PIERINA
• Al Final:
Pila de Lixiviación
Botadero de Desmonte
Tajo
1. Tecnología:Palanca para desarrollo
Planes de minado.
Modelo-Mina
Whitttle Qpit
Diseño optimo de pit, donde intervienen variables geológicas, Diseño Fases de minado, donde interviene modelo
Geotécnicos, Costos, etc. buscando optimizar el VPN Geológico, Geotécnicos, Hidrológico, Rutas, etc.
buscando optimizar Stripping
IT EM UNIT
Minimum au grade for value calculation g/t
Gold price US$/oz
Silver price US$/oz
Gold recovery crusher %
Silver recovery crusher %
Gold recovery rom %
Silver recovery rom %
G&A US$/t ore
Sustaining G&A US$/t ore
Crushing + stacking (exclude leaching) US$/t ore
Crushing + stacking sustaining capital US$/t ore
Leaching US$/t ore
Leaching sustaining US$/t ore
Merril crowe, smelter US$/oz
Merril Crowe, smelter sustaining capital US$/oz
Gold refinig charges US$/oz
Silver refining charges US$/oz
Base truck chancado m.a.s.l
Base truck waste m.a.s.l
Ore base mining cost US$/t
W aste base mining cost US$/t
Ore/waste mining sustaining capital US$/t
Incremental rom haul/tonne US$/t
Ore incremental mining cost/10 mt bench below US$/t
Ore incremental mining cost/10 mt bench above US$/t
1.1. Tecnología:Palanca para desarrollo
Planes de minado. Qpit
MedSystem Excel
Access
2002 Forecast Rev. 2C (Mine Plan R3-D) For Internal Use Only
Update: June 12, 2002 using November 2001 Model
Actuals Forecast
2001 Jan-02 Feb-02 Mar-02 Apr-02 May-02 Jun-02 Jul-02 Aug-02 Sep-02 Oct-02 Nov-02 Dec-02 TOTAL
FROM MINE TO CRUSHER
Ore (Ktonnes) 1,003 951 959 904 1,055 1,059 1,094 1,094 1,059 1,094 987 740 12,000
Au (g/t) 2.63 2.36 2.27 2.58 2.52 2.37 2.83 3.03 2.11 2.89 3.40 2.77 2.648
Ag (g/t) 8.11 10.32 12.93 14.86 17.00 17.01 20.62 21.83 18.40 15.36 17.07 13.15 15.755
Waste (Ktonnes) 1,261 1,030 1,097 1,136 1,594 1,530 1,511 1,517 1,479 1,525 1,366 1,594 16,639
Total Mined (Ktonne 2,306 2,057 2,134 2,060 2,651 2,600 2,631 2,629 2,546 2,630 2,360 2,346 28,950
Total Moved include R 3,308 3,008 3,093 2,964 3,706 3,658 3,725 3,724 3,605 3,724 3,347 3,087 40,950
Average Ktonnes/Plan 32.9 34.0 30.9 30.1 34.0 35.3 35.3 35.3 35.3 35.3 32.9 23.9 32.9
Average Ktonnes Mine 75.6 73.5 68.8 68.7 85.5 86.7 84.9 84.8 84.9 84.8 78.7 75.7 79.4
El presupuesto del año en curso es un documento que contiene datos tales como las producciones de mineral, desmonte,
leyes, cantidad de metal, recuperaciones en planta, radios de desbroce, etc. A partir de este documento se realizan los
planes mensuales.
2. Uso de información a tiempo real
para el desarrollo y control -
Plan Minado Mensual/Semanal
2.1 Base de Datos de Producción
La B. D. de producción tiene como objetivo centralizar la información generada diariamente de las
operaciones a través del sistema SQL (en proceso de implementación). El cual permitirá poner en
línea toda la información y evitar duplicidad de trabajos, el uso de B.D. es importante por las
estadísticas generadas que permiten proyectar los parámetros de producción para el plan de minado.
Fase I
Recolección de data a tiempo real, a través del sistema Dispatch
Con 02 repetidoras que cubren las zonas de operación diaria.
