Ⅱ. Decoration Works
1/80
BOQ of Architectural Construction of Main Po
1. Contractor supply:
1. 8~10mm tiles, seams be filled by neat cement; concrete, rebar
DM 2A -地板砖地面 2. 20mm 1:3 cement mortar; 1.甲供:钢筋、混凝土
1. 8-10厚地砖,素水泥浆擦缝; 3. One layer of neat cement binding
2. 20厚1:3水泥砂浆; course (mixed with construction glue);
DM 2A - Wear-resisting 3. 素水泥浆一道(內掺建筑胶); 4. Grade A ground slab (Φ10@200 two layer rebar,
2.3 tile-A Thickness 230 mm 4. A级地面垫层(Φ10@200双层钢筋,250厚钢筋 250mm concrete)(detail refer T0103-02) M2
(tile size 600*600) 混凝土)(详见 T0103-02) 5. polyethylene film vapor barrier;
5. 聚乙烯薄膜防潮层; 6. 150mm gravel perfused with M5 cement mortar, vibrated
6. 150厚碎石灌M5水泥浆,振捣密实; and compacted.
7. 素土夯实。 7. Rammed by soil.(including surface cleaning and
levelling)
2/80
BOQ of Architectural Construction of Main Po
1. Contractor supply:
concrete, rebar
1. 8~10mm tiles firmly paved and clapped to be smooth , 1.甲供:钢筋、混凝土
seams be filled by neat cement;
2. 20mm 1:3 cement mortar;
DM 3 -防水地板砖地面
3. 1.5mm polyurethane waterproofing paint, the surface be
1. 8-10厚地砖铺实拍平,素水泥浆擦缝;
sprinkled with sand, at the junction of metope and
2. 20厚1:3水泥砂浆;
ground, the paint should be 150mm over the ground along
3. 1.5厚聚氨酯防水涂料(2道),面撒细黄沙,
the wall.
四周沿墙上翻150mm高
4. One layer of base primer;
DM 3 - waterproof tile- 4. 刷基层处理剂一遍;
5. fine aggregate concrete, 1% slope to ground
2.5 Thickness 232 mm 5. 最薄处20mm厚C20细石混凝土,向地漏找坡 M2
leakage(the thinnest point should not be less than
(tile size 300*300) 1%;
20mm);
6. B级地面垫层(Φ10@300单层双向钢筋,120厚
6. Grade B ground slab (Φ10@300 single layer two-way
钢筋混凝土)(详见 T0103-02)
concrete slab, 120mm concrete)(detail refer T0103-02)
7. 聚乙烯薄膜防潮层;
7. polyethylene film vapor barrier;
8. 150厚碎石灌M5水泥浆,振捣密实;
8. 150mm gravel perfused with M5 cement mortar, vibrated
9. 素土夯实。
and compacted.
9. Rammed by soil.(including surface cleaning and
levelling)
3/80
BOQ of Architectural Construction of Main Po
4/80
BOQ of Architectural Construction of Main Po
5/80
BOQ of Architectural Construction of Main Po
1. Contractor supply:
concrete, rebar
1. 20mm 1:2.5 cement mortar which is no sparking, surface 1.甲供:钢筋、混凝土
DM 6 -不发火花水泥砂浆地面 screeding and pressed polish;
1. 20mm厚1:2.5不发火花水泥砂浆抹面压光 2. One layer of neat cement binding course;
2. 素水泥结合层一道; 3. Grade B ground slab (Φ10@300 single layer two-way
DM 6 - no-sparkig cement 3. B级地面垫层(Φ10@300单层双向钢筋,120厚 concrete slab, 120mm concrete)(detail refer T0103-02) ;
2.9 M2
motor floor 钢筋混凝土)(详见 T0103-02) 4. polyethylene film vapor barrier;
4. 聚乙烯薄膜防潮层; 5. 150mm gravel perfused with M5 cement mortar, vibrated
5. 150厚碎石灌M5水泥浆,振捣密实; and compacted.
6. 素土夯实。 6. Rammed by soil.(including surface cleaning and
levelling)(including surface cleaning and levelling)
6/80
BOQ of Architectural Construction of Main Po
7/80
BOQ of Architectural Construction of Main Po
LM 2 -地板砖楼面
1. 8~10mm tiles firmly paved and clapped to be smooth ,
1. 8-10厚地砖,素水泥浆擦缝;
seams be filled by neat cement;
LM 2 tile 2. 20厚1:3干硬性水泥砂浆;
2.12 2. 20mm 1:3 dry-hard cement mortar; M2
(tile size 600*600) 3. 素水泥浆结合层一道;
3. One layer of neat cement binding course;
4. 钢筋混凝土楼板(已完成)
4. Reinforced concrete slab (finished).
1. Contractor supply:
C20 concrete
1. 8~10mm tiles firmly paved and clapped to be smooth , 1.甲供:混凝土 C20
LM 3 -防水地板砖楼面
seams be filled by neat cement;
1. 8-10厚地砖,素水泥浆擦缝;
2. 25mm 1:4 dry-hard cement mortar;
2. 25厚1:4干硬性水泥砂浆;
3. 1.5mm polyurethane waterproofing paint, the surface be
3.1.5mm厚聚氨酯防水涂料(2道),面撒细黄沙
sprinkled with sand, at the junction of metope and ground,
,四周沿墙上翻150mm;
LM 3 waterproof tile the paint should be 150mm over the ground along the wall.
