VALOR REFERENCIAL
AREA ARQUITECTURA 2,426,375.62
AREA ING. ESTRUCTURAL 669,302.05
AREA ING. SANITARIA 201,493.05
AREA ING. ELECTRICA 285,127.98
AREA ING. ELECTROMECANICA 191,148.31
TOTAL: 3,773,447.01
COSTOS DE INVERSIÓN
PROYECTO: AMPL. CENTRO DE SALUD ALTO CHIJINI UV "A"
(EXPRESADO EN BOLIVIANOS)
INVERSIÓN EN OBRAS CIVILES 3,773,447.01
TOTAL: 3,773,447.01
COSTOS DE SUPERVISION (Expresado en Bolivianos)
RGC DIFERENCIA
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
0.00 191,148.31
0 0
57.40%
33.23%
3.06%
2.87%
0.29%
PROYECTO: AMPL. CENTRO DE SALUD ALTO CHIJINI UV "A"
320742.99585
COSTOS DE MANTENIMIENTO POR COMPONENTE PROYECTO: AMPL.
CENTRO DE SALUD ALTO CHIJINI UV "A"
DESCRIPCION
AREA TOTAL:
MATERIAL IMPORTADO 18,819.28 18,819.28 84,114.94 0.05867403
MATERIAL NACIONAL 65,295.66 65,295.66 0.20357625
MANO DE OBRA CALIFICADA 79,848.07 79,848.07 0.24894718
MANO DE OBRA NO CALIFICADA 2,109.49 2,109.49 0.00657689
BENEFICIOS SOCIALES 58,337.39 58,337.39 0.18188204
IMPUESTO AL VALOR AGREGADO 20,961.39 20,961.39 161,256.33 0.06535259
MAQUINARIA IMPORTADA 2,085.20 2,085.20 0.00650114
MAQUINARIA NACIONAL 0.00 0.00 0
HERRAMIENTAS 9,675.28 9,675.28 0.03016522
GASTOS GENERALES 25,713.04 25,713.04 0.08016713
UTILIDADES 28,284.35 28,284.35 0.08818384
IMPUESTOS A LAS TRANSACCIONES 9,613.85 9,613.85 0.02997369
TOTAL: 320,743.00 320,743.00
PERIODO 0 1
COSTOS ACTUALIZADOS: 5,025,078.40 779,640.36
BENEFICIOS ACTUALIZAD 0.00 1,793,094.88
8.166666667
O DE CAJA
ROYECTO: AMPL. CENTRO DE SALUD ALTO CHIJINI UV "A"
AÑO 3 AÑO 4 AÑO 5 AÑO 10 AÑO 15 AÑO 20
2,227,358.70 2,338,726.64 2,455,662.97 3,134,117.37 4,000,016.21 5,105,146.94
738,454.50 775,377.23 814,146.09 1,039,079.64 1,326,158.19 1,692,551.24
1,488,904.20 1,563,349.41 1,641,516.88 2,095,037.73 2,673,858.03 3,412,595.70
949,277.03 954,811.91 1,064,498.11 1,211,904.16 1,382,498.65 1,579,960.13
949,277.03 954,811.91 1,064,498.11 1,211,904.16 1,382,498.65 1,579,960.13
856,533.53 882,229.53 908,696.42 1,053,428.20 1,221,212.00 1,415,719.41
856,533.53 882,229.53 908,696.42 1,053,428.20 1,221,212.00 1,415,719.41
51,393.39 51,907.32 52,426.39 55,100.67 57,911.35 60,865.42
46,721.26 47,188.47 47,660.36 50,091.51 52,646.69 55,332.20
4,672.13 4,718.85 4,766.04 5,009.15 5,264.67 5,533.22
41,350.12 20,675.06 103,375.30 103,375.30 103,375.30 103,375.30
41,350.12 20,675.06 103,375.30 103,375.30 103,375.30 103,375.30
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
1,278,081.67 1,383,914.72 1,391,164.86 1,922,213.20 2,617,517.56 3,525,186.81
2 3 4 9 14 19 20 SUMA
711,444.72 663,694.30 592,494.95 375,247.84 237,855.20 150,879.96 145,371.82 12,639,470.80
1,671,030.11 1,557,274.89 1,451,263.54 1,020,120.11 717,061.38 504,035.77 469,723.58 19,909,651.15
DETALLE DE EQUIPAMIENTO PROYECTO: AMPL. CENTRO DE SALUD ALTO
CHIJINI UV "A"
AREA MEDICA EQUIPAMIENTO
Consultorio 7,139.13
Consultorio de odontologia 113,491.88
Dots 0.00
Sala de pre parto 4,166.08
Sala de parto 153,604.82
Laboratorio 318,486.20
Sala de internacion de transito varones 782,000.00
Sala de internacion de transito mujeres 782,000.00
