DEPARTMENT ORDER ) SUBJECT: REVISED GUIDELINES IN THE


PREPARATION OF DETAILED

NO.
77 ~
)
ENGINEERING DESIGN,
"AS-STAKED", REVISED, AND
Series of 201~9IJ'.>1,'f "AS-BUILT" PLANS FOR HIGHWAY,
BRIDGE AND WATER PROJECTS

In order to standardize the preparation of Detailed Engineering Design (DED), "As-Staked",


Revised and "As-Built" plans for highway, bridge and water projects implemented by 'the
Department, the following guidelines are hereby prescribed:

1. All sheets in a set of DED, "As-Staked", Revised and "As-Built" Plans for Bridge, Highway,
Water Engineering and other related projects shall be uniform and of one standard A3 size
(297mm x 420mm) high quality white paper (minimum of 80gsm/substance 24).

2. Draftsmanship shall be of professional quality. All plans shall be printed and drafted using
computer-aided design (CAD) software.

3. The meaning and intent of the provisions and/or specifications under the General Notes
shall be made clear and specific and shall leave no room for misinterpretations that may
lead to Variation Orders later on.

4. The scale to be used for various parts of the design plans (i.e. plan, profile, cross-sections,
structural details, etc.) shall vary depending on the scale prescribed in the latest DGCS
edition and/or the designer's desired scale provided that each part shall be presented
clearly and readable when printed in A3 size paper.

5. The title block for all sheets shall be made an integral part of the sheet of plan and not
merely patched-up therein. Cover sheets and title blocks shall vary depending on the
preparing and approving office. Formats for cover sheets and title blocks are as presented
in the following annexes:

• Cover Sheets:
Annexes "A-1" to "A-11" Detailed Engineering Design Plans
Annexes "B-1" to "B-6" "As-Staked" Plans
Annexes "C-1" to "C-11" Revised Plans
Annexes "D-1" to "D-6" "As-Built" Plans
D.O. No.1L, Series of 2018
Revised Guidelines in the preparation of Detailed Engineering Design,
"As-Staked" / Revised, and "As-Built" plans for Highway,
Bridge and Water projects

Page 2 of 2

• Title/Signature Blocks:
Annexes "E-1" to "E-3" Detailed Engineering Design Plans
Annexes "F-1" to "F-2" "As-Staked" Plans
Annexes "G-1" to "G-3" Revised Plans
Annexes "H-1" to "H-2" "As-Built" Plans

NOTE: All dimensions shown are in millimeters.

6. For DED plans prepared by design consultants and "As-Staked", Revised or "As-Built" Plans
checked/reviewed by construction supervision consultants, all sheets including the cover
page shall be provided with a liability waiver duly signed by their Project Manager. The
waiver shall also be made an integral part of all sheets and not merely patched-up. Format
of the liability waivers shall be as presented in annexes "1-1" to "1-4".

7. All sheets of the set of plan shall be neat, clean and without any crossed-out or voided
portion therein. Plans with corrections made by reviewing officials/offices shall be returned
to the designing office to be corrected and replaced.

8. The text style shall be Arial for all parts of the plan. Text height may vary depending also
on the designer's desired size as long as all words are maintained legible.
However, standard text heights for cover sheets and title blocks shall be as illustrated in
annexes "J-1 to J-5".

This Order shall supersede D.O. No. 56, series of 1995 and other previous issuances
inconsistent herewith, and shall take effect immediately.

~v2 -
MARK A. VILLAi
Secretary

5.1.3 DLB/ECM/LND
Departrrent of Public Works and Highways
Office of the Secretary

1111111 111111111111111111111111111111
WIN8R01465
15 mm from edge of the paper

Annex "A - 1"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<REGIONAL OFFICE NO.>
<DISTRICT ENGINEERING OFFICE>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

DETAILED ENGINEERING DESIGN PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>

SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME>
CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DATE: DATE: DATE:

Plans prepared and approved by District Engineering Offices


Detailed Engineering Design
15 mm from edge of the paper

Annex "A - 2"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<REGIONAL OFFICE NO.>
<DISTRICT ENGINEERING OFFICE>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

DETAILED ENGINEERING DESIGN PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>
NOTE:

PURSUANTTO ITEM 5 OF ANNEX 'A' OF THE REVISEDIMPLEMENTINGRULES


AND REGULATION OF R.A. 9184, THE APPROVAL BY THE AUTHORIZED
GOVERNMENTOFFICIALSOF DETAILEDENGINEERINGSURVEYSAND DESIGNS
UNDERTAKENBY CONSULTANTSNEITHERDIMINISHESTHE RESPONSIBILITYOF
THE LATTERFOR THE TECHNICALINTEGRITYOF THE SURVEYSAND DESIGNS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITYTO THE APPROVING
.
OFFICIALS

THE DESIGN CONSULTANTSHALL BE HELD FULLY RESPONSIBLEFOR THE


FAILUREOF THEFACILITIES/STRUCTURES
DUE TO FAULTYDESIGNEXCEPTFOR
THE CHANGES MADE WITHOUT THE CONFORMITY OF THE CONSULTANTS.

PROJECT MANAGER
<Consultant/s>

SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME>
PROJECT MANAGER ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
<CONSULTANT NAME> DATE: DATE:
DATE:

Plans prepared by Consultants and approved by District Engineering Offices


Detailed Engineering Design
15 mm from edge of the paper

Annex "A - 3"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<REGIONAL OFFICE NO.>
<DISTRICT ENGINEERING OFFICE>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

DETAILED ENGINEERING DESIGN PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>

SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME>
CHIEF, PLANNING AND DESIGN SECTION DISTRICT ENGINEER REGIONAL DIRECTOR
DATE: DATE: DATE:

Plans prepared by District Engineering Offices and approved by respective Regional Offices
Detailed Engineering Design
15 mm from edge of the paper

Annex "A - 4"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<REGIONAL OFFICE NO.>
<DISTRICT ENGINEERING OFFICE>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

DETAILED ENGINEERING DESIGN PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>
NOTE:

PURSUANTTO ITEM 5 OF ANNEX 'A' OF THE REVISEDIMPLEMENTINGRULES


AND REGULATION OF R.A. 9184, THE APPROVAL BY THE AUTHORIZED
GOVERNMENTOFFICIALSOF DETAILEDENGINEERINGSURVEYSAND DESIGNS
UNDERTAKENBY CONSULTANTSNEITHERDIMINISHESTHE RESPONSIBILITYOF
THE LATTERFOR THE TECHNICALINTEGRITYOF THE SURVEYSAND DESIGNS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITYTO THE APPROVING
.
OFFICIALS

THE DESIGN CONSULTANTSHALL BE HELD FULLY RESPONSIBLEFOR THE


FAILUREOF THEFACILITIES/STRUCTURES
DUE TO FAULTYDESIGNEXCEPTFOR
THE CHANGES MADE WITHOUT THE CONFORMITY OF THE CONSULTANTS.

PROJECT MANAGER
<Consultant/s>

SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME>
PROJECT MANAGER DISTRICT ENGINEER REGIONAL DIRECTOR
<CONSULTANT NAME> DATE: DATE:
DATE:

Plans prepared by Consultants, checked by District Engineering Offices and approved by their respective Reg
Detailed Engineering Design
15 mm from edge of the paper

Annex "A - 5"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<REGIONAL OFFICE NO.>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

DETAILED ENGINEERING DESIGN PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>

SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME>
CHIEF, PLANNING AND DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
DATE: DATE: DATE:

Plans prepared and approved by Regional Offices


Detailed Engineering Design
15 mm from edge of the paper

Annex "A - 6"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<REGIONAL OFFICE NO.>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

DETAILED ENGINEERING DESIGN PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>
NOTE:

PURSUANTTO ITEM 5 OF ANNEX 'A' OF THE REVISEDIMPLEMENTINGRULES


AND REGULATION OF R.A. 9184, THE APPROVAL BY THE AUTHORIZED
GOVERNMENTOFFICIALSOF DETAILEDENGINEERINGSURVEYSAND DESIGNS
UNDERTAKENBY CONSULTANTSNEITHERDIMINISHESTHE RESPONSIBILITYOF
THE LATTERFOR THE TECHNICALINTEGRITYOF THE SURVEYSAND DESIGNS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITYTO THE APPROVING
.
OFFICIALS

THE DESIGN CONSULTANTSHALL BE HELD FULLY RESPONSIBLEFOR THE


FAILUREOF THEFACILITIES/STRUCTURES
DUE TO FAULTYDESIGNEXCEPTFOR
THE CHANGES MADE WITHOUT THE CONFORMITY OF THE CONSULTANTS.

