You are on page 1of 8

Guidelines for Review of Vendor Document No.

Drawings and Documents 8-1741-0110


Rev. No.2
Page 1 of 8

GUIDELINES FOR REVIEW OF VENDOR DRAWINGS


AND DOCUMENTS

2 09.07.07 Reaffirmed and Reissued DDC DRC HOD

1 14.11.03 Revised and Issued for Implementation DDC DRC HOD


Issued for Implementation (after revising to meet
0 29.07.02 DDC DRC HOD
ISO-9001,2K version requirements)
Approved
Rev. No Date Purpose Prepared by Reviewed by
by

Template No. 5-0000-0001-T1 Rev. 1 Copyrights EIL – All rights reserved


Guidelines for Review of Vendor Document No.
Drawings and Documents 8-1741-0110
Rev. No.2
Page 2 of 8

Abbreviations:

P & ID Piping & Instrumentation Diagram


HFD Hydraulic Flow Diagram
PFD Process Flow Diagram
BEP Basic Engineering Package including process Calculations

Document Drafting Committee Members:

Mr. J.K.Joshi, Sr. Manager


Mr. V.K.Sharma, Manager
Mr. Vikram Singh, Dy. Manager

Document Review Committee Members

Mr. B.B.Lal, AGM


Mr. V. S. Chhaya, AGM
Mr. Susheel Sadh, Sr. Manager

Template No. 5-0000-0001-T2 Rev. 1 Copyrights EIL – All rights reserved


Guidelines for Review of Vendor Document No.
Drawings and Documents 8-1741-0110
Rev. No.2
Page 3 of 8

CONTENTS

CLAUSE NO. TITLE PAGE NO.

1. PURPOSE 4

2. SCOPE 4

3. REFERENCES 4

4. DEFINITIONS 4

5. METHODOLOGY 4

ANNEXURES

ANNEXURE-I Review of data sheet of a tank

ANNEXURE-II Review of GA drawing of tank

ANNEXURE-III Review of data sheet of pumps

Template No. 5-0000-0001-T2 Rev. 1 Copyrights EIL – All rights reserved


Guidelines for Review of Vendor Document No.
Drawings and Documents 8-1741-0110
Rev. No.2
Page 4 of 8

1.0 PURPOSE

This document enumerates the guidelines for review of vendor drawings and
documents.

2.0 SCOPE

This document is applicable while reviewing various documents/drawings


submitted by approved vendor with respect to all jobs related to Environment
Division.

3.0 REFERENCES

Bid document, Addendum, Corrigendum, Technical Memorandum, Minutes of


Meeting, Contract document, etc.

4.0 DEFINITIONS

DOCUMENTS: Documents shall include write-ups, design philosophy, design


basis, data sheets, equipment list, instrument list, line list, process design,
sizing, calculations, sketches etc, with reference to the specific project under
consideration.

5.0 METHODOLOGY

5.1 Vendor shall submit list of drawings & documents alongwith their suggestive
approval category for review by EIL during project kick off meeting.

5.2 Vendor shall submit all the drawings & documents to EIL as per the advise of
project division.

5.3 Environment Division, shall review these documents pertaining to Environment


Division from Process/Environment point of view and then release the
documents to the coordinating department for further review by other
concerned divisions/departments.

5.4 Reviewed drawing and documents shall be categorised as Code-1, Code-2 or


Code-3 approval categories as per EIL’s standards applicable from time to time.
The drawings and documents of information category or proprietary
equipments/systems shall be marked “Retained for information”.

5.5 All drawings & documents submitted by the vendor shall be reviewed as per
project specific schedule.

5.6 One copy of all the final drawings shall be maintained in the division for a period
mentioned for quality records.

5.7 The inputs furnished by Process group will form the basis for review, wherever
applicable. The critical parameters to be reviewed by Environment Division for
tanks & pumps are enclosed herewith as Annexure - I, II & III.

Template No. 5-0000-0001-T2 Rev. 1 Copyrights EIL – All rights reserved


Guidelines for Review of Vendor Document No.
Drawings and Documents 8-1741-0110
Rev. No.2
Page 5 of 8
ANNEXURE - I

REVIEW OF DATA SHEET OF TANK

Environment Division shall check the following parameters in the Data Sheet submitted by
the vendor as part of Basic Engineering Package vis-a-vis Process Data Sheet issued by
Process Division or Environment Division and included as part of Bid document.

1. Service

2. Type

3. Capacity

4. Diameter

5. Height

6. Design Code

7. Operating

- Pressure
- Temperature

8. Design Pressure

a) Positive
b) Vacuum

9. Design Temperature

10. Material of construction

11. Corrosion Allowance

a) Roof
b) Shell
c) Bottom

12. Lining/Painting(Internal)

13. Blanketing Gas Yes/No

Blanketing Gas Pressure -

14. Heating Coil Yes/No

15. Insulation "

16. Breather Valve "

Template No. 5-0000-0001-T2 Rev. 1 Copyrights EIL – All rights reserved


Guidelines for Review of Vendor Document No.
Drawings and Documents 8-1741-0110
Rev. No.2
Page 6 of 8
17. CO2 Absorber Yes/No

Fume Absorber "


Silica Gel breather "
Flame arrester "

18. Mixer "

19. Gauging & sampling Hatch "

20. PVRV "

21. Vent "

22. Level Indicator "

Template No. 5-0000-0001-T2 Rev. 1 Copyrights EIL – All rights reserved


Guidelines for Review of Vendor Document No.
Drawings and Documents 8-1741-0110
Rev. No.2
Page 7 of 8

ANNEXURE - II

REVIEW OF GA DRAWING OF TANK

Environment Division shall check the following parameters in the G.A. drawing of the tanks,
submitted by the vendor vis-a-vis the process data sheet and P&IDs included in the Basic
Engineering Package as reviewed and commented by Environment Division.

1. Service

2. Type : Fixed Roof/Floating Roof

3. Capacity

4. Diameter

5. Height

6. Design Pressure

a) Positive
b) Vacuum

7. Design Code

8. Design Temperature

9. Material of construction

10. Corrosion Allowance

- Roof
- Shell
- Bottom

11. Lining/Painting(Internal)

12. Nozzle Schedule ( dia and class) except nos. & dia of instrument nozzles.

Template No. 5-0000-0001-T2 Rev. 1 Copyrights EIL – All rights reserved


Guidelines for Review of Vendor Document No.
Drawings and Documents 8-1741-0110
Rev. No.2
Page 8 of 8

ANNEXURE - III

REVIEW OF DATA SHEET OF PUMPS

Environment Division shall review the following process parameters in the data sheet of
pumps included in the Basic Engineering Packages submitted by the vendor vis-a-vis the
Process Data Sheets included in the bid document and Hydraulic Calculations in the Basic
Engineering Package as reviewed and commented by Environment Division.

1. Service

2. Liquid handled

3. Liquid density

4. Presence of corrosive/toxic component Yes/No

5. Presence of suspended solids "

6. Flow Normal M3/hr

Max.

Min.

7. Suction pressure

8. Differential Head

9. NPSH available

10. Material of construction

Casing
Impeller/Rotor
Stator
Diaphragm

11. Seal Mech/Packing

Template No. 5-0000-0001-T2 Rev. 1 Copyrights EIL – All rights reserved