2.13 4. 基层处理剂一遍; M2
(tile size 300*300) 4. One layer of base primer;
5. 15mm1:2水泥砂浆找平;
5. 15mm 1:2 cement mortar screeding;
6. 50mmC20细石混凝土向地漏找1%坡(最薄处
6. 50mm C20 fine aggregate concrete, 0.5% slope to
不小于30mm)
ground leakage(the thinnest point should not be less
7. 钢筋混凝土楼板(已完成);
than 30mm);
7. Reinforced concrete slab (finished).
8/80
BOQ of Architectural Construction of Main Po
1. Contractor supply:
C20 concrete
1. 20mm granites tiles firmly paved and clapped to be 1.甲供:混凝土 C20
LM 5 -防腐花岗岩 smooth , seams be filled by epoxy resin daub;
1. 20mm厚花岗岩铺实拍平,环氧胶泥擦缝; 2. 4~6mm epoxy cement bonding layer;
2. 4-6mm环氧胶泥结合层; 3. 1.5mm polyurethane waterproofing paint, the surface be
3. 1.5mm厚聚氨酯防水涂料(2道),面撒细黄沙 sprinkled with sand, at the junction of metope and
LM 5 - anti-corrosion
,四周沿墙上翻150mm ground, the paint should be 150mm over the ground along
2.15 granites tiles floor M2
4. 刷基层处理剂一遍; the wall.
(tile size 600*600)
5. 最薄处20mm厚C20细石混凝土,向地漏找坡 4. One layer of base primer;
1%; 5. 15mm 1:2 cement mortar screeding;
6. 素水泥浆一道 6. C20 fine aggregate concrete, 1% slope to trench(the
7. 钢筋混凝土楼板(已完成) thinnest point should not be less than 20mm);
7. Reinforced concrete slab (finished).
9/80
BOQ of Architectural Construction of Main Po
LM 6 -活动地板
1. anti-static raised floor(height refer to building architecture
1. 抗静电活动地板(高度见设计);
drawings);
2. 20mm厚1:2水泥砂浆抹面压光
2. 20mm1:2 cement mortar precausions and light pressure;
3. 素水泥结合层一道;
2.16 LM 6 - raised floor 3. One layer of neat cement binding course; M2
4. 20mm厚水泥砂浆找平;
4. 15mm 1:2 cement mortar screeding and pressed polish;
5. 素水泥结合层一道;
5. One layer of neat cement binding course;
6.钢筋混凝土楼板(已完成)
6. Reinforced concrete slab (finished).
10/80
BOQ of Architectural Construction of Main Po
1. Contractor supply:
concrete brick
200mm thickness, with masonry motor
混凝土空心砖墙 1. brick install with motor, 1.甲供:混凝土空心砖
2.24 Concrete Brick wall 1. 砖墙砌筑(水泥砂浆) M2
2. others works for the brick
2. 砖墙相关的其它工作;
1. Contractor supply:
Concrete column
concrete, rebar
practical,Bond beam &
1.甲供:钢筋、混凝土
2.25 lintel beam, wall 1. 包含模板、施工、养护等 1. including form works, construction etc. M3
concrete foundation
构造柱、过梁、圈梁
Ceiling DP 1 - aluminum
alloy plate ceiling with 配套铝合金龙骨; 1. Matched aluminum alloy keel;
2.26 M2
aluminum alloy keel 方或矩形PVC 铝合金板 2. Square (rectangle) PVC board.
铝合金龙骨铝合金板吊顶
11/80
BOQ of Architectural Construction of Main Po
12/80
BOQ of Architectural Construction of Main Po
Base Board T1 - (high 刷专用界面剂一道; 1. Brush exclusive interface agent for one layer;
2.29 150) cement mortar 12mm1:3水泥砂浆 2. 12mm 1:3 cement lime mortar; M2
washboard 6mm1:2水泥砂浆抹面压光 3. 6mm 1:2 cement lime mortar plaster and pressed polish;
1. Contractor supply:
concrete, rebar
1. 60mm C20 thick fine aggregate concrete pavement, 1.甲供:钢筋、混凝土
bestrewed crosswise by grooves whose depth is 15mm.
1. 60mmC20细石混凝土面层留出横向连续凹槽,
2. One layer of neat cement binding course (mixed with
深15mm
construction glue).
2. 素水泥浆结合层一道;
2.31 Ramp A P1-A 3. Concrete slab grade A (Φ10@200 double layer rebar, M2
坡道 3. A级地面垫层(Φ10@200双层钢筋,250厚钢筋
250mm concrete)(detail refer T0103-02) .
混凝土)(详见 T0103-02)
4. 100mm thick screes(gravels) whose grain diameter is
4. 100mm厚10-40mm卵石(砾石)M5水泥砂浆
10~40mm,poured with M5 cement mortar,
5. rammed earth
13/80
BOQ of Architectural Construction of Main Po
1. Contractor supply:
C20 step and barricade concrete, rebar
concrete 包含模板、钢筋绑扎、砼浇筑等,Refer T0103-
2.33 1. including form works, construction etc. 1.甲供:钢筋、混凝土 M3
台阶、坡道挡墙C20混凝土 03
1. Contractor supply:
1. 60mm厚C20混凝土随捣压光 concrete
1. 60mm thick fine aggregate concrete pavement,
2.34 Apron 2. 150mm10-40卵石灌M2.5混合砂浆 1.甲供:混凝土 M2
散水 2. 150mm thickness 10-40mm stone with M2.5 motor
3. 素土夯实,向外找坡5%
14/80
BOQ of Architectural Construction of Main Po
WM 1D:
1. 防水卷材二层(上面一层防水卷材自带保护层 1. Two layers of waterproof roll, and surface protection;
RC roof (grade I,
); 2. 20mm 1:3 cement mortar screeding, and
2.38 structural slop and often- 2. 25mm 1:3水泥砂浆找平;; 0.75~0.90kg/m3 nylon being mixed; M2
step roof) 3. 50mm挤塑板; 3. 50mm extruded sheet;
钢筋混凝土屋面(结构找坡 4. 钢筋混凝土楼板(已施工)
4. reinforced concrete floor (under construction).
I级上人屋面)
15/80
BOQ of Architectural Construction of Main Po
1. 防滑地砖; 1. Floor for steel stairs, NOT including the steel stairs
2.40 Floor for Steel Stairs M2
2. 水泥砂浆找平 ,详见T0103-03 2. Cement Mortar Screeding (see details from T0103-03)
Due to the design drawings is not completed, the quantity of above item 2.1 to 2.41 is estimated, just for bidding, the final quantity shall based on the final designed drawings.