PROJECT MANAGER
<Consultant/s>

SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME>
PROJECT MANAGER ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
<CONSULTANT NAME> DATE: DATE:
DATE:

Plans prepared by Consultants and approved by Regional Offices


Detailed Engineering Design
15 mm from edge of the paper

Annex "A - 7"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<REGIONAL OFFICE NO.>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

DETAILED ENGINEERING DESIGN PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>

SUBMITTED: RECOMMENDED APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME> <NAME>
CHIEF, PLANNING AND DESIGN DIVISION REGIONAL DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
DATE: DATE: DATE: TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE:

Plans prepared by Regional Offices and approved at Central Office


Detailed Engineering Design
15 mm from edge of the paper

Annex "A - 8"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<REGIONAL OFFICE NO.>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

DETAILED ENGINEERING DESIGN PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>
NOTE:

PURSUANTTO ITEM 5 OF ANNEX 'A' OF THE REVISEDIMPLEMENTINGRULES


AND REGULATION OF R.A. 9184, THE APPROVAL BY THE AUTHORIZED
GOVERNMENTOFFICIALSOF DETAILEDENGINEERINGSURVEYSAND DESIGNS
UNDERTAKENBY CONSULTANTSNEITHERDIMINISHESTHE RESPONSIBILITYOF
THE LATTERFOR THE TECHNICALINTEGRITYOF THE SURVEYSAND DESIGNS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITYTO THE APPROVING
.
OFFICIALS

THE DESIGN CONSULTANTSHALL BE HELD FULLY RESPONSIBLEFOR THE


FAILUREOF THEFACILITIES/STRUCTURES
DUE TO FAULTYDESIGNEXCEPTFOR
THE CHANGES MADE WITHOUT THE CONFORMITY OF THE CONSULTANTS.

PROJECT MANAGER
<Consultant/s>

SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER REGIONAL DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<CONSULTANT NAME> DATE: DATE: TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE:

Plans prepared by Consultants, checked by Regional Offices and approved at Central Office
Detailed Engineering Design
15 mm from edge of the paper

Annex "A - 9"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<UPMO CLUSTER>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

DETAILED ENGINEERING DESIGN PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>

SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER PROJECT DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<UPMO CLUSTER> <UPMO CLUSTER> DATE: TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE: DATE:

Plans prepared by concerned UPMO Clusters and approved at Central Office


Detailed Engineering Design
15 mm from edge of the paper

Annex "A - 10"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<UPMO CLUSTER>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

DETAILED ENGINEERING DESIGN PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>
NOTE:

PURSUANTTO ITEM 5 OF ANNEX 'A' OF THE REVISEDIMPLEMENTINGRULES


AND REGULATION OF R.A. 9184, THE APPROVAL BY THE AUTHORIZED
GOVERNMENTOFFICIALSOF DETAILEDENGINEERINGSURVEYSAND DESIGNS
UNDERTAKENBY CONSULTANTSNEITHERDIMINISHESTHE RESPONSIBILITYOF
THE LATTERFOR THE TECHNICALINTEGRITYOF THE SURVEYSAND DESIGNS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITYTO THE APPROVING
.
OFFICIALS

THE DESIGN CONSULTANTSHALL BE HELD FULLY RESPONSIBLEFOR THE


FAILUREOF THEFACILITIES/STRUCTURES
DUE TO FAULTYDESIGNEXCEPTFOR
THE CHANGES MADE WITHOUT THE CONFORMITY OF THE CONSULTANTS.

PROJECT MANAGER
<Consultant/s>

SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER PROJECT DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<CONSULTANT NAME> <UPMO CLUSTER> DATE: TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE: DATE:

Plans prepared By Consultant/s, checked by concerned UPMO Clusters and approved at Central O
Detailed Engineering Design
15 mm from edge of the paper

Annex "A - 11"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BUREAU OF DESIGN
MANILA

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

DETAILED ENGINEERING DESIGN PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>

SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME>
CHIEF, <CONCERNED DIVISION> DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
DATE: DATE: TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE:

Plans prepared by the Bureau of Design


Detailed Engineering Design
15 mm from edge of the paper

Annex "B - 1"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<REGIONAL OFFICE NO.>
<DISTRICT ENGINEERING OFFICE>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

"AS-STAKED" PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER CHIEF, <IMPLEMENTING SECTION> ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
<CONTRACTOR NAME> DATE: DATE: DATE:
DATE:

"As-Staked" Plans prepared by Contractor and approved by District Engineering Offices


15 mm from edge of the paper

Annex "B - 2"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<REGIONAL OFFICE NO.>
<DISTRICT ENGINEERING OFFICE>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

"AS-STAKED" PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER CHIEF, <IMPLEMENTING SECTION> DISTRICT ENGINEER ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
<CONTRACTOR NAME> DATE: DATE: DATE: DATE:
DATE:

"As-Staked" Plans prepared by Contractor, checked by District Engineering Offices and approved by respective Regional O
15 mm from edge of the paper

Annex "B - 3"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<REGIONAL OFFICE NO.>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

"AS-STAKED" PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER CHIEF, <IMPLEMENTING DIVISION> ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
<CONTRACTOR NAME> DATE: DATE: DATE:
DATE:

"As-Staked" Plans prepared by Contractor and approved by Regional Offices


15 mm from edge of the paper

Annex "B - 4"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<REGIONAL OFFICE NO.>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

"AS-STAKED"PLAN FOR
<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER CHIEF, <IMPLEMENTING DIVISION
> REGIONAL DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<CONTRACTOR NAME> DATE: DATE: DATE: TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE:

"As-Staked" Plans prepared by Contractor, checked by Regional Offices and approved at Central Office
15 mm from edge of the paper

Annex "B - 5"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<UPMO CLUSTER>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

"AS-STAKED" PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER PROJECT MANAGER PROJECT DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<CONTRACTOR NAME> <UPMO CLUSTER
> <UPMO CLUSTER> DATE: TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE:
DATE: DATE:

"As-Staked" Plans prepared by Contractor, checked by concerned UPMO Clusters and approved at Central Office
15 mm from edge of the paper

Annex "B - 6"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<UPMO CLUSTER>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

"AS-STAKED" PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID> NOTE:

PURSUANTTO ITEM 6.4 OF ANNEX 'B' OF THE REVISEDIMPLEMENTINGRULES AND


REGULATIONOF R.A. 9184, THE CONSTRUCTIONSUPERVISIONCONSULTANTSHALL
BE RESPONSIBLEFOR VERIFICATIONAND CHECKINGOF QUANTITIESAND QUALITIES
OF WORKACCOMPLISHED BY THE CONTRACTORAS AGAINSTTHE APPROVEDPLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBLEFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR
QUALITY OF WORKMANSHIPACCOMPLISHEDBY THE CONTRACTOREXCEPT FOR
THOSEFAILUREDUE TO FAULTYDESIGNAS PER APPROVEDDETAILEDENGINEERING
DESIGN PLAN. THE APPROVALBY THE AUTHORIZEDGOVERNMENTOFFICIALSOF
"AS-STAKED", REVISED OR "AS-BUILT" PLANS UNDERTAKEN/CHECKEDBY
CONSTRUCTION SUPERVISION CONSULTANTS NEITHER DIMINISHES THE
RESPONSIBILITYOF THE LATTERFOR THE TECHNICALINTEGRITYOF THE SAIDPLANS
.
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS

PROJECT MANAGER
<Consultant/s>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER PROJECT MANAGER PROJECT DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<CONTRACTOR NAME> <CONSTRUCTION SUPERVISION <UPMO CLUSTER> DATE: TECHNICAL SERVICES TECHNICAL SERVICES
DATE: CONSULTANT> DATE: DATE: DATE:
DATE:

"As-Staked" Plans for UPMO implemented projects with Construction Supervision Consultant/s prepared by Contracto
15 mm from edge of the paper

Annex "C - 1"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<REGIONAL OFFICE NO.>
<DISTRICT ENGINEERING OFFICE>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

REVISED PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER CHIEF, <IMPLEMENTING SECTION> ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
<CONTRACTOR NAME> DATE: DATE: DATE:
DATE:

Revised Plans prepared by Contractor and approved by District Engineering Offices


15 mm from edge of the paper

Annex "C - 2"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<REGIONAL OFFICE NO.>
<DISTRICT ENGINEERING OFFICE>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

REVISED PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>
NOTE:

PURSUANTTO ITEM 7 OF DPWH DEPARTMENTORDER NO. 50, SERIES 2002, THE


DETAILEDENGINEERINGDESIGNCONSULTANTISSUE THIS NON-OBJECTIONTO VARY
TO THE RECOMMENDATIONOF THE IMPLEMENTINGOFFICE,INCORPORATING MAJOR
CHANGES IN THE ORIGINAL DESIGN DURING THE PROJECT IMPLEMENTATION
PROVIDED,HOWEVER,THAT THIS ISSUANCEWILL NOT RELIEVETHE ENTITY WHICH
DESIGNED THE CHANGES OF ITS RESPONSIBILITY FOR SUCH.

CONCURRED BY:

PROJECT MANAGER
<DED Consultant/s>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER CHIEF, <IMPLEMENTING SECTION> ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
<CONTRACTOR NAME> DATE: DATE: DATE:
DATE:

Revised Plans prepared by Contractor, concurred by Design Consultants and approved by District Engineering Offices
15 mm from edge of the paper

Annex "C - 3"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<REGIONAL OFFICE NO.>
<DISTRICT ENGINEERING OFFICE>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

REVISED PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER CHIEF, <IMPLEMENTING SECTION> DISTRICT ENGINEER ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
<CONTRACTOR NAME> DATE: DATE: DATE: DATE:
DATE:

Revised Plans prepared by Contractor, checked by District Engineering Offices and approved by respective Regional Of
15 mm from edge of the paper

Annex "C - 4"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<REGIONAL OFFICE NO.>
<DISTRICT ENGINEERING OFFICE>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

REVISED PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>
NOTE:

PURSUANTTO ITEM 7 OF DPWH DEPARTMENTORDER NO. 50, SERIES 2002, THE


DETAILEDENGINEERINGDESIGNCONSULTANTISSUE THIS NON-OBJECTIONTO VARY
TO THE RECOMMENDATIONOF THE IMPLEMENTINGOFFICE,INCORPORATING MAJOR
CHANGES IN THE ORIGINAL DESIGN DURING THE PROJECT IMPLEMENTATION
PROVIDED,HOWEVER,THAT THIS ISSUANCEWILL NOT RELIEVETHE ENTITY WHICH
DESIGNED THE CHANGES OF ITS RESPONSIBILITY FOR SUCH.

