CAIRO METRO- LINE No. 4 PROJECT PHASE(1)
SCALE TITLE
1:100

NOTES : DRAWING CM4P1 - DD - DR - WED - S18 - WAR - 501101 - JDC - S01


DATE REVISION DESCRIPTION DRAWN BY CHECKED BY APPROVED BY 01- LEVEL ±0.00=(+ 81.00) NUMBER

84
TD_CV_ST_***_***.dwg
CM4P1 - DD - DR - WED - S18 - WAR - 501105 - JDC - S01 DRAWING NUMBER

1 2 3 4 5 6 7 8
+ 14.00 07
T.O.P
+ 13.60
T.O.S

1200 400
+ 12.40 07 07 + 12.40
T.O.P T.O.P

160 1150 300

160 1150 300

160 1150 300

160 1150 300

1150 300
+ 10.85 02 02 02 05 02 01 02 02 05 02 + 10.85
T.O.S T.O.S

2370

2370

2370
3490
+ 7.30 06 + 7.30

160 1120

160 1120

160 1120
2nd F.F.L 01 01 01 05 01 01 05 2nd F.F.L

160
14300

7460
12400

12400

12600
2370

2370

2370
3490
+ 3.65 + 3.65

160 1120

160 1120

160 1120
1st F.F.L 02 02 02 05 05 02 02 02 05 02 1st F.F.L

160
02 08

2370

2370

2370

3390
3190
08
Stainless Steel Stainless Steel
Handrail Handrail
± 0.00

400 820

400 820

400 820
01 01 03 01 01 03 ± 0.00
Ground F.F.L Ground F.F.L

400
200

200
- 0.30 - 0.30
Road Level Road Level

Elevation 1
1 SCALE 1:100

D C B A
+ 14.00 07 + 14.00
T.O.P T.O.P
+ 13.60 + 13.60
T.O.S T.O.S
1200 400

1600
+ 12.40 07 07 + 12.40
T.O.P T.O.P

1150 300

300

160 1180 300

160 1150 300


EXTERIOR FINISHES
+ 10.85 02 05 01 02 + 10.85
T.O.S T.O.S

2200
External Rough Paint on Plaster
01
(Dark Color)
01 External Smooth Paint on Plaster

1200
02

3490

3490
(Light Color)

+ 7.30 06 + 7.30
2nd F.F.L 01 05 02 2nd F.F.L 03 Granite Skirting (400 mm Height)

2450

160

160
14200

14200
7460

04 G.R.C Screen
12400

12600
1200

3490

3490
01
05 Groove 30 mm
+ 3.65 + 3.65
1st F.F.L 02 02 1st F.F.L
2450

06 Curtain Wall

160

400 160
490
02 08 02

07 Granite Capping
1200

3190
3390

08
Stainless Steel

2500
Handrail
08
400 1100

± 0.00
Ground F.F.L
03 ± 0.00
Ground F.F.L
08 Granite Cladding
400

200
300

- 0.30 - 0.30
Road Level Road Level

Elevation 2
2 SCALE 1:100

KEY PLAN: LAYOUT:


NATIONAL AUTHORITY FOR TUNNELS
GREATER CAIRO METRO- LINE No. 4 PROJECT PHASE(1)
SCALE TITLE
2
1:100

NOTES : DRAWING CM4P1 - DD - DR - WED - S18 - WAR - 501105 - JDC - S01


DATE REVISION DESCRIPTION DRAWN BY CHECKED BY APPROVED BY 1
01- LEVEL ±0.00=(+ 81.00) NUMBER

85
TD_CV_ST_***_***.dwg
CM4P1 - DD - DR - WED - S18 - WAR - 501107 - JDC - S01 DRAWING NUMBER

8 7 6 5 4 3 2 1
+ 14.00
T.O.P

1200 290 400

850

1600
+ 12.40 Paint On Cement Paint On Cement + 13.60
T.O.P Plaster Plaster STAIRCASE T.O.S

1200
2290
ST02

1250
+ 11.15

1550

1550

1550

1550

1550

800
+ 10.85 T.O.S
T.O.S

2600

2450
640
740

700

1400
890

1190

1190
1150
Corridor Copy Room Corridor Storage Corridor

3390
STAIRCASE STAIRCASE

3850
1200

1200

3600
3550

3350

1200

1200
ST01 2ND11 2ND12 2ND11 2ND13 2ND11 ST02

2250

2250
       

2750
2200

2200

2200
  Paint On Cement    Paint On Cement 

1300
+ 7.30 Plaster Plaster + 7.30

1000
2nd F.F.L 2nd F.F.L

400

400
2450

1190 260

2450

14000
640
740

700
890

1170

1200
1150
12400

3390
STAIRCASE Corridor Copy Room Corridor Server Room Corridor STAIRCASE
1200

1200
3650

3650
3400
3350

1200

1200
ST01 1ST11 1ST12 1ST11 1ST13 1ST11 ST02

2250

2250
       

2750

2220
2200

2200
 Paint On Cement    Paint On Cement  
1300

+ 3.65 Plaster Plaster + 3.65

1000
1st F.F.L 1st F.F.L

400

400
2450

Light Court Light Court

2150
1190 260
GR11 GR13

640
740

700

900
890

890

1190
1150
STAIRCASE Corridor Copy Room Corridor Storage Corridor STAIRCASE
1200

1200
3650

3650
3400
3350
ST01 GR10     GR12 GR10     GR14 GR10 ST02

2400

2400

2750
2500

2500

2500
2200

2200

2200
     
1300

1300

±0.00 ±0.00
- 0.30 Ground F.F.L Ground F.F.L - 0.30

250

250
ROAD LEVEL Cement Tiles Cement Tiles ROAD LEVEL
200x200mm 200x200mm

SECTION A-A D D
1 SCALE 1:100 + 12.40 Granite Cladding + 12.40 Granite Cladding
T.O.P T.O.P

