You are on page 1of 162

CONTRACTOR: HPL ELECTRIC & POWER PVT. LTD.

POWER TRANSMISSION CORPORATION OF UTTARKHAND


CLIENT:
LIMITED(PTCUL)

PROJECT: 220/132/33kV SUBSTATION, DEHRADUN

DATED 19.08.13 DESIGNER: VOLTECH ENGINEERS PVT LTD

DSGND. MN
TITLE: RELAY SETTING CALCULATION AND COORDINATION
A For Approval 19.08.13 CHKD. GP
REV. DESCRIPTION BY APPVD. DATE APPVD. GP DOC. NO: VE-J108-D-E212 REV: A
CONTENT

S.No Description Page No

A NOTES 1
1 11/0.415kV 2
1.1 0.415kV MSB Bus coupler 3
1.2 0.415kV MSB Incomer-1 5
1.3 0.415kV MSB Incomer-2 7
1.4 11/0.415kV 400KVA Transformer 9
2 33kV 11
2.1 33kV Capacitor bank- OC and EF 12
2.2 33kV Line OC and EF 14
2.3 33kV Bus coupler OC and EF 16
2.4 40 MVA Transformer OC and EF(LV Side) 18
3 132kV 20
3.1 40 MVA Transformer OC and EF(HV Side) 21
3.2 160MVA Transformer OC and EF(LV Side) 23
3.3 132kV Line OC and EF 25
3.4 132 kV Line Distance Protection(30kM) 27
3.5 132 kV Line Distance Protection(22kM) 34
3.6 132 kV Line Distance Protection(15kM) 41
3.7 132/33kV 40 MVA Trafo Differential Protection 48
4 220kV 52
4.1 160 MVA Transformer OC and EF 53
4.2 220 kV Bus Coupler OC and EF 55
4.3 220 kV Line OC and EF 57
4.4 220kV Distance Protection(50kM) Main-1 59
4.5 220kV Distance Protection(40kM) Main-1 66
4.6 220kV Distance Protection(10kM) Main-1 73
4.7 220kV Distance Protection(50kM) Main-2 80
4.8 220kV Distance Protection(40kM) Main-2 86
4.9 220kV Distance Protection(10kM) Main-2 92
4.10 220/132kV 160 MVA Transformer Differential Proetction 98
4.11 220/132kV 160 MVA Restricted Earthfault Proetction 102
4.12 220 kV Bus Bar protection 106
5 11/0.433kV POC Coordination 108
6 11/0.433kV EOC Coordination 109
7 0.433-33kV POC Coordination 110
8 0.433-33kV EOC Coordination 111
9 132-33kV POC Coordination 112
10 132-33kV EOC Coordination 113
11 220-132kV POC Coordination 114
12 220-132kV EOC Coordination 115
13 220-132kV SC Trip Coordination 116
14 OLV-SC Analysis Three phase-Minimum 117
15 OLV-SC Analysis Three phase-Maximum 118
16 OLV-SC Analysis Ph-G-Minimum 119
17 OLV-SC Analysis Ph-G-Maximum 120
18 Short Circuit Analysis Repot-Minimum 121
19 Short Circuit Analysis Repot-Maximum 121
20 Relay Setting -ETAP Format 150

Total Pages -160

A1
Note:
1
SBEF Protection For 160MVA Transformer is Not provided, Since the NCT is Not available

2 There is no NCT for REF and SBEF Protection of 40 MVA Transformer,

Page 1 of 160
0.415kV FEEDERS

Page 2 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR MSB BC CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER MSB BC
1.1. Non Directional Overcurrent and Earth Fault Protection for 0.415kV MSB BC

CT Details
CT Ratio = 1000/1 A
CT Primary = 1000 A
CT Secondary = 1 A
Class = 5P20
Transformer Data:
Rated power = 0.4 MVA
Rated HV Voltage = 11.00 kV
Rated LV Voltage = 0.43 kV
Full Load current HV Side = 21.00 A
Full Load current LV Side = 533.36 A
Impedence = 0.450 4.50%
Phase Over current setting
O/C SETTING (51):
The relay setting shall be such that it shall not operate for max.
probable load current
Load current I load = 533.36 A
CT secondary current, = i Load / CT ratio
= 0.53
Consider 110% of transformer Full load = 586.70 Primary
Pickup Phase fault Secondary , recommended = 0.59 Secondary
Time Multiplier Setting
Characteristics = IDMT Normal inverse
t Required operating time in seconds = grading time + Downstream relay
Minimum grading time interval considered operating time
in sec = 0.25
Minimum Fault current = 11240.00 A From ETAP
I Fault current at secondary = I fault / CT ratio
11.24 A
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.25*(((11.24/0.6)^0.02)-1))/0.14)
= 0.1
Instantaneous Phase Overcurrent Setting
For High set considering the 130% of through fault current = 1540.83 A
= 1.541 A
t = 0.100 Sec
Earth Over current setting HV side
In solidly earthed system a setting of 10 to 20% of CT Primary = 200.00 A Primary
current is considered = I earth fault / CT ratio
Setting of 20% is selected = (200/1000)
= 0.200 A Secondary
Time Multiplier Setting
CHARACTERISTICS = IDMT Normal inverse
t Required operating time in seconds = grading time + Downstream relay
Minimum grading time interval considered operating time
in sec = 0.25
Fault current = 11340.00 A From ETAP
I Fault current at secondary = I fault / CT ratio
11.34
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.25*(((11.34/0.2)^0.02)-1))/0.14)
= 0.15

Instantaneous Earth Overcurrent Setting


For High set considering the 100% of CT Primary Current = 1000.00 A
= 1.000 A
t = 0.100 Sec

Page 3 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR MSB BC CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER MSB BC
Setting Table:

F650
GROUP-1 Non Directional Phase Overcurrent- 51
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.59 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.11 0 900 0.01 S

F650
GROUP-1 Non Directional Phase Overcurrent- 50
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 1.54 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.10 0 900 0.01 S

F650
GROUP-1 Non Directional Earth Overcurrent- 51N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.20 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.15 0 900 0.01 S

F650
GROUP-1 Non Directional Earth Overcurrent- 50N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 1.00 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.10 0 900 0.01 S

Page 4 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 0.415kV INCOMER-1 CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 0.415kV Incomer-1
1.2 Non Directional Overcurrent and Earth Fault Protection for 0.415 kV MSB Incomer-1

CT Details
CT Ratio = 1000/1 A
CT Primary = 1000 A
CT Secondary = 1 A
Class = 5P20
Transformer Data:
Rated power = 0.4 MVA
Rated HV Voltage = 11.00 kV
Rated LV Voltage = 0.43 kV
Full Load current HV Side = 21.00 A
Full Load current LV Side = 533.36 A
Impedence = 0.450 4.50%
Phase Over current setting
O/C SETTING (51):
The relay setting shall be such that it shall not operate for max.
probable load current
Load current I load = 533.36 A
CT secondary current, = i Load / CT ratio
= 0.53
Consider 110% of transformer Full load = 586.70 Primary
Pickup Phase fault Secondary , recommended = 0.59 Secondary
Time Multiplier Setting
Characteristics = IDMT Normal inverse
t Required operating time in seconds = grading time + Downstream relay
Minimum grading time interval considered operating time
in sec = 0.50
Minimum Fault current = 11240.00 A From ETAP
I Fault current at secondary = I fault / CT ratio
11.24 A
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.5*(((11.24/0.6)^0.02)-1))/0.14)
= 0.2
Instantaneous Phase Overcurrent Setting
For High set considering the 130% of through fault current = 1540.83 A
= 1.541 A
t = 0.200 Sec
Earth Over current setting HV side
In solidly earthed system a setting of 10 to 20% of CT Primary = 200.00 A Primary
current is considered = I earth fault / CT ratio
Setting of 20% is selected = (200/1000)
= 0.200 A Secondary
Time Multiplier Setting
CHARACTERISTICS = IDMT Normal inverse
t Required operating time in seconds = grading time + Downstream relay
Minimum grading time interval considered operating time
in sec = 0.50
Fault current = 11340.00 A From ETAP
I Fault current at secondary = I fault / CT ratio
11.34
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.5*(((11.34/0.2)^0.02)-1))/0.14)
= 0.30

Instantaneous Earth Overcurrent Setting


For High set considering the 100% of CT Primary Current = 1000.00 A
= 1.000 A
t = 0.200 Sec

Page 5 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 0.415kV INCOMER-1 CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 0.415kV Incomer-1
Setting Table:

F650
GROUP-1 Non Directional Phase Overcurrent- 51
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.59 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.22 0 900 0.01 S

F650
GROUP-1 Non Directional Phase Overcurrent- 50
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 1.54 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.20 0 900 0.01 S

F650
GROUP-1 Non Directional Earth Overcurrent- 51N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.20 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.30 0 900 0.01 S

F650
GROUP-1 Non Directional Earth Overcurrent- 50N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 1.00 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.20 0 900 0.01 S

Page 6 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 0.415kV INCOMER-2 CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 0.415kV Incomer-2
1.3. Non Directional Overcurrent and Earth Fault Protection for 0.415kV Incomer-2

CT Details
CT Ratio = 1000/1 A
CT Primary = 1000 A
CT Secondary = 1 A
Class = 5P20
Transformer Data:
Rated power = 0.6 MVA
Rated HV Voltage = 33.00 kV
Rated LV Voltage = 0.43 kV
Full Load current HV Side = 11.02 A
Full Load current LV Side = 840.05 A
Impedence = 0.500 5.00%
Phase Over current setting
O/C SETTING (51):
The relay setting shall be such that it shall not operate for max.
probable load current
Load current I load = 840.05 A
CT secondary current, = i Load / CT ratio
= 0.84
Consider 110% of transformer Full load = 924.05 Primary
Pickup Phase fault Secondary , recommended = 0.92 Secondary
Time Multiplier Setting
Characteristics = IDMT Normal inverse
t Required operating time in seconds = grading time + Downstream relay
Minimum grading time interval considered operating time
in sec = 0.50
Minimum Fault current = 15570.00 A From ETAP
I Fault current at secondary = I fault / CT ratio
15.57 A
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.5*(((15.57/0.9)^0.02)-1))/0.14)
= 0.2
Instantaneous Phase Overcurrent Setting
For High set considering the 130% of through fault current = 2184.13 A
= 2.184 A
t = 0.200 Sec
Earth Over current setting HV side
In solidly earthed system a setting of 10 to 20% of CT Primary = 200.00 A Primary
current is considered = I earth fault / CT ratio
Setting of 20% is selected = (200/1000)
= 0.200 A Secondary
Time Multiplier Setting
CHARACTERISTICS = IDMT Normal inverse
t Required operating time in seconds = grading time + Downstream relay
Minimum grading time interval considered operating time
in sec = 0.50
Fault current = 15840.00 A From ETAP
I Fault current at secondary = I fault / CT ratio
15.84
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.5*(((15.84/0.2)^0.02)-1))/0.14)
= 0.3

Instantaneous Earth Overcurrent Setting


For High set considering the 100% of CT Primary Current = 1000.00 A
= 1.000 A
t = 0.200 Sec

Page 7 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 0.415kV INCOMER-2 CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 0.415kV Incomer-2
Setting Table:

F650
GROUP-1 Non Directional Phase Overcurrent- 51
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.92 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.21 0 900 0.01 S

F650
GROUP-1 Non Directional Phase Overcurrent- 50
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 2.18 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.20 0 900 0.01 S

F650
GROUP-1 Non Directional Earth Overcurrent- 51N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.20 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.33 0 900 0.01 S

F650
GROUP-1 Non Directional Earth Overcurrent- 50N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 1.00 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.20 0 900 0.01 S

Page 8 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 11/0.415kV 400KVA Trafo 11kV Side CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 11/0.415kV 400KVA Tafo-11kV Side
1.4. Non Directional Overcurrent and Earth Fault Protection for 11kV Incomer

CT Details
CT Ratio = 100/1 A
CT Primary = 100 A
CT Secondary = 1 A
Class = 5P20
Transformer Data:
Rated power = 0.4 MVA
Rated HV Voltage = 11.00 kV
Rated LV Voltage = 0.43 kV
Full Load current HV Side = 21.00 A
Full Load current LV Side = 533.36 A
Impedence = 0.450 4.50%
Phase Over current setting
O/C SETTING (51):
The relay setting shall be such that it shall not operate for max.
probable load current
Load current I load = 21.00 A
CT secondary current, = i Load / CT ratio
= 0.21
Consider 110% of transformer Full load = 23.09 Primary
Pickup Phase fault Secondary , recommended = 0.23 Secondary
Time Multiplier Setting
Characteristics = IDMT Normal inverse
t Required operating time in seconds = grading time + Downstream relay
Minimum grading time interval considered operating time
in sec = 0.75
Minimum Fault current = 15230.00 A From ETAP
I Fault current at secondary = I fault / CT ratio
152.30 A
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.75*(((152.3/0.2)^0.02)-1))/0.14)
= 0.74
Instantaneous Phase Overcurrent Setting
For High set considering the 130% of through fault current = 60.65 A Calculated
= 0.607 A
t = 0.300 Sec

Setting Table:

F650
GROUP-1 Non Directional Phase Overcurrent- 51
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.23 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.74 0 900 0.01 S

F650
GROUP-1 Non Directional Phase Overcurrent- 50
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.61 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.30 0 900 0.01 S

Page 9 of 160
ERROR: undefined
OFFENDING COMMAND: ‘~

STACK:

Page 10 of 160
33kV FEEDERS

Page 11 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 19.08.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 33kV CAPACITOR BANK CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 33kV Capacitor Bank
2.1. Directional Overcurrent and Earth Fault Protection for 33kV capacitor Bank Feeder

CT Details
CT Ratio = 200-100/1 A
CT Primary = 200 A
CT Secondary = 1 A
Class = PS

Capacitor Bank Details


Rated kVAR = 10000 kVAR
Rated Voltage = 33 kV
Rated Current = 175 A

Phase Over current setting


O/C SETTING (51):
The relay setting shall be such that it shall not operate for max.
probable load current
Load current I load = 175 A Considering the CT Ratio
CT secondary current, = i Load / CT ratio
= 0.87
Consider 110% of transformer Full load = 192.46 Primary
Pickup Phase fault Secondary , recommended = 0.96 Secondary

Time Multiplier Setting


Characteristics = IDMT IEC-Standard inverse

t Required operating time in seconds = grading time + Downstream relay


Minimum grading time interval considered operating time
in sec = 0.10

Minimum Fault current = 3640 A From ETAP


I Fault current at secondary = I fault / CT ratio
18.20 A
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.1*(((18.2/1)^0.02)-1))/0.14)
= 0.04
Maximum fault Current = 9620 A Primary From ETAP
= 48.10 A Secondary
Operating time at Maximum fault Current = 0.07 Sec

Earth Over current setting HV side


In solidly earthed system a setting of 10 to 20% of CT Primary = 40.00 A Primary
current is considered = I earth fault / CT ratio
Setting of 20% is selected = (40/200)
= 0.20 A Secondary

Time Multiplier Setting


CHARACTERISTICS = IDMT IEC-Standard inverse

t Required operating time in seconds = grading time + Downstream relay


Minimum grading time interval considered operating time
in sec = 0.10

Fault current = 3880 A From ETAP


I Fault current at secondary = I fault / CT ratio
19.40
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.1*(((19.4/0.2)^0.02)-1))/0.14)
= 0.07
Maximum fault Current = 9650 A Primary From ETAP
= 48.25 A Secondary
Operating time at Maximum fault Current = 0.08 Sec

Page 12 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 19.08.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 33kV CAPACITOR BANK CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 33kV Capacitor Bank
Setting Table:

F650
GROUP-1 Directional Phase Overcurrent- 67
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA 45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 0.96 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.04 0 900 0.01 S

F650
GROUP-1 Directional Earth Overcurrent- 67N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA -45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40 0 300 1V
Pickup Level 0.2 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.07 0 900 0.01 S

Page 13 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 33kV LINE CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 33kV Line
2.2. Directional Overcurrent and Earth Fault Protection for 33kV Line Feeder

CT Details
CT Ratio = 400-200/1 A
CT Primary = 400 A
CT Secondary = 1 A
Class = PS

Phase Over current setting


O/C SETTING (51):
The relay setting shall be such that it shall not operate for max.
probable load current
Load current I load = 400 A Considering the CT Ratio
CT secondary current, = i Load / CT ratio
= 1.00
Consider 110% of transformer Full load = 400.00 Primary
Pickup Phase fault Secondary , recommended = 1.00 Secondary

Time Multiplier Setting


Characteristics = IDMT Normal inverse

t Required operating time in seconds = grading time + Downstream relay


Minimum grading time interval considered operating time
in sec = 0.10

Fault current = 3640 A From ETAP


I Fault current at secondary = I fault / CT ratio
9.10 A
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.1*(((9.1/1)^0.02)-1))/0.14)
= 0.03
Maximum fault Current = 9620.00 A Primary From ETAP
= 24.05 A Secondary
Operating time at Maximum fault Current = 0.07 Sec

Earth Over current setting HV side


In solidly earthed system a setting of 10 to 20% of CT Primary = 80.0 A Primary
current is considered = I earth fault / CT ratio
Setting of 20% is selected = (80/400)
= 0.20 A Secondary

Time Multiplier Setting


CHARACTERISTICS =

t Required operating time in seconds = grading time + Downstream relay


Minimum grading time interval considered operating time
in sec = 0.10

Fault current = 3880 A From ETAP


I Fault current at secondary = I fault / CT ratio
9.70
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.1*(((9.7/0.2)^0.02)-1))/0.14)
= 0.06
Maximum fault Current = 9650.00 A Primary From ETAP
= 24.13 A Secondary
Operating time at Maximum fault Current = 0.08 Sec

Page 14 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 33kV LINE CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 33kV Line
Setting Table:

F650
GROUP-1 Directional Phase Overcurrent- 67
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA 45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 1.00 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.03 0 900 0.01 S

F650
GROUP-1 Directional Earth Overcurrent- 67N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA -45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 0.2 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.06 0 900 0.01 S

Page 15 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 33kV BUS COUPLER CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 33kV Bus Coupler
2.3. Non Directional Overcurrent and Earth Fault Protection for 33kV Bus Coupler

CT Details
CT Ratio = 800-400/1 A
CT Primary = 800 A
CT Secondary = 1 A
Class = PS

Phase Over current setting


O/C SETTING (51):
The relay setting shall be such that it shall not operate for max.
probable load current
Load current I load = 699.8 A Considering the CT Ratio
CT secondary current, = i Load / CT ratio
= 0.8747988
Consider 110% of transformer Full load = 769.82294 Primary
Pickup Phase fault Secondary , recommended = 0.96 Secondary

Time Multiplier Setting


Characteristics = IDMT Normal inverse

t Required operating time in seconds = grading time + Downstream relay


Minimum grading time interval considered operating time
in sec = 0.32

Fault current = 3640 A From ETAP


I Fault current at secondary = I fault / CT ratio
4.55 A
0.02
TMS = (t *((If/IS) -1)) /0.14
= (0.32*(((4.55/1)^0.02)-1))/0.14)
= 0.07
Maximum fault Current = 4810 A Primary From ETAP
= 6.01 A Secondary
Operating time at Maximum fault Current = 0.27 Sec

Earth Over current setting HV side


In solidly earthed system a setting of 10 to 20% of CT Primary = 160.00 A Primary
current is considered = I earth fault / CT ratio
Setting of 20% is selected = (160/800)
= 0.2 A Secondary

Time Multiplier Setting


CHARACTERISTICS = IDMT Normal inverse

t Required operating time in seconds = grading time + Downstream relay


Minimum grading time interval considered operating time
in sec = 0.33

Fault current = 3880 A From ETAP


I Fault current at secondary = I fault / CT ratio
4.85
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.33*(((4.85/0.2)^0.02)-1))/0.14)
= 0.16
Maximum fault Current = 4820 A Primary From ETAP
= 6.03 A Secondary
Operating time at Maximum fault Current = 0.31 Sec

Page 16 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 33kV BUS COUPLER CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 33kV Bus Coupler
Setting Table:

F650
GROUP-1 Non Directional Phase Overcurrent- 51
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.96 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.07 0 900 0.01 S

F650
GROUP-1 Non Directional Earth Overcurrent- 51N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.2 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.1 0 900 0.01 S

Page 17 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 33kV INCOMER CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 132/33kV,40 MVA Trafo 33kV Side
2.4. Non Directional Overcurrent and Earth Fault Protection for 33kV Incomer

CT Details
CT Ratio = 800-400/1 A
CT Primary = 800 A
CT Secondary = 1 A
Class = PS
Transformer Data:
Rated power = 40 MVA
Rated HV Voltage = 132.00 kV
Rated LV Voltage = 33.00 kV
Full Load current HV Side = 174.96 A
Full Load current LV Side = 699.84 A
Impedence = 0.138 13.80%
Phase Over current setting
O/C SETTING (51):
The relay setting shall be such that it shall not operate for max.
probable load current
Load current I load = 699.84 A
CT secondary current, = i Load / CT ratio
= 0.87
Consider 110% of transformer Full load = 769.82 Primary
Pickup Phase fault Secondary , recommended = 0.96 Secondary
Time Multiplier Setting
Characteristics = IDMT Normal inverse
t Required operating time in seconds = grading time + Downstream relay
Minimum grading time interval considered operating time
in sec = 0.52
Minimum Fault current = 3640.00 A From ETAP
I Fault current at secondary = I fault / CT ratio
4.55 A
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.52*(((4.55/1)^0.02)-1))/0.14)
= 0.12
Maximum through fault Current = 5020.00 A Primary From ETAP
= 6.28 A Secondary
Operating time at Maximum fault Current = 0.43 Sec
Instantaneous Phase Overcurrent Setting
For High set considering the 130% of through fault current = 6592.69 A
= 8.241 A
t = 0.250 Sec
Earth Over current setting HV side
In solidly earthed system a setting of 10 to 20% of CT Primary = 160.00 A Primary
current is considered = I earth fault / CT ratio
Setting of 20% is selected = (160/800)
= 0.200 A Secondary
Time Multiplier Setting
CHARACTERISTICS = IDMT Normal inverse
t Required operating time in seconds = grading time + Downstream relay
Minimum grading time interval considered operating time
in sec = 0.56
Fault current = 3880.00 A From ETAP
I Fault current at secondary = I fault / CT ratio
4.85
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.56*(((4.85/0.2)^0.02)-1))/0.14)
= 0.26
Maximum fault Current = 5030.00 A Primary From ETAP
= 6.29 A Secondary
Operating time at Maximum fault Current = 0.515 Sec

Instantaneous Earth Overcurrent Setting


For High set considering the 200% of CT Primary Current = 1600.00 A
= 2.000 A
t = 0.100 Sec

Page 18 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 33kV INCOMER CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 132/33kV,40 MVA Trafo 33kV Side
Setting Table:

F650
GROUP-1 Non Directional Phase Overcurrent- 51
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.96 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.12 0 900 0.01 S

F650
GROUP-1 Non Directional Phase Overcurrent- 50
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 8.24 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.25 0 900 0.01 S

F650
GROUP-1 Non Directional Earth Overcurrent- 51N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.20 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.26 0 900 0.01 S

F650
GROUP-1 Non Directional Earth Overcurrent- 50N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 2.00 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.10 0 900 0.01 S

Page 19 of 160
132kV FEEDERS

Page 20 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132/33kV TRANSFORMER(40MVA) CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 132/33kV,40 MVA Trafo 132kV Side
3.1. Non Directional Overcurrent and Earth Fault Protection for 132/33kV Transformer(40MVA)

CT Details
CT Ratio = 800-400/1 A
CT Primary = 400 A
CT Secondary = 1 A
Class = PS

Transformer Data:
Rated power = 40 MVA
Rated HV Voltage = 132.00 kV
Rated LV Voltage = 33.00 kV
Full Load current HV Side = 174.96 A
Full Load current LV Side = 699.84 A
Impedence = 0.138 13.80%
Phase Over current setting
O/C SETTING (51):
The relay setting shall be such that it shall not operate for max.
probable load current
Load current I load = 174.96 A
CT secondary current, = i Load / CT ratio
= 0.44
Consider 110% of transformer Full load = 192.46 Primary
Pickup Phase fault Secondary , recommended = 0.48 Secondary
Time Multiplier Setting
Characteristics = IDMT Normal inverse
t Required operating time in seconds = grading time + Downstream relay
Minimum grading time interval considered operating time
in sec = 0.68
Minimum Fault current = 2970.00 A From ETAP
I Fault current at secondary = I fault / CT ratio
7.43 A
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.68*(((7.43/0.5)^0.02)-1))/0.14)
= 0.27
Maximum fault Current = 28280.00 A From ETAP
70.70
Operating time at Maximum fault Current = 0.37 Sec
Instantaneous Phase Overcurrent Setting
For High set considering the 130% of Through Fault current in = 1648.17 A Calculated
HV Side = 4.12 A
t = 0.30 Sec

Earth Over current setting HV side


In solidly earthed system a setting of 10 to 20% of CT Primary = 80.00 A Primary
current is considered = I earth fault / CT ratio
Setting of 20% is selected = (80/400)
= 0.20 A Secondary
Time Multiplier Setting
CHARACTERISTICS = IDMT Normal inverse
t Required operating time in seconds = grading time + Downstream relay
Minimum grading time interval considered operating time
in sec = 0.77
Fault current = 3720.00 A From ETAP
I Fault current at secondary = I fault / CT ratio
9.30
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.77*(((9.3/0.2)^0.02)-1))/0.14)
= 0.44
Maximum through fault Current = 28990.00 A Primary Calculated
= 72.48 A Secondary
Operating time at Maximum fault Current = 0.488 Sec
Instantaneous Earth Overcurrent Setting
For High set considering the 200% of CT Primary Current = 800.00 A
= 2.00 A
t = 0.35 Sec

Page 21 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132/33kV TRANSFORMER(40MVA) CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 132/33kV,40 MVA Trafo 132kV Side

Setting Table:
F650
GROUP-1 Directional Phase Overcurrent- 67
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA 45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 0.48 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.3 0 900 0.01 S

F650
GROUP-1 Directional Phase Overcurrent- 67 INST
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA 45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 4.12 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.30 0 900 0.01 S

F650
GROUP-1 Directional Earth Overcurrent- 67N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA -45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 0.2 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.44 0 900 0.01 S

F650
GROUP-1 Directional Earth Overcurrent- 67N INST
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA -45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 2.0 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.35 0 900 0.01 S

Page 22 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV SIDE TRANSFORMER(160MVA) CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 220/132kV,160 MVA Trafo 132kV Side
3.2. Directional Overcurrent and Earth Fault Protection for 132kV Side of 220/132kV Transformer(160MVA)

CT Details
CT Ratio = 800-400/1 A
CT Primary = 800 A
CT Secondary = 1 A
Class = PS

Transformer Data:
Rated power = 160 MVA
Rated HV Voltage = 220.00 kV
Rated LV Voltage = 132.00 kV
Full Load current HV Side = 419.90 A
Full Load current LV Side = 699.84 A
Phase Over current setting
O/C SETTING (51):
The relay setting shall be such that it shall not operate for max.
probable load current
Load current I load = 699.84 A
CT secondary current, = i Load / CT ratio
= 0.87
Consider 110% of transformer Full load = 769.82 Primary
Pickup Phase fault Secondary , recommended = 0.96 Secondary

Time Multiplier Setting


Characteristics = IDMT Normal inverse

t Required operating time in seconds = grading time + Downstream relay


Minimum grading time interval considered operating time
in sec = 0.70

Fault current = 3890.00 A From ETAP


I Fault current at secondary = I fault / CT ratio
4.86 A
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.7*(((4.86/1)^0.02)-1))/0.14)
= 0.17

Instantaneous Phase Overcurrent Setting


For High set considering the 130% of Through Fault current in = 7581.59 A From ETAP
HV Side = 9.48 A
t = 0.50 Sec

Earth Over current setting HV side


In solidly earthed system a setting of 10 to 20% of CT Primary = 160.00 A Primary
current is considered = I earth fault / CT ratio
Setting of 20% is selected = (160/800)
= 0.20 A Secondary
Time Multiplier Setting
CHARACTERISTICS = IDMT Normal inverse

t Required operating time in seconds = grading time + Downstream relay


Minimum grading time interval considered operating time
in sec = 0.72

Fault current = 1400.00 A A From ETAP


I Fault current at secondary = I fault / CT ratio
1.75
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.72*(((1.75/0.2)^0.02)-1))/0.14)
= 0.2
Instantaneous Earth Overcurrent Setting
1310.00
For High set considering the 200% of CT Primary Current = 1965.00 A
= 2.46 A
t = 0.60 Sec

Page 23 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV SIDE TRANSFORMER(160MVA) CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 220/132kV,160 MVA Trafo 132kV Side
Setting Table:

F650
GROUP-1 Directional Phase Overcurrent- 67
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA 45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 0.96 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.17 0 900 0.01 S

F650
GROUP-1 Directional Phase Overcurrent- 67 INST
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA 45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 9.48 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.50 0 900 0.01 S

F650
GROUP-1 Directional Earth Overcurrent- 67N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA -45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 0.2 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.23 0 900 0.01 S

F650
GROUP-1 Directional Earth Overcurrent- 67N INST
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA -45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 2.5 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.60 0 900 0.01 S

Page 24 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 132kV Line
3.3. Directional Overcurrent and Earth Fault Protection for 132kV Line

CT Details
CT Ratio = 800-400/1 A
CT Primary = 400 A
CT Secondary = 1 A
Class = PS

Phase Over current setting


O/C SETTING (51):
The relay setting shall be such that it shall not operate for max.
probable load current
Load current I load = 400 A
CT secondary current, = i Load / CT ratio
= 1.00
Consider 110% of transformer Full load = 400.00 Primary
Pickup Phase fault Secondary , recommended = 1.00 Secondary

Time Multiplier Setting


Characteristics = IDMT Normal inverse

t Required operating time in seconds =


grading time + Zone-2 operating time
Minimum grading time interval considered
in sec = 0.65

Fault current = 1940 A From ETAP


I Fault current at secondary = I fault / CT ratio
4.85 A
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.65*(((4.85/1)^0.02)-1))/0.14)
= 0.15

Earth Over current setting HV side


In solidly earthed system a setting of 10 to 20% of CT Primary = 80.00 A Primary
current is considered = I earth fault / CT ratio
Setting of 20% is selected = (80/400)
= 0.20 A Secondary

Time Multiplier Setting


CHARACTERISTICS = IDMT Normal inverse

t Required operating time in seconds = grading time + Downstream relay


Minimum grading time interval considered operating time
in sec = 0.65

Fault current = 2390 A From ETAP


I Fault current at secondary = I fault / CT ratio
5.98
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.65*(((5.98/0.2)^0.02)-1))/0.14)
= 0.33

Page 25 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 132kV Line
Setting table

F650
GROUP-1 Directional Phase Overcurrent- 67
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA 45.00 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 1.00 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.15 0 900 0.01 S

F650
GROUP-1 Directional Earth Overcurrent- 67N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA -45.00 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 0.20 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.33 0 900 0.01 S

Page 26 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(30KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-30KM

3.4. Distance Protection for 132kV-30KM Line

System Details for 220kV line


Nominal system voltage,UN = 132000V 132000 V
Current transformer ratio,Nct = 400/1A 400.0
Voltage transformer ratio,Nvt = 132000/110 1200.0
Ratio of secondary to primary impedance,Nct/Nvt = 0.33
Protected OHL Type = ACSR PANTHER
Current rating in Amps = 400.0 Considered CT Ratio
Protected OHL length = 30.0 KM
Positive seq.Resistance of OHL in Ω, per kM, Rprim = 0.167
Positive seq.Reactance of OHL in Ω, per kM, Xprim = 0.432
O
Positive seq.impedance of OHL in Ω, per kM, Zprim = 0.463 68.8
Zero seq.Resistance of OHL in Ω, per kM, Rprim = 0.406
Zero seq.Reactance of OHL in Ω, per kM, Xprim = 0.622
O
Zero seq.impedance of OHL in Ω, per kM, Zprim = 0.743 56.9

Adjacent Longest Line details


Protected OHL length = 22.80 KM
Positive seq.Resistance of OHL in Ω, per kM, Rprim = 0.167
Positive seq.Reactance of OHL in Ω, per kM, Xprim = 0.432
O
Positive seq.impedance of OHL in Ω, per kM, Zprim = 0.463 68.8
Zero seq.Resistance of OHL in Ω, per kM, Rprim = 0.406
Zero seq.Reactance of OHL in Ω, per kM, Xprim = 0.622
O
Zero seq.impedance of OHL in Ω, per kM, Zprim = 0.743 56.9

Adjacent Shortest Line details


Protected OHL length = 11.00 KM
Positive seq.Resistance of OHL in Ω, per kM, Rprim = 0.167
Positive seq.Reactance of OHL in Ω, per kM, Xprim = 0.432
O
Positive seq.impedance of OHL in Ω, per kM, Zprim = 0.46 68.8
Zero seq.Resistance of OHL in Ω, per kM, Rprim = 0.406
Zero seq.Reactance of OHL in Ω, per kM, Xprim = 0.622
O
Zero seq.impedance of OHL in Ω, per kM, Zprim = 0.74 56.9

PT Details:
PT Ratio = 132000/110 V
PT Primary Voltage = 132000.0 V
PT Secondary Voltage = 110.0 V
System Frequency = 50.0 HZ

Distance element Settings:


Reactance settings
Zone 1 Settings
Required Zone 1 reach is to be 85% of the Protected line
X1prim = 85% * Xprim = 11.02
X1sec = Nct/Nvt * Xprim = 3.67

Zone 2 Settings
Zone 2 element setting with a reach of 120% of Protected line reactance accounts for effect of infeed.This point must be verified
using a fault study to calculate the apparent ohms at the local terminal for a fault at the remote end of transmission line.
In our case 120% is considered for the zone-2 elements with assurance that all faults in the protected line are detectable,even
with infeed from remote terminals.

Assuming the zone-1 reach for the adjacent line protection is set at 85% of that line reactance, and it is to be verified such that
the zone-2 reach of 120%(protected line) shall not extend beyond the max.effective zone-1 reach of the adjacent line protection.
Zone-2 setting limit = Protected line reactance +
0.85 * adjacent shortest line reactance
= 5.67
Zone-2 setting with 120% reach = 5.18
Since 120%, 5.18 is lower than zone-2 limit. 5.67, so the zone-2 setting of 120% will not overreach beyond zone-1 setting
of adjacent line protection. Therefore we consider 120% of protected line reactance
Hence set X2 prim = 15.55
Hence set X2 sec = 5.18

Page 27 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(30KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-30KM
Zone 3 Settings
For Zone3 setting , it is customery to select 1.2 (Protected line + 50% Adjacent Longest line)
X3prim, reach = 21.46
X3sec = Nct/Nvt * X3prim*IN/A = 7.15

Zone 4 Settings
For Zone4 setting, reverse reach impedence is typically 20% Zone 1 reach Impedance.
X4prim, reach = 2.20
X4sec = Nct/Nvt * X4prim*IN/A = 0.73

Resistance settings
For resistance setting of OHL, consideration of AC resistance is most important. Also tower footing resistance shall be
accounted in the calculation.

