You are on page 1of 384

የገፅ ቁጥር፡------------- Page No

NOMY ENGINEERING P.L.C የውል ቁጥር፡


----------- Contract No

የክፍያ ማጠቃለያ ቁጥር 01


Summary Of Statement 01
ሥራው
Project: G+7 CONDOMINIUM APARTEMENT

ቦታው
Site Location: KOYE FECH TYPOLOGY:S(G+7)LINEARE

የሥራው ተቃራጩ
Contractor: DUZA CONSTRACTION BLOCK NO. 400 Parcel:33

Details of works executed and/or materials supplied

ÉU` uŸòM(w`) ÉS` (w`)


Sub Total(Birr) Total (Birr)
SÓKÝ
}/l DESCRIPTION ¾¨<K ¾}c^¨< ¾¨<K
Item No. Contract Executed Contract

B. SUB -STRUCTURE
1 Excavation and Earthwork 997,507.88 #DIV/0!
2 Concrete Work 763,235.74 604,761.48
3 Masnory Work 259,963.50 -

SUB-TOTAL B 2,020,707.12
C. SUPER STRUCTURE
1 Concrete Work 1,764,401.28
2 Block Work 225,144.62 -
3 Finishing Work 1,449,763.45
SUB-TOTAL C 3,439,309.35
ÖpLL ÉU` (Total) B+C 5,460,016.47
’@/— --------------------------------------Ÿ²=I uLà ¾}²[²\ƒ N=dx‹ ƒ¡¡M SJ“†¨<” u²=G<U SW[ƒ eŸ³_ É[e ¾}W^¨< Y^“

¨ÃU ¾k[u¨< °n ÖpLL ªÒ w`

I/We ------------------------- here by certifiy that the above figures are correct and that the total value of work executed
and/or materials supplied to date is birr
----------------------- ------------------ ---------------------
Y^ ተs^ß ኦፊስ ኢንጂነር ተቆጣጣሪ መሐንዲስ
Contractor Office Engineer Residance Engineer
የገፅ ቁጥር፡------------- Page No
የውል ቁጥር፡
----------- Contract No

የክፍያ ማጠቃለያ ቁጥር 01


Summary Of Statement 01

TYPOLOGY:S(G+7)LINEARE

BLOCK NO. 400 Parcel:33

Details of works executed and/or materials supplied

ÉS` (w`)
Total (Birr)

¾}W^¨<
Executed

#DIV/0!

-
#DIV/0!
¡M SJ“†¨<” u²=G<U SW[ƒ eŸ³_ É[e ¾}W^¨< Y^“

gures are correct and that the total value of work executed
------------------ ---------------------
ተቆጣጣሪ መሐንዲስ
Residance Engineer
NOMY ENGINEERING P.L.C.
¾pÉT>Á ¡õÁ Ue¡` ¨[kƒ-01
PAYMENT CERTIFICATE NO 01
d

¨<M l :-
Contract no:-______________________________

Y^¬:-
Construction of Condomiunium Apartments
Project :-
x ¨< :-
Location :-
Kuye Feche
›c]¨< S/u?ƒ :-
Client :- Project 12 Housing Development Branch Office
¾e^ }kD^ß
Contractor :- DUZA CONSTRACTION
›T"] SN”Ç=e
Consultant :- Nomy Engineering P.l.C

TYPOLOGY NO:-S(G+7)LINEAR
PARCEL NO:-33
BLOCK NO:-B 400

›v] uJ’¨< ¾¡õÁ c’É ØÁo Sc[ƒ  cŸ ³_ É[e }kD^Û ¾W^¨< Y^“/Ák[u¨< °n ªÒ
As per attached statement the value of work executed and or materials supplied to date is

PREVIOUS PAYMENTS PREVIOUS ADVANCE PAYMENT

l. k” ¾Ñ”²u< M¡ w` ¾.}. . l. k” ¾Ñ”²u< M¡ w` ¾.}. .


Amount Before Amount Before VAT 1
No. Date VAT (15%) No. Date VAT (15%)
VAT (Birr) (Birr)
1st 292,668.29 43,900.24
2
2nd 390,224.39 58,533.66
3rd 292,668.29 43,900.24
3
4th 379151.04 56,872.66

É
To

ÉU` ÉU`
0.00 0.00 1,354,712.01 203,206.80
TOTAL TOTAL

20% advance payment check


amount of advance taken (birr) 1,354,712.01
amount of advance repaid (birr) #DIV/0!
outstanding advance payment (birr) #DIV/0!

KY^ }kD^Û w` 1165372.09 K=ŸðM S‰K<” 

We certify that the contractor is entiteled to th


Birr : ONE MILLION ONE HUNDERED SIXTY FIVE THOUSAND THREE HUNDERED

__________________________
}[ÒÓ×DM x  “ k” _______________________
Certified Date & Place
NEERING P.L.C.
Á Ue¡` ¨[kƒ-01
TIFICATE NO 01
date of signature of contract: 21/09/2006 E.C
Performance bond expiry date: May 31, 2014 + 720days+ 365days
Advance bond expiry date: May 31, 2014 +720days

¨<K< ¾}ð[Suƒ
Date of signiture of cont:-

¾Ñ”²u< M¡ w`
Amount (Birr)

Main Contract (Before VAT) 4,877,804.84


Supplementary cont. (Incl VAT)
Variation order(Incl VAT)

Revised contract(Before Vat) 1,895,755.21

Total Sum (Before Vat) 6,773,560.05


VAT (15%) 1,016,034.01

Total sum (Inc VAT) 7,789,594.06

CONTRACT AMOUNT WITHOUT VAT TOTAL ADVANCE AMOUNT WITHOUT VAT


(BIRR) (BIRR)

6,773,560.05 1,354,712.01

Total excuted
AMOUNT(BIRR) #DIV/0!
›ekÉV ¾}ŸðK
-
Previous payments

p“i
-
Rebate
SÁ¹
#DIV/0!
Retantion (5%)
SkÝ
-
Penality
›ekÉV ¾}ŸðK
¾pÉT>Á ¡õÁ
#DIV/0!
Previous Advance
payment 20%
¾°n }k“i
Material deduction
ÉU`
#DIV/0! #DIV/0!
Total
ÖpLL ÉU`
#DIV/0!
Total sum
(}. . ÚUa)
#DIV/0!
VAT(15%)
Retantion VAT(15%) #DIV/0!
¾}×^ K}kD^Û ¾T>ŸðM
#DIV/0!
Net sum due to the contractor

K=ŸðM S‰K<”  እና [ÒÓ×K”::

or is entiteled to the sum of


ND THREE HUNDERED SEVENTY TWO BIRR & 09 /100 ONLY

çÉkDM _________________________
Approved
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 9

Project: OBU
Location : CHIRO
Client :moe
Consultant :acute ENGINEERING PLC.
Contractor: tnt
SUB
No. Size Quantity

1 18.07
45.29 818.39

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 10

Project: OBU
Location : CHIRO
Client :moe
Consultant :acute ENGINEERING PLC.
Contractor: tnt
SUB

818.39

1 818.39
0.74 606.18
606.18

1 818.39
2.98 2441.36
2441.36

1 818.39
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 11

Project: OBU
Location : CHIRO
Client :moe
Consultant :acute ENGINEERING PLC.
Contractor: tnt
SUB
#DIV/0! #DIV/0!
#DIV/0!

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 12

Project: OBU
Location : CHIRO
Client :moe
Consultant :acute ENGINEERING PLC.
Contractor: tnt
SUB
No. Size Quantity

1 631.00
-0.45
-283.95

10 -0.30
0.40

-0.45
0.54
15 -0.30
0.50
-0.45
1.01
11 -0.40
0.60
-0.45
1.19
16 -0.30
0.60
-0.45
1.30
4.04

1 -180.25
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 13

Project: OBU
Location : CHIRO
Client :moe
Consultant :acute ENGINEERING PLC.
Contractor: tnt
SUB
0.50
-0.45 40.56

818.39
2.78 2275.13
631.00
-2.78 -1754.18
694.34

163.68
606.18
2441.36
#DIV/0!

#DIV/0!

587.82 587.82
587.82

2 3.18
0.25 1.59
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 14

Project: OBU
Location : CHIRO
Client :moe
Consultant :acute ENGINEERING PLC.
Contractor: tnt
SUB

4 14.49
0.25 14.49
2 9.26
0.25 4.63

2 12.11
0.25 6.06
1 4.72
0.25 1.18

1 5.18
0.25 1.30
1 32.04
0.25 8.01
1 40.62
0.25 10.16
47.40

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 15

Project: OBU
Location : CHIRO
Client :moe
Consultant :acute ENGINEERING PLC.
Contractor: tnt
SUB
No. Size Quantity

10 0.30
0.40
-0.45 -0.54

5 0.30
0.50
-0.45 -0.34

2 0.30
0.50
-0.45 -0.14

7 0.30
0.50
-0.45 -0.47

1 0.30
0.50
-0.45 -0.07

9 0.40
0.60
-0.45 -0.97

2 0.40
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 16

Project: OBU
Location : CHIRO
Client :moe
Consultant :acute ENGINEERING PLC.
Contractor: tnt
SUB
0.60
-0.45 -0.22

16 0.30
0.60
-0.45 -1.30
-4.04

2 3.78
0.25
0.40 0.76
1 6.93
0.25
0.40 0.69
2 8.85
0.25
0.40 1.77
1 7.98
0.25
0.40 0.80
2 15.69
0.25
0.40 3.14
2 3.36
0.25
0.40 0.67
2 3.13
0.25
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 17

Project: OBU
Location : CHIRO
Client :moe
Consultant :acute ENGINEERING PLC.
Contractor: tnt
SUB
0.40 0.63
2 10.14
0.25
0.40 2.03
10.48

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 18

Project: OBU
Location : CHIRO
Client :moe
Consultant :acute ENGINEERING PLC.
Contractor: tnt
SUB
No. Size Quantity

1 3.93
0.25
1.15 1.13

1 3.86
0.20
1.15 0.89
1 3.86
0.20
1.15 0.89
3 1.70
0.20
2.20 2.24
5.15

163.38
1.50 245.07
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 19

Project: OBU
Location : CHIRO
Client :moe
Consultant :acute ENGINEERING PLC.
Contractor: tnt
SUB

1 5.65
1.00 5.65
1 19.27
1.00 19.27
4 21.53
1.00 86.12
2 15.81
1.00 31.62
2 7.93
1.00 15.86
2 20.23
1.00 40.46
1 5.00
1.00 5.00
1 24.27
1.00 24.27
1 10.65
1.00 10.65
1 14.56
1.00 14.56
1 7.34
1.00 7.34
1 59.07

1.00 59.07
1 77.54
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 20

Project: OBU
Location : CHIRO
Client :moe
Consultant :acute ENGINEERING PLC.
Contractor: tnt
SUB

1.00 77.54
1 57.58

1.00 57.58
1 19.96
1.00 19.96
720.01

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 21

Project: OBU
Location : CHIRO
Client :moe
Consultant :acute ENGINEERING PLC.
Contractor: tnt
SUB
No. Size Quantity
2 1.98
0.40 1.58
2 14.64
0.40 11.71
2 3.56
0.40 2.84
2 3.31
0.40 2.64
1 2.79
0.40 1.11
1 2.54
0.40 1.01
1 5.78
0.40 2.31
1 5.53
0.40 2.21
1 2.79
0.40 1.11
1 2.54
0.40 1.01
2 5.76
0.40 4.60
1 3.56
0.40 1.42
1 3.31
0.40 1.32
1 3.23
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 22

Project: OBU
Location : CHIRO
Client :moe
Consultant :acute ENGINEERING PLC.
Contractor: tnt
SUB
0.40 1.29
1 2.98
0.40 1.19
2 14.64
0.40 11.71
2 2.23
0.40 1.78
2 1.98
0.40 1.58
1 9.39
0.40 3.75
1 9.14
0.40 3.65
1 3.13
0.40 1.25
1 2.88
0.40 1.15
1 3.31
0.40 1.32
1 3.06
0.40 1.22
1 15.69
0.40 6.28
1 15.44
0.40 6.18
1 12.39
0.40 4.95
1 12.14
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 23

Project: OBU
Location : CHIRO
Client :moe
Consultant :acute ENGINEERING PLC.
Contractor: tnt
SUB
0.40 4.85
87.07

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 24

Project: OBU
Location : CHIRO
Client :moe
Consultant :acute ENGINEERING PLC.
Contractor: tnt
SUB
No. Size Quantity

2 3.93
1.15 9.04
2 0.25
1.15 0.58

1 3.86
1.15 4.44
1 3.86
1.15 4.44
4 1.62
1.15 7.46
2 2.10

2.20 9.24
4 1.70
2.20 14.96
50.15

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 25

Project: OBU
Location : CHIRO
Client :moe
Consultant :acute ENGINEERING PLC.
Contractor: tnt
SUB

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 26

Project: OBU
Location : CHIRO
Client :moe
Consultant :acute ENGINEERING PLC.
Contractor: tnt
SUB

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 27

TAKEOFF

IRO Typology:SEM-138
Block no: 138
cute ENGINEERING PLC.
nt
SUB-STRUCTURE TAKEOFF
Description No. Size

A. SUB-STRUCTURE
1. EXCAVATION & EARTH WORK 2.00 13.48

1.1. Site Clearing and removing of the top


200mm thick soil 4.58
Total building area 1.00
1.00 2.70
5.58
1.00
1.00 6.04
7.80
1.00
1.00 4.51
7.80
1.00
4.00 2.70
2.98
1.00
1.00 1.52
2.21
1.00
1.00 1.32
2.21
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 28

TAKEOFF

IRO Typology:SEM-138
Block no: 138
cute ENGINEERING PLC.
nt
SUB-STRUCTURE TAKEOFF
1.00
1.00 1.25
2.94
1.00

1.00 2.21
4.50
1.00
m2 Total for item 1.1 1.00 1.25
1.44
1.2. Bulk Excavation in ordinary soil not
exceeding 1000mm from NGL 1.00
D=1.5-0.2=1.3 1.00 2.93
4.65
m3 Total for item 1.2 1.00
1.3. Bulk Excavation in ordinary soil
exceeding 1500mm but not 3000mm from
NGL 1.00 2.90
4.93
1.00
m3 Total for item 1.3 1.00 10.60

1.4. Bulk Excavation in ordinary soil


exceeding 3000mm but not 4500mm from
NGL 7.86
1.00
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 29

TAKEOFF

IRO Typology:SEM-138
Block no: 138
cute ENGINEERING PLC.
nt
SUB-STRUCTURE TAKEOFF
1.00 2.55
m3 Total for item 1.4 10.51

1.00

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 30

TAKEOFF

IRO Typology:SEM-138
Block no: 138
cute ENGINEERING PLC.
nt
SUB-STRUCTURE TAKEOFF
Description No. Size
FILL UNDER GRADE BEAM 1 33.89
Total building area 0.25
2 5.13
m3 total 0.25
DDT FOUNDATION COLUMN
C1

C2,C2',C3&C3' 1.00 587.82


0.50

1.00 7.15
C4&C4' 0.50
1.00

6.00 16.13
C5 0.50
1.00

2.00 9.41
m3 total 0.50
DDT MOSONARY AROUND THE
BUILDING 1.00
Perimeterof mosonary
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 31

TAKEOFF

IRO Typology:SEM-138
Block no: 138
cute ENGINEERING PLC.
nt
SUB-STRUCTURE TAKEOFF
2.00 7.72
m3 total 0.50
BACK FILL AROUND THE BUILDING 1.00

2.00 15.36
DEDUCT TOTAL BUILDING VOLUM 0.50
1.00
m3 total item 1.12 total fill
1.00 6.01
1.15. Cartaway surplus excavated material to
a distance not exceeding 5km 0.50
m3 Total for item 1.1 1.00
m3 Total for item 1.2
m3 Total for item 1.3 1.00 12.65
m3 Total for item 1.4 0.50
1.00

m3 Total for item 1.15 1.00 14.56


2. CONCRETE WORKS 0.50
2.1. 50 mm thick lean concrete in C-5 with
minimum cement content of 150 kg/m3 of
concrete under:- 1.00
a. Under Mat footing
1.00 7.34
m2 Total for item 2.1(a) 0.50
d. Under Grade beam 1.00
Axis 1,14 b/n C-D
1.00 36.67
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 32

TAKEOFF

IRO Typology:SEM-138
Block no: 138
cute ENGINEERING PLC.
nt
SUB-STRUCTURE TAKEOFF

Axis 2,3,12,13 b/n A-E 0.50


1.00
Axis 4,11 b/n B-D
1.00 39.87

Axis 5,10 b/n A'-D' 0.50


1.00
Axis 7 b/n B'-D'
1 39.37

Axis 8 b/n B-C 0.50


1.00
Axis B b/n 2-13
1 19.96
Axis C b/n 2-14 0.50
1.00

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 33

TAKEOFF

IRO Typology:SEM-138
Block no: 138
cute ENGINEERING PLC.
nt
SUB-STRUCTURE TAKEOFF
Description No. Size
b. in Foundation column 4 2.23
C-1 0.25
0.40
2 15.89
0.25
C-2 0.40
4 3.23
0.25
0.40
C-2' 2 2.71
0.25
0.40
1 6.28
C-3 0.25
0.40
1 6.26
0.25
C-3' 0.40
1 13.39
0.25
0.40
C-4 1 12.41
0.25
0.40
1 22.65
C-4' 0.25
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 34

TAKEOFF

IRO Typology:SEM-138
Block no: 138
cute ENGINEERING PLC.
nt
SUB-STRUCTURE TAKEOFF
0.40
1 5.00
0.25
C-5 0.40
2 1.51
0.25
m3 Total for item 2.2(b) 0.40
c. in Grade beam 2 2.74
Axis 1'& 14' (C-D) 0.25
0.40
1 40.17
Axis 1 (C-E) 0.25
0.40
2 45.07
Axis 2' & 13' (A-C) 0.25
0.40
ext. 1 4.80
Axis 2 (C-E') 0.25
0.40
2 1.51
Axis 3 & 12 (A-E') 0.25
0.40
1 25.12
Axis 3' & 12' (A-B) 0.25
0.40
2 4.88
Axis 3'' & 12'' (D-E) 0.25
0.40
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 35

TAKEOFF

IRO Typology:SEM-138
Block no: 138
cute ENGINEERING PLC.
nt
SUB-STRUCTURE TAKEOFF

Axis 4 & 11 (A'''- D)

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 36

TAKEOFF

IRO Typology:SEM-138
Block no: 138
cute ENGINEERING PLC.
nt
SUB-STRUCTURE TAKEOFF
Description No. Size
d. in shear /concrete/ wall
Shear wall 10 1.40

depth is 1.15 because it starts from mat beam -0.45


l=0.4+0.75=1.15 5 1.60
-0.45
Lift wall 2 1.60
back -0.45
l=0.4+0.75=1.15 7 1.60
-0.45
front 1 1.60
l=0.4+0.75=1.15 -0.45
9 2.00
sides & partition -0.45
l=0.4+0.8+1.0=2.2 2 2.00
-0.45
m3 Total for item 2.2(d) 16 1.80