16/80
BOQ of Architectural Construction of Main Po
17/80
BOQ of Architectural Construction of Main Po
推拉窗(带纱窗) Side window(with screen Including windows and frame, accessories, hardware etc.
3.19 C1515 Ls
window) 含窗框、窗、配件、五金等
推拉窗(带纱窗) Side window(with screen Including windows and frame, accessories, hardware etc.
3.20 C2115 Ls
window) 含窗框、窗、配件、五金等
推拉窗(带纱窗) Side window(with screen Including windows and frame, accessories, hardware etc.
3.21 C3015 Ls
window) 含窗框、窗、配件、五金等
推拉窗(带纱窗) Side window(with screen Including windows and frame, accessories, hardware etc.
3.22 C18018 Ls
window) 含窗框、窗、配件、五金等
推拉窗(带纱窗) Side window(with screen Including windows and frame, accessories, hardware etc.
3.23 C97018 Ls
window) 含窗框、窗、配件、五金等
18/80
BOQ of Architectural Construction of Main Po
19/80
BOQ of Architectural Construction of Main Po
tap for wash basin DN15 PN 0.6MPa, stainless steel Including materials, accessories, hardware etc.
4.7 set
洗手盆水龙头 不锈钢 含所有材料、配件、五金等
tap for slop sink DN15 PN 0.6MPa, stainless steel Including materials, accessories, hardware etc.
4.8 set
拖布池水龙头 不锈钢 含所有材料、配件、五金等
4.10 globe valve DN40 PN 0.6MPa, stainless steel Including materials, accessories, hardware etc. set
截止阀 不锈钢 含所有材料、配件、五金等
4.11 globe valve DN32 PN 0.6MPa, stainless steel Including materials, accessories, hardware etc. set
截止阀 不锈钢 含所有材料、配件、五金等
globe valve DN25 PN 0.6MPa, stainless steel Including materials, accessories, hardware etc.
4.12 set
截止阀 不锈钢 含所有材料、配件、五金等
20/80
BOQ of Architectural Construction of Main Po
4.13 globe valve DN15 PN 0.6MPa, stainless steel Including materials, accessories, hardware etc. set
截止阀 不锈钢 含所有材料、配件、五金等
4.14 water pipe DN40 ø42*1 PN 0.6MPa, stainless steel 316L Including materials, accessories, hardware etc. m
生活水管 不锈钢 含所有材料、配件、五金等
4.15 water pipe DN32 ø38*1 PN 0.6MPa, stainless steel 316L Including materials, accessories, hardware etc. m
生活水管 不锈钢 含所有材料、配件、五金等
4.16 water pipe DN25 ø28*0.8 PN 0.6MPa, stainless steel 316L Including materials, accessories, hardware etc. m
生活水管 不锈钢 含所有材料、配件、五金等
4.17 water pipe DN20 ø22*0.6 PN 0.6MPa, stainless steel 316L Including materials, accessories, hardware etc. m
生活水管 不锈钢 含所有材料、配件、五金等
4.18 water pipe DN15 ø16*0.6 PN 0.6MPa, stainless steel 316L Including materials, accessories, hardware etc. m
生活水管 不锈钢 含所有材料、配件、五金等
4.19 water pipe DN40 ø42*3 PN 0.6MPa, stainless steel 316L Including materials, accessories, hardware etc. m
生活水管 不锈钢 含所有材料、配件、五金等
21/80
BOQ of Architectural Construction of Main Po
V. Mechanical Work
Aluminum alloy
Including materials, accessories, hardware etc.
5.2 waterproof shutter 3000*3500mm 含所有材料、配件、五金等
Pcs
铝合金防雨百叶
Angle steel
5.3 L50*5mm m
角钢
Angle steel
5.4 L40*5mm m
角钢
22/80
BOQ of Architectural Construction of Main Po
Ⅵ . Electrical Work
23/80
BOQ of Architectural Construction of Main Po
wall-type tri-proof lamp 220V 150W Including materials, accessories, hardware etc.
6.3
含所有材料、配件、五金等
set
吸壁式三防灯
emergency wall-type tri-
Including materials, accessories, hardware etc.
6.4 proof lamp 220V 100W 含所有材料、配件、五金等
set
应急吸壁式三防灯
wall-type explosion tri-
Including materials, accessories, hardware etc.
6.5 proof lamp 220V 150W 含所有材料、配件、五金等
set
吸壁式防爆三防灯
emergency wall-type
Including materials, accessories, hardware etc.
6.6 explosion tri-proof lamp 220V 100W 含所有材料、配件、五金等
set
应急吸壁式防爆三防灯
fluorestcent lamp
Including materials, accessories, hardware etc.
6.10 single-tube 220V 36W 含所有材料、配件、五金等
set
单管荧光灯
fluorestcent lamp
Including materials, accessories, hardware etc.
6.11 double-tube 220V 36*2W 含所有材料、配件、五金等
set
双管荧光灯
24/80
BOQ of Architectural Construction of Main Po
25/80
BOQ of Architectural Construction of Main Po
26/80
BOQ of Architectural Construction of Main Po
27/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
1.00 -
1.00 -
28/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
50 479,500 23,975,000
29/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
50 469,500 23,475,000
50 524,500 26,225,000
30/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
31/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
50 374,500 18,725,000
32/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
50 2,088,500 104,425,000
33/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
50 1,824,500 91,225,000
34/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
31 513,000 15,728,580
35/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
20 1,735,000 34,700,000
36/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
50 1,960,000 98,000,000
50 215,000 10,750,000
37/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
20 1,772,000 35,440,000
30 2,945,000 88,350,000
30 66,000 1,980,000
38/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
39/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
-
90 135,000 12,150,000
30 349,800 10,494,000
30 196,000 5,880,000
40/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
41/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
42/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
43/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
44/80
onstruction of Main Power Building
Unit Price Total Price
Qty Steel door(lightRemark
gray)
Material Construction (IDR)
45/80
onstruction of Main Power Building Aluminum alloy windows
46/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
47/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
48/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
10 0 0 - 电缆等是否有?