Resistive Reach Calculations


Minimum Load impedence to the relay = Vn (phase - neutral) / In
= (110/√3/1)
= 63.51 Ω
Typically,phase fault distance zones would avoid the minimum load impedence by a margin of ≥ 40%,earth
fault zones would use a ≥ 20% margin.
This allows maximum resistive reaches = 38.11 Ω secondary
for Phase faults
This allows maximum resistive reaches = 50.81 Ω secondary
for Earth faults
Ra = (28710 x L) / If^1.4
Where:
If = Minimum expected phase-phase fault current (A);
L = Maximum phase conductor separation (m);
Ra = Arc resistance, calculated from the van Warrington
formula (W).
fault current = 3.89 kA
Conductor spaces = 2.7 mtrs
Primary resistive coverage = 0.73 Ω
for phase faults
(RARC is = 1.325 Ω
RTFT Tower Foot Resistance = 10 Ω
Zone-1 setting(same way as done above for X reach)
R1 sec = R1sec + 0.5RARC+ RTFT = 4.98

Zone-2 setting(same way as done above for X reach)


R2 sec = R2sec + 0.5RARC+ RTFT = 5.56

Zone-3 setting(same way as done above for X reach)


R3 sec = R3sec + 0.5RARC+ RTFT = 6.33

Zone-4 setting(same way as done above for X reach)


R4 sec = R4sec + 0.5RARC+ RTFT = 3.84

Time setting
Zone-1 setting = 0.00 sec
Zone-2 setting
zone-2 time delay should be set to discreminative with the primary line protection of the next line sections
including circuit breaker trip time
Adjoining line protection operating time = 0.040
Breaker opening time = 0.080
Local relay reset = 0.030
Grading margin = 0.250
Required zone-2 time delay = 0.40
set zone-2 at = 0.40 sec
Zone-3 setting
zone-3 time delay shall be such that zone-2 time delay plus grading margin
zone-2 time delay = 0.400
Grading margin = 0.400
Required zone-3 time delay = 0.80
set zone-3 at = 0.80 sec

Page 28 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(30KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-30KM
Zone-4 setting
zone-4 might be used to provide back up protection for the local bus bar. zone-4 time delay shall be such that LBB time delay
plus grading margin
LBB time delay = 0.200
Grading margin = 0.250
Required zone-4 time delay = 0.45
set zone-4 at = 0.50 sec

Earth Impedance matching factor for Zone-1,2,3 & 4


RE/RL = 1/3 (R0/R1 -1) = 0.48
XE/XL = 1/3 (X0/X1 -1) = 0.15

R0-R1 = 0.24
X0-X1 = 0.19
O
Z0-Z1 = 0.31 38.53
O
Z0/Z1 MAG & ANGLE= (Z0-Z1)/3Z1 = 0.22 -30.29
Where
R1 is +ve seq. resistance of protected line
R0 is zero seq. resistance of protected line
X1 is +ve seq. reactance of protected line
X0 is zero seq. reactance of protected line

Load impedance value


Rload prim = Umin/√3*ILmax
Where
Umin = minimum operating voltage, 0.9*UN = 118800
ILmax = max load current = 400.000
Hence Rload prim = 171.48
Rload sec = 57.16
The setting shall be applied 30% lower
= 40.01
than calculated above
The above is calculated for ph to earth and for ph to ph it is same value because current is multiplied by √3
PHI load , maximum load angle
As load current ideally is in phase with the voltage, the difference is indicated with the power factor cosØ. The largest angle
of the load impedance is therefore given by the worst, smallest powerfactor. We considered the worst power factor under
full load condition is 0.9.
Øload- max = cos -1(power factor min)
Øload- max = cos-1 (0.9)
Øload- max O
= 26.00

Power Swing Detection:


The power swing detect element provides both power swing blocking and out-of-step tripping functions.
Power swing Shape, = QUAD
Power swing Mode, = Two step
Power swing Supervision, = 0.600 pu (typical setting from manual)
Power swing Forward Reach(inner) = 7.15 Ω
(considered zone-3 reactance boundary)
Power swing Forward RCA = 68.8 O
Power swing Forward Reach(outer) = 8.58 Ω
(120% of inner Reach)
Power swing Reverse Reach(inner) is considered as 50% zone-3 Reactance Reach + zone-4 Reactance Reach
Power swing Reverse Reach(inner) = 4.31 Ω
Power swing Reverse Reach(outer) = 5.17 Ω
(120% of Reverse inner Reach)
Power swing inner Right blinder = 6.33 Ω
(considered zone-3 resistive boundary)
Power swing outer Right blinder = 7.59 Ω
(120% of inner Right blinder)
Power swing inner Left blinder = 6.33 Ω
(considered zone-3 resistive boundary)
Power swing outer Left blinder = 7.59 Ω
(120% of inner Left blinder)

VT Fuse fail
Function enabled

Page 29 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(30KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-30KM
Broken Conductor Protection
Full load current = 400.000 A
Considered I2 = 40.00 A (10% of fullload current)
I2 / I1 = 0.10
Allow for tolerences and load varations = 200%
I2 / I1 = 20.00 %
time delay = 5.00 s

Auto Reclosure:
This autoreclose can be single pole tripping for single phase faults and three phase tripping for multi-phase faults.
1 pole:
In this mode, the recloser starts the AR-1P DEAD TIME for the first shot if the fault is single phase.
If the fault is three phase or three pole trip occurred on the breaker during single initiation, the scheme goes to lockout with out reclosing.
AR Mode, = 1 pole
AR Max Number of Shots, = 1.00
AR Close Time Breaker 1, = 0.20 s
AR Block Time Upon Man Cls. = 10.00 s
AR Reset Time, = 25.00 s
AR Breaker1 Fail Option, = Lockout
AR Incomplete Sequence Time, = 2.00 s
AR 1-P Dead Time, 1.00 s
AR Breaker Sequence, = 1.00

Local Breaker Backup Protection


In general, a breaker failure scheme determines that a breaker signaled to trip has not cleared a fault with in a definite time,
so further tripping action must be performed.
BF1 MODE, = 3-Pole
BF1 SOURCE, = SRC1
BF1 USE AMP SUPV, = Yes
BF1 USE SEAL-IN, = Yes
BF1 PH AMP SUPV, = 0.20 pu
BF1 N AMP SUPV, = 0.20 pu
BF1 USE TIMER1, = Yes
BF1 TIMER1 PICKUP DELAY, = 0.20 S
BF1 TRIP DROPOUT = 0.00 S

Setting Recommendation for UV


PT Ratio = 132000/110
Under = 1200.00
voltage = 0.90*Nominal Volt
= 118800 v 90% OF Rated Voltage
Select Under voltage setting, 27 = 118800/1200
= 99.000 V
≈ 0.90 pu
Time delay setting , 27 = 3.00 s

Page 30 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(30KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-30KM

Settings Table

Menu text Recommended Setting


PHASE DISTANCE ELEMENTS
Setting Unit
Line setting
Line Length 30.00 km
PHASE DIST Z1 DIR Forward
PHASE DIST SHAPE Quadrilateral
PHS DIST Z1 REACH 3.67 Ω
PHS DIST Z1 RCA 68.82 DEG
PHS DIST Z1 COMP LIMIT 90.00 DEG
PHS DIST Z1 DIR RCA 68.82 DEG
PHS DIST Z1 DIR COMP LIMIT 90.00 DEG
PHS DIST Z1 QUAD RGT BLD 4.98 Ω
PHS DIST Z1 QUAD RGT BLD RCA 68.82 DEG
PHS DIST Z1 QUAD LFT BLD 4.98 Ω
PHS DIST Z1 QUAD LFT BLD RCA 68.82 DEG
PHASE DIST Z1 DELAY 0.00 S
PHS DIST Z1 SUPV 0.34 pu

PHASE DIST Z2 DIR Forward


PHASE DIST SHAPE Quadrilateral
PHS DIST Z2 REACH 5.18 Ω
PHS DIST Z2 RCA 68.82 DEG
PHS DIST Z2 COMP LIMIT 90.00 DEG
PHS DIST Z2 DIR RCA 68.82 DEG
PHS DIST Z2 DIR COMP LIMIT 90.00 DEG
PHS DIST Z2 QUAD RGT BLD 5.56 Ω
PHS DIST Z2 QUAD RGT BLD RCA 68.82 DEG
PHS DIST Z2 QUAD LFT BLD 5.56 Ω
PHS DIST Z2 QUAD LFT BLD RCA 68.82 DEG
PHASE DIST Z2 DELAY 0.40 S

PHASE DIST Z3 DIR Forward


PHASE DIST SHAPE Quadrilateral
PHS DIST Z3 REACH 7.15 Ω
PHS DIST Z3 RCA 68.82 DEG
PHS DIST Z3 COMP LIMIT 90.00 DEG
PHS DIST Z3 DIR RCA 68.82 DEG
PHS DIST Z3 DIR COMP LIMIT 90.00 DEG
PHS DIST Z3 QUAD RGT BLD 6.33 Ω
PHS DIST Z3 QUAD RGT BLD RCA 68.82 DEG
PHS DIST Z3 QUAD LFT BLD 6.33 Ω
PHS DIST Z3 QUAD LFT BLD RCA 68.82 DEG
PHASE DIST Z3 DELAY 0.80 S

PHASE DIST Z4 DIR Reverse


PHASE DIST SHAPE Quadrilateral
PHS DIST Z4 REACH 0.73 Ω
PHS DIST Z4 RCA 68.82 DEG
PHS DIST Z4 COMP LIMIT 90.00 DEG
PHS DIST Z4 DIR RCA 68.82
PHS DIST Z4 DIR COMP LIMIT 90.00 DEG
PHS DIST Z4 QUAD RGT BLD 6.33 Ω
PHS DIST Z4 QUAD RGT BLD RCA 68.82 DEG
PHS DIST Z4 QUAD LFT BLD 6.33 Ω
PHS DIST Z4 QUAD LFT BLD RCA 68.82 DEG
PHASE DIST Z4 DELAY 0.50 S

Page 31 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(30KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-30KM

Menu text Recommended Setting


PHASE DISTANCE ELEMENTS
Setting Unit
Line setting
GND DIST Z1 DIR Forward
GND DIST SHAPE Quadrilateral
GND DIST Z1 REACH 3.67 Ω
GND DIST Z1 RCA 68.82 DEG
GND DIST Z1 COMP LIMIT 90.00 DEG
GND DIST Z1 DIR RCA 68.82 DEG
GND DIST Z1 DIR COMP LIMIT 90.00 DEG
GND DIST Z1 QUAD RGT BLD 4.98 Ω
GND DIST Z1 QUAD RGT BLD RCA 68.82 DEG
GND DIST Z1 QUAD LFT BLD 4.98 Ω
GND DIST Z1 QUAD LFT BLD RCA 68.82 DEG
GND DIST Z1 DELAY 0.00 S
GND DIST Z1 Z0/Z1 MAG 0.22
GND DIST Z1 Z0/Z1 ANG -30.29 DEG

GND DIST Z2 DIR Forward


GND DIST SHAPE Quadrilateral
GND DIST Z2 REACH 5.18 Ω
GND DIST Z2 RCA 68.82 DEG
GND DIST Z2 COMP LIMIT 90.00 DEG
GND DIST Z2 DIR RCA 68.82 DEG
GND DIST Z2 DIR COMP LIMIT 90.00 DEG
GND DIST Z2 QUAD RGT BLD 5.56 Ω
GND DIST Z2 QUAD RGT BLD RCA 68.82 DEG
GND DIST Z2 QUAD LFT BLD 5.56 Ω
GND DIST Z2 QUAD LFT BLD RCA 68.82 DEG
GND DIST Z2 DELAY 0.40 S
GND DIST Z2 Z0/Z1 MAG 0.22 Ω
GND DIST Z2 Z0/Z1 ANG -30.29 DEG

GND DIST Z3 DIR Forward


GND DIST SHAPE Quadrilateral
GND DIST Z3 REACH 7.15 Ω
GND DIST Z3 RCA 68.82 DEG
GND DIST Z3 QUAD RGT BLD 6.33 Ω
GND DIST Z3 QUAD RGT BLD RCA 68.82 DEG
GND DIST Z3 QUAD LFT BLD 6.33 Ω
GND DIST Z3 QUAD LFT BLD RCA 68.82 DEG
GND DIST Z3 DELAY 0.80 S
GND DIST Z3 Z0/Z1 MAG 0.22 Ω
GND DIST Z3 Z0/Z1 ANG -30.29 DEG

GND DIST Z4 DIR Reverse


GND DIST SHAPE Quadrilateral
GND DIST Z4 REACH 0.73 Ω
GND DIST Z4 RCA 68.82 DEG
GND DIST Z4 QUAD RGT BLD 6.33 Ω
GND DIST Z4 QUAD RGT BLD RCA 68.82 DEG
GND DIST Z4 QUAD LFT BLD 6.33 Ω
GND DIST Z4 QUAD LFT BLD RCA 68.82 DEG
GND DIST Z4 DELAY 0.50 S
GND DIST Z4 Z0/Z1 MAG 0.22 Ω
GND DIST Z4 Z0/Z1 ANG -30.29 DEG

LOAD ENCROACHMENT
LOAD ENCROACHMENT MIN VOLT 0.25 pu
LOAD ENCROACHMENT REACH 40.01 Ω
LOAD ENCROACHMENT ANGLE 26.00 DEG
LOAD ENCROACHMENT PKP DELAY 0.00 S
LOAD ENCROACHMENT RST DELAY 0.00 S

Page 32 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(30KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-30KM
Menu text Recommended Setting
PHASE DISTANCE ELEMENTS
Setting Unit
POWER SWING DETECT
POWER SWING SHAPE Quadrilateral
POWER SWING MODE Two Step
POWER SWING SUPV 0.60 pu
POWER SWING FWD REACH 7.15 Ω
POWER SWING QUAD FWD REACH OUT 8.58
POWER SWING FWD RCA 68.82 DEG
POWER SWING REV REACH 4.31 Ω
POWER SWING QUAD REV REACH OUT 5.17 Ω
POWER SWING OUTER RGT BLD 7.59 Ω
POWER SWING OUTER LFT BLD 7.59 Ω
POWER SWING INNER RGT BLD 6.33 Ω
POWER SWING INNER LFT BLD 6.33 Ω
POWER SWING PICKUP DELAY1 0.03 S
POWER SWING RESET DELAY1 0.05 S
POWER SWING PICKUP DELAY2 0.02 S
POWER SWING PICKUP DELAY3 0.01 S
POWER SWING PICKUP DELAY4 0.02 S
POWER SWING SEAL IN DELAY 0.40 S
POWER SWING TRIP MODE Delayed S
LINE PICKUP (SOTF)
PHASE IOC LINE PICKUP 1.00 pu
LINE UV PICKUP 0.70 pu
LINE END OPEN PICKUP DELAY 0.15 S
LINE END OPEN RESET DELAY 0.09 S
LINE OV PICKUP DELAY 0.04 S
AR COORDINATION BYPASS Enabled
AR COORDINATION PICKUP DELAY 0.05 S
AR COORDINATION RESET DELAY 0.01 S
LINE PICKUP DISTANCE TRIP Enabled
FUSE FAILURE
FUNCTION Enabled
AUTO RECLOSE
FUNCTION Enabled
AR MODE 1 pole
MAX NUMBER OF SHOTS 1.00
AR CLOSE TIME BKR1 0.20 S
AR BLK TIME UPON MAN CLS 10.00 S
AR RESET TIME 25.00 S
AR BKR1 FAIL OPTION Lockout
AR INCOMPLETE SEQ TIME 2.00 S
AR 1-P DEAD TIME 1.00 S
AR BKR1 SEQUENCE 1.00
BREAKER FAILURE 1
FUNCTION Enabled
BR1 MODE 3-Pole
BF1 SOURCE SRC1
BF1 USE AMP SUPV Yes
BF1 USE SEAL-IN Yes
BF1 PH AMP SUPV PICKUP 0.20 pu
BF1 N AMP SUPV PICKUP 0.20 pu
BF1 USE TIMER1 Yes
BF1 TIMER1 PICKUP DELAY 0.20 S
BF1 TRIP DROPOUT 0.00 S
BROKEN CONDUCTOR (F650 RELAY)
TAP LEVEL IN PERCENTAGE OF I2/I1 20.00 %
TRIP TIME 5.00 S
UNDERVOLTAGE
PHASE UV1 FUNCTION Enabled
PHASE UV1 MODE Phase to Phase
PHASE UV1 PICKUP 0.90 pu
PHASE UV1 DELAY 3.00 s

Page 33 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(22KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-22KM

3.5. Distance Protection for 132kV-30KM Line

System Details for 220kV line


Nominal system voltage,UN = 132000V 132000 V
Current transformer ratio,Nct = 400/1A 400.0
Voltage transformer ratio,Nvt = 132000/110 1200.0
Ratio of secondary to primary impedance,Nct/Nvt = 0.33
Protected OHL Type = ACSR PANTHER
Current rating in Amps = 400.0 Considered CT Ratio
Protected OHL length = 22.0 KM
Positive seq.Resistance of OHL in Ω, per kM, Rprim = 0.167
Positive seq.Reactance of OHL in Ω, per kM, Xprim = 0.432
O
Positive seq.impedance of OHL in Ω, per kM, Zprim = 0.463 68.8
Zero seq.Resistance of OHL in Ω, per kM, Rprim = 0.406
Zero seq.Reactance of OHL in Ω, per kM, Xprim = 0.622
O
Zero seq.impedance of OHL in Ω, per kM, Zprim = 0.743 56.9

Adjacent Longest Line details


Protected OHL length = 44.28 KM
Positive seq.Resistance of OHL in Ω, per kM, Rprim = 0.167
Positive seq.Reactance of OHL in Ω, per kM, Xprim = 0.432
O
Positive seq.impedance of OHL in Ω, per kM, Zprim = 0.463 68.8
Zero seq.Resistance of OHL in Ω, per kM, Rprim = 0.406
Zero seq.Reactance of OHL in Ω, per kM, Xprim = 0.622
O
Zero seq.impedance of OHL in Ω, per kM, Zprim = 0.743 56.9

Adjacent Shortest Line details


Protected OHL length = 8.60 KM
Positive seq.Resistance of OHL in Ω, per kM, Rprim = 0.167
Positive seq.Reactance of OHL in Ω, per kM, Xprim = 0.432
O
Positive seq.impedance of OHL in Ω, per kM, Zprim = 0.46 68.8
Zero seq.Resistance of OHL in Ω, per kM, Rprim = 0.406
Zero seq.Reactance of OHL in Ω, per kM, Xprim = 0.622
O
Zero seq.impedance of OHL in Ω, per kM, Zprim = 0.74 56.9

PT Details:
PT Ratio = 132000/110 V
PT Primary Voltage = 132000.0 V
PT Secondary Voltage = 110.0 V
System Frequency = 50.0 HZ

Distance element Settings:


Reactance settings
Zone 1 Settings
Required Zone 1 reach is to be 85% of the Protected line
X1prim = 85% * Xprim = 8.08
X1sec = Nct/Nvt * Xprim = 2.69

Zone 2 Settings
Zone 2 element setting with a reach of 120% of Protected line reactance accounts for effect of infeed.This point must be verified
using a fault study to calculate the apparent ohms at the local terminal for a fault at the remote end of transmission line.
In our case 120% is considered for the zone-2 elements with assurance that all faults in the protected line are detectable,even
with infeed from remote terminals.

Assuming the zone-1 reach for the adjacent line protection is set at 85% of that line reactance, and it is to be verified such that
the zone-2 reach of 120%(protected line) shall not extend beyond the max.effective zone-1 reach of the adjacent line protection.
Zone-2 setting limit = Protected line reactance +
0.85 * adjacent shortest line reactance
= 4.22
Zone-2 setting with 120% reach = 3.80
Since 120%, 3.80 is lower than zone-2 limit. 4.22, so the zone-2 setting of 120% will not overreach beyond zone-1 setting
of adjacent line protection. Therefore we consider 120% of protected line reactance
Hence set X2 prim = 11.40
Hence set X2 sec = 3.80

Page 34 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(22KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-22KM
Zone 3 Settings
For Zone3 setting , it is customery to select 1.2 (Protected line + 50% Adjacent Longest line)
X3prim, reach = 22.88
X3sec = Nct/Nvt * X3prim*IN/A = 7.63

Zone 4 Settings
For Zone4 setting, reverse reach impedence is typically 20% Zone 1 reach Impedance.
X4prim, reach = 1.62
X4sec = Nct/Nvt * X4prim*IN/A = 0.54

Resistance settings
For resistance setting of OHL, consideration of AC resistance is most important. Also tower footing resistance shall be
accounted in the calculation.

Resistive Reach Calculations


Minimum Load impedence to the relay = Vn (phase - neutral) / In
= (110/√3/1)
= 63.51 Ω
Typically,phase fault distance zones would avoid the minimum load impedence by a margin of ≥ 40%,earth
fault zones would use a ≥ 20% margin.
This allows maximum resistive reaches = 38.11 Ω secondary
for Phase faults
This allows maximum resistive reaches = 50.81 Ω secondary
for Earth faults
Ra = (28710 x L) / If^1.4
Where:
If = Minimum expected phase-phase fault current (A);
L = Maximum phase conductor separation (m);
Ra = Arc resistance, calculated from the van Warrington
formula (W).
fault current = 4.8 kA
Conductor spaces = 2.7 mtrs
Primary resistive coverage = 0.54 Ω
for phase faults
(RARC is = 1.325 Ω
RTFT Tower Foot Resistance = 10 Ω
Zone-1 setting(same way as done above for X reach)
R1 sec = R1sec + 0.5RARC+ RTFT = 4.60

Zone-2 setting(same way as done above for X reach)


R2 sec = R2sec + 0.5RARC+ RTFT = 5.03

Zone-3 setting(same way as done above for X reach)


R3 sec = R3sec + 0.5RARC+ RTFT = 6.51

Zone-4 setting(same way as done above for X reach)


R4 sec = R4sec + 0.5RARC+ RTFT = 3.76

Time setting
Zone-1 setting = 0.00 sec
Zone-2 setting
zone-2 time delay should be set to discreminative with the primary line protection of the next line sections
including circuit breaker trip time
Adjoining line protection operating time = 0.040
Breaker opening time = 0.080
Local relay reset = 0.030
Grading margin = 0.250
Required zone-2 time delay = 0.40
set zone-2 at = 0.40 sec
Zone-3 setting
zone-3 time delay shall be such that zone-2 time delay plus grading margin
zone-2 time delay = 0.400
Grading margin = 0.400
Required zone-3 time delay = 0.80
set zone-3 at = 0.80 sec

Page 35 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(22KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-22KM
Zone-4 setting
zone-4 might be used to provide back up protection for the local bus bar. zone-4 time delay shall be such that LBB time delay
plus grading margin
LBB time delay = 0.200
Grading margin = 0.250
Required zone-4 time delay = 0.45
set zone-4 at = 0.50 sec

Earth Impedance matching factor for Zone-1,2,3 & 4


RE/RL = 1/3 (R0/R1 -1) = 0.48
XE/XL = 1/3 (X0/X1 -1) = 0.15

R0-R1 = 0.24
X0-X1 = 0.19
O
Z0-Z1 = 0.31 38.53
O
Z0/Z1 MAG & ANGLE= (Z0-Z1)/3Z1 = 0.22 -30.29
Where
R1 is +ve seq. resistance of protected line
R0 is zero seq. resistance of protected line
X1 is +ve seq. reactance of protected line
X0 is zero seq. reactance of protected line

Load impedance value


Rload prim = Umin/√3*ILmax
Where
Umin = minimum operating voltage, 0.9*UN = 118800
ILmax = max load current = 400.000
Hence Rload prim = 171.48
Rload sec = 57.16
The setting shall be applied 30% lower
= 40.01
than calculated above
The above is calculated for ph to earth and for ph to ph it is same value because current is multiplied by √3
PHI load , maximum load angle
As load current ideally is in phase with the voltage, the difference is indicated with the power factor cosØ. The largest angle
of the load impedance is therefore given by the worst, smallest powerfactor. We considered the worst power factor under
full load condition is 0.9.
Øload- max = cos -1(power factor min)
Øload- max = cos-1 (0.9)
Øload- max O
= 26.00

Power Swing Detection:


The power swing detect element provides both power swing blocking and out-of-step tripping functions.
Power swing Shape, = QUAD
Power swing Mode, = Two step
Power swing Supervision, = 0.600 pu (typical setting from manual)
Power swing Forward Reach(inner) = 7.63 Ω
(considered zone-3 reactance boundary)
Power swing Forward RCA = 68.8 O
Power swing Forward Reach(outer) = 9.15 Ω
(120% of inner Reach)
Power swing Reverse Reach(inner) is considered as 50% zone-3 Reactance Reach + zone-4 Reactance Reach
Power swing Reverse Reach(inner) = 4.35 Ω
Power swing Reverse Reach(outer) = 5.22 Ω
(120% of Reverse inner Reach)
Power swing inner Right blinder = 6.51 Ω
(considered zone-3 resistive boundary)
Power swing outer Right blinder = 7.81 Ω
(120% of inner Right blinder)
Power swing inner Left blinder = 6.51 Ω
(considered zone-3 resistive boundary)
Power swing outer Left blinder = 7.81 Ω
(120% of inner Left blinder)

VT Fuse fail
Function enabled

Page 36 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(22KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-22KM
Broken Conductor Protection
Full load current = 400.000 A
Considered I2 = 40.00 A (10% of fullload current)
I2 / I1 = 0.10
Allow for tolerences and load varations = 200%
I2 / I1 = 20.00 %
time delay = 5.00 s

Auto Reclosure:
This autoreclose can be single pole tripping for single phase faults and three phase tripping for multi-phase faults.
1 pole:
In this mode, the recloser starts the AR-1P DEAD TIME for the first shot if the fault is single phase.
If the fault is three phase or three pole trip occurred on the breaker during single initiation, the scheme goes to lockout with out reclosing.
AR Mode, = 1 pole
AR Max Number of Shots, = 1.00
AR Close Time Breaker 1, = 0.20 s
AR Block Time Upon Man Cls. = 10.00 s
AR Reset Time, = 25.00 s
AR Breaker1 Fail Option, = Lockout
AR Incomplete Sequence Time, = 2.00 s
AR 1-P Dead Time, 1.00 s
AR Breaker Sequence, = 1.00

Local Breaker Backup Protection


In general, a breaker failure scheme determines that a breaker signaled to trip has not cleared a fault with in a definite time,
so further tripping action must be performed.
BF1 MODE, = 3-Pole
BF1 SOURCE, = SRC1
BF1 USE AMP SUPV, = Yes
BF1 USE SEAL-IN, = Yes
BF1 PH AMP SUPV, = 0.20 pu
BF1 N AMP SUPV, = 0.20 pu
BF1 USE TIMER1, = Yes
BF1 TIMER1 PICKUP DELAY, = 0.20 S
BF1 TRIP DROPOUT = 0.00 S

Setting Recommendation for UV


PT Ratio = 132000/110
Under = 1200.00
voltage = 0.90*Nominal Volt
= 118800 v 90% OF Rated Voltage
Select Under voltage setting, 27 = 118800/1200
= 99.000 V
≈ 0.90 pu
Time delay setting , 27 = 3.00 s

Page 37 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(22KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-22KM

Settings Table

Menu text Recommended Setting


PHASE DISTANCE ELEMENTS
Setting Unit
Line setting
Line Length 22.00 km
PHASE DIST Z1 DIR Forward
PHASE DIST SHAPE Quadrilateral
PHS DIST Z1 REACH 2.69 Ω
PHS DIST Z1 RCA 68.82 DEG
PHS DIST Z1 COMP LIMIT 90.00 DEG
PHS DIST Z1 DIR RCA 68.82 DEG
PHS DIST Z1 DIR COMP LIMIT 90.00 DEG
PHS DIST Z1 QUAD RGT BLD 4.60 Ω
PHS DIST Z1 QUAD RGT BLD RCA 68.82 DEG
PHS DIST Z1 QUAD LFT BLD 4.60 Ω
PHS DIST Z1 QUAD LFT BLD RCA 68.82 DEG
PHASE DIST Z1 DELAY 0.00 S
PHS DIST Z1 SUPV 0.34 pu

PHASE DIST Z2 DIR Forward


PHASE DIST SHAPE Quadrilateral
PHS DIST Z2 REACH 3.80 Ω
PHS DIST Z2 RCA 68.82 DEG
PHS DIST Z2 COMP LIMIT 90.00 DEG
PHS DIST Z2 DIR RCA 68.82 DEG
PHS DIST Z2 DIR COMP LIMIT 90.00 DEG
PHS DIST Z2 QUAD RGT BLD 5.03 Ω
PHS DIST Z2 QUAD RGT BLD RCA 68.82 DEG
PHS DIST Z2 QUAD LFT BLD 5.03 Ω
PHS DIST Z2 QUAD LFT BLD RCA 68.82 DEG
PHASE DIST Z2 DELAY 0.40 S

PHASE DIST Z3 DIR Forward


PHASE DIST SHAPE Quadrilateral
PHS DIST Z3 REACH 7.63 Ω
PHS DIST Z3 RCA 68.82 DEG
PHS DIST Z3 COMP LIMIT 90.00 DEG
PHS DIST Z3 DIR RCA 68.82 DEG
PHS DIST Z3 DIR COMP LIMIT 90.00 DEG
PHS DIST Z3 QUAD RGT BLD 6.51 Ω
PHS DIST Z3 QUAD RGT BLD RCA 68.82 DEG
PHS DIST Z3 QUAD LFT BLD 6.51 Ω
PHS DIST Z3 QUAD LFT BLD RCA 68.82 DEG
PHASE DIST Z3 DELAY 0.80 S

PHASE DIST Z4 DIR Reverse


PHASE DIST SHAPE Quadrilateral
PHS DIST Z4 REACH 0.54 Ω
PHS DIST Z4 RCA 68.82 DEG
PHS DIST Z4 COMP LIMIT 90.00 DEG
PHS DIST Z4 DIR RCA 68.82
PHS DIST Z4 DIR COMP LIMIT 90.00 DEG
PHS DIST Z4 QUAD RGT BLD 6.51 Ω
PHS DIST Z4 QUAD RGT BLD RCA 68.82 DEG
PHS DIST Z4 QUAD LFT BLD 6.51 Ω
PHS DIST Z4 QUAD LFT BLD RCA 68.82 DEG
PHASE DIST Z4 DELAY 0.50 S

Page 38 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(22KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-22KM

Menu text Recommended Setting


PHASE DISTANCE ELEMENTS
Setting Unit
Line setting
GND DIST Z1 DIR Forward
GND DIST SHAPE Quadrilateral
GND DIST Z1 REACH 2.69 Ω
GND DIST Z1 RCA 68.82 DEG
GND DIST Z1 COMP LIMIT 90.00 DEG
GND DIST Z1 DIR RCA 68.82 DEG
GND DIST Z1 DIR COMP LIMIT 90.00 DEG
GND DIST Z1 QUAD RGT BLD 4.60 Ω
GND DIST Z1 QUAD RGT BLD RCA 68.82 DEG
GND DIST Z1 QUAD LFT BLD 4.60 Ω
GND DIST Z1 QUAD LFT BLD RCA 68.82 DEG
GND DIST Z1 DELAY 0.00 S
GND DIST Z1 Z0/Z1 MAG 0.22
GND DIST Z1 Z0/Z1 ANG -30.29 DEG

GND DIST Z2 DIR Forward


GND DIST SHAPE Quadrilateral
GND DIST Z2 REACH 3.80 Ω
GND DIST Z2 RCA 68.82 DEG
GND DIST Z2 COMP LIMIT 90.00 DEG
GND DIST Z2 DIR RCA 68.82 DEG
GND DIST Z2 DIR COMP LIMIT 90.00 DEG
GND DIST Z2 QUAD RGT BLD 5.03 Ω
GND DIST Z2 QUAD RGT BLD RCA 68.82 DEG
GND DIST Z2 QUAD LFT BLD 5.03 Ω
GND DIST Z2 QUAD LFT BLD RCA 68.82 DEG
GND DIST Z2 DELAY 0.40 S
GND DIST Z2 Z0/Z1 MAG 0.22 Ω
GND DIST Z2 Z0/Z1 ANG -30.29 DEG

GND DIST Z3 DIR Forward


GND DIST SHAPE Quadrilateral
GND DIST Z3 REACH 7.63 Ω
GND DIST Z3 RCA 68.82 DEG
GND DIST Z3 QUAD RGT BLD 6.51 Ω
GND DIST Z3 QUAD RGT BLD RCA 68.82 DEG
GND DIST Z3 QUAD LFT BLD 6.51 Ω
GND DIST Z3 QUAD LFT BLD RCA 68.82 DEG
GND DIST Z3 DELAY 0.80 S
GND DIST Z3 Z0/Z1 MAG 0.22 Ω
GND DIST Z3 Z0/Z1 ANG -30.29 DEG

GND DIST Z4 DIR Reverse


GND DIST SHAPE Quadrilateral
GND DIST Z4 REACH 0.54 Ω
GND DIST Z4 RCA 68.82 DEG
GND DIST Z4 QUAD RGT BLD 6.51 Ω
GND DIST Z4 QUAD RGT BLD RCA 68.82 DEG
GND DIST Z4 QUAD LFT BLD 6.51 Ω
GND DIST Z4 QUAD LFT BLD RCA 68.82 DEG
GND DIST Z4 DELAY 0.50 S
GND DIST Z4 Z0/Z1 MAG 0.22 Ω
GND DIST Z4 Z0/Z1 ANG -30.29 DEG

LOAD ENCROACHMENT
LOAD ENCROACHMENT MIN VOLT 0.25 pu
LOAD ENCROACHMENT REACH 40.01 Ω
LOAD ENCROACHMENT ANGLE 26.00 DEG
LOAD ENCROACHMENT PKP DELAY 0.00 S
LOAD ENCROACHMENT RST DELAY 0.00 S

Page 39 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(22KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-22KM
Menu text Recommended Setting
PHASE DISTANCE ELEMENTS
Setting Unit
POWER SWING DETECT
POWER SWING SHAPE Quadrilateral
POWER SWING MODE Two Step
POWER SWING SUPV 0.60 pu
POWER SWING FWD REACH 7.63 Ω
POWER SWING QUAD FWD REACH OUT 9.15
POWER SWING FWD RCA 68.82 DEG
POWER SWING REV REACH 4.35 Ω
POWER SWING QUAD REV REACH OUT 5.22 Ω
POWER SWING OUTER RGT BLD 7.81 Ω
POWER SWING OUTER LFT BLD 7.81 Ω
POWER SWING INNER RGT BLD 6.51 Ω
POWER SWING INNER LFT BLD 6.51 Ω
POWER SWING PICKUP DELAY1 0.03 S
POWER SWING RESET DELAY1 0.05 S
POWER SWING PICKUP DELAY2 0.02 S
POWER SWING PICKUP DELAY3 0.01 S
POWER SWING PICKUP DELAY4 0.02 S
POWER SWING SEAL IN DELAY 0.40 S
POWER SWING TRIP MODE Delayed S
LINE PICKUP (SOTF)
PHASE IOC LINE PICKUP 1.00 pu
LINE UV PICKUP 0.70 pu
LINE END OPEN PICKUP DELAY 0.15 S
LINE END OPEN RESET DELAY 0.09 S
LINE OV PICKUP DELAY 0.04 S
AR COORDINATION BYPASS Enabled
AR COORDINATION PICKUP DELAY 0.05 S
AR COORDINATION RESET DELAY 0.01 S
LINE PICKUP DISTANCE TRIP Enabled
FUSE FAILURE
FUNCTION Enabled
AUTO RECLOSE
FUNCTION Enabled
AR MODE 1 pole
MAX NUMBER OF SHOTS 1.00
AR CLOSE TIME BKR1 0.20 S
AR BLK TIME UPON MAN CLS 10.00 S
AR RESET TIME 25.00 S
AR BKR1 FAIL OPTION Lockout
AR INCOMPLETE SEQ TIME 2.00 S
AR 1-P DEAD TIME 1.00 S
AR BKR1 SEQUENCE 1.00
BREAKER FAILURE 1
FUNCTION Enabled
BR1 MODE 3-Pole
BF1 SOURCE SRC1
BF1 USE AMP SUPV Yes
BF1 USE SEAL-IN Yes
BF1 PH AMP SUPV PICKUP 0.20 pu
BF1 N AMP SUPV PICKUP 0.20 pu
BF1 USE TIMER1 Yes
BF1 TIMER1 PICKUP DELAY 0.20 S
BF1 TRIP DROPOUT 0.00 S
BROKEN CONDUCTOR (F650 RELAY)
TAP LEVEL IN PERCENTAGE OF I2/I1 20.00 %
TRIP TIME 5.00 S
UNDERVOLTAGE
PHASE UV1 FUNCTION Enabled
PHASE UV1 MODE Phase to Phase
PHASE UV1 PICKUP 0.90 pu
PHASE UV1 DELAY 3.00 s

Page 40 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(15KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-15KM

3.6. Distance Protection for 132kV-30KM Line

System Details for 220kV line


Nominal system voltage,UN = 132000V 132000 V
Current transformer ratio,Nct = 400/1A 400.0
Voltage transformer ratio,Nvt = 132000/110 1200.0
Ratio of secondary to primary impedance,Nct/Nvt = 0.33
Protected OHL Type = ACSR PANTHER
Current rating in Amps = 400.0 Considered CT Ratio
Protected OHL length = 15.0 KM
Positive seq.Resistance of OHL in Ω, per kM, Rprim = 0.167
Positive seq.Reactance of OHL in Ω, per kM, Xprim = 0.432
O
Positive seq.impedance of OHL in Ω, per kM, Zprim = 0.463 68.8
Zero seq.Resistance of OHL in Ω, per kM, Rprim = 0.406
Zero seq.Reactance of OHL in Ω, per kM, Xprim = 0.622
O
Zero seq.impedance of OHL in Ω, per kM, Zprim = 0.743 56.9

Adjacent Longest Line details


Protected OHL length = 5.60 KM
Positive seq.Resistance of OHL in Ω, per kM, Rprim = 0.167
Positive seq.Reactance of OHL in Ω, per kM, Xprim = 0.432
O
Positive seq.impedance of OHL in Ω, per kM, Zprim = 0.463 68.8
Zero seq.Resistance of OHL in Ω, per kM, Rprim = 0.406
Zero seq.Reactance of OHL in Ω, per kM, Xprim = 0.622
O
Zero seq.impedance of OHL in Ω, per kM, Zprim = 0.743 56.9

Adjacent Shortest Line details


Protected OHL length = 5.60 KM
Positive seq.Resistance of OHL in Ω, per kM, Rprim = 0.167
Positive seq.Reactance of OHL in Ω, per kM, Xprim = 0.432
O
Positive seq.impedance of OHL in Ω, per kM, Zprim = 0.46 68.8
Zero seq.Resistance of OHL in Ω, per kM, Rprim = 0.406
Zero seq.Reactance of OHL in Ω, per kM, Xprim = 0.622
O
Zero seq.impedance of OHL in Ω, per kM, Zprim = 0.74 56.9

PT Details:
PT Ratio = 132000/110 V
PT Primary Voltage = 132000.0 V
PT Secondary Voltage = 110.0 V
System Frequency = 50.0 HZ

Distance element Settings:


Reactance settings
Zone 1 Settings
Required Zone 1 reach is to be 85% of the Protected line
X1prim = 85% * Xprim = 5.51
X1sec = Nct/Nvt * Xprim = 1.84

Zone 2 Settings
Zone 2 element setting with a reach of 120% of Protected line reactance accounts for effect of infeed.This point must be verified
using a fault study to calculate the apparent ohms at the local terminal for a fault at the remote end of transmission line.
In our case 120% is considered for the zone-2 elements with assurance that all faults in the protected line are detectable,even
with infeed from remote terminals.

Assuming the zone-1 reach for the adjacent line protection is set at 85% of that line reactance, and it is to be verified such that
the zone-2 reach of 120%(protected line) shall not extend beyond the max.effective zone-1 reach of the adjacent line protection.
Zone-2 setting limit = Protected line reactance +
0.85 * adjacent shortest line reactance
= 2.85
Zone-2 setting with 120% reach = 2.59
Since 120%, 2.59 is lower than zone-2 limit. 2.85, so the zone-2 setting of 120% will not overreach beyond zone-1 setting
of adjacent line protection. Therefore we consider 120% of protected line reactance
Hence set X2 prim = 7.78
Hence set X2 sec = 2.59

Page 41 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(15KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-15KM
Zone 3 Settings
For Zone3 setting , it is customery to select 1.2 (Protected line + 50% Adjacent Longest line)
X3prim, reach = 9.23
X3sec = Nct/Nvt * X3prim*IN/A = 3.08

Zone 4 Settings
For Zone4 setting, reverse reach impedence is typically 20% Zone 1 reach Impedance.
X4prim, reach = 1.10
X4sec = Nct/Nvt * X4prim*IN/A = 0.37

Resistance settings
For resistance setting of OHL, consideration of AC resistance is most important. Also tower footing resistance shall be
accounted in the calculation.

Resistive Reach Calculations


Minimum Load impedence to the relay = Vn (phase - neutral) / In
= (110/√3/1)
= 63.51 Ω
Typically,phase fault distance zones would avoid the minimum load impedence by a margin of ≥ 40%,earth
fault zones would use a ≥ 20% margin.
This allows maximum resistive reaches = 38.11 Ω secondary
for Phase faults
This allows maximum resistive reaches = 50.81 Ω secondary
for Earth faults
Ra = (28710 x L) / If^1.4
Where:
If = Minimum expected phase-phase fault current (A);
L = Maximum phase conductor separation (m);
Ra = Arc resistance, calculated from the van Warrington
formula (W).
fault current = 6.01 kA
Conductor spaces = 2.7 mtrs
Primary resistive coverage = 0.40 Ω
for phase faults
(RARC is = 1.325 Ω
RTFT Tower Foot Resistance = 10 Ω
Zone-1 setting(same way as done above for X reach)
R1 sec = R1sec + 0.5RARC+ RTFT = 4.27

Zone-2 setting(same way as done above for X reach)


R2 sec = R2sec + 0.5RARC+ RTFT = 4.56

Zone-3 setting(same way as done above for X reach)


R3 sec = R3sec + 0.5RARC+ RTFT = 4.75

Zone-4 setting(same way as done above for X reach)


R4 sec = R4sec + 0.5RARC+ RTFT = 3.70

Time setting
Zone-1 setting = 0.00 sec
Zone-2 setting
zone-2 time delay should be set to discreminative with the primary line protection of the next line sections
including circuit breaker trip time
Adjoining line protection operating time = 0.040
Breaker opening time = 0.080
Local relay reset = 0.030
Grading margin = 0.250
Required zone-2 time delay = 0.40
set zone-2 at = 0.40 sec
Zone-3 setting
zone-3 time delay shall be such that zone-2 time delay plus grading margin
zone-2 time delay = 0.400
Grading margin = 0.400
Required zone-3 time delay = 0.80
set zone-3 at = 0.80 sec

Page 42 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(15KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-15KM
Zone-4 setting
zone-4 might be used to provide back up protection for the local bus bar. zone-4 time delay shall be such that LBB time delay
plus grading margin
LBB time delay = 0.200
Grading margin = 0.250
Required zone-4 time delay = 0.45
set zone-4 at = 0.50 sec

Earth Impedance matching factor for Zone-1,2,3 & 4


RE/RL = 1/3 (R0/R1 -1) = 0.48
XE/XL = 1/3 (X0/X1 -1) = 0.15

R0-R1 = 0.24
X0-X1 = 0.19
O
Z0-Z1 = 0.31 38.53
O
Z0/Z1 MAG & ANGLE= (Z0-Z1)/3Z1 = 0.22 -30.29
Where
R1 is +ve seq. resistance of protected line
R0 is zero seq. resistance of protected line
X1 is +ve seq. reactance of protected line
X0 is zero seq. reactance of protected line

Load impedance value


Rload prim = Umin/√3*ILmax
Where
Umin = minimum operating voltage, 0.9*UN = 118800
ILmax = max load current = 400.000
Hence Rload prim = 171.48
Rload sec = 57.16
The setting shall be applied 30% lower
= 40.01
than calculated above
The above is calculated for ph to earth and for ph to ph it is same value because current is multiplied by √3
PHI load , maximum load angle
As load current ideally is in phase with the voltage, the difference is indicated with the power factor cosØ. The largest angle
of the load impedance is therefore given by the worst, smallest powerfactor. We considered the worst power factor under
full load condition is 0.9.
Øload- max = cos -1(power factor min)
Øload- max = cos-1 (0.9)
Øload- max O
= 26.00

Power Swing Detection:


The power swing detect element provides both power swing blocking and out-of-step tripping functions.
Power swing Shape, = QUAD
Power swing Mode, = Two step
Power swing Supervision, = 0.600 pu (typical setting from manual)
Power swing Forward Reach(inner) = 3.08 Ω
(considered zone-3 reactance boundary)
Power swing Forward RCA = 68.8 O
Power swing Forward Reach(outer) = 3.69 Ω
(120% of inner Reach)
Power swing Reverse Reach(inner) is considered as 50% zone-3 Reactance Reach + zone-4 Reactance Reach
Power swing Reverse Reach(inner) = 1.91 Ω
Power swing Reverse Reach(outer) = 2.29 Ω
(120% of Reverse inner Reach)
Power swing inner Right blinder = 4.75 Ω
(considered zone-3 resistive boundary)
Power swing outer Right blinder = 5.70 Ω
(120% of inner Right blinder)
Power swing inner Left blinder = 4.75 Ω
(considered zone-3 resistive boundary)
Power swing outer Left blinder = 5.70 Ω
(120% of inner Left blinder)

VT Fuse fail
Function enabled

Page 43 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(15KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-15KM
Broken Conductor Protection
Full load current = 400.000 A
Considered I2 = 40.00 A (10% of fullload current)
I2 / I1 = 0.10
Allow for tolerences and load varations = 200%
I2 / I1 = 20.00 %
time delay = 5.00 s

Auto Reclosure:
This autoreclose can be single pole tripping for single phase faults and three phase tripping for multi-phase faults.
1 pole:
In this mode, the recloser starts the AR-1P DEAD TIME for the first shot if the fault is single phase.
If the fault is three phase or three pole trip occurred on the breaker during single initiation, the scheme goes to lockout with out reclosing.
AR Mode, = 1 pole
AR Max Number of Shots, = 1.00
AR Close Time Breaker 1, = 0.20 s
AR Block Time Upon Man Cls. = 10.00 s
AR Reset Time, = 25.00 s
AR Breaker1 Fail Option, = Lockout
AR Incomplete Sequence Time, = 2.00 s
AR 1-P Dead Time, 1.00 s
AR Breaker Sequence, = 1.00

Local Breaker Backup Protection


In general, a breaker failure scheme determines that a breaker signaled to trip has not cleared a fault with in a definite time,
so further tripping action must be performed.
BF1 MODE, = 3-Pole
BF1 SOURCE, = SRC1
BF1 USE AMP SUPV, = Yes
BF1 USE SEAL-IN, = Yes
BF1 PH AMP SUPV, = 0.20 pu
BF1 N AMP SUPV, = 0.20 pu
BF1 USE TIMER1, = Yes
BF1 TIMER1 PICKUP DELAY, = 0.20 S
BF1 TRIP DROPOUT = 0.00 S

