Ground Floor

No Description L W H Unit N0> ded


1 Excavation of foudation treanch 94.6 0.6 0.4 M3
2 Excavation of footing of ( 1.5 1.5 1.2 M3 30
3 Lean concrete 10cm, thick 1.5 1.5 0.1 M3 30
4 Rcc concrete for footing 1.4 1.4 0.5 M3 30

Construction of Rubble stone


foundation.All joints between
stone filled with cement/sand
mortar (1:4 rotio). Minimum height
of foundation wall from ground
5 level is 50 cm 94.6 0.4 0.8 M3 1

Construction of Rcc Tie beam on


foundation (40cmX20cm), 1:2:4 (1-
3" maximum aggregate size) ratio
with 12mm rebar & 20cm,c/c
staffs.Concrete mix should be
thorought vibrated to remove any
6 air spaces. 94.6 0.4 0.2 M3 1
7 Back filling and compact 506.28 1 M3 1
8 lean concrete for floor 506.28 0.05 M3 1
9 RRC circular columns 0.1256 3.8 12
9 Rcc square colums 0.4 0.4 3.8 M3 18
10 Hallow block construction walls 94.6 3.2 M2 37
11 Rcc for linters for Block wall 94.6 0.2 0.2 M3
12 Rcc beam under slab 245 0.3 0.4 M3
13 Rcc slab 506.28 0.2 M3
14 Rcc for stair 3 4 0.2 M2 2
15 Varanda ls
16 Plastering of internal and external 94.6 3.2 M2 2 37
17 Floor tiles M2
18 Wall tiles M2
19 White washing 94.6 3.2 M2 2 37
20 Distambar 94.6 3.2 M2 2 37
21 Imported wooder doors +frame+ locks& hings Pcs
22 Almunium door M2
23 Aluminium windows M2
24 Aluminium windows for stair
25 Hand rail Ls
26 Wc accessories Set
27 Water instalation Ls
28 Electrical instalation Ls
29 Septictank 4x3x4.3m 4 2.5 4.5 M3

First Floor
No Description L W H Unit N0>
1 Rcc for colums rectangular 0.4 0.4 3.2 M3 21
RCC circular columns 0.1256 3.2 M3 9
2 Hallow block construction walls 506.28 3.2 M2
3 Rcc for linters for Block wall 108.6 0.2 0.2 M3
4 Rcc beam under slab 245 0.4 0.2 M3
5 Rcc slab 500 0.15 M3
6 Rcc for stair 3 4 0.2 M2 2
7 Varanda ls
8 Plastering of internal and external 108.6 3.2 M2 2
9 Floor tiles M2
10 Wall tiles M2
11 White washing 155 3.2 M2 2
12 Distambar 155 3.2 M2 2
13 Hand rail Ls
14 Wc accessories Set
15 Water instalation Ls
16 Electrical instalation Ls

second Floor
No Description L W H Unit N0>
1 Rcc for colums rectangular 0.4 0.4 3.2 M3 21

RCC circular columns 0.1256 3.2 M3 9


2 Hallow block construction walls 506.28 3.2 M2
3 Rcc for linters for Block wall 108.6 0.2 0.2 M3
4 Rcc beam under slab 245 0.4 0.2 M3
5 Rcc slab 500 0.15 M3
6 Rcc for stair 3 4 0.2 M2 2
7 Varanda ls
8 Plastering of internal and external 108.6 3.2 M2 2
9 Floor tiles M2
10 Wall tiles M2
11 White washing 155 3.2 M2 2
12 Distambar 155 3.2 M2 2
13 Hand rail Ls
14 Wc accessories Set
15 Water instalation Ls
16 Electrical instalation Ls
19 Wc accessories Set
20 Water instalation Ls
21 Electrical instalation Ls
22 Septictank 4x3x4.3m M3
17 Staircase room & roofing+ Batuto Ls
18 Brimetr Wall Ls