100

100
1250

1250
1550

1550

1550

1550
1450

1450
+ 10.85 +10.85 + 10.85 +10.85 + 10.85
T.O.S T.O.S. T.O.S T.O.S. T.O.S

Smooth Paint
(Light Color)
Smooth Paint

640

640
Smooth Paint (Light Color) Venetian Blind
Venetian Blind Venetian Blind
(Light Color)
D C B A
Gypsum Tiles Gypsum Tiles Gypsum Tiles

2340

2340

2340

2340
600x600 mm 600x600 mm 600x600 mm
+ 14.00 + 14.00
T.O.P T.O.P CURTAIN WALL

3550

3550

3550

3550
Secretary G.Manger Lounge

3490

3490
2ND15 2ND17 2ND21

2750

2750
Granite Sill Granite Sill

2750
+ 12.40 + 12.40
T.O.P T.O.P 370 mm 370 mm STAINLESS
STEEL HANDRAIL
Rough Paint Rough Paint
(Dark Color)

1100
(Dark Color)
1550

1550

1550

1550

1550

1550

1050

1050
160 1450

160 1450

1150

1150
+ 10.85 + 10.85
T.O.S T.O.S + 7.30 + 7.30 + 7.30
+7.20 +7.20

8110
2nd F.F.L 2nd F.F.L 2nd F.F.L
2nd T.O.S. 2nd T.O.S.
Exhaust Air

100

100
Smooth Paint
740

740

Louver Smooth Paint


1190

1190

(Light Color)
(Light Color)
2340

2340

2340

2340

Office Room Office Room

640

640
Smooth Paint
Smooth Paint
3550

3550

Venetian Blind
3390

3390

2ND19 2ND08 Venetian Blind Venetian Blind (Light Color)


2250

2250

(Light Color)
2200

2200

+ 7.30 + 7.30
1050

1050

Gypsum Tiles Gypsum Tiles


160 1150

160 1150

Gypsum Tiles

2340

2340

2340

2340
2nd F.F.L 2nd F.F.L

11500
600x600 mm 600x600 mm
400

400

600x600 mm

3650

3650

3650

3650
Exhaust Air Office Room G.Manger Lounge
740

740

Louver

3490

3490
1190

1190

1ST15 1ST17 1ST21


12520

12520

2750

2750
2340

2340

2340

2340

Office Room Office Room Granite Sill Granite Sill

2750
3650

3650

370 mm 370 mm STAINLESS


3390

3390

1ST19 1ST08
2250

2250

STEEL HANDRAIL
Rough Paint Rough Paint
2200

2200

(Dark Color) (Dark Color)

1100
1050

1050
1150

1150
+ 3.65 + 3.65
1050

1050
160 1150

160 1150

1st F.F.L 1st F.F.L + 3.65 + 3.65 + 3.65


400

400

1st F.F.L + 3.55 1st F.F.L + 3.55 1st F.F.L


Exhaust Air 1st T.O.S. 1st T.O.S.

100

100
740

740

Louver Smooth Paint


1190

1190

(Light Color)
2340

2340

2340

2340

Office Room Light Court Worker Room Smooth Paint Smooth Paint

640

640
3650

3650

(Light Color) (Light Color)


3390

3390

GR19 GR11 GR08 Venetian Blind Smooth Paint Venetian Blind


2400

2400

(Light Color)
Rough Paint
2200

2200

(Dark Color)
±0.00 ±0.00
1050

1050

Gypsum Tiles Gypsum Tiles

2340

2340

2340

2340
1270

1270

- 0.30 Ground F.F.L Ground F.F.L - 0.30


Cement Tiles 600x600 mm 600x600 mm
250

250

ROAD LEVEL 200x200mm ROAD LEVEL


3650

3650

3650

3650
G.Manger Office Room

3390
3590

3590
GR16 GR17

2750
 Granite Sill Granite Sill

2750
 370 mm 370 mm
Rough Paint Rough Paint
(Dark Color) (Dark Color)
SECTION B-B

850

850
1050

1050
2 SCALE 1:100 ±0.00
Granite Skirting
(400 mm Height) ±0.00
Granite Skirting
(400 mm Height) ±0.00
Ground F.F.L Ground F.F.L Ground F.F.L
- 0.20 - 0.20 - 0.20

400

400
Curb Level Curb Level Curb Level

WALL SECTION 1 WALL SECTION 2 WALL SECTION 3


3 SCALE 1:50 4 SCALE 1:50
5 SCALE 1:50

KEY PLAN: LAYOUT:


B
NATIONAL AUTHORITY FOR TUNNELS
GREATER CAIRO METRO- LINE No. 4 PROJECT PHASE(1)
SCALE TITLE
AS SHOWN
A A BUILDING 01 - ARCHITECTURAL SECTIONS
(ALL LEVELS) - OVERALL

DRAWING
WS3

NOTES :
DATE REVISION DESCRIPTION DRAWN BY CHECKED BY APPROVED BY
WS1 WS2 B

NUMBER CM4P1 - DD - DR - WED - S18 - WAR - 501107 - JDC - S01


01- LEVEL ±0.00=(+ 81.00)