8 0 0 -
49/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
7 0 -
50/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
7 -
51/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
52/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
9 100,000 900,000
53/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
ontractor, the others test and detection shall be carry out by subcontractor. The concrete shall be
车能到位置。
54/80
Unit Price List
Item Total Unit Price
No. Scopes of Works Price (IDR) Unit
Code Name (IDR)
II. Decorative Works
2-3 mm nonmetal aggregate wear - resisting layer(nonmetal aggregate material is made up of quartz
120,000
aggregate, special cement and other addictive of a certain grain degree)
50 mm C20 fine aggregate concrete, proper placed finished; 25,000
Wear-resisting
one layer of neat cement binding course; 21,000
2.1 DM1A nonmetal aggregate-A 302,500 m2
Thickness 350 mm grade A ground slab(Φ10@200 two layer rebar, 250mm concrete)not included material 45,000
Polyethylene film slab; 1,500
150mm gravel perfused with M5 cement mortar, vibrated and compacted; 60,000
rammed by soil (including surface cleaning and levelling) 30,000
2-3 mm nonmetal aggregate wear - resisting layer(nonmetal aggregate material is made up of quartz
120,000
aggregate, special cement and other addictive of a certain grain degree)
50 mm C20 fine aggregate concrete, proper placed finished; 25,000
Wear-resisting
one layer of neat cement binding course; 21,000
2.2 DM1B nonmetal aggregate-B 292,500 m2
Thickness 250 mm grade B ground slab(Φ10@300 single layer rebar, 120mm concrete)not included material 35,000
Polyethylene film slab; 1,500
150mm gravel perfused with M5 cement mortar, vibrated and compacted; 60,000
rammed by soil (including surface cleaning and levelling) 30,000
8~10mm tiles, seams be filled by neat cement; 262,000
20mm 1:3 cement mortar; 60,000
Wear-resisting tile-A One layer of neat cement binding course (mixed with construction glue); 21,000
2.3 DM2A Thickness 230 mm grade A ground slab(Φ10@200 two layer rebar, 250mm concrete)not included material 45,000 479,500 m2
(tile size 600*600) polyethylene film vapor barrier; 1,500
150mm gravel perfused with M5 cement mortar, vibrated and compacted. 60,000
Rammed by soil.(including surface cleaning and levelling) 30,000
Unit Price List
Item Total Unit Price
No. Scopes of Works Price (IDR) Unit
Code Name (IDR)
8~10mm tiles, seams be filled by neat cement; 262,000
20mm 1:3 cement mortar; 60,000
Wear-resisting tile-B One layer of neat cement binding course (mixed with construction glue); 21,000
2.4 DM2B Thickness 330 mm grade B ground slab(Φ10@300 single layer rebar, 120mm concrete)not included material 35,000 469,500 m2
(tile size 600*600) polyethylene film vapor barrier; 1,500
150mm gravel perfused with M5 cement mortar, vibrated and compacted. 60,000
Rammed by soil. 30,000
8~10mm tiles firmly paved and clapped to be smooth , seams be filled by neat cement; 170,000
20mm 1:3 cement mortar; 60,000
1.5mm polyurethane waterproofing paint, the surface be sprinkled with sand, at the junction of metope and 120,000
ground, the paint should be 150mm over the ground along the wall.
waterproof tile- One layer of base primer; 30,000
2.5 DM3 Thickness 232 mm 524,500 m2
fine aggregate concrete, 1% slope to ground leakage (not include material) 18,000
(tile size 300*300)
grade B ground slab(Φ10@300 single layer rebar, 120mm concrete)not included material 35,000
polyethylene film vapor barrier; 1,500
150mm gravel perfused with M5 cement mortar, vibrated and compacted. 60,000
Rammed by soil.(including surface cleaning and levelling) 30,000
40mm C20 fine aggregate concrete, reinforced with bidirectional Ф4 rebar, distance @150, the surface be
sprinkled with 2~3mm fine cement and be pressed polish(nonmetal aggregate material is made up of quartz
38,000
aggregate, special cement and other addictive of a certain grain degree, the relevant technical information
refer to subcontractor’s specifications) ;
Wear-resisting 1.5mm polyurethane waterproofing paint, the surface be sprinkled with sand, at the junction of metope and
120,000
nonmetal aggregate ground, the paint should be 150mm over the ground along the wall.
2.6 DM4A 384,000 m2
waterproof concrete-A
One layer of base primer; 30,000
Thickness 262 mm
20mm 1:3 cement mortar sloping(thinnest point); 60,000
grade A ground slab(Φ10@200 two layer rebar, 250mm concrete)not included material 45,000
polyethylene film vapor barrier; 1,500
150mm gravel perfused with M5 cement mortar, vibrated and compacted. 60,000
Rammed by soil.(including surface cleaning and levelling) 30,000
40mmC20 fine aggregate concrete, reinforced with bidirectional Ф4 rebar, distance @150, the surface be
sprinkled with 2~3mm fine cement and be pressed polish (nonmetal aggregate material is made up of quartz
38,000
aggregate, special cement and other addictive of a certain grain degree, the relevant technical information
refer to subcontractor’s specifications)
Wear-resisting
nonmetal aggregate
Unit Price List
Item Total Unit Price
No. Scopes of Works Price (IDR) Unit
Code Name (IDR)
Wear-resisting 1.5mm polyurethane waterproofing paint, the surface be sprinkled with sand, at the junction of metope and
120,000
nonmetal aggregate ground, the paint should be 150mm over the ground along the wall.