Fence Wall

1 Excavation of foudation treanch 132 0.5 0.5 M3


Construction of Rubble stone
2 foundation 132 0.4 0.6 M3 1
3 Rcc for colums 0.4 0.4 3 M3 2
4 stone construction walls 54 0.3 2 M3 1
5 Hallow block construction walls 132 2 M2 1
6 Plastering of internal and external 132 2 M2 2
7 Local floor tiles M2
8 main door
9 White washing 132 M2 2
10 Car Parking Structure
11 Distambar 132 M2 2
12 lean concrate for the gate 2 3.5 0.3 2
Qty Rate Amount
22.704 $ 15.00 $ 340.56
81 $ 15.00 $ 1,215.00
6.75 $ 120.00 $ 810.00
29.4 $ 320.00 $ 9,408.00

30.272 $ 55.00 $ 1,664.96

7.568 $ 320.00 $ 2,421.76


506.28 $ 8.00 $ 4,050.24
25.314 $ 120.00 $ 3,037.68
5.72736 $ 320.00 $ 1,832.76
10.944 $ 320.00 $ 3,502.08
266.06 $ 18.00 $ 4,789.08
3.784 $ 320.00 $ 1,210.88
29.4 $ 320.00 $ 9,408.00
101.256 $ 320.00 $ 32,401.92
4.8 $ 320.00 $ 1,536.00
$ -
531.44 $ 3.50 $ 1,860.04
506.28 $ 18.00 $ 9,113.04
0 $ 16.00 $ -
531.44 $ 1.00 $ 531.44
531.44 $ 2.00 $ 1,062.88
3 $ 185.00 $ 555.00
0 $ 140.00 $ -
11 $ 95.00 $ 1,045.00
0 $ 100.00 $ -
0 $ 1,400.00
$ 5,840.76
$ 1,700.00
$ 3,893.85
45 $ 65.00 $ 2,925.00
$ 107,555.93

Qty Rate Amount


10.752 $ 320.00 $ 3,440.64
3.61728 $ 320.00 $ 1,157.53
1620.1 $ 18.00 $ 29,161.73
4.344 $ 320.00 $ 1,390.08
19.6 $ 320.00 $ 6,272.00
75 $ 320.00 $ 24,000.00
4.8 $ 320.00 $ 1,536.00
$ -
695.04 $ 3.50 $ 2,432.64
250 $ 18.00 $ 4,500.00
130 $ 16.00 $ 2,080.00
992 $ 1.50 $ 1,488.00
992 $ 2.00 $ 1,984.00
0 $ 1,400.00
$ 2,700.00
$ 2,000.00
$ 2,600.00
Err:522

Qty Rate Amount


10.752 $ 320.00 $ 3,440.64

3.61728 $ 320.00 $ 1,157.53


1620.1 $ 18.00 $ 29,161.73
4.344 $ 320.00 $ 1,390.08
19.6 $ 320.00 $ 6,272.00
75 $ 320.00 $ 24,000.00
4.8 $ 320.00 $ 1,536.00
$ -
695.04 $ 3.50 $ 2,432.64
250 $ 18.00 $ 4,500.00
130 $ 16.00 $ 2,080.00
992 $ 1.50 $ 1,488.00
992 $ 2.00 $ 1,984.00
0 $ 1,400.00
$ 2,700.00
$ 2,000.00
$ 2,600.00
$ 800.00
$ 800.00
$ 1,000.00
0 $ 1,500.00
0 $ 4,500.00
0 $ 2,500.00
$ 99,242.62

33 $ 8.00 $ 264.00

31.68 $ 50.00 $ 1,584.00


0.96 $ 280.00 $ 268.80
27 $ 165.00 $ 4,455.00
264 $ 16.00 $ 4,224.00
264 $ 2.00 $ 528.00
165 $ 12.00 $ 1,980.00
1 $1,000.00 $ 1,000.00
264 $ 0.50 $ 132.00
$ 800.00
264 $ 0.80 $ 211.20
2.1 $ 140.00 $ 294.00
$ 15,477.00
Sammery
NO Description Amount
1 Ground Floor $ 107,555.93
2 First Floor Err:522
3 Services $ 99,242.62
4 Fance Wall $ 15,477.00
Total Err:522
supper strucrute

sand in CUM

deduction
D1 3 2.2 2.4 15.84
D2 3 1.2 2.2 7.92
D3 7 1 2.2 15.4
W1 6 2 1.5 18
W2 1 0.8 1 0.8
57.96