86
TD_CV_ST_***_***.dwg
CM4P1 - DD - DR - WED - S18 - WAR - 503144- JDC - S01 DRAWING NUMBER

03
--
03 PAPER TOWEL DISPENSER
03 03 FIBER CEMENT BOARD 03
WITH V.P
HAND DRYER

FLOOR DRAIN

430
500
D-A90
D-A90 100
R18.A 1100 100 2480 700 700 700
1200

R18.A 700 700 350


02 02

275
1600
-- -- TOILET PAPER HOLDER

5760 5760 480 4800 480


3600 200 800 300 800 100 SOAP DISPENSER

3260

2400
Toilet(M)

100
D-A90 D-A90 MIRROR
3300

R18.B R18.C
A90.R18
± 00.00 800 800 500 CERAMIC TILES + 3.00
2100

F.F.L (200mmx200mm)
685 800 750 150 B.L
3600 100 1000 100 1000

1600
500 500
200 100

FLOOR DRAIN

600

600

430
160

160
200

200

260

260

480
600

600
200
100
MIRROR 750 750 150
1600

1600

01 500 800 500 500 500 3560


-- 3600 100 1000 100 1000
SOAP DISPENSER TOILET PAPER CERAMIC TILES + 3.00
2800

2760

1800
Toilet(W) HOLDER (200mmx200mm) B.L
D-A90 D-A90
100

A90.R19 R19.B R19.C


HAND DRYER
± 00.00
F.F.L

275
1200

4560
1100

D-A90 D-A90
R19.A R19.A
1100 100 4600 480 4800 480
FLOOR DRAIN

500

480
PAPER TOWEL DISPENSER

FIBER CEMENT BOARD


03 03 03 WITH V.P 03

DIMENSION PLAN FURNITURE PLAN FLOORING PLAN CEILING PLAN


13.1 SCALE 1:50
13.2 SCALE 1:50
13.3 SCALE 1:50
13.4 SCALE 1:50

A90.R18,R19

03 03

FIBER CEMENT BOARD FIBER CEMENT BOARD


WITH V.P WITH V.P CERAMIC TILES
(200mmx200mm) FIBER CEMENT BOARD
COVE LIGHT WITH V.P
CERAMIC TILES CERAMIC TILES 18 MM HPL TOILET
(200mmx200mm) + 3.00 (200mmx200mm) + 3.00 DOOR + 3.00
B.L B.L B.L
800

800
830

HAND DRYER FLOORS FINISHES


120

HAND DRYER
PAPER TOWEL FIBER CEMENT BOARD WITH V.P
DISPENSER
1000
3000

3000

3000
MARBLE URINAL
Lighting Fixt. (Refer To Elec. Drawings)
2200

2200

2200
PARTITION
400

1500
1500

1500
705

HVAC Fixt. (Refer To HVAC Drawings)


570

570
± 00.00 ± 00.00 ± 00.00
650

600

600
400

400
F.F.L F.F.L
300

300

300
F.F.L
PRESENCE DETECTOR

 
PAPER TOWEL DISPENSER
 MARBLE URINAL PAPER TOWEL DISPENSER 

 PARTITION 

 

 

 

 



A90.R18,R19
13 SCALE 1:50

KEY PLAN: LAYOUT:


NATIONAL AUTHORITY FOR TUNNELS
GREATER CAIRO METRO- LINE No. 4 PROJECT PHASE(1)
SCALE TITLE MAIN WORKSHOP
1:50 BUILDING 03 - ARCHITECTURAL ENLARGEMENTS
(GROUND LEVEL) SHEET-13
TOILETS

NOTES : DRAWING CM4P1 - DD - DR - WED - S18 - WAR - 503144- JDC - S01


DATE REVISION DESCRIPTION DRAWN BY CHECKED BY APPROVED BY NUMBER

87
01- LEVEL ±0.00=(+ 81.00)
TD_CV_ST_***_***.dwg
CM4P1 - DD - DR - WED - S18 - WAR - 503145- JDC - S01 DRAWING NUMBER

STEEL DOOR WITH POLYVINYL CHLORIDE SELF-ADHESIVE SHEET STEEL DOOR WITH POLYVINYL CHLORIDE SELF-ADHESIVE SHEET

OUT IN

400*400 mm FIXED 400*400 mm FIXED


GLASS WINDOW GLASS WINDOW
STRUCTURAL OPENING

STRUCTURAL OPENING
4500

4500
4500

4500
F F F F F F F F

1450

1450
SECTION ELEVATION SECTION ELEVATION

5500 5000
STRUCTURAL OPENING STRUCTURAL OPENING
OUT OUT

IN IN

PLAN PLAN
DOOR TYPE A1 DOOR TYPE A2
01 02 SCALE 1:20
SCALE 1:20

KEY PLAN: LAYOUT:


NATIONAL AUTHORITY FOR TUNNELS
GREATER CAIRO METRO- LINE No. 4 PROJECT PHASE(1)
SCALE TITLE MAIN WORKSHOP
1:20 BUILDING 03 - ARCHITECTURAL OPENINGS
(ALL LEVELS) SHEET-01
DOORS

88
NOTES : DRAWING CM4P1 - DD - DR - WED - S18 - WAR - 503145- JDC - S01
DATE REVISION DESCRIPTION DRAWN BY CHECKED BY APPROVED BY 01- LEVEL ±0.00=(+ 81.00) NUMBER
TD_CV_ST_***_***.dwg
CM4P1 - DD - DR - WED - S18 - WAR - 503147- JDC - S01 DRAWING NUMBER

