Professional Documents
Culture Documents
EQUIPO
COSTO
DESCRIPCION Numero TARIFA C/HORA Rend. u/h
TOTAL
A B C=AxB R D=CxR
Herramienta menor (5.00% M.O.) 1.00 0.20 1.0000 0.20
Retroexcavadora 1.00 26.40 1.0000 26.40
SUB - TOTAL (M) 26.60
MANO DE OBRA
COSTO
DESCRIPCION Numero JOR. / HORA C / HORA Rend. u/h
TOTAL
A B C=AxB R D=CxR
2.00 3.41 6.82 0.1500 1.02
0.10 3.83 0.38 0.1500 0.06
1.00 5.00 5.00 0.1500 0.75
0.10 3.45 0.34 0.1500 0.05
SUB - TOTAL (N) 1.88
MATERIALES
COSTO
DESCRIPCION UND. CANTIDAD P. UNITARIO
TOTAL
A B C=AxB
SUB - TOTAL (O) 0.00
TRANSPORTE
COSTO
DESCRIPCION UND. CANTIDAD DMT (Km) TARIFA (Km)
TOTAL
A B C D=AxBxC
SUB - TOTAL (N)
TOTAL COSTOS DIRECTOS (M+N+O+P) 28.48
TOTAL COSTOS INDIRECTOS 0.00 0.00
UTILIDAD 0.00 0.00
EQUIPO
COSTO
DESCRIPCION Numero TARIFA C/HORA Rend. u/h
TOTAL
A B C=AxB R D=CxR
SUB - TOTAL (M) 0.00
MANO DE OBRA
COSTO
DESCRIPCION Numero JOR. / HORA C / HORA Rend. u/h
TOTAL
A B C=AxB R D=CxR
SUB - TOTAL (N) 0.00
MATERIALES
COSTO
DESCRIPCION UND. CANTIDAD P. UNITARIO
TOTAL
A B C=AxB
Bodega y cocina m2 1.00 226.00 226.00
SUB - TOTAL (O) 226.00
TRANSPORTE
COSTO
DESCRIPCION UND. CANTIDAD DMT (Km) TARIFA (Km)
TOTAL
A B C D=AxBxC
SUB - TOTAL (N)
TOTAL COSTOS DIRECTOS (M+N+O+P) 226.00
TOTAL COSTOS INDIRECTOS 0.00 0.00
UTILIDAD 0.00 0.00
ESPECIFICACION:
EQUIPO
COSTO
DESCRIPCION Numero TARIFA C/HORA Rend. u/h
TOTAL
A B C=AxB R D=CxR
Herramienta manual 1.00 0.20 0.8208 0.16
Soldadora 1.00 2.50 0.8208 2.05
SUB - TOTAL (M) 2.21
MANO DE OBRA
COSTO
DESCRIPCION Numero JOR. / HORA C / HORA Rend. u/h
TOTAL
A B C=AxB R D=CxR
3.00 3.41 10.23 0.8208 8.40
1.00 3.45 3.45 0.8208 2.83
0.10 3.83 0.38 0.8208 0.31
SUB - TOTAL (N) 11.54
MATERIALES
COSTO
DESCRIPCION UND. CANTIDAD P. UNITARIO
TOTAL
A B C=AxB
Platina 12x3mm
u 0.03 2.46 0.07
peso=1,70kgx6m
Tubo de hg 2" m 1.20 5.65 6.78
Electrodo # 6011 1/8 Kg 0.35 5.10 1.78
Malla de cerramiento 50/10 m2 2.40 7.54 18.10
SUB - TOTAL (O) 26.73
TRANSPORTE
COSTO
DESCRIPCION UND. CANTIDAD DMT (Km) TARIFA (Km)
TOTAL
A B C D=AxBxC
SUB - TOTAL (N)
TOTAL COSTOS DIRECTOS (M+N+O+P) 40.48
TOTAL COSTOS INDIRECTOS 0.00 0.00
UTILIDAD 0.00 0.00
EQUIPO
COSTO
DESCRIPCION Numero TARIFA C/HORA Rend. u/h
TOTAL
A B C=AxB R D=CxR
SUB - TOTAL (M) 0.00
MANO DE OBRA
COSTO
DESCRIPCION Numero JOR. / HORA C / HORA Rend. u/h
TOTAL
A B C=AxB R D=CxR
SUB - TOTAL (N) 0.00
MATERIALES
COSTO
DESCRIPCION UND. CANTIDAD P. UNITARIO
TOTAL
A B C=AxB
Container de basura u 1.00 3,575.32 3,575.32
SUB - TOTAL (O) 3,575.32
TRANSPORTE
COSTO
DESCRIPCION UND. CANTIDAD DMT (Km) TARIFA (Km)
TOTAL
A B C D=AxBxC
SUB - TOTAL (N)
TOTAL COSTOS DIRECTOS
3,575.32
(M+N+O+P)
TOTAL COSTOS INDIRECTOS 0.00 0.00
UTILIDAD 0.00 0.00
EQUIPO
COSTO
DESCRIPCION Numero TARIFA C/HORA Rend. u/h