2.7 DM4B 374,500 m2
waterproof concrete-B One layer of base primer; 30,000
Thickness 262 mm
20mm 1:3 cement mortar sloping(thinnest point); 60,000
grade B ground slab(Φ10@300 single layer rebar, 120mm concrete)not included material 35,000
polyethylene film vapor barrier; 1,500
150mm gravel perfused with M5 cement mortar, vibrated and compacted. 60,000
Rammed by soil.(including surface cleaning and levelling) 30,000
Unit Price List
Item Total Unit Price
No. Scopes of Works Price (IDR) Unit
Code Name (IDR)
anti-static raised floor (the elevation see from the design drawings); 1,800,000
20mm1:2 cement mortar precausions and light pressure; 45,000
One layer of neat cement binding course; 21,000
20mm1:2 cement mortar precausions; 45,000
Plain cement binds together; 21,000
2.8 DM5 raised floor 2,088,500 m2
20mm thickness of polymer cement waterproofing mortar; 30,000
grade B ground slab(Φ10@300 single layer rebar, 120mm concrete)not included material 35,000
polyethylene film vapor barrier; 1,500
150mm gravel perfused with M5 cement mortar, vibrated and compacted. 60,000
Rammed by soil. (including surface cleaning and levelling) 30,000
20mm 1:2.5 cement mortar which is no sparking, surface screeding and pressed polish; 81,020
One layer of neat cement binding course; 21,000
no-sparkig cement grade B ground slab(Φ10@300 single layer rebar, 120mm concrete)not included material 35,000
2.9 DM6 228,520 m2
motor floor polyethylene film vapor barrier; 1,500
150mm gravel perfused with M5 cement mortar, vibrated and compacted. 60,000
Rammed by soil.(including surface cleaning and levelling)(including surface cleaning and levelling) 30,000
20mm granites tiles firmly paved and clapped to be smooth , seams be filled by epoxy resin daub; 1,450,000
4~6mmpolyurethane
1.5mm epoxy cementwaterproofing
bonding layer;paint, the surface be sprinkled with sand, at the junction of metope and 67,000
ground, the paint should be 150mm over the ground along the wall. 120,000
One layer of base primer; 30,000
anti-corrosion granites C20 fine aggregate concrete, 1% slope to ground leakage(the thinnest point should not be less than 20mm); 10,000
2.10 DM7 tiles floor 1,824,500 m2
Neat cement binding course 21,000
(tile size 600*600)
grade B ground slab(Φ10@300 single layer rebar, 120mm concrete)not included material 35,000
polyethylene film vapor barrier; 1,500
150mm gravel perfused with M5 cement mortar, vibrated and compacted. 60,000
Rammed by soil.(including surface cleaning and levelling) 30,000
1. 2~3mm nonmetal aggregate wearresisting layer (nonmetal aggregate material is made up of quartz
aggregate, special cement and other addictive of a certain grain degree, the relevant technical information 120,000
wear-resisting nonmetal refer to subcontractor’s specifications);
2.11 LM1 156,000 m2
aggregate 2. 30mm C20 fine aggregate concrete, proper placed and finished; 15,000
3. One layer of neat cement binding course; 21,000
4. Reinforced concrete slab. (Finished) -
8~10mm tiles firmly paved and clapped to be smooth , seams be filled by neat cement; 262,000
tile 20mm 1:3 dry-hard cement mortar; 99,000
2.12 LM2 382,000 m2
(tile size 600*600)
Unit Price List
Item Total Unit Price
No. Scopes of Works Price (IDR) Unit
Code Name
tile (IDR)
2.12 LM2 382,000 m2
(tile size 600*600) One layer of neat cement binding course; 21,000
Reinforced concrete slab (finished). -
8~10mm tiles firmly paved and clapped to be smooth , seams be filled by neat cement; 170,000
25mm 1:4 dry-hard cement mortar; 110,000
1.5mm polyurethane waterproofing paint, the surface be sprinkled with sand, at the junction of metope and
120,000
ground, the paint should be 150mm over the ground along the wall.
waterproof tile
2.13 LM3 One layer of base primer; 30,000 513,000 m2
(tile size 300*300)
15mm 1:2 cement mortar screeding; 58,000
50mm C20 fine aggregate concrete, 0.5% slope to ground leakage(the thinnest point should not be less than
25,000
30mm);
Reinforced concrete slab (finished). -
40mm C20 fine aggregate concrete, reinforced with bidirectional Ф4 rebar, distance @150, the surface be
sprinkled with 2mm fine cement and be pressed polish (nonmetal aggregate material is made up of quartz
38,000
aggregate, special cement and other addictive of a certain grain degree, the relevant technical information
refer to subcontractor’sspecifications);
Wear-resisting
2.14 LM4 nonmetal aggregate 1.5mm polyurethane waterproofing paint, the surface be sprinkled with sand, at the junction of metope and 120,000 203,000 m2
waterproof concrete ground, the paint should be 150mm over the ground along the wall.
1:2 cement mortar screeding to falls (the thickness of the thinnest point should not be less than 20mm), the
45,000
junction of metope and ground be plastered into slope foot.
