You are on page 1of 12

Project : Design and Construction of Putatan Water Treatment Plant 2 Consultant : Arup

Owner : Maynilad Water Services, Inc. Contractor : AJF Consortium


Structure BAF AREA
RECORD OF FILLINGS Location GL 1-17/C-D
Date April 17 - 22, 2018

Change in Time lapse Rate of Filling Allow. Hourly


Date Time Eleveation (m) Remarks
Elevation (m) (hours) (m/hour) Rate of Filling
Jan. 02, 2018 6:00 AM 0.0000
7:00 AM 0.0833 0.0833 1 0.083 0.083 Within the Allowable
8:00 AM 0.1667 0.0833 1 0.083 0.083 Within the Allowable
9:00 AM 0.2500 0.0833 1 0.083 0.083 Within the Allowable
3:00 PM 0.7500 0.5000 6 0.083 0.083 Within the Allowable
9:00 PM 1.2500 0.5000 6 0.083 0.083 Within the Allowable
Jan. 03, 2018 3:00 AM 1.7500 0.5000 6 0.083 0.083 Within the Allowable
9:00 AM 2.2500 0.5000 6 0.083 0.083 Within the Allowable
3:00 PM 2.7500 0.5000 6 0.083 0.083 Within the Allowable
9:00 PM 3.2500 0.5000 6 0.083 0.083 Within the Allowable
Jan. 04, 2018 12:00 AM 4.5500 1.3000 16 0.081 0.083 Within the Allowable
Jan. 05-10, 2018 9:00 AM - - - - - Leak Repair
Jan. 11, 2018 6:00 AM 3.7500 0.5000 6 0.083 0.083 Within the Allowable
12:00 PM 4.2500 0.5000 6 0.083 0.083 Within the Allowable
4:00 PM 4.5500 0.3000 4 0.067 0.083 Within the Allowable

Prepared by: Noted by: Verified by:

AJF QC representative AJF Construction Manager Arup Representative


water filling jan.2 - jan. 4
Stabilization jan. 5 - jan. 11
refilling to 4.55 meter level jan. 22 jan. 12
test period jan13 - jan. 20
Project : Design and Construction of Putatan Water Treatment Plant 2 Consultant :
Owner : Maynilad Water Services, Inc. Contractor :
Structure
WATER LEVEL MEASUREMENT RECORDS Location
Date
End of Stabilization Period
Reading on Tank
160 cm
Equivalent Height of Water in the Tank
4.55 m
Beaker, Water Level Elevation
40 cm
Date of Reading
Apr. 17, 2018
Time of Reading
9:00 AM
Weather Condition

Tank Water Elevation

Day 1
Reading on Tank
160 cm
Equivalent Height of Water in the Tank
4.547 m
Beaker, Water Level Elevation
40 cm
Date of Reading
Apr. 18, 2018
Time of Reading
9:00 AM
Weather Condition

Tank Water Elevation

Day 2
Reading on Tank
159.8 cm
Equivalent Height of Water in the Tank
4.545 m
Beaker, Water Level Elevation
39.7 cm
Date of Reading
Apr. 19, 2018
Time of Reading
9:00 AM
Weather Condition

Tank Water Elevation

Day 3
Reading on Tank
Project : Design and Construction of Putatan Water Treatment Plant 2 Consultant :
Owner : Maynilad Water Services, Inc. Contractor :
Structure
WATER LEVEL MEASUREMENT RECORDS Location
Date
159.6 cm
Equivalent Height of Water in the Tank
4.543 m
Beaker, Water Level Elevation
39.6 cm
Date of Reading
Apr. 20, 2018
Time of Reading
1:00 PM
Weather Condition

Tank Water Elevation


Project : Design and Construction of Putatan Water Treatment Plant 2 Consultant :
Owner : Maynilad Water Services, Inc. Contractor :
Structure
WATER LEVEL MEASUREMENT RECORDS Location
Date
Day 4
Reading on Tank
159.4 cm
Equivalent Height of Water in the Tank
4.541 m
Beaker, Water Level Elevation
39.4 cm
Date of Reading
Apr. 21, 2018
Time of Reading
9:00 AM
Weather Condition

Tank Water Elevation

Day 5
Reading on Tank
159 cm
Equivalent Height of Water in the Tank
4.537 m
Beaker, Water Level Elevation
39 cm
Date of Reading
Apr. 22, 2018
Time of Reading
11:00 AM
Weather Condition

Tank Water Elevation


Project : Design and Construction of Putatan Water Treatment Plant 2 Consultant :
Owner : Maynilad Water Services, Inc. Contractor :
Structure
WATER LEVEL MEASUREMENT RECORDS Location
Date

