I have Five years experience of Secondary Design and Testing commissioning on projects of EHV, HV and
MV Substations of variable complexities and have vast exposure to cross cultural environments. I seek my
next challenge with a firm that offers growth potential and an exciting career path.

PROFESSIONAL EXPERIENCE:

SIEMENS PAKISTAN ENGINEERING CO. LTD. May 2014 –Till Date

Designation: Engineering Coordinator

Working as Engineering Coordinator in the Design Department of High Voltage Substations in Energy Sector – EM-TS

Worked on the following projects:

· 220/132kV/11kV GIS Mauripur Ext SS


· 220kV GIS Gulshan & 132kV AIS Gulshan Ext SS
· 220kV GIS New Port Qasim & 132kV AIS New Port Qasim Ext SS
· 220kV GIS New Port Qasim & 132kV AIS New Port Qasim Ext SS
· 220kV GIS Surjani & 132kV AIS Surjani Ext SS
· 220/132kV GIS KDA Ext SS
· 220/132kV GIS Baldia Ext SS
· 132/11kV AIS BOC Ext SS
· 132/11kV AIS Landhi Ext SS
· 132/11kV GIS Valika Ext SS
· 132/11kV GIS Queens Road Ext SS
· 132/11kV GIS Old Town Ext SS
· 132/11kV GIS Laboure Square SS
· 132/11kV GIS Shadman SS
· 132/11kV GIS Old Golimar SS
· 132/11kV GIS GADAP SS

JOB RESPONSIBILITIES

· Prepare concept diagram, Trip logic, Relay list & signal list.
· Designing and Execution of control, protection & Local control cubicle schematics on the basis of concept
diagram, trip logic & Signal list.
· Develop Interlocking logics for Circuit Breaker, Isolators and Earthing Switches.
· Cable Planning of Control and Protection schemes.
· Develop interfacing between HV devices (CB, DS, CT’s etc) and control / protection cubicles.
· Selection of different components, i.e. Relays, Tripping Relays, switches & contactors etc.

Unrestricted
· Holding frequent meeting with customer and consultant to clarify technical points in order to finalize the
control/ protection schemes.
· Getting approval from Consultant like NESPAK/BARQABB/WAPDA/KE etc. of various control &
protection schemes
· Prepare Single line diagram of ACDB, DCDB ,Emergency lighting, 48V DCDB.
· DC and AC Load Calculations.
· Coordination with supplier of 220/132kV Circuit Breaker, Disconnectors, Transformer, CT’s, CCVT’s in
order to finalize our control & protection schemes and to avoid any ambiguity during execution work at site.
· Technical Calculation for Current Transformer.
· Technical Calculation for Voltage Transformer.
· Termination of all external panel(e.g Fault recoder,Event recorder,Battery charger,PLC,transformer fan
control panel,trafo motor drive unit, HV devices(CB,Isolator,busbar Isolator,VT,CT,gas comaprment etc)
· Prepare complete checklist of projects & implement relevant quality issues
· Relay Settings
· Complete FAT(Factory Acceptance test) drawings.

Designation: Commissioning Engineer

Working as Commissioning Engineer in the Project Management Department of High Voltage Substations in Energy Sector –

EM-TS . Worked on the following projects:

· 220kV/132kV Loralaie AIS Substation


· HESCO 07 & 10 Project-132kV /11kV AIS Substation
· 132kV/11kV AKUH GIS Substation
· 132kV/11kV AKUH GIS Substation(Ext)

JOB RESPONSIBILITIES

Control & Protection Schemes Testing

• Testing of Control and Protection schemes for Air (AIS) and Gas (GIS) Insulated
Switchgear Grid stations having Single, Breaker & Half and Double Busbar for Line,
Transformer and Coupler bays, including:
• Breaker and Isolators operations and Interlocking checks, Breaker failure protection and
synchronizing scheme, Alarm and Annunciations Checks and Trip circuit supervision
scheme.
• CT& VT Secondary and Primary Injection, CT Ratio, Polarity and CT Saturation test
• Transformer and busbar Stability& Differential (High Impedance and Low Impedance)
Scheme Test.
Relay Testing

Transformer Differential (Siemens 7UT), Over current & earth fault relay, Over/under voltage,
Breaker Failure & Synch Check Relays (Siemens 7VK),

Power Transformer Testing

• Excitation current
• Capacitance and Dissipation factor test, Transformer Turn Ratio Test, Winding Resistance
Test, Winding Insulation Test, Automatic Voltage Regulator and OLTC Testing
HV Equipment Testing

• Current Transformers Tests (Ratio, Polarity, Insulation, Winding Resistance, Burden)


• Voltage Transformers (Ratio, Polarity, Insulation, Winding Resistance)

Unrestricted
• Surge Arrestor (Insulation, Hipot)
• Sf6 Circuit Breaker & Disconnector/Earthing switch (Timing, Contact Resistance,
Insulation)
MV and LV System Commissioning
• Commissioning of 11KV switchgears, 11/0.4KV Distribution Transformer, 11KV
Capacitor Banks, 400V Switchgears Testing, Battery Chargers and Batteries testing.

RABAF ENGINEERS. April, 2013 –March, 2014

Designation: Electrical Engineer

Working as Electrical Engineer on the following project:

· ADB-TRANCHE-III-GEPCO-01-No of AIS substation

JOB RESPONSIBILITIES

· Prepare of Primary engineering design drawings : Single Line Diagram, Switchyard layout, Cable tray
layout, Panel arrangement layout plan.
· Preparation of all interfacing details of substation including control and power cable layout plan and
associated schedule.
· Preparation of overall Cable Termination plan.
· Cable Planning of Control and Protection schemes.
· Develop interfacing between HV devices (CB, DS, CT’s etc) and control / protection cubicles.
· Selection of different components, i.e. Relays, Tripping Relays, switches & contactors etc.
· Holding frequent meeting with customer and consultant to clarify technical points in order to finalize the
control/ protection schemes.
· Prepare Single line diagram of ACDB, DCDB ,Emergency lighting, 48V DCDB.
· DC and AC Load Calculations.
· Coordination with supplier of 132kV Circuit Breaker, Disconnectors, Transformer, CT’s, CCVT’s in order
to finalize our control & protection schemes and to avoid any ambiguity during execution work at site.
· Technical Calculation for Current Transformer.
· Technical Calculation for Voltage Transformer.

Academic Qualification

Year Institute and Qualification

2008 - 2012 Bachelors of Engineering - Electrical from Islamia University of Bahawalpur, Pakistan.

Higher Secondary Certificate, Board of Intermediate& Secondary Education DGK,


2006- 2008
Pakistan.
Secondary School Certificate, Board of Intermediate& Secondary Education DGK,
2004 - 2006
Pakistan.

Test Sets And Software:


Software: MS Office/Project,Autocad, Siemens Digsi. Omicron Test Universe, ELCAD 7.7.1

Unrestricted
Test Set: Dobble, Primery injection ODEN AT, Severker 760, Torkel load discharge, TTR, Delta2000,
Megger, Winding Resistance, TM1600 Breaker timing test Set

Professional Certification:

Registered Engineer (Elect/ 37266) – Pakistan Engineering Council.