TOTAL
A B C=AxB R D=CxR
Herramienta manual 6.00 0.20 0.0540 0.06
SUB - TOTAL (M) 0.06
MANO DE OBRA
COSTO
DESCRIPCION Numero JOR. / HORA C / HORA Rend. u/h
TOTAL
A B C=AxB R D=CxR
3.00 3.41 10.23 0.0540 0.55
2.00 3.45 6.90 0.0540 0.37
2.00 3.83 7.66 0.0540 0.41
SUB - TOTAL (N) 1.33
MATERIALES
COSTO
DESCRIPCION UND. CANTIDAD P. UNITARIO
TOTAL
A B C=AxB
Manguera pe liviana de 2" m 1.05 0.98 1.03
SUB - TOTAL (O) 1.03
TRANSPORTE
COSTO
DESCRIPCION UND. CANTIDAD DMT (Km) TARIFA (Km)
TOTAL
A B C D=AxBxC
SUB - TOTAL (N)
TOTAL COSTOS DIRECTOS
2.42
(M+N+O+P)
TOTAL COSTOS INDIRECTOS 0.00 0.00
UTILIDAD 0.00 0.00
EQUIPO
COSTO
DESCRIPCION Numero TARIFA C/HORA Rend. u/h
TOTAL
A B C=AxB R D=CxR
SUB - TOTAL (M) 0.00
MANO DE OBRA
COSTO
DESCRIPCION Numero JOR. / HORA C / HORA Rend. u/h
TOTAL
A B C=AxB R D=CxR
SUB - TOTAL (N) 0.00
MATERIALES
COSTO
DESCRIPCION UND. CANTIDAD P. UNITARIO
TOTAL
A B C=AxB
Alquiler de cabañas sanitarias u 3.00 145.22 435.66
SUB - TOTAL (O) 435.66
TRANSPORTE
COSTO
DESCRIPCION UND. CANTIDAD DMT (Km) TARIFA (Km)
TOTAL
A B C D=AxBxC
SUB - TOTAL (N)
TOTAL COSTOS DIRECTOS
435.66
(M+N+O+P)
TOTAL COSTOS INDIRECTOS 0.00 0.00
UTILIDAD 0.00 0.00
ESPECIFICACION:
EQUIPO
COSTO
DESCRIPCION Numero TARIFA C/HORA Rend. u/h
TOTAL
A B C=AxB R D=CxR
Teodolito 0.40 3.00 1.2000 1.44
Herramienta Menor 0.28 0.04 1.2000 0.01
SUB - TOTAL (M) 1.45
MANO DE OBRA
COSTO
DESCRIPCION Numero JOR. / HORA C / HORA Rend. u/h
TOTAL
A B C=AxB R D=CxR
0.03 3.82 0.11 1.2000 0.14
0.05 3.41 0.17 1.2000 0.20
0.05 3.45 0.17 1.2000 0.21
SUB - TOTAL (N) 0.55
MATERIALES
COSTO
DESCRIPCION UND. CANTIDAD P. UNITARIO
TOTAL
A B C=AxB
Tiras de Eucalipto u 0.20 0.26 0.05
Estacas u 0.20 0.12 0.02
SUB - TOTAL (O) 0.07
TRANSPORTE
COSTO
DESCRIPCION UND. CANTIDAD DMT (Km) TARIFA (Km)
TOTAL
A B C D=AxBxC
Hojade148
ESPECIFICACION:
EQUIPO
COSTO
DESCRIPCION Numero TARIFA C/HORA Rend. u/h
TOTAL
A B C=AxB R D=CxR
Retroexcavadora 1.00 26.40 0.0800 2.11
SUB - TOTAL (M) 2.11
MANO DE OBRA
COSTO
DESCRIPCION Numero JOR. / HORA C / HORA Rend. u/h
TOTAL
A B C=AxB R D=CxR
1.00 3.45 3.45 0.0800 0.28
1.00 3.82 3.82 0.0800 0.31
SUB - TOTAL (N) 0.59
MATERIALES
COSTO
DESCRIPCION UND. CANTIDAD P. UNITARIO
TOTAL
A B C=AxB
SUB - TOTAL (O) 0.00
TRANSPORTE
COSTO
DESCRIPCION UND. CANTIDAD DMT (Km) TARIFA (Km)
TOTAL
A B C D=AxBxC
SUB - TOTAL (N)
TOTAL COSTOS DIRECTOS
2.70
(M+N+O+P)
TOTAL COSTOS INDIRECTOS 0.00 0.00
UTILIDAD 0.00 0.00
Hojade148
UNIDAD: m3
ESPECIFICACION:
EQUIPO
COSTO
DESCRIPCION Numero TARIFA C/HORA Rend. u/h
TOTAL
A B C=AxB R D=CxR
Herramienta manual 1.00 0.20 0.0830 0.02
Plancha vibroapisonadora 1.00 5.50 0.3320 1.83
Hojade148
UNIDAD: m3
ESPECIFICACION:
EQUIPO
COSTO
DESCRIPCION Numero TARIFA C/HORA Rend. u/h
TOTAL
A B C=AxB R D=CxR