Professional Documents
Culture Documents
TM
PRISM, TM DASmap and TM FASTapps are trademarks of Advanced Control Systems. Other product and company names appearing in this document may be trademarks of their respective owners.
— Voltage minimization — Event Scheduler and Simulation Control
— Phase Balancing (Trainer Interface)
© Advanced Control Systems. This publication is not intended to form the basis of a contract. Specifications subject to change without notice.
z Incident and Outage Ticket Generation — ESRI auto extract
z Restoration Switching Plans — Intergraph GTech auto extract
z Work Process Management — Small World Insync extract
z Crew Assignment / Crew Management — Autodesk® Map extract
z Interactive Crew Callout Voice Response z IVR / AMI Interface
System — “Last Gasp” Outage Call / Event Notification
z Real-time Reliability IEEE 1366 Performance — Call Back List Notification
Indices Calculation
— AMI / AMR ‘Ping’ Confirmation
z Water Outage Management (H2OMS)
— TOU Load Reporting
z ICCP Inter Control Center Protocol /
Historical Archiving and Reporting IEC 60870-6/TASE.2
z Temporal data archiving z OMS interface
z Data calculations
z Data reporting and publishing Substation FASTapps TM
z Web services reporting (run in the substation Intelligent Remote Terminal Unit—ITU)
z Dashboards z PRISM GUI
z FDIR
z Feeder Loss Minimization
z Feeder Voltage reduction
z Integrated Volt / VAr control
TM
z Loading Relief
2755 Northwoods Parkway | Norcross, Georgia 30071 | Tel: 770.446.8854 | Fax: 770.448.0957
Sales: 800.831.7223 sales@acsatlanta.com | HelpDesk: 800.241.7317 help.desk@acsatlanta.com
www.acsatlanta.com / www.efacec.com | Document number: G SAM DB 0000 R0 08/2009