2.3. Provide, cut & fix in position formwork -0.45


a. for Mat footing
external
l=(0.25+3.24+3.405+5.505+3.48+0.25)x2+(0.
25+3.2+5.08+3.63+3.41+3.2+2.02+5+1.82+3.
2+3.4+3.68+5.08+3.15+0.25)x2+(3.24x6)+(3.
48x5)+(0.77x2)=163.38 mts
1 3.78
0.40
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 37

TAKEOFF

IRO Typology:SEM-138
Block no: 138
cute ENGINEERING PLC.
nt
SUB-STRUCTURE TAKEOFF
mat beam internal 1 3.28
axis 1 b/n C-E 0.40
1 6.48
axis 2 b/n A-E 0.40
l=(2.74x2)+(2.905x2)+5+2.98=19.27 1 6.23
axis 3,5,10,12 b/n A-E 0.40
l=2.74+(2.905x2)+(5x2)+2.98=21.53 1 8.85
axis 4,11 b/n B-D 0.40
l=(2.905x2)+(5x2)=15.81 1 8.60
axis 6,9 b/n A-B & D-E 0.40
l=2.98+2.74+2.21=7.93 1 7.28
axis 7,8 b/n A'-D 0.40
l=(2.21x2)+(5x2)+(2.905x2)=20.23 1 7.03
axis 7' b/n B-C 0.40
1 15.69
axis 13 b/n A-E 0.40
l=2.98+5x2+2.905x2+2.74x2=24.27 1 15.44
axis 14 b/n B-E 0.40
l=5+2.905+2.74=10.645 1 3.31
axis A b/n 2-13 0.40
l=4.58x2+2.7x2=14.56 1 3.06
axis A' b/n 6-9 0.40
l=1.52+4.5+1.32=7.34 1 3.13
axis B b/n 2-14 0.40
l=4.58x4+3.13+2.91+2.7x2+1.52+4.5+4+1.32
+4.72+4.52+2.9+3.18+2.65=59.07 1 2.88
axis C b/n 1-14 0.40
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 38

TAKEOFF

IRO Typology:SEM-138
Block no: 138
cute ENGINEERING PLC.
nt
SUB-STRUCTURE TAKEOFF

l=2.7+4.58x4+3.13x2+2.91x2+4.72x2+4.5+4
+4.52x2+2.9x2+3.18x2+2.65x2=77.54 1 9.39
axis D b/n 1-14 0.40
l=2.7+4.58x4+3.13+2.91+4.72+2.7x2+4.5+4.
52+2.9+3.18+2.65x2=57.58 1 9.14
axis E b/n 1-14 0.40
l= 2.7x4+4.58x2=19.96 2 2.23
m2 Total for item 2.3(a) 0.40

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 39

TAKEOFF

IRO Typology:SEM-138
Block no: 138
cute ENGINEERING PLC.
nt
SUB-STRUCTURE TAKEOFF
Description No. Size
int. 1 8.65
0.40
Axis 5 (A-E) 1 8.45
ext. & int. 0.40
Axis 6 (A-B) & (D-E) 1 11.91
ext. 0.40
int. 1 11.41
0.40
Axis 7 (A'-B) 1 3.63
ext. 0.40
int. 1 3.13
0.40
Axis 7 (B'-D"') 1 20.15
ext. 0.40
int. 1 17.65
0.40
Axis 8 (A'-B) 1 5.50
ext. 0.40
int. 1 5.00
0.40
Axis 8 (B-C) 2 1.76
ext. & int. 0.40
Axis 9 (A-B) 2 1.51
ext. 0.40
int. 2 2.99
0.40
Axis 9 (D-E) 2 2.74
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 40

TAKEOFF

IRO Typology:SEM-138
Block no: 138
cute ENGINEERING PLC.
nt
SUB-STRUCTURE TAKEOFF
ext. 0.40
int. 1 39.07
0.40
Axis 10 (A-E) 1 40.32
ext. & int. 0.40
Axis 10' (A''-B) & (D-D'') 1 45.32
ext. 0.40
int. 1 45.07
0.40
Axis 11 (A'''- D) 1 44.57
ext. 0.40
int. 1 45.07
0.40
Axis 11' (D-E) 1 5.30
ext. 0.40
int. 1 4.80
0.40
Axis 11'' (A-B) 2 1.76
ext. 0.40
int. 2 1.51
0.40
Axis 12 (A-E') 1 24.92
ext. 0.40
int. 1 21.92
0.40
Axis 13 (B-E) 2 5.38
ext. 0.40
int. 2 4.88
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 41

TAKEOFF

IRO Typology:SEM-138
Block no: 138
cute ENGINEERING PLC.
nt
SUB-STRUCTURE TAKEOFF
0.40

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 42

TAKEOFF

IRO Typology:SEM-138
Block no: 138
cute ENGINEERING PLC.
nt
SUB-STRUCTURE TAKEOFF
Description No. Size
d. Shear wall

1 96.41
0.50
0.00

Lift wall
External
1 96.41
0.50
0.00
Internal

External

Internal 1 83.84
0.50
m2 Total for item 2.3(d) 0.00

1 83.84
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 43

TAKEOFF

IRO Typology:SEM-138
Block no: 138
cute ENGINEERING PLC.
nt
SUB-STRUCTURE TAKEOFF
0.50
0.00

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 44

TAKEOFF

IRO Typology:SEM-138
Block no: 138
cute ENGINEERING PLC.
nt
SUB-STRUCTURE TAKEOFF

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 45

Typology:SEM-138
Block no: 138

E TAKEOFF
Quantity Description

1.12 Fill around foundation to maintain


the desired level with selected borrowed
non expansive material and compact in
layers not exceeding 200mm.
on axis b/n A-E & 2-3 &12-13

123.48
on axis b/n C-D & 1-2

15.07
on axis b/n B-D & 3-5

47.11
on axis b/n B-D & 5-7

35.18
on axis b/n A-B& 5-6 &9-10

32.18
on axis b/n A'-B& 6 -7

3.36
on axis b/n A'-B & 8-9

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 46

Typology:SEM-138
Block no: 138

E TAKEOFF
2.92
on axis b/n B-C & 7-7'

3.68
on axis b/n A'-B& 7''-8'

9.95
on axis b/n B-C & 7''-8'

1.80
on axis b/n C-D & 7-8

13.62

on axis b/n B-C & 7'-8

14.30
on axis b/n B-D & 8-12

83.32
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 47

Typology:SEM-138
Block no: 138

E TAKEOFF
on axis b/n B-E & 13-14

26.80
412.75 m3 total

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 48

Typology:SEM-138
Block no: 138

E TAKEOFF
Quantity Description
Axis D b/n 1-14
8.47
Axis E b/n 2-3 & 12-13
2.57

11.04
58.44 m2 Total for item 2.1(d)
2.2. Reinforced concrete in class C-25 cast
into formworks and vibrate around rod
reinforcement bars.
a. in Mat footing
footing
293.91
mat beam
axis 1 b/n C-E
MB-8
3.57

axis 2,3,5,10,12,13 b/n A-E


MB-9, MB-10, MB-12
48.39

axis 4,11 b/n B-D


MB-11

9.41

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 49

Typology:SEM-138
Block no: 138

E TAKEOFF
axis 6,9 b/n A-B & D-E
l=3.48+0.5+3.24+0.5=7.72
7.72 MB-13, MB-14

axis 7,8 b/n A'-D


MB-15, MB-18
15.36

axis 7' b/n B-C

MB-17
3.00

axis 14 b/n B-E


MB-19
6.33

axis A b/n 2-3, 5-6, 9-10, 12-13


l=5.08x2+3.2x2-(0.5x4)=14.56

7.28 MB-4, MB-5

axis A' b/n 6-9


l=2.02+5+1.82-(0.5x3)=7.34
3.67 MB-6

axis B b/n 2-14


Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 50

Typology:SEM-138
Block no: 138

E TAKEOFF
l=5.08x2+3.63+3.41+3.2x2+2.02+5+1.82+
3.4+3.68+3.15-(0.5x12)=36.67
18.34 MB-1

axis C b/n 1-14


l=3.2+5.08x2+3.63+3.41+3.2x2+2.02+5+1.
82+3.4+3.68+3.15-(0.5x12)=39.87
19.94 MB-2

axis D b/n 1-14


l=3.2+5.08x2+3.63+3.41+3.2x2+2.02+5+1.
82+3.4+3.68+3.15-(0.5x13)=39.37
19.69 MB-3

axis E b/n 1-3, 5-6, 9-10, 12-14


l= 3.2x4+5.08x2-(0.5x6)=19.96
9.98 MB-5, MB-7
466.58 m3 Total for item 2.2(a)

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 51

Typology:SEM-138
Block no: 138

E TAKEOFF
Quantity Description
Axis 4' & 10' (A''-B) & (D-D'')

0.89
Axis 5 & 10 (A-E)

3.18
Axis 6 & 9 (A-B) & (D-E)

1.29
Axis 7 & 8 (A'-B)

0.54
Axis 7 (B'-D"')

0.63
Axis 8 (B-C')

0.63
Axis 13 (B-E')

1.34
Axis 14 (B-E)

1.24
Axis A (2'-3'), (5-6), (9-10), (12',13')

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 52

Typology:SEM-138
Block no: 138

E TAKEOFF
2.27
Axis A' (7-8)

0.50
Axis A'' (4'-5), (10-10')

0.30
Axis A''' (11-12'), (3'-4)

0.55
Axis B (2-14)

4.02
Axis C & D (1'-14')

9.01
Axis D' (1'-14')

0.48
Axis D'' (4'-5), (10-10')

0.30
Axis E (1-14)

2.51
Axis E' (2-3), (12-13)

0.98
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 53

Typology:SEM-138
Block no: 138

E TAKEOFF
30.65
41.13 m3 Total for item 2.2(c)

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 54

Typology:SEM-138
Block no: 138

E TAKEOFF
Quantity Description
b. for Foundation column
C-1

-6.30
C-2
-3.60
C-2'
-1.44
C-3
-5.04
C-3'
-0.72
C-4
-8.10
C-4'
-1.80
C-5

-12.96
-39.96 m2 Total for item 2.3(b)

c. for Grade beam


Axis 1' (C-D)
1.51 ext.
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 55

Typology:SEM-138
Block no: 138

E TAKEOFF
int.
1.31
Axis 1 (C-E)
2.59 ext.
int.
2.49
Axis 2' (A-C)
3.54 ext.
int.
3.44
Axis 2 (C-E')
2.91 ext.
int.
2.81
Axis 3 (A-E')
6.28 ext.
int.
6.18
Axis 3' (A-B)
1.32 ext.
int.
1.22
Axis 3'' (D-E)
1.25 ext.

int.
1.15
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 56

Typology:SEM-138
Block no: 138

E TAKEOFF

Axis 4 (A'''- D)
3.75 ext.

int.
3.65
Axis 4' (A''-B) & (D-D'')
1.78 ext.
47.20

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 57

Typology:SEM-138
Block no: 138

E TAKEOFF
Quantity Description
Axis 13' (A-C)
3.46 ext.
int.
3.38
Axis 14 (B-E)
4.76 ext.
int.
4.56
Axis 14' (C-D)
1.45 ext.
int.
1.25
Axis A (2'-3'), (5-6), (9-10), (12',13')
8.06 ext.
int.
7.06
Axis A' (7-8)
2.20 ext.
int.
2.00
Axis A'' (4'-5), (10-10')
1.41 ext.
int.
1.21
Axis A''' (11-12'), (3'-4)
2.39 ext.
int.
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 58

Typology:SEM-138
Block no: 138

E TAKEOFF
2.19
Axis B (2-14)
15.63 ext.
int.
16.13
Axis C (1'-14')
18.13 ext.
int.
18.03
Axis D (1'-14')
17.83 ext.
int.
18.03
Axis D' (1'-14')
2.12 ext.
int.
1.92
Axis D'' (4'-5), (10-10')
1.41 ext.
int.
1.21
Axis E (1-14)
9.97 ext.
int.
8.77
Axis E' (2-3), (12-13)
4.30 ext.
int.
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 59

Typology:SEM-138
Block no: 138

E TAKEOFF
3.90
182.76
317.03 m2 Total for item 2.3(c)

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 60

Typology:SEM-138
Block no: 138

E TAKEOFF
Quantity Description
3. MASONRY WORKS
3.1. 500mm thick stone masonry
foundation below ground level bedded in
cement mortar(1:3) in full joints.
Perimeterof mosonary

0.00 m3 total
3.2. Ditto but for exposed parts above
natural ground level.
B/n axis 1-7
Perimeterof mosonary

0.00 m3 total

3.1. 500mm thick stone masonry


foundation below ground level bedded in
cement mortar(1:3) in full joints.
Perimeterof mosonary

0.00 m3 total
3.2. Ditto but for exposed parts above
natural ground level.
B/n axis 1-7
Perimeterof mosonary
Client________________________ Consultant ________________________ Contractor _____________________
Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 61

Typology:SEM-138
Block no: 138

E TAKEOFF

0.00 m3 total

Client________________________ Consultant ________________________ Contractor _____________________


Payment-1 Construction of Cost Efficent Appartments at Kuye Feche, P-17 62

Typology:SEM-138
Block no: 138

E TAKEOFF

Client________________________ Consultant ________________________ Contractor _____________________


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 63

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

MAT SLAB HORIZONTAL BAR


b/n axis A-B & 2-3 C/C 160 14 9.861 20 x 1 x 1
b/n axis B-C & 2-3 C/C 160 16 7.62 32 x 1 x 1
On axis 3 b/n & B-C C/C 200 20 2.865 26 x 1 x 1
b/n axis C-D & 1-2 C/C 160 14 5.215 20 x 1 x 1
On axis 2 b/n & C-D C/C 160 14 2.73 20 x 1 x 1
b/n axis 2-3 & C-D C/C 160 14 5.58 20 x 1 x 1
b/n 1-2 & D-E C/C 160 14 5.165 18 x 1 x 1
On axis 2 b/n & D-E C/C 160 14 2.73 18 x 1 x 1
b/n axis 2-3 & D-E C/C 160 14 7.771 18 x 1 x 1
b/n axis 3-4 & B-C C/C 200 16 4.13 26 x 1 x 1
on axis 4 b/n B-C C/C 200 20 2.31 26 x 1 x 1
b/n 4-5 & B-C C/C 200 16 3.914 26 x 1 x 1
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 64

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

b/n 3-4 & C-D C/C 160 14 4.131 20 x 1 x 1


on axis 4 b/n C-D C/C 160 14 2.31 20 x 1 x 1
b/n 4-5 & C-D C/C 160 14 3.913 20 x 1 x 1
b/n axis 5-6 & A-B C/C 160 14 7.07 20 x 1 x 1
on axis 5 b/n B-C C/C 200 20 2.825 26 x 1 x 1
b/n 5-6 & B-C C/C 200 16 5.691 26 x 1 x 1
on axis 5 b/n C-D C/C 160 14 2.838 20 x 1 x 1
on axis 5-6 & C-D C/C 160 14 5.564 20 x 1 x 1
b/n axis 5-6 & D-E C/C 160 14 6.432 18 x 1 x 1
b/n 7-8 & A-B C/C 200 14 5.507 13 x 1 x 1
on axis 7 b/n B-C C/C 200 20 4.74 26 x 1 x 1
b/n 7-8 & B-C C/C 200 16 5.52 16 x 1 x 1
on axis 7 b/n C-D C/C 200 14 3.38 16 x 1 x 1
b/n 7-8 & C-D C/C 160 14 5.652 20 x 1 x 1
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 65

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

b/n 8-10 & A - B C/C 160 14 7.07 20 x 1 x 1


on axis 8 b/n B-C C/C 200 20 2.774 26 x 1 x 1
b/n 8-10 & B-C C/C 200 16 5.52 26 x 1 x 1
on axis 8 b/n C-D C/C 200 14 3.38 16 x 1 x 1
b/n axis 8-10 & C-D C/C 160 14 5.52 20 x 1 x 1
b/n axis 9-10 & D-E C/C 160 14 6.432 18 x 1 x 1
on axis 10 b/n B-C C/C 200 20 2.825 26 x 1 x 1
b/n 10-12 & B-C C/C 200 16 7.58 26 x 1 x 1
on axis 11 b/n B-C C/C 200 20 2.31 26 x 1 x 1
on axis 10 b/n C-D C/C 160 14 2.838 20 x 1 x 1
on axis 11 b/n C-D C/C 160 14 2.31 20 x 1 x 1
b/n 10-12 & C-D C/C 160 14 7.5 20 x 1 x 1
b/n axis 12-13 & A-B C/C 160 16 5.58 32 x 1 x 1
on axis 12 b/n B-C C/C 200 20 2.865 26 x 1 x 1
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 66

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

b/n 12-13 & C-D C/C 160 14 5.58 20 x 1 x 1


b/n 12-13 & D-E C/C 160 14 7.771 18 x 1 x 1
b/n 13-14 & B-C C/C 160 14 4.91 32 x 1 x 1
on axis 13 b/n B-C C/C 160 14 2.75 32 x 1 x 1
b/n 13-14 & C-D C/C 160 14 4.91 20 x 1 x 1
on axis 13 b/n C-D C/C 160 14 2.75 20 x 1 x 1
b/n 13-14 & D-E C/C 160 14 5.165 18 x 1 x 1
on axis 13 b/n D-E C/C 160 14 2.75 18 x 1 x 1
TOTAL LENGTH (m
UNIT WEIGHT (Kg/m
TOTAL WEIGHT (Kg

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 67

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

MAT SLAB VERTICAL BAR


b/n axis A-B & 2-3 C/C 200 16 5.24 24 x 1 x 1
b/n axis B-C & 2-3 C/C 200 16 5.93 24 x 1 x 1
On axis B b/n & B-C C/C 200 20 2.975 24 x 1 x 1
b/n axis C-D & 1-2 C/C 160 14 5.339 18 x 1 x 1
On axis C b/n & 2-3 C/C 200 20 2.97 24 x 1 x 1
b/n C-D & 2-3 C/C 160 14 3.93 30 x 1 x 1
on axis D b/n 1-2 C/C 200 14 2.245 18 x 1 x 1
on axis D b/n 2-3 C/C 160 20 2.245 30 x 1 x 1
b/n 1-2 & D-E C/C 160 14 5.162 18 x 1 x 1
b/n 2-3 & D-E C/C 200 20 5.111 24 x 1 x 1
b/n 3-4 & B-C C/C 160 14 8.041 21 x 1 x 1
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 68