Setting Recommendation for UV


PT Ratio = 132000/110
Under = 1200.00
voltage = 0.90*Nominal Volt
= 118800 v 90% OF Rated Voltage
Select Under voltage setting, 27 = 118800/1200
= 99.000 V
≈ 0.90 pu
Time delay setting , 27 = 3.00 s

Page 44 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(15KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-15KM

Settings Table

Menu text Recommended Setting


PHASE DISTANCE ELEMENTS
Setting Unit
Line setting
Line Length 15.00 km
PHASE DIST Z1 DIR Forward
PHASE DIST SHAPE Quadrilateral
PHS DIST Z1 REACH 1.84 Ω
PHS DIST Z1 RCA 68.82 DEG
PHS DIST Z1 COMP LIMIT 90.00 DEG
PHS DIST Z1 DIR RCA 68.82 DEG
PHS DIST Z1 DIR COMP LIMIT 90.00 DEG
PHS DIST Z1 QUAD RGT BLD 4.27 Ω
PHS DIST Z1 QUAD RGT BLD RCA 68.82 DEG
PHS DIST Z1 QUAD LFT BLD 4.27 Ω
PHS DIST Z1 QUAD LFT BLD RCA 68.82 DEG
PHASE DIST Z1 DELAY 0.00 S
PHS DIST Z1 SUPV 0.34 pu

PHASE DIST Z2 DIR Forward


PHASE DIST SHAPE Quadrilateral
PHS DIST Z2 REACH 2.59 Ω
PHS DIST Z2 RCA 68.82 DEG
PHS DIST Z2 COMP LIMIT 90.00 DEG
PHS DIST Z2 DIR RCA 68.82 DEG
PHS DIST Z2 DIR COMP LIMIT 90.00 DEG
PHS DIST Z2 QUAD RGT BLD 4.56 Ω
PHS DIST Z2 QUAD RGT BLD RCA 68.82 DEG
PHS DIST Z2 QUAD LFT BLD 4.56 Ω
PHS DIST Z2 QUAD LFT BLD RCA 68.82 DEG
PHASE DIST Z2 DELAY 0.40 S

PHASE DIST Z3 DIR Forward


PHASE DIST SHAPE Quadrilateral
PHS DIST Z3 REACH 3.08 Ω
PHS DIST Z3 RCA 68.82 DEG
PHS DIST Z3 COMP LIMIT 90.00 DEG
PHS DIST Z3 DIR RCA 68.82 DEG
PHS DIST Z3 DIR COMP LIMIT 90.00 DEG
PHS DIST Z3 QUAD RGT BLD 4.75 Ω
PHS DIST Z3 QUAD RGT BLD RCA 68.82 DEG
PHS DIST Z3 QUAD LFT BLD 4.75 Ω
PHS DIST Z3 QUAD LFT BLD RCA 68.82 DEG
PHASE DIST Z3 DELAY 0.80 S

PHASE DIST Z4 DIR Reverse


PHASE DIST SHAPE Quadrilateral
PHS DIST Z4 REACH 0.37 Ω
PHS DIST Z4 RCA 68.82 DEG
PHS DIST Z4 COMP LIMIT 90.00 DEG
PHS DIST Z4 DIR RCA 68.82
PHS DIST Z4 DIR COMP LIMIT 90.00 DEG
PHS DIST Z4 QUAD RGT BLD 4.75 Ω
PHS DIST Z4 QUAD RGT BLD RCA 68.82 DEG
PHS DIST Z4 QUAD LFT BLD 4.75 Ω
PHS DIST Z4 QUAD LFT BLD RCA 68.82 DEG
PHASE DIST Z4 DELAY 0.50 S

Page 45 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(15KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-15KM

Menu text Recommended Setting


PHASE DISTANCE ELEMENTS
Setting Unit
Line setting
GND DIST Z1 DIR Forward
GND DIST SHAPE Quadrilateral
GND DIST Z1 REACH 1.84 Ω
GND DIST Z1 RCA 68.82 DEG
GND DIST Z1 COMP LIMIT 90.00 DEG
GND DIST Z1 DIR RCA 68.82 DEG
GND DIST Z1 DIR COMP LIMIT 90.00 DEG
GND DIST Z1 QUAD RGT BLD 4.27 Ω
GND DIST Z1 QUAD RGT BLD RCA 68.82 DEG
GND DIST Z1 QUAD LFT BLD 4.27 Ω
GND DIST Z1 QUAD LFT BLD RCA 68.82 DEG
GND DIST Z1 DELAY 0.00 S
GND DIST Z1 Z0/Z1 MAG 0.22
GND DIST Z1 Z0/Z1 ANG -30.29 DEG

GND DIST Z2 DIR Forward


GND DIST SHAPE Quadrilateral
GND DIST Z2 REACH 2.59 Ω
GND DIST Z2 RCA 68.82 DEG
GND DIST Z2 COMP LIMIT 90.00 DEG
GND DIST Z2 DIR RCA 68.82 DEG
GND DIST Z2 DIR COMP LIMIT 90.00 DEG
GND DIST Z2 QUAD RGT BLD 4.56 Ω
GND DIST Z2 QUAD RGT BLD RCA 68.82 DEG
GND DIST Z2 QUAD LFT BLD 4.56 Ω
GND DIST Z2 QUAD LFT BLD RCA 68.82 DEG
GND DIST Z2 DELAY 0.40 S
GND DIST Z2 Z0/Z1 MAG 0.22 Ω
GND DIST Z2 Z0/Z1 ANG -30.29 DEG

GND DIST Z3 DIR Forward


GND DIST SHAPE Quadrilateral
GND DIST Z3 REACH 3.08 Ω
GND DIST Z3 RCA 68.82 DEG
GND DIST Z3 QUAD RGT BLD 4.75 Ω
GND DIST Z3 QUAD RGT BLD RCA 68.82 DEG
GND DIST Z3 QUAD LFT BLD 4.75 Ω
GND DIST Z3 QUAD LFT BLD RCA 68.82 DEG
GND DIST Z3 DELAY 0.80 S
GND DIST Z3 Z0/Z1 MAG 0.22 Ω
GND DIST Z3 Z0/Z1 ANG -30.29 DEG

GND DIST Z4 DIR Reverse


GND DIST SHAPE Quadrilateral
GND DIST Z4 REACH 0.37 Ω
GND DIST Z4 RCA 68.82 DEG
GND DIST Z4 QUAD RGT BLD 4.75 Ω
GND DIST Z4 QUAD RGT BLD RCA 68.82 DEG
GND DIST Z4 QUAD LFT BLD 4.75 Ω
GND DIST Z4 QUAD LFT BLD RCA 68.82 DEG
GND DIST Z4 DELAY 0.50 S
GND DIST Z4 Z0/Z1 MAG 0.22 Ω
GND DIST Z4 Z0/Z1 ANG -30.29 DEG

LOAD ENCROACHMENT
LOAD ENCROACHMENT MIN VOLT 0.25 pu
LOAD ENCROACHMENT REACH 40.01 Ω
LOAD ENCROACHMENT ANGLE 26.00 DEG
LOAD ENCROACHMENT PKP DELAY 0.00 S
LOAD ENCROACHMENT RST DELAY 0.00 S

Page 46 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(15KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-15KM
Menu text Recommended Setting
PHASE DISTANCE ELEMENTS
Setting Unit
POWER SWING DETECT
POWER SWING SHAPE Quadrilateral
POWER SWING MODE Two Step
POWER SWING SUPV 0.60 pu
POWER SWING FWD REACH 3.08 Ω
POWER SWING QUAD FWD REACH OUT 3.69
POWER SWING FWD RCA 68.82 DEG
POWER SWING REV REACH 1.91 Ω
POWER SWING QUAD REV REACH OUT 2.29 Ω
POWER SWING OUTER RGT BLD 5.70 Ω
POWER SWING OUTER LFT BLD 5.70 Ω
POWER SWING INNER RGT BLD 4.75 Ω
POWER SWING INNER LFT BLD 4.75 Ω
POWER SWING PICKUP DELAY1 0.03 S
POWER SWING RESET DELAY1 0.05 S
POWER SWING PICKUP DELAY2 0.02 S
POWER SWING PICKUP DELAY3 0.01 S
POWER SWING PICKUP DELAY4 0.02 S
POWER SWING SEAL IN DELAY 0.40 S
POWER SWING TRIP MODE Delayed S
LINE PICKUP (SOTF)
PHASE IOC LINE PICKUP 1.00 pu
LINE UV PICKUP 0.70 pu
LINE END OPEN PICKUP DELAY 0.15 S
LINE END OPEN RESET DELAY 0.09 S
LINE OV PICKUP DELAY 0.04 S
AR COORDINATION BYPASS Enabled
AR COORDINATION PICKUP DELAY 0.05 S
AR COORDINATION RESET DELAY 0.01 S
LINE PICKUP DISTANCE TRIP Enabled
FUSE FAILURE
FUNCTION Enabled
AUTO RECLOSE
FUNCTION Enabled
AR MODE 1 pole
MAX NUMBER OF SHOTS 1.00
AR CLOSE TIME BKR1 0.20 S
AR BLK TIME UPON MAN CLS 10.00 S
AR RESET TIME 25.00 S
AR BKR1 FAIL OPTION Lockout
AR INCOMPLETE SEQ TIME 2.00 S
AR 1-P DEAD TIME 1.00 S
AR BKR1 SEQUENCE 1.00
BREAKER FAILURE 1
FUNCTION Enabled
BR1 MODE 3-Pole
BF1 SOURCE SRC1
BF1 USE AMP SUPV Yes
BF1 USE SEAL-IN Yes
BF1 PH AMP SUPV PICKUP 0.20 pu
BF1 N AMP SUPV PICKUP 0.20 pu
BF1 USE TIMER1 Yes
BF1 TIMER1 PICKUP DELAY 0.20 S
BF1 TRIP DROPOUT 0.00 S
BROKEN CONDUCTOR (F650 RELAY)
TAP LEVEL IN PERCENTAGE OF I2/I1 20.00 %
TRIP TIME 5.00 S
UNDERVOLTAGE
PHASE UV1 FUNCTION Enabled
PHASE UV1 MODE Phase to Phase
PHASE UV1 PICKUP 0.90 pu
PHASE UV1 DELAY 3.00 s

Page 47 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132/33-40MVATRAFO DIFF PROTN CKD: GP
RELAY MAKE GE MODEL T60 BAY/FEEDER 132/33-40 MVA Trafo

3.7. 40MVA.TRAFO DIFF. SETTING CALCULATION

Transformer Data:
Rated Power, Prated = 40.0 MVA
Rated Voltage
HV, Vnom[1] = 132.0 kV
LV, Vnom[2] = 33.0 kV
% Impedance = 0.138 13.80% .
Vector Group = YN yn 0
132kV SIDE Primary-winding 1, CT Ratio
(Inom,a) = 400.0 1.0 A (800-400/1A)
33kV SIDE Primary-winding 2, CT Ratio
(Inom,b) = 800.0 1.0 A (800-400/1A)
OLTC Range on 132kV side + 15.0 %
to
- 5.0 %
Step Size 1.25 Max Step 12.00 Min Step 4.00
Voltage at Min Tap Position = 151.8 kV
Voltage at Max Tap Position = 125.4 kV
Highest voltage tolerence, Vmax = 37.95 kV
Lowest voltage tolerence,Vmin = 31.35 kV

The reference winding is determined as follows,


Rated current on winding 1- Irated = Prated / (√3*Vnom[1] )
= (40*1000)/(1.732*132)
Irated [1], = 174.95 A

Rated current on winding 2- Irated = Prated / (√3*Vnom[2] )


= (40*1000)/(1.732*33)
Irated [2], = 699.82 A

With this rated currents the CT margin for Winding1& winding 2 as follows,
CT margin for windings 1, Imargin[1] = CT primary[1] / Irated[1]
= 400/174.95
Imargin[1], = 2.29
CT margin for windings 2, Imargin[2] = CT primary[2] / Irated[2]
= 800/699.82
Imargin[2], = 1.14
Note: In the entire calculation primary and secondary windings are referred as winding "1" & "2" respectively.
Since Imargin[2] < Imargin[1], the reference winding W ref is winding 2.
The unit for calculation of the differential and restraint currents and base for the differentialrestraint setting is
the CT primary associated with the reference winding.

Calculation of magnitude compensation factor (M),


=
magnitude compensation factor for winding [1], M[1] IPrimary [1] × Vnom [1] / IPrimary [2] × Vnom[2]
= 400x132000/800x33000
132kV side M[1], = 2.00
=
magnitude compensation factor for winding [2], M[2] IPrimary [2] × Vnom [2] / IPrimary [2] × Vnom[2]
= 800x33000/800x33000
33kV side M[2], = 1.00

Page 48 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132/33-40MVATRAFO DIFF PROTN CKD: GP
RELAY MAKE GE MODEL T60 BAY/FEEDER 132/33-40 MVA Trafo
a) Calculating the minimum differential pickup current required for relay to operate,
Criteria:
The minimum differential pickup should be above the no load current of the transformer when the secondary side of the breaker is
open
Stability of relay when the transformer is operating under no load (Secondary side breaker is open) and the transformer is drawn
the magnetising current(up to 5% of rated current)

=
No load current of the transformer primary current, 0.05×174.95
= 8.75 A
No load current refered to the CT secondary, = 8.7475/400
= 0.022 A
No load current to the relay after applying magnitude compendation factor M[1],
= 0.022×2
IS1 = 0.044 A

= side)
No load current of the transf. winding2,(secondary 0.0
IS2 = 0.0
Differential current IdA, = | Is1+Is2 |
= |0.044+0 |
Id A, = 0.0440 A
Restraining current IrA, = max( | Is1|, |Is2 |)
= max( |0.044|, |0 |)
IrA, = 0.0440 A
The differential current IdA=0.0440A is found to be less than the minimum pickup selected setting of 0.1 is
adequate as the relay catalogue has a setting generally recommended between 0.1 to 0.3.

b) Selection of Break point 1 and slope 1:


Recommened Settings,
The Break point 1 setting is based on the pu value of the full load transformer current
HV side (Winding -1) = 0.44 pu
LV side (Winding -2) = 0.87 pu
Hence we choose Break point-1 = 2 pu
Slope -1 = 25%

Differential / Restraint Current in the Tap Changer Extreme Position:

Nominal Voltage, Vnom = 2 ( Vmax X Vmin) / (Vmax + Vmin)


= 2(37.95*31.35)/(37.95+31.35)
= 34.34 kv

Object current of regulated side, IN2 = SN/(1.732 X VN2)


= (40*1000)/(1.732x34.336)
= 672.61 A
Corresponds on the CT2 secondary side = IN2 / CT2
to IN2 = 672.62/800
= 0.84 A ~ INobj

Corresponds on the CT1 secondary side = IN1 / CT1


to IN1 = 174.95/400
= 0.44 A ~ INobj

Object current in maximum tap position, = SN/(1.732 X Vmax)


IN2(+15%) = (40*1000)/(1.732x37.95)
= 608.56

Corresponds on the CT2 secondary side = IN2(+15%) / CT2


to IN2 = 608.56/800
= 0.76 A ~ 0.90 INobj

Differential current in maximum tap = | IN2(+15%) - INobj |


position IDiff = I0.905INobj-INobjl
= 0.10 INobj

Page 49 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132/33-40MVATRAFO DIFF PROTN CKD: GP
RELAY MAKE GE MODEL T60 BAY/FEEDER 132/33-40 MVA Trafo
Restriant current in maximum tap position = | IN2(+15%) + INobj |
IRestaint = I0.905INobj+INobjl
= 1.90 INobj

Object current in minimum tap position, = SN/(1.732 X Vmin)


IN2(-5%) = (40*1000)/(1.732x31.35)
= 736.67

Corresponds on the CT2 secondary side = IN2(-5%) / CT2


to IN2 = 736.67/800
= 0.92 A ~ 1.10 INobj

Differential current in minimum tap = | IN2(-5%) - INobj |


position IDiff = I1.095INobj-INobjl
= 0.10 INobj

Restriant current in minimum tap position = | IN2(-5%) + INobj |


IRestaint = I1.095INobj+INobjl
= 2.10 INobj

Iop, Relay operating current at +15% tap, = slope1 X Irest


= 0.25x1.905INObj
= 0.48 INObj
whereas the Idiff , 0.1 INObj is less than 0.47 INObj . Hence the relay is Stable.

Iop, Relay operating current at -5% tap, = slope1 X Irest


= 0.25x2.095INObj
= 0.52 INObj
whereas the Idiff , 0.1 INObj is less than 0.51 INObj . Hence the relay is Stable.

From the above calculation it is derived that , under rated condition and at Tap Changer Extreme positions,
Operating current are not in the Tripping Area .

C) Selection of Break point 2 and slope 2:

break point 2
The setting for Break point -2 depend very much on the capability of CTs to correctly transform Primary into
secondary currents during external faults. Break point -2 should be set below the fault current that is most likely to saturate
some CTs due to an AC Component alone
External Fault current = 12.72 pu

Break point- 2 = 8 pu
Slope-2 = 98% (as per relay catalogue)
2nd HARMONICS:
The percentage of harmonics present in the inrush current, for the relay to recognise the inrush current is set as 20%
as per manufacturer recommended,

INRUSH INHIBIT LEVEL, = 20%


INRUSH INHIBIT FUNCTION ADAPTIVE 2nd Harmonic
(now a days all modern transformers produce low 2nd harmonic ratios)
INRUSH INHIBIT MODE PER PHASE

5TH HARMONICS:
This
setting is
OVEREXCITN INHIBIT LEVEL, = 30%
Instantaneous differential protection:
The pickup thersold should be set greater than the maximum spurious differential current that could be encountered
under non-internal fault conditions ( typically maganetizing inrush current or an external fault with extremely severe CT saturation.
I) Magnetizing inrush current = 6 x Full load current
= 1049.70 A
= 2.62 pu

Page 50 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132/33-40MVATRAFO DIFF PROTN CKD: GP
RELAY MAKE GE MODEL T60 BAY/FEEDER 132/33-40 MVA Trafo
II) External fault condition:
HV Side Fault Current = 3.18 pu
LV Side Fault Current = 6.36 pu
For safety margin we choosen instantaneous 8 pu
differential protection setting
VOLTS PER HERTZ (OVER FLUX):
The per-unit V/HZ value is calculated using the maximum of the three-phase voltage inputs or the auxiliary
voltage channel Vx input, if the source is not configured with Phase voltages.

The volts-per-Hertz protection, to protect transformers during potentially damaging over voltage and under
frequency disturbances.
According to experience we set the definite time curve with the following settings,
Stage-1
Volts/Hz 1 Pickup, = 1.1 pu
Volts/Hz 1 Curve, = Definite Time
Volts /Hz 1 TD Multiplier, = 10.0 S
Volts/Hz 1 T-Reset, = 0.0 S

Stage-2
Volts/Hz 2 Pickup, = 1.2 pu
Volts/Hz 2 Curve, = Definite Time
Volts /Hz 2 TD Multiplier, = 1.0 S
Volts/Hz 2 T-Reset, = 0.0 S

Setting Table:

Menu Text Setting Range


Recomm.Setting
PERCENT DIFFERENTIAL Min Max

PERCENT DIFFERENTIAL PICKUP 0.1 pu 0.05 pu 1 pu


PERCENT DIFFERENTIAL SLOPE1 0.25 15% 1
PERCENT DIFFERENTIAL BREAK1 2 pu 1 pu 2 pu
PERCENT DIFFERENTIAL BREAK2 8 pu 2 pu 30 pu
PERCENT DIFFERENTIAL SLOPE2 0.98 50% 1
2nd Harmonic INRUSH INHIBIT LEVEL 0.2 1% 0.4
2nd Harmonic INRUSH INHIBIT MODE PER PHASE perphase,2-out-of-3,Avg.
2nd Harmonic INHIBIT FUNCTION Adaptive Adaptive, Traditional,Disabled
OVEREXCITN INHIBIT FUNCTION 5th disabled,5th
OVEREXCITN INHIBIT LEVEL 0.3 1% 40%
INST DIFFERENTIAL PICKUP 8 pu 2 pu 30 pu
VOLTS/HZ 1
VOLTS/HZ 1 PICKUP 1.1 pu 0.8 pu 4 pu
VOLTS/HZ 1 CURVE Definite Time Definite Time, IDMT
VOLTS/HZ 1 TD MULTIPLIER 10 s 5% 600 S
VOLTS/HZ 1 T-RESET 0s 0S 1000 S
VOLTS/HZ 2
VOLTS/HZ 2 PICKUP 1.2 pu 0.8 pu 4 pu
VOLTS/HZ 2 CURVE Definite Time Definite Time, IDMT
VOLTS/HZ 2 TD MULTIPLIER 1s 5% 600 S
VOLTS/HZ 2 T-RESET 0s 0S 1000 S

Page 51 of 160
220kV FEEDERS

Page 52 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 160MVA TRANSFORMER 220kV SIDE CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 220/132kV,160 MVA Trafo 220kV Side
4.1. Directional Overcurrent and Earth Fault Protection for 160MVA Transformer(220kV Side)

CT Details
CT Ratio = 800-400/1 A
CT Primary = 800 A
CT Secondary = 1 A
Class = PS

Transformer Data:
Rated power = 160 MVA
Rated HV Voltage = 220.00 kV
Rated LV Voltage = 132.00 kV
Full Load current HV Side = 419.90 A
Full Load current LV Side = 699.84 A

Phase Over current setting


O/C SETTING (51):
The relay setting shall be such that it shall not operate for max.
probable load current
Load current I load = 419.90 A
CT secondary current, = i Load / CT ratio
= 0.52
Consider 110% of transformer Full load = 461.89 Primary
Pickup Phase fault Secondary , recommended = 0.58 Secondary
Time Multiplier Setting
Characteristics = IDMT Normal inverse
t Required operating time in seconds = grading time + Downstream relay
Minimum grading time interval considered operating time
in sec = 0.62

Fault current = 3660 A From ETAP


I Fault current at secondary = I fault / CT ratio
4.58 A
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.62*(((4.58/0.6)^0.02)-1))/0.14)
= 0.19
Maximum fault Current = 28160 A Primary From ETAP
= 35.20 A Secondary
Operating time at Maximum fault Current = 0.30 Sec
Instantaneous Phase Overcurrent Setting
For High set considering the 130% of Through Fault current in = 4548.95 A Calculated
HV Side = 5.69 A
t = 0.35 Sec
Earth Over current setting HV side
In solidly earthed system a setting of 10 to 20% of CT Primary = 160 A Primary
current is considered = I earth fault / CT ratio
Setting of 20% is selected = (160/800)
= 0.20 A Secondary
Time Multiplier Setting
CHARACTERISTICS = IDMT Normal inverse

t Required operating time in seconds = grading time + Downstream relay


Minimum grading time interval considered operating time
in sec = 0.74
Fault current = 1420.00 A From ETAP
I Fault current at secondary = I fault / CT ratio
1.78
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.74*(((1.78/0.2)^0.02)-1))/0.14)
= 0.24
Maximum fault Current = 25980.00 A From ETAP
32.48
Operating time at Maximum fault Current = 0.31 Sec
Instantaneous Earth Overcurrent Setting
For High set considering the 200% of CT Primary Current = 1600.00 A
= 2.00 A
t = 0.50 Sec

Page 53 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 160MVA TRANSFORMER 220kV SIDE CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 220/132kV,160 MVA Trafo 220kV Side
Setting Table:

F650
GROUP-1 Directional Phase Overcurrent- 67
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA 45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 0.58 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.19 0 900 0.01 S

F650
GROUP-1 Directional Phase Overcurrent- 67 INST
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA 45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 5.69 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.35 0 900 0.01 S

F650
GROUP-1 Directional Earth Overcurrent- 67N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA -45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 0.2 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.24 0 900 0.01 S

F650
GROUP-1 Directional Earth Overcurrent- 67N INST
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA -45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 2.0 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.50 0 900 0.01 S

Page 54 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 220kV BUS COUPLER CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 220kV Bus Coupler
4.2. Non Directional Overcurrent and Earth Fault Protection for 220kV Buscoupler

CT Details
CT Ratio = 1600-800/1 A
CT Primary = 1600 A
CT Secondary = 1 A
Class = PS

Transformer Data:
Rated power = 160 MVA
Rated HV Voltage = 220 kV
Rated LV Voltage = 132 kV
Full Load current HV Side = 420 A
Full Load current LV Side = 700 A

Phase Over current setting


O/C SETTING (51):
The relay setting shall be such that it shall not operate for max.
probable load current
Load current I load = 1600 A
CT secondary current, = i Load / CT ratio
= 1.00
Consider 110% of transformer Full load = 1600.00 Primary
Pickup Phase fault Secondary , recommended = 1.00 Secondary

Time Multiplier Setting


Characteristics = IDMT Normal inverse

t Required operating time in seconds =


grading time
Minimum grading time interval considered
in sec = 0.87

Fault current (220kV Line-3+220kV Line-4) = 7980 A From ETAP


I Fault current at secondary = I fault / CT ratio
4.99 A
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.87*(((4.99/1)^0.02)-1))/0.14)
= 0.20
Maximum fault Current = 18150 A Primary From ETAP
= 11.34 A Secondary
Operating time at Maximum fault Current = 0.57 Sec

Earth Over current setting HV side


In solidly earthed system a setting of 10 to 20% of CT Primary = 320.00 A Primary
current is considered = I earth fault / CT ratio
Setting of 20% is selected = (320/1600)
= 0.20 A Secondary

Time Multiplier Setting


CHARACTERISTICS = IDMT Normal inverse

t Required operating time in seconds = grading time + Downstream relay


Minimum grading time interval considered operating time
in sec = 0.56

Fault current = 6950 A From ETAP


I Fault current at secondary = I fault / CT ratio
4.34
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.56*(((4.34/0.2)^0.02)-1))/0.14)
= 0.3
Maximum fault Current = 17460 A Primary From ETAP
= 10.91 A Secondary
Operating time at Maximum fault Current = 0.43 Sec

Page 55 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 220kV BUS COUPLER CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 220kV Bus Coupler
Setting Table:

F650
GROUP-1 Directional Phase Overcurrent- 67
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 1.00 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.20 0 900 0.01 S

F650
GROUP-1 Directional Earth Overcurrent- 67N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.2 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.3 0 900 0.01 S

Page 56 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 220kV LINE CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line
4.3. Non Directional Overcurrent and Earth Fault Protection for 220kV Line

CT Details
CT Ratio = 1600-800/1 A
CT Primary = 1600 A For 10kM Line
800 A For 40 & 50kM Line
CT Secondary = 1 A
Class = PS

Transformer Data:
Rated power = 160 MVA
Rated HV Voltage = 220 kV
Rated LV Voltage = 132 kV
Full Load current HV Side = 420 A
Full Load current LV Side = 700 A

Phase Over current setting


O/C SETTING (51):
The relay setting shall be such that it shall not operate for
max. probable load current
Load current I load = 1600 A
CT secondary current, = i Load / CT ratio
= 1.00
Consider 110% of transformer Full load = 1600.00 Primary
Pickup Phase fault Secondary , recommended = 1.00 Secondary

Time Multiplier Setting


Characteristics = IDMT Normal inverse

t Required operating time in seconds = grading time + Downstream relay


Minimum grading time interval operating time
considered in sec = 0.82
Fault current = 7980 A From ETAP
I Fault current at secondary = I fault / CT ratio
4.99 A
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.82*(((4.99/1)^0.02)-1))/0.14)
= 0.2
Maximum fault Current = 28160 A Primary From ETAP
= 17.60 A Secondary
Operating time at Maximum fault Current = 0.45 Sec
Earth Over current setting HV side
In solidly earthed system a setting of 10 to 20% of CT = 320 A Primary
Primary current is considered = I earth fault / CT ratio
Setting of 20% is selected = (320/1600)
= 0.20 A Secondary
Time Multiplier Setting
CHARACTERISTICS = IDMT Normal inverse

t Required operating time in seconds = grading time + Downstream relay


Minimum grading time interval operating time
considered in sec = 0.68

Fault current = 6950 A From ETAP


I Fault current at secondary = I fault / CT ratio
4.34375
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.68*(((4.34/0.2)^0.02)-1))/0.14)
= 0.31
Maximum fault Current = 26870 A Primary From ETAP
= 16.79 A Secondary
Operating time at Maximum fault Current = 0.47 Sec

Page 57 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 220kV LINE CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line
Setting Table:

D60
GROUP-1 Non Directional Phase Overcurrent- 51
RECOMMEND SETTING RANGE
MENU TEXT STEP SIZE UNIT
SETTING MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 1.00 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.19 0 900 0.01 S

F650
GROUP-1 Non Directional Earth Overcurrent- 51N
RECOMMEND SETTING RANGE
MENU TEXT STEP SIZE UNIT
SETTING MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.2 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.31 0 900 0.01 S

Page 58 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(50Km)

4.4. Distance Protection -220kV Line(50kM)

System Details for 220kV line


Nominal system voltage,UN = 220000V 220000 V
Current transformer ratio,Nct = 800/1A 800.0
Voltage transformer ratio,Nvt = 220000/110 2000.0
Ratio of secondary to primary impedance,Nct/Nvt = 0.40
Protected OHL Type = ACSR ZEBRA
Current rating in Amps = 800.0 Considered CT Ratio
Protected OHL length = 50.0 KM
Positive seq.Resistance of OHL in Ω, per kM, Rprim = 0.084
Positive seq.Reactance of OHL in Ω, per kM, Xprim = 0.428
O
Positive seq.impedance of OHL in Ω, per kM, Zprim = 0.436 78.9
Zero seq.Resistance of OHL in Ω, per kM, Rprim = 0.292
Zero seq.Reactance of OHL in Ω, per kM, Xprim = 1.240
O
Zero seq.impedance of OHL in Ω, per kM, Zprim = 1.274 76.8

Adjacent Longest Line details


Protected OHL length = 104.97 KM
Positive seq.Resistance of OHL in Ω, per kM, Rprim = 0.084
Positive seq.Reactance of OHL in Ω, per kM, Xprim = 0.428
O
Positive seq.impedance of OHL in Ω, per kM, Zprim = 0.436 78.9
Zero seq.Resistance of OHL in Ω, per kM, Rprim = 0.292
Zero seq.Reactance of OHL in Ω, per kM, Xprim = 1.240
O
Zero seq.impedance of OHL in Ω, per kM, Zprim = 1.274 76.8

Adjacent Shortest Line details


Protected OHL length = 23.97 KM
Positive seq.Resistance of OHL in Ω, per kM, Rprim = 0.08
Positive seq.Reactance of OHL in Ω, per kM, Xprim = 0.43
O
Positive seq.impedance of OHL in Ω, per kM, Zprim = 0.44 78.9
Zero seq.Resistance of OHL in Ω, per kM, Rprim = 0.29
Zero seq.Reactance of OHL in Ω, per kM, Xprim = 1.24
O
Zero seq.impedance of OHL in Ω, per kM, Zprim = 1.27 76.8

PT Details:
PT Ratio = 220000/110 V
PT Primary Voltage = 220000.0 V
PT Secondary Voltage = 110.0 V
System Frequency = 50.0 HZ

Distance element Settings:


Reactance settings
Zone 1 Settings
Required Zone 1 reach is to be 85% of the Protected line
X1prim = 85% * Xprim = 18.19
X1sec = Nct/Nvt * Xprim = 7.28

Zone 2 Settings
Zone 2 element setting with a reach of 120% of Protected line reactance accounts for effect of infeed.This point must be verified
using a fault study to calculate the apparent ohms at the local terminal for a fault at the remote end of transmission line.
In our case 120% is considered for the zone-2 elements with assurance that all faults in the protected line are detectable,even
with infeed from remote terminals.

Assuming the zone-1 reach for the adjacent line protection is set at 85% of that line reactance, and it is to be verified such that
the zone-2 reach of 120%(protected line) shall not extend beyond the max.effective zone-1 reach of the adjacent line protection.
Zone-2 setting limit = (Protected line reactance +
0.85 * adjacent shortest line reactance)
= 12.05
Zone-2 setting with 120% reach = 10.272
Since 120%, 10.272 is lower than zone-2 limit. 12.048, so the zone-2 setting of 120% will not overreach beyond zone-1 setting
of adjacent line protection. Therefore we consider 120% of protected line reactance
Hence set X2 prim = 25.68
Hence set X2 sec = 10.27

Page 59 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(50Km)
Zone 3 Settings
For Zone3 setting , it is customery to select 1.2 (Protected line + 50% Adjacent Longest line)
X3prim, reach = 43.86
X3sec = Nct/Nvt * X3prim*IN/A = 17.55

Zone 4 Settings
For Zone4 setting, reverse reach impedence is typically 20% Zone 1 reach Impedance.
X4prim, reach = 3.64
X4sec = Nct/Nvt * X4prim*IN/A = 1.46

Resistance settings
For resistance setting of OHL, consideration of AC resistance is most important. Also tower footing resistance shall be
accounted in the calculation.

Resistive Reach Calculations


Minimum Load impedence to the relay = Vn (phase - neutral) / In
= (110/√3/1)
= 63.51 Ω
Typically,phase fault distance zones would avoid the minimum load impedence by a margin of ≥ 40%,earth
fault zones would use a ≥ 20% margin.
This allows maximum resistive reaches = 38.11 Ω secondary
for Phase faults
This allows maximum resistive reaches = 50.81 Ω secondary
for Earth faults
Ra = (28710 x L) / If^1.4
Where:
If = Minimum expected phase-phase fault current (A);
L = Maximum phase conductor separation (m);
Ra = Arc resistance, calculated from the van Warrington
formula (W).
fault current = 3.66 kA
Conductor spaces = 4.5 mtrs
Primary resistive coverage = 1.33 Ω
for phase faults
(RARC is = 1.325 Ω
RTFT Tower Foot Resistance = 10 Ω
Zone-1 setting(same way as done above for X reach)
R1 sec = R1sec + 0.5RARC+ RTFT = 5.69

Zone-2 setting(same way as done above for X reach)


R2 sec = R2sec + 0.5RARC+ RTFT = 6.28

Zone-3 setting(same way as done above for X reach)


R3 sec = R3sec + 0.5RARC+ RTFT = 8.39

Zone-4 setting(same way as done above for X reach)


R4 sec = R4sec + 0.5RARC+ RTFT = 4.55

Time setting
Zone-1 setting = 0.00 sec
Zone-2 setting
zone-2 time delay should be set to discreminative with the primary line protection of the next line sections
including circuit breaker trip time
Adjoining line protection operating time = 0.040
Breaker opening time = 0.080
Local relay reset = 0.030
Grading margin = 0.250
Required zone-2 time delay = 0.40
set zone-2 at = 0.40 sec
Zone-3 setting
zone-3 time delay shall be such that zone-2 time delay plus grading margin
zone-2 time delay = 0.400
Grading margin = 0.400
Required zone-3 time delay = 0.80
set zone-3 at = 0.80 sec

Page 60 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(50Km)
Zone-4 setting
zone-4 might be used to provide back up protection for the local bus bar. zone-4 time delay shall be such that LBB time delay
plus grading margin
LBB time delay = 0.200
Grading margin = 0.250
Required zone-4 time delay = 0.45
set zone-4 at = 0.50 sec

Earth Impedance matching factor for Zone-1,2,3 & 4


RE/RL = 1/3 (R0/R1 -1) = 0.83
XE/XL = 1/3 (X0/X1 -1) = 0.63

R0-R1 = 0.21
X0-X1 = 0.81
O
Z0-Z1 = 0.84 75.62
O
Z0/Z1 MAG & ANGLE= (Z0-Z1)/3Z1 = 0.64 -3.30
Where
R1 is +ve seq. resistance of protected line
R0 is zero seq. resistance of protected line
X1 is +ve seq. reactance of protected line
X0 is zero seq. reactance of protected line

Load impedance value


Rload prim = Umin/√3*ILmax
Where
Umin = minimum operating voltage, 0.9*UN = 198000
ILmax = max load current = 800.000
Hence Rload prim = 142.90
Rload sec = 57.16
The setting shall be applied 30% lower
= 40.01
than calculated above
The above is calculated for ph to earth and for ph to ph it is same value because current is multiplied by √3
PHI load , maximum load angle
As load current ideally is in phase with the voltage, the difference is indicated with the power factor cosØ. The largest angle
of the load impedance is therefore given by the worst, smallest powerfactor. We considered the worst power factor under
full load condition is 0.9.
Øload- max = cos -1(power factor min)
Øload- max = cos-1 (0.9)
Øload- max O
= 26.00

Power Swing Detection:


The power swing detect element provides both power swing blocking and out-of-step tripping functions.
Power swing Shape, = QUAD
Power swing Mode, = Two step
Power swing Supervision, = 0.600 pu (typical setting from manual)
Power swing Forward Reach(inner) = 17.55 Ω
(considered zone-3 reactance boundary)
Power swing Forward RCA = 78.9 O
Power swing Forward Reach(outer) = 21.05 Ω
(120% of inner Reach)
Power swing Reverse Reach(inner) is considered as 50% zone-3 Reactance Reach + zone-4 Reactance Reach
Power swing Reverse Reach(inner) = 10.23 Ω
Power swing Reverse Reach(outer) = 12.27 Ω
(120% of Reverse inner Reach)
Power swing inner Right blinder = 8.39 Ω
(considered zone-3 resistive boundary)
Power swing outer Right blinder = 10.06 Ω
(120% of inner Right blinder)
Power swing inner Left blinder = 8.39 Ω
(considered zone-3 resistive boundary)
Power swing outer Left blinder = 10.06 Ω
(120% of inner Left blinder)

VT Fuse fail
Function enabled

Page 61 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(50Km)
Broken Conductor Protection
Full load current = 800.000 A
Considered I2 = 80.00 A (10% of fullload current)
I2 / I1 = 0.10
Allow for tolerences and load varations = 200%
I2 / I1 = 20.00 %
time delay = 5.00 s

Auto Reclosure:
This autoreclose can be single pole tripping for single phase faults and three phase tripping for multi-phase faults.
1 pole:
In this mode, the recloser starts the AR-1P DEAD TIME for the first shot if the fault is single phase.
If the fault is three phase or three pole trip occurred on the breaker during single initiation, the scheme goes to lockout with out reclosing.
AR Mode, = 1 pole
AR Max Number of Shots, = 1.00
AR Close Time Breaker 1, = 0.20 s
AR Block Time Upon Man Cls. = 10.00 s
AR Reset Time, = 25.00 s
AR Breaker1 Fail Option, = Lockout
AR Incomplete Sequence Time, = 2.00 s
AR 1-P Dead Time, 1.00 s
AR Breaker Sequence, = 1.00

Local Breaker Backup Protection


In general, a breaker failure scheme determines that a breaker signaled to trip has not cleared a fault with in a definite time,
so further tripping action must be performed.
BF1 MODE, = 3-Pole
BF1 SOURCE, = SRC1
BF1 USE AMP SUPV, = Yes
BF1 USE SEAL-IN, = Yes
BF1 PH AMP SUPV, = 0.20 pu
BF1 N AMP SUPV, = 0.20 pu
BF1 USE TIMER1, = Yes
BF1 TIMER1 PICKUP DELAY, = 0.20 S
BF1 TRIP DROPOUT = 0.00 S

Setting Recommendation for UV


PT Ratio = 220000/110
Under = 2000.00
voltage = 0.90*Nominal Volt
= 198000 v 90% OF Rated Voltage
Select Under voltage setting, 27 = 198000/2000
= 99.000 V
≈ 0.90 pu
Time delay setting , 27 = 3.00 s

Page 62 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(50Km)

Settings Table

Menu text Recommended Setting


PHASE DISTANCE ELEMENTS
Setting Unit
Line setting
Line Length 50.00 km
PHASE DIST Z1 DIR Forward
PHASE DIST SHAPE Quadrilateral
PHS DIST Z1 REACH 7.28 Ω
PHS DIST Z1 RCA 78.92 DEG
PHS DIST Z1 COMP LIMIT 90.00 DEG
PHS DIST Z1 DIR RCA 78.92 DEG
PHS DIST Z1 DIR COMP LIMIT 90.00 DEG
PHS DIST Z1 QUAD RGT BLD 5.69 Ω
PHS DIST Z1 QUAD RGT BLD RCA 78.92 DEG
PHS DIST Z1 QUAD LFT BLD 5.69 Ω
PHS DIST Z1 QUAD LFT BLD RCA 78.92 DEG
PHASE DIST Z1 DELAY 0.00 S
PHS DIST Z1 SUPV 0.34 pu

PHASE DIST Z2 DIR Forward


PHASE DIST SHAPE Quadrilateral
PHS DIST Z2 REACH 10.27 Ω
PHS DIST Z2 RCA 78.92 DEG
PHS DIST Z2 COMP LIMIT 90.00 DEG
PHS DIST Z2 DIR RCA 78.92 DEG
PHS DIST Z2 DIR COMP LIMIT 90.00 DEG
PHS DIST Z2 QUAD RGT BLD 6.28 Ω
PHS DIST Z2 QUAD RGT BLD RCA 78.92 DEG
PHS DIST Z2 QUAD LFT BLD 6.28 Ω
PHS DIST Z2 QUAD LFT BLD RCA 78.92 DEG
PHASE DIST Z2 DELAY 0.40 S

