You are on page 1of 2

Section II – Technical Specifications

Tender enquiry no. : STDS/12­1/2016­17/17­18/PUR/STL/D­836

Name of the equipment : Electrical Work in New MCB Testing Lab in STL.

SCOPE : The scope of work covers the supply and installation of the electrical equipments required for electrification work in the MCB test 
laboratory of STL,CPRI,STDS,Bhopal.

Note: The Offers should be submitted only in this format otherwise the offer will be liable for rejection .A detailed technical catalogue 
/literature/pamphlet and any other technical details shall be sent in hard copy in a sealed cover super scribing enquiry number and due date 
so as to reach the following address within the due date and time. This is very much essential to evaluate your offer. The work is to be done at 
Switchgear Testing and Development Station,Bhopal

Name of the Vendor :

Offer No and date: 

SI.No CPRI Specification/Requirements To be Completed by the Bidder

Guaranteed Technical 
Deviation/Remarks specify if any
Particulars (GTP)

Guarantee : The performance guarantee of the electrical equipments 
1 should be one year from the date of commissioning. 10% bank 
guarantee during warranty period is required.

2 OBJECTIVE :Electrical Work in New MCB Testing Lab in STL.

3 DETAILED SPECIFICATION

S.No Description Unit

Supply, Installation, Testing and Commissioning (SITC) of LT 
Control Panel Wall/Floor Mounting, Dust and Vermin Proof 
3.1
Fabricated With 14 SWG MS Sheet and Painted by Powder Coating 
in Siemens grey Color as per following details.

3.1.1      Incomer

(A) 200A, MCB – 01Nos.

(B)  40X4 mm Size Copper Busbar TPN – 01 Set.

3.1.2      Outgoing

(A) C63A, TPN MCB ‐ 01 Nos.

(B)  C32A, TPN MCB ‐ 03 Nos.

(C)  C32A, SPN MCB ‐ 08 Nos.

(D) Digital Panel Meter with Display for A/V/F with Suitable CTs.
SI.No CPRI Specification/Requirements To be Completed by the Bidder

Guaranteed Technical 
Deviation/Remarks specify if any
Particulars (GTP)

Supply, Installation, Testing and Commissioning (SITC) of Metal 
3.2 Clad Plug Socket Unit 20A SP With 20A SPN MCB in Fabricated AC 
Box Including Fixing in PVC Casing Capping.

Supply, Installation, Testing and Commissioning (SITC) of 95 
3.3 Sq.mm, 3.5 Core PVC insulated and Sheathed armed Copper Cable 
for Connection of Proposed LT Panel as per item No. 1

Supply, Installation, Testing and Commissioning (SITC) of 16 
3.4 Sq.mm, 4 Core PVC insulated and Sheathed, Unarmed Copper 
Cable for Connection of Proposed Machine.

Supply, Installation, Testing and Commissioning (SITC) of 16 
3.5 Sq.mm, 4 Core PVC insulated and Sheathed, Unarmed Copper 
Cable for Connection of Proposed Machine.

Operating specification Power supply : 230Vac/415V , 50Hz, single 
4
phase/3‐phase.

The work is to be executed within 30days from the date of placement of 
5
purchase order.

The work done will be checked by the users in the laboratory and the 
6 payment will be done against the satisfactory completion of the work as 
specified by the personnels in the laboratory.

Any assistance required from CPRI shall be intimated before initiation of 
7
the work.
Other terms & conditions : All other terms and conditions shall comply 
with CPRI's purchase procedure. The circuit diagram, operation 
manuals, maintenance instructions of the test 
8
system/equipment/instrument shall be submitted in duplicate to CPRI 
alongwith the set‐up.
PN: 1. A detailed technical catalogue/phamlet and other details shall be sent in hard copy in a sealed cover super scribing tender enquiry number and 
due date so as to reach the following address within the time. This is very much essential to evaluate your offer.
2. Letter of authorization issued by the principal shall be sent by the Indian agents who have offered on behalf of their principals. 
Address : Joint Director
Central Power Research Institute
STDS, Govindpura, Bhopal‐ 462023.