IN IN IN OUT
OUT OUT IN OUT OUT IN OUT IN
OUT IN IN OUT

WOODEN DOOR

HANDLE

STRUCTURAL OPENING
HANDLE HANDLE HANDLE

2200
2200

2200
2200

2200
LOCK WITH KEY LOCK WITH KEY LOCK WITH KEY
1000

1000
1000

900
SECTION ELEVATION SECTION ELEVATION SECTION ELEVATION
SECTION ELEVATION

HANDLE
OUT OUT OUT
IN

IN
1000
1400 IN 1600 IN
1000
DOOR TYPE B9 DOOR TYPE B10 DOOR TYPE B11
STRUCTURAL OPENING STRUCTURAL OPENING
STRUCTURAL OPENING OUT DOOR TYPE E1 PLAN
01 SCALE 1:20
02 SCALE 1:20
03 SCALE 1:20 03 SCALE 1:20
PLAN PLAN PLAN

IN OUT IN OUT OUT IN IN OUT IN OUT OUT IN


OUT IN OUT IN

WOODEN DOOR
WOODEN DOOR WOODEN
DOOR

HANDLE
HANDLE HANDLE HANDLE
2200

2200

2200

2200
1000
900

900

900

250
SECTION ELEVATION
SECTION ELEVATION SECTION ELEVATION SECTION ELEVATION
WOODEN DOOR

OUT OUT OUT OUT

IN IN IN IN
900 1600 900 1600

DOOR TYPE E2 DOOR TYPE E3 DOOR TYPE E4 DOOR TYPE E5


04 PLAN 05 PLAN 06 SCALE 1:20
PLAN 07 SCALE 1:20
PLAN
SCALE 1:20 SCALE 1:20

KEY PLAN: LAYOUT:


NATIONAL AUTHORITY FOR TUNNELS
GREATER CAIRO METRO- LINE No. 4 PROJECT PHASE(1)
SCALE TITLE MAIN WORKSHOP
1:20 BUILDING 03 - ARCHITECTURAL OPENINGS
(ALL LEVELS) SHEET-03
DOORS

DRAWING CM4P1 - DD - DR - WED - S18 - WAR - 503147- JDC - S01

89
NOTES :
DATE REVISION DESCRIPTION DRAWN BY CHECKED BY APPROVED BY 01- LEVEL ±0.00=(+ 81.00) NUMBER
TD_CV_ST_***_***.dwg
CM4P1 - DD - DR - WED - S18 - WAR - 571101 - JDC - S01 DRAWING NUMBER

3
571102

2000 24200 2000


5500 5500 6500 6500
2055 800 4245 2500 10000 2500 2100 24200
X 622848.144
X 622843.136 POLYURETHANE COATING - 0.30 POLYURETHANE COATING - 0.30 POLYURETHANE COATING Y 809032.149
ON CONCRETE RAMP LOOSE GRAVEL ON CONCRETE RAMP 5500 5500 6500 6500
Y 809008.677 ON CONCRETE STAIRS Road Level Road Level
7100 2500 10000 2500 2100

2400
3500 1900 2950 4000 8500 4000 3350
- 0.15 - 0.15
2400

2400

2400
± 0.00 - 0.15

2100
INTAKE SHAFT

2850
Curb Level Curb Level Curb Level POLYURETHANE COATING
F.F.L
- 0.30 GR02 ON CONCRETE STAIRS
Road Level D D
D
GR01C GR01D
GR01B
1000

1000

900
700
800 800 4250 2500 10000 2500 1900

800
950 5850 2500 10000 2500 1900

850
± 0.00
F.F.L

2000
1900
± 0.00
1850

± 0.00

1900

1000

1000
D D Switch Room 1 W2
800

800

800
6 -1.45

2730

2730
115X140cm F.F.L

1300
GR01A GR01A
F.F.L F.F.L. GR01E

900
950 Exhaust Fan
4 Louvers 11505 571102 5000 6245 2 GR01
1700
571102 line of machine line of machine line of machine 571102

900

900
4800

4800

4800
5200
5000

5000
5200

5200

5000

5000

5200
1700 Edge of Slab Edge of Slab Edge of Slab
2000
Switch Room 1
line of machine line of machine

1000
1100
2000

3200
800

800
GR01
3400

3400
2800

Edge of Slab Edge of Slab


A A
571102 1300 2000 1800 2560 2290 571102 23800

3850
2050 1700 2300 3300 1800 2700

1270

1270

270 800

1100

1400
23800 2025 3000 13750 3000 2025

- 0.15 W1 W1
1000

1000

1000
GR01C GR01B
Curb Level
2225 3000 13750 3000 2225
- 0.30 LOOSE GRAVEL X 622853.034
X 622848.026 Y 809031.106 5500 5500 6500 6500
Y 808997.634 Road Level
5500 5500 6500 6500
24200
2000 24200 2000

1
571102

Ground Floor Plan Ground Floor Plan at Upper Window Level at 3.00m
1 SCALE 1:100 2 SCALE 1:100

3
3 571102
571102
24200
24000
24200
- 0.30 - 0.30
5500 5500 6500 6500 Road Level Road Level

3500 1900 2950 4000 8500 4000 3350

2400
2850

2850
- 0.30
± 0.00 - 0.15 - 0.15
Road Level - 0.15
F.F.L Curb Level Curb Level
Curb Level