CONCURRED BY:

PROJECT MANAGER
<DED Consultant/s>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER CHIEF, <IMPLEMENTING SECTION> DISTRICT ENGINEER ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
<CONTRACTOR NAME> DATE: DATE: DATE: DATE:
DATE:

Revised Plans prepared by Contractor, concurred by Design Consultants, checked by District Engineering Offices
and approved by their respective Regional Offices
15 mm from edge of the paper

Annex "C - 5"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<REGIONAL OFFICE NO.>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

REVISED PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER CHIEF, <IMPLEMENTING DIVISION> ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
<CONTRACTOR NAME> DATE: DATE: DATE:
DATE:

Revised Plans prepared by Contractor and approved by Regional Offices


15 mm from edge of the paper

Annex "C - 6"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<REGIONAL OFFICE NO.>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

REVISED PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>
NOTE:

PURSUANTTO ITEM 7 OF DPWH DEPARTMENTORDER NO. 50, SERIES 2002, THE


DETAILEDENGINEERINGDESIGNCONSULTANTISSUE THIS NON-OBJECTIONTO VARY
TO THE RECOMMENDATIONOF THE IMPLEMENTINGOFFICE,INCORPORATING MAJOR
CHANGES IN THE ORIGINAL DESIGN DURING THE PROJECT IMPLEMENTATION
PROVIDED,HOWEVER,THAT THIS ISSUANCEWILL NOT RELIEVETHE ENTITY WHICH
DESIGNED THE CHANGES OF ITS RESPONSIBILITY FOR SUCH.

CONCURRED BY:

PROJECT MANAGER
<DED Consultant/s>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER CHIEF, <IMPLEMENTING DIVISION> ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
<CONTRACTOR NAME> DATE: DATE: DATE:
DATE:

Revised Plans prepared by Contractor, concurred by Design Consultants and approved by Regional Offices
15 mm from edge of the paper

Annex "C - 7"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<REGIONAL OFFICE NO.>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

REVISED PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER CHIEF, <IMPLEMENTING DIVISION
> REGIONAL DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<CONTRACTOR NAME> DATE: DATE: DATE: TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE:

Revised Plans prepared by Contractor, checked by Regional Offices and approved at Central Office
15 mm from edge of the paper

Annex "C - 8"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<REGIONAL OFFICE NO.>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

REVISED PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>
NOTE:

PURSUANTTO ITEM 7 OF DPWH DEPARTMENTORDER NO. 50, SERIES 2002, THE


DETAILEDENGINEERINGDESIGNCONSULTANTISSUE THIS NON-OBJECTIONTO VARY
TO THE RECOMMENDATIONOF THE IMPLEMENTINGOFFICE,INCORPORATING MAJOR
CHANGES IN THE ORIGINAL DESIGN DURING THE PROJECT IMPLEMENTATION
PROVIDED,HOWEVER,THAT THIS ISSUANCEWILL NOT RELIEVETHE ENTITY WHICH
DESIGNED THE CHANGES OF ITS RESPONSIBILITY FOR SUCH.

CONCURRED BY:

PROJECT MANAGER
<DED Consultant/s>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER CHIEF, <IMPLEMENTING DIVISION
> REGIONAL DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<CONTRACTOR NAME> DATE: DATE: DATE: TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE:

Revised Plans prepared by Contractor, concurred by Design Consultants, checked by Regional Offices and approved at Cen
15 mm from edge of the paper

Annex "C - 9"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<UPMO CLUSTER>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

REVISED PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER PROJECT MANAGER PROJECT DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<CONTRACTOR NAME> <UPMO CLUSTER
> <UPMO CLUSTER> DATE: TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE:
DATE: DATE:

Revised Plans prepared by Contractor, checked by concerned UPMO Clusters and approved at Central Office
15 mm from edge of the paper

Annex "C - 10"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<UPMO CLUSTER>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

REVISED PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>
NOTE:

PURSUANTTO ITEM 7 OF DPWH DEPARTMENTORDER NO. 50, SERIES 2002, THE


DETAILEDENGINEERINGDESIGNCONSULTANTISSUE THIS NON-OBJECTIONTO VARY
TO THE RECOMMENDATIONOF THE IMPLEMENTINGOFFICE,INCORPORATING MAJOR
CHANGES IN THE ORIGINAL DESIGN DURING THE PROJECT IMPLEMENTATION
PROVIDED,HOWEVER,THAT THIS ISSUANCEWILL NOT RELIEVETHE ENTITY WHICH
DESIGNED THE CHANGES OF ITS RESPONSIBILITY FOR SUCH.

CONCURRED BY:

PROJECT MANAGER
<DED Consultant/s>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER PROJECT MANAGER PROJECT DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<CONTRACTOR NAME> <UPMO CLUSTER
> <UPMO CLUSTER> DATE: TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE:
DATE: DATE:

Revised Plans prepared by Contractor, concurred by Design Consultants, checked by concerned UPMO Clusters and approved
15 mm from edge of the paper

Annex "C - 11"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<UPMO CLUSTER>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

REVISED PLAN FOR


<NAME OF PROJECT> NOTE:

<SECTION> PURSUANTTO ITEM 7 OF DPWH DEPARTMENTORDER NO. 50, SERIES 2002, THE
DETAILEDENGINEERINGDESIGNCONSULTANTISSUE THIS NON-OBJECTION TO VARY
TO THE RECOMMENDATIONOF THE CONSTRUCTIONSUPERVISIONCONSULTANTS,
INCORPORATINGMAJOR CHANGESIN THE ORIGINALDESIGNDURINGTHE PROJECT

<LOCATION> IMPLEMENTATIONPROVIDED,HOWEVER,THATTHIS ISSUANCEWILL NOT RELIEVETHE


ENTITY WHICH DESIGNED THE CHANGES OF ITS RESPONSIBILITY FOR SUCH.

<STATION LIMITS> CONCURRED BY:

<NET LENGTH> PROJECT MANAGER


<DED Consultant/s>

<ROAD SECTION / BRIDGE ID> NOTE:

PURSUANTTO ITEM 6.4 OF ANNEX 'B' OF THE REVISEDIMPLEMENTINGRULES AND


REGULATIONOF R.A. 9184, THE CONSTRUCTIONSUPERVISIONCONSULTANTSHALL
BE RESPONSIBLEFOR VERIFICATIONAND CHECKINGOF QUANTITIESAND QUALITIES
OF WORKACCOMPLISHED BY THE CONTRACTORAS AGAINSTTHE APPROVEDPLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBLEFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR
QUALITY OF WORKMANSHIPACCOMPLISHEDBY THE CONTRACTOREXCEPT FOR
THOSEFAILUREDUE TO FAULTYDESIGNAS PER APPROVEDDETAILEDENGINEERING
DESIGN PLAN. THE APPROVALBY THE AUTHORIZEDGOVERNMENTOFFICIALSOF
"AS-STAKED", REVISED OR "AS-BUILT" PLANS UNDERTAKEN/CHECKEDBY
CONSTRUCTION SUPERVISION CONSULTANTS NEITHER DIMINISHES THE
RESPONSIBILITYOF THE LATTERFOR THE TECHNICALINTEGRITYOF THE SAIDPLANS
.
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS

PROJECT MANAGER
<Consultant/s>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER PROJECT MANAGER PROJECT DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<CONTRACTOR NAME> <CONSTRUCTION SUPERVISION <UPMO CLUSTER> DATE: TECHNICAL SERVICES TECHNICAL SERVICES
DATE: CONSULTANT> DATE: DATE: DATE:
DATE:

Revised Plans for UPMO implemented projects with Construction Supervision Consultant/s prepared by Contractor
15 mm from edge of the paper

Annex "D - 1"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<REGIONAL OFFICE NO.>
<DISTRICT ENGINEERING OFFICE>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

"AS-BUILT" PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER CHIEF, <IMPLEMENTING SECTION> ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
<CONTRACTOR NAME> DATE: DATE: DATE:
DATE:

"As-Built" Plans prepared by Contractor and approved by District Engineering Offices


15 mm from edge of the paper

Annex "D -2"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<REGIONAL OFFICE NO.>
<DISTRICT ENGINEERING OFFICE>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

"AS-BUILT" PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER CHIEF, <IMPLEMENTING SECTION> DISTRICT ENGINEER ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
<CONTRACTOR NAME> DATE: DATE: DATE: DATE:
DATE:

"As-Built" Plans prepared by Contractor, checked by District Engineering Offices and approved by respective Regional Of
15 mm from edge of the paper

Annex "D - 3"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<REGIONAL OFFICE NO.>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