Reinforced concrete slab (finished). -
20mm granites tiles firmly paved and clapped to be smooth , seams be filled by epoxy resin daub; 1,450,000
4~6mm epoxy cement bonding layer; 67,000
1.5mm polyurethane waterproofing paint, the surface be sprinkled with sand, at the junction of metope and
anti-corrosion granites ground, the paint should be 150mm over the ground along the wall. 120,000
2.15 LM5 tiles floor 1,735,000 m2
(tile size 600*600) One layer of base primer; 30,000
15mm 1:2 cement mortar screeding; 58,000
C20 fine aggregate concrete, 1% slope to trench(the thinnest point should not be less than 20mm); 10,000
Reinforced concrete slab (finished). -
Unit Price List
Item Total Unit Price
No. Scopes of Works Price (IDR) Unit
Code Name (IDR)
anti-static raised floor(height refer to building architecture drawings); 1,800,000
20mm1:2 cement mortar precausions and light pressure; 60,000
One layer of neat cement binding course; 21,000
2.16 LM6 raised floor 1,960,000 m2
15mm 1:2 cement mortar screeding and pressed polish; 58,000
One layer of neat cement binding course; 21,000
Reinforced concrete slab (finished). -
Unit Price List
Item Total Unit Price
No. Scopes of Works Price (IDR) Unit
Code Name (IDR)
Mixed Mortar or spray (or brush) latex paint of internal wall; 27,000
Interior wall -1A 5mm thick 1:0.5:3 cement-lime mortar; 32,000
2.17 IW1A wall painting -1A 165,000 m2
15mm thick 1:1:6 cement-lime mortar; 53,000
thickness 20mm
brush building glue and plain compo once(building glue:water=1:4) 53,000
brush antacid painting of internal wall (thickness); 28,000
Interior wall-1B 5mm thick 1:0.5:3 cement-lime mortar; 32,000
2.18 IW1B wall painting -1B 166,000 m2
15mm thick 1:1:6 cement-lime mortar; 53,000
thickness 20mm
brush building glue and plain compo once(building glue:water=1:4) 53,000
brush antacid painting of internal wall (thickness); 28,000
Interior wall -1C 5mm thick 1:0.5:3 cement-lime mortar; 32,000
2.19 IW1C wall painting -1C 166,000 m2
15mm thick 1:1:6 cement-lime mortar; 53,000
thickness 20mm
brush building glue and plain compo once(building glue:water=1:4) 53,000
5~7mm white glazed ceramic tile, seams filled with white cement. 70,000
Inerior Wall 2 - glazed 3~4mm 1:1 cement paste and add the 20% weight construction glue of it; 28,000
2.20 IW2 ceramic wall tile One layer of neat cement binding course; 21,000 215,000 m2
thickness 25mm 15mm 1:3 cement mortar; 58,000
Brush exclusive interface agent for one layer; 38,000
Brush with coated mixed paint twice (thickness) and brush coated primer once; 75,000
Interior Wall 3- wall Scraping putty leveling once; 3,000
2.21 IW3 painting -3 thickness 187,000 m2
5~8mm 1:2cement mortar; 51,000
20mm
15mm 1:3 cement mortar; 58,000
20mm granites tiles firmly paved and clapped to be smooth, seams be filled by epoxy resin daub. 1,450,000
5mm mating epoxy cement bonded layer; 49,000
Interior wall 4 - 1.5mm polyurethane waterproofing paint, the surface be sprinkled with sand; 120,000
2.22 IW4 wall painting -4 1,772,000 m2
7mm polymer cement mortar screeding; 70,000
thickness 40mm
5mm 1:3 cement mortar; 45,000
Brush exclusive interface agent for one layer; 38,000
Unit Price List
Item Total Unit Price
No. Scopes of Works Price (IDR) Unit
Code Name (IDR)
Brush with coated mixed paint twice (thickness) and brush coated primer once; 87,000
5mm dry powder type of polymer cement waterproof mortar, and press a layer of alkali resistant glass fiber
Exterior wall 3 - 70,000
mesh inside it;
2.23 EW3 wall painting -3 269,250 m2
thickness 30mm 6mm 1:2.5 cement mortar; 29,700
9mm 1:3 cement mortar; 44,550
Brush exclusive interface agent for one layer; 38,000
brick install with motor, 90,000
2.24 Concrete Brick wall others works for the brick 15,000 105,000 m2
Concrete column
practical, Bond beam &
2.25 including form works, construction etc. 2,945,000.00 2,945,000 m2
lintel beam, wall
concrete foundation
Ceiling aluminum alloy Matched aluminum alloy keel;
2.26 DP1 plate ceiling with Square (rectangle) PVC board. 66,000 m2
aluminum alloy keel
Standard light gage steel keel: the central distance of main keels should not more than 1200, and of the
Ceiling DP 2 - mineral second-rate keels should be 600mm, the wall should be less than 300mm apart from the nearest hanging
2.27 DP2 wool board with light bar; 24,000 m2
gage steel keel
Mineral wool board.
Base Board T1 - (high Brush exclusive interface agent for one layer; 38,000
2.29 150) cement mortar 12mm 1:3 cement lime mortar; 59,400 135,650 m2
washboard 6mm 1:2 cement lime mortar plaster and pressed polish; 38,250
Brush exclusive interface agent for one layer; 38,000
Base Board T2 - (high 9mm 1:3 cement lime mortar; 44,550
150) ceramic tile 6mm 1:2 cement lime mortar; 38,250
2.30 349,800 m2
washboard thickness 26 One layer of neat cement binding course; 21,000
mm 3~4mm 1:1 cement paste and add the 20% weight construction glue of it; 28,000
5~7mm white glazed ceramic tile, size is 600mmx100mm, seams filled with white cement. 180,000
Unit Price List
Item Total Unit Price
No. Scopes of Works Price (IDR) Unit
Code Name (IDR)
60mm thick fine aggregate concrete pavement, fck=4000psi bestrewed crosswise by grooves whose depth is
70,000
15mm.
One layer of neat cement binding course(mixed with construction glue); 21,000
2.31 Ramp A P1-A grade B ground slab(Φ10@300 single layer rebar, 120mm concrete)not included material 35,000 196,000 m2
100mm thick screes(gravels) whose grain diameter is 10~40mm,poured with M5 cement mortar, 40,000
rammed earth 30,000
60mm thick fine aggregate concrete pavement, fck=4000psi bestrewed crosswise by grooves whose depth is
70,000
15mm.
One layer of neat cement binding course(mixed with construction glue); 21,000
2.32 Ramp B P1-B grade B ground slab(Φ10@300 single layer rebar, 120mm concrete)not included material 35,000 196,000 m2
100mm thick screes(gravels) whose grain diameter is 10~40mm,poured with M5 cement mortar, 40,000
rammed earth 30,000
C20 step and barricade 1. including form works, construction etc.
