You are on page 1of 2
Thermax Limited Inspection of ar Enviro Division Pulsing pipe concentricity Enviro Division ENV TGACTIM/OS REV, OT TO/a/aOEG Purpose "+ Toanaureconcanteky of pulling pipes holes with reference to tubeshect holes. scope ‘With ensuring the concenrcty and proper alignment of pulsing pipe enables to Increase the work feof dust bog stem Concent Checking gouge Procedure: 1.Concentrty gauge tobe manufactured 2s per Drowing No. TLOAC-FK-ORGOO RO 2. Adimension hl be checked as per concentcy gauge drawing 2. Inspection of Pung pipes with reference to tubesheet hoes to be checked with concen gauge 4. nar the gauge inside the tubesheet hole proper 5.Ficthe Concent in trough the gauge from bottom sea tubesheet hole. 6 check the pla found propery passing trough the pulsing pip ole Prepared by checked by fevowed By Approved by QA Head bas an saga aie wancam BFE] : # [ise | a" ai i Oi A i L @|"se — NOISIAIG OMIANA ae di GaLINIT XVINMAHL 8 1 00880-K1KO¥OL |STOH Sdid ONISTNd OL TIOH La3HS SAN, | a [acon |

You might also like