You are on page 1of 6

LOG SHEET OF DIVERSIFIED TRAINING FOR ARCHITECTS LICENSURE EXAMINATION

SUMMARY

FIELD OF PRACTICE MINIMUM


% (MAX) CREDIT HOURS TOTAL NO. OF HOURS
ACCOMPLISHED
balance/excess

ARCHITECTURAL DESIGNING/DRAFTING, STRUCTURAL


CONCEPTUALIZATION, PLANNING & THE LIKE 30% 1152 1252 A 100

PREPARATION OF CONTRACT DOCUMENTS,


SPECIFICATION WRITING, BILL OF MATERIALS, COST
ESTIMATES, GENERAL CONDITIONS, BIDDING 25% 960 976 B 16
DOCUMENTS, CLERK OF WORKS AND THE LIKE
FIELD SUPERINTEDENCE, PROJECT MANAGEMENT
ADMINISTRATION & THE LIKE 15% 576 836 C 260
TECHNICAL, ECONOMIC AND FINANCIAL FEASIBILITY
STUDIES, PROJECT PROMOTIONAL, PRE-DESIGN & THE
LIKES
10% 384 400 D 16
ARCHITECTURAL LAY-OUTING OF MECHANICAL
ELECTRICAL, ELECTRONIC, SANITARY, PLUMBING,
COMMUNICATIONS AND OTHER UTILITY SYSTEMS,
EQUIPMENT AND FIXTURES ARCH'L LIGTHING,
10% 384 528 E 144
ACOUSTICS ANDINTERIORS/SPACE
ARCHITECTURAL ALLIED FIELD OF PLANNING,
PRACTICE
RESTORATION/PRESERVATION AND OTHER ANCILLARY
SERVICES
10% 384 460 F 76

TOTAL 3840 4452 612

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
Project title: Ms. XX Residence
Location: Porac Pampanga
Conducted ar. Programming and feasibility 8 11 10 21 1 11 188
Schematic Design preparation 24 1 11 7 2 11 44
Consultation and presentation to client 8 2 11 18 2 11 36
Preparation of drawings for building permit 21 2 11 25 2 11 100
Architectural Interior space planning 28 2 11 25 3 11
Preparation of estimates, specifications and materials 28 3 11 2 5 11 92
Meeting with client and project approval 6 5 11 13 5 11 24
Application for building permit 16 5 11 23 5 11 24
Site Supervision 24 5 11 29 11 11 380
Preparation of Architectural shop drawings 1 12 11 29 12 11 48
Consultation meeting with client 4 1 12 13 1 12 32
Application for occupancy 16 1 12 31 1 12 48
Architectural Interior detailing 1 2 12 29 2 12
Final cost analysis of the project 1 3 12 23 3 12 68

TOTAL NO OF HOURS 192 232 380 280 0


PERIOD COVERED Corresponding Number of hours of Described
PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
Project title: Dr. XYZ Residence
Location: Villa Teresa, Brgy. Sto Rosario, Angeles City
Site Inspection, data gathering and analysis 2 5 12 11 5 12 64
Conducted ar. Programming and feasibility 14 5 12 25 5 12 80
Schematic Design preparation and rendering 28 5 12 15 6 12 112
Consultation and presentation to client 18 6 12 22 6 12 40
Preparation of drawings for building permit 25 6 12 17 8 12 304
Preparation of estimates, specifications and materials 20 8 12 21 9 12 184
Preparation of Bid documents and contracts 24 9 12 28 9 12 80
Architectural Interior Planning 1 10 12 12 10 12
Application for building permit 15 10 12 22 10 12 48
Site Supervision 23 10 12 27 3 13 352
Layouting of Electrical, mechanical, Sanitary, plumbing 2 2 13 27 3 13 480
Architectural show drawings 1 4 13 10 5 13 228
Preparation of Asbuilt plans 14 5 13 12 7 13 336
Architectural Interior Detailing 15 7 13 31 7 13
Application for Occupancy 1 8 13 23 8 13 96

TOTAL NO OF HOURS
980 408 416 120 480

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
Project title: ABC Medical Arts building Renovation
Location: Rizal St. Balibago Angeles City
Site Inspection, data gathering and analysis 26 8 13 30 8 13 40
Asbuilt drawing of plans 2 9 13 6 9 13 40
Schematic Design preparation and rendering 16 9 13 20 9 13 40
Layouting of Electrical, mechanical, Sanitary, plumbing 23 9 13 30 9 13 48
Preparation of estimates, specifications and materials 1 10 13 15 11 13 256
Preparation of Bid documents and contracts 18 11 13 29 11 13 80
Architectural Interior detailing and planning 2 12 13 20 12 13
TOTAL NO OF HOURS
80 336 40 0 48
Prepared by:

Ar. Jan Philippe N. Cortes


Hope it will help! Cheers and good luck!
TION

balance/excess

100

16

260

16

144

76

612

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS 35

188
HOURS PER
DAY 8
44
36
TOTAL 280
100
80 80
92
24
24
380
48
32
48
76 76
68

156 1240
hours of Described Total No.
OP) of hours CALCULATOR
F
NO. OF DAYS 0

64
HOURS PER
DAY 0
80
112
TOTAL 0
40
304
184
80
80 80
48
352
480
228
336
104 104
96

184 2588

hours of Described Total No.


OP) of hours CALCULATOR
F
NO. OF DAYS 0

40
HOURS PER
DAY 0
40
40
TOTAL 0
48
256
80
120 120
120 624

You might also like