2.33 4,150,000 m3
concrete
60mm thick fine aggregate concrete pavement,
70,000
150mm thickness 10-40mm stone with M2.5 motor 60,000
2.34 Apron 130,000 m3
8~10mm tiles firmly paved and clapped to be smooth , seams be 5~8mm, and filled by 1:1 cement mortar;
25mm 1:4 dry-hard cement mortar, the surface be sprinkled with plain cement; 110,000
RC roof (grade I, One layer of 0.4mm polyethylene film be fully paved; 1,500
2.35 WM 1A architectural slop and Two layers of waterproof roll; 195,000 418,500 m2
often-step roof) 20mm 1:3 cement mortar screeding, and 0.75~0.90kg/m3 nylon being mixed; 77,000
50mm extruded sheet; 35,000
reinforced concrete floor (under construction). -
8~10mm tiles firmly paved and clapped to be smooth , seams be 5~8mm, and filled by 1:1 cement mortar; -
25mm 1:4 dry-hard cement mortar, the surface be sprinkled with plain cement; 110,000
RC roof (grade I, One layer of 0.4mm polyethylene film be fully paved; 1,500
2.36 WM 1B structural slop and Two layers of waterproof roll; 195,000 418,500 m2
often-step roof) 20mm 1:3 cement mortar screeding, and 0.75~0.90kg/m3 nylon being mixed; 77,000
50mm extruded sheet; 35,000
reinforced concrete floor (under construction). -
Unit Price List
Item Total Unit Price
No. Scopes of Works Price (IDR) Unit
Code Name (IDR)
Two layers of waterproof roll, and surface protection; 195,000
RC roof (grade I, 20mm 1:3 cement mortar screeding, and 0.75~0.90kg/m3 nylon being mixed; 77,000
2.37 WM 1C structural slop and non- 1:8 expanded pearlite cement sloping by 2%, and the thinnest point is not less than 20mm; 20,000 327,000 m2
step roof) 50mm extruded sheet; 35,000
reinforced concrete floor (under construction). -
Two layers of waterproof roll, and surface protection; 195,000
RC roof (grade I, 20mm 1:3 cement mortar screeding, and 0.75~0.90kg/m3 nylon being mixed; 77,000
2.38 WM 1D structural slop and 50mm extruded sheet; 35,000 307,000 m2
often-step roof) reinforced concrete floor (under construction). -
8~10mm tiles firmly paved and clapped to be smooth , seams be 5~8mm, and filled by 1:1 cement mortar; -
25mm 1:4 dry-hard cement mortar, the surface be sprinkled with plain cement; 110,000
One layer of 0.4mm polyethylene film be fully paved; 1,500
RC roof (grade I, One layer of water-proof roll; 130,000
2.39 WM 2A structural slop and 373,500 m2
20mm 1:3 cement mortar screeding, and 0.75~0.90kg/m3 nylon being mixed; 77,000
often-step roof)
1:8 expanded pearlite cement sloping by 2%, and the thinnest point is not less than 30mm; 20,000
50mm extruded sheet; 35,000
reinforced concrete floor (under construction). -
Floor for steel stairs, NOT including the steel stairs
25,000
2.40 Floor for Steel Stairs 83,000 m2
Cement Mortar Screeding (see details from T0103-03) 58,000
including material supply and construction etc. 24,000,000
2.41 Embedded 24,000,000 T
lighting
6.1 distribution NM-XRMG3-36B - set
Box
lighting
6.2 distribution NM-XRMG3-36B - -
Box
Proyek : Project Pembangunan Jalan Tol Cinere Jagorawi Paket 2A (Tengah)
Waktu Pelaksanaan : 14 Bulan
Waktu Pemeliharaan : 36 Bulan (Jaminan Performa)
Nilai Kontrak :
RINCIAN BIAYA UMUM LAPANGAN
Sub Total
b Biaya Kantor & Rumah Tangga
1 Sewa Kantor Kontraktor & pemeliharaan bln 14.00
1 Sewa Mess karyawan bln 14.00
3 AC 3/4 PK bh 6.00
2 Tagihan PLN Mess bln 14.00
5 Tagihan telephone + Internet bln 14.00
3 Tagihan PAM Mess bln 14.00
7 Progress photos & Montly report bln 14.00
4 Alat-alat tulis bln 14.00
5 Administrasi ISO-9002 lot 14.00
10 Rapat mingguan bln 14.00
6 Catering ( 30 Org x 25 hr x Rp. 7500 ) bln 14.00
7 Selamatan lot 1.00
8 Tol dan Restribusi oprs kantor 2x30x50000 bln 14.00
9 Copy original lbr 100.00
15 As build draw 10 set uk A3 lbr 100.00
16 As build draw 1 set uk A1 Kalkir Sephia lbr 100.00
10 Jilid dokumen lot 25.00
11 Tempat tidur dan perlengkapan bh 30.00
12 Aqua ( 4 galon x 30 Day x Rp.12000 ) bln 14.00
13 Kertas
- Uk.A3 ( 15 rim/bln) bln 14.00
- Uk.A4 ( 20 rim/bln) bln 14.00
- Uk.A1 1500 lbr lbr 1,500.00
- Kertas Blangko, request, dll bln 14.00
14 Kelengkapan Satpam + seragam 3 set lot 3.00
15 Tinta printer ( 4 nos/month ) bln 14.00
16 Akomodasi Mess bln 14.00
17 Lembur Konsultan bln 14.00
No. Uraian Pekerjaan Unit Volume
Sub Total
c Biaya Administrasi Umum Dll
1 Pengurusan tagihan bln 12.00
2 Pengurusan Dokumen kontrak, dan PHO nos 1.00
3 Biaya Pemeliharaan dan FHO nos 1.00
4 Biaya Fasilitas direksi ls 1.00
Sub Total
d Biaya Lain-lain
1 Buang Sampah Harian bln 1.00
2 Biaya Penambahan Daya listrik lot 1.00
3 Biaya Pembersihan Akhir/perbaikan Ls 1.00