Espera 3,850.00
Farmacia 7,500.00
Porteria 3,740.00
informaciones 8,355.00
Total 2,184,333.11
PERIODO 0 1
COSTOS ACTUALIZ 5,527,586.24 873,840.73
BENEFICIOS ACTU 0.00 2,121,294.00
PERIODO 0 1
2 3 4 9 14 19 20 SUMA
898,519.68 944,604.91 950,093.07 1,093,016.45 1,258,443.21 1,449,944.28 1,574,426.91 29,057,274.58
2,227,358.70 2,338,726.64 2,455,662.97 3,134,117.37 4,000,016.21 5,105,146.94 5,360,404.29 70,142,610.04
2 3 4 9 14 19 20 SUMA
COSTO
CASO CANTIDAD PORCENTAJE CASOS AL AÑO
PROMEDIO
COSTO TOTAL
ANUAL
489,600.00
27,200.00
153,000.00
669,800.00
COSTO TOTAL
ANUAL
693,600.00
428,400.00
228,480.00
1,350,480.00
RESUMEN DE CARGAS
Potencia
Factor de
Medidor Tablero Nº Instalada
Demanda
(W)
TPB-S (1φ) 3051 1
TPB-A (3φ) 20472 1
M-G
TP1-S (1φ) 7906 0.7
TP2-S (1φ) 8447 0.7
TOTAL 39876
POTENCIA INSTALADA PI
FACTOR DE DEMANDA
POTENCIA DEMANDADA (W)
FACTOR DE POTENCIA
POTENCIA DEMANDADA (VA)
COSTOS POR CONSUMO DE ENERGÍA ELÉCTRICA PARA LA CONSTRUCCIÓN DEL PARQUE DE RECREACIÓN FAMILIAR
POTENCIA
POTENCIA FACTOR DE
ÁREA DEMANDADA (kw-
INSTALADA (kw) POTENCIA h)
POTENCIA
HORAS COSTO POR COSTO TOTAL COSTO TOTAL COSTO TOTAL
DEMANDADA (kw- SERVICIO
TRABAJADAS (Bs./Kw) (Bs./Día) (Bs./Mes) (Bs./Año)
h/día)
CONSUMO DE AGUA POR AREA PROYECTO: AMPL. CENTRO DE SALUD ALTO CHIJINI UV "A"
50 175 0.175
50 155 0.155
50 185 0.185
50 772 0.772
50 534.5 0.5345
50 290 0.29
50 290 0.29
50 245 0.245
50 450 0.45
50 1080 1.08
50 175 0.175
50 185 0.185
4536.5 0
0 4.5365
Proyecto: AMPL. CENTRO DE SALUD ALTO CHIJINI
UV "A"
(Expresado en Bolivianos)
COSTOS POR SERVICIO TELEFONICO
DETALLE CANTIDAD
CONSUMO POR DIA (Min): 240
CONSUMO POR MES(Min): 5,280
CONSUMO POR AÑO(Min): 63,360
TARIFA POR CONSUMO(Bs./Min): 0.125
COSTO POR DIA (Bs.): 30 0.125
COSTO POR MES (BS.): 660
COSTO POR AÑO (Bs.): 7,920
SUELDOS Y SALARIOS PROYECTO: AMPL. CENTRO DE SALUD ALTO CHIJINI UV "A"
(Expresado en Bolivianos)
SUELDOS Y
CANTIDAD DE SUELDOS Y SALARIOS
DESCRIPCION SALARIOS (Bs.
PERSONAL (Bs. /Mes) (3)=(1)*(2)
/Mes) (2)
81,250.00
77,584.00
137,436.00
68,718.00
64,350.00
68,718.00
68,718.00
64,350.00
93,880.80
29,965.00
28,925.00
23,470.20
807,365.00
BENEFICIARIOS
BENEFICIARIOS DIRECTOS 1,240
BENEFICARIOS INDIRECTOS 18,576
TOTAL: 19,816
Estructura de Financiamiento por componente - Financiamiento Propio Proyecto: AMPL. CENTRO DE SALUD ALTO CHIJ
Financiamiento Externo G.A.M.E.A.
Descripción Total Financiamiento
Crédito Externo Donación Efectivo
Externo
USOS Y FUENTES.
Cuadro de Usos y Fuentes de Recursos Economicos Proyecto: AMPL. CENTRO DE SALUD ALTO CHIJINI UV "A"
CONSTRUCCIONES E
RECURSOS GASTOS
PERIODO CREDITO TOTAL FUENTES INVERSION EN
GAMEA INFRAESTRUCTURA OPERATIVOS
COSTOS DE
EQUIPAMIENTO TOTAL USOS
MANTENIMIENTO
SUELDOS Y
CANTIDAD DE SUELDOS Y SALARIOS TIEMPO DE SUELDOS Y
DESCRIPCIÓN PERSONAL (1) SALARIOS (Bs./MES) TRABAJO SALARIOS(Bs./AÑO)
(Bs./MES) (2) (3)=(1)X(2) (4)=(3)X(12MESES)
2400
2 1800
COSTOS DE MANTENIMIENTO
(EXPRESADO EN BOLIVIANOS)
PRIMER AÑO: 32,074.30
SEGUNDO AÑO: 32,074.30
TERCER AÑO: 64,148.60
CUARTO AÑO: 32,074.30
QUINTO AÑO: 160,371.50
TOTAL(Bs.): 320,743.00