"AS-BUILT" PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER CHIEF, <IMPLEMENTING DIVISION> ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
<CONTRACTOR NAME> DATE: DATE: DATE:
DATE:

"As-Built" Plans prepared by Contractor and approved by Regional Offices


15 mm from edge of the paper

Annex "D - 4"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<REGIONAL OFFICE NO.>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

"AS-STAKED"PLAN FOR
<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER CHIEF, <IMPLEMENTING DIVISION> REGIONAL DIRECTOR ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<CONTRACTOR NAME> DATE:
DATE: REGIONAL OPERATIONS REGIONAL OPERATIONS
DATE: DATE: DATE:

"As-Built" Plans prepared by Contractor, checked by Regional Offices and approved at Central Office
15 mm from edge of the paper

Annex "D - 5"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<UPMO CLUSTER>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

"AS-BUILT" PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER PROJECT MANAGER PROJECT DIRECTOR ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<CONTRACTOR NAME> <UPMO CLUSTER> <UPMO CLUSTER> UPMO OPERATIONS UPMO OPERATIONS
DATE: DATE: DATE: DATE: DATE:

"As-Built" Plans prepared by Contractor, Checked by concerned UPMO Clusters and approved at Central Office
15 mm from edge of the paper

Annex "D - 6"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<UPMO CLUSTER>
<ADDRESS>

C.Y. <YEAR> PROJECT


30 mm from edge of the paper

"AS-BUILT" PLAN FOR


<NAME OF PROJECT>
<SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID> NOTE:

PURSUANTTO ITEM 6.4 OF ANNEX 'B' OF THE REVISEDIMPLEMENTINGRULES AND


REGULATIONOF R.A. 9184, THE CONSTRUCTIONSUPERVISIONCONSULTANTSHALL
BE RESPONSIBLEFOR VERIFICATIONAND CHECKINGOF QUANTITIESAND QUALITIES
OF WORKACCOMPLISHED BY THE CONTRACTORAS AGAINSTTHE APPROVEDPLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBLEFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR
QUALITY OF WORKMANSHIPACCOMPLISHEDBY THE CONTRACTOREXCEPT FOR
THOSEFAILUREDUE TO FAULTYDESIGNAS PER APPROVEDDETAILEDENGINEERING
DESIGN PLAN. THE APPROVALBY THE AUTHORIZEDGOVERNMENTOFFICIALSOF
"AS-STAKED", REVISED OR "AS-BUILT" PLANS UNDERTAKEN/CHECKEDBY
CONSTRUCTION SUPERVISION CONSULTANTS NEITHER DIMINISHES THE
RESPONSIBILITYOF THE LATTERFOR THE TECHNICALINTEGRITYOF THE SAIDPLANS
.
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS

PROJECT MANAGER
<Consultant/s>

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>
<NAME> <NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER PROJECT MANAGER PROJECT DIRECTOR ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<CONTRACTOR NAME> <CONSTRUCTION SUPERVISION <UPMO CLUSTER> UPMO OPERATIONS UPMO OPERATIONS
DATE: CONSULTANT> DATE: DATE: DATE:
DATE:

"As-Built" Plans for UPMO implemented projects with Construction Supervision Consultant/s prepared by Contractor
Annex "E-1"

5.00
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES <SIGNATURE OVER NAME>
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEERING ASSISTANT

20.00
<REGIONAL OFFICE NO.>

15.00
<DISTRICT ENGINEERING OFFICE> PREPARED: <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME>
<ADDRESS> ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
<SIGNATURE OVER NAME> DATE: DATE: DATE: DATE:
ENGINEER II

70.00 51.00 51.00 40.00 35.00 35.00 35.00 35.00 11.50 11.50
375.00

Plans prepared and approved by District Engineering Offices


Detailed Engineering Design

5.00
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
<LOGO/S> REPUBLIC OF THE PHILIPPINES
<SIGNATURE OVER NAME>
<POSITION> DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

20.00
<REGIONAL OFFICE NO.>

15.00
SUBMITTED: <DISTRICT ENGINEERING OFFICE> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME>
<CONSULTANT/S> <ADDRESS> CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
<ADDRESS> <SIGNATURE OVER NAME> DATE: DATE: DATE:
PROJECT MANAGER

35.00 40.00 51.00 51.00 70.00 35.00 35.00 35.00 11.50 11.50
375.00

Plans prepared by Consultants and approved by District Engineering Offices


Detailed Engineering Design

5.00
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

20.00
<REGIONAL OFFICE NO.>

15.00
<DISTRICT ENGINEERING OFFICE> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME>
<ADDRESS> ENGINEER II CHIEF, PLANNING AND DESIGN SECTION
CHIEF, PLANNING AND DESIGN DIVISION DISTRICT ENGINEER REGIONAL DIRECTOR
DATE: DATE: DATE: DATE: DATE:

70.00 53.50 53.50 35.00 35.00 35.00 35.00 35.00 11.50 11.50
375.00

Plans prepared by District Engineering Offices and approved by respective Regional Offices
Detailed Engineering Design

5.00
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
<LOGO/S>
<SIGNATURE OVER NAME>
<POSITION>

20.00
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

15.00
SUBMITTED: <REGIONAL OFFICE NO.>
<SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME>
<CONSULTANT/S> CHIEF, PLANNING AND DESIGN SECTION
CHIEF, PLANNING AND DESIGN DIVISION DISTRICT ENGINEER REGIONAL DIRECTOR
<ADDRESS> <SIGNATURE OVER NAME> <DISTRICT ENGINEERING OFFICE>
DATE: DATE: DATE: DATE:
<ADDRESS>
PROJECT MANAGER

35.00 40.00 51.00 51.00 35.00 35.00 35.00 35.00 35.00 11.50 11.50
375.00

Plans prepared by Consultants, checked by District Engineering Offices and approved by their respective Reg
Detailed Engineering Design
Annex "E-2"

5.00
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES <SIGNATURE OVER NAME>
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEERING ASSISTANT

20.00
<REGIONAL OFFICE NO.>

15.00
PREPARED: <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME>
<ADDRESS>
CHIEF, <CONCERNED DESIGN SECTION>
CHIEF, PLANNING AND DESIGN DIVISION ASSISTANTREGIONAL DIRECTOR REGIONAL DIRECTOR
<SIGNATURE OVER NAME> DATE: DATE: DATE: DATE:
ENGINEER II

70.00 51.00 51.00 40.00 35.00 35.00 35.00 35.00 11.50 11.50
375.00

Plans prepared and approved by Regional Offices


Detailed Engineering Design

5.00
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
<LOGO/S>
<SIGNATURE OVER NAME>
<POSITION>

20.00
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

15.00
SUBMITTED: <REGIONAL OFFICE NO.>
<SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME>
<CONSULTANT/S> CHIEF, <CONCERNED DESIGN SECTION>
CHIEF, PLANNING AND DESIGN DIVISION ASSISTANTREGIONAL DIRECTOR REGIONAL DIRECTOR
<ADDRESS> <SIGNATURE OVER NAME> <REGIONAL OFFICE NO.> DATE: DATE: DATE: DATE:
<ADDRESS>
PROJECT MANAGER

35.00 40.00 51.00 51.00 35.00 35.00 35.00 35.00 35.00 11.50 11.50
375.00

Plans prepared by Consultants and approved by Regional Offices


Detailed Engineering Design

5.00
PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES <SIGNATURE OVER NAME>
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS <POSITION> (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)

20.00
<REGIONAL OFFICE NO.>

15.00
SUBMITTED: <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <NAME> <NAME> <NAME>
<ADDRESS>
CHIEF, <CONCERNED DESIGN DIVISION> REGIONAL DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<SIGNATURE OVER NAME> BUREAU OF DESIGN DATE: DATE: TECHNICAL SERVICES TECHNICAL SERVICES
CHIEF, PLANNING AND DESIGN DIVISION DATE: DATE: DATE:

70.00 33.50 33.50 40.00 35.00 35.00 35.00 35.00 35.00 11.50 11.50
375.00

Plans prepared by Regional Offices and approved at Central Office


Detailed Engineering Design

5.00
PREPARED: PROJECT NAME AND LOCATION:SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
<LOGO/S>
<SIGNATURE OVER NAME>
<POSITION> (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)

20.00
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

15.00
SUBMITTED: <REGIONAL OFFICE NO.> > <SIGNATURE OVER NAME>
<SIGNATURE OVER NAME <SIGNATURE OVER NAME> <NAME> <NAME> <NAME>
CHIEF, <CONCERNED DESIGN DIVISION>
CHIEF, PLANNING AND DESIGN DIVISION REGIONAL DIRECTOR ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<CONSULTANT/S> <REGIONAL OFFICE NO.>
DIRECTOR IV, BUREAU OF DESIGN
<ADDRESS> <SIGNATURE OVER NAME> DATE: BUREAU OF DESIGN DATE: DATE: TECHNICAL SERVICES TECHNICAL SERVICES
<ADDRESS> DATE: DATE:
PROJECT MANAGER DATE:

35.00 40.00 31.00 31.00 35.00 30.00 30.00 30.00 30.00 30.00 30.00 11.50 11.50
375.00

Plans prepared by Consultants, checked by Regional Offices and approved at Central Office
Detailed Engineering Design
Annex "E-3"

5.00
PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES <SIGNATURE OVER NAME>
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER <II/III> (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)