2 Operasional Konsultan MK & Supervisi bln 14.00
Sub Total
Total Biaya Umum
No. Uraian Pekerjaan Unit Volume
Investasi kendaraan
Pembelian Mobil Toyota Kijang Inova Type G ( Diesel) unit -
( masuk ke biaya alat)
Sewa Kendaraan
Sewa Kend. Niaga untuk Manager ( 3 unit) bln 14.00
Sewa Kend. Niaga untuk operasional kantor ( 1 unit) bln 14.00
Sewa Kend. Pick-up untuk lapangan ( 2 unit) bln 14.00
Sewa Sepeda Motor ( 5 unit ) bln 14.00
1 Operasional kendaraan
Kendaraan operasional (7 unit)
- Fuel ( 20 Ltr x 25 day x Rp 6500 x 3) untuk Manager Bln 14.00
- Fuel ( 20 ltr x 25 day x Rp 6500 x 3 ) bln 14.00
- Service : Tune Up nos 21.00
- Ganti Ban nos 12.00
- Tol & Retribusi ( 15000 x 14 x 25 ) bln 14.00
- Fuel ( 2 ltr x 25 day x Rp 6500 x 5 ) Spd Mtr bln 14.00
Harga Jumlah
21,133,148.00 253,597,776.00
16,093,668.00 193,124,016.00
7,000,000.00 84,000,000.00
5,500,000.00 66,000,000.00
9,896,545.60 118,758,547.20
11,853,016.00 142,236,192.00
9,896,545.60 237,517,094.40
7,000,000.00 168,000,000.00
7,000,000.00 168,000,000.00
9,821,790.40 235,722,969.60
9,896,545.60 118,758,547.20
5,500,000.00 66,000,000.00
11,816,072.80 141,792,873.60
6,500,000.00 156,000,000.00
4,000,000.00 48,000,000.00
11,563,339.60 138,760,075.20
10,975,898.40 131,710,780.80
6,500,000.00 78,000,000.00
7,500,000.00 90,000,000.00
10,975,898.40 131,710,780.80
7,500,000.00 90,000,000.00
10,025,068.40 120,300,820.80
7,000,000.00 84,000,000.00
7,000,000.00 84,000,000.00
7,000,000.00 84,000,000.00
6,500,000.00 312,000,000.00
6,500,000.00 78,000,000.00
8,746,222.00 104,954,664.00
6,500,000.00 78,000,000.00
9,821,790.40 117,861,484.80
7,000,000.00 84,000,000.00
4,000,000.00 48,000,000.00
6,503,079.40 234,110,858.40
3,000,000.00 108,000,000.00
4,000,000.00 48,000,000.00
2,500,000.00 150,000,000.00
4,592,917,480.80
Harga Jumlah
Include Gaji
135,590,748.86 135,590,748.86
329,330,590.11 658,661,180.23
329,330,590.11 329,330,590.11
Rp 5,716,500,000.00
Harga Jumlah
Harga Jumlah
3,500,000.00 14,000,000.00
3,000,000.00 18,000,000.00
750,000.00 38,250,000.00
200,000.00 1,000,000.00
1,200,000.00 3,600,000.00
2,800,000.00 2,800,000.00
7,000,000.00 28,000,000.00
9,000,000.00 27,000,000.00
5,000,000.00 15,000,000.00
1,250,000.00 1,250,000.00
150,000.00 1,500,000.00
60,000,000.00 60,000,000.00
1,500,000.00 1,500,000.00
1,250,000.00 1,250,000.00
1,100,000.00 2,200,000.00
5,000,000.00 5,000,000.00
1,600,000.00 4,800,000.00
1,500,000.00 3,000,000.00
Rp 228,150,000.00
12,500,000.00 175,000,000.00
3,500,000.00 49,000,000.00
4,500,000.00 27,000,000.00
2,500,000.00 35,000,000.00
3,000,000.00 42,000,000.00
1,500,000.00 21,000,000.00
150,000.00 2,100,000.00
750,000.00 10,500,000.00
350,000.00 4,900,000.00
1,000,000.00 14,000,000.00
5,625,000.00 78,750,000.00
7,500,000.00 7,500,000.00
3,000,000.00 42,000,000.00
50,000.00 5,000,000.00
70,000.00 7,000,000.00
45,000.00 4,500,000.00
100,000.00 2,500,000.00
250,000.00 7,500,000.00
1,440,000.00 20,160,000.00
150,000.00 2,100,000.00
150,000.00 2,100,000.00
3,000.00 4,500,000.00
1,000,000.00 14,000,000.00
500,000.00 1,500,000.00
2,000,000.00 28,000,000.00
500,000.00 7,000,000.00
12,000,000.00 168,000,000.00
Harga Jumlah
5,000,000.00 70,000,000.00
750,000.00 10,500,000.00
1,000,000.00 14,000,000.00
Rp 877,110,000.00
5,000,000.00 60,000,000.00
50,000,000.00 50,000,000.00
63,890,000.00 63,890,000.00
120,000,000.00 120,000,000.00
Rp 293,890,000.00
100,000.00 100,000.00
7,500,000.00 7,500,000.00
5,000,000.00 5,000,000.00
12,000,000.00 168,000,000.00
Rp 180,600,000.00
Rp 1,579,750,000.00
Harga Jumlah
Harga Jumlah
Rp -
3,000,000.00 42,000,000.00
7,500,000.00 15,000,000.00
57,000,000.00
15,000.00 45,000,000.00
750,000.00 15,000,000.00
2,500,000.00 7,500,000.00
1,500,000.00 12,000,000.00
1,500,000.00 12,000,000.00
5,000,000.00 10,000,000.00
- -
12,000,000.00 168,000,000.00
5,000,000.00 70,000,000.00
4,500,000.00 63,000,000.00
3,750,000.00 52,500,000.00
9,750,000.00 136,500,000.00
9,750,000.00 136,500,000.00
2,000,000.00 42,000,000.00
1,000,000.00 12,000,000.00
5,250,000.00 73,500,000.00
1,625,000.00 22,750,000.00
1,000,000.00 14,000,000.00
otal Biaya Kendaraan Rp 790,750,000.00
3,000,000.00 3,000,000.00
3,500,000.00 196,000,000.00
250,000.00 45,000,000.00
Harga Jumlah
300,000.00 18,000,000.00
200,000.00 20,000,000.00
2,000,000.00 28,000,000.00
500,000.00 7,000,000.00
4,000,000.00 56,000,000.00
3,000,000.00 42,000,000.00
750,000.00 10,500,000.00
1,000,000.00 14,000,000.00
2,500,000.00 35,000,000.00
b Total Perijinan Rp 101,500,000.00
8,720,000,000.00