Unfortunately, today’s TREMIX scene has been hijacked by one-time labour operators, knowing
nothing about the actual significance of the process. These fly-by-night operators have access to the
equipment but not to the technology & perform works at low rates, which are always attractive to
clients. Many a times, vacuuming, the very heart of the process is not done. To incorporate the
technical aspects of this fine process & give you the ‘real thing’ Henceforth Veenaa Group has
decided to carry out all the Tremix related work under one umbrella. Being qualified civil
engineers, we understand & know the theory behind the process. Significance of dewatering is
clearly understood.
The Procedure
The method involves laying the floor in the following sequence :
The Benefits
The VDS(trimix) flooring services that we offer to clients are a Vacuum Dewatered (VD) Flooring
method, is a system for laying high quality concrete floors with superior cost-effectiveness. The key
to the use of this method is the dewatering of concrete by vacuum process surplus water from the
concrete is removed immediately after placing and vibration, reducing the water: cement ratio to an
optimum level. Therefore, adopting the VD Flooring method facilitates use of concrete with better
workability than what is normally possible. A lowered water to cement ratio due to vacuum
dewatering leads to improvement in each of the concrete properties listed above.
• We do TREMIX work with our machinery on square meter OR square feet basis. Our scope
of work includes channel fixing, surface vibration & leveling, vacuum dewatering, floating
& toweling the surface.
• Pouring of concrete & poker vibration does not include in TREMIX work.
• Advance with your work order and interim payment to be made weekly for the quantity of
work done weekly.
• Electricity & Water required for the work shall be provided free of cost at site.
• Facility to Stay of 6 workers for duration of work shall be provided free of cost.
• Minimum output shall be 150.00 sq. mt. (1600.00 sq. ft.) per day and further, Machinery &
Man Power idol charge will be Rs. 3000.00 per day.