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

on axis C b/n & 3-4 C/C 160 16 2.97 21 x 1 x 1


b/n 3-4 & C-D C/C 160 14 5.439 21 x 1 x 1
b/n 4-5 & B-C C/C 160 14 8.041 20 x 1 x 1
on axis C b/n 4-5 C/C 160 16 2.97 20 x 1 x 1
b/n 4-5 & C-D C/C 160 14 5.439 20 x 1 x 1
b/n A-B & 5-6 C/C 160 14 5.531 18 x 1 x 1
on axis B b/n & 5-6 C/C 160 16 2.975 18 x 1 x 1
b/n B-C & 5-6 C/C 160 14 5.931 18 x 1 x 1
on axis C b/n 5-6 C/C 160 16 2.975 18 x 1 x 1
b/n C-D & 5-6 C/C 160 14 3.93 18 x 1 x 1
on axis D b/n 5-6 C/C 160 16 2.245 18 x 1 x 1
b/n D-E & 5-6 C/C 160 14 5.111 18 x 1 x 1
b/n 7-8 & B-C C/C 200 16 8.105 30 x 1 x 1
on axis C b/n 7-8 C/C 160 16 2.97 30 x 1 x 1
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 69

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

b/n C-D & 7-8 C/C 160 14 5.439 30 x 1 x 1


b/n A-B & 9-10 C/C 160 14 5.24 18 x 1 x 1
b/n B-C & 8-10 C/C 160 14 6.005 30 x 1 x 1
on axis C b/n 8-10 C/C 160 16 2.97 30 x 1 x 1
b/n C-D & 8-10 C/C 160 14 3.801 30 x 1 x 1
on axis D b/n 9-10 C/C 160 16 2.245 18 x 1 x 1
b/n D-E & 9-10 C/C 160 14 5.162 18 x 1 x 1
b/n 10-11 & B -C C/C 160 14 8.116 20 x 1 x 1
on axis C b/n 10-11 C/C 160 16 2.97 20 x 1 x 1
b/n 10-11 & C -D C/C 160 14 5.364 20 x 1 x 1
b/n 11-12 & B-C C/C 160 14 8.116 21 x 1 x 1
on axis C b/n 11-12 C/C 160 16 2.97 21 x 1 x 1
b/n 11-12 & C-D C/C 160 14 5.364 21 x 1 x 1
b/n A-B & 12-13 C/C 200 16 5.24 24 x 1 x 1
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 70

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

b/n B-C & 12-13 C/C 200 20 2.975 24 x 1 x 1


b/n B-C & 12-13 C/C 200 16 6.029 24 x 1 x 1
on axis C b/n 12-13 C/C 200 20 2.97 24 x 1 x 1
b/n C-D & 12-13 C/C 160 14 3.779 30 x 1 x 1
on axis D b/n 12-13 C/C 160 20 2.245 20 x 1 x 1
b/n D-E & 12-13 C/C 200 20 5.162 24 x 1 x 1
b/n 13-14 & B-C C/C 160 14 8.116 17 x 1 x 1
b/n 13-14 & C-D C/C 160 14 5.339 17 x 1 x 1
on axis D b/n 13-14 C/C 200 14 2.245 14 x 1 x 1
b/n 13-14 7 D-E C/C 160 14 5.111 17 x 1 x 1

TOTAL LENGTH (m
UNIT WEIGHT (Kg/m
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 71

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

TOTAL WEIGHT (Kg


TOTAL LENGTH (m)
TOTAL MAT VERTICAL &
UNIT WEIGHT (Kg/m)
HORIZONTAL BAR
TOTAL WEIGHT (Kg)

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 72

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

FOUNDATION COLOUMN
C1 16 1.18 8 x 10 x 1

C2 20 1.18 8 x 5 x 1

C2' 20 1.18 8 x 2 x 1

C3 20 1.18 16 x 7 x 1

C3' 20 1.18 16 x 1 x 1

C4 20 1.18 16 x 9 x 1

C4' 20 1.18 16 x 2 x 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 73

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

C5 20 1.18 16 x 16 x 1

Stirrup 8 0.35 12 x 7 x 1

Stirrup 8 0.45 12 x 7 x 1

Stirrup 8 0.65 12 x 7 x 1

Stirrup 8 0.96 12 x 7 x 1

Stirrup 8 1.128 12 x 7 x 1

Stirrup 8 1.3 12 x 7 x 1

Stirrup 8 1.5 12 x 7 x 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 74

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

Stirrup 8 1.7 12 x 7 x 1

Stirrup 8 1.9 12 x 7 x 1

TOTAL LENGTH (m

UNIT WEIGHT (Kg/m

TOTAL WEIGHT (Kg


Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 75

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

GRADE BEAM
G.B 1
Top 14 8.25 2 x 1 x 1
" 14 7.40 2 x 1 x 1
" 14 7.55 2 x 1 x 1
" 14 5.72 2 x 1 x 1
" 14 7.48 2 x 1 x 1
" 14 10.92 2 x 1 x 1
Negato\ive 14 1.42 1 x 1 x 1
" 14 2.76 1 x 1 x 1
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 76

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

" 14 2.90 1 x 2 x 1
" 14 2.35 1 x 1 x 1
" 14 2.20 1 x 1 x 1
" 14 1.72 1 x 1 x 1
" 14 5.89 2 x 1 x 1
" 14 3.44 1 x 1 x 1
" 14 2.71 1 x 1 x 1
Bottom 14 9.78 2 x 1 x 1
14 9.07 2 x 1 x 1
14 10.83 2 x 1 x 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 77

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

14 7.70 2 x 1 x 1
14 8.82 2 x 1 x 1
G.B 2
Top 14 3.57 2 x 2 x 1
" 14 9.13 2 x 2 x 1
" 14 7.40 2 x 2 x 1
" 14 7.60 2 x 2 x 1
" 14 5.67 2 x 2 x 1
" 14 7.43 2 x 2 x 1
" 14 9.11 2 x 2 x 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 78

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

" 14 3.57 2 x 2 x 1
" 14 2.57 2 x 2 x 1
" 14 2.76 1 x 2 x 1
" 14 2.90 1 x 2 x 1
" 14 2.35 1 x 2 x 1
" 14 2.83 1 x 2 x 1
" 14 3.39 1 x 2 x 1
Negative
" 14 3.39 1 x 2 x 1
" 14 2.82 1 x 2 x 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 79

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

" 14 2.34 1 x 2 x 1
" 14 2.90 1 x 2 x 1
" 14 2.76 1 x 2 x 1
" 14 2.57 2 x 2 x 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 80

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

Bottom
" 14 4.32 2 x 2 x 1
" 14 9.31 2 x 2 x 1
" 14 9.07 2 x 2 x 1
" 14 10.83 2 x 2 x 1
" 14 7.69 2 x 2 x 1
" 14 9.97 2 x 2 x 1
G.B 3
Top 14 7.22 2 x 2 x 1
" 14 2.71 2 x 2 x 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 81

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

14 6.72 2 x 2 x 1
G.B 4
14 4.25 2 x 4 x 1
14 3.75 2 x 4 x 1
G.B 5
14 6.30 2 x 1 x 1
14 5.80 2 x 1 x 1
14 2.05 2 x 1 x 1
G.B 6
14 3.36 2 x 2 x 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 82

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

14 3.86 2 x 2 x 1
G.B 7
14 2.66 4 x 2 x 1
14 2.16 4 x 2 x 1
G.B 8
14 11.22 2 x 2 x 1
14 10.72 2 x 2 x 1
Negative 14 1.42 1 x 2 x 1
" 14 2.76 1 x 2 x 1
" 16 4.15 1 x 2 x 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 83

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

G.B 9
14 5.99 2 x 2 x 1
14 5.49 2 x 2 x 1
G.B 10
14 4.35 2 x 2 x 1
14 3.85 2 x 2 x 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 84

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

G.B 11 14 7.53 2 x 1 x 1
14 7.03 2 x 1 x 1
14 1.43 1 x 1 x 1
14 2.20 1 x 1 x 1
14 1.33 1 x 1 x 1
G.B 12
14 9.81 2 x 2 x 1
14 9.31 2 x 2 x 1
14 2.98 1 x 2 x 1
G.B 13
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 85

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

14 8.48 2 x 1 x 1
14 7.98 2 x 1 x 1
Negative 14 2.51 2 x 1 x 1
" 14 2.24 1 x 1 x 1
" 14 1.51 1 x 1 x 1
G.B 14
14 6.56 2 x 3 x 1
14 7.95 2 x 3 x 1
14 9.38 2 x 3 x 1
14 4.63 2 x 3 x 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 86

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

14 2.51 2 x 3 x 1
Negative 14 2.24 1 x 3 x 1
" 14 2.97 1 x 3 x 1
" 14 2.16 1 x 3 x 1
G.B 15
14 4.41 2 x 2 x 1
14 3.91 2 x 2 x 1
G.B 16
14 4.02 2 x 2 x 1
14 3.52 2 x 2 x 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 87

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

G.B 17
Top 14 10.86 2 x 2 x 1
Negative 14 1.51 1 x 2 x 1
" 14 3.32 1 x 2 x 1
" 14 10.37 1 x 2 x 1
bottom 14 10.37 2 x 2 x 1
G.B 18
14 3.10 2 x 4 x 1
14 2.60 2 x 4 x 1
G.B 19
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 88

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

top 14 5.61 2 x 2 x 1
top 14 11.33 2 x 2 x 1
Negative 14 1.51 1 x 2 x 1
" 14 2.97 2 x 2 x 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 89

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

" 14 2.24 1 x 2 x 1
" 14 1.43 1 x 2 x 1
bottom 14 7.05 2 x 2 x 1
bottom 14 9.39 2 x 2 x 1
G.B 20
14 4.34 2 x 2 x 1
14 3.84 2 x 2 x 1
G.B 21
14 4.00 2 x 2 x 1
14 3.50 2 x 2 x 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 90

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

G.B 22
14 4.24 2 x 2 x 1
14 3.74 2 x 2 x 1
G.B 23
14 6.59 2 x 1 x 1
14 6.09 2 x 1 x 1
G.B 24
top 14 4.08 2 x 1 x 1
top 14 6.18 2 x 1 x 1
Negtive 14 2.86 1 x 1 x 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 91

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

bottom 14 9.17 2 x 1 x 1
G.B 25
top 14 5.61 2 x 1 x 1
top 14 7.95 2 x 1 x 1
Negtive 14 2.19 1 x 1 x 1
" 14 2.97 1 x 1 x 1
" 14 1.51 1 x 1 x 1
bottom 14 3.62 2 x 1 x 1
bottom 14 9.43 2 x 1 x 1
G.B 26
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 92

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

14 5.95 2 x 2 x 1
14 5.45 2 x 2 x 1
G.B 27
14 1.97 12 x 1 x 1
14 1.47 12 x 1 x 1
Stirrup c/c 200 8 1.20 1912 x 1 x 1

TOTAL LENGTH (m
UNIT WEIGHT (Kg/m
TOTAL WEIGHT (Kg
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 93

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

Shear wall
CW1 12 4.09 18 x 4 x 1
8 4.09 15 x 4 x 1
CW2 12 4.09 10 x 6 x 1
8 3.72 12 x 3 x 1
16 4.84 6 x 2 x 1
16 4.84 5 x 3 x 1
16 4.84 4 x 1 x 1
16 4.84 3 x 2 x 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 94

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

16 4.84 2 x 2 x 1
Spacer 8 0.35 33 x 2 x 1
SW 1 8 0.35 19 x 3 x 1
20 4.88 5 x 2 x 1
8 7.45 12 x 2 x 1
12 4.88 19 x 2 x 1

TOTAL LENGTH (m
UNIT WEIGHT (Kg/m

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 95

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

TOTAL WEIGHT (Kg

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 96

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

MAT BEAM-1 (1500X500)


TOP
20 5.96 4 x 1 x 1

20 7.63 4 x 1 x 1

20 10.77 4 x 1 x 1

20 5.67 4 x 1 x 1

20 7.63 4 x 1 x 1

20 9.10 4 x 1 x 1
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 97

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

BOTTM
20 7.51 4 1 1

20 9.79 4 1 1

20 10.17 4 1 1

20 11.83 4 1 1

20 6.32 4 1 1
NEGATIVE
20 3.55 4 1 1

20 2.9 10 1 1
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 98

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

20 2.32 4 1 1

20 2.28 4 1 1

20 5.94 5 1 1

20 1.67 4 1 1

20 2.2 4 1 1

20 2.75 5 1 1

12 5.4 2 1 1
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 99

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

12 7.63 2 1 1

12 10.77 2 1 1

12 5.67 2 1 1

12 7.63 2 1 1

12 8.6 2 1 1

12 6.81 2 1 1

12 9.79 2 1 1
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 100

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

12 10.17 2 1 1

12 11.83 2 1 1

12 5.62 2 1 1
stirrup 10 3.7 190 1 1
" 12 3.7 64 1 1
" 10 1.7 201 1 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 101

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

MAT BEAM-2 & 3 (1500X500)


TOP
20 2.82 4 2 x 1

20 10.93 4 2 x 1

20 9.07 4 2 x 1

20 5.7 4 2 x 1

20 5.67 4 2 x 1
7.63
20 4 2 x 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 102

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

20 5.68 4 2 1

20 4.37 4 2 1

20 3.55 13 1 1

20 2.38 2 1 1
BOTTM
20 6.91 4 2 1

20 8.47 4 2 1

20 9.93 4 2 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 103

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

20 9.92 4 2 1

20 8.48 4 2 1

20 6.91 4 2 1

20 2.75 10 2 1

20 2.9 10 2 1

20 2.82 18 1 1

20 3.39 19 1 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 104

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

12 2.82 2 2 1

12 10.91 2 2 1

12 9.07 2 2 1

12 5.7 2 2 1

12 5.67 2 2 1

12 7.63 2 2 1

12 5.68 2 2 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 105

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

12 3.87 2 2 1

12 6.21 2 2 1

12 8.47 2 2 1

12 9.93 2 2 1

12 9.92 2 2 1

12 8.48 2 2 1

12 6.21 2 2 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 106

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

stirrup 10 3.7 119 2 1


" 12 3.7 158 2 1
" 10 1.7 216 2 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 107

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

MAT BEAM- 4 (1500X500)


20 6.83 4 x 2 x 1

20 6.83 4 x 2 x 1

20 2.56 1 x 2 x 1

20 2.56 1 x 2 x 1

12 5.83 2 x 2 x 1

12 5.43 2 x 2 x 1
stirrup 10 1.7 24 x 2 x 1
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 108

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

" 12 3.7 32 x 2 x 1

MAT BEAM- 5 (1500X500)


20 4.9 4 2 1

20 4.9 4 2 1

12 3.9 2 4 1

12 3.5 2 4 1
stirrup 10 3.7 19 4 1
" 10 1.7 15 4 1
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 109

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

MAT BEAM- 6 (1500X500)


20 10.88 4 2 1

20 10.88 4 2 1

12 8.68 2 2 1

12 9.48 2 2 1
stirrup 12 3.7 42 3 1
" 10 1.7 32 3 1
MAT BEAM- 7 (1500X500)
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 110

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

20 9.28 4 2 1

20 9.28 4 1 1

20 2.75 1 1 1

20 2.21 1 2 1

12 8.28 2 2 1

12 7.88 2 2 1
stirrup 10 3.7 19 2 1
" 12 3.7 32 2 1
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 111

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

" 10 1.7 39 2 1
MAT BEAM- 8 (1500X500)
20 8.32 4 1 1

20 8.32 4 1 1

12 7.32 2 1 1

12 6.92 2 1 1
stirrup 10 3.7 40 1 1
" 10 1.7 30 1 1
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 112

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

MAT BEAM- 9 (1500X500)


20 7.80 4 1 1
20 9.98 4 1 1
20 6.06 4 1 1
20 11.72 4 1 1
20 2.97 4 1 1

12 7.3 2 1 1

12 9.48 2 1 1
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 113

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

12 5.36 2 1 1

12 11.02 2 1 1
stirrup 10 3.7 40 1 1
" 10 1.7 72 1 1
" 12 3.7 54 1 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 114

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

MAT BEAM- 10 (1500X500)


20
7.8 4 x 3 x 1
20
9.98 4 x 3 x 1
20
6.86 4 x 3 x 1
20
11.72 4 x 3 x 1
20
3.8 3 x 3 x 1
20
2.97 16 x 3 x 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 115

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

12
7.3 2 x 3 x 1
12
9.48 2 x 3 x 1
12
5.36 2 x 3 x 1
12
11.02 2 x 3 x 1
stirrup 10
3.7 60 x 5 x 1
" 12
3.7 34 x 5 x 1
" 10
1.7 72 x 5 x 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 116

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

MAT BEAM- 11 (1500X500)


20 10.56 4 2 1

20 10.56 4 2 1

20 3.8 3 2 1

20 2.97 7 2 1

20 2.32 7 2 1

12 9.56 2 2 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 117

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

12 9.16 2 2 1
stirrup 10
3.7 21 2 1
" 12
3.7 34 2 1
" 10
1.7 42 2 1
MAT BEAM- 12 (1500X500)
20 7.8 4 2 1

20 9.98 4 2 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 118

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

20 6.56 4 2 1

20 11.72 4 2 1

20 3.8 3 2 1
2.97 8
20 2 1
2.32 8
20 2 1
12 7.30 2
2 1
12 9.48 2
2 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 119

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

12 5.36 2 2 1
12 11.02 2 2 1
stirrup 10 3.7 60 x 2 1
" 12 3.7 34 x 2 1
" 10
1.7 72 x 2 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 120

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

MAT BEAM- 13 & 14 (1500X500)


20 4.95 4 x 4 x 1
20 4.95 4 x 4 x 1
12 3.95 2 x 4 x 1
12 3.55 2 x 4 x 1
stirrup 10 3.7 35 x 4 x 1
" 10 1.7 26 x 4 x 1
MAT BEAM- 15 (1500X500)
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 121

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

20 9.96 5 x 1 x 1
20 3.85 5 1 1
20 3.11 5 1 1
20 10.93 5 1 1
12 9.46 2 1 1
12 3.35 2 1 1
12 2.41 2 1 1
12 10.23 2 1 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 122

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

stirrup 10 3.7 71 1 1
" 10 1.7 54 1 1
MAT BEAM- 16 (1500X500)
20 3.8 4 1 1

20 3.8 4 1 1

12 2.8 2 1 1

12 2.4 2 1 1
stirrup 10 3.7 9 1 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 123

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

" 10 1.7 7 1 1
MAT BEAM- 17 (1500X500)
20 7.06 4 1 1

20 7.06 4 1 1

12 6.06 2 1 1

12 5.66 2 1 1
stirrup 10 3.7 34 1 1
" 10 1.7 26 1 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 124

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

MAT BEAM- 18 (1500X500)


20 9.96 4 1 1

20 3.85 4 1 1

20 3.11 4 1 1

20 10.93 4 1 1

12 9.46 2 1 1

12 3.35 2 1 1

12 2.41 2 1 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 125

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

12 10.23 2 1 1
stirrup 10 3.7 21 1 1
" 10 1.7 54 1 1
" 12 3.70 50 1 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 126