+ 4.60 + 4.60 ± 0.00


± 0.00
850

11925 5090 6585 T.O.P T.O.P


F.F.L F.F.L

2350

1900
Culvert Room 6

1900
- 2.90 + 4.00
1100

+ 5.90 + 4.00
4 Culvert Level BS01 571102 -1.45
2 4 T.O.S T.O.S
2
F.F.L. 571102 T.O.S 571102
571102 Line of structure Line of structure Line of structure 571102
4600

4800
5200

5000

5000

5200

5200

5000

5000

5200
opening above opening above opening above 1250
- 0.15
Line of structure Line of structure Curb Level
2650

2650
A opening above opening above A A
571102 571102

3850

3850
571102 571102 + 4.60
23600 Granite capping
2000 T.O.P 23800 2000

- 0.15

1000
Curb Level

5500 5500 6500 6500 - 0.30


24000 Road Level
24200
24200
1
571102
1
571102

Basement Floor Plan


3 Roof Floor Plan
SCALE 1:100
4 SCALE 1:100

FINISHING SCHEDULE

ROOM FLOOR SKIRTING Wall CEILING

GR01 EPOXY COATING 200mm MORTAR BASE CEMENT PLASTER 20-25mm PAINT ON CEMENT PLASTER
Switch Room 1 (WITH HARDENER) WITH EPOXY PAINT WITH PAINTS

GR02 EPOXY COATING 200mm MORTAR BASE CEMENT PLASTER 20-25mm CEMENT PLASTER 20-25mm
INTAKE SHAFT (WITH HARDENER) WITH EPOXY PAINT WITH PAINTS WITH PAINT
BS01 EPOXY COATING 200mm MORTAR BASE CEMENT PLASTER 20-25mm PAINT ON CEMENT PLASTER
Culvert Room (WITH HARDENER) WITH EPOXY PAINT WITH PAINTS

FINISHING SCHEDULE
5 SCALE N.T.S

KEY PLAN: LAYOUT:


NATIONAL AUTHORITY FOR TUNNELS
GREATER CAIRO METRO- LINE No. 4 PROJECT PHASE(1)
SCALE TITLE
1:100 SWITCH ROOM 1
BUILDING-07.1 ARCHITECTURAL FLOOR PLANS

NOTES : DRAWING CM4P1 - DD - DR - WED - S18 - WAR - 571101 - JDC - S01


DATE REVISION DESCRIPTION DRAWN BY CHECKED BY APPROVED BY 01- LEVEL ±0.00=(+ 81.00) NUMBER
TD_CV_ST_***_***.dwg
90
CM4P1 - DD - DR - WED - S18 - WAR - 571102 - JDC - S01 DRAWING NUMBER

Air intake ELEVATION FINISHES


90X130cm
+5.90 PVC Louvers + 5.90
T.O.S T.O.S
with insect net External Rough Paint on Plaster
01
06 (Dark Color)

1300

1300
+4.60 +4.60 + 4.60 + 4.60
T.O.P 02 06 02 T.O.P T.O.P 02 T.O.P
External Smooth Paint on Plaster
02
(Light Color)

600

600

600

600
1100

1100

1100
05 01 01 01 01 05
+4.00 +4.00 + 4.00 + 4.00
T.O.S. T.O.S. T.O.S. T.O.S.
01 03 Granite Skirting

900

900

300 900
01

6200

6200
01

3900

4900
4900
4000

4000

4000

4000
05 02
02 02 05 04 G.RC. screen (NOT USED)

2050
2050
01 01
01 01 Exhaust Fan with

2200
01 aluminum weather
+ 0.00 + 0.00 + 0.00 cover and insect net + 0.00
Ground F.F.L Ground F.F.L Ground F.F.L Ground F.F.L 05 Groove 30 mm

600

600
03 03 03

300

300

300

300
Elevation 1 Elevation 2
- 0.30 - 0.30 - 0.30 - 0.30
Road Level Road Level Road Level Road Level 06 Granite capping
1 SCALE 1:100
2 SCALE 1:100

+ 5.90 + 5.90
T.O.S T.O.S

1300

1300
+ 4.60 01 + 4.60 + 4.60 01 + 4.60
T.O.P 06 T.O.P T.O.P 06 T.O.P
300 1100 100

300 1100 100

1100 100

950 150
600

600

600

600
920
01 02 05 02 01
02 02
+ 4.00 + 4.00 + 4.00 + 4.00
T.O.S. T.O.S. T.O.S. T.O.S.
05

1260
300 900

300 900
01 01

6200

6200
02 05

3900
4900

4900
4000

4000

4000

4000
05 05
3100

3100
01 01

1870
01 01

2200

2200
01
01
+ 0.00 + 0.00 + 0.00 + 0.00
Ground F.F.L Ground F.F.L Ground F.F.L Ground F.F.L

600
03 03 03
300

300

300

300
Elevation 4
- 0.30 - 0.30 - 0.30 - 0.30
Road Level
Elevation 3 Road Level Road Level
4
Road Level

3 SCALE 1:100 SCALE 1:100

- 100mm thickness (cement tiles-


cement mortar -sand layer )
- 30 mm cement screed for protection
4 4
+5.90 - protection layer (GEO. textile sheet).
T.O.S - water proofing membrane (p.v.c
proof layer).
- screed laid to falls, 50mm thick at Epoxy coating
(with hardener) Steel
1300

+4.60 minimum +4.60 Brick wall


Granite capping Granite capping on concrete 5000 handrail
T.O.P - Re-inforced concrete slab. T.O.P
Brick wall Steel
900
600

600

±0.00 handrail handrail ±0.00 270 270 270 270 270 770 270 270 270 270 270 270 270 270 285 S1
Brick wall
900 450