20.00
15.00
SUBMITTED: <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <NAME> <NAME> <NAME>
<UPMO Cluster> CHIEF, <CONCERNED DESIGN DIVISION> PROJECT DIRECTOR
<ADDRESS> DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<SIGNATURE OVER NAME> BUREAU OF DESIGN <UPMO CLUSTER> DATE: TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER DATE: DATE: DATE: DATE:

70.00 33.50 33.50 40.00 35.00 35.00 35.00 35.00 35.00 11.50 11.50
375.00

Plans prepared by concerned UPMO Clusters and approved at Central Office


Detailed Engineering Design

5.00
PREPARED: PROJECT NAME AND LOCATION:SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
<LOGO/S>
<SIGNATURE OVER NAME>
<POSITION> (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)

20.00
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

15.00
SUBMITTED: > <SIGNATURE OVER NAME>
<SIGNATURE OVER NAME <SIGNATURE OVER NAME> <NAME> <NAME> <NAME>
<CONSULTANT/S> <UPMO CLUSTER> PROJECT MANAGER CHIEF, <CONCERNED DESIGN DIVISION> PROJECT DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<ADDRESS> <SIGNATURE OVER NAME> <ADDRESS> DATE: BUREAU OF DESIGN <UPMO CLUSTER> DATE: TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER DATE: DATE: DATE: DATE:

35.00 40.00 31.00 31.00 35.00 30.00 30.00 30.00 30.00 30.00 30.00 11.50 11.50
375.00

Plans prepared By Consultant/s, checked by concerned UPMO Clusters and approved at Central O
Detailed Engineering Design

5.00
PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES <SIGNATURE OVER NAME>
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER <II/III> (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)

20.00
BUREAU OF DESIGN

15.00
CHECKED: <SIGNATURE OVER NAME> <NAME> <NAME> <NAME>
MANILA
CHIEF, <CONCERNED DESIGN DIVISION>DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<SIGNATURE OVER NAME> BUREAU OF DESIGN DATE: TECHNICAL SERVICES TECHNICAL SERVICES
CHIEF, <CONCERNED SECTION> DATE: DATE: DATE:

70.00 51.00 51.00 40.00 35.00 35.00 35.00 35.00 11.50 11.50
375.00

Plans prepared by the Bureau of Design


Detailed Engineering Design
Annex "F-1"

5.00
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: SUBMITTED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
<LOGO/S>

20.00
REPUBLIC OF THE PHILIPPINES

15.00
>
<SIGNATURE OVER NAME DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME
<REGIONAL OFFICE NO.>
<CONTRACTOR/S> PROJECT MANAGER PROJECT ENGINEER CHIEF, <IMPLEMENTING SECTION> CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
<ADDRESS> DATE: <DISTRICT ENGINEERING OFFICE> DATE: DATE: DATE: DATE: DATE:
<ADDRESS>

35.00 35.00 36.00 36.00 35.00 35.00 35.00 35.00 35.00 35.00 11.50 11.50
375.00

"As-Staked" Plans prepared by Contractor and approved by District Engineering Offices

5.00
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENED APPROVED SET NO. SHEET NO.
<LOGO/S>
<SIGNATURE OVER NAME>
PROJECT ENGINEER

20.00
REPUBLIC OF THE PHILIPPINES
>
<SIGNATURE OVER NAME

15.00
>
<SIGNATURE OVER NAME SUBMITTED:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME
<REGIONAL OFFICE NO.>
PROJECT MANAGER CHIEF, PLANNING AND DESIGN DIVISION DISTRICT ENGINEER ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
<CONTRACTOR/S>
<ADDRESS> DATE: <DISTRICT ENGINEERING OFFICE> <SIGNATURE OVER NAME> DATE: DATE: DATE: DATE:
<ADDRESS> CHIEF, <IMPLEMENTING SECTION>

35.00 35.00 33.50 33.50 35.00 40.00 35.00 35.00 35.00 35.00 11.50 11.50
375.00

"As-Staked" Plans prepared by Contractor, checked by District Engineering Offices and approved by respective Regional O

5.00
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: SUBMITTED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
<LOGO/S>

20.00
REPUBLIC OF THE PHILIPPINES

15.00
>
<SIGNATURE OVER NAME DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME
<CONTRACTOR/S> PROJECT MANAGER <REGIONAL OFFICE NO.> PROJECT ENGINEER CHIEF, <IMPLEMENTING SECTION> CHIEF, PLANNING AND DESIGN SECTION ASSISTANTREGIONAL DIRECTOR REGIONAL DIRECTOR
<ADDRESS> DATE: <ADDRESS> DATE: DATE: DATE: DATE: DATE:

35.00 35.00 36.00 36.00 35.00 35.00 35.00 35.00 35.00 35.00 11.50 11.50
375.00

"As-Staked" Plans prepared by Contractor and approved by Regional Offices

5.00
PREPARED: PROJECT NAME AND LOCATION:SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
<LOGO/S>
<SIGNATURE OVER NAME>
PROJECT ENGINEER (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)

20.00
REPUBLIC OF THE PHILIPPINES

15.00
>
<SIGNATURE OVER NAME DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SUBMITTED: <SIGNATURE OVER NAME>
<SIGNATURE OVER NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER CHIEF, <CONCERNED DESIGN DIVISION> REGIONAL DIRECTOR ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<CONTRACTOR/S> <REGIONAL OFFICE NO.> DIRECTOR IV, BUREAU OF DESIGN
<ADDRESS>
DATE: <ADDRESS> <SIGNATURE OVER NAME> BUREAU OF DESIGN DATE: DATE: TECHNICAL SERVICES TECHNICAL SERVICES
CHIEF, <IMPLEMENTING DIVISION> DATE: DATE: DATE:

35.00 30.00 31.00 31.00 35.00 40.00 30.00 30.00 30.00 30.00 30.00 11.50 11.50
375.00

"As-Staked" Plans prepared by Contractor, checked by Regional Offices and approved at Central Office
Annex "F-2"

5.00
PREPARED: PROJECT NAME AND LOCATION:SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
<LOGO/S>
<SIGNATURE OVER NAME>
PROJECT ENGINEER (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)

20.00
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

15.00
>
<SIGNATURE OVER NAME <REGIONAL OFFICE NO.> SUBMITTED: <SIGNATURE OVER NAME>
<SIGNATURE OVER NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER <ADDRESS> CHIEF, <CONCERNED DESIGN DIVISION> PROJECT DIRECTOR ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<CONTRACTOR/S> DIRECTOR IV, BUREAU OF DESIGN
<ADDRESS>
DATE: <SIGNATURE OVER NAME> BUREAU OF DESIGN <UPMO CLUSTER> DATE: TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER DATE: DATE: DATE: DATE:

35.00 30.00 31.00 31.00 35.00 40.00 30.00 30.00 30.00 30.00 30.00 11.50 11.50
375.00

"As-Staked" Plans prepared by Contractor, checked by concerned UPMO Clusters and approved at Central Office

5.00
PREPARED: SUBMITTED: PROJECT NAME AND LOCATION: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SHEET NO.
<LOGO/S> <LOGO/S>
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)

20.00
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

15.00
<SIGNATURE OVER NAME > <SIGNATURE OVER NAME >SHEET CONTENTS: > <SIGNATURE OVER NAME>
<SIGNATURE OVER NAME <SIGNATURE OVER NAME> <NAME> <NAME> <NAME>
<CONTRACTOR/S> PROJECT MANAGER <CONSULTANT/S> PROJECT MANAGER <UPMO CLUSTER> PROJECT MANAGER CHIEF, <CONCERNED DESIGN DIVISION> PROJECT DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<ADDRESS> DATE: <ADDRESS> DATE:
<ADDRESS> DATE: BUREAU OF DESIGN <UPMO CLUSTER> DATE: TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE: DATE:

30.00 25.00 30.00 25.00 38.50 35.00 30.00 30.00 30.00 30.00 30.00 30.00 11.50
375.00

"As-Staked" Plans for UPMO implemented projects with Construction Supervision Consultant/s prepared by Contracto
Annex "G-1"

5.00
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: SUBMITTED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
<LOGO/S>

20.00
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

15.00
>
<SIGNATURE OVER NAME <REGIONAL OFFICE NO.>
>
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME
<CONTRACTOR/S> PROJECT MANAGER <DISTRICT ENGINEERING OFFICE> PROJECT ENGINEER CHIEF, <IMPLEMENTING SECTION> CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DATE: <ADDRESS> DATE: DATE: DATE: DATE: DATE:
<ADDRESS>

35.00 35.00 36.00 36.00 35.00 35.00 35.00 35.00 35.00 35.00 11.50 11.50
375.00

Revised Plans prepared by Contractor and approved by District Engineering Offices

5.00
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: SUBMITTED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
<LOGO/S>

20.00
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

15.00
>
<SIGNATURE OVER NAME <REGIONAL OFFICE NO.>
>
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME
<CONTRACTOR/S> PROJECT MANAGER <DISTRICT ENGINEERING OFFICE> PROJECT ENGINEER CHIEF, <IMPLEMENTING SECTION> CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DATE: <ADDRESS> DATE: DATE: DATE: DATE: DATE:
<ADDRESS>