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

MAT BEAM- 19 (1500X500)


20 4.37 4 1 1

20 10.08 4 1 1

20 6.13 4 1 1

20 8.33 4 1 1

20 2.97 1 1 1

20 2.63 1 1 1
12 3.82 2 1 1

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 127

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

12 9.53 2 1 1
12 5.36 2 1 1
12 7.6 2 1 1
stirrup 12 3.7 74 1 1
" 10 1.7 56 1 1

TOTAL LENGTH (m
UNIT WEIGHT (Kg/m
TOTAL WEIGHT (Kg
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 128

Project: KOYE FITCHE


CliEnt:
AAHDPO POJECT 17
CONSULTANT: NOMY CONSULTANT P.L.C
REINFORCEMENT BAR SCHED
SUB-STRUC

No of member

No of Floor
No of Bars
Location Shape Dia Length

TOTAL LENGTH (m
SUB-STRACTURE TOTAL UNIT WEIGHT (Kg/m
TOTAL WEIGHT (Kg

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 129

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24

197.22 197.22
243.84 243.84
74.49 74.49
104.3 104.30
54.6 54.60
111.6 111.60
92.97 92.97
49.14 49.14
139.878 139.88
107.38 107.38
60.06 60.06
101.764 101.76
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 130

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
82.62 82.62
46.2 46.20
78.26 78.26
141.4 141.40
73.45 73.45
147.966 147.97
56.76 56.76
111.28 111.28
115.776 115.78
71.591 71.59
123.24 123.24
88.32 88.32
54.08 54.08
113.04 113.04
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 131

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
141.4 141.40
72.124 72.12
143.52 143.52
54.08 54.08
110.4 110.40
115.776 115.78
73.45 73.45
197.08 197.08
60.06 60.06
56.76 56.76
46.2 46.20
150 150.00
178.56 178.56
74.49 74.49
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 132

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
111.6 111.60
139.878 139.88
157.12 157.12
88 88.00
98.2 98.20
55 55.00
92.97 92.97
49.5 49.50
OTAL LENGTH (m) 0.00 0.00 0.00 0.00 3087.60 1208.43 611.36 0.00
T WEIGHT (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551
TAL WEIGHT (Kg) 0.00 0.00 0.00 0.00 3729.82 1906.90 1508.85 0.00

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 133

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
Err:504

Err:504 Err:504 Err:504 Err:504 Err:504

125.76 125.76
142.32 142.32
71.4 71.40
96.102 96.10
71.28 71.28
117.9 117.90
40.41 40.41
67.35 67.35
92.916 92.92
122.664 122.66
168.861 168.86
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 134

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
62.37 62.37
114.219 114.22
160.82 160.82
59.4 59.40
108.78 108.78
99.558 99.56
53.55 53.55
106.758 106.76
53.55 53.55
70.74 70.74
40.41 40.41
91.998 92.00
243.15 243.15
89.1 89.10
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 135

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
163.17 163.17
94.32 94.32
180.15 180.15
89.1 89.10
114.03 114.03
40.41 40.41
92.916 92.92
162.32 162.32
59.4 59.40
107.28 107.28
170.436 170.44
62.37 62.37
112.644 112.64
125.76 125.76
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 136

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
71.4 71.40
144.696 144.70
71.28 71.28
113.37 113.37
44.9 44.90
123.888 123.89
137.972 137.97
90.763 90.76
31.43 31.43
86.887 86.89

OTAL LENGTH (m) 0.00 0.00 0.00 0.00 2926.75 1391.35 644.16 0.00

T WEIGHT (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 137

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
TAL WEIGHT (Kg) 0.00 0.00 0.00 0.00 3535.51 2195.54 1589.79 0.00
(m) 0.00 0.00 0.00 0.00 6014.35 2599.78 1255.53 0.00
g/m) 0.22 0.40 0.62 0.89 1.21 1.58 2.47 3.55
(Kg) 0.00 0.00 0.00 0.00 7265.33 4102.45 3098.64 0.00

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 138

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24

94.40 94.40

47.20 47.20

18.88 18.88

132.16 132.16

18.88 18.88

169.92 169.92

37.76 37.76

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 139

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
302.08 302.08

29.40 29.40

37.80 37.80

54.60 54.60

80.64 80.64

94.75 94.75

109.20 109.20

126.00 126.00

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 140

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
142.80 142.80

159.60 159.60

OTAL LENGTH (m) 0.00 834.79 0.00 0.00 0.00 94.40 726.88 0.00

T WEIGHT (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551

TAL WEIGHT (Kg) 0.00 329.74 0.00 0.00 0.00 148.96 1793.94 0.00

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 141

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
Err:504 Err:504 Err:504 Err:504 Err:504 Err:504

16.50 16.50
14.80 14.80
15.09 15.09
11.44 11.44
14.96 14.96
21.84 21.84
1.42 1.42
2.76 2.76
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 142

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
5.80 5.80
2.35 2.35
2.20 2.20
1.72 1.72
11.77 11.77
3.44 3.44
2.71 2.71
19.56 19.56
18.14 18.14
21.66 21.66

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 143

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
15.39 15.39
17.63 17.63

14.28 14.28
36.52 36.52
29.60 29.60
30.38 30.38
22.68 22.68
29.72 29.72
36.42 36.42

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 144

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
14.28 14.28
10.28 10.28
5.51 5.51
5.80 5.80
4.69 4.69
5.65 5.65
6.78 6.78

6.78 6.78
5.64 5.64

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 145

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
4.68 4.68
5.80 5.80
5.51 5.51
10.28 10.28

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 146

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24

17.28 17.28
37.24 37.24
36.28 36.28
43.32 43.32
30.78 30.78
39.88 39.88

28.88 28.88
10.83 10.83

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 147

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
26.88 26.88

34.00 34.00
30.00 30.00

12.60 12.60
11.60 11.60
4.10 4.10

13.44 13.44

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 148

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
15.44 15.44

21.24 21.24
17.24 17.24

44.86 44.86
42.86 42.86
2.83 2.83
5.51 5.51
8.30 8.30

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 149

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24

23.94 23.94
21.94 21.94

17.38 17.38
15.38 15.38

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 150

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
15.05 15.05
14.05 14.05
1.43 1.43
2.20 2.20
1.33 1.33

39.24 39.24
37.24 37.24
5.95 5.95

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 151

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
16.95 16.95
15.95 15.95
5.01 5.01
2.24 2.24
1.51 1.51

39.36 39.36
47.68 47.68
56.28 56.28
27.75 27.75

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 152

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
15.03 15.03
6.72 6.72
8.91 8.91
6.48 6.48

17.64 17.64
15.64 15.64

16.08 16.08
14.08 14.08

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 153

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24

43.44 43.44
3.02 3.02
6.64 6.64
20.73 20.73
41.46 41.46

24.80 24.80
20.80 20.80

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 154

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
22.44 22.44
45.33 45.33
3.02 3.02
11.88 11.88

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 155

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
4.48 4.48
2.86 2.86
28.20 28.20
37.56 37.56

17.34 17.34
15.34 15.34

15.98 15.98
13.98 13.98

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 156

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24

16.94 16.94
14.94 14.94

13.17 13.17
12.17 12.17

8.17 8.17
12.36 12.36
2.86 2.86

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 157

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
18.33 18.33

11.22 11.22
15.90 15.90
2.19 2.19
2.97 2.97
1.51 1.51
7.24 7.24
18.86 18.86

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 158

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
23.80 23.80
21.80 21.80

23.58 23.58
17.58 17.58
2294.40 2294.40

OTAL LENGTH (m) 0.00 2294.40 0.00 0.00 2172.85 8.30 0.00 0.00

T WEIGHT (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551

TAL WEIGHT (Kg) 0.00 906.29 0.00 0.00 2624.80 13.10 0.00 0.00
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 159

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24

294.48 294.48

245.58 245.58

245.4 245.40

134.028 134.03

58.08 58.08

72.6 72.60

19.36 19.36

29.04 29.04

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 160

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
19.36 19.36

23.1 23.10

19.95 19.95

48.8 48.80

178.8 178.80

185.44 185.44

OTAL LENGTH (m) 0.00 601.46 0.00 725.32 0.00 198.44 48.80 0.00
T WEIGHT (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 161

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
TAL WEIGHT (Kg) 0.00 237.58 0.00 644.08 0.00 313.14 120.44 0.00

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 162

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24

23.84
23.84
30.52
30.52
43.08
43.08
22.68
22.68
30.52
30.52
36.40
36.4
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 163

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
30.04
30.04
39.16
39.16
40.68
40.68
47.32
47.32
25.28
25.28
14.20
14.2
29.00
29
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 164

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
9.28
9.28
9.12
9.12
29.70
29.7
6.68
6.68
8.80
8.8
13.75
13.75
10.80
10.8
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 165

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
15.26
15.26
21.54
21.54
11.34
11.34
15.26
15.26
17.20
17.2
13.62
13.62
19.58
19.58
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 166

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
20.34
20.34
23.66
23.66
11.24
11.24
703.00
703
236.80
236.8
341.70
341.7

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 167

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24

22.56
22.56
87.44
87.44
72.56
72.56
45.60
45.6
45.36
45.36
61.04
61.04

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 168

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
45.44
45.44
34.96
34.96
46.15
46.15
4.76
4.76
55.28
55.28
67.76
67.76
79.44
79.44

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 169

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
79.36
79.36
67.84
67.84
55.28
55.28
55.00
55
58.00
58
50.76
50.76
64.41
64.41

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 170

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
11.28
11.28
43.64
43.64
36.28
36.28
22.80
22.8
22.68
22.68
30.52
30.52
22.72
22.72

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 171

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
15.48
15.48
24.84
24.84
33.88
33.88
39.72
39.72
39.68
39.68
33.92
33.92
24.84
24.84

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 172

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
880.60
880.6
1169.20
1169.2
734.40
734.4

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 173

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24

54.64 54.64

54.64 54.64

5.12 5.12

5.12 5.12

23.32 23.32

21.72 21.72

81.6 81.60
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 174

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
236.8 236.80

39.2 39.20

39.2 39.20

31.2 31.20

28 28.00

281.2 281.20

102 102.00
Client ......................................... Consultant ................................. Contractor ................................
Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 175

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24

87.04 87.04

87.04 87.04

34.72 34.72

37.92 37.92

466.2 466.20

163.2 163.20

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 176

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
74.24 74.24

37.12 37.12

2.75 2.75

4.42 4.42

33.12 33.12

31.52 31.52

140.6 140.60

236.8 236.80

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 177

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
132.6 132.60

33.28 33.28

33.28 33.28

14.64 14.64

13.84 13.84

148 148.00

51 51.00

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 178

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24

31.2 31.20

39.92 39.92

24.24 24.24

46.88 46.88

11.88 11.88

14.6 14.60

18.96 18.96

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 179

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
10.72 10.72

22.04 22.04

148 148.00

122.4 122.40

199.8 199.80

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 180

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24

93.60
93.6
119.76
119.76
82.32
82.32
140.64
140.64
34.20
34.2
142.56
142.56

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 181

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
43.80
43.8
56.88
56.88
32.16
32.16
66.12
66.12
1110.00
1110
629.00
629
612.00
612

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 182

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24

84.48
84.48
84.48
84.48
22.80
22.8
41.58
41.58
32.48
32.48
38.24
38.24

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 183

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
36.64
36.64
155.40
155.4
251.60
251.6
142.80
142.8

62.40
62.4
79.84
79.84

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 184

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
52.48
52.48
93.76
93.76
22.80
22.8
47.52
47.52
37.12
37.12
29.20
29.2
37.92
37.92

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 185

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
21.44 21.44

44.08 44.08

444 444.00

251.6 251.60

244.80
244.8

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 186

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24

79.2 79.20

79.2 79.20

31.6 31.60

28.4 28.40

518 518.00

176.8 176.80

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 187

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
49.8 49.80

19.25 19.25

15.55 15.55

54.65 54.65

18.92 18.92

6.7 6.70

4.82 4.82

20.46 20.46

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 188

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
262.7 262.70

91.8 91.80

15.2 15.20

15.2 15.20

5.6 5.60

4.8 4.80

33.3 33.30

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 189

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
11.9 11.90

28.24 28.24

28.24 28.24

12.12 12.12

11.32 11.32

125.8 125.80

44.2 44.20

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 190

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24

39.84 39.84

15.4 15.40

12.44 12.44

43.72 43.72

18.92 18.92

6.7 6.70

4.82 4.82

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 191

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
20.46 20.46

77.7 77.70

91.8 91.80

185 185.00

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 192

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24

17.48 17.48

40.32 40.32

24.52 24.52

33.32 33.32

2.97 2.97

2.63 2.63

7.64 7.64

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 193

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
19.06 19.06

10.72 10.72

15.2 15.20

273.8 273.80

95.2 95.20

OTAL LENGTH (m) 0.00 0.00 8268.50 5709.78 0.00 0.00 4192.25 0.00

T WEIGHT (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551

TAL WEIGHT (Kg) 0.00 0.00 5101.66 5070.28 0.00 0.00 10346.47 0.00

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 194

T BAR SCHEDULE
SUB-STRUCTURE

Total
Dia Dia Dia Dia Dia Dia Dia Dia
Length

6 8 10 12 14 16 20 24
OTAL LENGTH (m) 0.00 3730.65 8268.50 6435.10 8187.20 2900.92 6223.46 0.00
T WEIGHT (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551
TAL WEIGHT (Kg) - 1,473.61 5,101.66 5,714.37 9,890.14 4,577.65 15,359.49 -

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 195

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 196

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 197

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 198

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 199

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 200

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 201

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 202

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 203

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 204

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 205

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 206

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 207

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 208

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 209

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 210

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 211

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 212

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 213

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 214

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 215

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 216

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 217

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 218

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 219

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 220

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 221

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 222

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 223

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 224

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 225

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 226

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 227

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 228

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 229

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 230

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 231

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 232

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 233

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 234

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 235

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 236

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 237

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 238

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 239

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 240

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 241

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 242

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 243

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 244

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 245

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 246

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 247

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 248

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 249

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 250

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 251

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 252

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 253

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 254

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 255

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 256

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 257

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 258

Remarks

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 259

Remarks

0.00

Client ......................................... Consultant ................................. Contractor ................................


Payment - 1 Construction of Cost Efiicent Appartments at Kuye Feche, P-17 260

Remarks
0.00

Client ......................................... Consultant ................................. Contractor ................................


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Item no Description Unit Qty

SUMMARY OF BILL OF QUANTITIES

FOR

SEMINAR BUILDING M1L

A-SUB STRUCTURE

1 Excavation and earth work.................................................................... Birr


2 Concrete work..................................................................................... Birr
3 Masonary work..................................................................................... Birr

TOTAL A........... Birr

B. SUPER STRUCTURE

1 Concrete work...................................................................................................... Birr


2 Walling......................................................................................................... Birr
3 Roofing..................................................................................................... Birr
4 Carpentry and Joinery........................................................................................ Birr
5 Metal work......................................................................................... Birr
6 Steel Structure.................................................................................................... Birr
7 Plastering and Pointing......................................................................................... Birr
8 Finishing...................................................................................................... Birr
9 Glazing...................................................................................................... Birr
10 Painting................................................................................................. Birr
11 Sanitary Installation........................................................................... Birr
12 Electrical Installation,.......................................................................... Birr

Total B .............................. Birr

Acute Engineering Plc. Page 261 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Item no Description Unit Qty

Total A + B ....................... Birr

Two Blocks of Seminar ....................... Birr

15% VAT Birr

Total Amount with VAT ....................... Birr

Acute Engineering Plc. Page 262 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Item no Description Unit Qty


A-SUB STRUCTURE
1.0 EXCAVATION & EARTH WORK

1.01 Clear and remove top soil to an average depth of 200mm. M2 818.00
1.02 Bulk excavation in ordinary soil to reduce level to depth not exceeding M3 1,227.00
1500mm .
1.03 Ditto as item No 1.02 but exceeding 1500mm but not exceeding 3000mm. M3 409.00
1.04 Ditto as item No 1.02 but exceeding 3000mm but not exceeding 4500mm. M3 20.00
1.05 Ditto as item 1.02 but in weathered rock M3 10.00
1.06 Ditto as item 1.03 but in weathered rock M3 10.00
1.07 Ditto as item 1.02 but in Hard rock M3 10.00
1.08 Pit excavation in ordinary soil to a depth not exceeding 1500mm from reduce
ground level. M3 596.25

1.09 Ditto but exceeding 1500mm but not exceeding 3000mm. M3 596.25
1.10 Pit excavation in Weathered rock to a depth not exceeding 1500mm
from reduce ground level. M3 48.00

1.11 Ditto to item No 1.09 but exceeding 1500mm but not exceeding 3000mm. M3 48.00
1.12 Ditto as item No 1.09 but in Hard rock M3 48.00
Trench excavation in ordinary soil to a depth of 1500mm from reduced
1.13 ground level. M3 90.65

Fill around foundation and building in non expansive selected material from
1.14 quarry waste well rolled and compacted in layers not exceeding 200 mm thick. M3 481.00

Fill around foundation and building in non expansive selected material from
1.15 site well rolled and compacted in layers not exceeding 200 mm thick. M3 481.00

Fill under hard core with imported selected material from quarry waste well
1.16 rolled and compacted in layers not exceeding 200 mm thick. M3 306.47

1.17 Load and cart away surplus excavated material to an appropriate tip outside the
M3 2,601.75
university compound to a distance not less than 5km.
250mm thick basaltic stone hardcore well rolled, consolidated and blinded
1.18 with crushed stone . M2 510.79

TOTAL CARRIED TO SUMMARY ..........................

2.0 CONCRETE WORK

Acute Engineering Plc. Page 263 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Item no Description Unit Qty


2.01 50 mm lean concrete quality C-5, with minimum cement content of 150 kg
/m3, of concrete;

a) Under Footings M2 305.50


b) Under beam and floor slab M2 122.82
c) Under masonry wall M2 56.66

2.02 Reinforced concrete quality C-25,360 kg of cement/m3 filled in to form work


and vibrated around rod reinforcement.(Formwork and reinforcement
measured separately)

a) In footings M3 219.94
b) In foundation columns M3 11.40
c) In grade beams M3 46.06
d) In 100mm thick ground floor slab. M2 510.79

2.03 Provide, cut and fix in position sawn structural wood or steel formwork which
ever is appropriate;

a) To footings M2 318.16
b) To foundation columns M2 133.00
c) To grade beams M2 307.04

Acute Engineering Plc. Page 264 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Item no Description Unit Qty


2.04 Mild steel reinforcement according to structural drawing. Price includes
cutting, bending, placing in position,tying wire and concrete spacers.

a) Dia 8 mm deformed bar Kg 2,858.89


b) Dia 12 mm deformed bar Kg 1,604.10
c) Dia 14 mm deformed bar Kg 8,814.62
d) Dia 16 mm deformed bar Kg 1,431.56
e) Dia 20mm deformed bar Kg 3,166.69

2.05 10x100mm Styrofoam expansion joint filler between ground beam and floor
slab. Ml 446.82

TOTAL CARRIED TO SUMMARY ..........................

