Quality Standard For : Mechanical and Electrical (M & E) Works (Plumbing and Sanitary) OSB/WIR/F-02

Project : Issue:2 Rev:0


Location of Structure : Ground Floor / 1st Floor / 2nd Floor / 3rd Floor / Roof Effective Date: 1 Feb 2010
Block Number ; Ö Pass Inspection - To be initialled and Dated
Lot(s) Number : X Fail Inspection - To be rectified and to pass Inspection Upon Corrective Action
Drawing Ref :
REMARKS
ITEM ELEMENT STANDARDS TOLERANCE ASSESSMENT TOOL INSPECTION
(Hightlight major defects)
1 Exposed Pipes 1. Installation

(a) Pipes properly support, bend without distostin kink Visual


and damage

(b) Joints are watertight Visual

(c) Pipe ends properly capped Visual

(d) No cold water pipes below sewerage pipes Visual

2. Alignment

(a) Horizantally, verticaly and povallel aligned to Spirit Level and


building surface Measuring Tape

(b) Inclined pipes laid to proper gradients Visual

(c) Plumb ≤ 3mm per 1m height Plumb Test and


Measuring Tape
3. Clearance
(a) Do not cause obstruction and pause safety hazard Visual
at public area
Attended by Inspected by Verified by

Contractor Technical Assistant /Project Engineer QAQC Representative


Name : Name : Name :
Date : Date : Date :
Quality Standard For : Mechanical and Electrical (M & E) Works (Plumbing and Sanitary) OSB/WIR/F-02
Project : Issue:2 Rev:0
Location of Structure : Ground Floor / 1st Floor / 2nd Floor / 3rd Floor / Roof Effective Date: 1 Feb 2010
Block Number ; Ö Pass Inspection - To be initialled and Dated
Lot(s) Number : X Fail Inspection - To be rectified and to pass Inspection Upon Corrective Action
Drawing Ref :
TOLERANCE REMARKS
ITEM ELEMENT STANDARDS ASSESSMENT TOOL INSPECTION
(Hightlight major defects)
(b) Sufficient clearance between installed pipes/ceiling Visual
and pipes/wall for accessibility

(c) Service pipe duct accessible Visual

4. No visible damage

(a) Painting with good opacity and no dripping Visual

(b) No visible damage Visual

2 Water Tank 1. Installation

(a) All openings properly covered Visual

(b) Joints and pipe connections are watertight Visual

(c) Not located below swerage pipe Visual

(d) Corrosion resistant external cat laddos provided for Visual


cold water tank
(e) Overflow pipe to be discharged at proper location Visual

Attended by Inspected by Verified by


Contractor Technical Assistant /Project Engineer QAQC Representative
Name : Name : Name :
Date : Date : Date :
Quality Standard For : Mechanical and Electrical (M & E) Works (Plumbing and Sanitary) OSB/WIR/F-02
Project : Issue:2 Rev:0
Location of Structure : Ground Floor / 1st Floor / 2nd Floor / 3rd Floor / Roof Effective Date: 1 Feb 2010
Block Number ; Ö Pass Inspection - To be initialled and Dated
Lot(s) Number : X Fail Inspection - To be rectified and to pass Inspection Upon Corrective Action
Drawing Ref :
REMARKS
ITEM ELEMENT STANDARDS TOLERANCE ASSESSMENT TOOL INSPECTION
(Hightlight major defects)
(f) Well supported on plinth or beares Visual

2. Netting

(a) Netting properly fitted for overflow/warning/vent pipe Visual

3. Clearances

(a) Accessible for maintenance minimum clearance Visual


of 600m all rounded the water tank

4. No visible damage

(a) No visible damage Visual

(b) Clean and free from debris Visual

3 Pump and Motor 1. Installation

(a) No noticeable vibration and noise from pump motor Visual


(b) Test certificate for alignment of pump and motor Visual
from manufactory
Attended by Inspected by Verified by

Contractor Technical Assistant /Project Engineer QAQC Representative


Name : Name : Name :
Date : Date : Date :
Quality Standard For : Mechanical and Electrical (M & E) Works (Plumbing and Sanitary) OSB/WIR/F-02
Project : Issue:2 Rev:0
Location of Structure : Ground Floor / 1st Floor / 2nd Floor / 3rd Floor / Roof Effective Date: 1 Feb 2010
Block Number ; Ö Pass Inspection - To be initialled and Dated
Lot(s) Number : X Fail Inspection - To be rectified and to pass Inspection Upon Corrective Action
Drawing Ref :
REMARKS
ITEM ELEMENT STANDARDS TOLERANCE ASSESSMENT TOOL INSPECTION
(Hightlight major defects)
2. Electrical termination

(a) No bad/loose electrical/termination Visual

3. No visible damage
Attended by Inspected by Verified by

Contractor Technical Assistant /Project Engineer QAQC Representative


Name : Name : Name :
Date : Date : Date :