You are on page 1of 1

WATER NOC

P.O.BOX : 564, Tel: 04-3244444, Fax: 04-3240801


DUBAI, U.A.E. Web: www.dewa.gov.ae
494700
345-6903
NOTE :
MANDATORY REQUIREMENT FOR BUILDINGS AND LABOUR ACCOMMODATION :
1. FOR RESIDENTIAL BUILDINGS 24 HOURS DOMESTIC TANK
CAPACITY SHALL BE MAINTAINED FOR PREMIISES USE ON GROUND / UNDERGROUND .

!
2. FOR LABOUR ACCOMMODATION BUILDINGS 48 HOURS DOMESTIC TANK

!
CAPACITY SHALL BE MAINTAINED FOR PREMISES USE ON GROUND / UNDERGROUND 345-0791

!
-D

!
u
b
2787400

2787400
a

-D
i
F

u
o

b
u 345-0867

a
n

i
ta

F
in

o
n

u
!
345-4477 ta S
tr
d
in
!
! one
e
S e
t
nd

tr
e
a

e
Ab
!

t
MM

on
!

at i
0
15

er
!

Op
!

In
8082253

MM
!
d

0
!

45
! one
nda
Ab
!

345-0868 345-0792
MM
!
0
15
!
!

WM
Z
!

30
!

0
MM
!

-
Bation In
Op
!

er

er
Op

d
at
!

ion
In

rd

Zd
M

a
!

v
! 2787300

2787300
rd
0

le
45
!

d
v
o

NOTE :
!

le
B

1. DEWA SHALL PROVIDE ONLY THE345-0793


METER AS PER DEWA'S
u
fa

SPECIFICATIONS, WATER METER CHAMBER SHALL BE


li

B
a
!

LOCATED OUTSIDE THE PLOT LIMIT.. fa


h

li
K

2 .METER SHALL BE EASILY ACCESSIBLE FOR READING a 345-7551


h
rj

3. REINSTATEMENT IN DEVELOPER AREAS SHALL BE DONE u 22 345-0420

d
K 5
BY THE OWNER /CONTRACTOR / DEVELOPER, -B rj Z M

/
u M
ion

AS PER DEVELOPER / DM / RTA / DEWA SPECIFICATIONS AND -B In


at

Op
er

STANDARDS . er
Op

at
In

ion
M
M

NOTE : 345-0421
0

494700
30

PLOT TO BE DEMARCATED AND P&E (WATER) -


345-6789
DEWA MUST BE NOTIFIED ( TEL : 04 3220632 , 04 3220670, 050 4604745 )
PRIOR TO START EXCAVATION WORKS AND INSTALLATION /
MOBILIZATION OF MACHINARIES / EQUIPMENTS FOR NECESSARY
SHOP DRAWING SHALL BE
CHECKING OF SERVICES WITHIN THE PLOT.
APPROVED FROM DEWA.
THE OWNER WILL BE RESPONSIBLE FOR THE CHECKING
BEFORE COMMENCEMENT OF ANY WORKS.
OR RELOCATIONS WATER PIPELINE FOUND WITHIN THE PLOT.

NOTES: NOC NO : 8082253


DM NOC REF. :
NO OBJECTION COMMUNITY : 345 - BURJ KHALIFA

SUBJECT TO CONDITIONS IN THE ENCLOSED NOTES.


PLOT NO : 345-0792
DEWA (W) NOC IS VALID UP TO (6) SIX MONTHS FROM OWNER : JARVIS CORPORATION LIMITED
THE DATE OF ISSUE. ISSUED TO : BRIGHT ELECTRICAL WORKS LLC
WATER NETWORK LEGEND PURPOSE : HOTEL
CONTRACTOR MUST OBTAIN NOC FOR TAPPING CONTROL VALVE WATER LINE
CONSTRUCTION PRIOR TO COMMENCEMENT Common Tap
b Non-Return In Service (AC Line) SCALE 1 : 1000
OF ANY WORKS WITH TRIAL EXCAVATION DETAILS Single Tap SYSTEM VALVE In Service (LDPE Line) PREPARED BY : MUNA_JUMA
TAKEN BY CONSULTANT. CONSUMER METER
Ball Proposed
¤ A

Bulk
THIS NOC PERMITS TO WORK WITHIN THE PLOT Combination B Butterfly ! ! Abandon CHECKED BY : WALEED
Double-Air APPROVED BY : DY.MANAGER (NOC) / SMEW
d DGate/dWash-Out
CONDUIT SYSTEM
LIMIT ONLY Filling Culvert
Standard
d Pressure-Relief Duct
WARNING
METER CASING
FlowMeter Single-Air Protective Slab
PressureMeter FITTING Protective Tunnel G/U WATER TANK : 59800 GAL
IT IS LIKELY THAT EXISTING LDPE LINES ARE PASSING
ã WaterQualityMeter « Bend
6
WATER STRUCTURES
THROUGH YOUR PROPOSED WORKING AREA. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO LOCATE IT
PUMPS Cross d PumpHouse O.H WATER TANK : 0 GAL
BY TRIAL EXCAVATION PRIOR TO THE COMMENCEMENT Pumps + Analyzer
End Cap
Reservoir
TOTAL QUANTITY : 59800 GAL
¾
WATER WELL
OF THE WORK. DEWA WILL NOT BE RESPONSIBLE FOR WaterTank
ANY BREAKAGE TO THESE LINES. THE CHARGES WILL Waterwell LDPE Tee
SAMPLE POINTS Reducer PumpStation
BE MADE AS PER ACT (2)/1994 OF GOVERNMENT OF
DUBAI. Sample Points Z Tee TreatmentPlant
A4 DATE : 04-Aug-2018 SHEET NO : 1 OF 1

You might also like