3.0 MASONRY WORK

400mm thick hard trachytic roughly dressed stone masonry foundation wall
3.01 below ground level bedded in cement mortar mix ratio (1:3). M3 70.75

3.02 Ditto but for exposed part above natural ground level. M3 35.38

TOTAL CARRIED TO SUMMARY ..........................

B-SUPER STRUCTURE

1.0 CONCRETE WORK

1.01 Reinforced concrete quality C-25,360 kg of cement/m3 filled in to form work


and vibrated around rod reinforcement.(Formwork and reinforcement
measured separately)

a) In Elevation columns M3 60.33


b) In Floor beams M3 85.84
c) In Roof beams M3 11.19
d) In 150mm thick RC solid slab M2 73.94
e) In stair case M3 16.68

Ribbed slab for suspended floor slab made of 60 mm thick concrete slab in C-
25,60x120 mm one way concrete girder with c/c spacing of 600mm ,220x520
1.02 mm hollow concrete ribbed block and all according to the structural detail M2 2,078.93
drawing.

Acute Engineering Plc. Page 265 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Item no Description Unit Qty


1.03 Provide, cut and fix in position sawn structural wood or steel formwork which
ever is appropriate;

a) To Elevation columns M2 703.84


b) To Floor beams M2 654.13
c) To Roof beams M2 149.20
d) To 150mm thick RC solid slab M2 73.94
e) In stair case M2 104.58

1.04 Pre-cast elements (PB1) to the size of 4770x120x80mm made of 0.046m3 of


concrete in C-25 /beam.Price includes beam errecting, reinforcement bar
bending, placing in position,welding, mould and all according to structural
detail drawing.

(a) Dia 6mm plain bar (2.78pcs )


(b) Dia 12 mm deformed bar ( 0.44pc )
(c) Dia 14 mm deformed bar ( 0.8 pc )
to be placed in position. Pcs 856.00

Acute Engineering Plc. Page 266 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Item no Description Unit Qty


1.05 Mild steel reinforcement according to structural drawing. Price includes
cutting, bending, placing in position , tying wire, concrete spacers and
reinforcement bar chairs.

a) Dia 6 mm plain bar Kg 3,374.45


b) Dia 8 mm deformed bar Kg 4,120.91
c) Dia 10mm deformed bar Kg 3,384.45
d) Dia 12mm deformed bar Kg 5,020.74
e) Dia 14 mm deformed bar Kg 4,229.56
f) Dia 16 mm deformed bar Kg 9,738.60
g) Dia 20mm deformed bar Kg 9,620.31

TOTAL CARRIED TO SUMMARY ..........................

2.0 BLOCK WORK

2.01 Class C,190mm thick HCB wall with the designed compressive strength ,
bedded in cement mortar (1:3). M2 3,009.24

2.02 Ditto as item 2.01 but 150mm thick M2 121.84


2.03 Ditto as item 2.01 but 100mm thick M2 74.66
Supply and lay 200mm thick inclined type louvered wall with horizontally
2.04 embeded mosquito mesh. All work shall be complete in accordance with the M2 18.18
Architectural detail drawing.

TOTAL CARRIED TO SUMMARY ..........................

3.0 ROOFING

3.01 Roof cover in precoated or galvanized EGA - 400, 0.4mm thick fixed to steel
lattice purlin.Price includes G-28 flat sheet dev. Length 330 ridge cap and UV
resistance washers. (Purlin measured separately and roof measured in M2 659.27
horizontal projection).

3.02 Supply and fix G-28 galvanized flat metal sheet gutter in accordance with the
Architectural detail drawing. Price shall include all necessary accessories,
metal bracket suspenders, one coat of antirust paint and two coat of synthetic
enamel paint.

a) Development Length =700mm Ml 77.56

3.03 Ditto item 3.02 but copping with flashing Dev. length 1000mm. Ml 42.08

Acute Engineering Plc. Page 267 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Item no Description Unit Qty


Supply and fix wire mesh ventilation size 60x60mm (in flat metal frames)
under eave with combination of ribbed sheet size 120x60mm nailed to
3.04 structural wood battens size 40x50mmplaced 1200x600mm. Price include one M2 38.78
coat of anti rust and two coats of synthetic paint.

3.05 Ditto as above but to metal fascia board dev. Length 300mm Ml 77.56

TOTAL CARRIED TO SUMMARY ..........................

4.0 CARPENTRY & JOINERY

Supply and fix 8 mm thick chip wood ceiling on and including 40 x 50 mm


structural wood battens placed c/c 600 mm both ways suspended to steel truss
4.01 lower member. Price includes 40x40mm decorated hard wood corner list and M2 530.94
all other necessary accessories

4.02 Supply and fix 40 mm thick hollow core flush type wooden doors both side
covered with approved quality 4mm thick ply wood internally c/c 10cm 32x50
mm size solid wood bracings of approved quality with well seasoned 40 mm
thick solid wooden frame. Price includes approved quality cylindrical lock,
door stopper, approved quality hinges, approved type of paints, and all other
necessary accessories to complete the work. All works shall be in accordance
with the Architectural detail drawing and approval.

a )Type D1 = size: 1570x2540mm No 2.00


b )Type D1' = size: 1570x2740mm No 7.00

Acute Engineering Plc. Page 268 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Item no Description Unit Qty

c )Type D2 = size: 1770x2740mm No 7.00


d)Type D2' = size: 1700x2540mm No 3.00
e)Type D3 = size: 970x2740mm No 17.00
f)Type D3' = size: 970x2540mm No 1.00
g)Type D4 = size: 870x2740mm No 20.00
h)Type D4' = size: 870x2540mm No 4.00
i)Type D5 = size: 770x2740mm No 26.00
j)Type D5' = size: 770x2100mm No 5.00

TOTAL CARRIED TO SUMMARY ..........................

5.0 METAL WORK

5.01 Door and Windows are manufactured from 38x1.5mm LTZ profile and
partially covered with black iron sheet as per the Engineer's approval and
window door schedule. Unit price includes one coat of antirust and two coats
of synthetic enamel paint, approved quality of material.

Window

a) Type W1 = size: 4480x1410mm No 63.00


b) Type W2 = size: 1780x610mm No 12.00
c) Type W3 = size: 1510x1410mm No 8.00

Doors

a) Type D6 size 770x2000 mm Pcs 22.00

Window Doors

a )Type MD1 = size: 4410x2740mm Pcs 4.00


b )Type MD2 = size: 705x1606mm+770x2740mm +705x1606mm Pcs 2.00

Fabricate, assemble and fix hand and guard rail to stair case made from
50x50x2.5mm RHS top rail welded to 40x40x2mm RHS post fixed to
concrete steeps placed c/c 840mmm,( H=900mm) including 40x40x2mm RHS
5.02 bottom rail and 25 x 25x 2.5mm Horizontal RHS members placed c/c Ml 85.40
140mm .Unit price includes one coat of antirust and two coats of synthetic
enamel paint and all the necessary accessories to complete the work

Acute Engineering Plc. Page 269 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Item no Description Unit Qty


Fabricate, assemble and fix guard rail to balcony from 50x50x2.5mm RHS
top rail welded to 40x40x2mm RHS post fixed to concrete slab placed c/c
840mmm,( H=900mm) including 40x40x2mm RHS bottom rail and 25 x 25x
5.03 2.5mm Horizontal RHS members placed c/c 140mm .Unit price includes one Ml 17.15
coat of antirust and two coats of synthetic enamel paint and all the necessary
accessories to complete the work

TOTAL CARRIED TO SUMMARY ..........................

6-0 STEEL STRUCTURE

Supply, fabricate and mount steel CHS ,RHS column ,RHS truss and Steel
staircase according to the structural drawing .Price includes one coat of
antirust , two coats of synthetic enamel painting and all other necessary iron
mongery to complete the work.

6.01 RHS TRUSS

a) 60x60x3mm. kg 978.30
b) 40x40x3mm. kg 1,586.58

6.02 RHS Lattice Purlins


a) 25X25X2.5mm. kg 2,311.57

Acute Engineering Plc. Page 270 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Item no Description Unit Qty

6.03 Lattice purlin to truss connection Angle Iron

a) Size 25x25x2.5mm length 30mm Pcs 252.00

6.04 Bolts with Nuts

a) Dia 16mm J bolt. Dev length=400mm Pcs 32.00


b) Dia 12mm purlin to truss connection bolt. Dev length,100mm Pcs 252.00
c) Dia 20mm J bolt. Dev length=400mm Pcs 16.00

6.05 Metal plates


a) 2(200x200x6mm) Pcs 24.00
6.06 Gusset plates
a) 2(200x300x5mm) Pcs 30.00
b) 2(200x100x5mm) Pcs 2.00

TOTAL CARRIED TO SUMMARY ..........................

7.0 PLASTERING AND POINTING

7.01 Apply three coats of plastering in cement mortar (1:3) up to fine finish. Price
shall include pre-cleaning and preparation of the surface.

a)To internal wall surface M2 4,551.91


b)To external wall surface M2 1,384.47
c) To RC concrete ceiling M 2
2,215.84
d)To exposed column and beams M2 1,130.38

Apply two coats of plastering in cement mortar (1.3) to receive ceramic wall
7.02 tile. M2 337.97

Apply pointing to exposed part above ground level stone masonry foundation
7.03 wall recessed joint in cement sand mortar mix (1:2). M2 140.00

TOTAL CARRIED TO SUMMARY ..........................

8.FINISHING

8.01 48mm thick cement sand screed smoothly finished flooring in mortar mix
(1:3).
a) To receive plastic floor tile. M2 364.84

Acute Engineering Plc. Page 271 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Item no Description Unit Qty


8.02 Ditto as item No 8.01 but 40mm thick
a) To receive porcelain floor tile. M2 157.86

10 mm thick imported type approved quality non slippery Porcelain tile


flooring stuck down with approved type adhesive on cement sand screed floor
8.02 finish and joints grouted in appropriate color setting coat mortar. Color and M2 157.86
pattern of tile shall be approved by the Engineers.

Supply and fix 6 mm thick & 150x150mm white glazed ceramic wall tiles with
8.03 cement mortar (1:2) backing with 5mm joints to be grouted with white cement. M2 337.97

300x300x2mm PVC thick imported type hard plastic tile flooring stuck down
8.04 with approved type adhesive on cement and sand screed floor finsh. M2 364.84

8.05 10x100mm high Porcelain tile skirting stuck to wall with approved type of
adhesive Ml 78.74

8.06 10x100mm high PVC skirting stuck to wall with approved type of adhesive Ml 158.05

200x200x20mm Terrazzo tile flooring bedded on and including cement sand


8.01 mortar mix 1:3 and joints grouted in cement mortar. Price shall include 30mm M2 2,143.16
thick cement mortar bedding.

Acute Engineering Plc. Page 272 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Item no Description Unit Qty


10x100mm high Terrazzo tile skirting stuck to wall with approved type
8.02 adhesive with cement sand mortar backing. Ml 859.57

260x30mm Terrazzo window sill cut to appropriate size, weathered and


mounted on and including 30mm thick cement mortar (1:3) bedding. Price
8.07 includes making water drip and edge chamfering as shown on the Ml 321.32
Architectural detail drawing.

Granite tile flooring bedded on and including 30mm thick cement sand (1:3)
mortar.Type, color, size and pattern of tile shall comply with technical
8.08
specification requirement,Architects preference and approval.

- 20mm thick landing. M2 26.40


- Tread size 340x30mm Ml 120.24
- Riser size 130x20mm Ml 133.60
- 20x100mm Skirting Ml 97.44

Supply and fix 30 x 30 x 3 mm angle iron corner protection up to a height of


8.09 1500mm from floor finish level, flushed to walls. No 60.00

100mm thick precast concrete pavement in concrete class C-15 around the
8.10 building open jointed on and including 400mm selected material compacted M2 151.40
fill and 100mm thick redash or equivalent bedding material.

TOTAL CARRIED TO SUMMARY ..........................

9.0 GLAZING

9.01 4mm thick clear glass glazed to metal beads and approved quality putty. M2 569.57

TOTAL CARRIED TO SUMMARY ..........................


10.0 PAINTING

10.01 Apply three coats of approved quality plastic paint.Price shall include pre-
cleaning and preparation of surfaces.

a) To all internal wall surface. M2 4,237.28


b) To all external wall surface. M2 1,384.47
c) To exposed beams & columns. M2 1,130.38
d) To RC ceiling M2 2,215.84
e) To chip wood ceiling M2 530.94

Acute Engineering Plc. Page 273 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Item no Description Unit Qty

f) Oil paint to internal wall M2 314.63

TOTAL CARRIED TO SUMMARY ..........................

11.SANITARY INSTALLATION
11.1 SANITARY EQUIPMENT (FIXTURES)

a) All fixtures specified below are subject to the owner's or consultants


approval based on samples,catalogues and brochures presented by the
contractor.
b) Method of installation shall follow the recommendations of EBCS-9
c) All fixtures must bear at least CE or equivalent material quality
ceritification.
11.1.1 Supply and fix hand wash basins made of white vitreous
china as per the technical specificattion & complete with
the followings :
- Water saving, self closing push button faucet with 5 years guarantee
- P- smell bottle trap made from brass
- Heavey duty stainless steel 7 wires braided flexible pipes for
a working pressure of 4bars
- Chrome plated chains,with plug
- White vitreous china pedestal
- Lever action faucet with a minimum of 5 years guarantee
Price shall also include all the necessary accessories and assistance civil works
thereto.
Size : 500 x 400 mm /approximate size/ No 32.00

Acute Engineering Plc. Page 274 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Item no Description Unit Qty

11.1.2 Supply and fix close coupled, dual flush, wash down water closets made of
white vitreous china including low flush cistern and with all necessary
accessories & accessories.

Cistern… - Vitreous china with a capcity of 7-9 liter &


max. filling time of 2minutes,complete with
heavey duty float valve /resist 4bar water
pressure/, chrome plated steel flush valve,
heavey duty flexible pipes for a working
pressure of 4bars.

Seats… - Hard cover /smooth & non absorbent /


- Seats & cover to be fixed to WC pan with brass
/stainless stee/ hinges with protective
washers between hinge fixings & on both sides
of ceramic-ware. No 2.00

Supply and fix Turkish type water closets made of white vitreous china
ceramics complete with SS-304 stainless steel cistern (9-12 liters capacity),
heavey duty float valve conection, diameter 110mm P- smell trap, factory
11.1.1 made steel down pipe & heavey duty flexible pipe connction. Price shall No 20.00
include all the necessary accessories and shall full fill the requirments given
on EBCS-9.

Supply and fix wall mount Urinals made of white vitreous china complete
11.1.4 with heavy duty flushing valve, P-smell trap, flexible hose, strainer, supporting No 15.00
elements & all other necessary accessories which complete the set.

Supply and fix toilet paper holder made of white vitreous china ceramics
11.1.4 complete with all the necessary fixing accessories. No 32.00

Supply and fix crystal glass mirrors for toilet hand wash basins with copper
back protection, size:500x400 mmincluding chrome plated brass mirror clips
11.1.5 with chrome plated screws and etc... for hand wash basins. Price shall also No 32.00
include approved quality shelves.

Supply and fix Soap holder made of white vitreous china ceramics complete
11.1.6 with all the necessary fixing accessories. No 32.00

Supply and fix floor drains made of stainless steel of approved quality,
11.1.7 complete with P-smell trap and all other necessary fittings and accessories.

Size:- Dia. 110 mm No 16.00

Acute Engineering Plc. Page 275 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Item no Description Unit Qty


Supply and fix recessed wall mounted fire hose with cabinet complete with
dia.40mm and 36 meters long canvas hose, three way (spray, jet & nozzle),
angle valve with built in pressure reducer and with all other other necessary
accessories. Cabinet shall be factory made 1.2mm thick steel sheet, painted
11.1.8 with electrostatic powder coating and easily openable wired glass door with No 5.00
cabinet size 900 x 600x170mm. Price shall include 6kg ABC dry powder fire
extinguisher inside the cabinet.

11.2 WATER SUPPLY PIPES, VALVES AND ACCESSARIES

Water supply pipes shall be PPR pipes and be fixedto walls, beams, etc.Unit
price shall include all assistancecivil works and necessary fittings such as T,
bends, Y, reducers. All the necessary valves shall be fixed properly asper the
manufacturer's instruction and approvals

Supply and install PPR pipe (PN20) to internal water distribution system as
11.2.1 shown on the drawing, complete with the necessary accessaries.

dia. 20 mm Ml 45.00
dia. 25 " Ml 65.00
dia. 32 " Ml 15.00
dia. 40 " Ml 15.00
dia. 50 " Ml 8.00

Acute Engineering Plc. Page 276 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Item no Description Unit Qty

11.2.3 Ditto item no. 2.1 above, but galvanized steel pipes for fire fighting.
dia. 40mm Ml 5.00
dia. 50mm Ml 11.00
dia. 65mm Ml 9.00

11.2.4 Supply and fix chrome service valves of approved standard before hand wash
basins & water closets Complete with unions, elastic water proofing, hand
wheels of normal quality and with allother necessary accessories.

dia. 20 mm No 69.00

11.2.5 Supply and fix approved quality bronze gate valves at internal branch water
pipes and pipe inlet to building of the following sizes and as where shown on
the drawing.

a) dia .32 mm No 5.00


b) dia .50 mm No 1.00

11.3 WASTE, VENT AND STORM WATER PIPES AND


ACCESSORIES

All domestic waste, vent and storm water pipe lines shall be uPVC pipes
(PN6) and shall be provided with a minimum slope of 2% towards the outlet.
All uPVC pipes and necessary fittings shall be standard quality as specified in
the technical specification and be free from damage during storage,
constraction and etc. Unit price shall include all the necessary assistance civil
works, such as chiseling, fixing or hanging to walls, beams or slabs
etc..neccessary fittings such as bends, Y, T, etc. Storm water uPVC pipes shall
resist the external temprature and the quality shall meet the purpose.

11.3.1 Supply and lay internal uPVC (PN6) waste and vent pipes according to where
shown on the drawings. Complete with all the necessary fittings.

Dia. 50 mm Ml 20.00
" 80 " Ml 40.00
" 110 " Ml 45.00

11.3.2 Supply and install vent caps made of rigid uPVC to be connected to the roof
terminal of vent pipe as shown on theriser diagram,complete with all the
necessary sealing gaskets and accessories.

Dia. 110 mm No 1.00

Acute Engineering Plc. Page 277 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Item no Description Unit Qty


11.3.3 Supply and fix approved quality clean outs as where shown on the drawing.
Price shall include all the necessary connecting pieces.