35.00 35.00 36.00 36.00 35.00 35.00 35.00 35.00 35.00 35.00 11.50 11.50
375.00

Revised Plans prepared by Contractor, concurred by Design Consultants and approved by District Engineering Offices

5.00
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENED APPROVED SET NO. SHEET NO.
<LOGO/S>
<SIGNATURE OVER NAME>
PROJECT ENGINEER

20.00
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS >
<SIGNATURE OVER NAME

15.00
>
<SIGNATURE OVER NAME <REGIONAL OFFICE NO.> SUBMITTED: >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME
PROJECT MANAGER <DISTRICT ENGINEERING OFFICE> CHIEF, PLANNING AND DESIGN DIVISION DISTRICT ENGINEER ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
<CONTRACTOR/S>
<ADDRESS> DATE: <ADDRESS> <SIGNATURE OVER NAME> DATE: DATE: DATE: DATE:
CHIEF, <IMPLEMENTING SECTION>

35.00 35.00 33.50 33.50 35.00 40.00 35.00 35.00 35.00 35.00 11.50 11.50
375.00

Revised Plans prepared by Contractor, checked by District Engineering Offices and approved by respective Regional Off

5.00
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: SUBMITTED: REVIEWED: RECOMMENDED: APPROVED BY: SET NO. SHEET NO.
<LOGO/S>

20.00
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS >
<SIGNATURE OVER NAME

15.00
>
<SIGNATURE OVER NAME <REGIONAL OFFICE NO.>
>
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME
<CONTRACTOR/S> PROJECT MANAGER <DISTRICT ENGINEERING OFFICE> PROJECT ENGINEER CHIEF, <IMPLEMENTING SECTION> CHIEF, PLANNING AND DESIGN DIVISION DISTRICT ENGINEER REGIONAL DIRECTOR
DATE: <ADDRESS> DATE: DATE: DATE: DATE: DATE:
<ADDRESS>

35.00 35.00 36.00 36.00 35.00 35.00 35.00 35.00 35.00 35.00 11.50 11.50
375.00

Revised Plans prepared by Contractor, concurred by Design Consultants, checked by District Engineering Offices and
approved by their respective Regional Offices
Annex "G-2"

5.00
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: SUBMITTED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
<LOGO/S>

20.00
REPUBLIC OF THE PHILIPPINES
>
<SIGNATURE OVER NAME

15.00
>
<SIGNATURE OVER NAME DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME
<CONTRACTOR/S> PROJECT MANAGER <REGIONAL OFFICE NO.> PROJECT ENGINEER CHIEF, <IMPLEMENTING DIVISION> CHIEF, PLANNING AND DESIGN DIVISION ASSISTANTREGIONAL DIRECTOR REGIONAL DIRECTOR
DATE: DATE: DATE: DATE: DATE: DATE:
<ADDRESS> <ADDRESS>

35.00 35.00 36.00 36.00 35.00 35.00 35.00 35.00 35.00 35.00 11.50 11.50
375.00

Revised Plans prepared by Contractor and approved by Regional Offices

5.00
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: SUBMITTED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
<LOGO/S>

20.00
REPUBLIC OF THE PHILIPPINES
>
<SIGNATURE OVER NAME

15.00
>
<SIGNATURE OVER NAME DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME
<CONTRACTOR/S> PROJECT MANAGER <REGIONAL OFFICE NO.> PROJECT ENGINEER CHIEF, <IMPLEMENTING DIVISION> CHIEF, PLANNING AND DESIGN DIVISION ASSISTANTREGIONAL DIRECTOR REGIONAL DIRECTOR
DATE: <ADDRESS> DATE: DATE: DATE: DATE: DATE:
<ADDRESS>

35.00 35.00 36.00 36.00 35.00 35.00 35.00 35.00 35.00 35.00 11.50 11.50
375.00

Revised Plans prepared by Contractor, concurred by Design Consultants and approved by Regional Offices

5.00
PREPARED: PROJECT NAME AND LOCATION:SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
<LOGO/S>
<SIGNATURE OVER NAME>
PROJECT ENGINEER (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)

20.00
REPUBLIC OF THE PHILIPPINES

15.00
>
<SIGNATURE OVER NAME DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SUBMITTED: <SIGNATURE OVER NAME>
<SIGNATURE OVER NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER CHIEF, <CONCERNED DESIGN DIVISION> REGIONAL DIRECTOR ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<CONTRACTOR/S> <REGIONAL OFFICE NO.> DIRECTOR IV, BUREAU OF DESIGN
<ADDRESS>
DATE: <ADDRESS> <SIGNATURE OVER NAME> BUREAU OF DESIGN DATE: DATE: TECHNICAL SERVICES TECHNICAL SERVICES
CHIEF, <IMPLEMENTING DIVISION> DATE: DATE: DATE:

35.00 30.00 31.00 31.00 35.00 40.00 30.00 30.00 30.00 30.00 30.00 11.50 11.50
375.00

Revised Plans prepared by Contractor, checked by Regional Offices and approved at Central Office

5.00
PREPARED: PROJECT NAME AND LOCATION:SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
<LOGO/S>
<SIGNATURE OVER NAME>
PROJECT ENGINEER (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)

20.00
REPUBLIC OF THE PHILIPPINES

15.00
>
<SIGNATURE OVER NAME DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SUBMITTED: <SIGNATURE OVER NAME>
<SIGNATURE OVER NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER CHIEF, <CONCERNED DESIGN DIVISION> REGIONAL DIRECTOR ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<CONTRACTOR/S> <REGIONAL OFFICE NO.> DIRECTOR IV, BUREAU OF DESIGN
<ADDRESS>
DATE: <ADDRESS> <SIGNATURE OVER NAME> BUREAU OF DESIGN DATE: DATE: TECHNICAL SERVICES TECHNICAL SERVICES
CHIEF, <IMPLEMENTING DIVISION> DATE: DATE: DATE:

35.00 30.00 31.00 31.00 35.00 40.00 30.00 30.00 30.00 30.00 30.00 11.50 11.50
375.00

Revised Plans prepared by Contractor, concurred by Design Consultants, checked by Regional Offices and approved at Cen
Annex "G-3"

5.00
PREPARED: PROJECT NAME AND LOCATION:SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
<LOGO/S>
<SIGNATURE OVER NAME>
PROJECT ENGINEER (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)

20.00
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

15.00
>
<SIGNATURE OVER NAME SUBMITTED: <SIGNATURE OVER NAME>
<SIGNATURE OVER NAME> <NAME> <NAME> <NAME>
<CONTRACTOR/S> PROJECT MANAGER <UPMO CLUSTER> CHIEF, <CONCERNED DESIGN DIVISION> PROJECT DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<ADDRESS>
DATE: <ADDRESS> <SIGNATURE OVER NAME> BUREAU OF DESIGN <UPMO CLUSTER> DATE: TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER DATE: DATE: DATE: DATE:

35.00 30.00 31.00 31.00 35.00 40.00 30.00 30.00 30.00 30.00 30.00 11.50 11.50
375.00

Revised Plans prepared by Contractor, checked by concerned UPMO Clusters and approved at Central Office

5.00
PREPARED: PROJECT NAME AND LOCATION:SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
<LOGO/S>
<SIGNATURE OVER NAME>
PROJECT ENGINEER (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)

20.00
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

15.00
>
<SIGNATURE OVER NAME SUBMITTED: <SIGNATURE OVER NAME>
<SIGNATURE OVER NAME> <NAME> <NAME> <NAME>
<CONTRACTOR/S> PROJECT MANAGER <UPMO CLUSTER> CHIEF, <CONCERNED DESIGN DIVISION> PROJECT DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<ADDRESS>
DATE: <ADDRESS> <SIGNATURE OVER NAME> BUREAU OF DESIGN <UPMO CLUSTER> DATE: TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER DATE: DATE: DATE: DATE:

35.00 30.00 31.00 31.00 35.00 40.00 30.00 30.00 30.00 30.00 30.00 11.50 11.50
375.00

Revised Plans prepared by Contractor, concurred by Deign Consultants, checked by concerned UPMO Clusters and approved a

5.00
PREPARED: SUBMITTED: PROJECT NAME AND LOCATION: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SHEET NO.
<LOGO/S> <LOGO/S>
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)

20.00
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

15.00
<SIGNATURE OVER NAME > <SIGNATURE OVER NAME >SHEET CONTENTS: > <SIGNATURE OVER NAME>
<SIGNATURE OVER NAME <SIGNATURE OVER NAME> <NAME> <NAME> <NAME>
<CONTRACTOR/S> PROJECT MANAGER <CONSULTANT/S> PROJECT MANAGER <UPMO CLUSTER> PROJECT MANAGER CHIEF, <CONCERNED DESIGN DIVISION> PROJECT DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<ADDRESS> DATE: <ADDRESS> DATE:
<ADDRESS> DATE: BUREAU OF DESIGN <UPMO CLUSTER> DATE: TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE: DATE:

30.00 25.00 30.00 25.00 38.50 35.00 30.00 30.00 30.00 30.00 30.00 30.00 11.50
375.00

Revised Plans for UPMO implemented projects with Construction Supervision Consultant/s prepared by Contractor
Annex "H-1"