2.1 Base de Datos de Producción
Fase III
B.D. de producción , almacena todas la variables
de producción, el cual es usado estadísticamente
para realizar proyecciones de producción
mensual/semanal
Fase II
Fase II
SPEED ASSUMPTIONS
Haul Type Speed (km/hr)
Loaded Flat Haul 28.0
Empty Flat 28.0
Empty Uphill 19.2
Loaded Uphill 14.4
Down Hill 24.2
Calibration Dry Season 100%
Calibration Tran. Season 93%
Calibration Wet Season 85%
LOADING ASSUMPTIONS
TYPE Load time Spot-Queue Dump
Loader 2.85 0.98 1.49
Ore Bin 1.50 1.50 1.50
Crusher 2.50 1.00 2.46
TRUCK MECHANICALS
Tonnes per truck ~ 136- 8 un 136.2 (Standart Bed)
Tonnes per truck ~ 145 - 4 un 145.0 (Light Bed)
Average tonnes per truck 139.1
Truck Availability 92.8%
Truck Utilization 84.2%
Truck Usage 78.1%
Simulación al plan de Minado
Mensual/Semanal
30 Days in period May-02
calibrate
Road Dump Dump One-way travel d cycle Required Required
level Material Tonnes Pit Exit Destination Inpit Dist. Dist Lift Dist Dist time time Hours Trucks
3980 ORE 94,428 3970R CRUSHER 726 510 3935 0 1236 5.5 14.3 159 0.3
3970 ORE 644,849 3970R CRUSHER 679 510 3935 0 1189 5.1 13.9 1050 1.7
3960 ORE 90,329 3970R CRUSHER 522 510 3935 0 1032 5.2 13.9 148 0.2
3870 ORE 60,805 3920R CRUSHER 1003 487 3935 0 1490 9.3 18.0 129 0.2
3860 ORE 97,585 3920R CRUSHER 1019 487 3935 0 1506 9.9 18.7 214 0.3
3850 ORE 99,905 3920R CRUSHER 1086 487 3935 0 1573 10.8 19.6 229 0.4
4060 WASTE 4090E B2 295 833 4075 1978 3106 16.3 24.2 0 0.0
3980 WASTE 16,618 4040E B-4085 1128 1696 3975 1050 3874 23.1 31.0 60 0.1
3970 WASTE 50,210 3970E B-4085 433 2109 3975 1050 3592 22.7 30.6 181 0.3
3870 WASTE 3920R B-4085 1003 3760 3975 1050 5813 36.7 44.6 0 0.0
3860 WASTE 3920R B-4085 1019 3760 3975 1050 5829 37.4 45.3 0 0.0
4060 WASTE 22,538 4090E B2 295 833 4075 1978 3106 16.3 24.2 64 0.1
3980 WASTE 21,802 4040E B-4085 1128 1696 4055 950 3774 20.6 28.5 73 0.1
3970 WASTE 612,143 3970E B-4085 433 2109 4055 950 3492 20.2 28.1 2022 3.3
3870 WASTE 51,841 3920R B-4085 1003 3760 4055 950 5713 34.2 42.1 256 0.4
3860 WASTE 55,560 3920R B-4085 1019 3760 4055 950 5729 34.9 42.8 279 0.5
4060 WASTE 4090E B2 295 833 4075 1978 3106 16.3 24.2 0 0.0
3980 WASTE 4040E B-4085 1128 1696 4055 950 3774 20.6 28.5 0 0.0
3970 WASTE 94,068 3970E B-4085 433 2109 4055 950 3492 20.2 28.1 311 0.5
3870 WASTE 121,803 3920R B-4085 1003 3760 4055 950 5713 34.2 42.1 602 1.0
3860 WASTE 93,375 3920R B-4085 1019 3760 4055 950 5729 34.9 42.8 469 0.8
4133 ORE-BIN 1,087,901 4133OB LEACH PAD-2 0 0 4080 1250 1250 5.8 10.8 1277 2.1
Total 3,315,760 460 1038 746 2244 12.3 19.6 7524 12.2
Plan de Minado y Producción de Metal
Mensual/Semanal Sem01
Sem02
Sem03
Sem04
SEM 01:
BENCH Ore to Crusher Wst Rock Wst Fine Wst Sulf TOTAL Note (Sugestion)
TM Au Ag TM TM TM TM
4170 -
4160 50,000 0.98 1.14 68,000 118,000 OCS/MODEL
4150 -
4140 80,000 80,000 OCS\MODEL
4130 -
4120 -
4060 -
4020 -
3960 -
3950 -
3940 116,000 3.20 12.54 5,000 78,500 199,500 OCS/MODEL
3930 -
3920 15,000 15,000 OCS\MODEL
3860 41,500 2.80 67.00 41,500 OCS\MODEL
3850 -
3840 -
Stock to Crusher 2 -
TOTAL 207,500 2.59 20.69 - 153,000 93,500 454,000 803
• Cumplir el presupuesto (Budget) aprobado por la Coorporación. Tal como: cantidad de metal a
producir, tonelaje de mineral y desmonte, Relación de calidades de Mineral y Desmonte.
• Mantener un tajo flexible para obtener buen rendimiento del equipo.
• Planificar el minado según los requerimientos de materiales y supervisar la calidad del material que
se envía a la cancha de lixiviación para asegurar la percolación.
• Planificar para el cumplimiento del planeamiento de mediano y largo plazo, el cual esta vinculado al
planeamiento estratégico de la gerencia.
• Cumplir el pronostico del mes en curso (forecast).
EVALUACION
Plan Mensual/Semanal
EVALUACION SEM ANAL : M ine ral - De s m onte
120,000
100,000
80,000
TN
60,000
40,000
20,000
-
11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec
100
90
80
70
60
50
4-Dec 5-Dec 6-Dec 7-Dec 8-Dec 9-Dec 10-Dec
3930W
Jueves 05-Sep Mineral
4140E Desmonte
Viernes 06-Sep
3940E,3930W,38
Sabado 07-Sep 50W
3850W 3920W
Domingo 08-Sep Mineral Mineral/Desmonte
Lunes 09-Sep
Martes 10-Sep
Jueves 05-Sep
Sabado 07-Sep
Domingo 08-Sep
Jueves 05-Sep
Domingo 08-Sep
Martes 10-Sep