Dia. 80 mm No 6.00
Dia. 110 mm No 5.00

11.3.4 Supply and fix uPVC Downpipes (PN6) with mass concrete support at ground
level and complete with strainer at inlet, galvanized clips at every
elbows,joints and at every 1m interval & all the necessary accessories.Unit
price shall include all the necessary assistance work to complete the work.

Dia. 80mm Ml 66.00


Dia. 110mm Ml 83.00

11.4 Water proofing

Apply crystaline or compatable similar water proofing material for upper floor
wet areas (toilet rooms)to a height of 30cm on walls and columns as per the
manufacturer's instruction .The cost shall include cleaning of all dirts, trace of
grease, oil and loose particles and sealing of pipe penetrations with appropriate
material as per the manifucturer's instruction. The work shall be done on
subcontractual bases with the supplier of the material which will give material
& construction gurantee to the client

Type: BASF Masterseal 501/502, Sika Seal 105 or equivalent


M2 217.00

Acute Engineering Plc. Page 278 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Item no Description Unit Qty


11.5 Storm Water Drainage
11.5.1 Construct pre cast concrete storm water drainage ditch as shown on the
drawing. Price shall also include excavtion, cart away, sand bedding and all
assistsnce civil works as per the drawing.

Size = 1/2 400mm ML 110.00

11.5.2 Ditto as above but with metal grill cover as per the drawing.
ML 20.00

TOTAL CARRIED TO SUMMARY ..........................

12. ELECTRICAL INSTALLATION


Supply and install :-

1 Power/Tel. Line Intakes


(Provisional Quantity)

12.1 Manhole

12.1.1 Manhole in bricks and with concrete base internally of 600x600x700mm


including concrete cover with lifting hole. No 2.00

12.2 PVC pipes.


12.2.1 110 mm diameter.(Power Intake ) M 12.00
12.2.2 110 mm diameter.(Tel Intake ) M 12.00

12.3 Feeder Cables & Pipes

PVC Sheathed PVC Insulated power cable type SEMENS NYY 0.6/1KV or
equivalent to be drawn inside PVC conduit and of

Cables

12.3.1 5x16 from MDB-SAL to SDB-SA1 M 4.00


12.3.2 5x16 but from MDB-SAL to SDB-SA2 M 7.00
12.3.3 5x16 but from MDB-SAL to SDB-SA3 M 10.00
12.3.4 5x10 from MDB-SAL to SDB-SA4 M 13.00

PVC pipes.
12.3.5 75 mm diameter. M 20.00
12.3.6 50 mm diameter. M 10.00

12.4 Low Voltage System Earth

Acute Engineering Plc. Page 279 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Item no Description Unit Qty

12.4.1 Low voltage system earthing 1x50mm² (12m) bare copper conductor inside
rigid conduit of 110mm diameter & 1500x16mm copper bond earthing rod
inside manhole (measured elsewhere) including all connecting accessories. No 1.00

12.5 Distribution Boards

12.5.1 Surface mounted main distributiom board (MDB-SAL) in sheet steel


enclosure, with lockable door including bus bars of 250Amp, 3 Phase rating,
neutral and earth bars, connection terminals, complete and consisting of:-

1 main pc 200A, MCCB, 3Phase.


3 pcs 63A, MCB,3Phase
1 pc 40A, MCB,3Phase
4 pcs 16A, MCB, 1Phase
10 pcs 10A, MCB, 1Phase No 1.00

12.5.2 Flush mounted distribution board, (SDB-SA4) in sheet steel enclosure with
lockable door and including bus bars of 63Amp/3Phase, all necessary fixing
and connecting accessories, complete and consisting:-

1 pc main 40A, MCB, 3Phase


7 pcs 16A, MCB, 1Phase
10 pcs 16A, MCB, 1Phase No 1.00

Acute Engineering Plc. Page 280 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Item no Description Unit Qty

12.5.3 Flush mounted distribution board, (SDB-SA3 & SDB-SA2) in sheet steel
enclosure with lockable door and including bus bars of 80Amp/3Phase, all
necessary fixing and connecting accessories, complete and consisting:-

1 pc main 63A, MCB, 3Phase


18 pcs 16A, MCB, 1Phase
6 pcs 10A, MCB, 1Phase No 2.00

12.5.4 Ditto, but SDB-SA1 and consisting:-


1 pc main 63A, MCB, 3Phase
17 pcs 16A, MCB, 1Phase
7 pcs 10A, MCB, 1Phase No 1.00

12.6 Light Points


12.6.1 surface mounted light points fed through PVC insulated conductors of
2x2.5mm2 inside PVC conduits of 16mm diameter, including junction boxes
with covers and insulating screw cap connectors, complete. No 384.00

12.7 Extra Over Light Points for Flush Mounted Switches


(Type Legrand Suno or Equivalent)

12.7.1 Flush mounting single switch, 7740 01 + 77 40 41 No 68.00


12.7.2 Flush mounting 2 gang single switch, 7740 05 + 77 40 42 No 59.00
12.7.3 Flush mounting two-way switch, 7740 06 + 77 40 41 No 14.00
12.7.4 Flush mounting intermediate switch, 7740 07 + 77 40 41 No 8.00

12.8 Socket Outlet Points

12.8.1 Flush mounted 10-16A/1P socket outlet points fed through PVC insulated
conductors of 3x2.5mm2 inside PVC conduit of 16mm diameter including
junction boxes with covers and insulating screw cap connectors. No 214.00

12.9 Flush Mounted Socket Outlets with Earth Contact


(Type Legrand Suno or Equivalent)

12.9.1 Flush mounting socket outlet of 10-16A/1P, 7740 20 + 77 40 41. No 84.00


12.9.2 Flush mounting socket outlet of 10-16A/1P twin, 7740 25+ 77 40 42. No 141.00
12.10 Data /Telecom Points/Outlets
(Type Legrand Suno or Approved Equivalent)

12.10.1 Data/telephone points fed through 2x(twisted pair category 6 UTP cable)
inside PVC conduit of 25mm diameter. No 141.00

Acute Engineering Plc. Page 281 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Item no Description Unit Qty


12.10.2 RJ 45 twin outlets type LEGRAND 2(74213) category 6 with 8 contacts
complete with clip on support frame. No 141.00

Telephone Distrubution cables

12.10.3 10 pairs (10x2x0.5sq.mm) indoor telephone cable trunk in PVC dia.50mmor


equivalent pair as ETC standard m 200.00

12.10.4 PVC Pipe of 50mm diameter for future back bone cabling m 200.00

Telephone and Data Distribution Frame


(To be done by Speciallized sub contractor)

12.10.5 19" cabinate (MDF) wall mounting cabinet, fixed type version 12U- made of
white sheet metal equiped with reversable curved front door made of screen-
printed safty glass, reversable metal rear door and including:-

1 pc 100 Pair Rack Mountable Telephone Terminal Panel


1 pc Telephone Panal, 24port rack mountable
1 pc Cable organizer (manegment panel)
1 pcs 19" patch panel Rj-45 cat-6,
1 pc Cable organizer (manegment panel)
1 pc Power Supply Unit 19" -French Standard 230V 8x2P+E sockets black
24 pcs cat 6 UTP patch cords 1m length
All connection accessories: No 1.00

Acute Engineering Plc. Page 282 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Item no Description Unit Qty

12.10.6 19" cabinate (IDF) wall mounting, fixed type version 12U- made of white
sheet metal equiped with reversable curved front door made of screen-printed
safty glass, reversable metal rear door and including:-

1 pc Telephone Panal, 24port rack mountable


1 pc Cable organizer (manegment panel)
2 pcs 19" patch panel Rj-45 cat-6,
1 pcs Cable organizer (manegment panel) for patch cords
1 pc Power supply Unit 19" -French Standard 230V 8x2P+E sockets black
30 pcs Rj-45 cat 6 U/UTP patch cords
All connection accessories: No 1.00

12.10.7 19" cabinate (IDF) wall mounting, fixed type version 15U- made of white
sheet metal equiped with reversable curved front door made of screen-printed
safty glass, reversable metal rear door and including:-

1 pc Telephone Panal, 24port rack mountable


1 pc Cable organizer (manegment panel)
2 pcs 19" patch panel Rj-45 cat-6,
1 pcs Cable organizer (manegment panel) for patch cords
1 pc Power supply Unit 19" -French Standard 230V 8x2P+E sockets black
72 pcs Rj-45 cat 6 U/UTP patch cords
All connection accessories: No 3.00

12.10.8 30x20cm covered pulling box for data cable pulling purpose No 31.00

12.11 Lightning Protection System

12.11.1 Air termination circular Galvanized steel rod of 16mm diameter and up to
3.0m length mounted on the air termination network. No 2.00

12.11.2 1x50mm sq. circular bare galvanized steel wire for roof conductor which is
mounted on the roof in the form of a mesh. M 235.00

12.11.3 1x50mm sq. circular bare galvanized steel wire down


conductor from roof bond to test junction box inside PVC conduit of 32mm. M 60.00

12.11.4 Testing junction boxes at 1.5m above ground level made of galvanized steel. No 8.00
12.11.5 1x50mm bare galvanized steel conductor from testing junction box to earth M 42.00
rod.
12.11.6 1500mm long and 50x50x3mm X-head galvanized steel earth rod including
all connecting accessories. No 8.00

12.11.7 Bonding materials for down conductor with galvanized steel air termination
netwok. L.S. 1.00

Acute Engineering Plc. Page 283 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Item no Description Unit Qty


12.11.8 30x3.5mm galvanized steel ring earth termination network around the building
atleast one meter away from the wall of the building. M 292.00

12.12 Light Fittings and Lamps


(Specified Type or Equivalent)

Connected and tested including lamps and accessories complete, all as


specified or described in lighting fittings schedule and as shown on the
drawings.
12.12.1 MODUS TU 118K +1xT8 18W/840 lamp. No 9.00

12.12.2 MODUS TU 136K+1xT8 36W/840 lamp. No 116.00

12.12.3 MODUS TU 236 K+2xT8 36W/840 lamps. No 245.00


12.12.4 MODUS TU 136K+RFTUB 136+1xT8 36W/840 lamp. No 14.00

TOTAL CARRIED TO SUMMARY ..........................

Acute Engineering Plc. Page 284 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Rate Amount

F BILL OF QUANTITIES

FOR

AR BUILDING M1L

797,195.45
1,325,829.10
108,976.23

2,232,000.78

3,405,411.53
834,535.80
245,635.34
693,498.08
602,955.39
298,561.75
1,394,449.85
1,712,774.38
166,906.79
337,246.50
577,359.56
1,351,727.49

11,621,062.47

Acute Engineering Plc. Page 285 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Rate Amount

13,853,063.24

27,706,126.49

4,155,918.97

31,862,045.46

Acute Engineering Plc. Page 286 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Rate Amount

14.97 12,248.70
99.28 121,820.65
114.56 46,854.10
129.50 2,590.00
207.32 2,073.19
233.23 2,332.34
373.18 3,731.75

110.31 65,775.21

135.39 80,724.12

248.78 11,941.60

310.98 14,927.00
414.64 19,902.72

110.31 10,000.04

202.09 97,203.27

69.66 33,507.66

202.09 61,933.24

50.22 130,668.77

154.59 78,961.10

797,195.45

Acute Engineering Plc. Page 287 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Rate Amount

84.52 25,820.86
84.52 10,380.41
84.52 4,788.48

1,922.91 422,920.98
1,922.91 21,921.17
1,922.91 88,561.54
192.29 98,219.69

204.60 65,095.54
204.60 27,211.80
204.60 62,820.38

Acute Engineering Plc. Page 288 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Rate Amount

30.90 88,339.68
25.82 41,417.89
25.82 227,593.46
25.82 36,962.92
25.82 81,763.96

49.26 22,010.35

1,325,829.10

993.44 70,285.88

1,093.72 38,690.35

108,976.23

2,029.87 122,459.62
2,029.87 174,234.95
2,029.87 22,714.25
304.48 22,514.63
2,029.87 33,864.20

395.21 821,612.19

Acute Engineering Plc. Page 289 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Rate Amount

215.56 151,718.89
215.56 141,003.83
215.56 32,161.55
215.56 15,939.45
215.56 22,542.69

899.26 769,769.18

Acute Engineering Plc. Page 290 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Rate Amount

30.90 104,270.64
30.90 127,335.97
30.90 104,579.58
25.82 129,635.53
25.82 109,207.35
25.82 251,450.53
25.82 248,396.49

3,405,411.53

259.91 782,130.64

235.62 28,708.13
220.86 16,488.58

396.41 7,208.45

834,535.80

297.57 196,178.83

193.75 15,027.25

241.14 10,147.17

Acute Engineering Plc. Page 291 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Rate Amount

447.11 17,338.93

89.52 6,943.17

245,635.34

408.32 216,791.91

10,970.32 21,940.64
11,834.12 82,838.86

Acute Engineering Plc. Page 292 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Rate Amount

13,341.65 93,391.58
11,878.69 35,636.07
7,311.53 124,295.98
6,777.84 6,777.84
6,557.76 131,155.25
6,079.09 24,316.37
5,804.00 150,903.91
4,448.32 22,241.59

693,498.08

6,005.24 378,330.21
1,032.25 12,386.95
2,024.09 16,192.70

1,765.90 38,849.78

13,855.89 55,423.55
5,015.91 10,031.82

894.59 76,398.13

Acute Engineering Plc. Page 293 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Rate Amount

894.59 15,342.25

602,955.39

53.68 52,515.11
53.68 85,167.47

53.68 124,084.91

Acute Engineering Plc. Page 294 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Rate Amount

35.31 8,898.50

74.80 2,393.60
42.26 10,649.52
97.72 1,563.52

212.34 5,096.23

265.43 7,962.86
115.02 230.04

298,561.75

133.86 609,319.07
137.54 190,420.63
172.76 382,809.35
147.82 167,092.40

103.70 35,047.59

69.72 9,760.80

1,394,449.85

117.93 43,023.75

Acute Engineering Plc. Page 295 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Rate Amount

98.27 15,513.53

810.40 127,932.34

385.66 130,341.90

296.11 108,031.47

101.89 8,022.82

41.02 6,483.21

421.97 904,350.20

Acute Engineering Plc. Page 296 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Rate Amount

73.55 63,221.37

177.51 57,037.51

1,643.74 43,394.74
722.78 86,907.07
270.38 36,122.77
211.18 20,577.38

129.21 7,752.51

357.07 54,061.83

1,712,774.38

293.04 166,906.79

166,906.79

31.85 134,957.35
33.69 46,642.95
32.89 37,178.12
38.46 85,221.39
34.05 18,078.38

Acute Engineering Plc. Page 297 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Rate Amount

48.21 15,168.31

337,246.50

1,978.52 63,312.56

Acute Engineering Plc. Page 298 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Rate Amount

2,335.02 4,670.04

4,180.02 83,600.40

2,751.21 41,268.21

277.47 8,878.92

810.78 25,944.92

277.47 8,878.92

517.13 8,274.11

Acute Engineering Plc. Page 299 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Rate Amount

14,423.84 72,119.20

120.68 5,430.60
156.66 10,182.90
191.73 2,875.95
260.06 3,900.90
323.54 2,588.32

Acute Engineering Plc. Page 300 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Rate Amount

240.26 1,201.31
256.79 2,824.74
381.80 3,436.24

373.95 25,802.44

1,076.00 5,380.00
1,779.19 1,779.19

83.20 1,663.96
122.51 4,900.25
197.74 8,898.13

103.33 103.33

Acute Engineering Plc. Page 301 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Rate Amount

384.72 2,308.30
527.37 2,636.84

125.15 8,260.10
201.45 16,720.47

391.43 84,940.31

Acute Engineering Plc. Page 302 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Rate Amount

352.42 38,766.20

1,290.59 25,811.80

577,359.56

3,035.02 6,070.04

110.70 1,328.35
110.70 1,328.35

379.28 1,517.11
379.28 2,654.95
379.28 3,792.79
268.97 3,496.66

86.81 1,736.17
68.99 689.87

Acute Engineering Plc. Page 303 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Rate Amount

3,258.87 3,258.87

23,586.87 23,586.87

5,673.39 5,673.39

Acute Engineering Plc. Page 304 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Rate Amount

8,548.65 17,097.30

8,548.65 8,548.65

432.10 165,926.40

145.31 9,881.08
192.76 11,372.84
164.02 2,296.28
173.70 1,389.60

487.23 104,267.22

134.87 11,329.08

236.92 33,405.72

823.90 116,169.67

Acute Engineering Plc. Page 305 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Rate Amount

909.87 128,291.67

133.12 26,624.39

68.99 13,797.35

27,312.85 27,312.85

Acute Engineering Plc. Page 306 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Rate Amount

38,431.62 38,431.62

45,308.62 135,925.86

255.69 7,926.42

1,354.18 2,708.37

79.13 18,595.00

79.13 4,747.66

678.62 5,428.96

79.13 3,323.36

1,568.48 12,547.87

11,664.45 11,664.45

Acute Engineering Plc. Page 307 of 384


ODABULTUM UNIVERSITY SEMINAR BUILDING M1L

Rate Amount

115.90 33,841.64

652.77 5,874.93

778.39 90,293.24

945.90 231,745.50
1,130.65 15,829.10

1,351,727.49

Acute Engineering Plc. Page 308 of 384


ACUTE ENGINEERING PLC
Contracto
SUB STRUCTURE DATA
Typology : FFL FROM PROF.=

Excavation depth for Masonary


Grade beam depth

Bulk excavation <

PIT EXCAVATION

Above NGL

Below NGL
Axis

1500

L V=(H-A) W=(H-V-L)

A1 0.50 -1.94 3.00 0 0.00


A2 0.50 -1.95 3.00 0 0.00
A3 0.50 -1.98 3.00 0 0.00
A4 0.50 -1.89 3.00 0 0.00
A5 0.50 -1.92 3.00 0 0.00
A6 0.50 -1.12 3.00 0 0.00
A7 0.50 -1.63 3.00 0 0.00
A8 0.50 -1.46 3.00 0 0.00

CONTRACTOR------------------- CONSULTANT-------------------- CLIENT--------------------------


ACUTE ENGINEERING PLC
Contracto
SUB STRUCTURE DATA
Typology : FFL FROM PROF.=

Grade beam depth Excavation depth for Masonary

Bulk excavation <

PIT EXCAVATION

Above NGL

Below NGL
Axis

1500

A9 0.50 -1.45 3.00 0 0.00


A10 0.50 -1.37 3.00 0 0.00
B1 0.50 -1.49 3.00 0 0.00
B2 0.50 -1.55 3.00 0 0.00
B3 0.50 -1.58 3.00 0 0.00
B4 0.50 -1.49 3.00 0 0.00
B5 0.50 -1.48 3.00 0 0.00
B6 0.50 -0.75 3.00 0 0.00
B7 0.50 -1.09 3.00 0 0.00
B8 0.50 -1.01 3.00 0 0.00