PHASE DIST Z3 DIR Forward


PHASE DIST SHAPE Quadrilateral
PHS DIST Z3 REACH 17.55 Ω
PHS DIST Z3 RCA 78.92 DEG
PHS DIST Z3 COMP LIMIT 90.00 DEG
PHS DIST Z3 DIR RCA 78.92 DEG
PHS DIST Z3 DIR COMP LIMIT 90.00 DEG
PHS DIST Z3 QUAD RGT BLD 8.39 Ω
PHS DIST Z3 QUAD RGT BLD RCA 78.92 DEG
PHS DIST Z3 QUAD LFT BLD 8.39 Ω
PHS DIST Z3 QUAD LFT BLD RCA 78.92 DEG
PHASE DIST Z3 DELAY 0.80 S

PHASE DIST Z4 DIR Reverse


PHASE DIST SHAPE Quadrilateral
PHS DIST Z4 REACH 1.46 Ω
PHS DIST Z4 RCA 78.92 DEG
PHS DIST Z4 COMP LIMIT 90.00 DEG
PHS DIST Z4 DIR RCA 78.92
PHS DIST Z4 DIR COMP LIMIT 90.00 DEG
PHS DIST Z4 QUAD RGT BLD 8.39 Ω
PHS DIST Z4 QUAD RGT BLD RCA 78.92 DEG
PHS DIST Z4 QUAD LFT BLD 8.39 Ω
PHS DIST Z4 QUAD LFT BLD RCA 78.92 DEG
PHASE DIST Z4 DELAY 0.50 S

Page 63 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(50Km)

Menu text Recommended Setting


PHASE DISTANCE ELEMENTS
Setting Unit
Line setting
GND DIST Z1 DIR Forward
GND DIST SHAPE Quadrilateral
GND DIST Z1 REACH 7.28 Ω
GND DIST Z1 RCA 78.92 DEG
GND DIST Z1 COMP LIMIT 90.00 DEG
GND DIST Z1 DIR RCA 78.92 DEG
GND DIST Z1 DIR COMP LIMIT 90.00 DEG
GND DIST Z1 QUAD RGT BLD 5.69 Ω
GND DIST Z1 QUAD RGT BLD RCA 78.92 DEG
GND DIST Z1 QUAD LFT BLD 5.69 Ω
GND DIST Z1 QUAD LFT BLD RCA 78.92 DEG
GND DIST Z1 DELAY 0.00 S
GND DIST Z1 Z0/Z1 MAG 0.64
GND DIST Z1 Z0/Z1 ANG -3.30 DEG

GND DIST Z2 DIR Forward


GND DIST SHAPE Quadrilateral
GND DIST Z2 REACH 10.27 Ω
GND DIST Z2 RCA 78.92 DEG
GND DIST Z2 COMP LIMIT 90.00 DEG
GND DIST Z2 DIR RCA 78.92 DEG
GND DIST Z2 DIR COMP LIMIT 90.00 DEG
GND DIST Z2 QUAD RGT BLD 6.28 Ω
GND DIST Z2 QUAD RGT BLD RCA 78.92 DEG
GND DIST Z2 QUAD LFT BLD 6.28 Ω
GND DIST Z2 QUAD LFT BLD RCA 78.92 DEG
GND DIST Z2 DELAY 0.40 S
GND DIST Z2 Z0/Z1 MAG 0.64 Ω
GND DIST Z2 Z0/Z1 ANG -3.30 DEG

GND DIST Z3 DIR Forward


GND DIST SHAPE Quadrilateral
GND DIST Z3 REACH 17.55 Ω
GND DIST Z3 RCA 78.92 DEG
GND DIST Z3 QUAD RGT BLD 8.39 Ω
GND DIST Z3 QUAD RGT BLD RCA 78.92 DEG
GND DIST Z3 QUAD LFT BLD 8.39 Ω
GND DIST Z3 QUAD LFT BLD RCA 78.92 DEG
GND DIST Z3 DELAY 0.80 S
GND DIST Z3 Z0/Z1 MAG 0.64 Ω
GND DIST Z3 Z0/Z1 ANG -3.30 DEG

GND DIST Z4 DIR Reverse


GND DIST SHAPE Quadrilateral
GND DIST Z4 REACH 1.46 Ω
GND DIST Z4 RCA 78.92 DEG
GND DIST Z4 QUAD RGT BLD 8.39 Ω
GND DIST Z4 QUAD RGT BLD RCA 78.92 DEG
GND DIST Z4 QUAD LFT BLD 8.39 Ω
GND DIST Z4 QUAD LFT BLD RCA 78.92 DEG
GND DIST Z4 DELAY 0.50 S
GND DIST Z4 Z0/Z1 MAG 0.64 Ω
GND DIST Z4 Z0/Z1 ANG -3.30 DEG

LOAD ENCROACHMENT
LOAD ENCROACHMENT MIN VOLT 0.25 pu
LOAD ENCROACHMENT REACH 40.01 Ω
LOAD ENCROACHMENT ANGLE 26.00 DEG
LOAD ENCROACHMENT PKP DELAY 0.00 S
LOAD ENCROACHMENT RST DELAY 0.00 S

Page 64 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(50Km)
Menu text Recommended Setting
PHASE DISTANCE ELEMENTS
Setting Unit
POWER SWING DETECT
POWER SWING SHAPE Quadrilateral
POWER SWING MODE Two Step
POWER SWING SUPV 0.60 pu
POWER SWING FWD REACH 17.55 Ω
POWER SWING QUAD FWD REACH OUT 21.05
POWER SWING FWD RCA 78.92 DEG
POWER SWING REV REACH 10.23 Ω
POWER SWING QUAD REV REACH OUT 12.27 Ω
POWER SWING OUTER RGT BLD 10.06 Ω
POWER SWING OUTER LFT BLD 10.06 Ω
POWER SWING INNER RGT BLD 8.39 Ω
POWER SWING INNER LFT BLD 8.39 Ω
POWER SWING PICKUP DELAY1 0.03 S
POWER SWING RESET DELAY1 0.05 S
POWER SWING PICKUP DELAY2 0.02 S
POWER SWING PICKUP DELAY3 0.01 S
POWER SWING PICKUP DELAY4 0.02 S
POWER SWING SEAL IN DELAY 0.40 S
POWER SWING TRIP MODE Delayed S
LINE PICKUP (SOTF)
PHASE IOC LINE PICKUP 1.00 pu
LINE UV PICKUP 0.70 pu
LINE END OPEN PICKUP DELAY 0.15 S
LINE END OPEN RESET DELAY 0.09 S
LINE OV PICKUP DELAY 0.04 S
AR COORDINATION BYPASS Enabled
AR COORDINATION PICKUP DELAY 0.05 S
AR COORDINATION RESET DELAY 0.01 S
LINE PICKUP DISTANCE TRIP Enabled
FUSE FAILURE
FUNCTION Enabled
AUTO RECLOSE
FUNCTION Enabled
AR MODE 1 pole
MAX NUMBER OF SHOTS 1.00
AR CLOSE TIME BKR1 0.20 S
AR BLK TIME UPON MAN CLS 10.00 S
AR RESET TIME 25.00 S
AR BKR1 FAIL OPTION Lockout
AR INCOMPLETE SEQ TIME 2.00 S
AR 1-P DEAD TIME 1.00 S
AR BKR1 SEQUENCE 1.00
BREAKER FAILURE 1
FUNCTION Enabled
BR1 MODE 3-Pole
BF1 SOURCE SRC1
BF1 USE AMP SUPV Yes
BF1 USE SEAL-IN Yes
BF1 PH AMP SUPV PICKUP 0.20 pu
BF1 N AMP SUPV PICKUP 0.20 pu
BF1 USE TIMER1 Yes
BF1 TIMER1 PICKUP DELAY 0.20 S
BF1 TRIP DROPOUT 0.00 S
BROKEN CONDUCTOR (F650 RELAY)
TAP LEVEL IN PERCENTAGE OF I2/I1 20.00 %
TRIP TIME 5.00 S
UNDERVOLTAGE
PHASE UV1 FUNCTION Enabled
PHASE UV1 MODE Phase to Phase
PHASE UV1 PICKUP 0.90 pu
PHASE UV1 DELAY 3.00 s

Page 65 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(40kM)

4.5. Distance Protection -220kV Line(40kM)

System Details for 220kV line


Nominal system voltage,UN = 220000V 220000 V
Current transformer ratio,Nct = 800/1A 800.0
Voltage transformer ratio,Nvt = 220000/110 2000.0
Ratio of secondary to primary impedance,Nct/Nvt = 0.40
Protected OHL Type = ACSR ZEBRA
Current rating in Amps = 800.0 Considered CT Ratio
Protected OHL length = 40.0 KM
Positive seq.Resistance of OHL in Ω, per kM, Rprim = 0.084
Positive seq.Reactance of OHL in Ω, per kM, Xprim = 0.428
O
Positive seq.impedance of OHL in Ω, per kM, Zprim = 0.436 78.9
Zero seq.Resistance of OHL in Ω, per kM, Rprim = 0.292
Zero seq.Reactance of OHL in Ω, per kM, Xprim = 1.240
O
Zero seq.impedance of OHL in Ω, per kM, Zprim = 1.274 76.8

Adjacent Longest Line details


Protected OHL length = 81.85 KM
Positive seq.Resistance of OHL in Ω, per kM, Rprim = 0.084
Positive seq.Reactance of OHL in Ω, per kM, Xprim = 0.428
O
Positive seq.impedance of OHL in Ω, per kM, Zprim = 0.436 78.9
Zero seq.Resistance of OHL in Ω, per kM, Rprim = 0.292
Zero seq.Reactance of OHL in Ω, per kM, Xprim = 1.240
O
Zero seq.impedance of OHL in Ω, per kM, Zprim = 1.274 76.8

Adjacent Shortest Line details


Protected OHL length = 5.77 KM
Positive seq.Resistance of OHL in Ω, per kM, Rprim = 0.08
Positive seq.Reactance of OHL in Ω, per kM, Xprim = 0.43
O
Positive seq.impedance of OHL in Ω, per kM, Zprim = 0.44 78.9
Zero seq.Resistance of OHL in Ω, per kM, Rprim = 0.29
Zero seq.Reactance of OHL in Ω, per kM, Xprim = 1.24
O
Zero seq.impedance of OHL in Ω, per kM, Zprim = 1.27 76.8

PT Details:
PT Ratio = 220000/110 V
PT Primary Voltage = 220000.0 V
PT Secondary Voltage = 110.0 V
System Frequency = 50.0 HZ

Distance element Settings:


Reactance settings
Zone 1 Settings
Required Zone 1 reach is to be 85% of the Protected line
X1prim = 85% * Xprim = 14.55
X1sec = Nct/Nvt * Xprim = 5.82

Zone 2 Settings
Zone 2 element setting with a reach of 120% of Protected line reactance accounts for effect of infeed.This point must be verified
using a fault study to calculate the apparent ohms at the local terminal for a fault at the remote end of transmission line.
In our case 120% is considered for the zone-2 elements with assurance that all faults in the protected line are detectable,even
with infeed from remote terminals.

Assuming the zone-1 reach for the adjacent line protection is set at 85% of that line reactance, and it is to be verified such that
the zone-2 reach of 120%(protected line) shall not extend beyond the max.effective zone-1 reach of the adjacent line protection.
Zone-2 setting limit = Protected line reactance +
0.85 * adjacent shortest line reactance
= 7.69
Zone-2 setting with 120% reach = 8.22
Since 120%, 8.22 is Higher than zone-2 limit. 7.69, so the zone-2 setting of 120% will overreach beyond zone-1 setting
of adjacent line protection. Therefore we consider 100% of protected line reactance + 50% of Adjacent Shortest Line
Hence set X2 prim = 18.35
Hence set X2 sec = 7.34

Page 66 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(40kM)
Zone 3 Settings
For Zone3 setting , it is customery to select 1.2 (Protected line + 50% Adjacent Longest line)
X3prim, reach = 41.56
X3sec = Nct/Nvt * X3prim*IN/A = 16.63

Zone 4 Settings
For Zone4 setting, reverse reach impedence is typically 20% Zone 1 reach Impedance.
X4prim, reach = 2.91
X4sec = Nct/Nvt * X4prim*IN/A = 1.16

Resistance settings
For resistance setting of OHL, consideration of AC resistance is most important. Also tower footing resistance shall be
accounted in the calculation.

Resistive Reach Calculations


Minimum Load impedence to the relay = Vn (phase - neutral) / In
= (110/√3/1)
= 63.51 Ω
Typically,phase fault distance zones would avoid the minimum load impedence by a margin of ≥ 40%,earth
fault zones would use a ≥ 20% margin.
This allows maximum resistive reaches = 38.11 Ω secondary
for Phase faults
This allows maximum resistive reaches = 50.81 Ω secondary
for Earth faults
Ra = (28710 x L) / If^1.4
Where:
If = Minimum expected phase-phase fault current (A);
L = Maximum phase conductor separation (m);
Ra = Arc resistance, calculated from the van Warrington
formula (W).
fault current = 4.18 kA
Conductor spaces = 4.5 mtrs
Primary resistive coverage = 1.10 Ω
for phase faults
(RARC is = 1.325 Ω
RTFT Tower Foot Resistance = 10 Ω
Zone-1 setting(same way as done above for X reach)
R1 sec = R1sec + 0.5RARC+ RTFT = 5.40

Zone-2 setting(same way as done above for X reach)


R2 sec = R2sec + 0.5RARC+ RTFT = 5.87

Zone-3 setting(same way as done above for X reach)


R3 sec = R3sec + 0.5RARC+ RTFT = 7.52

Zone-4 setting(same way as done above for X reach)


R4 sec = R4sec + 0.5RARC+ RTFT = 4.49

Time setting
Zone-1 setting = 0.00 sec
Zone-2 setting
zone-2 time delay should be set to discreminative with the primary line protection of the next line sections
including circuit breaker trip time
Adjoining line protection operating time = 0.040
Breaker opening time = 0.080
Local relay reset = 0.030
Grading margin = 0.250
Required zone-2 time delay = 0.40
set zone-2 at = 0.40 sec
Zone-3 setting
zone-3 time delay shall be such that zone-2 time delay plus grading margin
zone-2 time delay = 0.400
Grading margin = 0.400
Required zone-3 time delay = 0.80
set zone-3 at = 0.80 sec

Page 67 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(40kM)
Zone-4 setting
zone-4 might be used to provide back up protection for the local bus bar. zone-4 time delay shall be such that LBB time delay
plus grading margin
LBB time delay = 0.200
Grading margin = 0.250
Required zone-4 time delay = 0.45
set zone-4 at = 0.50 sec

Earth Impedance matching factor for Zone-1,2,3 & 4


RE/RL = 1/3 (R0/R1 -1) = 0.83
XE/XL = 1/3 (X0/X1 -1) = 0.63

R0-R1 = 0.21
X0-X1 = 0.81
O
Z0-Z1 = 0.84 75.62
O
Z0/Z1 MAG & ANGLE= (Z0-Z1)/3Z1 = 0.64 -3.30
Where
R1 is +ve seq. resistance of protected line
R0 is zero seq. resistance of protected line
X1 is +ve seq. reactance of protected line
X0 is zero seq. reactance of protected line

Load impedance value


Rload prim = Umin/√3*ILmax
Where
Umin = minimum operating voltage, 0.9*UN = 198000
ILmax = max load current = 800.000
Hence Rload prim = 142.90
Rload sec = 57.16
The setting shall be applied 30% lower
= 40.01
than calculated above
The above is calculated for ph to earth and for ph to ph it is same value because current is multiplied by √3
PHI load , maximum load angle
As load current ideally is in phase with the voltage, the difference is indicated with the power factor cosØ. The largest angle
of the load impedance is therefore given by the worst, smallest powerfactor. We considered the worst power factor under
full load condition is 0.9.
Øload- max = cos -1(power factor min)
Øload- max = cos-1 (0.9)
Øload- max O
= 26.00

Power Swing Detection:


The power swing detect element provides both power swing blocking and out-of-step tripping functions.
Power swing Shape, = QUAD
Power swing Mode, = Two step
Power swing Supervision, = 0.600 pu (typical setting from manual)
Power swing Forward Reach(inner) = 16.63 Ω
(considered zone-3 reactance boundary)
Power swing Forward RCA = 78.9 O
Power swing Forward Reach(outer) = 19.95 Ω
(120% of inner Reach)
Power swing Reverse Reach(inner) is considered as 50% zone-3 Reactance Reach + zone-4 Reactance Reach
Power swing Reverse Reach(inner) = 9.48 Ω
Power swing Reverse Reach(outer) = 11.37 Ω
(120% of Reverse inner Reach)
Power swing inner Right blinder = 7.52 Ω
(considered zone-3 resistive boundary)
Power swing outer Right blinder = 9.02 Ω
(120% of inner Right blinder)
Power swing inner Left blinder = 7.52 Ω
(considered zone-3 resistive boundary)
Power swing outer Left blinder = 9.02 Ω
(120% of inner Left blinder)

VT Fuse fail
Function enabled

Page 68 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(40kM)
Broken Conductor Protection
Full load current = 800.000 A
Considered I2 = 80.00 A (10% of fullload current)
I2 / I1 = 0.10
Allow for tolerences and load varations = 200%
I2 / I1 = 20.00 %
time delay = 5.00 s

Auto Reclosure:
This autoreclose can be single pole tripping for single phase faults and three phase tripping for multi-phase faults.
1 pole:
In this mode, the recloser starts the AR-1P DEAD TIME for the first shot if the fault is single phase.
If the fault is three phase or three pole trip occurred on the breaker during single initiation, the scheme goes to lockout with out reclosing.
AR Mode, = 1 pole
AR Max Number of Shots, = 1.00
AR Close Time Breaker 1, = 0.20 s
AR Block Time Upon Man Cls. = 10.00 s
AR Reset Time, = 25.00 s
AR Breaker1 Fail Option, = Lockout
AR Incomplete Sequence Time, = 2.00 s
AR 1-P Dead Time, 1.00 s
AR Breaker Sequence, = 1.00

Local Breaker Backup Protection


In general, a breaker failure scheme determines that a breaker signaled to trip has not cleared a fault with in a definite time,
so further tripping action must be performed.
BF1 MODE, = 3-Pole
BF1 SOURCE, = SRC1
BF1 USE AMP SUPV, = Yes
BF1 USE SEAL-IN, = Yes
BF1 PH AMP SUPV, = 0.20 pu
BF1 N AMP SUPV, = 0.20 pu
BF1 USE TIMER1, = Yes
BF1 TIMER1 PICKUP DELAY, = 0.20 S
BF1 TRIP DROPOUT = 0.00 S

Setting Recommendation for UV


PT Ratio = 220000/110
Under = 2000.00
voltage = 0.90*Nominal Volt
= 198000 v 90% OF Rated Voltage
Select Under voltage setting, 27 = 198000/2000
= 99.000 V
≈ 0.90 pu
Time delay setting , 27 = 3.00 s

Page 69 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(40kM)

Settings Table

Menu text Recommended Setting


PHASE DISTANCE ELEMENTS
Setting Unit
Line setting
Line Length 40.00 km
PHASE DIST Z1 DIR Forward
PHASE DIST SHAPE Quadrilateral
PHS DIST Z1 REACH 5.82 Ω
PHS DIST Z1 RCA 78.92 DEG
PHS DIST Z1 COMP LIMIT 90.00 DEG
PHS DIST Z1 DIR RCA 78.92 DEG
PHS DIST Z1 DIR COMP LIMIT 90.00 DEG
PHS DIST Z1 QUAD RGT BLD 5.40 Ω
PHS DIST Z1 QUAD RGT BLD RCA 78.92 DEG
PHS DIST Z1 QUAD LFT BLD 5.40 Ω
PHS DIST Z1 QUAD LFT BLD RCA 78.92 DEG
PHASE DIST Z1 DELAY 0.00 S
PHS DIST Z1 SUPV 0.34 pu

PHASE DIST Z2 DIR Forward


PHASE DIST SHAPE Quadrilateral
PHS DIST Z2 REACH 7.34 Ω
PHS DIST Z2 RCA 78.92 DEG
PHS DIST Z2 COMP LIMIT 90.00 DEG
PHS DIST Z2 DIR RCA 78.92 DEG
PHS DIST Z2 DIR COMP LIMIT 90.00 DEG
PHS DIST Z2 QUAD RGT BLD 5.87 Ω
PHS DIST Z2 QUAD RGT BLD RCA 78.92 DEG
PHS DIST Z2 QUAD LFT BLD 5.87 Ω
PHS DIST Z2 QUAD LFT BLD RCA 78.92 DEG
PHASE DIST Z2 DELAY 0.40 S

PHASE DIST Z3 DIR Forward


PHASE DIST SHAPE Quadrilateral
PHS DIST Z3 REACH 16.63 Ω
PHS DIST Z3 RCA 78.92 DEG
PHS DIST Z3 COMP LIMIT 90.00 DEG
PHS DIST Z3 DIR RCA 78.92 DEG
PHS DIST Z3 DIR COMP LIMIT 90.00 DEG
PHS DIST Z3 QUAD RGT BLD 7.52 Ω
PHS DIST Z3 QUAD RGT BLD RCA 78.92 DEG
PHS DIST Z3 QUAD LFT BLD 7.52 Ω
PHS DIST Z3 QUAD LFT BLD RCA 78.92 DEG
PHASE DIST Z3 DELAY 0.80 S

PHASE DIST Z4 DIR Reverse


PHASE DIST SHAPE Quadrilateral
PHS DIST Z4 REACH 1.16 Ω
PHS DIST Z4 RCA 78.92 DEG
PHS DIST Z4 COMP LIMIT 90.00 DEG
PHS DIST Z4 DIR RCA 78.92
PHS DIST Z4 DIR COMP LIMIT 90.00 DEG
PHS DIST Z4 QUAD RGT BLD 7.52 Ω
PHS DIST Z4 QUAD RGT BLD RCA 78.92 DEG
PHS DIST Z4 QUAD LFT BLD 7.52 Ω
PHS DIST Z4 QUAD LFT BLD RCA 78.92 DEG
PHASE DIST Z4 DELAY 0.50 S

Page 70 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(40kM)

Menu text Recommended Setting


PHASE DISTANCE ELEMENTS
Setting Unit
Line setting
GND DIST Z1 DIR Forward
GND DIST SHAPE Quadrilateral
GND DIST Z1 REACH 5.82 Ω
GND DIST Z1 RCA 78.92 DEG
GND DIST Z1 COMP LIMIT 90.00 DEG
GND DIST Z1 DIR RCA 78.92 DEG
GND DIST Z1 DIR COMP LIMIT 90.00 DEG
GND DIST Z1 QUAD RGT BLD 5.40 Ω
GND DIST Z1 QUAD RGT BLD RCA 78.92 DEG
GND DIST Z1 QUAD LFT BLD 5.40 Ω
GND DIST Z1 QUAD LFT BLD RCA 78.92 DEG
GND DIST Z1 DELAY 0.00 S
GND DIST Z1 Z0/Z1 MAG 0.64
GND DIST Z1 Z0/Z1 ANG -3.30 DEG

GND DIST Z2 DIR Forward


GND DIST SHAPE Quadrilateral
GND DIST Z2 REACH 7.34 Ω
GND DIST Z2 RCA 78.92 DEG
GND DIST Z2 COMP LIMIT 90.00 DEG
GND DIST Z2 DIR RCA 78.92 DEG
GND DIST Z2 DIR COMP LIMIT 90.00 DEG
GND DIST Z2 QUAD RGT BLD 5.87 Ω
GND DIST Z2 QUAD RGT BLD RCA 78.92 DEG
GND DIST Z2 QUAD LFT BLD 5.87 Ω
GND DIST Z2 QUAD LFT BLD RCA 78.92 DEG
GND DIST Z2 DELAY 0.40 S
GND DIST Z2 Z0/Z1 MAG 0.64 Ω
GND DIST Z2 Z0/Z1 ANG -3.30 DEG

GND DIST Z3 DIR Forward


GND DIST SHAPE Quadrilateral
GND DIST Z3 REACH 16.63 Ω
GND DIST Z3 RCA 78.92 DEG
GND DIST Z3 QUAD RGT BLD 7.52 Ω
GND DIST Z3 QUAD RGT BLD RCA 78.92 DEG
GND DIST Z3 QUAD LFT BLD 7.52 Ω
GND DIST Z3 QUAD LFT BLD RCA 78.92 DEG
GND DIST Z3 DELAY 0.80 S
GND DIST Z3 Z0/Z1 MAG 0.64 Ω
GND DIST Z3 Z0/Z1 ANG -3.30 DEG

GND DIST Z4 DIR Reverse


GND DIST SHAPE Quadrilateral
GND DIST Z4 REACH 1.16 Ω
GND DIST Z4 RCA 78.92 DEG
GND DIST Z4 QUAD RGT BLD 7.52 Ω
GND DIST Z4 QUAD RGT BLD RCA 78.92 DEG
GND DIST Z4 QUAD LFT BLD 7.52 Ω
GND DIST Z4 QUAD LFT BLD RCA 78.92 DEG
GND DIST Z4 DELAY 0.50 S
GND DIST Z4 Z0/Z1 MAG 0.64 Ω
GND DIST Z4 Z0/Z1 ANG -3.30 DEG

LOAD ENCROACHMENT
LOAD ENCROACHMENT MIN VOLT 0.25 pu
LOAD ENCROACHMENT REACH 40.01 Ω
LOAD ENCROACHMENT ANGLE 26.00 DEG
LOAD ENCROACHMENT PKP DELAY 0.00 S
LOAD ENCROACHMENT RST DELAY 0.00 S

Page 71 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(40kM)
Menu text Recommended Setting
PHASE DISTANCE ELEMENTS
Setting Unit
POWER SWING DETECT
POWER SWING SHAPE Quadrilateral
POWER SWING MODE Two Step
POWER SWING SUPV 0.60 pu
POWER SWING FWD REACH 16.63 Ω
POWER SWING QUAD FWD REACH OUT 19.95
POWER SWING FWD RCA 78.92 DEG
POWER SWING REV REACH 9.48 Ω
POWER SWING QUAD REV REACH OUT 11.37 Ω
POWER SWING OUTER RGT BLD 9.02 Ω
POWER SWING OUTER LFT BLD 9.02 Ω
POWER SWING INNER RGT BLD 7.52 Ω
POWER SWING INNER LFT BLD 7.52 Ω
POWER SWING PICKUP DELAY1 0.03 S
POWER SWING RESET DELAY1 0.05 S
POWER SWING PICKUP DELAY2 0.02 S
POWER SWING PICKUP DELAY3 0.01 S
POWER SWING PICKUP DELAY4 0.02 S
POWER SWING SEAL IN DELAY 0.40 S
POWER SWING TRIP MODE Delayed S
LINE PICKUP (SOTF)
PHASE IOC LINE PICKUP 1.00 pu
LINE UV PICKUP 0.70 pu
LINE END OPEN PICKUP DELAY 0.15 S
LINE END OPEN RESET DELAY 0.09 S
LINE OV PICKUP DELAY 0.04 S
AR COORDINATION BYPASS Enabled
AR COORDINATION PICKUP DELAY 0.05 S
AR COORDINATION RESET DELAY 0.01 S
LINE PICKUP DISTANCE TRIP Enabled
FUSE FAILURE
FUNCTION Enabled
AUTO RECLOSE
FUNCTION Enabled
AR MODE 1 pole
MAX NUMBER OF SHOTS 1.00
AR CLOSE TIME BKR1 0.20 S
AR BLK TIME UPON MAN CLS 10.00 S
AR RESET TIME 25.00 S
AR BKR1 FAIL OPTION Lockout
AR INCOMPLETE SEQ TIME 2.00 S
AR 1-P DEAD TIME 1.00 S
AR BKR1 SEQUENCE 1.00
BREAKER FAILURE 1
FUNCTION Enabled
BR1 MODE 3-Pole
BF1 SOURCE SRC1
BF1 USE AMP SUPV Yes
BF1 USE SEAL-IN Yes
BF1 PH AMP SUPV PICKUP 0.20 pu
BF1 N AMP SUPV PICKUP 0.20 pu
BF1 USE TIMER1 Yes
BF1 TIMER1 PICKUP DELAY 0.20 S
BF1 TRIP DROPOUT 0.00 S
BROKEN CONDUCTOR (F650 RELAY)
TAP LEVEL IN PERCENTAGE OF I2/I1 20.00 %
TRIP TIME 5.00 S
UNDERVOLTAGE
PHASE UV1 FUNCTION Enabled
PHASE UV1 MODE Phase to Phase
PHASE UV1 PICKUP 0.90 pu
PHASE UV1 DELAY 3.00 s

Page 72 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(10kM)

4.6. Distance Protection -220kV Line(10kM)

System Details for 220kV line


Nominal system voltage,UN = 220000V 220000 V
Current transformer ratio,Nct = 800/1A 800.0
Voltage transformer ratio,Nvt = 220000/110 2000.0
Ratio of secondary to primary impedance,Nct/Nvt = 0.40
Protected OHL Type = TWIN ACSR ZEBRA
Current rating in Amps = 800.0 Considered CT Ratio
Protected OHL length = 10.0 KM
Positive seq.Resistance of OHL in Ω, per kM, Rprim = 0.022
Positive seq.Reactance of OHL in Ω, per kM, Xprim = 0.290
O
Positive seq.impedance of OHL in Ω, per kM, Zprim = 0.291 85.6
Zero seq.Resistance of OHL in Ω, per kM, Rprim = 0.284
Zero seq.Reactance of OHL in Ω, per kM, Xprim = 0.978
O
Zero seq.impedance of OHL in Ω, per kM, Zprim = 1.019 73.8

Adjacent Longest Line details


Protected OHL length = 10.00 KM
Positive seq.Resistance of OHL in Ω, per kM, Rprim = 0.022
Positive seq.Reactance of OHL in Ω, per kM, Xprim = 0.290
O
Positive seq.impedance of OHL in Ω, per kM, Zprim = 0.291 85.6
Zero seq.Resistance of OHL in Ω, per kM, Rprim = 0.284
Zero seq.Reactance of OHL in Ω, per kM, Xprim = 0.978
O
Zero seq.impedance of OHL in Ω, per kM, Zprim = 1.019 73.8

Adjacent Shortest Line details


Protected OHL length = 10.00 KM
Positive seq.Resistance of OHL in Ω, per kM, Rprim = 0.02
Positive seq.Reactance of OHL in Ω, per kM, Xprim = 0.29
O
Positive seq.impedance of OHL in Ω, per kM, Zprim = 0.29 85.6
Zero seq.Resistance of OHL in Ω, per kM, Rprim = 0.284
Zero seq.Reactance of OHL in Ω, per kM, Xprim = 0.978
O
Zero seq.impedance of OHL in Ω, per kM, Zprim = 1.02 73.8

PT Details:
PT Ratio = 220000/110 V
PT Primary Voltage = 220000.0 V
PT Secondary Voltage = 110.0 V
System Frequency = 50.0 HZ

Distance element Settings:


Reactance settings
Zone 1 Settings
Required Zone 1 reach is to be 85% of the Protected line
X1prim = 85% * Xprim = 2.47
X1sec = Nct/Nvt * Xprim = 0.99

Zone 2 Settings
Zone 2 element setting with a reach of 120% of Protected line reactance accounts for effect of infeed.This point must be verified
using a fault study to calculate the apparent ohms at the local terminal for a fault at the remote end of transmission line.
In our case 120% is considered for the zone-2 elements with assurance that all faults in the protected line are detectable,even
with infeed from remote terminals.

Assuming the zone-1 reach for the adjacent line protection is set at 85% of that line reactance, and it is to be verified such that
the zone-2 reach of 120%(protected line) shall not extend beyond the max.effective zone-1 reach of the adjacent line protection.
Zone-2 setting limit = Protected line reactance +
0.85 * adjacent shortest line reactance
= 2.15
Zone-2 setting with 120% reach = 1.39
Since 120%, 1.39 is lower than zone-2 limit. 2.15, so the zone-2 setting of 120% will not overreach beyond zone-1 setting
of adjacent line protection. Therefore we consider 120% of protected line reactance
Hence set X2 prim = 3.48
Hence set X2 sec = 1.39

Page 73 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(10kM)
Zone 3 Settings
For Zone3 setting , it is customery to select 1.2 (Protected line + 50% Adjacent Longest line)
X3prim, reach = 5.22
X3sec = Nct/Nvt * X3prim*IN/A = 2.09

Zone 4 Settings
For Zone4 setting, reverse reach impedence is typically 20% Zone 1 reach Impedance.
X4prim, reach = 0.49
X4sec = Nct/Nvt * X4prim*IN/A = 0.20

Resistance settings
For resistance setting of OHL, consideration of AC resistance is most important. Also tower footing resistance shall be
accounted in the calculation.

Resistive Reach Calculations


Minimum Load impedence to the relay = Vn (phase - neutral) / In
= (110/√3/1)
= 63.51 Ω
Typically,phase fault distance zones would avoid the minimum load impedence by a margin of ≥ 40%,earth
fault zones would use a ≥ 20% margin.
This allows maximum resistive reaches = 38.11 Ω secondary
for Phase faults
This allows maximum resistive reaches = 50.81 Ω secondary
for Earth faults
Ra = (28710 x L) / If^1.4
Where:
If = Minimum expected phase-phase fault current (A);
L = Maximum phase conductor separation (m);
Ra = Arc resistance, calculated from the van Warrington
formula (W).
fault current = 7.98 kA
Conductor spaces = 4.5 mtrs
Primary resistive coverage = 0.45 Ω
for phase faults
(RARC is = 1.325 Ω
RTFT Tower Foot Resistance = 10 Ω
Zone-1 setting(same way as done above for X reach)
R1 sec = R1sec + 0.5RARC+ RTFT = 4.34

Zone-2 setting(same way as done above for X reach)


R2 sec = R2sec + 0.5RARC+ RTFT = 4.37

Zone-3 setting(same way as done above for X reach)


R3 sec = R3sec + 0.5RARC+ RTFT = 4.43

Zone-4 setting(same way as done above for X reach)


R4 sec = R4sec + 0.5RARC+ RTFT = 4.28

Time setting
Zone-1 setting = 0.00 sec
Zone-2 setting
zone-2 time delay should be set to discreminative with the primary line protection of the next line sections
including circuit breaker trip time
Adjoining line protection operating time = 0.040
Breaker opening time = 0.080
Local relay reset = 0.030
Grading margin = 0.250
Required zone-2 time delay = 0.40
set zone-2 at = 0.40 sec
Zone-3 setting
zone-3 time delay shall be such that zone-2 time delay plus grading margin
zone-2 time delay = 0.400
Grading margin = 0.400
Required zone-3 time delay = 0.80
set zone-3 at = 0.80 sec

Page 74 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(10kM)
Zone-4 setting
zone-4 might be used to provide back up protection for the local bus bar. zone-4 time delay shall be such that LBB time delay
plus grading margin
LBB time delay = 0.200
Grading margin = 0.250
Required zone-4 time delay = 0.45
set zone-4 at = 0.50 sec

Earth Impedance matching factor for Zone-1,2,3 & 4


RE/RL = 1/3 (R0/R1 -1) = 3.91
XE/XL = 1/3 (X0/X1 -1) = 0.79

R0-R1 = 0.26
X0-X1 = 0.69
O
Z0-Z1 = 0.74 69.19
O
Z0/Z1 MAG & ANGLE= (Z0-Z1)/3Z1 = 0.84 -16.41
Where
R1 is +ve seq. resistance of protected line
R0 is zero seq. resistance of protected line
X1 is +ve seq. reactance of protected line
X0 is zero seq. reactance of protected line

Load impedance value


Rload prim = Umin/√3*ILmax
Where
Umin = minimum operating voltage, 0.9*UN = 198000
ILmax = max load current = 800.000
Hence Rload prim = 142.90
Rload sec = 57.16
The setting shall be applied 30% lower
= 40.01
than calculated above
The above is calculated for ph to earth and for ph to ph it is same value because current is multiplied by √3
PHI load , maximum load angle
As load current ideally is in phase with the voltage, the difference is indicated with the power factor cosØ. The largest angle
of the load impedance is therefore given by the worst, smallest powerfactor. We considered the worst power factor under
full load condition is 0.9.
Øload- max = cos -1(power factor min)
Øload- max = cos-1 (0.9)
Øload- max O
= 26.00

Power Swing Detection:


The power swing detect element provides both power swing blocking and out-of-step tripping functions.
Power swing Shape, = QUAD
Power swing Mode, = Two step
Power swing Supervision, = 0.600 pu (typical setting from manual)
Power swing Forward Reach(inner) = 2.09 Ω
(considered zone-3 reactance boundary)
Power swing Forward RCA = 85.6 O
Power swing Forward Reach(outer) = 2.51 Ω
(120% of inner Reach)
Power swing Reverse Reach(inner) is considered as 50% zone-3 Reactance Reach + zone-4 Reactance Reach
Power swing Reverse Reach(inner) = 1.24 Ω
Power swing Reverse Reach(outer) = 1.49 Ω
(120% of Reverse inner Reach)
Power swing inner Right blinder = 4.43 Ω
(considered zone-3 resistive boundary)
Power swing outer Right blinder = 5.31 Ω
(120% of inner Right blinder)
Power swing inner Left blinder = 4.43 Ω
(considered zone-3 resistive boundary)
Power swing outer Left blinder = 5.31 Ω
(120% of inner Left blinder)

VT Fuse fail
Function enabled

Page 75 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(10kM)
Broken Conductor Protection
Full load current = 800.000 A
Considered I2 = 80.00 A (10% of fullload current)
I2 / I1 = 0.10
Allow for tolerences and load varations = 200%
I2 / I1 = 20.00 %
time delay = 5.00 s

Auto Reclosure:
This autoreclose can be single pole tripping for single phase faults and three phase tripping for multi-phase faults.
1 pole:
In this mode, the recloser starts the AR-1P DEAD TIME for the first shot if the fault is single phase.
If the fault is three phase or three pole trip occurred on the breaker during single initiation, the scheme goes to lockout with out reclosing.
AR Mode, = 1 pole
AR Max Number of Shots, = 1.00
AR Close Time Breaker 1, = 0.20 s
AR Block Time Upon Man Cls. = 10.00 s
AR Reset Time, = 25.00 s
AR Breaker1 Fail Option, = Lockout
AR Incomplete Sequence Time, = 2.00 s
AR 1-P Dead Time, 1.00 s
AR Breaker Sequence, = 1.00

Local Breaker Backup Protection


In general, a breaker failure scheme determines that a breaker signaled to trip has not cleared a fault with in a definite time,
so further tripping action must be performed.
BF1 MODE, = 3-Pole
BF1 SOURCE, = SRC1
BF1 USE AMP SUPV, = Yes
BF1 USE SEAL-IN, = Yes
BF1 PH AMP SUPV, = 0.20 pu
BF1 N AMP SUPV, = 0.20 pu
BF1 USE TIMER1, = Yes
BF1 TIMER1 PICKUP DELAY, = 0.20 S
BF1 TRIP DROPOUT = 0.00 S

Setting Recommendation for UV


PT Ratio = 220000/110
Under = 2000.00
voltage = 0.90*Nominal Volt
= 198000 v 90% OF Rated Voltage
Select Under voltage setting, 27 = 198000/2000
= 99.000 V
≈ 0.90 pu
Time delay setting , 27 = 3.00 s

Page 76 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(10kM)

Settings Table

Menu text Recommended Setting


PHASE DISTANCE ELEMENTS
Setting Unit
Line setting
Line Length 10.00 km
PHASE DIST Z1 DIR Forward
PHASE DIST SHAPE Quadrilateral
PHS DIST Z1 REACH 0.99 Ω
PHS DIST Z1 RCA 85.60 DEG
PHS DIST Z1 COMP LIMIT 90.00 DEG
PHS DIST Z1 DIR RCA 85.60 DEG
PHS DIST Z1 DIR COMP LIMIT 90.00 DEG
PHS DIST Z1 QUAD RGT BLD 4.34 Ω
PHS DIST Z1 QUAD RGT BLD RCA 85.60 DEG
PHS DIST Z1 QUAD LFT BLD 4.34 Ω
PHS DIST Z1 QUAD LFT BLD RCA 85.60 DEG
PHASE DIST Z1 DELAY 0.00 S
PHS DIST Z1 SUPV 0.34 pu

PHASE DIST Z2 DIR Forward


PHASE DIST SHAPE Quadrilateral
PHS DIST Z2 REACH 1.39 Ω
PHS DIST Z2 RCA 85.60 DEG
PHS DIST Z2 COMP LIMIT 90.00 DEG
PHS DIST Z2 DIR RCA 85.60 DEG
PHS DIST Z2 DIR COMP LIMIT 90.00 DEG
PHS DIST Z2 QUAD RGT BLD 4.37 Ω
PHS DIST Z2 QUAD RGT BLD RCA 85.60 DEG
PHS DIST Z2 QUAD LFT BLD 4.37 Ω
PHS DIST Z2 QUAD LFT BLD RCA 85.60 DEG
PHASE DIST Z2 DELAY 0.40 S

