Daily Checklist for Plastering

Project : Doc. No. : QA/CL-MSN/


Client : Project Location :

SITE LOCATION DATE

YES NO NA
BEFORE PLASTERING

Check Drg./ Number/ Date & Revision for all other service like electrical,
1 plumbing etc.,

2 Safety access platform

3 Check for hacking/ Button marking / Mortar thickness

4 Provision of chicken mesh for conduits, column brick work joints & other

5 Preparation of Surface - Remove moss/ efflorescence & Dampen Surface

6 Material stacked - Cement, sand at various locations

7 Prewetting of surface

8 Quality of Sand - screening silt

9 Check the Beam, B/W joints packing with Nito Bond AR

10 check for Door Frame Projections


DURING PLASTERING
1 Platform for mortar mixing on tray

2 Check for thickness/ level & line & right angle

3 Proportion of mix

4 Addition of water proofing compound

5 Proper roughing of first coat

6 Check for collection of mortar spills

7 Cleaning of dead mortar

8 Check for waviness

9 Check for grooves/ drip moulds


Application of cement slurry on concrete surface/Space for tile area, cutting
10 for skirting area

11 Check for loft thickness and top surface in dead level W/Robe size

AFTER PLASTERING
1 Curing water distribution for various locations

2 Check for hollowness

3 Check for cracks

4 Check of plastering date for curing

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:
B
Daily Checklist for Masonry

Project : Doc. No. : QA/CL-MSN/


Client : Project Location :

SITE LOCATION DATE

YES NO NA

1 Availbility of MATERIAL AS PER Daily requirement & test report

2 Cleaning work area off loose material/ concrete

3 Proper stacking of bricks/ blocks

4 Quality of bricks/ Sand. Test performed and ok? Note supplier.

5 Wetting of bricks. When?

6 Door frames if any erected in position?

7 Line out rechecked? Room dimension, diagonals, alignment with one


layer of bricks work, door opening position & verticality, etc

8 Check mortar preparation & provision platform.

9 Check mortar thickness

10 Check plumb

11 Check finished level, Rt angle/ Proportion of mix

12 Check hacking/ conduit/ silt contect in sand

13 Check cleaning of dead mortar

14 Check curing/ raking

15 Check for any addition & alterations

16 Check roof height front……….. & rear ………...