5.00
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
<LOGO/S>

20.00
REPUBLIC OF THE PHILIPPINES

15.00
>
<SIGNATURE OVER NAME DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME
<REGIONAL OFFICE NO.>
<CONTRACTOR/S> PROJECT MANAGER PROJECT ENGINEER CHIEF, <IMPLEMENTING SECTION> ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
<ADDRESS> DATE: <DISTRICT ENGINEERING OFFICE> DATE: DATE: DATE: DATE:
<ADDRESS>

35.00 35.00 53.50 53.50 35.00 35.00 35.00 35.00 35.00 11.50 11.50
375.00

"As-Built" Plans prepared by Contractor and approved by District Engineering Offices

5.00
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
<LOGO/S>

20.00
REPUBLIC OF THE PHILIPPINES

15.00
>
<SIGNATURE OVER NAME DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME
<REGIONAL OFFICE NO.>
<CONTRACTOR/S> PROJECT MANAGER PROJECT ENGINEER CHIEF, <IMPLEMENTING SECTION> DISTRICT ENGINEER ASSISTANTREGIONAL DIRECTOR REGIONAL DIRECTOR
<ADDRESS> DATE: <DISTRICT ENGINEERING OFFICE> DATE: DATE: DATE: DATE: DATE:
<ADDRESS>

35.00 35.00 36.00 36.00 35.00 35.00 35.00 35.00 35.00 35.00 11.50 11.50
375.00

"As-Built" Plans prepared by Contractor, checked by District Engineering Offices and approved by respective Regional Of

5.00
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
<LOGO/S>

20.00
REPUBLIC OF THE PHILIPPINES

15.00
>
<SIGNATURE OVER NAME DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME
<CONTRACTOR/S> PROJECT MANAGER <REGIONAL OFFICE NO.> PROJECT ENGINEER CHIEF, <IMPLEMENTING DIVISION> ASSISTANTREGIONAL DIRECTOR REGIONAL DIRECTOR
<ADDRESS> DATE: <ADDRESS> DATE: DATE: DATE: DATE:

35.00 35.00 53.50 53.50 35.00 35.00 35.00 35.00 35.00 11.50 11.50
375.00

"As-Built" Plans prepared by Contractor and approved by Regional Offices

5.00
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
<LOGO/S>
(SEE COVER SHEET) (SEE COVER SHEET)

20.00
REPUBLIC OF THE PHILIPPINES

15.00
>
<SIGNATURE OVER NAME DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME <SIGNATURE OVER NAME> <NAME> <NAME>
<CONTRACTOR/S> PROJECT MANAGER <REGIONAL OFFICE NO.> PROJECT ENGINEER CHIEF, <IMPLEMENTING DIVISION> REGIONAL DIRECTOR ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<ADDRESS> DATE: <ADDRESS> DATE: DATE: DATE: REGIONAL OPERATIONS REGIONAL OPERATIONS
DATE: DATE:

35.00 35.00 36.00 36.00 35.00 35.00 35.00 35.00 35.00 35.00 11.50 11.50
375.00

"As-Built" Plans prepared by Contractor, checked by Regional Offices and approved at Central Office
Annex "H-2"

5.00
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
<LOGO/S>
(SEE COVER SHEET) (SEE COVER SHEET)

20.00
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

15.00
>
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME >
<SIGNATURE OVER NAME <SIGNATURE OVER NAME> <NAME> <NAME>
<CONTRACTOR/S> PROJECT MANAGER <UPMO CLUSTER> PROJECT ENGINEER PROJECT MANAGER PROJECT DIRECTOR ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<ADDRESS> DATE: <ADDRESS> DATE: DATE: <UPMO CLUSTER> UPMO OPERATIONS UPMO OPERATIONS
DATE:
DATE: DATE:

35.00 35.00 36.00 36.00 35.00 35.00 35.00 35.00 35.00 35.00 11.50 11.50
375.00

"As-Built" Plans prepared by Contractor, checked by concerned UPMO Clusters and approved at Central Office

5.00
PREPARED: SUBMITTED: PROJECT NAME AND LOCATION: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
<LOGO/S> <LOGO/S>
(SEE COVER SHEET) (SEE COVER SHEET)

20.00
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

15.00
<SIGNATURE OVER NAME > <SIGNATURE OVER NAME>SHEET CONTENTS: > <SIGNATURE OVER NAME>
> <SIGNATURE OVER NAME
<SIGNATURE OVER NAME <NAME> <NAME>
<CONTRACTOR/S> PROJECT MANAGER <CONSULTANT/S> PROJECT MANAGER <UPMO CLUSTER> PROJECT ENGINEER PROJECT MANAGER PROJECT DIRECTOR ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<ADDRESS> DATE: <ADDRESS> DATE:
<ADDRESS> DATE: DATE: <UPMO CLUSTER> UPMO OPERATIONS UPMO OPERATIONS
DATE: DATE: DATE:

30.00 25.00 30.00 25.00 57.00 35.00 30.00 30.00 30.00 30.00 30.00 11.50 11.50
375.00

"As-Built" Plans for UPMO implemented projects with Construction Supervision Consultant/s prepared by Contractor
Annex "I - 1"
LIABILITY WAIVER
SIGNED BY DESIGN CONSULTANT/S FOR
DETAILED ENGINEERING DESIGN PLANS

NOTE:

PURSUANTTO ITEM 5 OF ANNEX 'A' OF THE REVISEDIMPLEMENTINGRULES


AND REGULATION OF R.A. 9184, THE APPROVAL BY THE AUTHORIZED
GOVERNMENTOFFICIALSOF DETAILEDENGINEERINGSURVEYSAND DESIGNS
UNDERTAKENBY CONSULTANTSNEITHERDIMINISHESTHE RESPONSIBILITY OF
THE LATTERFOR THE TECHNICALINTEGRITYOF THE SURVEYSAND DESIGNS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITYTO THE APPROVING

45.00 mm
.
OFFICIALS

THE DESIGN CONSULTANTSHALL BE HELD FULLY RESPONSIBLEFOR THE


FAILUREOF THE FACILITIES/STRUCTURES
DUE TO FAULTYDESIGNEXCEPTFOR
THE CHANGES MADE WITHOUT THE CONFORMITY OF THE CONSULTANTS.

PROJECT MANAGER
<Consultant/s>

75.00 mm

USE 1.25 mm FONT SIZE


Annex "I - 2"
LIABILITY WAIVER
SIGNED BY CONSTRUCTION SUPERVISION CONSULTANT/S
FOR "AS-STAKED", AND "AS-BUILT" PLANS

NOTE:

PURSUANTTO ITEM6.4 OF ANNEX'B' OF THE REVISEDIMPLEMENTING


RULES
AND REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION
CONSULTANTSHALL BE RESPONSIBLEFOR VERIFICATIONAND CHECKING
OF QUANTITIES AND QUALITIES OF WORK ACCOMPLISHED BY THE
CONTRACTORAS AGAINST THE APPROVEDPLANS, SPECIFICATIONSAND
PROGRAM OF WORKS.

THE CONSTRUCTIONSUPERVISIONCONSULTANTSHALL BE HELD FULLY


RESPONSIBLEFOR THE FAILUREOF THE FACILITIES/STRUCTURES
DUE TO

45.00 mm
POOR QUALITYOF WORKMANSHIPACCOMPLISHEDBY THE CONTRACTOR
EXCEPTFOR THOSE FAILUREDUE TO FAULTYDESIGNAS PER APPROVED
DETAILEDENGINEERINGDESIGNPLAN.THE APPROVALBY THE AUTHORIZED
GOVERNMENTOFFICIALSOF "AS-STAKED",REVISEDOR "AS-BUILT"PLANS
UNDERTAKEN/CHECKED BY CONSTRUCTIONSUPERVISIONCONSULTANTS
NEITHER DIMINISHES THE RESPONSIBILITYOF THE LATTER FOR THE
TECHNICALINTEGRITYOF THE SAID PLANS NOR TRANSFERANY PART OF
.
THAT RESPONSIBILITY TO THE APPROVING OFFICIALS

PROJECT MANAGER
<Consultant/s>

75.00 mm

USE 1.25 mm FONT SIZE


Annex "I - 3"
LIABILITY WAIVER FOR
REVISED PLANS CONCURRED BY DED CONSULTANTS

NOTE:

PURSUANTTO ITEM 7 OF DPWH DEPARTMENTORDER NO. 50, SERIES 2002, THE


DETAILEDENGINEERINGDESIGNCONSULTANTISSUETHIS NON-OBJECTION TO VARY
TO THE RECOMMENDATIONOF THE IMPLEMENTINGOFFICE,INCORPORATING MAJOR
CHANGES IN THE ORIGINAL DESIGN DURING THE PROJECT IMPLEMENTATION

40.00 mm
PROVIDED,HOWEVER,THAT THIS ISSUANCEWILL NOT RELIEVETHE ENTITYWHICH
DESIGNED THE CHANGES OF ITS RESPONSIBILITY FOR SUCH.