PHASE DIST Z3 DIR Forward


PHASE DIST SHAPE Quadrilateral
PHS DIST Z3 REACH 2.09 Ω
PHS DIST Z3 RCA 85.60 DEG
PHS DIST Z3 COMP LIMIT 90.00 DEG
PHS DIST Z3 DIR RCA 85.60 DEG
PHS DIST Z3 DIR COMP LIMIT 90.00 DEG
PHS DIST Z3 QUAD RGT BLD 4.43 Ω
PHS DIST Z3 QUAD RGT BLD RCA 85.60 DEG
PHS DIST Z3 QUAD LFT BLD 4.43 Ω
PHS DIST Z3 QUAD LFT BLD RCA 85.60 DEG
PHASE DIST Z3 DELAY 0.80 S

PHASE DIST Z4 DIR Reverse


PHASE DIST SHAPE Quadrilateral
PHS DIST Z4 REACH 0.20 Ω
PHS DIST Z4 RCA 85.60 DEG
PHS DIST Z4 COMP LIMIT 90.00 DEG
PHS DIST Z4 DIR RCA 85.60
PHS DIST Z4 DIR COMP LIMIT 90.00 DEG
PHS DIST Z4 QUAD RGT BLD 4.43 Ω
PHS DIST Z4 QUAD RGT BLD RCA 85.60 DEG
PHS DIST Z4 QUAD LFT BLD 4.43 Ω
PHS DIST Z4 QUAD LFT BLD RCA 85.60 DEG
PHASE DIST Z4 DELAY 0.50 S

Page 77 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(10kM)

Menu text Recommended Setting


PHASE DISTANCE ELEMENTS
Setting Unit
Line setting
GND DIST Z1 DIR Forward
GND DIST SHAPE Quadrilateral
GND DIST Z1 REACH 0.99 Ω
GND DIST Z1 RCA 85.60 DEG
GND DIST Z1 COMP LIMIT 90.00 DEG
GND DIST Z1 DIR RCA 85.60 DEG
GND DIST Z1 DIR COMP LIMIT 90.00 DEG
GND DIST Z1 QUAD RGT BLD 4.34 Ω
GND DIST Z1 QUAD RGT BLD RCA 85.60 DEG
GND DIST Z1 QUAD LFT BLD 4.34 Ω
GND DIST Z1 QUAD LFT BLD RCA 85.60 DEG
GND DIST Z1 DELAY 0.00 S
GND DIST Z1 Z0/Z1 MAG 0.84
GND DIST Z1 Z0/Z1 ANG -16.41 DEG

GND DIST Z2 DIR Forward


GND DIST SHAPE Quadrilateral
GND DIST Z2 REACH 1.39 Ω
GND DIST Z2 RCA 85.60 DEG
GND DIST Z2 COMP LIMIT 90.00 DEG
GND DIST Z2 DIR RCA 85.60 DEG
GND DIST Z2 DIR COMP LIMIT 90.00 DEG
GND DIST Z2 QUAD RGT BLD 4.37 Ω
GND DIST Z2 QUAD RGT BLD RCA 85.60 DEG
GND DIST Z2 QUAD LFT BLD 4.37 Ω
GND DIST Z2 QUAD LFT BLD RCA 85.60 DEG
GND DIST Z2 DELAY 0.40 S
GND DIST Z2 Z0/Z1 MAG 0.84 Ω
GND DIST Z2 Z0/Z1 ANG -16.41 DEG

GND DIST Z3 DIR Forward


GND DIST SHAPE Quadrilateral
GND DIST Z3 REACH 2.09 Ω
GND DIST Z3 RCA 85.60 DEG
GND DIST Z3 QUAD RGT BLD 4.43 Ω
GND DIST Z3 QUAD RGT BLD RCA 85.60 DEG
GND DIST Z3 QUAD LFT BLD 4.43 Ω
GND DIST Z3 QUAD LFT BLD RCA 85.60 DEG
GND DIST Z3 DELAY 0.80 S
GND DIST Z3 Z0/Z1 MAG 0.84 Ω
GND DIST Z3 Z0/Z1 ANG -16.41 DEG

GND DIST Z4 DIR Reverse


GND DIST SHAPE Quadrilateral
GND DIST Z4 REACH 0.20 Ω
GND DIST Z4 RCA 85.60 DEG
GND DIST Z4 QUAD RGT BLD 4.43 Ω
GND DIST Z4 QUAD RGT BLD RCA 85.60 DEG
GND DIST Z4 QUAD LFT BLD 4.43 Ω
GND DIST Z4 QUAD LFT BLD RCA 85.60 DEG
GND DIST Z4 DELAY 0.50 S
GND DIST Z4 Z0/Z1 MAG 0.84 Ω
GND DIST Z4 Z0/Z1 ANG -16.41 DEG

LOAD ENCROACHMENT
LOAD ENCROACHMENT MIN VOLT 0.25 pu
LOAD ENCROACHMENT REACH 40.01 Ω
LOAD ENCROACHMENT ANGLE 26.00 DEG
LOAD ENCROACHMENT PKP DELAY 0.00 S
LOAD ENCROACHMENT RST DELAY 0.00 S

Page 78 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(10kM)
Menu text Recommended Setting
PHASE DISTANCE ELEMENTS
Setting Unit
POWER SWING DETECT
POWER SWING SHAPE Quadrilateral
POWER SWING MODE Two Step
POWER SWING SUPV 0.60 pu
POWER SWING FWD REACH 2.09 Ω
POWER SWING QUAD FWD REACH OUT 2.51
POWER SWING FWD RCA 85.60 DEG
POWER SWING REV REACH 1.24 Ω
POWER SWING QUAD REV REACH OUT 1.49 Ω
POWER SWING OUTER RGT BLD 5.31 Ω
POWER SWING OUTER LFT BLD 5.31 Ω
POWER SWING INNER RGT BLD 4.43 Ω
POWER SWING INNER LFT BLD 4.43 Ω
POWER SWING PICKUP DELAY1 0.03 S
POWER SWING RESET DELAY1 0.05 S
POWER SWING PICKUP DELAY2 0.02 S
POWER SWING PICKUP DELAY3 0.01 S
POWER SWING PICKUP DELAY4 0.02 S
POWER SWING SEAL IN DELAY 0.40 S
POWER SWING TRIP MODE Delayed S
LINE PICKUP (SOTF)
PHASE IOC LINE PICKUP 1.00 pu
LINE UV PICKUP 0.70 pu
LINE END OPEN PICKUP DELAY 0.15 S
LINE END OPEN RESET DELAY 0.09 S
LINE OV PICKUP DELAY 0.04 S
AR COORDINATION BYPASS Enabled
AR COORDINATION PICKUP DELAY 0.05 S
AR COORDINATION RESET DELAY 0.01 S
LINE PICKUP DISTANCE TRIP Enabled
FUSE FAILURE
FUNCTION Enabled
AUTO RECLOSE
FUNCTION Enabled
AR MODE 1 pole
MAX NUMBER OF SHOTS 1.00
AR CLOSE TIME BKR1 0.20 S
AR BLK TIME UPON MAN CLS 10.00 S
AR RESET TIME 25.00 S
AR BKR1 FAIL OPTION Lockout
AR INCOMPLETE SEQ TIME 2.00 S
AR 1-P DEAD TIME 1.00 S
AR BKR1 SEQUENCE 1.00
BREAKER FAILURE 1
FUNCTION Enabled
BR1 MODE 3-Pole
BF1 SOURCE SRC1
BF1 USE AMP SUPV Yes
BF1 USE SEAL-IN Yes
BF1 PH AMP SUPV PICKUP 0.20 pu
BF1 N AMP SUPV PICKUP 0.20 pu
BF1 USE TIMER1 Yes
BF1 TIMER1 PICKUP DELAY 0.20 S
BF1 TRIP DROPOUT 0.00 S
BROKEN CONDUCTOR (F650 RELAY)
TAP LEVEL IN PERCENTAGE OF I2/I1 20.00 %
TRIP TIME 5.00 S
UNDERVOLTAGE
PHASE UV1 FUNCTION Enabled
PHASE UV1 MODE Phase to Phase
PHASE UV1 PICKUP 0.90 pu
PHASE UV1 DELAY 3.00 s

Page 79 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(50KM)

4.7. Distance protection MAIN-2

CT Details
CT Ratio = 800/1A
CT Primary = 800 A
CT Secondary = 1 A
CTR = 800
Class = PS

System Details
VT Ratio = 220kV/√3
= 110V/√3
VT Primary = 220000 V
VT Secondary = 110 V
PTR 2000.00
Frequency = 50HZ
Maximum fault current = 3.66kA

OHL Details
Condutor type = ZEBRA
Line Length = 50km
Line impedence
Positive sequence impedence (Z1) = 0.084 +j 0.428
Zero sequence impedence ( Z0 ) = 0.292 +j 1.240
Line Length = 50 km
Current rating in Amps = 800
Line impedences
Z1 = 0.436 L 78.920 Ω/km

Z0 = 1.274 L 76.750 Ω/km

Z0/Z1 = 2.921 L -2.170 °

Adjacent Longest Line details


Condutor type Zebra
Line Length 104.97km
Line impedence
Positive sequence impedence (Z1) 0.084 +j 0.428
Zero sequence impedence ( Z0 ) 0.292 +j 1.240
Line Length 104.970 km
Line impedences
Z1 = 0.436 L 78.920 Ω/km
Z0 = 1.274 L 76.750 Ω/km

Adjacent Shortest Line details


Condutor type Zebra
Line Length 23.97km
Line impedence
Positive sequence impedence (Z1) 0.084 +j 0.428
Zero sequence impedence ( Z0 ) 0.292 +j 1.240
Line Length 23.970 km
Line impedences
Z1 = 0.436 L 78.920 Ω/km

Z0 = 1.274 L 76.750 Ω/km

Page 80 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(50KM)

Relay settings
Line impedence
Ratio of secondary to primary impedence = CT ratio / VT ratio
(800/2000)
0.40
Line impedence secondary = ratio CT/VT x line impedence primary
0.4*50*0.436
Line impedence = 8.72 L 79.00
Relay line angle settings -90° to 90° in 1° steps.Therefore, select Line Angle =79° for convenience.
Therefore set Line Impedence and Line Angle = 8.72 L 79.00 Ω secondary

Zone 1 Phase Reach Settings


Required Zone 1 reach is to be 85% of the Protected line
Zone 1 Reach = (0.85*8.72)
Z1 = 7.41 L 79.00 Ω secondary
The Line Angle = 79.00
Therefore actual Zone 1 reach, Z1 = 7.41 L 79.00 Ω secondary

Zone 2 Phase Reach Settings


Required Zone 2 reach is to be 120% of the Protected line

Zone 2 Reach = (1.2*8.723)


10.47 L 79.00 Ω secondary
Actual Zone 2 reach, Z2 = 10.47 L 79.00

Zone 3 Phase Reach Settings


Required Zone 3 forward reach
(100% of the protected line +50%of the adjacent longest line) x 1.2
Zone 3 Reach = (1*8.723)+(0.5*0.436*104.97*0.4)*1.2
= 21.45 L 79.00 Ω secondary
Actual Zone 3 reach, Z3 = 21.45 L 79.00

Zone 4 Reverse Reach Settings


Required Zone4 reverse reach impedence,typically 20% Zone 1 reach
= 0.2*7.414
Z4 = 1.48 L 79.00 Ω secondary
ZONE TIMER SETTING:
tZ1 = 0 s

tZ2 = 0.40 s

tZ3 = 0.80 s

tZ4 = 0.50 s

Residual Compensation for Earth Fault Element

This feature is useful where line impedence characteristics change between sections or where hybrid circuits are used. here,the line
impedence characteristics not known for adjacent sections.Hence a common KZ0 factor can be applied to each zone.

kZ0 Res. Comp, │kZ0│ = (Z0-Z1) / 3Z1


kZ0 Angle, L kZ0 = L (Z0-Z1) /3Z1

Z0-Z1 = (0.292+j1.24)-(0.0838+j0.428)
= 0.2082 +j 0.812
0.84 L 75.62 °
(Z0-Z1) / 3Z1 = (0.838/(3*0.436)) L75.62-78.92
0.64 L -3.30 °
kZ0 Res. Comp, │kZ0│ = 0.64
kZ0 Angle, L kZ0 = -3.30 °

Page 81 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(50KM)

Resistive Reach Calculations


Minimum Load impedence to the = Vn (phase - neutral) / In
relay
Minimum Load impedence to the = (110V/√3 /1)
relay = 63.51 Ω secondary
Typically,phase fault distance zones would avoid the minimum load impedence by a margin of ≥ 40%,earth fault
zones would use a ≥ 20% margin.
This allows maximum resistive reaches = 38.11 Ω secondary
for Phase faults
This allows maximum resistive reaches = 50.81 Ω secondary
for Earth faults
Ra = (28710 x L) / If^1.4
Where: If = Minimum expected phase-phase fault current (A);
L = Maximum phase conductor separation (m);
Ra = Arc resistance, calculated from the van Warrington formula (W).
fault current = 3.660 kA
Conductor spaces = 4.500 mtrs
Primary resistive coverage for phase = 1.33 Ω
faults
assuming a typical earth fault = 40.00 Ω
coverage
RPH (min) = 1.325*0.4 0.530 Ω
RG (min) = 40*0.4 16 Ω

Selection of Resistive Reaches


The Zone 2 elements satisfy R2Ph ≤ (R3Ph x 80%), and R2G ≤ (R3G x 80%)
R3Ph - R4Ph should be set ≤ 80% Z minimum load - ∆R
Minimum Maximum Zone 1 Zone 2 Zones 3 & 4
Phase (RPh)Ω 0.53 38.11 19.51 24.39 30.48
Earth (RG)Ω 16.00 50.81 21.43 28.58 38.11

Power Swing Block


∆R and ∆X band settings are both set between 10 - 30% of R3Ph as recommended by AREVA

Minimum 10% x 30.48 = 3.05


Maximum 30% x 30.48 = 9.15
Considering power swing frequency and load impedence and angle between sources,the ∆R becomes
∆R = 0.16*Rload (min)
0.16*63.51*0.6 (40% of margin is considered)
= 6.10 (this value is well within the min&max limits above)
Biased Residual Current IN> = 40% (typical setting from manual)
Biased Negative Sequence Current I2> = 30% (typical setting from manual)
Power swing current = 2 In
minimum setting for Imax line> = 1.2 x (max.power swing current)
= 1.2*2*1
minimum setting for Imax line> = 2.40
minimum fault current level = 3660.00 A
Fault current in secondary = 3660*1/800
= 4.58 A
maximum setting for Imax line> = 0.8 x (min.phase fault current level)
= 3.66 A
Hence setting for Imax line> = 3.66 A

Broken Conductor Protection


Full load current = 800 A
= 80.00 A (10% of fullload current)
I2 / I1 = 0.10
Allow for tolerences and load varations = 200%
I2 / I1 = 0.20
time delay = 60.00 s

Page 82 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(50KM)

SOTF
SOTF Protection operates 120% of fault current with breaker closing command
Fault current = 3660 A
= 1.2*3660
= 4392
= 5.5 A

Auto Reclosure:
This autoreclose can be single pole tripping for single phase faults and three phase tripping for multi-phase faults.

1 pole:

In this mode, the recloser starts the AR-1P DEAD TIME for the first shot if the fault is single phase. If the fault is three
phase or three pole trip occurred on the breaker during single initiation, the scheme goes to lockout with out reclosing.

Number of Shots = 1
1P Dead Time = 1 s
Healthy Window 5 s
Reclaim Time = 25 s
Discrimination Time = 5 s
A/R Inhibit Window = 5 s
Block auto-recloser = 11111111 11111111

AR Close pulse length = 0.20 s

Local Breaker Backup protection


In general, a breaker failure scheme determines that a breaker signaled to trip has not cleared a fault with in a definite
time, so further tripping action must be performed.
CB Fail 1 Timer = 0.20 s
I< Current Set = 0.20 In

Setting Recommendation for Under Voltage


PT Ratio = 220000/110
Under = 2000.00
0.90 *
voltage = Nominal
= 0.9x220000 90 %
= 198000 v
Select Under voltage setting, 27 = 198000/2000
= 99 V
Time delay setting , 27 = 3 s

Page 83 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(50KM)

Settings Table

Menu text Settimg


GROUP1 DISTANCE ELEMENTS
Recommenmded Unit
Line setting
Line Length 50.00 km
Line Impedence 8.72 Ω
Line Angle 79.00
Zone setting
Zone status
KZ1 Res Comp 0.64 Ω
KZ1 Angle -3.30
Z1 7.41 Ω
R1G 21.43 Ω
R1ph 19.51 Ω
tZ1 0.00 s
KZ2 Res Comp 0.64 Ω
KZ2 Angle -3.30
Z2 10.47 Ω
R2G 28.58 Ω
R2ph 24.39 Ω
tZ2 0.40 s
KZ3/4 Res Comp 0.64 Ω
KZ3/4 Angle -3.30
Z3 21.45 Ω
R3G -R4G 38.11 Ω
R3ph - R4ph 30.48 Ω
tZ3 0.80 s
Z4 1.48 Ω
tZ4 0.50 s
GROUP1 POWER SWING
Delta R 6.10 Ω
Delta X 6.10 Ω
IN>Status Enabled
IN>(%Imax) 0.40
I2>Status Enabled
I2>(%Imax) 0.30
Imax line>Status Enabled
Imax line> 3.66 A
Unblocking Time delay 30.00 s
Blocking Zones 0'0'0'0'0'0'0'0

GROUP 1 AUTORECLOSE
AUTORECLOSE MODE
1P Trip Mode Single
Max number of shots 1.00
1P - Dead Time 1(HSAR) 1.00 s
Healthy window 5.00 s
Reclaim Time 25.00 s
Discrimination Time 5.00 s
A/R Inhibit Window 5.00 s
Close Pulse Time 0.20 s
AUTORECLOSE LOCKOUT
Block A/R 11111111 11111111

LOCAL BREAKER BACKUP PROTECTION


CB Fail & I<
Breaker Fail
CB Fail 1 Timer 0.20 s
I< Current Set 0.20 0.00

Page 84 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(50KM)

GROUP 1 VOLT Protection


V<Measur't Mode Phase-phase
V<1 Voltage Set 99.00 V
V<1 Time delay 3.00 s

GROUP 1 BROKEN CONDUCTOR


Broken conductor Enabled
I2 / I1 0.20 A
I2 / I1 Time Delay 60.00 s
I2 / I1 Trip Enabled

GROUP 1 SUPERVISION
VT Supervision
VTS Time Delay 5.00 s
VTS I2>IO>inhibit 0.20 A
Detect 3P Enabled
Threshold 3P 10 V
Delta I> 0.20 A

Page 85 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(40KM)

4.8. Distance protection MAIN-2

CT Details
CT Ratio = 800/1A
CT Primary = 800 A
CT Secondary = 1 A
CTR = 800
Class = PS

System Details
VT Ratio = 220kV/√3
= 110V/√3
VT Primary = 220000 V
VT Secondary = 110 V
PTR 2000.00
Frequency = 50HZ
Maximum fault current = 3.66kA

OHL Details
Condutor type = ZEBRA
Line Length = 50km
Line impedence
Positive sequence impedence (Z1) = 0.084 +j 0.428
Zero sequence impedence ( Z0 ) = 0.292 +j 1.240
Line Length = 50 km
Current rating in Amps = 800
Line impedences
Z1 = 0.436 L 78.920 Ω/km

Z0 = 1.274 L 76.750 Ω/km

Z0/Z1 = 2.921 L -2.170 °

Adjacent Longest Line details


Condutor type Zebra
Line Length 81.85km
Line impedence
Positive sequence impedence (Z1) 0.084 +j 0.428
Zero sequence impedence ( Z0 ) 0.292 +j 1.240
Line Length 81.850 km
Line impedences
Z1 = 0.436 L 78.920 Ω/km
Z0 = 1.274 L 76.750 Ω/km

Adjacent Shortest Line details


Condutor type Zebra
Line Length 5.77km
Line impedence
Positive sequence impedence (Z1) 0.084 +j 0.428
Zero sequence impedence ( Z0 ) 0.292 +j 1.240
Line Length 5.770 km
Line impedences
Z1 = 0.436 L 78.920 Ω/km

Z0 = 1.274 L 76.750 Ω/km

Page 86 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(40KM)

Relay settings
Line impedence
Ratio of secondary to primary impedence = CT ratio / VT ratio
(800/2000)
0.40
Line impedence secondary = ratio CT/VT x line impedence primary
0.4*50*0.436
Line impedence = 8.72 L 79.00
Relay line angle settings -90° to 90° in 1° steps.Therefore, select Line Angle =79° for convenience.
Therefore set Line Impedence and Line Angle = 8.72 L 79.00 Ω secondary

Zone 1 Phase Reach Settings


Required Zone 1 reach is to be 85% of the Protected line
Zone 1 Reach = (0.85*0)
Z1 = 7.41 L 79.00 Ω secondary
The Line Angle = 79.00
Therefore actual Zone 1 reach, Z1 = 7.41 L 79.00 Ω secondary

Zone 2 Phase Reach Settings


Required Zone 2 reach is to be 120% of the Protected line

Zone 2 Reach = (1.2*8.723)


10.47 L 79.00 Ω secondary
Actual Zone 2 reach, Z2 = 10.47 L 79.00

Zone 3 Phase Reach Settings


Required Zone 3 forward reach
(100% of the protected line +50%of the adjacent longest line) x 1.2
Zone 3 Reach = (1*8.723)+(0.5*0.436*81.85*0.4)*1.2
= 19.03 L 79.00 Ω secondary
Actual Zone 3 reach, Z3 = 19.03 L 79.00

Zone 4 Reverse Reach Settings


Required Zone4 reverse reach impedence,typically 20% Zone 1 reach
= 0.2*7.414
Z4 = 1.48 L 79.00 Ω secondary
ZONE TIMER SETTING:
tZ1 = 0 s

tZ2 = 0.40 s

tZ3 = 0.80 s

tZ4 = 0.50 s

Residual Compensation for Earth Fault Element

This feature is useful where line impedence characteristics change between sections or where hybrid circuits are used. here,the line
impedence characteristics not known for adjacent sections.Hence a common KZ0 factor can be applied to each zone.

kZ0 Res. Comp, │kZ0│ = (Z0-Z1) / 3Z1


kZ0 Angle, L kZ0 = L (Z0-Z1) /3Z1

Z0-Z1 = (0.292+j1.24)-(0.0838+j0.428)
= 0.2082 +j 0.812
0.84 L 75.62 °
(Z0-Z1) / 3Z1 = (0.838/(3*0.436)) L75.62-78.92
0.64 L -3.30 °
kZ0 Res. Comp, │kZ0│ = 0.64
kZ0 Angle, L kZ0 = -3.30 °

Page 87 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(40KM)

Resistive Reach Calculations


Minimum Load impedence to the = Vn (phase - neutral) / In
relay
Minimum Load impedence to the = (110V/√3 /1)
relay = 63.51 Ω secondary
Typically,phase fault distance zones would avoid the minimum load impedence by a margin of ≥ 40%,earth fault
zones would use a ≥ 20% margin.
This allows maximum resistive reaches = 38.11 Ω secondary
for Phase faults
This allows maximum resistive reaches = 50.81 Ω secondary
for Earth faults
Ra = (28710 x L) / If^1.4
Where: If = Minimum expected phase-phase fault current (A);
L = Maximum phase conductor separation (m);
Ra = Arc resistance, calculated from the van Warrington formula (W).
fault current = 3.660 kA
Conductor spaces = 4.500 mtrs
Primary resistive coverage for phase = 1.33 Ω
faults
assuming a typical earth fault = 40.00 Ω
coverage
RPH (min) = 1.325*0.4 0.530 Ω
RG (min) = 40*0.4 16 Ω

Selection of Resistive Reaches


The Zone 2 elements satisfy R2Ph ≤ (R3Ph x 80%), and R2G ≤ (R3G x 80%)
R3Ph - R4Ph should be set ≤ 80% Z minimum load - ∆R
Minimum Maximum Zone 1 Zone 2 Zones 3 & 4
Phase (RPh)Ω 0.53 38.11 19.51 24.39 30.48
Earth (RG)Ω 16.00 50.81 21.43 28.58 38.11

Power Swing Block


∆R and ∆X band settings are both set between 10 - 30% of R3Ph as recommended by AREVA

Minimum 10% x 30.48 = 3.05


Maximum 30% x 30.48 = 9.15
Considering power swing frequency and load impedence and angle between sources,the ∆R becomes
∆R = 0.16*Rload (min)
0.16*63.51*0.6 (40% of margin is considered)
= 6.10 (this value is well within the min&max limits above)
Biased Residual Current IN> = 40% (typical setting from manual)
Biased Negative Sequence Current I2> = 30% (typical setting from manual)
Power swing current = 2 In
minimum setting for Imax line> = 1.2 x (max.power swing current)
= 1.2*2*1
minimum setting for Imax line> = 2.40
minimum fault current level = 3660.00 A
Fault current in secondary = 3660*1/800
= 4.58 A
maximum setting for Imax line> = 0.8 x (min.phase fault current level)
= 3.66 A
Hence setting for Imax line> = 3.66 A
Broken Conductor Protection
Full load current = 800 A
= 80.00 A (10% of fullload current)
I2 / I1 = 0.10
Allow for tolerences and load varations = 200%
I2 / I1 = 0.20
time delay = 60.00 s

Page 88 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(40KM)

SOTF
SOTF Protection operates 120% of fault current with breaker closing command
Fault current = 3660 A
= 1.2*3660
= 4392
= 5.5 A

Auto Reclosure:
This autoreclose can be single pole tripping for single phase faults and three phase tripping for multi-phase faults.

1 pole:

In this mode, the recloser starts the AR-1P DEAD TIME for the first shot if the fault is single phase. If the fault is three
phase or three pole trip occurred on the breaker during single initiation, the scheme goes to lockout with out reclosing.

Number of Shots = 1
1P Dead Time = 1 s
Healthy Window 5 s
Reclaim Time = 25 s
Discrimination Time = 5 s
A/R Inhibit Window = 5 s
Block auto-recloser = 11111111 11111111

AR Close pulse length = 0.20 s

Local Breaker Backup protection


In general, a breaker failure scheme determines that a breaker signaled to trip has not cleared a fault with in a definite
time, so further tripping action must be performed.
CB Fail 1 Timer = 0.20 s
I< Current Set = 0.20 In

Setting Recommendation for Under Voltage


PT Ratio = 220000/110
Under = 2000.00
0.90 *
voltage = Nominal
= 0.9x220000 90 %
= 198000 v
Select Under voltage setting, 27 = 198000/2000
= 99 V
Time delay setting , 27 = 3 s

Page 89 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(40KM)

Settings Table

Menu text Settimg


GROUP1 DISTANCE ELEMENTS
Recommenmded Unit
Line setting
Line Length 50.00 km
Line Impedence 8.72 Ω
Line Angle 79.00
Zone setting
Zone status
KZ1 Res Comp 0.64 Ω
KZ1 Angle -3.30
Z1 7.41 Ω
R1G 21.43 Ω
R1ph 19.51 Ω
tZ1 0.00 s
KZ2 Res Comp 0.64 Ω
KZ2 Angle -3.30
Z2 10.47 Ω
R2G 28.58 Ω
R2ph 24.39 Ω
tZ2 0.40 s
KZ3/4 Res Comp 0.64 Ω
KZ3/4 Angle -3.30
Z3 19.03 Ω
R3G -R4G 38.11 Ω
R3ph - R4ph 30.48 Ω
tZ3 0.80 s
Z4 1.48 Ω
tZ4 0.50 s
GROUP1 POWER SWING
Delta R 6.10 Ω
Delta X 6.10 Ω
IN>Status Enabled
IN>(%Imax) 0.40
I2>Status Enabled
I2>(%Imax) 0.30
Imax line>Status Enabled
Imax line> 3.66 A
Unblocking Time delay 30.00 s
Blocking Zones 0'0'0'0'0'0'0'0

GROUP 1 AUTORECLOSE
AUTORECLOSE MODE
1P Trip Mode Single
Max number of shots 1.00
1P - Dead Time 1(HSAR) 1.00 s
Healthy window 5.00 s
Reclaim Time 25.00 s
Discrimination Time 5.00 s
A/R Inhibit Window 5.00 s
Close Pulse Time 0.20 s
AUTORECLOSE LOCKOUT
Block A/R 11111111 11111111

LOCAL BREAKER BACKUP PROTECTION


CB Fail & I<
Breaker Fail
CB Fail 1 Timer 0.20 s
I< Current Set 0.20 0.00

Page 90 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(40KM)

GROUP 1 VOLT Protection


V<Measur't Mode Phase-phase
V<1 Voltage Set 99.00 V
V<1 Time delay 3.00 s

GROUP 1 BROKEN CONDUCTOR


Broken conductor Enabled
I2 / I1 0.20 A
I2 / I1 Time Delay 60.00 s
I2 / I1 Trip Enabled

GROUP 1 SUPERVISION
VT Supervision
VTS Time Delay 5.00 s
VTS I2>IO>inhibit 0.20 A
Detect 3P Enabled
Threshold 3P 10 V
Delta I> 0.20 A

Page 91 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(10KM)

4.9. Distance protection MAIN-2

CT Details
CT Ratio = 800/1A
CT Primary = 800 A
CT Secondary = 1 A
CTR = 800
Class = PS

System Details
VT Ratio = 220kV/√3
= 110V/√3
VT Primary = 220000 V
VT Secondary = 110 V
PTR 2000.00
Frequency = 50HZ
Maximum fault current = 7.98kA

OHL Details
Condutor type = ZEBRA
Line Length = 10km
Line impedence
Positive sequence impedence (Z1) = 0.022 +j 0.290
Zero sequence impedence ( Z0 ) = 0.284 +j 0.978
Line Length = 10 km
Current rating in Amps = 800
Line impedences
Z1 = 0.291 L 85.660 Ω/km

Z0 = 1.018 L 73.810 Ω/km

Z0/Z1 = 3.502 L -11.850 °

Adjacent Longest Line details


Condutor type Zebra
Line Length 81.85km
Line impedence
Positive sequence impedence (Z1) 0.022 +j 0.290
Zero sequence impedence ( Z0 ) 0.284 +j 0.978
Line Length 10 km
Line impedences
Z1 = 0.291 L 85.660 Ω/km
Z0 = 1.018 L 73.810 Ω/km

Adjacent Shortest Line details


Condutor type Zebra
Line Length 5.77km
Line impedence
Positive sequence impedence (Z1) 0.022 +j 0.290
Zero sequence impedence ( Z0 ) 0.284 +j 0.978
Line Length 10 km
Line impedences
Z1 = 0.291 L 85.660 Ω/km

Z0 = 1.018 L 73.810 Ω/km

Page 92 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(10KM)

Relay settings
Line impedence
Ratio of secondary to primary impedence = CT ratio / VT ratio
(800/2000)
0.40
Line impedence secondary = ratio CT/VT x line impedence primary
0.4*10*0.291
Line impedence = 1.16 L 86.00
Relay line angle settings -90° to 90° in 1° steps.Therefore, select Line Angle =79° for convenience.
Therefore set Line Impedence and Line Angle = 1.16 L 86.00 Ω secondary

Zone 1 Phase Reach Settings


Required Zone 1 reach is to be 85% of the Protected line
Zone 1 Reach = (0.85*0)
Z1 = 0.99 L 79.00 Ω secondary
The Line Angle = 79.00
Therefore actual Zone 1 reach, Z1 = 0.99 L 79.00 Ω secondary

Zone 2 Phase Reach Settings


Required Zone 2 reach is to be 120% of the Protected line

Zone 2 Reach = (1.2*1.163)


1.40 L 79.00 Ω secondary
Actual Zone 2 reach, Z2 = 1.40 L 79.00

Zone 3 Phase Reach Settings


Required Zone 3 forward reach
(100% of the protected line +50%of the adjacent longest line) x 1.2
Zone 3 Reach = (1*1.163)+(0.5*0.291*10*0.4)*1.2
= 2.09 L 79.00 Ω secondary
Actual Zone 3 reach, Z3 = 2.09 L 79.00

Zone 4 Reverse Reach Settings


Required Zone4 reverse reach impedence,typically 20% Zone 1 reach
= 0.2*0.989
Z4 = 0.20 L 79.00 Ω secondary
ZONE TIMER SETTING:
tZ1 = 0 s

tZ2 = 0.40 s

tZ3 = 0.80 s

tZ4 = 0.50 s

Residual Compensation for Earth Fault Element

This feature is useful where line impedence characteristics change between sections or where hybrid circuits are used. here,the line
impedence characteristics not known for adjacent sections.Hence a common KZ0 factor can be applied to each zone.

kZ0 Res. Comp, │kZ0│ = (Z0-Z1) / 3Z1


kZ0 Angle, L kZ0 = L (Z0-Z1) /3Z1

Z0-Z1 = (0.284+j0.978)-(0.022+j0.29)
= 0.262 +j 0.688
0.74 L 69.15 °
(Z0-Z1) / 3Z1 = (0.736/(3*0.291)) L69.15-85.66
0.84 L -16.51 °
kZ0 Res. Comp, │kZ0│ = 0.84
kZ0 Angle, L kZ0 = -16.51 °

Page 93 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(10KM)

Resistive Reach Calculations


Minimum Load impedence to the = Vn (phase - neutral) / In
relay
Minimum Load impedence to the = (110V/√3 /1)
relay = 63.51 Ω secondary
Typically,phase fault distance zones would avoid the minimum load impedence by a margin of ≥ 40%,earth fault
zones would use a ≥ 20% margin.
This allows maximum resistive reaches = 38.11 Ω secondary
for Phase faults
This allows maximum resistive reaches = 50.81 Ω secondary
for Earth faults
Ra = (28710 x L) / If^1.4
Where: If = Minimum expected phase-phase fault current (A);
L = Maximum phase conductor separation (m);
Ra = Arc resistance, calculated from the van Warrington formula (W).
fault current = 7.980 kA
Conductor spaces = 4.500 mtrs
Primary resistive coverage for phase = 0.45 Ω
faults
assuming a typical earth fault = 40.00 Ω
coverage
RPH (min) = 0.445*0.4 0.178 Ω
RG (min) = 40*0.4 16 Ω
Selection of Resistive Reaches
The Zone 2 elements satisfy R2Ph ≤ (R3Ph x 80%), and R2G ≤ (R3G x 80%)
R3Ph - R4Ph should be set ≤ 80% Z minimum load - ∆R
Minimum Maximum Zone 1 Zone 2 Zones 3 & 4
Phase (RPh)Ω 0.18 38.11 19.51 24.39 30.48
Earth (RG)Ω 16.00 50.81 21.43 28.58 38.11

Power Swing Block


∆R and ∆X band settings are both set between 10 - 30% of R3Ph as recommended by AREVA

Minimum 10% x 30.48 = 3.05


Maximum 30% x 30.48 = 9.15
Considering power swing frequency and load impedence and angle between sources,the ∆R becomes
∆R = 0.16*Rload (min)
0.16*63.51*0.6 (40% of margin is considered)
= 6.10 (this value is well within the min&max limits above)
Biased Residual Current IN> = 40% (typical setting from manual)
Biased Negative Sequence Current I2> = 30% (typical setting from manual)
Power swing current = 2 In
minimum setting for Imax line> = 1.2 x (max.power swing current)
= 1.2*2*1
minimum setting for Imax line> = 2.40
minimum fault current level = 7980.00 A
Fault current in secondary = 7980*1/800
= 9.98 A
maximum setting for Imax line> = 0.8 x (min.phase fault current level)
= 7.98 A
Hence setting for Imax line> = 7.98 A
Broken Conductor Protection
Full load current = 800 A
= 80.00 A (10% of fullload current)
I2 / I1 = 0.10
Allow for tolerences and load varations = 200%
I2 / I1 = 0.20
time delay = 60.00 s

Page 94 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(10KM)

SOTF
SOTF Protection operates 120% of fault current with breaker closing command
Fault current = 7980 A
= 1.2*7980
= 9576
= 12.0 A

Auto Reclosure:
This autoreclose can be single pole tripping for single phase faults and three phase tripping for multi-phase faults.

1 pole:

In this mode, the recloser starts the AR-1P DEAD TIME for the first shot if the fault is single phase. If the fault is three
phase or three pole trip occurred on the breaker during single initiation, the scheme goes to lockout with out reclosing.

Number of Shots = 1
1P Dead Time = 1 s
Healthy Window 5 s
Reclaim Time = 25 s
Discrimination Time = 5 s
A/R Inhibit Window = 5 s
Block auto-recloser = 11111111 11111111

AR Close pulse length = 0.20 s

Local Breaker Backup protection


In general, a breaker failure scheme determines that a breaker signaled to trip has not cleared a fault with in a definite
time, so further tripping action must be performed.
CB Fail 1 Timer = 0.20 s
I< Current Set = 0.20 In

Setting Recommendation for Under Voltage


PT Ratio = 220000/110
Under = 2000.00
0.90 *
voltage = Nominal
= 0.9x220000 90 %
= 198000 v
Select Under voltage setting, 27 = 198000/2000
= 99 V
Time delay setting , 27 = 3 s

Page 95 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(10KM)

Settings Table

Menu text Settimg


GROUP1 DISTANCE ELEMENTS
Recommenmded Unit
Line setting
Line Length 10.00 km
Line Impedence 1.16 Ω
Line Angle 86.00
Zone setting
Zone status
KZ1 Res Comp 0.84 Ω
KZ1 Angle -16.51
Z1 0.99 Ω
R1G 21.43 Ω
R1ph 19.51 Ω
tZ1 0.00 s
KZ2 Res Comp 0.84 Ω
KZ2 Angle -16.51
Z2 1.40 Ω
R2G 28.58 Ω
R2ph 24.39 Ω
tZ2 0.40 s
KZ3/4 Res Comp 0.84 Ω
KZ3/4 Angle -16.51
Z3 2.09 Ω
R3G -R4G 38.11 Ω
R3ph - R4ph 30.48 Ω
tZ3 0.80 s
Z4 0.20 Ω
tZ4 0.50 s
GROUP1 POWER SWING
Delta R 6.10 Ω
Delta X 6.10 Ω
IN>Status Enabled
IN>(%Imax) 0.40
I2>Status Enabled
I2>(%Imax) 0.30
Imax line>Status Enabled
Imax line> 7.98 A
Unblocking Time delay 30.00 s
Blocking Zones 0'0'0'0'0'0'0'0

GROUP 1 AUTORECLOSE
AUTORECLOSE MODE
1P Trip Mode Single
Max number of shots 1.00
1P - Dead Time 1(HSAR) 1.00 s
Healthy window 5.00 s
Reclaim Time 25.00 s
Discrimination Time 5.00 s
A/R Inhibit Window 5.00 s
Close Pulse Time 0.20 s
AUTORECLOSE LOCKOUT
Block A/R 11111111 11111111

LOCAL BREAKER BACKUP PROTECTION


CB Fail & I<
Breaker Fail
CB Fail 1 Timer 0.20 s
I< Current Set 0.20 0.00

Page 96 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(10KM)

GROUP 1 VOLT Protection


V<Measur't Mode Phase-phase
V<1 Voltage Set 99.00 V
V<1 Time delay 3.00 s

GROUP 1 BROKEN CONDUCTOR


Broken conductor Enabled
I2 / I1 0.20 A
I2 / I1 Time Delay 60.00 s
I2 / I1 Trip Enabled

GROUP 1 SUPERVISION
VT Supervision
VTS Time Delay 5.00 s
VTS I2>IO>inhibit 0.20 A
Detect 3P Enabled
Threshold 3P 10 V
Delta I> 0.20 A

Page 97 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 220/132-160MVATRAFO DIFF PROTN CKD: GP
RELAY MAKE GE MODEL T60 BAY/FEEDER 220/132-160 MVA Trafo

4.10.Differential Protection For 160MVA Transformer

Transformer Data:
Rated Power, Prated = 160.0 MVA
Rated Voltage
HV, Vnom[1] = 220.0 kV
LV, Vnom[2] = 132.0 kV
% Impedance = 0.125 12.50% .
Vector Group = YNa0
220kV SIDE Primary-winding 1, CT Ratio
(Inom,a) = 800.0 1.0 A (1600-800/1A)
132kV SIDE Primary-winding 2, CT Ratio
(Inom,b) = 800.0 1.0 A (800-400/1A)
OLTC Range on 132kV side + 10.0 % Step
to
- 5.0 %
Step Size 1.25 Max Step 8.00 Min Step 4.00
Voltage at Min Tap Position = kV
242.0
Voltage at Max Tap Position = kV
209.0
Highest voltage tolerence, Vmax = 145.20 kV
Lowest voltage tolerence,Vmin = 125.40 kV

The reference winding is determined as follows,


Rated current on winding 1- Irated = Prated / (√3*Vnom[1] )
= (160*1000)/(1.732*220)
Irated [1], = 419.89 A

Rated current on winding 2- Irated = Prated / (√3*Vnom[2] )


= (160*1000)/(1.732*132)
Irated [2], = 699.82 A

With this rated currents the CT margin for Winding1& winding 2 as follows,
CT margin for windings 1, Imargin[1] = CT primary[1] / Irated[1]
= 800/419.89
Imargin[1], = 1.91
CT margin for windings 2, Imargin[2] = CT primary[2] / Irated[2]
= 800/699.82
Imargin[2], = 1.14
Note: In the entire calculation primary and secondary windings are referred as winding "1" & "2" respectively.
Since Imargin[2] < Imargin[1], the reference winding W ref is winding 2.
The unit for calculation of the differential and restraint currents and base for the differentialrestraint setting is
the CT primary associated with the reference winding.