CONTRACTOR------------------- CONSULTANT-------------------- CLIENT--------------------------


ACUTE ENGINEERING PLC
Contracto
SUB STRUCTURE DATA
Typology : FFL FROM PROF.=

Grade beam depth Excavation depth for Masonary

Bulk excavation <

PIT EXCAVATION

Above NGL

Below NGL
Axis

1500

B9 0.50 -0.92 3.00 0 0.00


B10 0.50 -0.89 3.00 0 0.00
C1 0.50 -0.97 3.00 0 0.00
C2 0.50 -0.96 3.00 0 0.00
C3 0.50 -0.99 3.00 0 0.00
C4 0.50 -0.90 3.00 0 0.00
C5 0.50 -0.58 3.00 0 0.00
C6 0.50 -0.40 3.00 0 0.00
C7 0.50 -0.49 3.00 0 0.00
C8 0.50 -0.46 3.00 0 0.00

CONTRACTOR------------------- CONSULTANT-------------------- CLIENT--------------------------


ACUTE ENGINEERING PLC
Contracto
SUB STRUCTURE DATA
Typology : FFL FROM PROF.=

Grade beam depth Excavation depth for Masonary

Bulk excavation <

PIT EXCAVATION

Above NGL

Below NGL
Axis

1500

C9 0.50 -0.35 3.00 0 0.00


C10 0.50 -0.24 3.00 0 0.00
D1 0.50 -0.51 3.00 0 0.00
D2 0.50 -0.49 3.00 0 0.00
D3 0.50 -0.46 3.00 0 0.00
D4 0.50 -0.57 3.00 0 0.00
D5 0.50 -0.07 3.00 0 0.00
D6 0.50 -0.15 3.00 0 0.00
D7 0.50 -0.04 3.00 0 0.00
D8 0.50 0.00 2.83 0 0.00

CONTRACTOR------------------- CONSULTANT-------------------- CLIENT--------------------------


ACUTE ENGINEERING PLC
Contracto
SUB STRUCTURE DATA
Typology : FFL FROM PROF.=

Excavation depth for Masonary


Grade beam depth

Bulk excavation <

PIT EXCAVATION

Above NGL

Below NGL
Axis

1500

D9 0.50 0.00 2.79 0 0.00


D10 0.50 0.00 2.71 0 0.00
Total in cm 20.00 -37.63 119.33 0 0.00
Ave. depth
in m

0.50 0.94 2.98 0.00 0.00

CONTRACTOR------------------- CONSULTANT-------------------- CLIENT--------------------------


AcuteEngineering

Project=OdabultumUniversity

Client=FDREMinistryOfEducation
ctor=TNT CONSTRUCTION AND TRADING
Location=Chiro
Block=SEM -138
FFL= 1867.8

N.G.L site Bulk Pit


No Axis Depth
Elevation clearing Reduced Cut
(m)
Level Depth(m) Remark
1 A1 1869.442 1869.242 1867.3 -1.942 3
2 A2 1869.455 1869.255 1867.3 -1.955 3
3 A3 1869.482 1869.282 1867.3 -1.982 3
4 A4 1869.393 1869.193 1867.3 -1.893 3
5 A5 1869.424 1869.224 1867.3 -1.924 3
6 A6 1868.618 1868.418 1867.3 -1.118 3
7 A7 1869.131 1868.931 1867.3 -1.631 3
8 A8 1868.964 1868.764 1867.3 -1.464 3
9 A9 1868.954 1868.754 1867.3 -1.454 3
10 A10 1868.869 1868.669 1867.3 -1.369 3
11 B1 1868.987 1868.787 1867.3 -1.487 3
12 B2 1869.047 1868.847 1867.3 -1.547 3
13 B3 1869.076 1868.876 1867.3 -1.576 3
14 B4 1868.994 1868.794 1867.3 -1.494 3
15 B5 1868.976 1868.776 1867.3 -1.476 3
16 B6 1868.247 1868.047 1867.3 -0.747 3
17 B7 1868.589 1868.389 1867.3 -1.089 3
18 B8 1868.507 1868.307 1867.3 -1.007 3
19 B9 1868.424 1868.224 1867.3 -0.924 3
20 B10 1868.395 1868.195 1867.3 -0.895 3
21 C1 1868.474 1868.274 1867.3 -0.974 3
22 C2 1868.461 1868.261 1867.3 -0.961 3
23 C3 1868.488 1868.288 1867.3 -0.988 3
24 C4 1868.401 1868.201 1867.3 -0.901 3
25 C5 1868.081 1867.881 1867.3 -0.581 3
26 C6 1867.904 1867.704 1867.3 -0.404 3
27 C7 1867.99 1867.79 1867.3 -0.49 3
28 C8 1867.957 1867.757 1867.3 -0.457 3
29 C9 1867.853 1867.653 1867.3 -0.353 3
30 C10 1867.737 1867.537 1867.3 -0.237 3
31 D1 1868.013 1867.813 1867.3 -0.513 3
32 D2 1867.993 1867.793 1867.3 -0.493 3
33 D3 1867.964 1867.764 1867.3 -0.464 3
34 D4 1868.074 1867.874 1867.3 -0.574 3
35 D5 1867.574 1867.374 1867.3 -0.074 3
36 D6 1867.649 1867.449 1867.3 -0.149 3
37 D7 1867.541 1867.341 1867.3 -0.041 3
38 D8 1867.326 1867.126 1867.126 0 2.826
39 D9 1867.287 1867.087 1867.087 0 2.787
40 D10 1867.212 1867.012 1867.012 0 2.712
Total
Max 1869.482 1869.282 1867.3 0 3
Min 1867.212 1867.012 1867.012 -1.982 2.712
Average 1868.423825 1868.223825 1867.283125 -0.9407 2.983125
FFL 1867.8

AcuteEngineering
Project=OdabultumUniversity
Client=FDREMinistryOfEducation
Contractor=MesafintYerdaweBC
Location=Chiro
Block=DHB-T2-173

N.G.L site Bulk Pit


No Axis
Elevation clearing Depth
Reduced Cut
(m)
Level Depth(m) Remark
11 A1 1851.069 1850.869 1850.869 -0.078 3.3 edge
12 B1 1851.608 1851.408 1851.408 -0.617 3.3
13 C1 1851.815 1851.615 1851.615 -0.824 3.3
14 D1 1852.228 1852.028 1852.028 -1.237 3.3
15 E1 1852.339 1852.139 1852.139 -1.348 3.3
16 F1 1852.196 1851.996 1851.996 -1.205 3.3
17 G1 1852.87 1852.67 1852.67 -1.879 3.3 edge
20 A2 1850.761 1850.561 1850.561 0 3.07
21 B2 1851.284 1851.084 1851.084 -0.293 3.3
22 C2 1851.411 1851.211 1851.211 -0.42 3.3
23 D2 1851.791 1851.591 1851.591 -0.8 3.3
24 E2 1851.918 1851.718 1851.718 -0.927 3.3
25 F2 1851.816 1851.616 1851.616 -0.825 3.3
26 G2 1852.376 1852.176 1852.176 -1.385 3.3
29 A3 1850.291 1850.091 1850.091 0 2.6 edge
30 B3 1850.625 1850.425 1850.425 0 2.934
31 C3 1851.025 1850.825 1850.825 -0.034 3.3
32 D3 1851.242 1851.042 1851.042 -0.251 3.3
33 E3 1851.275 1851.075 1851.075 -0.284 3.3
34 F3 1851.339 1851.139 1851.139 -0.348 3.3
35 G3 1851.925 1851.725 1851.725 -0.934 edge
Total
Max 1852.969 1852.769 1850.791 0 3.3
Min 1850.199 1849.999 1849.999 -1.978 2.6
Average 1851.53368889 1851.333689 1850.677111 -0.66 3.2352
FFL 1851.291
RAW

OGL FGL Elevation


Differenc
e
A1 1869.442 A1 1867.833 1.409 C8 1867.957 C8
A2 1869.455 A2 1867.897 1.358 C9 1867.853 C9
A3 1869.482 A3 1867.891 1.391 C10 1867.737 C10
A4 1869.393 A4 1867.817 1.376 D1 1868.013 D1
A5 1869.424 A5 1867.783 1.441 D2 1867.993 D2

A6 1868.618 A6 1867.806 0.612 D3 1867.964 D3

1869.131 1.015 1868.074


A7 A7 1867.916 D4 D4
A8 1868.964 A8 1867.74 1.024 D5 1867.574 D5
A9 1868.954 A9 1867.698 1.056 D6 1867.649 D6
A10 1868.869 A10 1867.852 0.817 D7 1867.541 D7
B1 1868.987 B1 1867.836 0.951 D8 1867.326 D8
B2 1869.047 B2 1867.856 0.991 D9 1867.287 D9
B3 1869.076 B3 1867.891 0.985 D10 1867.212 D10
B4 1868.994 B4 1867.747 1.047
B5 1868.976 B5 1867.729 1.047
B6 1868.247 B6 1867.764 0.283
B7 1868.589 B7 1867.862 0.527
B8 1868.507 B8 1867.819 0.488
B9 1868.424 B9 1867.864 0.36
B10 1868.395 B10 1867.822 0.373
C1 1868.474 C1 1867.952 0.322
C2 1868.461 C2 1867.881 0.38
C3 1868.488 C3 1867.897 0.391
C4 1868.401 C4 1867.888 0.313
C5 1868.081 C5 1867.762 0.119
C6 1867.904 C6 1867.821 -0.117
C7 1867.99 C7 1867.841 -0.051
AcuteEngineering
Project=OdabultumUniversity
Client=FDREMinistryOfEducation
Contractor=MesafintYerdaweBC
Location=Chiro
Block=DHB-T2-173 raw

N.G.L site
No Axis Bulk
Elevation clearing

Rediuce CutDepth
Level (m)
11 A1 1851.069 1850.869 1850.791 -0.078
12 B1 1851.608 1851.408 1850.791 -0.617
13 C1 1851.815 1851.615 1850.791 -0.824
14 D1 1852.228 1852.028 1850.791 -1.237
15 E1 1852.339 1852.139 1850.791 -1.348
16 F1 1852.196 1851.996 1850.791 -1.205
17 G1 1852.87 1852.67 1850.791 -1.879
20 A2 1850.761 1850.561 1850.561 0
21 B2 1851.284 1851.084 1850.791 -0.293
22 C2 1851.411 1851.211 1850.791 -0.42
23 D2 1851.791 1851.591 1850.791 -0.8
24 E2 1851.918 1851.718 1850.791 -0.927
25 F2 1851.816 1851.616 1850.791 -0.825
26 G2 1852.376 1852.176 1850.791 -1.385
29 A3 1850.291 1850.091 1850.091 0
30 B3 1850.625 1850.425 1850.425 0
31 C3 1851.025 1850.825 1850.791 -0.034
32 D3 1851.242 1851.042 1850.791 -0.251
33 E3 1851.275 1851.075 1850.791 -0.284
34 F3 1851.339 1851.139 1850.791 -0.348
35 G3 1851.925 1851.725 1850.791 -0.934
Total
Max 1852.969 1852.769 1850.791 0
Min 1850.199 1849.999 1849.999 -1.978
Average 1851.534 1851.334 1850.677 -0.65658
FFL 1851.291
1867.762 -0.005
1867.71 -0.057
1867.706 -0.169
1867.885 -0.072
1867.843 -0.05

1867.768 -0.004

0.148
1867.726
1867.7 -0.326
1867.663 -0.214
1867.513 -0.172
1867.297 -0.171
1867.253 -0.166
1867.233 -0.221
Pit

Depth
(m)
Remark
3.3 edge
3.3
3.3
3.3
3.3
3.3
3.3 edge
3.07
3.3
3.3
3.3
3.3
3.3
3.3
2.6 edge
2.934
3.3
3.3
3.3
3.3
edge

3.3
2.6
3.2352
Project12
Location ; Fetche Koye
Client ; AAHDPO
consultant: NOMY ENGINEERING
Contractor ; DUZA CONSTRACTION

DESCRIPTION

SPEC Contract
ITEM UNIT
REF Qty
A. SUB-STRUCTURE

1.EXCAVATION & EARTH WORKS


1.1 Site clearing and removing of the
top 200mm thick soil m2 939.42
1.2 Bulk excavation in ordinary soil not
exceeding 1500mm from NGL. m3 1326.79
1.3 Bulk excavation in ordinary soil
exceeding 1500mm but not
exceeding 3000mm from NGL. m3 1326.79

CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------


Project12
Location ; Fetche Koye
Client ; AAHDPO
consultant: NOMY ENGINEERING
Contractor ; DUZA CONSTRACTION

DESCRIPTION

SPEC Contract
ITEM UNIT
REF Qty
A. SUB-STRUCTURE

1.4 Bulk excavation in ordinary soil


exceeding 3000mm but not
exceeding 4500mm from NGL. m3
1.5 Excavate in ordinary soil for trench
foundation to a depth not
exceeding 1500mm from reduced m3
1.6 level.
Excavate in ordinary soil for Trench
to a depth exceeding 1500mm but
not 3000mm from reduced level.
CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
Project12
Location ; Fetche Koye
Client ; AAHDPO
consultant: NOMY ENGINEERING
Contractor ; DUZA CONSTRACTION

DESCRIPTION

SPEC Contract
ITEM UNIT
REF Qty
A. SUB-STRUCTURE

1.7 Excavate in ordinary soil for


isolated footing to a depth not
exceeding 1500mm from reduced m3
1.8 level.
Ditto item 1.6 exceeding 1500mm
but not exceeding 3000mm. m3
1.8 Excavate in soft rock for isolated
footing to a depth not exceeding
1500mm from reduced level. m3
1.9 Ditto item 1.8 exceeding 1500mm
but not exceeding 3000mm. m3
CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
Project12
Location ; Fetche Koye
Client ; AAHDPO
consultant: NOMY ENGINEERING
Contractor ; DUZA CONSTRACTION

DESCRIPTION

SPEC Contract
ITEM UNIT
REF Qty
A. SUB-STRUCTURE

1.10 Excavate in hard rock for isolated


footing to a depth not exceeding
1500mm from reduced level. m3
1.11 Ditto item 1.10 exceeding 1500mm. m3
1.12 Fill around footings and foundation
column to maintain the desired
level with selected borrowed non
expansive material and compact in m3 2356.54
layers not exceeding 200mm.
CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
Project12
Location ; Fetche Koye
Client ; AAHDPO
consultant: NOMY ENGINEERING
Contractor ; DUZA CONSTRACTION

DESCRIPTION

SPEC Contract
ITEM UNIT
REF Qty
A. SUB-STRUCTURE

1.13 Fill under hard core with non-


expansive selected material from
quarry and compact in layers not
exceeding 200mm thick by
sprinkling water to insure 95%
m3 309.91
modified AASHTO dry density.
1.14 Fill under hard core with non-
expansive selected material from
site and compact in layers not
exceeding 200mm thick by
sprinkling water to insure 95%
m3
CONTRACTOR-------------------
modified AASHTO dry density.
OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
Project12
Location ; Fetche Koye
Client ; AAHDPO
consultant: NOMY ENGINEERING
Contractor ; DUZA CONSTRACTION

DESCRIPTION

SPEC Contract
ITEM UNIT
REF Qty
A. SUB-STRUCTURE

1.15 Cart away surplus excavated


material to a distance not m3 2841.46
1.16 exceeding
250mm thick5kms.
sound basaltic or
equivalent stone hard-core finished
and blinded with crushed stone. m2 516.52

TOTAL CARRIED TO SUMMARY ......

CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------


Project12
Location ; Fetche Koye
Client ; AAHDPO
consultant: NOMY ENGINEERING
Contractor ; DUZA CONSTRACTION

DESCRIPTION

SPEC Contract
ITEM UNIT
REF Qty
A. SUB-STRUCTURE

2.CONCRETE WORKS
2.1 50mm thick lean concrete in C-5 with
minimum cement content of 150kg/m3
ofa)
concrete
footingunder:
(MAT) m2 575.29
b) Mat beams & slabs m2
c) stone masonry m2 82.75
d) grade beam m2 57.86
e) 10cm thick ground floor slab m2 516.52
CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
Project12
Location ; Fetche Koye
Client ; AAHDPO
consultant: NOMY ENGINEERING
Contractor ; DUZA CONSTRACTION

DESCRIPTION

SPEC Contract
ITEM UNIT
REF Qty
A. SUB-STRUCTURE

2.2 Reinforced concrete in class C-25 (with


a 28-day 15cm cube crushing strength
of 25MPa), cast into formworks and
vibrated around rod reinforcement bars.
( formwork & reinforcement bars are
measured separately.) in: "Type of
cement to be ordinary portland cement
a) footing (MAT) m3
b) Mat beams & slabs m3 464.05
c) foundation column m3 24.75
d) grade beam m3 40.49
CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
Project12
Location ; Fetche Koye
Client ; AAHDPO
consultant: NOMY ENGINEERING
Contractor ; DUZA CONSTRACTION

DESCRIPTION

SPEC Contract
ITEM UNIT
REF Qty
A. SUB-STRUCTURE

e) shear wall m3 7.63


f) Enterance Steps m3
g) Ramp m3
h) 100mm thick ground floor slab m2 516.52
2.3 Provide, cut & fix in position sawn
seasoned Zigba wood Formwork For:
a) footing
m2
b) Mat beams & slabs
m2 684.45
CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
Project12
Location ; Fetche Koye
Client ; AAHDPO
consultant: NOMY ENGINEERING
Contractor ; DUZA CONSTRACTION

DESCRIPTION

SPEC Contract
ITEM UNIT
REF Qty
A. SUB-STRUCTURE

c) foundation column
m2 266.40
d) grade beam
m2 425.12
e) shear wall
m2 88.33
f)Entrance Steps
m2 0.00
2.4 Reinforcement steel bars according to
structural drawing. Price includes
cutting, bending, placing in position and
tying wires.
a) dia. 6mm plain bar
kg 1126.35
CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
Project12
Location ; Fetche Koye
Client ; AAHDPO
consultant: NOMY ENGINEERING
Contractor ; DUZA CONSTRACTION

DESCRIPTION

SPEC Contract
ITEM UNIT
REF Qty
A. SUB-STRUCTURE

b) dia. 8mm deformed bar


kg 1706.08
c) dia. 10mm deformed bar
kg 1843.82
d) dia. 12mm deformed bar
kg 3228.46
e) dia. 14mm deformed bar
kg 10320.69
f) dia. 16 mm deformed bar
kg 5021.57
g) dia. 20 mm deformed bar
kg 12521.10
h) dia. 24 mm deformed bar
kg 7649.59
CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
Project12
Location ; Fetche Koye
Client ; AAHDPO
consultant: NOMY ENGINEERING
Contractor ; DUZA CONSTRACTION

DESCRIPTION

SPEC Contract
ITEM UNIT
REF Qty
A. SUB-STRUCTURE

TOTAL CARRIED TO SUMMARY .......


