Project Summary
Project Name:
M&S Engineering Saves Design Time on
Springs Hill Treatment Plant
Expansion
Water Treatment Plant Expansion
Project Location: Project to Increase Efficiency of Water Distribution System and Conserve
Seguin, Texas, United States
Organization:
Valuable Groundwater Resources
M&S Engineering
Be Inspired Category: A New Standard for Environmental Challenges Overcome
Innovation in Water and Stewardship Factors that contributed to project success included state-of-
Wastewater Treatment Plants The management of Springs Hill Water Supply Corpora- the-art technology; coordination across multiple project teams,
Bentley Software Used: tion, Seguin, Texas, has implemented a set of in-house operational personnel, and stakeholders; use of green technol-
• MicroStation® policies to increase the efficiency and cost-effectiveness ogy; and the development of a solution that combined the best
• WaterCAD® of its water distribution system. The policies include green of what had performed well for the plant operators over the
Project Objectives: infrastructure improvements that set the standard for en- past two decades with new and more efficient technology.
Develop a sustainable solution to vironmental stewardship for the benefit of its constituents.
double the capacity of an existing Among the obstacles M&S Engineering had to overcome were:
Equally important, they set an example for neighboring
surface water treatment plant
utilities to follow. 1. Limited regional precedence for the incorporation of green
while decreasing the burden on
the region’s fragile groundwater infrastructure into a water utility,
resources. To meet Springs Hill’s goals, M&S Engineering deployed
2. A very tight timeframe for design, permitting, bidding,
Bentley’s WaterCAD for water distribution system analysis
and construction,
and design and MicroStation for infrastructure design. The
3. The need to incorporate 40-year-old infrastructure.
Fast Facts software helped the engineering team develop a sustain-
able solution for doubling the capacity by expanding an By leveraging experienced personnel and robust software M&S
• The expansion of the water treat- existing surface water treatment plant, as part of an effort Engineering was able to efficiently deliver the project ahead
ment plant is intended to decrease
reliance on fragile groundwater
to decrease the burden on the region’s fragile groundwater of an almost impossibly tight schedule. The addition will work
resources resources. The realized time savings using Bentley software seamlessly with the existing infrastructure currently operated
directly contributed to substantial cost savings. by Springs Hill with little additional operator training.
• Funding and tight deadlines were
some of the obstacles overcome by
M&S Engineering
• WaterCAD allowed the project team
to quickly and efficiently evaluate a
variety of potential solutions
• New treatment plant works seam-
lessly with the existing infrastructure
• The number of small time incre-
ments saved through the efficient
use of the user-friendly software
added up to a substantial savings in
both time and money.
© 2011 Bentley Systems, Incorporated. Bentley, the “B” Bentley logo, MicroStation, and WaterCAD are either registered or unregistered trademarks or service marks
of Bentley Systems, Incorporated or one of its direct or indirect wholly owned subsidiaries. Other brands and product names are trademarks of their respective own-
ers. BAA018330-1/0001 02/11