Calculation of magnitude compensation factor (M),


=
magnitude compensation factor for winding [1], M[1] IPrimary [1] × Vnom [1] / IPrimary [2] × Vnom[2]
= 800x220000/800x132000
220kV side M[1], = 1.67
=
magnitude compensation factor for winding [2], M[2] IPrimary [2] × Vnom [2] / IPrimary [2] × Vnom[2]
= 800x132000/800x132000
132kV side M[2], = 1.00

Page 98 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 220/132-160MVATRAFO DIFF PROTN CKD: GP
RELAY MAKE GE MODEL T60 BAY/FEEDER 220/132-160 MVA Trafo
a) Calculating the minimum differential pickup current required for relay to operate,
Criteria:
The minimum differential pickup should be above the no load current of the transformer when the secondary side of the breaker is
open
Stability of relay when the transformer is operating under no load (Secondary side breaker is open) and the transformer is drawn
the magnetising current(up to 5% of rated current)

=
No load current of the transformer primary current, 0.05×419.89
= 20.99 A
No load current refered to the CT secondary, = 20.9945/800
= 0.03 A
No load current to the relay after applying magnitude compendation factor M[1],
= 0.026×1.667
IS1 = 0.0433 A

= side)
No load current of the transf. winding2,(secondary 0.0
IS2 = 0.0
Differential current IdA, = | Is1+Is2 |
= |0.043+0 |
Id A, = 0.0433 A
Restraining current IrA, = max( | Is1|, |Is2 |)
= max( |0.043|, |0 |)
IrA, = 0.04 A
The differential current IdA=0.0433A is found to be less than the minimum pickup selected setting of 0.1 is
adequate as the relay catalogue has a setting generally recommended between 0.1 to 0.3.

b) Selection of Break point 1 and slope 1:


Recommened Settings,
The Break point 1 setting is based on the pu value of the full load transformer current
HV side (Winding -1) = 0.52 pu
LV side (Winding -2) = 0.87 pu
Hence we choose Break point-1 = 2 pu
Slope -1 = 25%

Differential / Restraint Current in the Tap Changer Extreme Position:

Nominal Voltage, Vnom = 2 ( Vmax X Vmin) / (Vmax + Vmin)


= 2(145.2*125.4)/(145.2+125.4)
= 134.58 kv

Object current of regulated side, IN2 = SN/(1.732 X VN2)


= (160*1000)/(1.732x134.576)
= 686.44 A
Corresponds on the CT2 secondary side = IN2 / CT2
to IN2 = 686.45/800
= 0.86 A ~ INobj

Corresponds on the CT1 secondary side = IN1 / CT1


to IN1 = 419.89/800
= 0.52 A ~ INobj

Object current in maximum tap position, = SN/(1.732 X Vmax)


IN2(+15%) = (160*1000)/(1.732x145.2)
= 636.22

Corresponds on the CT2 secondary side = IN2(+15%) / CT2


to IN2 = 636.22/800
= 0.80 A ~ 0.93 INobj

Differential current in maximum tap = | IN2(+15%) - INobj |


position IDiff = I0.927INobj-INobjl
= 0.07 INobj

Page 99 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 220/132-160MVATRAFO DIFF PROTN CKD: GP
RELAY MAKE GE MODEL T60 BAY/FEEDER 220/132-160 MVA Trafo
Restriant current in maximum tap position = | IN2(+15%) + INobj |
IRestaint = I0.927INobj+INobjl
= 1.93 INobj

Object current in minimum tap position, = SN/(1.732 X Vmin)


IN2(-5%) = (160*1000)/(1.732x125.4)
= 736.67

Corresponds on the CT2 secondary side = IN2(-5%) / CT2


to IN2 = 736.67/800
= 0.92 A ~ 1.07 INobj

Differential current in minimum tap = | IN2(-5%) - INobj |


position IDiff = I1.073INobj-INobjl
= 0.07 INobj

Restriant current in minimum tap position = | IN2(-5%) + INobj |


IRestaint = I1.073INobj+INobjl
= 2.07 INobj

Iop, Relay operating current at +15% tap, = slope1 X Irest


= 0.25x1.927INObj
= 0.48 INObj
whereas the Idiff , 0.1 INObj is less than 0.47 INObj . Hence the relay is Stable.

Iop, Relay operating current at -5% tap, = slope1 X Irest


= 0.25x2.073INObj
= 0.52 INObj
whereas the Idiff , 0.1 INObj is less than 0.51 INObj . Hence the relay is Stable.

From the above calculation it is derived that , under rated condition and at Tap Changer Extreme positions,
Operating current are not in the Tripping Area .

C) Selection of Break point 2 and slope 2:

Break point-2
The setting for Break point -2 depend very much on the capability of CTs to correctly transform Primary into
secondary currents during external faults. Break point -2 should be set below the fault current that is most likely to saturate
some CTs due to an AC Component alone
External Fault current = 7.00 pu

Break point- 2 = 8 pu
Slope-2 = 98% (as per relay catalogue)
2nd HARMONICS:
The percentage of harmonics present in the inrush current, for the relay to recognise the inrush current is set as 20%
as per manufacturer recommended,

INRUSH INHIBIT LEVEL, = 20%


INRUSH INHIBIT FUNCTION ADAPTIVE 2nd Harmonic
(now a days all modern transformers produce low 2nd harmonic ratios)
INRUSH INHIBIT MODE PER PHASE

5TH HARMONICS:
This
setting is
OVEREXCITN INHIBIT LEVEL, = 30%
Instantaneous differential protection:
The pickup thersold should be set greater than the maximum spurious differential current that could be encountered
under non-internal fault conditions ( typically maganetizing inrush current or an external fault with extremely severe CT saturation.
I) Magnetizing inrush current = 6 x Full load current
= 2519.34 A
= 3.15 pu

Page 100 of 160


DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 220/132-160MVATRAFO DIFF PROTN CKD: GP
RELAY MAKE GE MODEL T60 BAY/FEEDER 220/132-160 MVA Trafo
II) External fault condition:
HV Side Fault Current = 4.20 pu
LV Side Fault Current = 7.00 pu
For safety margin we choosen instantaneous 8 pu
differential protection setting
VOLTS PER HERTZ (OVER FLUX):
The per-unit V/HZ value is calculated using the maximum of the three-phase voltage inputs or the auxiliary
voltage channel Vx input, if the source is not configured with Phase voltages.

The volts-per-Hertz protection, to protect transformers during potentially damaging over voltage and under
frequency disturbances.
According to experience we set the definite time curve with the following settings,
Stage-1
Volts/Hz 1 Pickup, = 1.1 pu
Volts/Hz 1 Curve, = Definite Time
Volts /Hz 1 TD Multiplier, = 10.0 S
Volts/Hz 1 T-Reset, = 0.0 S

Stage-2
Volts/Hz 2 Pickup, = 1.2 pu
Volts/Hz 2 Curve, = Definite Time
Volts /Hz 2 TD Multiplier, = 1.0 S
Volts/Hz 2 T-Reset, = 0.0 S

Setting Table:

Menu Text Setting Range


Recomm.Setting
PERCENT DIFFERENTIAL Min Max

PERCENT DIFFERENTIAL PICKUP 0.1 pu 0.05 pu 1 pu


PERCENT DIFFERENTIAL SLOPE1 0.25 15% 1
PERCENT DIFFERENTIAL BREAK1 2 pu 1 pu 2 pu
PERCENT DIFFERENTIAL BREAK2 8 pu 2 pu 30 pu
PERCENT DIFFERENTIAL SLOPE2 0.98 50% 1
2nd Harmonic INRUSH INHIBIT LEVEL 0.2 1% 0.4
2nd Harmonic INRUSH INHIBIT MODE PER PHASE perphase,2-out-of-3,Avg.
2nd Harmonic INHIBIT FUNCTION Adaptive Adaptive, Traditional,Disabled
OVEREXCITN INHIBIT FUNCTION 5th disabled,5th
OVEREXCITN INHIBIT LEVEL 0.3 1% 40%
INST DIFFERENTIAL PICKUP 8 pu 2 pu 30 pu
VOLTS/HZ 1
VOLTS/HZ 1 PICKUP 1.1 pu 0.8 pu 4 pu
VOLTS/HZ 1 CURVE Definite Time Definite Time, IDMT
VOLTS/HZ 1 TD MULTIPLIER 10 s 5% 600 S
VOLTS/HZ 1 T-RESET 0s 0S 1000 S
VOLTS/HZ 2
VOLTS/HZ 2 PICKUP 1.2 pu 0.8 pu 4 pu
VOLTS/HZ 2 CURVE Definite Time Definite Time, IDMT
VOLTS/HZ 2 TD MULTIPLIER 1s 5% 600 S
VOLTS/HZ 2 T-RESET 0s 0S 1000 S

Page 101 of 160


DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 220/132-160MVATRAFO REF PROTN CKD: GP
RELAY MAKE GE MODEL T60 BAY/FEEDER 220/132-160 MVA Trafo

4.11Restricted Earth Fault portection For 160MVA Transformer

Transformer Data:
Rated Power, Prated = 160 MVA
Rated Voltage
HV, Vnom[1] = 220 kV
LV, Vnom[2] = 132 kV
% Impedance = 0.125 12.50% .
Vector Group = YN yn 0
132kV SIDE Primary-winding 1, CT Ratio Py Sec
(Inom,a) = 800 1 A (1600-800/1A)
33kV SIDE Primary-winding 2, CT Ratio
(Inom,b) = 800 1 A (800-400/1A)
Neutral CT Ratio = 600 1 A 600/1A
OLTC Range on 132kV side + 10 %
to
- 5 %
Step Size 1.25 Max Step 8.00 Min Step 4.00
Voltage at Min Tap Position = 242.00 kV
Voltage at Max Tap Position = 209.00 kV
Highest voltage tolerence, Vmax = 145.20 kV
Lowest voltage tolerence,Vmin = 125.40 kV

The reference winding is determined as follows,


Rated current on winding 1- Irated = Prated / (√3*Vnom[1] )
= (160*1000)/(1.732*220)
Irated [1], = 419.89 A

Rated current on winding 2- Irated = Prated / (√3*Vnom[2] )


= (160*1000)/(1.732*132)
Irated [2], = 699.82 A

Setting Calculation

Base kV = 132.00 220.00


Base MVA = 160.00 160.00
Base Impedence Zb= kV2 /MVA = 108.90 302.50
Zt=Zb*Zp.u = 13.61 37.81
If= kV/(√3*Zt) = 5598.71 3359.23

For a winding fault point at 5% Distance from the transformer neutral, the phase to ground
primary fault current is calculated as

Ifault = 0.05 x Igf(max)


= (0.05X3359.23)
= 167.97
Increase in phase current (Iph) due to the fault are 3Io= 0
negligible, meaning that

= | 3I
The ground differential pickup setting can be calculated , IO - Ig |
= (0-(167.97/800)
= 0.21

Note that phase CT primary is used as a unit for calculating the RGF setting . Hence, magnitude scaling is applied to
the measured ground current

The new restraint calculation algorithm provides very secure behavior of the element on external faults and CT saturation,
and high sensitivity on internal faults. The setting of the slope should be selected based on two criteria:

Reliable detection of the internal fault curents corresponding to the point of the selected distance from the grounded neutral

Page 102 of 160


DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 220/132-160MVATRAFO REF PROTN CKD: GP
RELAY MAKE GE MODEL T60 BAY/FEEDER 220/132-160 MVA Trafo
Security on external faults with or without CT saturation

Let us consider the case of an internal fault that occurs on in the winding at 5% distance from the transformer neutral.
The primary fault current of 167.97 A
IG = 0.21 pu
Based on 100% transformer load currents of 419.89 A On the Wye winding, the phase unit currents are

IA = IB=IC = 0.52 pu

and the symmetrical components are

I1 = 0.52 pu ; I2 = I0= 0 pu

The ground differential current is


IGD = | IG + IN |
= 0.21 pu + 0 pu
= 0.21 pu

The restraint current used by the relay algorithm is defined as the maximum from the |R1, |R2 , |R0 quantities,
based on the following symmentrical components calculations:
IGR = max( |R1, |R2, |R0)
The value of |R1 is calculating using the positive-sequence current:

|I_1 < 1.5 pu, then IR1 = |I_1| / 8


= 0.066
The value of |R2 is calculating using the negative-sequence current:
IR2 = 3 x |I_2|
= 0.000

The value of |R0 is calculating using the zero-sequence current:


IR0 = | IG - IN |
= 0.210 pu + 0 pu
= 0.210 pu

The ground restraint current is


IGR = max( |R1, |R2, |R0)
= max(0.066pu,0pu,0.21pu)
= 0.210 pu
The RGF element would therefore calculate a ground differential / restraint ratio of:
IGD / IGR X 100% = 0.21pu/0.21pux100%
100 %
The slope should be set at some level below 100%

If no CT Saturation is involved, the RGF protection detects no differential current during ground fault that are external to the zone.
However, RGF slope setting should be also selected to maintain the security on external faults with CT saturation.

External Solid phase A to ground fault with no CT Saturation.


Fault Current at secondary side,
IA = (3359.23/800) IB=IC=0
= 4.20
IN = 4.20 pu L 00
IG = 4.20 pu L 1800
The symmetrical components derived from the phase unit current are
I1= I2 = I0 = 1.40
The ground differential current will be
IGD = | IG + IN |
= 4.20 pu L 00 + 4.20 pu L 1800
= 0.00 pu
The |R1, |R2, and |R0 current are :
|R1 = |I_1| / 8
0.17

Page 103 of 160


DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 220/132-160MVATRAFO REF PROTN CKD: GP
RELAY MAKE GE MODEL T60 BAY/FEEDER 220/132-160 MVA Trafo
|R2 = 3 x |I_2|
= 4.20

|R0 = | IG - IN |
= 4.20 pu L 1800 - 4.20 pu L 00
= 8.40 pu
The ground restraint current is
IGR = max( |R1, |R2, |R0)
= max(0pu,0.175pu,8.4pu)
= 8.40 pu

The RGF element would therefore calculate calculate a ground differential / restraint ratio of:
IGD / IGR X 100% = 0pu/8.4pux100%
0.00 %
and the protection element is effectively in non operating stage.

External phase A to ground fault where the ground CT Saturates, producing only 5% of the total fault current
on its secondary winding.

Fault Current at secondary side, IA = IN = 4.20 pu L 00 IB=IC=0 pu


IG = 0.21 pu L 1800
The symmetrical components derived from the phase unit current are
I1= I2 = I0 = 1.40 pu

IGDbe
The ground differential current will = | IG + IN |
= 4.20 pu L 00 + 0.21 pu L 1800
= 3.99 pu
The |R1, |R2, and |R0 current are :
|R1 = |I_1| / 8
0.18
|R2 = 3 x |I_2|
= 4.20
|R0 = | IG - IN |
= 0.00 pu L 1800 - 4.20 pu L 00
= 4.20 pu

The restraint current is IGR = max( |R1, |R2, |R0)


= max(3.99pu,0.175pu,4.2pu)
= 4.20 pu

The RGF element would therefore calculate calculate a ground differential / restraint ratio of:

IGD / IGR X 100% = 3.99pu/4.2pux100%


= 95 %
This is well above the restraint characteristics in the operating region if no special treatment to the restraint is provided.

CT Saturation and switch off conditions, the ground restraint IGR is set to decay slowly. Since the CTs do not immediately saturate
at the same instant the fault occurs, the restraint current will be equal to the intial fault current value of 8.40pu(as in the
no saturation case).The restraint will drop to 50% of its original value after 15.5 cycles, so that if the worst case of saturation
occurs after a cycle, the restraint current will be approximately 7.98 pu,
IGD / IGR X 100% = 3.99pu/7.98pux100%
50 %

The slope would have to be above 50%(assuming very severe saturation leading to only 5% current from the saturated ground CT)
and below 100% (assuming detection of faults on the winding at 5% distance from the neutral point)

slope = 70 %

Page 104 of 160


DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 220/132-160MVATRAFO REF PROTN CKD: GP
RELAY MAKE GE MODEL T60 BAY/FEEDER 220/132-160 MVA Trafo

Setting Table:

Menu Text Setting Range


Recomm.Setting
Restricted Earth fault Protection Min Max

Restd GND FT1 Function Enabled Enabled/Disabled


Restd GND FT1 Source SRC1 SRC1,SRC2,SRC3,SRC4
Restd GND FT1 Pick Up 0.21 pu 0pu 30 pu
Restd GND FT1 Slope 70 pu 0% 100%
Restd GND FT1 Pick Up Delay 0s 0 600
Restd GND FT1 Reset Delay 0s 0 600
Restd GND FT1 Block Off
Restd GND FT1 Target Self Reset Self reset/Latched/Disabled
Restd GND FT1 Events Enabled Enabled/Disabled

Page 105 of 160


DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 220kV BUSBAR PROTECTION CKD: GP
RELAY MAKE GE MODEL B90 BAY/FEEDER 220kV BUS BAR

4.12.220kV BUSBAR PROTECTION

Input Parameters
CT Details:
CT Ratio CT Py CT Sec Rct in Lead Res Cable
Feeders CT class
(A) (A) (A) ohms (Ω/m) Length (m)
220kV Line-1 1600/1 1600 1.00 PS 8.00 1.24 168.00
220kV Line-2 1600/1 1600 1.00 PS 8.00 1.27 171.00
220kV Line-3 1600/1 1600 1.00 PS 8.00 1.00 135.00
220kV Line-4 1600/1 1600 1.00 PS 8.00 1.02 138.00
Trafo-1 1600/1 1600 1.00 PS 8.00 0.64 86.00
Trafo-2 1600/1 1600 1.00 PS 8.00 0.53 72.00
Transfer Bus Coupler 1600/1 1600 1.00 PS 8.00 0.56 75.00
Bus Coupler 1600/1 1600 1.00 PS 8.00 0.38 51.00

Relay details:
Type = B90
Burden = 0.2/12 VA
= 0.20 Ω
ktf = 5.00
Setting calculation
Base CT ratio selection
Base CT ratio shall be selected based = 1600.00 A
on highest CT ratio connected to the
protected bus
Basic fault data of the connected circuit
Circuit Ifault (kA) CT sec (A)
220kV Line-1 3.66 2.29
220kV Line-2 4.18 2.61
220kV Line-3 7.98 4.99
220kV Line-4 7.98 4.99
Trafo-1 1.40 0.88
Trafo-2 1.40 0.88
Transfer Bus Coupler 0.00 0.00
Bus Coupler 9.24 5.78
Tne Maximum Secondary current transformed Without Saturation
Imax = Vsat/Rs
Where,
Vsat = Saturation Voltage of CT
Rs = Total Burden Resistance

The Total burden Resistance Rs depends on the fault current and the connection of the CTs. For Single line to
ground fault and the CTs connection in Wye, the Burden Resistance is calculated as,
Rs = 2Rlead+RCT+RRelay
Where,
Rlead = Lead Resistance
RCT = CT Resistance
RRelay = Relay Input Resistance

Rs = 9.27
Imax = 7.00 A

Limits of linear operations of the CTs


Imax
Circuit Rs(Ω) Imax(PU) Imax(PU)
(A sec)
220kV Line-1 10.69 18.30 18.30 3.66
220kV Line-2 10.73 20.90 20.90 4.18
220kV Line-3 10.20 39.90 39.90 7.98
220kV Line-4 10.25 39.90 39.90 7.98
Trafo-1 9.47 7.00 7.00 1.40
Trafo-2 9.27 7.00 7.00 1.40
Transfer Bus Coupler 9.31 0.00 0.00 0.00
Bus Coupler 8.96 46.20 46.20 9.24

Page 106 of 160


DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 220kV BUSBAR PROTECTION CKD: GP
RELAY MAKE GE MODEL B90 BAY/FEEDER 220kV BUS BAR

CT Saturation voltage calculation


Knowing the Ktf value, The Saturation voltage needed to ensure stability for through faults will be

The over dimensioning factor can be as low as Ktf = 5 , particularly for voltages lower than 132 kV.

CT Knee point voltage, vkp = ktf . If. (2Rct + RL + Rp)


= (5*1.4*(2*1.24488+8+0.2)
= 74.83 V

Basic CT data
Circuit Ratio Vsat RCTSEC
220kV Line-1 1600/1 195.62 8
220kV Line-2 1600/1 224.35 8
220kV Line-3 1600/1 407.01 8
220kV Line-4 1600/1 408.78 8
Trafo-1 1600/1 66.32 8
Trafo-2 1600/1 64.87 8
Transfer Bus Coupler 1600/1 0.00 8
Bus Coupler 1600/1 413.76 8

The B90 relay requires the breakpoints to be entered as 'pu' values.


CT ratio 1600A is selected for the pu quantities. With a given Ibase current, the limits of linear operation have
been recalculated to pu values as follows
Low Slope Break point
Imax(pu) = Imax(sec)/ Ibase * CT ratio
(with no remanence) = (7/1600)*1600)
= 7.00 pu

with 80% remanence, Imax(pu) can be calculated is as follows


= 1.4 pu
High slope Break point
Imax(pu) = Imax(sec)/ Ibase * CT ratio
(with no remanence) = (46.2/1600)*1600)
= 39.90 pu

with 80% remanence, Imax(pu) can be calculated is as follows


= 7.98 pu

Low slope break point


Considering CTs that could be = 1.40 pu
connected LOW BPNT for minimum of
all feeders
High slope break point
Considering CTs that could be = 7.98 pu
connected HIGH BPNT for minimum of
all feeders
Pickup
For pickup setting 10% considered for = 0.1 pu
busbar protection

Setting Table:

Menu text Range Setting Unit


pickup 0.050 to 6.000 pu 0.1 pu
Low slope 15-100% 25 %
Low slope break point 1-30PU 1.40 pu
High slope 50-100% 80.00 %
High slope break point 1-30PU 7.98 pu
High set 0.10 to 99,99PU 4.62 pu

Page 107 of 160


Amps X 100 0.433kV Bus-1 (Nom. kV=0.433, Plot Ref. kV=0.433)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100

50 50

30 30

10 10

5 5
Seconds

Seconds
3 3
11kV - P
OC1

MSB IC-1 - P
1 OC1 1

MSB BC - P
.5 .5
OC1
.3 .3

.1 .1

.05 .05

.03 .03

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 100 0.433kV Bus-1 (Nom. kV=0.433, Plot Ref. kV=0.433)


1.968 5 10 30 50 100 300 500 1K 3K 5K 10K 39.36K

Amps 11kV Bus. (Nom. kV=11, Plot Ref. kV=11) ETAP Star 11.1.0C

11-0.433kV POC

Project: 220/132/33kV Sub station Date: 16-09-2013


Location: Dehradun SN: VOLTECHENG
Contract: HPL Rev: Base
Engineer: Marimuthu.N Fault: Phase
Filename: C:\ETAP 1110\HPL\HPL.OTI Circuit: 11/0.433kV

Page 108 of 160


Amps X 100 0.433kV Bus-1 (Nom. kV=0.433, Plot Ref. kV=0.433)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100

50 50

30 30

10 10

5 5
MSB IC-1 - G
Seconds

Seconds
OC1
3 3

MSB BC - G
OC1
1 1

.5 .5

.3 .3

.1 .1

.05 .05

.03 .03

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 100 0.433kV Bus-1 (Nom. kV=0.433, Plot Ref. kV=0.433)


6.561 30 50 100 300 500 1K 3K 5K 10K 30K 50K 131.2K

Amps (Plot Ref. kV=3.3) ETAP Star 11.1.0C

11-0.433kV EOC

Project: 220/132/33kV Sub station Date: 16-09-2013


Location: Dehradun SN: VOLTECHENG
Contract: HPL Rev: Base
Engineer: Marimuthu.N Fault: Ground
Filename: C:\ETAP 1110\HPL\HPL.OTI Circuit: 11/0.433kV

Page 109 of 160


Amps X 100 0.433kV Bus-2 (Nom. kV=0.433, Plot Ref. kV=0.433)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100

33kV Fuse
50 50

30 30

10 10

5
MSB IC-2 - P 5
Seconds

Seconds
OC1
3 3

1 1

.5 .5

.3 .3

.1 .1

.05 .05

.03 .03

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 100 0.433kV Bus-2 (Nom. kV=0.433, Plot Ref. kV=0.433)


.6561 3 5 10 30 50 100 300 500 1K 3K 5K 13.12K

Amps 33KV BUS 2 (Nom. kV=33, Plot Ref. kV=33)


ETAP Star 11.1.0C

33-0.433kV POC

Project: 220/132/33kV Sub station Date: 16-09-2013


Location: Dehradun SN: VOLTECHENG
Contract: HPL Rev: Base
Engineer: Marimuthu.N Fault: Phase
Filename: C:\ETAP 1110\HPL\HPL.OTI Circuit: 33/0.433kV

Page 110 of 160


Amps X 100 0.433kV Bus-2 (Nom. kV=0.433, Plot Ref. kV=0.433)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100

50 50

30 30

10 MSB IC-2 - G 10

OC1
5 5
Seconds

Seconds
3 3

1 1

.5 .5

.3 .3

.1 .1

.05 .05

.03 .03

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 100 0.433kV Bus-2 (Nom. kV=0.433, Plot Ref. kV=0.433)


6.561 30 50 100 300 500 1K 3K 5K 10K 30K 50K 131.2K

Amps (Plot Ref. kV=3.3)


ETAP Star 11.1.0C

33-0.433kV EOC

Project: 220/132/33kV Sub station Date: 16-09-2013


Location: Dehradun SN: VOLTECHENG
Contract: HPL Rev: Base
Engineer: Marimuthu.N Fault: Ground
Filename: C:\ETAP 1110\HPL\HPL.OTI Circuit: 33/0.433kV

Page 111 of 160


Amps X 100 33KV BUS 2 (Nom. kV=33, Plot Ref. kV=33)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100

50 50

30 30

10 10
40 MVA 132 KV SIDE TR-2 - P
OC1 - 67
5 5
Seconds

Seconds
40 MVA 33 KV SIDE TR-2 - P
3 OC1 3

33KV BUS COUPLER - P


OC1

1 33KV Capacitor Bank - P 1


OC1 - 67
33 KV LINE - P - 51
.5 .5
OC1
.3 .3

.1 .1

.05 .05

.03 .03

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 100 33KV BUS 2 (Nom. kV=33, Plot Ref. kV=33)


12.5 30 50 100 300 500 1K 3K 5K 10K 30K 50K 100K 250K

Amps 132KV BUS (Nom. kV=132, Plot Ref. kV=132) ETAP Star 11.1.0C

132-33kV POC

Project: 220/132/33kV Sub station Date: 16-09-2013


Location: Dehradun SN: VOLTECHENG
Contract: HPL Rev: Base
Engineer: Marimuthu.N Fault: Phase
Filename: C:\ETAP 1110\HPL\HPL.OTI Circuit: 132/33kV

Page 112 of 160


Amps X 10 33KV BUS 2 (Nom. kV=33, Plot Ref. kV=33)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100

50 50

30 30
40 MVA 132 KV SIDE TR-2 - N
OC1 - 67

10 40 MVA 33 KV SIDE TR-2 - N 10


OC1
5 5
Seconds

Seconds
33KV BUS COUPLER - N
3
OC1 3
33KV Capacitor Bank - N
OC1

1 33 KV LINE - N - 51 1
OC1

.5 .5

.3 .3

.1 .1

.05 .05

.03 .03

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 33KV BUS 2 (Nom. kV=33, Plot Ref. kV=33)


50 100 300 500 1K 3K 5K 10K 30K 50K 100K 300K 500K 1000K

Amps (Plot Ref. kV=3.3) ETAP Star 11.1.0C

132-33kV EOC

Project: 220/132/33kV Sub station Date: 16-09-2013


Location: Dehradun SN: VOLTECHENG
Contract: HPL Rev: Base
Engineer: Marimuthu.N Fault: Ground
Filename: C:\ETAP 1110\HPL\HPL.OTI Circuit: 132/33kV

Page 113 of 160


Amps X 100 220KV Bus1 (Nom. kV=220, Plot Ref. kV=220)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100

50 50
220 KV LINE - P - 51
30
OC1 30

BUS COUPLER - P
OC1

10 160 MVA TR-2 220KV SIDE - P 10


OC1 - 67

5 5
Seconds

Seconds
132KV LINE-4 - P - 51
3 OC1 - 67 3

40 MVA 132 KV SIDE TR-2 - P


OC1 - 67
1 1

.5 .5

.3 .3

.1 .1

.05 .05

.03 .03

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 100 220KV Bus1 (Nom. kV=220, Plot Ref. kV=220)


83.33 300 500 1K 3K 5K 10K 30K 50K 100K 300K 500K 1667K

Amps 132KV BUS (Nom. kV=132, Plot Ref. kV=132) ETAP Star 11.1.0C

220-132kV POC

Project: 220/132/33kV Sub station Date: 16-09-2013


Location: Dehradun SN: VOLTECHENG
Contract: HPL Rev: Base
Engineer: Marimuthu.N Fault: Phase
Filename: C:\ETAP 1110\HPL\HPL.OTI Circuit: 220/132kV

Page 114 of 160


Amps X 10 220KV Bus1 (Nom. kV=220, Plot Ref. kV=220)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100

50 50
BUS COUPLER - N
30 OC1 30

220 KV LINE - N - 51
OC1
10 10

160 MVA TR-2 220KV SIDE - N


5 OC1 - 67 5
Seconds

Seconds
3 3
132KV LINE-4 - N - 51
OC1 - 67

40 MVA 132 KV SIDE TR-2 - N


1 OC1 - 67 1

.5 .5

.3 .3

.1 .1

.05 .05

.03 .03

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 220KV Bus1 (Nom. kV=220, Plot Ref. kV=220)


333.3 1K 3K 5K 10K 30K 50K 100K 300K 500K 1000K 3000K 6667K

Amps (Plot Ref. kV=3.3) ETAP Star 11.1.0C

220-132kV EOC

Project: 220/132/33kV Sub station Date: 16-09-2013


Location: Dehradun SN: VOLTECHENG
Contract: HPL Rev: Base
Engineer: Marimuthu.N Fault: Ground
Filename: C:\ETAP 1110\HPL\HPL.OTI Circuit: 220/132kV

Page 115 of 160


Per Unit
.005 .01 .03 .05 .1 .3 .5 1 3 5 10 30 50 100
1K 1K
Normalized (shifted) TCC
Line-to-Ground (Sym) fault: 10.985kA @ 220kV
500 Adj Bus: Bus9 500
Connector: Bus9 - 50KM Line
300 SQOP File: Untitled 300
Data Rev: Base
Configuration: Normal
Date: 16-09-2013

100 100

50 50

30 30

160 MVA TR-2 132KV SIDE - P


10 OC1 - 67 10

1.372 kA @ 132 kV
t1: 2.04 s
5 5
Seconds

Seconds
3 220 KV LINE-4 - P - 51 3

OC1
1.221 kA @ 220 kV
t1: 3.3 s
1 1

.5 .5

.3 .3

.1 .1

.05 .05

.03 .03

.01 .01
.005 .01 .03 .05 .1 .3 .5 1 3 5 10 30 50 100

Per Unit ETAP Star 11.1.0C

220-132kV Trip Coord

Project: 220/132/33kV Sub station Date: 16-09-2013


Location: Dehradun SN: VOLTECHENG
Contract: HPL Rev: Base
Engineer: Marimuthu.N Fault: Phase(Normalized)
Filename: C:\ETAP 1110\HPL\HPL.OTI Circuit: 220/132

Page 116 of 160


One-Line Diagram - OLV1 (Star Sequence-of-Operation)
220kV IC Line-1 220kV IC Line-2 220kV OG Line-1 220kV OG Line-2
3722.87 MVAsc 3722.87 MVAsc 3722.87 MVAsc 3722.87 MVAsc

Bus6 Bus7 Bus8 Bus9

10KM Line 10KM Line-2 40KM Line 50KM Line

220 KV LINE-1 220 KV LINE 220 KV LINE-3 220 KV LINE-4


± ± ± ±

R R 0 R R U24 U8 U9 U10
0 kV 2972.199 MVAsc 2972.199 MVAsc 2972.199 MVAsc 2972.199 MVAsc
0
CB1 CB2 CB3 CB4 0 kV
Open Open
220KV Bus1 7.98 3.66 220KV Bus2 Bus11 Bus12 Bus13 Bus15
13
7.98 3.66
kA - kA -
CB5 CB6 Open 85.9 CB7 81.5
Open± ±
22KM Line 22KM Line. 15KM Line 30KM Line
160 MVA TR-1 220KV SIDE R ± R
R BUS COUPLER 160 MVA TR-2 220KV SIDE
160/160/53.33 MVA 160/160/53.33 MVA 132KV LINE-1 132KV LINE-2 132KV LINE-3 132KV LINE-4
T11 T2 ± ± ± ±

R R R R
± ±
±

160 MVA TR-1 132KV SIDE R 160 MVA TR-2 132KV SIDE R 11kV
R

CB8 CB9 CB21 CB10 CB11 CB12 CB13 0


0 kV
132KV BUS 2.97 0 Open Open Open Open
0 kV
CB14 CB15 2.97
15.23 kA -
40 MVA 132 KV SIDE TR-1 40 MVA 132 KV SIDE TR-2 85.2
±
± 11kV Bus. 15.2
R
R 3 kA
-87.
2
T6 T9 T5 400 kVA

40 MVA 40 MVA
±

± ± R MSB IC-1
R 40 MVA 33 KV SIDE TR-1 R
0
0 kV
CB16 CB17 CB22
3.64 40 MVA 33 KV SIDE TR-2 0
33KV BUS 1 Open kA -
87.7 3.64 33KV BUS 2 0 kV

3.64 33kV Fuse 3.64


kA -
CB18 87.7
R CB20
CB19
±
T7
±

33 KV LINE
±
R 630 kVA
R

33KV BUS COUPLER 33KV Capacitor Bank


±
0
0 0 kV R MSB IC-2
Bus Ref A 3.64 0 kV Bus Ref B 3.64
0 R MSB BC CB23
3.64 3.64 0 kV 0
kA - kA - 11.24 15.57 0 kV
87.7 87.7 ±

CAP1 0.433kV Bus-1 CB24 0.433kV Bus-2 15.5


Open 7 kA
10000 kvar 11.2 -58.
4 kA 1
-57.
2

Page 117 of 160


page 1 09:56:06 Sep 16, 2013 Project File: HPL
One-Line Diagram - OLV1 (Star Sequence-of-Operation)
220kV IC Line-1 220kV IC Line-2 220kV OG Line-1 220kV OG Line-2
3722.87 MVAsc 3722.87 MVAsc 3722.87 MVAsc 3722.87 MVAsc

Bus6 Bus7 Bus8 Bus9

10KM Line 10KM Line-2 40KM Line 50KM Line

220 KV LINE-1 220 KV LINE 220 KV LINE-3 220 KV LINE-4


± ± ± ±

R R 0 R R U24 U8 U9 U10
0 kV 2972.199 MVAsc 2972.199 MVAsc 2972.199 MVAsc 2972.199 MVAsc
0
CB1 CB2 CB3 CB4 0 kV
Open
220KV Bus1 7.98 7.98 3.66 220KV Bus2 Bus11 Bus12 Bus13 Bus15
13
23.9 23.9
2.19 5.84 9 kA - 18.15 2.19 9 kA
CB5 CB6 84.8 CB7 -84.
8
± ±

160 MVA TR-1 220KV SIDE 22KM Line 22KM Line. 15KM Line 30KM Line
R ± R
R BUS COUPLER 160 MVA TR-2 220KV SIDE
160/160/53.33 MVA 160/160/53.33 MVA 132KV LINE-1 132KV LINE-2 132KV LINE-3 132KV LINE-4
T11 T2 ± ± ± ±

R R R R
± ±
±

160 MVA TR-1 132KV SIDE R 160 MVA TR-2 132KV SIDE R 11kV
R

CB8 CB9 CB21 CB10 CB11 CB12 CB13 0


0 kV
132KV BUS 4.26 4.26 0 4.8 4.8 6.01 3.89
0 kV
CB14 CB15 27.8
26.68 8 kA
40 MVA 132 KV SIDE TR-1 40 MVA 132 KV SIDE TR-2 -79.
±
± 11kV Bus. 1
R 26.6
R 8 kA
-87.
8
T6 T9 T5 400 kVA

40 MVA 40 MVA
±

± ± R MSB IC-1
R 40 MVA 33 KV SIDE TR-1 R
0
0 kV
CB16 CB17 CB22
9.61 40 MVA 33 KV SIDE TR-2 0
33KV BUS 1 4.81 kA -
87.5 4.81 33KV BUS 2 0 kV

4.81 4.81 33kV Fuse 9.61


kA -
CB18 87.5
R CB20
CB19
±
T7
±

33 KV LINE
±
R 630 kVA
R

33KV BUS COUPLER 33KV Capacitor Bank


±
0
0 0 kV R MSB IC-2
Bus Ref A 9.61 0 kV Bus Ref B 9.61
0 R MSB BC CB23
9.61 9.61 0 kV 0
kA - kA - 11.37 16.07 0 kV
87.5 87.5 ±

CAP1 0.433kV Bus-1 CB24 0.433kV Bus-2 16.0


Open 7 kA
10000 kvar 11.3 -57
7 kA
-56.
8

Page 118 of 160


page 1 10:05:38 Sep 16, 2013 Project File: HPL
One-Line Diagram - OLV1 (Star Sequence-of-Operation)
220kV IC Line-1 220kV IC Line-2 220kV OG Line-1 220kV OG Line-2
3722.87 MVAsc 3722.87 MVAsc 3722.87 MVAsc 3722.87 MVAsc

Bus6 Bus7 Bus8 Bus9

10KM Line 10KM Line-2 40KM Line 50KM Line

220 KV LINE-1 220 KV LINE 220 KV LINE-3 220 KV LINE-4


± ± ± ±

R R 61 kV R R U24 U8 U9 U10
132. 2972.199 MVAsc 2972.199 MVAsc 2972.199 MVAsc 2972.199 MVAsc
V
88 k
CB1 CB2 CB3 CB4 119.
Open Open
220KV Bus1 6.95 1.08 220KV Bus2 Bus11 Bus12 Bus13 Bus15
13
6.95 4.3
kA 3.24 kA
CB5 CB6 Open CB7
Open± ±
22KM Line 22KM Line. 15KM Line 30KM Line
160 MVA TR-1 220KV SIDE R ± R
R BUS COUPLER 160 MVA TR-2 220KV SIDE
160/160/53.33 MVA 160/160/53.33 MVA 132KV LINE-1 132KV LINE-2 132KV LINE-3 132KV LINE-4
T11 T2 ± ± ± ±

R R R R
± ±
±

160 MVA TR-1 132KV SIDE R 160 MVA TR-2 132KV SIDE R 11kV
R

CB8 CB9 CB21 CB10 CB11 CB12 CB13 6 kV


67.3
132KV BUS 2.09 V Open Open Open Open
11 k
CB14 CB15 4.04
kA
40 MVA 132 KV SIDE TR-1 40 MVA 132 KV SIDE TR-2
±
± 11kV Bus. 0 kA
R
R

T6 T9 T5 400 kVA

40 MVA 40 MVA
±

± ± R MSB IC-1
R 40 MVA 33V KV SIDE TR-1 R
6 k
18.3
CB16 CB17 CB22
3.97 40 MVA 33 KV SIDE TR-2 6 kV
33KV BUS 1 Open kA
3.97 33KV BUS 2 18.3

3.97 33kV Fuse 3.97


kA
CB18
R CB20
CB19
±
T7
±

33 KV LINE
±
R 630 kVA
R

33KV BUS COUPLER 33KV Capacitor Bank


6 kV ±

6 kV 18.3 R MSB IC-2


Bus Ref A 3.97 18.3 Bus Ref B 3.97
kV R MSB BC CB23
3.97 3.97 0.25 kV
kA kA 11.34 15.84 0.25
±

CAP1 0.433kV Bus-1 CB24 0.433kV Bus-2 15.8


Open 4 kA
10000 kvar 11.3
4 kA

Page 119 of 160


page 1 10:09:48 Sep 16, 2013 Project File: HPL
One-Line Diagram - OLV1 (Star Sequence-of-Operation)
220kV IC Line-1 220kV IC Line-2 220kV OG Line-1 220kV OG Line-2
3722.87 MVAsc 3722.87 MVAsc 3722.87 MVAsc 3722.87 MVAsc

Bus6 Bus7 Bus8 Bus9

10KM Line 10KM Line-2 40KM Line 50KM Line

220 KV LINE-1 220 KV LINE 220 KV LINE-3 220 KV LINE-4


± ± ± ±

R R 28 kV R R U24 U8 U9 U10
127. 2972.199 MVAsc 2972.199 MVAsc 2972.199 MVAsc 2972.199 MVAsc
V
28 k
CB1 CB2 CB3 CB4 127.
Open
220KV Bus1 5.73 5.73 1.73 220KV Bus2 Bus11 Bus12 Bus13 Bus15
13.83
23.5 23.5
5.19 6.9 1 kA 16.62 5.19 1 kA
CB5 CB6 CB7
± ±

160 MVA TR-1 220KV SIDE 22KM Line 22KM Line. 15KM Line 30KM Line
R ± R
R BUS COUPLER 160 MVA TR-2 220KV SIDE
160/160/53.33 MVA 160/160/53.33 MVA 132KV LINE-1 132KV LINE-2 132KV LINE-3 132KV LINE-4
T11 T2 ± ± ± ±

R R R R
± ±
±

160 MVA TR-1 132KV SIDE R 160 MVA TR-2 132KV SIDE R 11kV
R

CB8 CB9 CB21 CB10 CB11 CB12 CB13 1 kV


74.5
132KV BUS 7.81 7.81 V 3.33 3.33 4.36 2.61
11 k
CB14 CB15 28.6
5 kA
40 MVA 132 KV SIDE TR-1 40 MVA 132 KV SIDE TR-2
±
± 11kV Bus. 0 kA
R
R

T6 T9 T5 400 kVA

40 MVA 40 MVA
±

± ± R MSB IC-1
R 40 MVA 33V KV SIDE TR-1 R
2 k
19.0
CB16 CB17 CB22
9.64 40 MVA 33 KV SIDE TR-2 2 kV
33KV BUS 1 4.82 kA
4.82 33KV BUS 2 19.0

4.82 4.82 33kV Fuse 9.64


kA
CB18
R CB20
CB19
±
T7
±

33 KV LINE
±
R 630 kVA
R

33KV BUS COUPLER 33KV Capacitor Bank


2 kV ±

2 kV 19.0 R MSB IC-2


Bus Ref A 9.64 19.0 Bus Ref B 9.64
kV R MSB BC CB23
9.64 9.64 0.25 kV
kA kA 11.42 16.18 0.25
±

CAP1 0.433kV Bus-1 CB24 0.433kV Bus-2 16.1


Open 8 kA
10000 kvar 11.4
2 kA

Page 120 of 160


page 1 10:07:37 Sep 16, 2013 Project File: HPL
Project: 220/132/33kV Sub station ETAP Page: 1
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

Electrical Transient Analyzer Program

Short-Circuit Analysis

IEC 60909 Standard


3-Phase, LG, LL, & LLG Fault Currents

Swing V-Control Load Total


Number of Buses: 8 0 11 19

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 4 2 0 0 8 4 18

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total
Number of Machines: 0 8 0 0 0 8

System Frequency: 50.00 Hz

Unit System: Metric

Project Filename: HPL

Output Filename: C:\ETAP 1110\HPL\Untitled.ST2

Page 121 of 160


Project: 220/132/33kV Sub station ETAP Page: 2
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: Yes Individual

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Global 0

Cable Resistance: Yes Global 0

Page 122 of 160


Project: 220/132/33kV Sub station ETAP Page: 3
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

0.433kV Bus-1 Load 0.433 0.433 1 100.00 -60.00

0.433kV Bus-2 Load 0.433 0.433 1 100.00 -30.00

11kV Bus. Load 11.000 11.000 1 100.00 -30.00

33KV BUS 1 Load 33.000 33.000 1 100.00 0.00

33KV BUS 2 Load 33.000 33.000 1 100.00 0.00

132KV BUS Load 132.000 132.000 1 100.00 0.00

220KV Bus1 Load 220.000 220.000 1 100.00 0.00

220KV Bus2 Load 220.000 220.000 1 100.00 0.00

Bus6 SWNG 220.000 220.000 1 100.00 0.00

Bus7 SWNG 220.000 220.000 1 100.00 0.00

Bus8 SWNG 220.000 220.000 1 100.00 0.00

Bus9 SWNG 220.000 220.000 1 100.00 0.00

Bus11 SWNG 132.000 132.000 1 100.00 0.00

Bus12 SWNG 132.000 132.000 1 100.00 0.00

Bus13 SWNG 132.000 132.000 1 100.00 0.00

Bus15 SWNG 132.000 132.000 1 100.00 0.00

Bus Ref A Load 33.000 33.000 1 100.00 0.00

Bus Ref B Load 33.000 33.000 1 100.00 0.00

T11~3 Load 11.000 11.000 0 100.00 0.00

19 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP .

Page 123 of 160


Project: 220/132/33kV Sub station ETAP Page: 4
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T5 0.400 11.000 0.433 4.50 1.50 0 0 0 0 0 4.5000 Dyn 30.000

T6 40.000 132.000 33.000 13.80 27.30 0 0 0 0 0 13.8000 YNyn 0.000

T7 0.630 33.000 0.433 5.00 1.50 0 0 0 0 0 5.0000 Dyn 30.000

T9 40.000 132.000 33.000 13.80 45.00 0 0 0 0 0 13.8000 YNyn 0.000

2-Winding Transformer Grounding Input Data

Grounding

Transformer Rating Conn. Primary Secondary


ID MVA Prim. kV Sec. kV Type Type kV Amp Ohm Type kV Amp Ohm

T5 0.400 11.000 0.433 D/Y Solid

T6 40.000 132.000 33.000 Y/Y Solid Solid

T7 0.630 33.000 0.433 D/Y Solid

T9 40.000 132.000 33.000 Y/Y Solid Solid

3-Winding Transformer Input Data

Transformer Rating Tap Impedance Z Variation Phase Shift


ID Winding MVA kV % %Z X/R MVAb % Tol. + 5% - 5% Type Angle

T2 Primary: 160.000 220.000 0 Zps = 12.50 45.00 160.000 0 0 0

Secondary: 160.000 132.000 0 Zpt = 45.65 45.00 160.000 0 Std Pos. Seq. 0.000

Tertiary: 53.330 11.000 0 Zst = 29.05 45.00 160.000 0 Std Pos. Seq. -30.000

T11 Primary: 160.000 220.000 0 Zps = 12.50 45.00 160.000 0 0 0

Secondary: 160.000 132.000 0 Zpt = 45.65 45.00 160.000 0 Std Pos. Seq. 0.000

Tertiary: 53.330 11.000 0 Zst = 29.05 45.00 160.000 0 Std Pos. Seq. -30.000

3-Winding Transformer Grounding Input Data

Transformer Rating Conn. Grounding


ID Winding MVA kV Type Type kV Amp Ohm

T2 Primary: 160.000 220.000 Wye Solid

Secondary: 160.000 132.000 Wye Solid

Tertiary: 53.330 11.000 Delta

Page 124 of 160


Project: 220/132/33kV Sub station ETAP Page: 5
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

3-Winding Transformer Grounding Input Data

Transformer Rating Conn. Grounding


ID Winding MVA kV Type Type kV Amp Ohm

T11 Primary: 160.000 220.000 Wye Solid

Secondary: 160.000 132.000 Wye Solid

Tertiary: 53.330 11.000 Delta

Impedance Input Data

Impedance Positive Sequence Impedance Zero Sequence Impedance


ID R X Y R0 X0 Y0 Unit

10KM Line 0.223 2.9 0 2.84 9.784 0 Ohm

10KM Line-2 0.223 2.9 0 2.84 9.784 0 Ohm

15KM Line 2.51145 6.48015 0 6.084 9.3315 0 Ohm

22KM Line 3.68346 9.50422 0 8.9232 13.6862 0 Ohm

22KM Line. 3.68346 9.50422 0 8.9232 13.6862 0 Ohm

30KM Line 5.0229 12.9603 0 12.168 18.663 0 Ohm

40KM Line 3.352 17.12 0 11.68 49.6 0 Ohm

50KM Line 4.19 21.4 0 14.6 62 0 Ohm

Page 125 of 160


Project: 220/132/33kV Sub station ETAP Page: 6
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

T5 2W XFMR 11kV Bus. 0.433kV Bus-1 608.80 913.20 1097.53

T6 2W XFMR 132KV BUS 33KV BUS 1 1.22 33.28 33.30

T7 2W XFMR 33KV BUS 2 0.433kV Bus-2 428.44 642.66 772.39

T9 2W XFMR 132KV BUS 33KV BUS 2 0.74 33.29 33.30

T2 3W Xfmr 220KV Bus2 132KV BUS 0.16 7.19 7.19

3W Xfmr 220KV Bus2 11kV Bus. -3.35 -150.79 150.83

3W Xfmr 132KV BUS 11kV Bus. 0.35 15.94 15.94

T11 3W Xfmr 220KV Bus1 132KV BUS 0.16 7.19 7.19

3W Xfmr 220KV Bus1 T11~3 -3.35 -150.79 150.83

3W Xfmr 132KV BUS T11~3 0.35 15.94 15.94

10KM Line Impedance Bus6 220KV Bus1 0.05 0.60 0.60

10KM Line-2 Impedance Bus7 220KV Bus1 0.05 0.60 0.60

15KM Line Impedance Bus13 132KV BUS 1.44 3.72 3.99

22KM Line Impedance Bus11 132KV BUS 2.11 5.45 5.85

22KM Line. Impedance Bus12 132KV BUS 2.11 5.45 5.85

30KM Line Impedance Bus15 132KV BUS 2.88 7.44 7.98

40KM Line Impedance Bus8 220KV Bus2 0.69 3.54 3.60

50KM Line Impedance Bus9 220KV Bus2 0.87 4.42 4.51

CB6 Tie Breakr 220KV Bus1 220KV Bus2

CB18 Tie Breakr 33KV BUS 1 Bus Ref A

CB19 Tie Breakr 33KV BUS 2 33KV BUS 1

CB20 Tie Breakr 33KV BUS 2 Bus Ref B

Page 126 of 160


Project: 220/132/33kV Sub station ETAP Page: 7
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

Power Grid Input Data

% Impedance
Power Grid Connected Bus Rating 100 MVA Base Grounding
ID ID MVASC kV R X" R/X" Type

220kV IC Line-1 Bus6 3722.870 220.000 0.19138 2.67927 0.07 Wye - Solid

220kV IC Line-2 Bus7 3722.870 220.000 0.19138 2.67927 0.07 Wye - Solid

220kV OG Line-1 Bus8 3722.870 220.000 0.19138 2.67927 0.07 Wye - Solid

220kV OG Line-2 Bus9 3722.870 220.000 0.19138 2.67927 0.07 Wye - Solid

U8 Bus12 2972.199 132.000 0.23971 3.35596 0.07 Wye - Solid

U9 Bus13 2972.199 132.000 0.23971 3.35596 0.07 Wye - Solid

U10 Bus15 2972.199 132.000 0.23971 3.35596 0.07 Wye - Solid

U24 Bus11 2972.199 132.000 0.23971 3.35596 0.07 Wye - Solid

Total Connected Power Grids ( = 8 ): 26780.276 MVA

Page 127 of 160


Project: 220/132/33kV Sub station ETAP Page: 8
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

SHORT- CIRCUIT REPORT

Fault at bus: 0.433kV Bus-1


Nominal kV = 0.433
Voltage c Factor = 0.95 (Minimum If)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

0.433kV Bus-1 Total 0.00 11.367 0.00 99.48 100.01 11.425 11.425 6.10E+002 9.33E+002 6.09E+002 9.13E+002

11kV Bus. 0.433kV Bus-1 98.49 11.367 98.98 100.00 99.51 11.425 11.425 * 6.10E+002 9.33E+002 6.09E+002 9.13E+002

# 220KV Bus2 11kV Bus. 99.98 0.058 99.99 100.00 99.98 0.033 0.000 3.04E+003 3.16E+003

# 132KV BUS 11kV Bus. 99.86 0.505 99.96 99.99 99.91 0.293 0.000 3.42E+002 3.63E+002

Bus8 220KV Bus2 99.99 0.001 100.00 100.00 99.99 0.000 0.000 1.47E+004 2.01E+004

Bus9 220KV Bus2 99.99 0.001 100.00 100.00 99.99 0.000 0.000 1.66E+004 2.31E+004

# 132KV BUS 220KV Bus2 99.86 0.004 99.96 99.99 99.91 0.001 0.000 3.26E+003 4.66E+003

Bus6 220KV Bus1 99.98 0.002 100.00 100.00 99.99 0.001 0.000 8.39E+003 9.97E+003

Bus7 220KV Bus1 99.98 0.002 100.00 100.00 99.99 0.001 0.000 8.39E+003 9.97E+003

# 132KV BUS 220KV Bus1 99.86 0.004 99.96 99.99 99.91 0.001 0.000 3.26E+003 4.66E+003

# T11~3 220KV Bus1 99.85 0.000 99.90 100.00 99.94 0.000 0.000 * 6.11E+004 8.74E+004

Bus13 132KV BUS 99.94 0.009 99.98 100.00 99.96 0.003 0.000 1.97E+003 4.37E+003

Bus11 132KV BUS 99.95 0.007 99.98 100.00 99.97 0.002 0.000 2.31E+003 5.55E+003

Bus12 132KV BUS 99.95 0.007 99.98 100.00 99.97 0.002 0.000 2.31E+003 5.55E+003

Bus15 132KV BUS 99.96 0.006 99.99 100.00 99.98 0.002 0.000 2.71E+003 6.89E+003

33KV BUS 1 132KV BUS 99.86 0.000 99.96 99.99 99.91 0.000 0.000

33KV BUS 2 132KV BUS 99.86 0.000 99.96 99.99 99.91 0.000 0.000

# T11~3 132KV BUS 99.85 0.000 99.90 100.00 99.94 0.000 0.000 * 6.11E+004 8.72E+004

220kV OG Line-1 Bus8 100.00 0.001 100.00 100.00 100.00 0.000 0.000 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV OG Line-2 Bus9 100.00 0.001 100.00 100.00 100.00 0.000 0.000 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV IC Line-1 Bus6 100.00 0.002 100.00 100.00 100.00 0.001 0.000 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV IC Line-2 Bus7 100.00 0.002 100.00 100.00 100.00 0.001 0.000 1.91E-001 2.68E+000 1.91E-001 2.68E+000

U9 Bus13 100.00 0.009 100.00 100.00 100.00 0.003 0.000 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U24 Bus11 100.00 0.007 100.00 100.00 100.00 0.002 0.000 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U8 Bus12 100.00 0.007 100.00 100.00 100.00 0.002 0.000 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U10 Bus15 100.00 0.006 100.00 100.00 100.00 0.002 0.000 2.40E-001 3.36E+000 2.40E-001 3.36E+000

0.433kV Bus-2 33KV BUS 2 99.86 0.000 99.91 100.00 99.95 0.000 0.000

Page 128 of 160


Project: 220/132/33kV Sub station ETAP Page: 9
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

(Cont.)

Fault at bus: 0.433kV Bus-1


Nominal kV = 0.433
Voltage c Factor = 0.95 (Minimum If)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

220KV Bus1 220KV Bus2 99.98 0.000 99.99 100.00 99.98 0.000 0.000

33KV BUS 1 Bus Ref A 99.86 0.000 99.96 99.99 99.91 0.000 0.000

33KV BUS 2 33KV BUS 1 99.86 0.000 99.96 99.99 99.91 0.000 0.000

33KV BUS 2 Bus Ref B 99.86 0.000 99.96 99.99 99.91 0.000 0.000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 11.367 11.425 9.844 11.427
Peak Current (kA), Method C : 18.617 18.711 16.122 18.714
Breaking Current (kA, rms, symm) : 11.425 9.844 11.427
Steady State Current (kA, rms) : 11.367 11.425 9.844 11.427

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer

Page 129 of 160


Project: 220/132/33kV Sub station ETAP Page: 10
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

Fault at bus: 0.433kV Bus-2


Nominal kV = 0.433
Voltage c Factor = 0.95 (Minimum If)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

0.433kV Bus-2 Total 0.00 16.075 0.00 99.33 100.01 16.182 16.182 4.29E+002 6.61E+002 4.28E+002 6.43E+002

33KV BUS 2 0.433kV Bus-2 98.02 16.075 98.66 100.00 99.35 16.182 16.182 * 4.29E+002 6.61E+002 4.28E+002 6.43E+002

132KV BUS 33KV BUS 2 99.82 0.105 99.89 100.00 99.93 0.061 0.000 5.51E+002 5.66E+002

132KV BUS 33KV BUS 1 99.82 0.105 99.89 100.00 99.93 0.061 0.000 5.43E+002 5.74E+002

Bus13 132KV BUS 99.92 0.011 99.95 100.00 99.98 0.007 0.000 1.22E+003 1.47E+003

Bus11 132KV BUS 99.94 0.009 99.96 100.00 99.98 0.005 0.000 1.48E+003 1.89E+003

Bus12 132KV BUS 99.94 0.009 99.96 100.00 99.98 0.005 0.000 1.48E+003 1.89E+003

Bus15 132KV BUS 99.95 0.007 99.97 100.00 99.99 0.004 0.000 1.77E+003 2.37E+003

# 220KV Bus2 132KV BUS 99.96 0.009 99.97 100.00 99.98 0.005 0.000 1.89E+003 1.54E+003

# 11kV Bus. 132KV BUS 99.80 0.000 99.87 99.94 99.99 0.000 0.000 * 3.54E+004 2.90E+004

# 220KV Bus1 132KV BUS 99.96 0.009 99.97 100.00 99.98 0.005 0.000 1.89E+003 1.54E+003

# T11~3 132KV BUS 99.80 0.000 99.87 99.94 99.99 0.000 0.000 * 3.54E+004 2.90E+004

U9 Bus13 100.00 0.011 100.00 100.00 100.00 0.007 0.000 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U24 Bus11 100.00 0.009 100.00 100.00 100.00 0.005 0.000 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U8 Bus12 100.00 0.009 100.00 100.00 100.00 0.005 0.000 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U10 Bus15 100.00 0.007 100.00 100.00 100.00 0.004 0.000 2.40E-001 3.36E+000 2.40E-001 3.36E+000

Bus8 220KV Bus2 99.98 0.002 99.99 100.00 99.99 0.001 0.000 5.46E+003 4.92E+003

Bus9 220KV Bus2 99.98 0.002 99.99 100.00 99.99 0.001 0.000 6.21E+003 5.66E+003

# 11kV Bus. 220KV Bus2 99.80 0.000 99.87 99.94 99.99 0.000 0.000 * 3.54E+004 2.91E+004

0.433kV Bus-1 11kV Bus. 99.80 0.000 99.92 99.88 100.00 0.000 0.000

Bus6 220KV Bus1 99.97 0.003 99.98 100.00 99.99 0.002 0.000 3.03E+003 2.37E+003

Bus7 220KV Bus1 99.97 0.003 99.98 100.00 99.99 0.002 0.000 3.03E+003 2.37E+003

# T11~3 220KV Bus1 99.80 0.000 99.87 99.94 99.99 0.000 0.000 * 3.54E+004 2.91E+004

220kV OG Line-1 Bus8 100.00 0.002 100.00 100.00 100.00 0.001 0.000 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV OG Line-2 Bus9 100.00 0.002 100.00 100.00 100.00 0.001 0.000 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV IC Line-1 Bus6 100.00 0.003 100.00 100.00 100.00 0.002 0.000 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV IC Line-2 Bus7 100.00 0.003 100.00 100.00 100.00 0.002 0.000 1.91E-001 2.68E+000 1.91E-001 2.68E+000

33KV BUS 1 Bus Ref A 98.02 0.000 98.66 100.00 99.35 0.000 0.000

33KV BUS 1 33KV BUS 2 98.02 0.105 98.66 100.00 99.35 0.061 0.000

Page 130 of 160


Project: 220/132/33kV Sub station ETAP Page: 11
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

(Cont.)

Fault at bus: 0.433kV Bus-2


Nominal kV = 0.433
Voltage c Factor = 0.95 (Minimum If)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

33KV BUS 2 Bus Ref B 98.02 0.000 98.66 100.00 99.35 0.000 0.000

220KV Bus1 220KV Bus2 99.96 0.002 99.97 100.00 99.98 0.001 0.000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 16.075 16.182 13.922 16.185
Peak Current (kA), Method C : 26.364 26.539 22.832 26.543
Breaking Current (kA, rms, symm) : 16.182 13.922 16.185
Steady State Current (kA, rms) : 16.075 16.182 13.922 16.185

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer

Page 131 of 160


Project: 220/132/33kV Sub station ETAP Page: 12
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

Fault at bus: 11kV Bus.


Nominal kV = 11.000
Voltage c Factor = 1.00 (Minimum If)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

11kV Bus. Total 0.00 26.699 0.00 173.21 173.21 0.000 0.000 7.37E-001 1.96E+001

0.433kV Bus-1 11kV Bus. 0.00 0.000 100.00 100.00 100.00 0.000 0.000

# 220KV Bus2 11kV Bus. 98.62 3.432 100.00 100.00 100.00 0.000 0.000 3.98E+000 1.53E+002

# 132KV BUS 11kV Bus. 91.52 30.131 100.00 100.00 100.00 0.000 0.000 6.30E-001 1.74E+001

Bus8 220KV Bus2 99.40 0.060 100.00 100.00 100.00 0.000 0.000 2.26E+002 2.49E+001

Bus9 220KV Bus2 99.47 0.052 100.00 100.00 100.00 0.000 0.000 2.58E+002 3.02E+001

# 132KV BUS 220KV Bus2 91.52 0.262 100.00 100.00 100.00 0.000 0.000 5.15E+001 6.74E+000

Bus6 220KV Bus1 98.87 0.114 100.00 100.00 100.00 0.000 0.000 1.19E+002 4.87E+000

Bus7 220KV Bus1 98.87 0.114 100.00 100.00 100.00 0.000 0.000 1.19E+002 4.87E+000

# 132KV BUS 220KV Bus1 91.52 0.262 100.00 100.00 100.00 0.000 0.000 5.15E+001 6.74E+000

# T11~3 220KV Bus1 90.68 0.014 100.00 100.00 100.00 0.000 0.000 9.66E+002 1.26E+002

Bus13 132KV BUS 96.03 0.517 100.00 100.00 100.00 0.000 0.000 4.29E+001 7.78E+000

Bus11 132KV BUS 96.83 0.412 100.00 100.00 100.00 0.000 0.000 5.35E+001 1.12E+001

Bus12 132KV BUS 96.83 0.412 100.00 100.00 100.00 0.000 0.000 5.35E+001 1.12E+001

Bus15 132KV BUS 97.43 0.334 100.00 100.00 100.00 0.000 0.000 6.57E+001 1.52E+001

33KV BUS 1 132KV BUS 91.52 0.000 100.00 100.00 100.00 0.000 0.000

33KV BUS 2 132KV BUS 91.52 0.000 100.00 100.00 100.00 0.000 0.000

# T11~3 132KV BUS 90.68 0.023 100.00 100.00 100.00 0.000 0.000 9.69E+002 8.46E+000

220kV OG Line-1 Bus8 100.00 0.060 100.00 100.00 100.00 0.000 0.000 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV OG Line-2 Bus9 100.00 0.052 100.00 100.00 100.00 0.000 0.000 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV IC Line-1 Bus6 100.00 0.114 100.00 100.00 100.00 0.000 0.000 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV IC Line-2 Bus7 100.00 0.114 100.00 100.00 100.00 0.000 0.000 1.91E-001 2.68E+000 1.91E-001 2.68E+000

U9 Bus13 100.00 0.517 100.00 100.00 100.00 0.000 0.000 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U24 Bus11 100.00 0.412 100.00 100.00 100.00 0.000 0.000 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U8 Bus12 100.00 0.412 100.00 100.00 100.00 0.000 0.000 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U10 Bus15 100.00 0.334 100.00 100.00 100.00 0.000 0.000 2.40E-001 3.36E+000 2.40E-001 3.36E+000

0.433kV Bus-2 33KV BUS 2 91.52 0.000 100.00 100.00 100.00 0.000 0.000

220KV Bus2 220KV Bus1 98.62 0.029 100.00 100.00 100.00 0.000 0.000

33KV BUS 1 Bus Ref A 91.52 0.000 100.00 100.00 100.00 0.000 0.000

Page 132 of 160


Project: 220/132/33kV Sub station ETAP Page: 13
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

(Cont.)

Fault at bus: 11kV Bus.


Nominal kV = 11.000
Voltage c Factor = 1.00 (Minimum If)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

33KV BUS 2 33KV BUS 1 91.52 0.000 100.00 100.00 100.00 0.000 0.000

33KV BUS 2 Bus Ref B 91.52 0.000 100.00 100.00 100.00 0.000 0.000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 26.699 0.000 23.122 23.122
Peak Current (kA), Method C : 71.651 0.000 62.051 62.051
Breaking Current (kA, rms, symm) : 0.000 23.122 23.122
Steady State Current (kA, rms) : 26.699 0.000 23.122 23.122

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer

Page 133 of 160


Project: 220/132/33kV Sub station ETAP Page: 14
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

Fault at bus: 33KV BUS 1


Nominal kV = 33.000
Voltage c Factor = 1.00 (Minimum If)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

33KV BUS 1 Total 0.00 9.625 0.00 99.84 99.94 9.646 9.646 7.79E-001 1.82E+001 8.03E-001 1.80E+001

132KV BUS 33KV BUS 1 91.59 4.812 91.79 99.84 99.94 4.823 4.823 1.82E+000 3.63E+001 1.87E+000 3.61E+001

0.433kV Bus-2 33KV BUS 2 0.00 0.000 57.70 57.65 100.00 0.000 0.000

132KV BUS 33KV BUS 2 91.59 4.813 91.79 99.84 99.94 4.823 4.823 1.30E+000 3.63E+001 1.35E+000 3.61E+001

Bus13 132KV BUS 96.06 0.512 96.45 99.91 99.70 0.463 0.365 1.68E+000 7.08E+000 3.73E+000 8.71E+000

Bus11 132KV BUS 96.86 0.408 97.21 99.91 99.75 0.365 0.278 2.35E+000 8.81E+000 5.36E+000 1.12E+001

Bus12 132KV BUS 96.86 0.408 97.21 99.91 99.75 0.365 0.278 2.35E+000 8.81E+000 5.36E+000 1.12E+001

Bus15 132KV BUS 97.46 0.331 97.76 99.91 99.79 0.293 0.219 3.12E+000 1.08E+001 7.22E+000 1.41E+001

# 220KV Bus2 132KV BUS 98.12 0.401 98.19 99.95 99.98 0.367 0.295 3.60E-001 9.27E+000 5.35E-001 1.17E+001

# 11kV Bus. 132KV BUS 90.82 0.021 95.03 95.84 100.00 0.108 0.365 * 6.75E+000 1.74E+002 2.10E-001 9.46E+000

# 220KV Bus1 132KV BUS 98.12 0.401 98.19 99.95 99.98 0.367 0.295 3.60E-001 9.27E+000 5.35E-001 1.17E+001

# T11~3 132KV BUS 90.82 0.021 95.03 95.84 100.00 0.108 0.365 * 6.75E+000 1.74E+002 2.10E-001 9.46E+000

U9 Bus13 100.00 0.512 100.00 100.00 100.00 0.463 0.365 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U24 Bus11 100.00 0.408 100.00 100.00 100.00 0.365 0.278 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U8 Bus12 100.00 0.408 100.00 100.00 100.00 0.365 0.278 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U10 Bus15 100.00 0.331 100.00 100.00 100.00 0.293 0.219 2.40E-001 3.36E+000 2.40E-001 3.36E+000

Bus8 220KV Bus2 99.19 0.080 99.34 99.94 99.90 0.065 0.034 8.84E-001 6.22E+000 2.60E+000 1.29E+001

Bus9 220KV Bus2 99.29 0.070 99.43 99.94 99.91 0.056 0.029 1.06E+000 7.10E+000 3.21E+000 1.55E+001

# 11kV Bus. 220KV Bus2 90.82 0.013 95.03 95.84 100.00 0.026 0.051 * 3.76E+000 3.90E+001 1.98E-001 8.89E+000

0.433kV Bus-1 11kV Bus. 90.82 0.000 98.11 93.86 98.89 0.000 0.000

Bus6 220KV Bus1 98.47 0.153 98.66 99.95 99.86 0.134 0.095 2.37E-001 3.28E+000 7.78E-001 4.70E+000

Bus7 220KV Bus1 98.47 0.153 98.66 99.95 99.86 0.134 0.095 2.37E-001 3.28E+000 7.78E-001 4.70E+000

# T11~3 220KV Bus1 90.82 0.013 95.03 95.84 100.00 0.026 0.051 * 3.76E+000 3.90E+001 1.98E-001 8.89E+000

220kV OG Line-1 Bus8 100.00 0.080 100.00 100.00 100.00 0.065 0.034 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV OG Line-2 Bus9 100.00 0.070 100.00 100.00 100.00 0.056 0.029 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV IC Line-1 Bus6 100.00 0.153 100.00 100.00 100.00 0.134 0.095 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV IC Line-2 Bus7 100.00 0.153 100.00 100.00 100.00 0.134 0.095 1.91E-001 2.68E+000 1.91E-001 2.68E+000

33KV BUS 1 Bus Ref A 0.00 0.000 0.00 99.84 99.94 0.000 0.000

33KV BUS 2 33KV BUS 1 0.00 4.813 0.00 99.84 99.94 4.823 4.823

33KV BUS 2 Bus Ref B 0.00 0.000 0.00 99.84 99.94 0.000 0.000

Page 134 of 160


Project: 220/132/33kV Sub station ETAP Page: 15
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

(Cont.)

Fault at bus: 33KV BUS 1


Nominal kV = 33.000
Voltage c Factor = 1.00 (Minimum If)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

220KV Bus1 220KV Bus2 98.12 0.078 98.19 99.95 99.98 0.073 0.064

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 9.625 9.646 8.335 9.640
Peak Current (kA), Method C : 25.636 25.692 22.201 25.676
Breaking Current (kA, rms, symm) : 9.646 8.335 9.640
Steady State Current (kA, rms) : 9.625 9.646 8.335 9.640

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer

Page 135 of 160


Project: 220/132/33kV Sub station ETAP Page: 16
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

Fault at bus: 33KV BUS 2


Nominal kV = 33.000
Voltage c Factor = 1.00 (Minimum If)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

33KV BUS 2 Total 0.00 9.625 0.00 99.84 99.94 9.646 9.646 7.79E-001 1.82E+001 8.03E-001 1.80E+001

0.433kV Bus-2 33KV BUS 2 0.00 0.000 57.70 57.65 100.00 0.000 0.000

132KV BUS 33KV BUS 2 91.59 4.813 91.79 99.84 99.94 4.823 4.823 1.30E+000 3.63E+001 1.35E+000 3.61E+001

132KV BUS 33KV BUS 1 91.59 4.812 91.79 99.84 99.94 4.823 4.823 1.82E+000 3.63E+001 1.87E+000 3.61E+001

Bus13 132KV BUS 96.06 0.512 96.45 99.91 99.70 0.463 0.365 1.68E+000 7.08E+000 3.73E+000 8.71E+000

Bus11 132KV BUS 96.86 0.408 97.21 99.91 99.75 0.365 0.278 2.35E+000 8.81E+000 5.36E+000 1.12E+001

Bus12 132KV BUS 96.86 0.408 97.21 99.91 99.75 0.365 0.278 2.35E+000 8.81E+000 5.36E+000 1.12E+001

Bus15 132KV BUS 97.46 0.331 97.76 99.91 99.79 0.293 0.219 3.12E+000 1.08E+001 7.22E+000 1.41E+001

# 220KV Bus2 132KV BUS 98.12 0.401 98.19 99.95 99.98 0.367 0.295 3.60E-001 9.27E+000 5.35E-001 1.17E+001

# 11kV Bus. 132KV BUS 90.82 0.021 95.03 95.84 100.00 0.108 0.365 * 6.75E+000 1.74E+002 2.10E-001 9.46E+000

# 220KV Bus1 132KV BUS 98.12 0.401 98.19 99.95 99.98 0.367 0.295 3.60E-001 9.27E+000 5.35E-001 1.17E+001

# T11~3 132KV BUS 90.82 0.021 95.03 95.84 100.00 0.108 0.365 * 6.75E+000 1.74E+002 2.10E-001 9.46E+000

U9 Bus13 100.00 0.512 100.00 100.00 100.00 0.463 0.365 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U24 Bus11 100.00 0.408 100.00 100.00 100.00 0.365 0.278 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U8 Bus12 100.00 0.408 100.00 100.00 100.00 0.365 0.278 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U10 Bus15 100.00 0.331 100.00 100.00 100.00 0.293 0.219 2.40E-001 3.36E+000 2.40E-001 3.36E+000

Bus8 220KV Bus2 99.19 0.080 99.34 99.94 99.90 0.065 0.034 8.84E-001 6.22E+000 2.60E+000 1.29E+001

Bus9 220KV Bus2 99.29 0.070 99.43 99.94 99.91 0.056 0.029 1.06E+000 7.10E+000 3.21E+000 1.55E+001

# 11kV Bus. 220KV Bus2 90.82 0.013 95.03 95.84 100.00 0.026 0.051 * 3.76E+000 3.90E+001 1.98E-001 8.89E+000

0.433kV Bus-1 11kV Bus. 90.82 0.000 98.11 93.86 98.89 0.000 0.000

Bus6 220KV Bus1 98.47 0.153 98.66 99.95 99.86 0.134 0.095 2.37E-001 3.28E+000 7.78E-001 4.70E+000

Bus7 220KV Bus1 98.47 0.153 98.66 99.95 99.86 0.134 0.095 2.37E-001 3.28E+000 7.78E-001 4.70E+000

# T11~3 220KV Bus1 90.82 0.013 95.03 95.84 100.00 0.026 0.051 * 3.76E+000 3.90E+001 1.98E-001 8.89E+000

220kV OG Line-1 Bus8 100.00 0.080 100.00 100.00 100.00 0.065 0.034 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV OG Line-2 Bus9 100.00 0.070 100.00 100.00 100.00 0.056 0.029 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV IC Line-1 Bus6 100.00 0.153 100.00 100.00 100.00 0.134 0.095 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV IC Line-2 Bus7 100.00 0.153 100.00 100.00 100.00 0.134 0.095 1.91E-001 2.68E+000 1.91E-001 2.68E+000

33KV BUS 1 Bus Ref A 0.00 0.000 0.00 99.84 99.94 0.000 0.000

33KV BUS 1 33KV BUS 2 0.00 4.812 0.00 99.84 99.94 4.823 4.823

33KV BUS 2 Bus Ref B 0.00 0.000 0.00 99.84 99.94 0.000 0.000

Page 136 of 160


Project: 220/132/33kV Sub station ETAP Page: 17
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

(Cont.)

Fault at bus: 33KV BUS 2


Nominal kV = 33.000
Voltage c Factor = 1.00 (Minimum If)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

220KV Bus1 220KV Bus2 98.12 0.078 98.19 99.95 99.98 0.073 0.064

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 9.625 9.646 8.335 9.640
Peak Current (kA), Method C : 25.636 25.692 22.201 25.676
Breaking Current (kA, rms, symm) : 9.646 8.335 9.640
Steady State Current (kA, rms) : 9.625 9.646 8.335 9.640

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer

Page 137 of 160


Project: 220/132/33kV Sub station ETAP Page: 18
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

Fault at bus: 132KV BUS


Nominal kV = 132.000
Voltage c Factor = 1.00 (Minimum If)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

132KV BUS Total 0.00 28.281 0.00 97.87 99.69 28.986 28.986 2.90E-001 1.52E+000 3.13E-001 1.40E+000

Bus13 132KV BUS 54.85 6.015 58.82 98.32 97.00 5.561 4.387 1.68E+000 7.08E+000 3.73E+000 8.71E+000

Bus11 132KV BUS 64.15 4.796 67.71 98.33 97.51 4.383 3.346 2.35E+000 8.81E+000 5.36E+000 1.12E+001

Bus12 132KV BUS 64.15 4.796 67.71 98.33 97.51 4.383 3.346 2.35E+000 8.81E+000 5.36E+000 1.12E+001

Bus15 132KV BUS 70.99 3.892 74.11 98.43 97.95 3.527 2.629 3.12E+000 1.08E+001 7.22E+000 1.41E+001

33KV BUS 1 132KV BUS 0.00 0.000 0.00 97.87 99.69 0.000 0.000

33KV BUS 2 132KV BUS 0.00 0.000 0.00 97.87 99.69 0.000 0.000

# 220KV Bus2 132KV BUS 77.53 4.716 77.76 99.28 99.92 4.406 3.551 3.60E-001 9.27E+000 5.35E-001 1.17E+001

# 11kV Bus. 132KV BUS 9.16 0.251 55.31 53.95 100.00 1.293 4.393 * 6.75E+000 1.74E+002 2.10E-001 9.46E+000

# 220KV Bus1 132KV BUS 77.53 4.716 77.76 99.28 99.92 4.406 3.551 3.60E-001 9.27E+000 5.35E-001 1.17E+001

# T11~3 132KV BUS 9.16 0.251 55.31 53.95 100.00 1.293 4.393 * 6.75E+000 1.74E+002 2.10E-001 9.46E+000

U9 Bus13 100.00 6.015 100.00 100.00 100.00 5.561 4.387 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U24 Bus11 100.00 4.796 100.00 100.00 100.00 4.383 3.346 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U8 Bus12 100.00 4.796 100.00 100.00 100.00 4.383 3.346 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U10 Bus15 100.00 3.892 100.00 100.00 100.00 3.527 2.629 2.40E-001 3.36E+000 2.40E-001 3.36E+000

0.433kV Bus-2 33KV BUS 2 0.00 0.000 57.56 56.51 100.00 0.000 0.000

Bus8 220KV Bus2 90.37 0.941 92.01 99.03 99.11 0.781 0.413 8.84E-001 6.22E+000 2.60E+000 1.29E+001

Bus9 220KV Bus2 91.57 0.823 93.07 99.11 99.21 0.677 0.345 1.06E+000 7.10E+000 3.21E+000 1.55E+001

# 11kV Bus. 220KV Bus2 9.16 0.151 55.31 53.95 100.00 0.307 0.613 * 3.76E+000 3.90E+001 1.98E-001 8.89E+000

0.433kV Bus-1 11kV Bus. 9.16 0.000 87.96 25.43 87.10 0.000 0.000

Bus6 220KV Bus1 81.63 1.798 83.54 99.04 98.62 1.610 1.144 2.37E-001 3.28E+000 7.78E-001 4.70E+000

Bus7 220KV Bus1 81.63 1.798 83.54 99.04 98.62 1.610 1.144 2.37E-001 3.28E+000 7.78E-001 4.70E+000

# T11~3 220KV Bus1 9.16 0.151 55.31 53.95 100.00 0.307 0.613 * 3.76E+000 3.90E+001 1.98E-001 8.89E+000

220kV OG Line-1 Bus8 100.00 0.941 100.00 100.00 100.00 0.781 0.413 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV OG Line-2 Bus9 100.00 0.823 100.00 100.00 100.00 0.677 0.345 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV IC Line-1 Bus6 100.00 1.798 100.00 100.00 100.00 1.610 1.144 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV IC Line-2 Bus7 100.00 1.798 100.00 100.00 100.00 1.610 1.144 1.91E-001 2.68E+000 1.91E-001 2.68E+000

33KV BUS 1 Bus Ref A 0.00 0.000 0.00 97.87 99.69 0.000 0.000

33KV BUS 2 33KV BUS 1 0.00 0.000 0.00 97.87 99.69 0.000 0.000

33KV BUS 2 Bus Ref B 0.00 0.000 0.00 97.87 99.69 0.000 0.000

Page 138 of 160


Project: 220/132/33kV Sub station ETAP Page: 19
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

(Cont.)