SUMMARY OF MEASUREMENTS RECORD

Equivalent
Reading on Reading on
Day of Observation Date Time Water Level in
Tank, cm Beaker, cm
Tank, m
End of Stabilization Apr. 17, 2018 9:00 AM 160 4.55 40
Day 1 Apr. 18, 2018 9:00 AM 160 4.547 40
Day 2 Apr. 19, 2018 9:00 AM 159.8 4.545 39.7
Day 3 Apr. 20, 2018 1:00 PM 159.6 4.543 39.6
Day 4 Apr. 21, 2018 9:00 AM 159.4 4.541 39.4
Day 5 Apr. 22, 2018 11:00 AM 159 4.537 39

6 PM

Record on Tank Record on Beak


160.2160 40.240
Reading on Beaker (cm)
160 159.8 40
Reading on Tank (cm)

39.7
159.8 159.6 39.8 39.6
159.6 159.4 39.6
159.4 39.4
159.2 159 39.2
159 39
158.8 38.8
158.6 38.6
158.4 38.4
1 2 3 4 5 1 2 3
Day (s) Day(s)

Prepared by: Noted by:

AJF QC representative AJF Construction Manager


Arup
AJF Consortium
BAF AREA
GL 1-17/C-D
April 17 - April 22, 2018

Beaker, Water Elevation

Beaker, Water Elevation

Beaker, Water Elevation


Arup
AJF Consortium
BAF AREA
GL 1-17/C-D
April 17 - April 22, 2018

Beaker, Water Elevation


Arup
AJF Consortium
BAF AREA
GL 1-17/C-D
April 17 - April 22, 2018

Beaker, Water Elevation

Beaker, Water Elevation


Arup
AJF Consortium
BAF AREA
GL 1-17/C-D
April 17 - April 22, 2018

Color Scheme on Weather Condition

12 MN

6 PM 6 AM

12 NN

Record on Beaker
40.240
Reading on Beaker (cm)

40
39.7
39.8 39.6
39.6 39.4
39.4
39.2 39
39
38.8
38.6
38.4
1 2 3 4 5
Day(s)

Verified by:

Arup Representative
Project : Design and Construction of Putatan Water Treatment Plant 2 Consultant : Arup
Owner : Maynilad Water Services, Inc. Contractor : AJF Consortium
Structure BAF AREA
LEAK REPAIR Location GL 1-17/C-D
Date April 18, 2018 - April 22, 2018
Incipit:
Leak repair were already done way before the water filling period. Weve repaired the area several times and the repair were by Gabb and Nich. The picture below was
the only picture taken at the duration of water filling.

Prepared by: Noted by: Verified by:

AJF QC representative AJF Construction Manager Arup Representative


Project : Design and Construction of Putatan Water Treatment Plant 2 Consultant : Arup
Owner : Maynilad Water Services, Inc. Contractor : AJF Consortium
WATERTIGHTNESS TEST REPORT
Structure : BAF AREA-GL 1-17/C-D Test Period : Jan. 14-20, 2018

Equivalent Change in Elev., Absolute Value,


Date Time Reading, cm Remarks
Water Level, m m mm

April 18, 2018 Wednesday 9:00 AM 160.00 4.547 Initial reading


April 19, 2018 Thursday 9:00 AM 159.80 4.545 - 0.002 2.000 Daily Reading
April 20, 2018 Friday 1:00 PM 159.60 4.543 - 0.002 2.000 Daily Reading
April 21, 2018 Saturday 9:00 AM 159.40 4.541 - 0.002 2.000 Daily Reading
April 22, 2018 Sunday Err:509 159.00 4.537 - 0.004 4.000 Daily Reading
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Daily Reading
Err:509 Err:509 12:00 AM Err:509 Err:509 Err:509 Err:509 Final reading
Err:509 Average Daily drop in level

Final Water Level, m Err:509


Equivalent Water Level at Tank No Data #VALUE! Difference of Water Level (A), mm
Initial Water Level, m 4.547

Water Level at Container Final Water Level, cm Err:509 Err:509 Err:509 Difference of Water Level (B), mm
Initial Water Level, cm 40.000

Correction due to Precipitation or Evaporation #VALUE! Err:509

Corrected Change of Water Level (A ± B), mm #VALUE! #VALUE!


Use plus sign when the correction is due to evaporation, minus if otherwise.

=4.547/500 x
Allowable Drop in Level (Ht/500), mm 9.094
1000
Remarks: The structure is considered water-tight.

Prepared by: Noted by: Verified by: