WWW.ZHONGWANG.COM
COMPANY PROFILE
Founded in 1993, Liaoning Zhongwang Group Co., Ltd. is principally engaged in the research and development, production and sale of a diversified portfolio of
high quality industrial and architectural aluminum extrusion products. Nowadays, we have been the largest industrial aluminum extrusion manufacturer in Asia
and the second largest in the world .
Since 2001, the company has been in China Fortune 500 Enterprises. In 2009, the company, as the world's largest IPO since the financial crisis, successfully listed
on the Hong Kong stock exchange, contributed to the global capital markets.
The company's products have passed the certification of the Det Norske Veritas Certification, Alstom Certification, IRIS Certification, Automobile Industry Quality
Management System Certification and Certification of Aeronautics and Astronautics etc., a series of well‐known international certifications.
The company will take this opportunity to continue to strengthen the R&D, increase production capacity, expand the market share of products and multiple
existing successful directions.
WWW.ZHONGWANG.COM
Walls, columns, Walls, columns, beams, Walls, columns, beams, Walls, columns, beams,
Application beams, plates, plates plates, bridges plates
bridges
Smooth and clean, reach Smooth and clean, reach Smooth and clean, reach
Concrete surface
coarse ordinary clear water finishing and decoration finishing and decoration
quality
requirements clear water requirements clear water requirements
Timber 30 Person/
30 13 Meter/ Day 3.6 Days 180 Days
Formwork Building
Aluminum 30 Person/
30 20 Meter/ Day 2.6 Days 150 Days
Formwork Building
WWW.ZHONGWANG.COM
102 extrusion production lines ranging from 5MN to 125MN in press capacity
Internationally advanced and full automatic product line for formwork deep processing
Annual aluminum formwork capacity will reach to 2,000,000㎡ by the end of 2016
WWW.ZHONGWANG.COM
Zhongwang Aluminum Formwork Service Advantages
Stripping Wall /
Slab Properly Sealed Column Formwork
Staircase & Elev-Pit
Other Trades—Vertical
Rebar,M&E & Plumbing Transferring Formwork
Form Oil (Oil based chemical) to be applied on the surface of all the Repeat last step to complete the assembly of both the Internal and External
panels before the assembly process. Wall Panels.
Outer Corner is fixed to External Wall Corner panel by round pin and Install Slab Corner on the top portion of the Wall Panels with round pin &
wedge. wedge.
Inner Corner is fixed to the Internal Wall panels by round pin & Middle, End Beam and Prop are combined by joint bar with long pin and
wedge. The internal and External Wall Panels are hold by Flat Tie wedge at the bottom section of the beams.
with Tie Bar Shield in between the panels.
Start the assembly of the Slab Panels from the corner section of the slab. Subsequently, fill out the whole slab area by pinning the slab panels together with the
link beams(comprises of End and Middle Beams).
Upon completion of the installation and fixing of the Wall and Slab Panels, a numbering sequence will be made for each of these panels with colour
identification scheme to differentiate each of the unit area such as bedrooms, bathroom & etc.. This numbering and color identification scheme will ensure that
each panel can be determined as to their exact location once they are transferred to the next level for installation.
Always ensure that all ties, pins and wedges are properly installed and secured before pouring concrete into the forms. Ensure that concrete pouring is
distribute evenly throughout the Wall Panels section before commencing to cast the slabs level area.
WWW.ZHONGWANG.COM
Upon removing the middle and end beams, the prop shall remained
undisturbed during this process to support the concrete slab.
After 12 hours, remove the internal Wall Forms by knocking out the wedges and pins. The
Wall Panels are to be moved to upper floor through the slab opening as shown. Proceed to strip the Slab Panels and transfer to the next level
according to the designated area and installation sequence.
After removing the External Wall Forms( the kicker should remain undisturbed ), the
dismantied wall panels from the ground floor level. For level one and above: an external
working platform is fixed to the external wall. The external wall forms from level one onward
shall be supported by the kickers. (these steps are to be repeated from one floor to another
floor.)
Striking wall formwork at the lowest floor. Position the working bracket, plywood for floor Pull out Al-Flat Tie by using disassembly tool. Remove the Tie Bar Shield
platform of upper floor. And link the working bracket with hoisting cable. in the wall with the Tie Bar Ejector.
Remove lower floor kicker, move the formwork to upper floor, internal formwork through slab
opening and external formwork through working platform.
Check the formwork and pour the concrete. 12 hours after pouring concrete, strike wall
formwork. Remove and hoist the lower floor working bracket up by using hoisting cable.
After removing the Wall Panels, proceed to the Slab Panel after 36 hours by removing the long
pins and wedges on the joint bars the end and middle beam section. When the cube tests shows that the slab concrete is sufficiently strong,
the prop together with the prop heads are removed and transferred to the
next level.
WWW.ZHONGWANG.COM
Korea
USA
Vietnam
India Malaysia
Singapore Australia
Panama Venezuela
Brazil
Chile Argentina
New Zealand