Fault at bus: 132KV BUS


Nominal kV = 132.000
Voltage c Factor = 1.00 (Minimum If)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

220KV Bus1 220KV Bus2 77.53 0.920 77.76 99.28 99.92 0.883 0.765

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 28.281 28.986 24.492 28.911
Peak Current (kA), Method C : 63.930 65.523 55.365 65.355
Breaking Current (kA, rms, symm) : 28.986 24.492 28.911
Steady State Current (kA, rms) : 28.281 28.986 24.492 28.911

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer

Page 139 of 160


Project: 220/132/33kV Sub station ETAP Page: 20
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

Fault at bus: 220KV Bus1


Nominal kV = 220.000
Voltage c Factor = 1.00 (Minimum If)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

220KV Bus1 Total 0.00 28.161 0.00 101.61 103.16 26.866 26.866 9.12E-002 9.27E-001 1.32E-001 1.06E+000

Bus6 220KV Bus1 18.28 7.984 27.65 98.50 96.22 7.080 6.016 2.37E-001 3.28E+000 7.78E-001 4.70E+000

Bus7 220KV Bus1 18.28 7.984 27.65 98.50 96.22 7.080 6.016 2.37E-001 3.28E+000 7.78E-001 4.70E+000

# 132KV BUS 220KV Bus1 63.27 2.309 66.18 98.96 99.76 2.212 2.231 1.24E+000 1.13E+001 1.23E+000 1.28E+001

# T11~3 220KV Bus1 70.74 0.123 84.45 88.18 100.00 0.996 3.222 * 2.32E+001 2.12E+002 1.98E-001 8.89E+000

Bus8 220KV Bus2 57.40 4.180 65.58 96.82 97.29 3.382 2.174 8.84E-001 6.22E+000 2.60E+000 1.29E+001

Bus9 220KV Bus2 62.76 3.656 70.20 97.00 97.54 2.929 1.812 1.06E+000 7.10E+000 3.21E+000 1.55E+001

# 132KV BUS 220KV Bus2 63.27 2.309 66.18 98.96 99.76 2.212 2.231 1.24E+000 1.13E+001 1.23E+000 1.28E+001

# 11kV Bus. 220KV Bus2 70.74 0.123 84.45 88.18 100.00 0.996 3.222 * 2.32E+001 2.12E+002 1.98E-001 8.89E+000

220kV IC Line-1 Bus6 100.00 7.984 100.00 100.00 100.00 7.080 6.016 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV IC Line-2 Bus7 100.00 7.984 100.00 100.00 100.00 7.080 6.016 1.91E-001 2.68E+000 1.91E-001 2.68E+000

Bus13 132KV BUS 82.71 2.248 85.25 99.48 98.81 1.921 1.481 1.68E+000 7.08E+000 3.73E+000 8.71E+000

Bus11 132KV BUS 86.22 1.793 88.40 99.49 99.00 1.514 1.129 2.35E+000 8.81E+000 5.36E+000 1.12E+001

Bus12 132KV BUS 86.22 1.793 88.40 99.49 99.00 1.514 1.129 2.35E+000 8.81E+000 5.36E+000 1.12E+001

Bus15 132KV BUS 88.83 1.455 90.68 99.53 99.16 1.219 0.887 3.12E+000 1.08E+001 7.22E+000 1.41E+001

33KV BUS 1 132KV BUS 63.27 0.000 66.18 98.96 99.76 0.000 0.000

33KV BUS 2 132KV BUS 63.27 0.000 66.18 98.96 99.76 0.000 0.000

# 11kV Bus. 132KV BUS 70.74 0.205 84.45 88.18 100.00 0.620 1.483 * 2.02E+001 7.71E+001 2.10E-001 9.46E+000

# T11~3 132KV BUS 70.74 0.205 84.45 88.18 100.00 0.620 1.483 * 2.02E+001 7.71E+001 2.10E-001 9.46E+000

220kV OG Line-1 Bus8 100.00 4.180 100.00 100.00 100.00 3.382 2.174 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV OG Line-2 Bus9 100.00 3.656 100.00 100.00 100.00 2.929 1.812 1.91E-001 2.68E+000 1.91E-001 2.68E+000

0.433kV Bus-1 11kV Bus. 70.74 0.000 93.96 81.27 97.33 0.000 0.000

U9 Bus13 100.00 2.248 100.00 100.00 100.00 1.921 1.481 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U24 Bus11 100.00 1.793 100.00 100.00 100.00 1.514 1.129 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U8 Bus12 100.00 1.793 100.00 100.00 100.00 1.514 1.129 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U10 Bus15 100.00 1.455 100.00 100.00 100.00 1.219 0.887 2.40E-001 3.36E+000 2.40E-001 3.36E+000

0.433kV Bus-2 33KV BUS 2 63.27 0.000 81.30 84.70 100.00 0.000 0.000

220KV Bus2 220KV Bus1 0.00 10.020 0.00 101.61 103.16 9.507 9.409

33KV BUS 1 Bus Ref A 63.27 0.000 66.18 98.96 99.76 0.000 0.000

Page 140 of 160


Project: 220/132/33kV Sub station ETAP Page: 21
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

(Cont.)

Fault at bus: 220KV Bus1


Nominal kV = 220.000
Voltage c Factor = 1.00 (Minimum If)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

33KV BUS 2 33KV BUS 1 63.27 0.000 66.18 98.96 99.76 0.000 0.000

33KV BUS 2 Bus Ref B 63.27 0.000 66.18 98.96 99.76 0.000 0.000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 28.161 26.866 24.388 27.770
Peak Current (kA), Method C : 69.772 66.563 60.425 68.803
Breaking Current (kA, rms, symm) : 26.866 24.388 27.770
Steady State Current (kA, rms) : 28.161 26.866 24.388 27.770

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer

Page 141 of 160


Project: 220/132/33kV Sub station ETAP Page: 22
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

Fault at bus: 220KV Bus2


Nominal kV = 220.000
Voltage c Factor = 1.00 (Minimum If)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

220KV Bus2 Total 0.00 28.161 0.00 101.61 103.16 26.866 26.866 9.12E-002 9.27E-001 1.32E-001 1.06E+000

Bus8 220KV Bus2 57.40 4.180 65.58 96.82 97.29 3.382 2.174 8.84E-001 6.22E+000 2.60E+000 1.29E+001

Bus9 220KV Bus2 62.76 3.656 70.20 97.00 97.54 2.929 1.812 1.06E+000 7.10E+000 3.21E+000 1.55E+001

# 132KV BUS 220KV Bus2 63.27 2.309 66.18 98.96 99.76 2.212 2.231 1.24E+000 1.13E+001 1.23E+000 1.28E+001

# 11kV Bus. 220KV Bus2 70.74 0.123 84.45 88.18 100.00 0.996 3.222 * 2.32E+001 2.12E+002 1.98E-001 8.89E+000

Bus6 220KV Bus1 18.28 7.984 27.65 98.50 96.22 7.080 6.016 2.37E-001 3.28E+000 7.78E-001 4.70E+000

Bus7 220KV Bus1 18.28 7.984 27.65 98.50 96.22 7.080 6.016 2.37E-001 3.28E+000 7.78E-001 4.70E+000

# 132KV BUS 220KV Bus1 63.27 2.309 66.18 98.96 99.76 2.212 2.231 1.24E+000 1.13E+001 1.23E+000 1.28E+001

# T11~3 220KV Bus1 70.74 0.123 84.45 88.18 100.00 0.996 3.222 * 2.32E+001 2.12E+002 1.98E-001 8.89E+000

220kV OG Line-1 Bus8 100.00 4.180 100.00 100.00 100.00 3.382 2.174 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV OG Line-2 Bus9 100.00 3.656 100.00 100.00 100.00 2.929 1.812 1.91E-001 2.68E+000 1.91E-001 2.68E+000

Bus13 132KV BUS 82.71 2.248 85.25 99.48 98.81 1.921 1.481 1.68E+000 7.08E+000 3.73E+000 8.71E+000

Bus11 132KV BUS 86.22 1.793 88.40 99.49 99.00 1.514 1.129 2.35E+000 8.81E+000 5.36E+000 1.12E+001

Bus12 132KV BUS 86.22 1.793 88.40 99.49 99.00 1.514 1.129 2.35E+000 8.81E+000 5.36E+000 1.12E+001

Bus15 132KV BUS 88.83 1.455 90.68 99.53 99.16 1.219 0.887 3.12E+000 1.08E+001 7.22E+000 1.41E+001

33KV BUS 1 132KV BUS 63.27 0.000 66.18 98.96 99.76 0.000 0.000

33KV BUS 2 132KV BUS 63.27 0.000 66.18 98.96 99.76 0.000 0.000

# 11kV Bus. 132KV BUS 70.74 0.205 84.45 88.18 100.00 0.620 1.483 * 2.02E+001 7.71E+001 2.10E-001 9.46E+000

# T11~3 132KV BUS 70.74 0.205 84.45 88.18 100.00 0.620 1.483 * 2.02E+001 7.71E+001 2.10E-001 9.46E+000

0.433kV Bus-1 11kV Bus. 70.74 0.000 93.96 81.27 97.33 0.000 0.000

220kV IC Line-1 Bus6 100.00 7.984 100.00 100.00 100.00 7.080 6.016 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV IC Line-2 Bus7 100.00 7.984 100.00 100.00 100.00 7.080 6.016 1.91E-001 2.68E+000 1.91E-001 2.68E+000

U9 Bus13 100.00 2.248 100.00 100.00 100.00 1.921 1.481 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U24 Bus11 100.00 1.793 100.00 100.00 100.00 1.514 1.129 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U8 Bus12 100.00 1.793 100.00 100.00 100.00 1.514 1.129 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U10 Bus15 100.00 1.455 100.00 100.00 100.00 1.219 0.887 2.40E-001 3.36E+000 2.40E-001 3.36E+000

0.433kV Bus-2 33KV BUS 2 63.27 0.000 81.30 84.70 100.00 0.000 0.000

220KV Bus1 220KV Bus2 0.00 18.153 0.00 101.61 103.16 17.363 17.457

33KV BUS 1 Bus Ref A 63.27 0.000 66.18 98.96 99.76 0.000 0.000

Page 142 of 160


Project: 220/132/33kV Sub station ETAP Page: 23
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

(Cont.)

Fault at bus: 220KV Bus2


Nominal kV = 220.000
Voltage c Factor = 1.00 (Minimum If)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

33KV BUS 2 33KV BUS 1 63.27 0.000 66.18 98.96 99.76 0.000 0.000

33KV BUS 2 Bus Ref B 63.27 0.000 66.18 98.96 99.76 0.000 0.000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 28.161 26.866 24.388 27.770
Peak Current (kA), Method C : 69.772 66.563 60.425 68.803
Breaking Current (kA, rms, symm) : 26.866 24.388 27.770
Steady State Current (kA, rms) : 28.161 26.866 24.388 27.770

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer

Page 143 of 160


Project: 220/132/33kV Sub station ETAP Page: 24
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

Fault at bus: Bus Ref A


Nominal kV = 33.000
Voltage c Factor = 1.00 (Minimum If)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus Ref A Total 0.00 9.625 0.00 99.84 99.94 9.646 9.646 7.79E-001 1.82E+001 8.03E-001 1.80E+001

132KV BUS 33KV BUS 1 91.59 4.812 91.79 99.84 99.94 4.823 4.823 1.82E+000 3.63E+001 1.87E+000 3.61E+001

0.433kV Bus-2 33KV BUS 2 0.00 0.000 57.70 57.65 100.00 0.000 0.000

132KV BUS 33KV BUS 2 91.59 4.813 91.79 99.84 99.94 4.823 4.823 1.30E+000 3.63E+001 1.35E+000 3.61E+001

Bus13 132KV BUS 96.06 0.512 96.45 99.91 99.70 0.463 0.365 1.68E+000 7.08E+000 3.73E+000 8.71E+000

Bus11 132KV BUS 96.86 0.408 97.21 99.91 99.75 0.365 0.278 2.35E+000 8.81E+000 5.36E+000 1.12E+001

Bus12 132KV BUS 96.86 0.408 97.21 99.91 99.75 0.365 0.278 2.35E+000 8.81E+000 5.36E+000 1.12E+001

Bus15 132KV BUS 97.46 0.331 97.76 99.91 99.79 0.293 0.219 3.12E+000 1.08E+001 7.22E+000 1.41E+001

# 220KV Bus2 132KV BUS 98.12 0.401 98.19 99.95 99.98 0.367 0.295 3.60E-001 9.27E+000 5.35E-001 1.17E+001

# 11kV Bus. 132KV BUS 90.82 0.021 95.03 95.84 100.00 0.108 0.365 * 6.75E+000 1.74E+002 2.10E-001 9.46E+000

# 220KV Bus1 132KV BUS 98.12 0.401 98.19 99.95 99.98 0.367 0.295 3.60E-001 9.27E+000 5.35E-001 1.17E+001

# T11~3 132KV BUS 90.82 0.021 95.03 95.84 100.00 0.108 0.365 * 6.75E+000 1.74E+002 2.10E-001 9.46E+000

U9 Bus13 100.00 0.512 100.00 100.00 100.00 0.463 0.365 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U24 Bus11 100.00 0.408 100.00 100.00 100.00 0.365 0.278 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U8 Bus12 100.00 0.408 100.00 100.00 100.00 0.365 0.278 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U10 Bus15 100.00 0.331 100.00 100.00 100.00 0.293 0.219 2.40E-001 3.36E+000 2.40E-001 3.36E+000

Bus8 220KV Bus2 99.19 0.080 99.34 99.94 99.90 0.065 0.034 8.84E-001 6.22E+000 2.60E+000 1.29E+001

Bus9 220KV Bus2 99.29 0.070 99.43 99.94 99.91 0.056 0.029 1.06E+000 7.10E+000 3.21E+000 1.55E+001

# 11kV Bus. 220KV Bus2 90.82 0.013 95.03 95.84 100.00 0.026 0.051 * 3.76E+000 3.90E+001 1.98E-001 8.89E+000

0.433kV Bus-1 11kV Bus. 90.82 0.000 98.11 93.86 98.89 0.000 0.000

Bus6 220KV Bus1 98.47 0.153 98.66 99.95 99.86 0.134 0.095 2.37E-001 3.28E+000 7.78E-001 4.70E+000

Bus7 220KV Bus1 98.47 0.153 98.66 99.95 99.86 0.134 0.095 2.37E-001 3.28E+000 7.78E-001 4.70E+000

# T11~3 220KV Bus1 90.82 0.013 95.03 95.84 100.00 0.026 0.051 * 3.76E+000 3.90E+001 1.98E-001 8.89E+000

220kV OG Line-1 Bus8 100.00 0.080 100.00 100.00 100.00 0.065 0.034 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV OG Line-2 Bus9 100.00 0.070 100.00 100.00 100.00 0.056 0.029 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV IC Line-1 Bus6 100.00 0.153 100.00 100.00 100.00 0.134 0.095 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV IC Line-2 Bus7 100.00 0.153 100.00 100.00 100.00 0.134 0.095 1.91E-001 2.68E+000 1.91E-001 2.68E+000

33KV BUS 1 Bus Ref A 0.00 9.625 0.00 99.84 99.94 9.646 9.646

33KV BUS 2 33KV BUS 1 0.00 4.813 0.00 99.84 99.94 4.823 4.823

33KV BUS 2 Bus Ref B 0.00 0.000 0.00 99.84 99.94 0.000 0.000

Page 144 of 160


Project: 220/132/33kV Sub station ETAP Page: 25
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

(Cont.)

Fault at bus: Bus Ref A


Nominal kV = 33.000
Voltage c Factor = 1.00 (Minimum If)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

220KV Bus1 220KV Bus2 98.12 0.078 98.19 99.95 99.98 0.073 0.064

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 9.625 9.646 8.335 9.640
Peak Current (kA), Method C : 25.636 25.692 22.201 25.676
Breaking Current (kA, rms, symm) : 9.646 8.335 9.640
Steady State Current (kA, rms) : 9.625 9.646 8.335 9.640

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer

Page 145 of 160


Project: 220/132/33kV Sub station ETAP Page: 26
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

Fault at bus: Bus Ref B


Nominal kV = 33.000
Voltage c Factor = 1.00 (Minimum If)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus Ref B Total 0.00 9.625 0.00 99.84 99.94 9.646 9.646 7.79E-001 1.82E+001 8.03E-001 1.80E+001

0.433kV Bus-2 33KV BUS 2 0.00 0.000 57.70 57.65 100.00 0.000 0.000

132KV BUS 33KV BUS 2 91.59 4.813 91.79 99.84 99.94 4.823 4.823 1.30E+000 3.63E+001 1.35E+000 3.61E+001

132KV BUS 33KV BUS 1 91.59 4.812 91.79 99.84 99.94 4.823 4.823 1.82E+000 3.63E+001 1.87E+000 3.61E+001

Bus13 132KV BUS 96.06 0.512 96.45 99.91 99.70 0.463 0.365 1.68E+000 7.08E+000 3.73E+000 8.71E+000

Bus11 132KV BUS 96.86 0.408 97.21 99.91 99.75 0.365 0.278 2.35E+000 8.81E+000 5.36E+000 1.12E+001

Bus12 132KV BUS 96.86 0.408 97.21 99.91 99.75 0.365 0.278 2.35E+000 8.81E+000 5.36E+000 1.12E+001

Bus15 132KV BUS 97.46 0.331 97.76 99.91 99.79 0.293 0.219 3.12E+000 1.08E+001 7.22E+000 1.41E+001

# 220KV Bus2 132KV BUS 98.12 0.401 98.19 99.95 99.98 0.367 0.295 3.60E-001 9.27E+000 5.35E-001 1.17E+001

# 11kV Bus. 132KV BUS 90.82 0.021 95.03 95.84 100.00 0.108 0.365 * 6.75E+000 1.74E+002 2.10E-001 9.46E+000

# 220KV Bus1 132KV BUS 98.12 0.401 98.19 99.95 99.98 0.367 0.295 3.60E-001 9.27E+000 5.35E-001 1.17E+001

# T11~3 132KV BUS 90.82 0.021 95.03 95.84 100.00 0.108 0.365 * 6.75E+000 1.74E+002 2.10E-001 9.46E+000

U9 Bus13 100.00 0.512 100.00 100.00 100.00 0.463 0.365 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U24 Bus11 100.00 0.408 100.00 100.00 100.00 0.365 0.278 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U8 Bus12 100.00 0.408 100.00 100.00 100.00 0.365 0.278 2.40E-001 3.36E+000 2.40E-001 3.36E+000

U10 Bus15 100.00 0.331 100.00 100.00 100.00 0.293 0.219 2.40E-001 3.36E+000 2.40E-001 3.36E+000

Bus8 220KV Bus2 99.19 0.080 99.34 99.94 99.90 0.065 0.034 8.84E-001 6.22E+000 2.60E+000 1.29E+001

Bus9 220KV Bus2 99.29 0.070 99.43 99.94 99.91 0.056 0.029 1.06E+000 7.10E+000 3.21E+000 1.55E+001

# 11kV Bus. 220KV Bus2 90.82 0.013 95.03 95.84 100.00 0.026 0.051 * 3.76E+000 3.90E+001 1.98E-001 8.89E+000

0.433kV Bus-1 11kV Bus. 90.82 0.000 98.11 93.86 98.89 0.000 0.000

Bus6 220KV Bus1 98.47 0.153 98.66 99.95 99.86 0.134 0.095 2.37E-001 3.28E+000 7.78E-001 4.70E+000

Bus7 220KV Bus1 98.47 0.153 98.66 99.95 99.86 0.134 0.095 2.37E-001 3.28E+000 7.78E-001 4.70E+000

# T11~3 220KV Bus1 90.82 0.013 95.03 95.84 100.00 0.026 0.051 * 3.76E+000 3.90E+001 1.98E-001 8.89E+000

220kV OG Line-1 Bus8 100.00 0.080 100.00 100.00 100.00 0.065 0.034 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV OG Line-2 Bus9 100.00 0.070 100.00 100.00 100.00 0.056 0.029 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV IC Line-1 Bus6 100.00 0.153 100.00 100.00 100.00 0.134 0.095 1.91E-001 2.68E+000 1.91E-001 2.68E+000

220kV IC Line-2 Bus7 100.00 0.153 100.00 100.00 100.00 0.134 0.095 1.91E-001 2.68E+000 1.91E-001 2.68E+000

33KV BUS 1 Bus Ref A 0.00 0.000 0.00 99.84 99.94 0.000 0.000

33KV BUS 1 33KV BUS 2 0.00 4.812 0.00 99.84 99.94 4.823 4.823

33KV BUS 2 Bus Ref B 0.00 9.625 0.00 99.84 99.94 9.646 9.646

Page 146 of 160


Project: 220/132/33kV Sub station ETAP Page: 27
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

(Cont.)

Fault at bus: Bus Ref B


Nominal kV = 33.000
Voltage c Factor = 1.00 (Minimum If)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

220KV Bus1 220KV Bus2 98.12 0.078 98.19 99.95 99.98 0.073 0.064

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 9.625 9.646 8.335 9.640
Peak Current (kA), Method C : 25.636 25.692 22.201 25.676
Breaking Current (kA, rms, symm) : 9.646 8.335 9.640
Steady State Current (kA, rms) : 9.625 9.646 8.335 9.640

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer

Page 147 of 160


Project: 220/132/33kV Sub station ETAP Page: 28
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

0.433kV Bus-1 0.433 11.367 18.617 11.367 11.425 18.711 11.425 11.425 9.844 16.122 9.844 9.844 11.427 18.714 11.427 11.427
0.433kV Bus-2 0.433 16.075 26.364 16.075 16.182 26.539 16.182 16.182 13.922 22.832 13.922 13.922 16.185 26.543 16.185 16.185
11kV Bus. 11.000 26.699 71.651 26.699 0.000 0.000 0.000 0.000 23.122 62.051 23.122 23.122 23.122 62.051 23.122 23.122
33KV BUS 1 33.000 9.625 25.636 9.625 9.646 25.692 9.646 9.646 8.335 22.201 8.335 8.335 9.640 25.676 9.640 9.640
33KV BUS 2 33.000 9.625 25.636 9.625 9.646 25.692 9.646 9.646 8.335 22.201 8.335 8.335 9.640 25.676 9.640 9.640
132KV BUS 132.000 28.281 63.930 28.281 28.986 65.523 28.986 28.986 24.492 55.365 24.492 24.492 28.911 65.355 28.911 28.911
220KV Bus1 220.000 28.161 69.772 28.161 26.866 66.563 26.866 26.866 24.388 60.425 24.388 24.388 27.770 68.803 27.770 27.770
220KV Bus2 220.000 28.161 69.772 28.161 26.866 66.563 26.866 26.866 24.388 60.425 24.388 24.388 27.770 68.803 27.770 27.770
Bus Ref A 33.000 9.625 25.636 9.625 9.646 25.692 9.646 9.646 8.335 22.201 8.335 8.335 9.640 25.676 9.640 9.640
Bus Ref B 33.000 9.625 25.636 9.625 9.646 25.692 9.646 9.646 8.335 22.201 8.335 8.335 9.640 25.676 9.640 9.640

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.

Page 148 of 160


Project: 220/132/33kV Sub station ETAP Page: 29
11.1.0C
Location: Dehradun Date: 16-09-2013
Contract: HPL SN: VOLTECHENG
Engineer: Marimuthu.N Revision: Base
Study Case: HPL
Filename: HPL Config.: Normal

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

0.433kV Bus-1 0.433 0.01143 0.01749 0.02089 0.01143 0.01749 0.02089 0.01141 0.01712 0.02058 0.00000 0.00000 0.00000

0.433kV Bus-2 0.433 0.00805 0.01239 0.01477 0.00805 0.01239 0.01477 0.00803 0.01205 0.01448 0.00000 0.00000 0.00000

11kV Bus. 11.000 0.00892 0.23770 0.23787 0.00892 0.23770 0.23787 0.00000 0.00000 0.00000

33KV BUS 1 33.000 0.08485 1.97772 1.97954 0.08485 1.97772 1.97954 0.08746 1.96469 1.96664 0.00000 0.00000 0.00000

33KV BUS 2 33.000 0.08485 1.97772 1.97954 0.08485 1.97772 1.97954 0.08746 1.96469 1.96664 0.00000 0.00000 0.00000

132KV BUS 132.000 0.50447 2.64711 2.69475 0.50447 2.64711 2.69475 0.54616 2.43871 2.49913 0.00000 0.00000 0.00000

220KV Bus1 220.000 0.44146 4.48871 4.51036 0.44146 4.48871 4.51036 0.64068 5.12409 5.16399 0.00000 0.00000 0.00000

220KV Bus2 220.000 0.44146 4.48871 4.51036 0.44146 4.48871 4.51036 0.64068 5.12409 5.16399 0.00000 0.00000 0.00000

Bus Ref A 33.000 0.08485 1.97772 1.97954 0.08485 1.97772 1.97954 0.08746 1.96469 1.96664 0.00000 0.00000 0.00000

Bus Ref B 33.000 0.08485 1.97772 1.97954 0.08485 1.97772 1.97954 0.08746 1.96469 1.96664 0.00000 0.00000 0.00000

Page 149 of 160


Project: 220/132/33kV Sub station ETAP Page: 1
Location: Dehradun 11.1.0C Date: 16-09-2013
Contract: HPL Revision: Base
Engineer: Marimuthu.N
Filename: HPL Overcurrent Relay Settings

OCR: 11kV
MFR: AREVA Tag #: CT Base kV If (kA)
Model: P127 Phase: 100/1 11.000

GND: 100/1 11.000

OC Level: OC1
Range Setting
Phase TOC IEC - Standard Inverse
Pickup (Tap) 0.1 - 25 xCT Sec 0.230
Time Dial 0.740
Phase INST Pickup 0.5 - 40 xCT Sec 1.000
Time Delay 0 - 150 0.300

OCR: 132KV LINE-1


MFR: GE Multilin Tag #: CT Base kV If (kA)
Model: F650 Phase: 400/1 132.000 29.03 3 ph, Asym. (Calc.)
29.03 LG, Asym. (Calc.)
GND: 400/1 132.000 29.03 LG, Asym. (Calc.)
Sen. GND: 400/1 132.000 29.03 LG, Asym. (Calc.)
OC Level: OC1
Range Setting Setting
Phase TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 1.000
Time Dial 0.150 Phase 67 Direction Reverse
MTA 45.00
Polarization Voltage
Neutral TOC IEC - Curve A Neutral 67 Direction Reverse
Pickup (Tap) 0.05 - 160 Sec - 1A 0.200 MTA 45.00
Time Dial 0.300 Polarization Voltage

OCR: 132KV LINE-2


MFR: GE Multilin Tag #: CT Base kV If (kA)
Model: F650 Phase: 400/1 132.000

GND: 400/1 132.000


Sen. GND: 400/1 132.000
OC Level: OC1
Range Setting Setting
Phase TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 1.000
Time Dial 0.150 Phase 67 Direction Reverse
MTA 45.00
Polarization Voltage
Neutral TOC IEC - Curve A Neutral 67 Direction Reverse
Pickup (Tap) 0.05 - 160 Sec - 1A 0.200 MTA 45.00
Time Dial 0.330 Polarization Voltage
Page 150 of 160
Project: 220/132/33kV Sub station ETAP Page: 2
Location: Dehradun 11.1.0C Date: 16-09-2013
Contract: HPL Revision: Base
Engineer: Marimuthu.N
Filename: HPL Overcurrent Relay Settings

OCR: 132KV LINE-3


MFR: GE Multilin Tag #: CT Base kV If (kA)
Model: F650 Phase: 400/1 132.000

GND: 400/1 132.000


Sen. GND: 400/1 132.000
OC Level: OC1
Range Setting Setting
Phase TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 1.000
Time Dial 0.150 Phase 67 Direction Reverse
MTA 45.00
Polarization Voltage
Neutral TOC IEC - Curve A Neutral 67 Direction Reverse
Pickup (Tap) 0.05 - 160 Sec - 1A 0.200 MTA 45.00
Time Dial 0.330 Polarization Voltage

OCR: 132KV LINE-4


MFR: GE Multilin Tag #: CT Base kV If (kA)
Model: F650 Phase: 400/1 132.000

GND: 400/1 132.000


Sen. GND: 400/1 132.000
OC Level: OC1
Range Setting Setting
Phase TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 1.000
Time Dial 0.150 Phase 67 Direction Reverse
MTA 45.00
Polarization Voltage
Neutral TOC IEC - Curve A Neutral 67 Direction Reverse
Pickup (Tap) 0.05 - 160 Sec - 1A 0.200 MTA 45.00
Time Dial 0.330 Polarization Voltage

Page 151 of 160


Project: 220/132/33kV Sub station ETAP Page: 3
Location: Dehradun 11.1.0C Date: 16-09-2013
Contract: HPL Revision: Base
Engineer: Marimuthu.N
Filename: HPL Overcurrent Relay Settings

OCR: 160 MVA TR-1 132KV SIDE


MFR: GE Multilin Tag #: CT Base kV If (kA)
Model: F650 Phase: 800/1 132.000

GND: 800/1 132.000


Sen. GND: 800/1 132.000
OC Level: OC1
Range Setting Setting
Phase TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 5A 0.960
Time Dial 0.170 Phase 67 Direction Forward
Phase INST Pickup 0.05 - 160 Sec - 1A 9.480 MTA 45.00
Time Delay 0 - 900 0.500 Polarization Voltage
Neutral TOC IEC - Curve A Neutral 67 Direction Forward
Pickup (Tap) 0.05 - 160 Sec - 1A 0.200 MTA 45.00
Time Dial 0.230 Polarization Voltage
Neutral INST Pickup 0.05 - 160 Sec - 1A 2.500
Time Delay 0 - 900 0.600

OCR: 160 MVA TR-1 220KV SIDE


MFR: GE Multilin Tag #: CT Base kV If (kA)
Model: F650 Phase: 800/1 220.000 33.57 3 ph, Asym. (Calc.)
33.57 LG, Asym. (Calc.)
GND: 800/1 220.000 33.57 LG, Asym. (Calc.)
Sen. GND: 800/1 220.000 33.57 LG, Asym. (Calc.)
OC Level: OC1
Range Setting Setting
Phase TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 0.580
Time Dial 0.190 Phase 67 Direction Forward
Phase INST Pickup 0.05 - 160 Sec - 1A 5.690 MTA 0.00
Time Delay 0 - 900 0.350 Polarization Voltage
Neutral TOC IEC - Curve A Neutral 67 Direction Forward
Pickup (Tap) 0.05 - 160 Sec - 1A 0.200 MTA 45.00
Time Dial 0.240 Polarization Voltage
Neutral INST Pickup 0.05 - 160 Sec - 5A 2.000
Time Delay 0 - 900 0.500

Page 152 of 160


Project: 220/132/33kV Sub station ETAP Page: 4
Location: Dehradun 11.1.0C Date: 16-09-2013
Contract: HPL Revision: Base
Engineer: Marimuthu.N
Filename: HPL Overcurrent Relay Settings

OCR: 160 MVA TR-2 132KV SIDE


MFR: GE Multilin Tag #: CT Base kV If (kA)
Model: F650 Phase: 800/1 132.000

GND: 800/1 132.000


Sen. GND: 800/1 132.000
OC Level: OC1
Range Setting Setting
Phase TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 0.960
Time Dial 0.170 Phase 67 Direction Forward
Phase INST Pickup 0.05 - 160 Sec - 1A 9.480 MTA 45.00
Time Delay 0 - 900 0.100 Polarization Dual
Neutral TOC IEC - Curve A Neutral 67 Direction Forward
Pickup (Tap) 0.05 - 160 Sec - 1A 0.200 MTA 45.00
Time Dial 0.230 Polarization Voltage
Neutral INST Pickup 0.05 - 160 Sec - 1A 2.500
Time Delay 0 - 900 0.600

OCR: 160 MVA TR-2 220KV SIDE


MFR: GE Multilin Tag #: CT Base kV If (kA)
Model: F650 Phase: 800/1 220.000

GND: 800/1 220.000


Sen. GND: 800/1 220.000
OC Level: OC1
Range Setting Setting
Phase TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 0.580
Time Dial 0.190 Phase 67 Direction Forward
Phase INST Pickup 0.05 - 160 Sec - 1A 5.690 MTA 45.00
Time Delay 0 - 900 0.350 Polarization Voltage
Neutral TOC IEC - Curve A Neutral 67 Direction Reverse
Pickup (Tap) 0.05 - 160 Sec - 1A 0.200 MTA 45.00
Time Dial 0.240 Polarization Voltage
Neutral INST Pickup 0.05 - 160 Sec - 1A 2.000
Time Delay 0 - 900 0.500

Page 153 of 160


Project: 220/132/33kV Sub station ETAP Page: 5
Location: Dehradun 11.1.0C Date: 16-09-2013
Contract: HPL Revision: Base
Engineer: Marimuthu.N
Filename: HPL Overcurrent Relay Settings

OCR: 220 KV LINE


MFR: GE Multilin Tag #: CT Base kV If (kA)
Model: F650 Phase: 1600/1 220.000 33.57 3 ph, Asym. (Calc.)
33.57 LG, Asym. (Calc.)
GND: 1600/1 220.000 33.57 LG, Asym. (Calc.)
Sen. GND: 1600/1 220.000 33.57 LG, Asym. (Calc.)
OC Level: OC1
Range Setting
Phase TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 1.000
Time Dial 0.200
Neutral TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 0.200
Time Dial 0.300

OCR: 220 KV LINE-1


MFR: GE Multilin Tag #: CT Base kV If (kA)
Model: F650 Phase: 1600/1 220.000 33.57 3 ph, Asym. (Calc.)
33.57 LG, Asym. (Calc.)
GND: 1600/1 220.000 33.57 LG, Asym. (Calc.)
Sen. GND: 1600/1 220.000 33.57 LG, Asym. (Calc.)
OC Level: OC1
Range Setting
Phase TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 1.000
Time Dial 0.200
Neutral TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 0.200
Time Dial 0.250

OCR: 220 KV LINE-3


MFR: GE Multilin Tag #: CT Base kV If (kA)
Model: F650 Phase: 800/1 220.000

GND: 800/1 220.000


Sen. GND: 800/1 220.000
OC Level: OC1
Range Setting
Phase TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 1.000
Time Dial 0.200
Neutral TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 0.200
Time Dial 0.250

Page 154 of 160


Project: 220/132/33kV Sub station ETAP Page: 6
Location: Dehradun 11.1.0C Date: 16-09-2013
Contract: HPL Revision: Base
Engineer: Marimuthu.N
Filename: HPL Overcurrent Relay Settings

OCR: 220 KV LINE-4


MFR: GE Multilin Tag #: CT Base kV If (kA)
Model: F650 Phase: 800/1 220.000

GND: 800/1 220.000


Sen. GND: 800/1 220.000
OC Level: OC1
Range Setting
Phase TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 1.000
Time Dial 0.200
Neutral TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 0.200
Time Dial 0.250

OCR: 33 KV LINE
MFR: GE Multilin Tag #: CT Base kV If (kA)
Model: F650 Phase: 400/1 33.000

GND: 400/1 33.000


Sen. GND: 400/1 33.000
OC Level: OC1
Range Setting
Phase TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 1.000
Time Dial 0.030
Neutral TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 0.200
Time Dial 0.060

OCR: 33KV BUS COUPLER


MFR: GE Multilin Tag #: CT Base kV If (kA)
Model: F650 Phase: 800/1 33.000

GND: 800/1 33.000


Sen. GND: 800/1 33.000
OC Level: OC1
Range Setting
Phase TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 0.960
Time Dial 0.070
Neutral TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 0.200
Time Dial 0.100

Page 155 of 160


Project: 220/132/33kV Sub station ETAP Page: 7
Location: Dehradun 11.1.0C Date: 16-09-2013
Contract: HPL Revision: Base
Engineer: Marimuthu.N
Filename: HPL Overcurrent Relay Settings

OCR: 33KV Capacitor Bank


MFR: GE Multilin Tag #: CT Base kV If (kA)
Model: F650 Phase: 200/1 33.000 7.24 3 ph, Asym. (Calc.)
7.24 LG, Asym. (Calc.)
GND: 200/1 33.000 7.24 LG, Asym. (Calc.)
Sen. GND: 200/1 33.000 7.24 LG, Asym. (Calc.)
OC Level: OC1
Range Setting Setting
Phase TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 0.960
Time Dial 0.040 Phase 67 Direction Forward
MTA 0.00
Polarization Voltage
Neutral TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 0.200
Time Dial 0.070

OCR: 40 MVA 132 KV SIDE TR-1


MFR: GE Multilin Tag #: CT Base kV If (kA)
Model: F650 Phase: 400/1 132.000

GND: 400/1 132.000


Sen. GND: 400/1 132.000
OC Level: OC1
Range Setting Setting
Phase TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 0.480
Time Dial 0.300 Phase 67 Direction Forward
Phase INST Pickup 0.05 - 160 Sec - 1A 4.000 MTA 0.00
Time Delay 0 - 900 0.300 Polarization Voltage
Neutral TOC IEC - Curve A Neutral 67 Direction Forward
Pickup (Tap) 0.05 - 160 Sec - 1A 0.200 MTA 45.00
Time Dial 0.440 Polarization Voltage
Neutral INST Pickup 0.05 - 160 Sec - 1A 5.600
Time Delay 0 - 900 0.350

Page 156 of 160


Project: 220/132/33kV Sub station ETAP Page: 8
Location: Dehradun 11.1.0C Date: 16-09-2013
Contract: HPL Revision: Base
Engineer: Marimuthu.N
Filename: HPL Overcurrent Relay Settings

OCR: 40 MVA 132 KV SIDE TR-2


MFR: GE Multilin Tag #: CT Base kV If (kA)
Model: F650 Phase: 400/1 132.000

GND: 400/1 132.000


Sen. GND: 400/1 132.000
OC Level: OC1
Range Setting Setting
Phase TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 0.480
Time Dial 0.300 Phase 67 Direction Forward
Phase INST Pickup 0.05 - 160 Sec - 1A 4.000 MTA 0.00
Time Delay 0 - 900 0.300 Polarization Voltage
Neutral TOC IEC - Curve A Neutral 67 Direction Forward
Pickup (Tap) 0.05 - 160 Sec - 1A 0.200 MTA 45.00
Time Dial 0.440 Polarization Voltage
Neutral INST Pickup 0.05 - 160 Sec - 1A 2.000
Time Delay 0 - 900 0.350

OCR: 40 MVA 33 KV SIDE TR-1


MFR: GE Multilin Tag #: CT Base kV If (kA)
Model: F650 Phase: 800/1 33.000

GND: 800/1 33.000


Sen. GND: 800/1 33.000
OC Level: OC1
Range Setting Setting
Phase TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 0.960
Time Dial 0.120
Phase INST Pickup 0.05 - 160 Sec - 1A 8.000
Time Delay 0 - 900 0.250
Neutral TOC IEC - Curve A Neutral 67 Direction Reverse
Pickup (Tap) 0.05 - 160 Sec - 1A 0.200 MTA 45.00
Time Dial 0.250 Polarization Voltage
Neutral INST Pickup 0.05 - 160 Sec - 5A 2.000
Time Delay 0 - 900 0.300

Page 157 of 160


Project: 220/132/33kV Sub station ETAP Page: 9
Location: Dehradun 11.1.0C Date: 16-09-2013
Contract: HPL Revision: Base
Engineer: Marimuthu.N
Filename: HPL Overcurrent Relay Settings

OCR: 40 MVA 33 KV SIDE TR-2


MFR: GE Multilin Tag #: CT Base kV If (kA)
Model: F650 Phase: 800/1 33.000

GND: 800/1 33.000


Sen. GND: 800/1 33.000
OC Level: OC1
Range Setting
Phase TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 0.960
Time Dial 0.120
Phase INST Pickup 0.05 - 160 Sec - 1A 8.000
Time Delay 0 - 900 0.250
Neutral TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 0.200
Time Dial 0.250
Neutral INST Pickup 0.05 - 160 Sec - 1A 2.000
Time Delay 0 - 900 0.300

OCR: BUS COUPLER


MFR: GE Multilin Tag #: CT Base kV If (kA)
Model: F650 Phase: 1600/1 220.000 22.10 3 ph, Sym. (Calc.)
22.10 LG, Sym. (Calc.)
GND: 1600/1 220.000 22.10 LG, Sym. (Calc.)
Sen. GND: 1600/1 220.000 22.10 LG, Sym. (Calc.)
OC Level: OC1
Range Setting
Phase TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 1.000
Time Dial 0.200
Neutral TOC IEC - Curve A
Pickup (Tap) 0.05 - 160 Sec - 1A 0.200
Time Dial 0.300

Page 158 of 160


Project: 220/132/33kV Sub station ETAP Page: 10
Location: Dehradun 11.1.0C Date: 16-09-2013
Contract: HPL Revision: Base
Engineer: Marimuthu.N
Filename: HPL Overcurrent Relay Settings

OCR: MSB BC
MFR: AREVA Tag #: CT Base kV If (kA)
Model: P127 Phase: 1000/1 0.433

GND: 1000/1 0.433

OC Level: OC1
Range Setting
Phase TOC IEC - Standard Inverse
Pickup (Tap) 0.1 - 25 xCT Sec 0.590
Time Dial 0.100
Phase INST Pickup 0.5 - 40 xCT Sec 1.500
Time Delay 0 - 150 0.100
Ground TOC IEC - Standard Inverse
Pickup (Tap) 0.002 - 1 xCT Sec 0.200
Time Dial 0.150
Ground INST Pickup 0.002 - 1 xCT Sec 1.000
Time Delay 0 - 150 0.100

OCR: MSB IC-1


MFR: AREVA Tag #: CT Base kV If (kA)
Model: P127 Phase: 1000/1 0.433

GND: 1000/1 0.433

OC Level: OC1
Range Setting
Phase TOC IEC - Standard Inverse
Pickup (Tap) 0.1 - 25 xCT Sec 0.590
Time Dial 0.200
Phase INST Pickup 0.5 - 40 xCT Sec 1.500
Time Delay 0 - 150 0.200
Ground TOC IEC - Standard Inverse
Pickup (Tap) 0.002 - 1 xCT Sec 0.200
Time Dial 0.300
Ground INST Pickup 0.002 - 1 xCT Sec 1.000
Time Delay 0 - 150 0.200

Page 159 of 160


Project: 220/132/33kV Sub station ETAP Page: 11
Location: Dehradun 11.1.0C Date: 16-09-2013
Contract: HPL Revision: Base
Engineer: Marimuthu.N
Filename: HPL Overcurrent Relay Settings

OCR: MSB IC-2


MFR: AREVA Tag #: CT Base kV If (kA)
Model: P127 Phase: 1000/1 0.433

GND: 1000/1 0.433

OC Level: OC1
Range Setting
Phase TOC IEC - Standard Inverse
Pickup (Tap) 0.1 - 25 xCT Sec 0.920
Time Dial 0.200
Phase INST Pickup 0.5 - 40 xCT Sec 2.000
Time Delay 0 - 150 0.200
Ground TOC IEC - Standard Inverse
Pickup (Tap) 0.002 - 1 xCT Sec 0.200
Time Dial 0.300
Ground INST Pickup 0.002 - 1 xCT Sec 1.000
Time Delay 0 - 150 0.200

Page 160 of 160

You might also like