Visual Examination
Dimensions Attached Separate sheet table 2 to 9
PERFORMANCE ( CL 9.2 )
a) Water Tightness Characteristic ( CL 9.2.1 )
b) Pressure Resistance Characteristic ( CL 9.2.2 )
c) Hydraulic Characteristic ( CL 9.2.3 )
d) Mechanical Strength Characteristic ( CL 9.2.4 )
TESTING OF NICKEL CHROMIUM PLATING IS:8376/1988
a) Thickness Test ( Cl 7.1 )
b) Thermal Cycling Test ( Cl 7.2 )
c) Corrosion Resistance Test ( Cl 7.3 )
d) Ductility Test ( Cl 7.4 )
NICKEL CHROMIUM PLATING TEST IS:1068/1993
a) Thickness of plating Cl 9.1
b) Adhesion Cl 9.2
c) Corrosion Resistance Cl 9.3
d) Ductility Cl 9.4
Any other tests as per R/C
* Use extra sheets if required * Number of specimen to be tested for each sample and test methods adopted for
different tests and criterion of conformity shall be as specified in the governing spec/R/C. * Results on all specimens to
be reported on separate sheets and only the final value as applicable shall be reported in the table above. * Values and
tolerances of different parameters shall be in accordance with the contract and shall be noted in the first column. *All
tests as per R.C spec shall be conducted. . *Where applicable raw material manufacturer test certificate as per relevant
specification shall be obtained from the supplier.
Conclusion:
Quantity accepted Quantity rejected
Packing details to be incorporated in I Note
How I Mark put Facsimile of I mark Name, designation, seal of Inspector
Name, Designation and seal of
supplier
Date
Place
DGS&D - QA Inspection Report for Self Closing Taps For Water Supply Purpose Version-1
( To be reported separately for each type & size ) DQA/GE/RC-116
(8)
QA Office File no. Inspection Call No and date
RC/Order no. Quantity ordered
Supplier Place of Inspection
Description of Stores Self Closing Taps For Water Supply Quantity offered
Purpose
Date of Inspection Call Date(s) of Inspection Quantity Inspected
Specification IS: 1711/1984 (Reaffirmed 2010)
Type:
Size:
No. of Samples drawn
Verify correctness as per Manufacture & Workmanship Cl Material Cl 4.1 Operation Cl 6 Finish Cl 7
contract (Tick √) 5.1
Marking Cl 10
Test Results Sample no.
Parameter Requirement 1 2 3 4 5
Visual Examination
Dimension Cl 3.1
( Attached separate sheet )