Quality Standard For : Mechanical and Electrical (M & E) Works (Plumbing and Sanitary) OSB/WIR/F-02
Project : Issue:2 Rev:0
Location of Structure : Ground Floor / 1st Floor / 2nd Floor / 3rd Floor / Roof Effective Date: 1 Feb 2010 Block Number ; Ö Pass Inspection - To be initialled and Dated Lot(s) Number : X Fail Inspection - To be rectified and to pass Inspection Upon Corrective Action Drawing Ref : REMARKS ITEM ELEMENT STANDARDS TOLERANCE ASSESSMENT TOOL INSPECTION (Hightlight major defects) 1 Exposed Pipes 1. Installation
(a) Pipes properly support, bend without distostin kink Visual
and damage
(b) Joints are watertight Visual
(c) Pipe ends properly capped Visual
(d) No cold water pipes below sewerage pipes Visual
2. Alignment
(a) Horizantally, verticaly and povallel aligned to Spirit Level and
building surface Measuring Tape
(b) Inclined pipes laid to proper gradients Visual
(c) Plumb ≤ 3mm per 1m height Plumb Test and
Measuring Tape 3. Clearance (a) Do not cause obstruction and pause safety hazard Visual at public area Attended by Inspected by Verified by
Name : Name : Name : Date : Date : Date : Quality Standard For : Mechanical and Electrical (M & E) Works (Plumbing and Sanitary) OSB/WIR/F-02 Project : Issue:2 Rev:0 Location of Structure : Ground Floor / 1st Floor / 2nd Floor / 3rd Floor / Roof Effective Date: 1 Feb 2010 Block Number ; Ö Pass Inspection - To be initialled and Dated Lot(s) Number : X Fail Inspection - To be rectified and to pass Inspection Upon Corrective Action Drawing Ref : TOLERANCE REMARKS ITEM ELEMENT STANDARDS ASSESSMENT TOOL INSPECTION (Hightlight major defects) (b) Sufficient clearance between installed pipes/ceiling Visual and pipes/wall for accessibility
(c) Service pipe duct accessible Visual
4. No visible damage
(a) Painting with good opacity and no dripping Visual
(b) No visible damage Visual
2 Water Tank 1. Installation
(a) All openings properly covered Visual
(b) Joints and pipe connections are watertight Visual
(c) Not located below swerage pipe Visual
(d) Corrosion resistant external cat laddos provided for Visual
cold water tank (e) Overflow pipe to be discharged at proper location Visual
Attended by Inspected by Verified by
Contractor Technical Assistant /Project Engineer QAQC Representative Name : Name : Name : Date : Date : Date : Quality Standard For : Mechanical and Electrical (M & E) Works (Plumbing and Sanitary) OSB/WIR/F-02 Project : Issue:2 Rev:0 Location of Structure : Ground Floor / 1st Floor / 2nd Floor / 3rd Floor / Roof Effective Date: 1 Feb 2010 Block Number ; Ö Pass Inspection - To be initialled and Dated Lot(s) Number : X Fail Inspection - To be rectified and to pass Inspection Upon Corrective Action Drawing Ref : REMARKS ITEM ELEMENT STANDARDS TOLERANCE ASSESSMENT TOOL INSPECTION (Hightlight major defects) (f) Well supported on plinth or beares Visual
2. Netting
(a) Netting properly fitted for overflow/warning/vent pipe Visual
3. Clearances
(a) Accessible for maintenance minimum clearance Visual
of 600m all rounded the water tank
4. No visible damage
(a) No visible damage Visual
(b) Clean and free from debris Visual
3 Pump and Motor 1. Installation
(a) No noticeable vibration and noise from pump motor Visual
(b) Test certificate for alignment of pump and motor Visual from manufactory Attended by Inspected by Verified by
Name : Name : Name : Date : Date : Date : Quality Standard For : Mechanical and Electrical (M & E) Works (Plumbing and Sanitary) OSB/WIR/F-02 Project : Issue:2 Rev:0 Location of Structure : Ground Floor / 1st Floor / 2nd Floor / 3rd Floor / Roof Effective Date: 1 Feb 2010 Block Number ; Ö Pass Inspection - To be initialled and Dated Lot(s) Number : X Fail Inspection - To be rectified and to pass Inspection Upon Corrective Action Drawing Ref : REMARKS ITEM ELEMENT STANDARDS TOLERANCE ASSESSMENT TOOL INSPECTION (Hightlight major defects) 2. Electrical termination
(a) No bad/loose electrical/termination Visual
3. No visible damage Attended by Inspected by Verified by