a 191011 0 m to 10 m metre 20
b 191012 10 m to 20 m metre 20
c 191013 20 m to 30 m metre 20
2 191060 Conducting in situ Vane shear test for soil as per IS: 4434 Each 20
Taking out 100mm dia & 450mm long undisturbed samples of soil from
bore holes including provision of air tight containers for packing and
lebelling including transporting the smples to laboratory. Piston sampler
3 191100 shall be used for extracting undisturbed samples where necessary. Each 20
Samples shall be collected as per IS 2720.
Taking out 100mm dia & 450mm long disturbed samples of soil from
191110 bore holes including provision of air tight containers for packing lebelling
4 Each 20
and transporting of smples to laboratory. Samples shall be collected as
per IS 2720.
195033 Abutment cap, Pier cap, staircase, Pedestal over pier/abutment cap,
c Seismic arrester etc. including crash barrier, kerb. Sqm 385.02
192103 Initial load test above 100 Tonne capacity up to 250 Tonne capacity pile
a Each 2
192104 Extra for every increase of 50 Tonne pile capacity or part thereof over
b Each 2
250 Tonne
192107 Routine Load Test above 100 Tonne capacity up to 250 Tonne capacity
c pile. Each 2
Lateral load testing of single pile in accordance with IS Code (IS: 2911-
Part IV) for determining safe allowable lateral load of pile with all labour,
17 192110 materials, tools & plants, equipments, machinery etc complete as per
drawing and specification.
28 131150 Providing and fixing medium grade GI pipes complete with GI fittings .
E Total (C+D)
F Contigency over item (E ) @3%
G Total (E+F)
Consultancy charges towards preparation of Detailed Design Drawing,
H TAD etc and proof checking of detailed Design and drawings by IIT/RITES
etc.
Rate Amount
(Rs.) (Rs.)
1393.80 27876
1509.95 30199
1742.25 34845
2323.00 46460
127.77 2555
174.23 3485
174.23 6969
1393.80 55752
1393.80 55752
696.90 27876
2323.00 92920
2787.60 111504
813.05 32522
2787.60 111504
2903.75 116150
2903.75 116150
76659.00 76659
397.13 125096
DETAILED ESTIMATE
NAXALBARI ROB at Rly. Km. 21/5-6 between Naxalbari - Bagdogra stations.
31072.33 776808
2888.42 818867
2077.03 32734
161.10 46252
261.30 68915
247.89 95443
261.30 129276
3032.84 444372
3321.68 1184146
DETAILED ESTIMATE
NAXALBARI ROB at Rly. Km. 21/5-6 between Naxalbari - Bagdogra stations.
10059.76 4828685
58021.44 1648389
186130.38 372261
173266.73 346533
168376.85 336754
76990.27 153981
80724.25 1937382
75782.97 75783
DETAILED ESTIMATE
NAXALBARI ROB at Rly. Km. 21/5-6 between Naxalbari - Bagdogra stations.
55.58 6896922
7590.00 4326300
80260.76 15891630
11.71 23420
155.11 x
20
=3102.2 175x20x
3102.2x 413.19=
413.19 = 14,46,165
12,81,798
413.19 826380
3500
949.28 353132
DETAILED ESTIMATE
NAXALBARI ROB at Rly. Km. 21/5-6 between Naxalbari - Bagdogra stations.
588.69 58869
0
872.11 87211
42682330
10670583
53352913
55000000
108352913
3250587
111603500
1000000
56758777
169362277
2 Steel Reinforcement :
(i) Bored pile 32982.11 x 2 Nos = 65964.22 Kg
(ii) Pile cap 9013.92 x 2 Nos = 18027.84 "
(iii) Pier shaft 7902.05 x 2 Nos. = 15804.1 "
(v) Pier cap 3867.34 x 2 No. = 7734.68 "
(vi) Pedestal 322.95 x 2 Nos = 645.9 "
(vii) Seismic Arrester 691.10 x 2 Nos = 1382.2 "
(viii) Crash barrier, Kerb 1366.61 x 1No = 1366.61 "
(ix) Deck slab 13164.00 x 1 No. = 13164.00 "
Total = 124090 Kg
3 Quantity of Cement
(i) Substructure (M-35)
(a) Bored pile = 2 x 240 @ 4.836 Q/m = 2321.28 Qtl.
(b) Pile cap =2 x 141.75 @ 4.22 Q/m 3
= 1196.37 Qtl.
(c ) Pier shaft =2 x 73.26 @ 4.22 Q/m3 = 618.31 Qtl.
(d) Pier cap =2 x 58.18 @ 4.22 Q/m 3
= 491.04 Qtl.
(ii) Superstructure (M-40)
(a) Pedestal = 2 x 1.44 @ 4.30 Q/m3 = 12.38 Qtl.
(b) Seismic Arrester =2 x 1.24 @ 4.30 Q/m 3
= 10.66 Qtl.
(c ) Crash barrier, Kerb =1 x 58.03 @ 4.30 Q/m3 = 249.53 Qtl.
(d) Deck slab =1x 176.74 @ 4.30 Q/m 3
= 759.98 Qtl.
(iii) P.C.C (M-15)
(a) Below pile cap = 2 x7.88 @ 2.20 Q/m3 = 34.67 Qtl.