CONCURRED BY:

PROJECT MANAGER
<DED Consultant/s>

75.00 mm

USE 1.25 mm FONT SIZE


Annex "I - 4"
LIABILITY WAIVER FOR
REVISED PLANS CONCURRED BY DED CONSULTANTS WITH
CONSTRUCTION SUPERVISION CONSULTANTS

NOTE:

PURSUANTTO ITEM 7 OF DPWH DEPARTMENTORDER NO. 50, SERIES 2002, THE


DETAILEDENGINEERINGDESIGNCONSULTANTISSUETHIS NON-OBJECTION TO VARY
TO THE RECOMMENDATION OF THE CONSTRUCTIONSUPERVISIONCONSULTANTS,
INCORPORATINGMAJORCHANGESIN THE ORIGINALDESIGNDURINGTHE PROJECT

40.00 mm
IMPLEMENTATIONPROVIDED,HOWEVER,THAT THIS ISSUANCEWILL NOT RELIEVE
THE ENTITY WHICH DESIGNED THE CHANGES OF ITS RESPONSIBILITY FOR SUCH.

CONCURRED BY:

PROJECT MANAGER
<DED Consultant/s>

75.00 mm

USE 1.25 mm FONT SIZE


15 mm from edge of the paper

Annex "J - 1"


m
m
40

REPUBLIC OF THE PHILIPPINES 4.50 mm

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


6.00 mm, Bold

<REGIONAL OFFICE NO.> 5.00 mm

<DISTRICT ENGINEERING OFFICE> 5.50 mm

<ADDRESS> 4.50 mm

For all plans approved by District Engineering Offices


30 mm from edge of the paper

m
m
40

REPUBLIC OF THE PHILIPPINES 4.50 mm

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


6.00 mm, Bold

<REGIONAL OFFICE NO.> 5.50 mm

<ADDRESS> 4.50 mm

For all plans approved by Regional Offices

m
m
40

REPUBLIC OF THE PHILIPPINES 4.50 mm

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

15 mm from edge of the paper


6.00 mm, Bold

<UPMO CLUSTER> 5.50 mm

<ADDRESS> 4.50 mm

For all plans approved by UPMO


15 mm from edge of the paper

Annex "J - 2"


m
m
40

REPUBLIC OF THE PHILIPPINES 4.50 mm

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


6.00 mm, Bold

BUREAU OF DESIGN 5.50 mm

MANILA 4.50 mm

For all plans approved by Bureau of Design

C.Y. <YEAR> PROJECT 4.50 mm


30 mm from edge of the paper

<DED/"AS-STAKED"/ REVISED/"AS-BUILT">
PLAN FOR 4.50 mm

<NAME OF PROJECT> 5.50 mm, Bold

<SECTION> 4.50 mm

<LOCATION> 4.50 mm

<STATION LIMITS> 4.50 mm

<NET LENGTH> 4.50 mm

<ROAD SECTION / BRIDGE ID> 4.50 mm

For all plans implemented and approved by the DPWH

62.50 125.00

SUBMITTED: RECOMMENDED: APPROVED: 2.00 mm

15 mm from edge of the paper


<SIGNATURE> <SIGNATURE> <SIGNATURE> 2.00 mm
<NAME> <NAME> <NAME> 2.00 mm, Bold
CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2.00 mm
DATE: DATE: DATE: 1.50 mm
37.50 50.00 75.00

Spacing sample for plans with three signatories on cover sheet


15 mm from edge of the paper

Annex "J - 3"


46.875 93.75

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>


<NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER CHIEF, <IMPLEMENTING DIVISION> ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
<CONTRACTOR NAME> DATE: DATE: DATE:
DATE:

21.875 50.00 43.75

Spacing sample for plans with four signatories on cover sheet


30 mm from edge of the paper

47.50 70.00

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>


<NAME> <NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER PROJECT MANAGER PROJECT DIRECTOR ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<CONTRACTOR NAME> <CONSTRUCTION SUPERVISION <UPMO CLUSTER> UPMO OPERATIONS UPMO OPERATIONS
DATE: CONSULTANT> DATE: DATE: DATE:
DATE:
22.50 50.00 20.00

Spacing sample for plans with five signatories on cover sheet

37.50 60.00

PREPARED: SUBMITTED: RECOMMENDED: APPROVED:

<SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE> <SIGNATURE>

15 mm from edge of the paper


<NAME> <NAME> <NAME> <NAME> <NAME> <NAME>
PROJECT MANAGER PROJECT MANAGER PROJECT DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
<CONTRACTOR NAME> <CONSTRUCTION SUPERVISION <UPMO CLUSTER> DATE: TECHNICAL SERVICES TECHNICAL SERVICES
DATE: CONSULTANT> DATE: DATE: DATE:
DATE:

12.50 50.00 10.00

Spacing sample for plans with six signatories on cover sheet


Annex "J-4"
m
m
15

REPUBLIC OF THE PHILIPPINES 1.125 mm


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS 1.375 mm, Bold
<REGIONAL OFFICE NO.> 1.25 mm(Omit this line for projects plans implemented by Regional Offices, UPMO Clusters or Bureau of Design)

<DISTRICT ENGINEERING OFFICE> 2.00 mm (Change "<DISTRICT ENGINEERING OFFICE>" into <REGIONAL OFFICE NO.>, UPMO <CLUSTER> or BUREAU OF DESIGN according to which office implements the project plan)
<ADDRESS> 1.125 mm

70.00

PROJECT NAME AND LOCATION: 1.25 mm

51.00

SHEET CONTENTS: 1.25 mm

51.00
DRAFTED: 1.25 mm

<SIGNATURE OVER NAME> 1.25 mm, Bold


ENGINEERING ASSISTANT 1.00 mm
PREPARED: 1.25 mm

<SIGNATURE OVER NAME> 1.25 mm, Bold


ENGINEER II 1.00 mm

40.00

REVIEWED: 1.25 mm

<SIGNATURE OVER NAME> 1.50 mm, Bold


ENGINEER II 1.20 mm
DATE: 1.00 mm

35.00

SUBMITTED: 1.25 mm

<SIGNATURE OVER NAME> 1.50 mm, Bold


CHIEF, PLANNING AND DESIGN SECTION 1.20 mm
DATE: 1.00 mm

35.00

RECOMMENDED: 1.25 mm

<SIGNATURE OVER NAME> 1.50 mm, Bold


ASSISTANT DISTRICT ENGINEER 1.20 mm
DATE: 1.00 mm

35.00

APPROVED: 1.25 mm

<SIGNATURE OVER NAME> 1.50 mm, Bold

DISTRICT ENGINEER 1.20 mm


DATE: 1.00 mm

35.00

1.25 mm SET NO.

(SET SYMBOL)1.50 mm, Bold D


(SET SHEET NO.) 1.50 mm
(SET TOTAL NO. OF SHEETS) 1.50 mm 11 16
Radius of Circle = 5.00 mm

11.50

1.25 mm SHEET NO.

(OVERALL SHEET NO.)


1.50 mm 84
(OVERALL TOTAL NO. OF SHEETS)
1.50 mm 226
Radius of Circle = 5.00 mm

11.50
Annex "J-5"

PREPARED: 1.25 mm
<LOGO/S>

<SIGNATURE OVER NAME> 1.25 mm, Bold


<CONTRACTOR/S> PROJECT MANAGER 1.20 mm
<ADDRESS> DATE: 1.00 mm

30.00 25.00

SUBMITTED: 1.25 mm
<LOGO/S>

<SIGNATURE OVER NAME> 1.25 mm, Bold


<CONSULTANT/S> PROJECT MANAGER 1.20 mm
<ADDRESS> DATE: 1.00 mm

30.00 25.00
PROJECT NAME AND LOCATION: 1.25 mm

SHEET CONTENTS: 1.25 mm

57.00

15 mm

REPUBLIC OF THE PHILIPPINES 0.80 mm


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS 0.95 mm, Bold
<REGIONAL OFFICE NO.> 0.90 mm(Omit this line for projects plans implemented by Regional Offices, UPMO Clusters or Bureau of Design)
<DISTRICT ENGINEERING OFFICE> 1.25 mm(Change "<DISTRICT ENGINEERING OFFICE>" into <REGIONAL OFFICE NO.>, UPMO <CLUSTER> or BUREAU OF DESIGN according to which office implements the project plan)
<ADDRESS> 0.80 mm
35.00

CHECKED: REVIEWED: 1.25 mm

> <SIGNATURE OVER NAME


<SIGNATURE OVER NAME > 1.50 mm, Bold
PROJECT ENGINEER PROJECT MANAGER 1.00 mm
DATE: DATE: 0.90 mm

30.00 30.00

RECOMMENDED: 1.25 mm

(SEE COVER SHEET) 1.25 mm

<SIGNATURE OVER NAME> <NAME> 1.50 mm, Bold


PROJECT DIRECTOR ASSISTANT SECRETARY FOR
<UPMO CLUSTER> UPMO OPERATIONS
1.00 mm
DATE: DATE:
0.90 mm

30.00 30.00

APPROVED: 1.25 mm

(SEE COVER SHEET) 1.25 mm

<NAME> 1.50 mm, Bold


UNDERSECRETARY FOR
1.00 mm
UPMO OPERATIONS
DATE: 0.90 mm

30.00

1.25 mm SET NO.

(SET SYMBOL)1.50 mm, Bold D


(SET SHEET NO.) 1.50 mm
(SET TOTAL NO. OF SHEETS) 1.50 mm 11 16
Radius of Circle = 5.00 mm

11.50

1.25 mm SHEET NO.

(OVERALL SHEET NO.)


1.50 mm 84
(OVERALL TOTAL NO. OF SHEETS)
1.50 mm 226
Radius of Circle = 5.00 mm

11.50

You might also like