3) Design Loads
Span of the gate B 15 m EL.ws 910 m
Maximum head water on the sill H 15 m EL.v 910 m
gate actual height h 15 m 15+200mm side seal EL.c 911.5 m
Gate sealing height h' 15.2 m EL.s 895 m
specific wt. of water ϒ 9.81 KN/m3
Water thrust
Horizontal thrust Wh 16551.43 KN
Vertical thrust Wv 14835.49 KN
Resultant water thrust Wr 22227.05 KN
angle at which water pressure act ϴ 41.87
Φ α β γ
0.1 0.1536 0.5114 0.335
Lower curve length L3 2.87 m 8.76 degree
middle curve length L2 9.54 m 29.18 degree
upper curve length L1 6.25 m 19.11 degree
Selection of arms position in main horizontal beam
overhanging length a1 3.375 m
midspan length b1 8.25 m
Calculation of axial load at arms
angle made by upper arm γl 11.01 deg sin(γl) 0.191
angle made by lower arm γu 18.17 deg sin(γu) 0.312
sin(γu +γl) 0.488
cos(γu +γl) 0.873
angle betn arms and pier face ω 5.16 deg cos(ω) 0.996 1.6875
sin(ω) 0.090 18.75
0.09
5.16
******** case of sloped radial arms to pier face
Load on each upper arm Pu 4370.67 kN
load on each lower arm Pl 7137.39 KN
******** case of radial arms parallel to pier face ω 0 deg
Load on each upper arm Pu 4352.94 kN
load on each lower arm Pl 7108.42 KN