3. MASONRY WORKS
3.1 500mm thick stone masonry foundation
below ground level bedded in cement
mortar (1:3) in full joints.
m3 126.34
3.2 Ditto but above ground level.
m3 126.34

TOTAL CARRIED TO SUMMARY ......

CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------


NOMY ENGINEERING P.L.C

Executed Qty

Contract
Unit Price Exeeded 5% of
Amount
Qty from Exeeded
Previous Current the Qty from
Executed Executed contract contract
Qty Qty Qty Qty

9.87 9272.08 0.00 818.39 0.00 46.97

53.36 70797.51 0.00 606.18 0.00 66.34

61.57 81690.46 0.00 2441.36 1114.57 66.34

CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------


NOMY ENGINEERING P.L.C

Executed Qty

Contract
Unit Price Exeeded 5% of
Amount
Qty from Exeeded
Previous Current the Qty from
Executed Executed contract contract
Qty Qty Qty Qty

69.60 0.00 0.00 #DIV/0! #DIV/0! 0.00

59.29 0.00 0.00 0.00 0.00 0.00

64.22 0.00 0.00 0.00 0.00 0.00


CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
NOMY ENGINEERING P.L.C

Executed Qty

Contract
Unit Price Exeeded 5% of
Amount
Qty from Exeeded
Previous Current the Qty from
Executed Executed contract contract
Qty Qty Qty Qty

59.29 0.00 0.00 0.00 0.00 0.00

72.76 0.00 0.00 0.00 0.00 0.00

176.36 0.00 0.00 0.00 0.00 0.00

220.46 0.00 0.00 0.00 0.00 0.00


CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
NOMY ENGINEERING P.L.C

Executed Qty

Contract
Unit Price Exeeded 5% of
Amount
Qty from Exeeded
Previous Current the Qty from
Executed Executed contract contract
Qty Qty Qty Qty

299.05 0.00 0.00 0.00 0.00


380.22 0.00 0.00 0.00 0.00 0.00

216.18 509436.82 0.00 694.34 0.00 117.83

CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------


NOMY ENGINEERING P.L.C

Executed Qty

Contract
Unit Price Exeeded 5% of
Amount
Qty from Exeeded
Previous Current the Qty from
Executed Executed contract contract
Qty Qty Qty Qty

212.76 65936.45 0.00 0.00 15.50

0.00 0.00 0.00 0.00


CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
NOMY ENGINEERING P.L.C

Executed Qty

Contract
Unit Price Exeeded 5% of
Amount
Qty from Exeeded
Previous Current the Qty from
Executed Executed contract contract
Qty Qty Qty Qty

63.58 180660.03 0.00 #DIV/0! #DIV/0! 142.07

154.33 79714.53 0.00 0.00 25.83

997507.88 0.00

CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------


NOMY ENGINEERING P.L.C

Executed Qty

Contract
Unit Price Exeeded 5% of
Amount
Qty from Exeeded
Previous Current the Qty from
Executed Executed contract contract
Qty Qty Qty Qty

16.17 9302.44 0.00 587.82 12.53 28.76


16.17 0.00 0.00
16.17 1338.07 0.00 0.00 4.14
16.17 935.54 0.00 58.44 0.59 2.89
16.17 8352.12 0.00 0.00 0.00 25.83
CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
NOMY ENGINEERING P.L.C

Executed Qty

Contract
Unit Price Exeeded 5% of
Amount
Qty from Exeeded
Previous Current the Qty from
Executed Executed contract contract
Qty Qty Qty Qty

666.36 0.00 0.00 0.00 0.00


666.36 309224.36 0.00 466.58 2.53 23.20
666.36 16492.41 0.00 -4.04 0.00 1.24
666.36 26979.38 0.00 41.13 0.64 2.02
CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
NOMY ENGINEERING P.L.C

Executed Qty

Contract
Unit Price Exeeded 5% of
Amount
Qty from Exeeded
Previous Current the Qty from
Executed Executed contract contract
Qty Qty Qty Qty
666.36 5084.06 0.00 5.15 0.00 0.38
666.36 0.00 0.00 0.00 0.00
666.36 0.00 0.00 0.00 0.00 0.00
66.64 34418.79 0.00 0.00 0.00 25.83

114.06 0.00 0.00 0.00 0.00 0.00


114.06 78068.37 0.00 720.01 35.56 34.22
CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
NOMY ENGINEERING P.L.C

Executed Qty

Contract
Unit Price Exeeded 5% of
Amount
Qty from Exeeded
Previous Current the Qty from
Executed Executed contract contract
Qty Qty Qty Qty
114.06 30385.58 0.00 -39.96 0.00 13.32
114.06 48489.28 0.00 317.03 0.00 21.26
114.06 10074.46 0.00 50.15 0.00 4.42
114.06 0.00 0.00 0.00 0.00

4.24 4775.72 0.00 0.00 0.00 56.32


CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
NOMY ENGINEERING P.L.C

Executed Qty

Contract
Unit Price Exeeded 5% of
Amount
Qty from Exeeded
Previous Current the Qty from
Executed Executed contract contract
Qty Qty Qty Qty

4.24 7233.78 0.00 1473.61 0.00 85.30

4.24 7817.80 0.00 5101.66 3257.84 92.19

4.24 13688.67 0.00 5714.37 2485.91 161.42

4.24 43759.73 0.00 9890.14 0.00 516.03

4.24 21291.46 0.00 4577.65 0.00 251.08

4.24 53089.46 0.00 15359.49 2838.39 626.06

4.24 32434.26 0.00 0.00 0.00 382.48


CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
NOMY ENGINEERING P.L.C

Executed Qty

Contract
Unit Price Exeeded 5% of
Amount
Qty from Exeeded
Previous Current the Qty from
Executed Executed contract contract
Qty Qty Qty Qty

763235.74 0.00

1023.75 129340.58 0.00 0.00 0.00 6.32


1033.90 130622.93 0.00 0.00 0.00 6.32

259963.50 0.00

CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------


BLOCK NO:400

ty >5%
Currently Exceeding
payable Amount to
Todate
greater Executed Previous be
Payable
than 5% Qty approved
of without by Head
Exeeded incuding Office
Qty 5%

0.00 818.39 8077.51 0.00

0.00 606.18 32345.86 0.00

1048.23 1326.79 81690.46 64539.59

CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------


BLOCK NO:400

ty >5%
Currently Exceeding
payable Amount to
Todate
greater Executed Previous be
Payable
than 5% Qty approved
of without by Head
Exeeded incuding Office
Qty 5%

#DIV/0! #DIV/0! #DIV/0! #DIV/0!

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
BLOCK NO:400

ty >5%
Currently Exceeding
payable Amount to
Todate
greater Executed Previous be
Payable
than 5% Qty approved
of without by Head
Exeeded incuding Office
Qty 5%

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
BLOCK NO:400

ty >5%
Currently Exceeding
payable Amount to
Todate
greater Executed Previous be
Payable
than 5% Qty approved
of without by Head
Exeeded incuding Office
Qty 5%

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00

0.00 694.34 150102.20 0.00

CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------


BLOCK NO:400

ty >5%
Currently Exceeding
payable Amount to
Todate
greater Executed Previous be
Payable
than 5% Qty approved
of without by Head
Exeeded incuding Office
Qty 5%

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
BLOCK NO:400

ty >5%
Currently Exceeding
payable Amount to
Todate
greater Executed Previous be
Payable
than 5% Qty approved
of without by Head
Exeeded incuding Office
Qty 5%

#DIV/0! #DIV/0! #DIV/0! #DIV/0!

0.00 0.00 0.00 0.00

0.00 #DIV/0! #DIV/0!

CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------


BLOCK NO:400

ty >5%
Currently Exceeding
payable Amount to
Todate
greater Executed Previous be
Payable
than 5% Qty approved
of without by Head
Exeeded incuding Office
Qty 5%

0.00 575.29 9302.44 0.00


0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 57.86 935.54 0.00
0.00 0.00 0.00 0.00
CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
BLOCK NO:400

ty >5%
Currently Exceeding
payable Amount to
Todate
greater Executed Previous be
Payable
than 5% Qty approved
of without by Head
Exeeded incuding Office
Qty 5%

0.00
0.00 0.00 0.00 0.00
0.00 464.05 309224.36 0.00
0.00 -4.04 -2689.76 0.00
0.00 40.49 26979.38 0.00
CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
BLOCK NO:400

ty >5%
Currently Exceeding
payable Amount to
Todate
greater Executed Previous be
Payable
than 5% Qty approved
of without by Head
Exeeded incuding Office
Qty 5%
0.00 5.15 3431.40 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00
1.34 684.45 78068.37 152.56
CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
BLOCK NO:400

ty >5%
Currently Exceeding
payable Amount to
Todate
greater Executed Previous be
Payable
than 5% Qty approved
of without by Head
Exeeded incuding Office
Qty 5%
0.00 -39.96 -4557.84 0.00
0.00 317.03 36160.21 0.00
0.00 50.15 5719.95 0.00
0.00 0.00 0.00 0.00

0.00

0.00 0.00 0.00 0.00


CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
BLOCK NO:400

ty >5%
Currently Exceeding
payable Amount to
Todate
greater Executed Previous be
Payable
than 5% Qty approved
of without by Head
Exeeded incuding Office
Qty 5%

0.00 1473.61 6248.09 0.00

3165.65 1843.82 7817.80 13422.37

2324.49 3228.46 13688.67 9855.82

0.00 9890.14 41934.17 0.00

0.00 4577.65 19409.23 0.00

2212.33 12521.10 53089.46 9380.30

0.00 0.00 0.00 0.00


CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
BLOCK NO:400

ty >5%
Currently Exceeding
payable Amount to
Todate
greater Executed Previous be
Payable
than 5% Qty approved
of without by Head
Exeeded incuding Office
Qty 5%

0.00 604761.48 32811.04

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00

0.00 0.00 0.00

CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------


BLOCK NO:400

Total Excuted

8077.51

32345.86

146230.05

CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------


BLOCK NO:400

Total Excuted

#DIV/0!

0.00

0.00
CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
BLOCK NO:400

Total Excuted

0.00

0.00

0.00

0.00
CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
BLOCK NO:400

Total Excuted

0.00
0.00

150102.20

CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------


BLOCK NO:400

Total Excuted

0.00

0.00
CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
BLOCK NO:400

Total Excuted

#DIV/0!

0.00

#DIV/0!

CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------


BLOCK NO:400

Total Excuted

9302.44
0.00
0.00
935.54
0.00
CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
BLOCK NO:400

Total Excuted

0.00
309224.36
-2689.76
26979.38
CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
BLOCK NO:400

Total Excuted

3431.40
0.00
0.00
0.00

0.00
78220.92
CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
BLOCK NO:400

Total Excuted

-4557.84
36160.21
5719.95
0.00

0.00
CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
BLOCK NO:400

Total Excuted

6248.09

21240.17

23544.49

41934.17

19409.23

62469.76

0.00
CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------
BLOCK NO:400

Total Excuted

637572.52
-

0.00
0.00

0.00

CONTRACTOR------------------- OFFICE ENGINEER--------------- RESIDENT ENGINEER------------


SEMINAR BLOCK FFL= 1867.8

Axis B.S I.S F.S H.I NGL EASTING NORTHING


Axis
BM5 1341 4950 1872.642 BM5
1141 1870.17
A1 732 1869.442 A1 704880.367 1001741.911
B1 1187 1868.987 B1 704879.435 1001745.761
C1 1700 1868.474 C1 704878.205 1001751.222
D1 2161 1868.013 D1 704877.142 1001755.927
A2 719 1869.455 A2 704875.464 1001740.56
B2 1127 1869.047 B2
C2 1713 1868.461 C2 704873.439 1001750.12
D2 2181 1867.993 D2 704872.462 1001754.819
A3 692 1869.482 A3 704870.891 1001739.512
B3 1098 1869.076 B3
C3 1686 1868.488 C3
D3 2210 1867.964 D3
A4 781 1869.393 A4
B4 1180 1868.994 B4
C4 1773 1868.401 C4
D4 2100 1868.074 D4
A5 750 1869.424 A5
B5 1198 1868.976 B5
Previous
C5 2093 1868.081 Road
C5
Cut
D5 2600 1867.574 D5 704858.434 1001751.669
A6 1556 1868.618 A6 704856.869 1001736.36
B6 1927 1868.247 B6
Previous
C6 2270 1867.904 Road
C6 704854.657 1001745.89
Cut
D6 2525 1867.649 D6 704853.659 1001750.726
A7 1043 1869.131 A7 704852.062 1001735.495
B7 1585 1868.589 B7
C7 2184 1867.99 C7
D7 2633 1867.541 D7 704849.685 1001749.078
A8 1210 1868.964 A8 704847.461 1001734.163
B8 1667 1868.507 B8
C8 2217 1867.957 C8 704545.346 1001743.772
D8 2848 1867.326 D8 704834.806 1001748.524
A9 1220 1868.954 A9 704842.545 1001733.421
B9 1750 1868.424 B9 7048841.69 1001737.382
C9 2321 1867.853 C9 704840.497 1001742.671
D9 2887 1867.287 D9 704839.513 1001747.341
A10 1305 1868.869 A10 704837.966 1001732.373
B10 1779 1868.395 B10 704837.103 1001736.15
C10 2437 1867.737 C10 704835.816 1001741.659
D10 2962 1867.212 D10 704834.806 1001746.25
TOP PEG 704837.073 1001736.136
TOP PEG 704842.669 1001733.107
TOP PEG 704875.482 1001740.543
TOP PEG 704834.775 1001746.276

After Bulk excavSEMINAR BLOCK


BM5 3345 435 73.05 N E
408 1872.64 1001755.968 704877.318
FFL(Floor Finished Level) SEM-138 1001745.767 704879.462
2.468 FFL= 1867.8 1001736.11 704837.055
Avg= 1868.42 0.62 1001746.238 704834.812
AVG= 1868.36 1001733.08 704842.628
1001744.609 704875.712
1001741.195 704880.239
1001751.832 704878.332
1001739.993 704870.58
1001746.579 704868.311
1001752.139 704867.335
1001737.448 704863.973
1001744.523 704861.416
1001749.378 704860.7
1001735.49 704857.076
1001742.964 704856.635
1001747.964 704854.967
1001734.352 704850.887
1001740.69 704850.157
BULK EXCAVATION AVG=
FFL=
remark
Bld area 660 m2
ELEVATION ΔH

1867.833 1.609
1867.836 1.151
1867.952 0.522
1867.885 0.128
1867.897 1.558
1867.856 1.191
1867.881 0.58
1867.843 0.15
1867.891 1.591
1867.891 1.185
1867.897 0.591
1867.768 0.196
1867.817 1.576
1867.747 1.247
1867.888 0.513
1867.726 0.348
1867.783 1.641
1867.729 1.247
1867.762 0.319
1867.7 -0.126
1867.806 0.812
1867.764 0.483
Previous
1867.821 Road Cut 0.083
1867.663 -0.014
1867.916 1.215
1867.862 0.727
1867.841 0.149
1867.513 0.028
1867.74 1.224
1867.819 0.688
1867.762 0.195
1867.297 0.029
1867.698 1.256
1867.864 0.56
1867.71 0.143
1867.253 0.034
1867.852 FALSE COLUMN 1.017
1867.822 0.573
1876.706 -8.969
1867.233 -0.021
1867.88
1867.867
1868.064
1867.387

Elv. Concatenate
1867.82 1001755.968,704877.318
1867.848 1001745.767,704879.462
1867.815 1001736.11,704837.055
1867.236 1001746.238,704834.812
1868.085 1001733.08,704842.628
1867.933 1001744.609,704875.712
1867.937 1001741.195,704880.239
1867.872 1001751.832,704878.332
1867.9 1001739.993,704870.58
1867.862 1001746.579,704868.311
1867.819 1001752.139,704867.335
1867.841 1001737.448,704863.973
1867.827 1001744.523,704861.416
1867.742 1001749.378,704860.7
1867.887 1001735.49,704857.076
1867.79 1001742.964,704856.635
1867.776 1001747.964,704854.967
1868.004 1001734.352,704850.887
1867.877 1001740.69,704850.157
1867.84
1867.8

Acute Engineering
SEMINAR BLOCK

Axis B.S I.S F.S H.I NGL

BM5 1710 1872.642


1874.352
A1 450 1873.902 FFL(Floor Finished Level) SEM-139
B1 941 1873.411 FFL= 1872.3
C1 1290 1873.062 Avg= 1872.98
D1 1515 1872.837
A2 489 1873.863
B2 940 1873.412
C2 1300 1873.052
D2 1560 1872.792
A3 545 1873.807
B3 993 1873.359
C3 1330 1873.022
D3 1480 1872.872
A4 510 1873.842
B4 1081 1873.271
C4 1273 1873.079
D4 2310 1872.042
A5 387 1873.965
B5 1471 1872.881
C5 1997 1872.355
D5 2400 1871.952
A6 788 1873.564
B6 858 1873.494
C6 1545 1872.807
D6 1790 1872.562
A7 690 1873.662
B7 1150 1873.202
C7 1547 1872.805
D7 1710 1872.642
A8 914 1873.438
B8 1298 1873.054
C8 1583 1872.769
D8 2010 1872.342
A9 1192 1873.16
B9 1404 1872.948
C9 1565 1872.787
D9 2600 1871.752
A10 1386 1872.966
B10 1740 1872.612
C10 1868 1872.484
D10 2719 1871.633
BM5 3345 435 73.05
408 1872.642
S.No Subject Core Idea Date Ref.No

1.Precast Beams edge Connection details in


b/nGirder beams not indicated on the
Structurals ST 9/18

2. Stair Case landing Project out from Axis A in


Request for Design b/n axis 5 & 6 to outside of the building on ST 12/12/2009 TNT/CO/TR/ODUR/
1 Clarification 01/18 but,on AR 01/15 it is not projected out OOH/09

3.The are two ground floor dwg one without


library AR 01/15 and with library AR 02/15

4. AR 07/15 SHOWS THICKNESS 15CM WHERE


AS ST 01/18 SHOWS 10CM THICKNESS
Number of.
Bar in Total
Length of Member(Pc Member(P Length(m
NO. LOCATION SHAPE DIA.(mm) Dia.6 Dia.8 Dia.10 Dia.12 Dia.14 Dia.16
Bar(m) Cs)
s) )

II. Foundation Columns

1 C1 20 4.8 8 6 230.4 0
2 ST-2 8 1.6 17 6 163.2 163.2
3 C2 20 4.8 10 29 1392
4 ST-2 8 1.6 17 29 788.8 788.8
5 C3 20 4.8 10 3 144
6 ST-2 8 1.6 17 3 81.6 81.6
TOTAL LENGTH(m) 0 1033.6 0 0 0
UNIT WEIGHT IN (Kg/m) 0.222 0.395 0.617 0.888 1.209 1.579
TOTAL WEIGHT (kg) 0 408.27 0 0 0 0
Dia.20

230.4

1392

144

1766.4
2.467
4357.7