F.F.L F.F.L 571102


-1.45
900

1300

1300
+4.00 +4.00

900

900
T.O.S. Line of machine T.O.S. 7 F.F.L
1800

100mmØ Steel pipe handrail

425
Line of machine Line of machine Line of machine Aluminum weather cover 571102
6200

04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 ± 00.00
at the exhaust fan
3100

F.F.L
4900

40mmØ Steel pipe handrail


4000

4000

4000

900
Epoxy coating

850
Switch Room 1
(with hardener)
GROUND FLOOR STAIRS
3100

18X161cm=2.90m
2650

GR01 on concrete -1.45


2200

F.F.L

425
2900

+ 0.00 Brick wall + 0.00

425
900

Ground F.F.L Ground F.F.L -1.45


handrail
Landing level F.F.L
300

300

Epoxy coating
Steel

850
(with hardener)
- 0.30 - 0.30 - Epoxy coating

1450
on concrete handrail

1250
Road Level -Epoxy coating Road Level (with hardener)
Culvert Room
2900

2900

(with hardener) - S.O.G 270 270 270 270 270 270 270 270 EQ.
2600

2600

S1

425
-Re-inForced BS01 -2.90 -2.90
-1.45
F.F.L F.F.L 571102 Epoxy coating

1100
Concrete Slab.
1450

900
F.F.L EQ. EQ.
(with hardener)
-2.90 on concrete
01 02 03 04 05 06 07 08 09 EQ. EQ.

161
F.F.L
- 2.90 - 2.90 EQ. EQ.
Culvert Level Culvert Level
-Epoxy coating
SECTION S1 BASEMENT FLOOR STAIRS
(with hardener)
Section A-A HANDRAIL DETAILS
-Re-inForced
Concrete Slab. 5 SCALE 1:100
7 SCALE 1:20
STAIR DETAILS
6 SCALE 1:50

KEY PLAN: LAYOUT:


NATIONAL AUTHORITY FOR TUNNELS
GREATER CAIRO METRO- LINE No. 4 PROJECT PHASE(1)
SCALE TITLE
AS SHOWN SWITCH ROOM 1
BUILDING-07.1 ARCHITECTURAL
ELEVATIONS , SECTION & STAIR DETAIL

NOTES : DRAWING CM4P1 - DD - DR - WED - S18 - WAR - 571102 - JDC - S01


DATE REVISION DESCRIPTION DRAWN BY CHECKED BY APPROVED BY 01- LEVEL ±0.00=(+ 81.00) NUMBER

91
TD_CV_ST_***_***.dwg
CM4P1 - DD - DR - WED - S18 - WAR - 571103 - JDC - S01 DRAWING NUMBER
IN OUT IN
OUT

IN OUT OUT IN

3100
HANDLE HANDLE LOCK WITH KEY
STRUCTURAL OPENING
2200

2200

PUSH PLATE

LOCK WITH KEY


1000

1000
KICK PLATE KICK PLATE

SECTION ELEVATION SECTION ELEVATION

HANDLE OUT

OUT

2500 IN
STRUCTURAL OPENING

800
STRUCTURAL OPENING IN PLAN
DOOR TYPE A1 DOOR TYPE A2 (Machine Door)
1 SCALE 1:20 PLAN 2 SCALE 1:20

6mm THICK CLEAR GLASS PVC FRAME IN OUT IN OUT

PRE-CAST
CONCRETE
LINTEL

900
900

6mm THICK CLEAR GLASS

ELEVATION 1 LONG ARM FOR OPENING


ELEVATION 1 LONG ARM FOR OPENING
PVC FRAME

A
-
6mm THICK CLEAR GLASS
EXHAUST FAN WITH PVC
WEATHER COVER AND
INSECT NET
OUT

2500
2500

IN 1000 1000 1000

1800
1800

3000

PLAN

SECTION A-A SECTION A-A

KEY PLAN: LAYOUT:


NATIONAL AUTHORITY FOR TUNNELS
GREATER CAIRO METRO- LINE No. 4 PROJECT PHASE(1)
SCALE TITLE
1:20 SWITCH ROOM 1
BUILDING-07.1 ARCHITECTURAL OPENINGS
ALL LEVELS - DOORS & WINDOWS

NOTES : DRAWING CM4P1 - DD - DR - WED - S18 - WAR - 571103 - JDC - S01

92
DATE REVISION DESCRIPTION DRAWN BY CHECKED BY APPROVED BY 01- LEVEL ±0.00=(+ 81.00) NUMBER
TD_CV_ST_***_***.dwg
CM4P1 - DD - DR - WED - S18 - WAR - 572101 - JDC - S01 DRAWING NUMBER

3 B
572103 572103

2000 43200 1000

6250 6100 6100 6100 6100 6100 6250

1850 1000 2850 150 1000 150 4800 150 1000 150 1150 2500 3600 2500 3600 2500 1150 150 1000 150 4800 150 1000 150 2850 1000 1850
POLYURETHANE COATING -0.30 POLYURETHANE COATING -0.30 -0.30 POLYURETHANE COATING POLYURETHANE COATING
LOOSE GRAVEL Road Level ON CONCRETE RAMP Road Level Road Level ON CONCRETE RAMP
ON CONCRETE STAIRS ON CONCRETE STAIRS

300

300
LOOSE GRAVEL
2900 2900 9700 4000 2100 4000 2100 4000 9700 2900 1900

2400

2400

2400

2400
X 622954.731 ±0.00 -0.15 ±0.00

2100

2100
-0.15 -0.15 -0.15
Y 809353.717 F.F.L Curb Level F.F.L
Curb Level Curb Level Curb Level
POLYURETHANE COATING X 622949.575
ON CONCRETE STAIRS D D D D D Y 809396.406
GR01A GR01B GR01C GR01D GR01E

