Professional Documents
Culture Documents
Days/Time
Monday Brief introduction to the Tests, studying its apparatus and theory.
Wednesday Performing the tests (ie, Moisture content, sieve analysis) of Sand.
Thursday Performing the Cube Test of concrete and test to determine Slit content of
sand.
Friday Creating Lab Reports of Results of these tests and understanding its
procedure and necessity.