INSTRUCTIONS TO STUDENTS:

1. This assignment is to be done in group of maximum 5 students.


2. All submission must be in ENGLISH.
3. Delay in submission shall be treated as NON-SUBMISSION

ASSIGNMENT OUTCOME:

Ability to distinguish the various contractual arrangement and tendering procedures


practiced in the construction industry. (CO2).
ASSESSMENT RUBRICS

WRITTEN REPORT ASSIGNMENT (80 marks)

1) Introduction (1-3 pages) = 5 marks


2) Observation Results (20 pages) = 60 marks
3) Conclusion (1-2 pages) = 5 marks
4) Organization = 5 marks
5) References (1 page) = 5 marks

a) Introduction = 5 marks
a. Exemplary – 5 : Insightful introduced and overview the topic, with examples of
current issues
b. Excellent – 4 : Insightful introduced and overview the topic
c. Good – 3 : Clear introduced and overview the topic
d. Average – 2 : Introduction is introduced and somewhat discussed.
e. Poor –1 : Introduction is introduced and somewhat is irrelevant.
f. Very poor – 0 : No introduction.

b) Observation results = 60 marks


a. Excellent : 50 – 60 : Work is clearly analyzed and reflected, with current examples
b. Good : 40 – 49 : Work is clearly analyzed and reflected.
c. Average : 20 – 39 : Work is introduced, analyzed but not clearly reflected.
d. Satisfy : 10 – 19 : Work is introduced and somewhat discussed.
e. Poor : 1 – 9 : Work is not clearly discussed and irrelevant.
f. Non-compliance : 0 : No work is done.

c) Conclusion = 5 marks
a. Exemplary – 5 : Conclusion is presented outstandingly clear, and demonstrated
the ability to related to the whole work to course outcome
b. Excellent – 4: Conclusion is presented clearly, and demonstrated the ability to
relate to the introduction part of the work
c. Good – 3 : Conclusion is presented clearly
d. Average – 2: Conclusion is moderately presented.
e. Poor – 1: Conclusion is irrelevant.
f. Very poor – 0: No conclusion is presented

d) Organisation (5 marks)
a. Exemplary – 5: Observation results are presented outstandingly clear,
effective and logically. Very smooth flow of ideas and expression.
b. Excellent – 4 : Observation results are presented clearly and logically.
c. Good – 3 : Observation results presented clearly
d. Average – 2: Average organization. There is moderate attempt to present the
observation results clearly, effectively and logically.
e. Poor – 1: Poor organization on observation results.
f. Very poor – 0: No appropriate organisation were made
e) References = 5 marks
a. Exemplary – 5 : more than 10 references from various sources and references is
presented with APA citation format, and cross referred to the whole Work.
b. Excellent – 4 : 6-10 references is presented with APA citation format, and cross
referred to the whole Work.
c. Good – 3 : 4-5 references is presented with APA citation format, and not all are
cross referred to the whole Work
d. Average - 2 : 1-3 references is presented with APA citation format, and not all are
cross referred to the whole Work
e. Poor – 1 : references is presented with poor format, and not all are cross referred
f. Very poor: 0 – No references is presented.

PEER ASSESSMENT (20 marks)

TOTAL WRITTEN REPORT ASSIGNMENT = Written report + Peer Assessment

= 100 Marks

QUESTION

Tender advertisement is one of the medium to call all interested contractor to join the tender.

Prepare a tender advertisement and report writing explaining on the draft tender
advertisement for the proposed Construction and Completion of Government building (refer
table below for the information):

LIST OF ESTIMATED NO. OF NO. OF LOCATION OF BUILDING


GROUP PROJECT UNIT STOREY THE PROJECT STRUCTURE
COST HEIGHT
Group 1 6.5 M 2 3 KUALA R.C STRUCTURE
LUMPUR
Group 2 4.9 M 2 2 PERAK R.C STRUCTURE

Group 3 5.0 M 2 1 PAHANG R.C STRUCTURE

Group 4 12.5 M 2 6 TERENGGANU STEEL STRUCTURE

Group 5 13.0 M 1 4 MELACCA TIMBER STRUCTURE

Group 6 7.0M 2 3 SELANGOR R.C STRUCTURE

Group 7 10.5 M 3 2 SARAWAK STEEL STRUCTURE

You are required to include the rationale of the advertisement items you have selected. You
are allowed to make any assumptions where necessary.
Submission requirements:

1) Report writing should not more than 10 pages.


2) The report should include the Introduction / explanation on the draft tender
advertisement / conclusion / references / other related information.
3) Draft tender advertisement should be presented / submitted in A3 size
(portrait).

END OF QUESTION