1000

650

650

650
1050 500 1000 11400 2500 3600 2500 3600 2500 11400 1000 1650
INTAKE SHAFT 6055

2050
4 ±0.00 ±0.00 7 2

1900
D ±0.00

800
-1.45

1300

1300

1300
±0.00

900
2800

2800

2800

2800

2800

2920
572103
GR02 GR02 F.F.L F.F.L Switch Room 2 F.F.L 572103 F.F.L 572103
F.F.L
115X140cm line of machine line of machine line of machine GR01 line of machine line of machine line of machine

4800
5200

5000

5000

5200
300 1700 Louvers Edge of slab Edge of slab Edge of slab Edge of slab Edge of slab Edge of slab

1820

1820
A line of machine line of machine A

770

770

770

770

770
3400

660
2850
572103 Edge of slab Edge of slab 572103

2650
-0.15
Curb Level 1700 3700 1800 4600 2300 3300 2300 3300 2300 3300 2300 2700 1300 1600 2230 2560 1510

1230

1230

1230

1230

1230

1220
300 730

300 730
2000 42800 1000

-0.15 -0.15 -0.15 X 622954.539


1000

1000

1000

1000
X 622959.695 Curb Level Curb Level 5x15cm Groove Curb Level Y 809397.006
Y 809354.315
LOOSE GRAVEL -0.30
LOOSE GRAVEL Road Level
5700 150 1000 150 10900 150 1000 150 4800 150 1000 150 10900 150 1000 150 5700
6250 6100 6100 6100 6100 6100 6250
2000 43200 1000

1 B
572103 572103

Ground Floor Plan


1 SCALE 1:100

43200

6250 6100 6100 6100 6100 6100 6250

1700 4000 150 1000 150 4800 150 1000 150 850 300 2500 300 850 1300 850 300 2500 300 850 1300 850 300 2500 300 850 150 1000 150 4800 150 1000 150 4850 850

W W W W W W W W W W
GR01A GR01B GR01C GR01D GR01E GR01F GR01G GR01H GR01I GR01J

700
900 500
350 4000 1300 4800 1300 850 3100 850 1300 850 3100 850 1300 850 3100 850 450 850 4800 1300 4000 1500

900
2600

Switch Room 2
GR01

4800
5200

5000

5000

5200
250

3000

3000
W
GR01K
2000

2000

W
GR01S
42800
500 5000 1300 5000 900 5000 1300 4800 1300 5000 900 5000 1300 5000 500
400

400
600

600
W W W W W W W
GR01R GR01Q GR01P GR01O GR01N GR01M GR01L

700 5000 150 1000 150 5000 900 5000 150 1000 150 4800 150 1000 150 5000 900 5000 150 1000 150 5000 700

6250 6100 6100 6100 6100 6100 6250

43200

Ground Floor Plan at Upper Window Level at 3.00m


2 SCALE 1:100

ROOM FLOOR SKIRTING Wall CEILING

GR01 EPOXY COATING 200mm MORTAR BASE CEMENT PLASTER 20-25mm CEMENT PLASTER 20-25mm
Switch Room 2 (WITH HARDENER) WITH EPOXY PAINT WITH PAINTS WITH PAINT

GR02 EPOXY COATING 200mm MORTAR BASE CEMENT PLASTER 20-25mm CEMENT PLASTER 20-25mm
INTAKE SHAFT (WITH HARDENER) WITH EPOXY PAINT WITH PAINTS WITH PAINT

FINISHING SCHEDULE
3 SCALE N.T.S

KEY PLAN: LAYOUT:


NATIONAL AUTHORITY FOR TUNNELS
GREATER CAIRO METRO- LINE No. 4 PROJECT PHASE(1)
SCALE TITLE
1:100
UP
SWITCH ROOM 2
BUILDING-07.2 ARCHITECTURAL FLOOR PLANS

NOTES : DRAWING CM4P1 - DD - DR - WED - S18 - WAR - 572101 - JDC - S01

93
DATE REVISION DESCRIPTION DRAWN BY CHECKED BY APPROVED BY 01- LEVEL ±0.00=(+ 81.00) NUMBER
TD_CV_ST_***_***.dwg
CM4P1 - DD - DR - WED - S18 - WAR - 572102 - JDC - S01 DRAWING NUMBER

3
572103 B
572103

43200

43000

-0.30 -0.30 -0.30 POLYURETHANE


POLYURETHANE Road Level Road Level Road Level POLYURETHANE COATING TREAD
COATING TREAD LOOSE GRAVEL COATING RAMP LOOSE GRAVEL

300

300
2400

2400
±0.00 -0.15 -0.15 -0.15 -0.15 ±0.00

2100

2100
2850
POLYURETHANE F.F.L. Curb Level Curb Level Curb Level Curb Level F.F.L.
COATING TREAD
2900 2900 9700 4000 2100 4000 2100 4000 9700 2900 1900

+5.90
300 1700 T.O.S. +4.60
Granite capping +4.60
T.O.P.

2350
T.O.P. 2
4

1900
572103 ±0.00 572103

8600
PENT HOUSE
F.F.L.

4800
5200

5000

5000

5200
2000 1350 +4.00
Granite capping
A T.O.S. A
572103 572103
+4.60 +4.60 Granite capping
T.O.P.

3700
42800 T.O.P.

-0.15 -0.15 -0.15


Curb Level Curb Level Curb Level
LOOSE GRAVEL
LOOSE GRAVEL -0.30 LOOSE GRAVEL
Road Level
43000
43200

1 B
572103
572103

Roof Plan
1 SCALE 1:100

3 B
572103
572103

43200

6250 6100 6100 6100 6100 6100 6250

650
4800
30625
4 -2.90 Culvert Room -2.90 7 2

1100
900
-1.45 572103
572103 F.F.L F.F.L 572103
BS01 F.F.L
Line of structure Line of structure Line of structure Line of structure Line of structure Line of structure
5200

5000

4600

5000

5200
opening above opening above opening above opening above opening above opening above
A A
Line of structure Line of structure

2850
572103 opening above 572103
opening above

42600

6250 6100 6100 6100 6100 6100 6250

43200

1 B
572103 572103

Basement Plan
2 SCALE 1:100

ROOM FLOOR SKIRTING Wall CEILING


BS01 EPOXY COATING 200mm MORTAR BASE WITH CEMENT PLASTER 20-25mm CEMENT PLASTER 20-25mm
Culvert Room (WITH HARDENER) EPOXY PAINT WITH PAINTS WITH PAINTS

FINISHING SCHEDULE
3 SCALE N.T.S

KEY PLAN: LAYOUT:


NATIONAL AUTHORITY FOR TUNNELS
GREATER CAIRO METRO- LINE No. 4 PROJECT PHASE(1)
SCALE TITLE
UP
1:100 SWITCH ROOM 2
BUILDING-07.2 ARCHITECTURAL FLOOR PLANS
(ROOF AND BASEMENT PLANS)

NOTES : DRAWING CM4P1 - DD - DR - WED - S18 - WAR - 572102 - JDC - S01

94
DATE REVISION DESCRIPTION DRAWN BY CHECKED BY APPROVED BY 01- LEVEL ±0.00=(+ 81.00) NUMBER
TD_CV_ST_***_***.dwg
CM4P1 - DD - DR - WED - S18 - WAR - 572103 - JDC - S01 DRAWING NUMBER

ELEVATION FINISHES

External Rough Paint on Plaster


01
(Dark Color)
Air intake
+5.90 90X130cm +5.90 External Smooth Paint on Plaster
T.O.S. T.O.S. 02
Louvers (Light Color)
01

1400
1300

1300
+4.60 +4.60 +4.60 +4.60 03
T.O.P
01
04 02 04 5x15cm Groove 04 T.O.P T.O.P 04 T.O.P Granite Skirting

740 280

740 280

280

500

500
600

600
1020

1100
920
01

180

180
02 01 02 01 01 02 02 05 04 Granite Capping
+4.00 +4.00 +4.00 +4.00

180
T.O.S. T.O.S. T.O.S. T.O.S.

900
1260

1260
900

900
6200

6200
05 Groove 30 mm

3900

3900

180

4900

4900

4100

4100
4000

4000
02 02 05 05 02 01 Aluminum

180

180
05 05 02 5x15cm Groove 01
01 01 weather cover

2150
5x15cm Groove 5x15cm

1870

1870

1870

1870
01
01 01 01 05 Groove at the exhaust
01 01 fan & insect net
±0.00 ±0.00 ±0.00 ±0.00
Ground F.F.L Ground F.F.L Ground F.F.L Ground F.F.L
600

600

600

600

600
03 03

600
03 03
300

300

300

300
-0.30
Road Level Elevation 1
-0.30
Road Level
-0.30
Road Level Elevation 2 -0.30
Road Level
1 SCALE 1:100
2 SCALE 1:100
Epoxy coating
(with hardener)
on concrete 5000

S1
270 270 270 270 270 770 270 270 270 270 270 270 270 270 572103
-1.45

1300

1300
900
900
F.F.L ±0.00
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 F.F.L

STEEL
+5.90 +5.90
GROUND FLOOR STAIRS HANDRAIL
T.O.S. T.O.S.

04

1300

1300

1300
+4.60 01 +4.60 +4.60 01 +4.60 S1
T.O.P 04 02 04 02 04 T.O.P T.O.P 02 T.O.P
270 270 270 270 270 270 270 270 572103
300 740 100

280
600

600

600

600
-1.45

1100
900
-2.90
180

180
1100

02

740

740
01 02 01 5x15cm Groove 01 5x15cm Groove 01 05 01 02 05 01 F.F.L F.F.L
+4.00 +4.00 +4.00 +4.00 1 2 3 4 5 6 7 8

180
T.O.S. T.O.S. T.O.S. T.O.S.
900

900

900
01

6200

6200
BASEMENT FLOOR STAIRS

3900

3900

180
180
4900

4900
4000

4000

4000

4000
05 02 05 05

3400

3400
01 Paint on brick
3100

3100

3100
5x15cm Groove 5x15cm Groove 01 01 05

1870

1870
2500

2500
handrail
2500

01

2200

2200
01
2200

01 01
01 01
±0.00 ±0.00 ±0.00 ±0.00
Ground F.F.L Ground F.F.L Ground F.F.L Ground F.F.L Steel

600
600

900
03 03 03 03
±0.00 8 handrail ±0.00
300

300

300

300
F.F.L 572103 F.F.L
-0.30 -0.30 -0.30 -0.30
Road Level
Elevation 3 Road Level Road Level
Elevation 4
Road Level
3 SCALE 1:100 4 SCALE 1:100 Epoxy coating
(with hardener)

18X161cm=2.90m

You might also like