You are on page 1of 3

WIR UPDATE APRIL 24, 2018

EXCAVATION AND PIPE LAYING

Excavation and Pipe Laying of DN1100 Raw Water


PWTP2-IN-WI-CON-8074 B Hold PIPE SUPPORT
Supply

Excavation and Pipe Laying of Permeate Pipe


PWTP2-IN-WI-CON-8344 UFRO DN1000 B Issued For Approval

Excavation and Pipe Laying of Permeate DN1000


PWTP2-IN-WI-CON-9044 B Hold PIPE SUPPORT
existing BAF
Excavation and Pipe Laying of Waste water DN150
PWTP2-IN-WI-CON-9161 A Resubmit PIPE SUPPORT
DAF To Chem1
Excavation and Pipe Laying of DN150 UF
PWTP2-IN-WI-CON-9165 A Resubmit PIPE SUPPORT
Backwash
Excavation and Pipe Laying of Waste water DN500
PWTP2-IN-WI-CON-9169 A Resubmit PIPE SUPPORT
BAF To Chem1

Excavation and Pipe Laying of DN600 UF


PWTP2-IN-WI-CON-9173 A Resubmit PIPE SUPPORT
Backwash

PIPE SUPPORT AND WAITING FOR


PWTP2-IN-WI-CON-9211 Excavation and Pipe Laying of Permeate DN1000 A Resubmit SCHEDULE OF INTERCONNECTION

WELDING WORKS

PWTP2-IN-WI-CON-9320 Welding works of DN1100 Raw Water Supply A Issued For Approval DONE, FOR PROCEED

PWTP2-IN-WI-CON-9212 Welding works of Permeate Pipe DN1000 B Issued For Approval DONE, FOR PROCEED

PWTP2-IN-WI-CON-9174 Welding works of DN600 UF Backwash B Issued For Approval DONE, FOR PROCEED

Welding works of DN500 Waste Water Pipe BAF to


PWTP2-IN-WI-CON-9170 A Issued For Approval DONE, FOR PROCEED
CHEM. 1

PWTP2-IN-WI-CON-9166 Welding works of DN150 UF Backwash B Issued For Approval DONE, FOR PROCEED

DONE, FOR PROCEED


Welding works of DN150 Waste Water Pipe DAF to
PWTP2-IN-WI-CON-9162 CHEM. 1 B Issued For Approval
DONE, FOR PROCEED
COATING
Coating of Welded Joint of Permeate Pipe DN1000
PWTP2-IN-WI-CON-9047 A Hold WAITING FOR DYE PEN TEST RESULT
Existing BAF
Coating of Welded Joint of Waste Water DN150 DAF
PWTP2-IN-WI-CON-9164 A Resubmit WAITING FOR DYE PEN TEST RESULT
to Chem1

PWTP2-IN-WI-CON-9168 Coating of Welded Joint of DN150 UF Backwash A Resubmit WAITING FOR DYE PEN TEST RESULT

Coating of Welded Joint of Waste Water DN500 BAF to WAITING FOR DYE PEN TEST RESULT
PWTP2-IN-WI-CON-9172 Chem1 A Issued For Approval

PWTP2-IN-WI-CON-9176 Coating of Welded Joint of DN600 UF Backwash A Resubmit WAITING FOR DYE PEN TEST RESULT

PWTP2-IN-WI-CON-9214 Coating of Welded Joint of Permeate Pipe DN1000 A Hold WAITING FOR DYE PEN TEST RESULT

PWTP2-IN-WI-CON-9306 Epoxy Coating of Raw Water Pump Station A Hold WAITING FOR DYE PEN TEST RESULT

DYE PENETRATION

Dye Penetration Test of Welded Joint DN1100 Raw


PWTP2-IN-WI-CON-8076 B Hold WAITING FOR DPT TEST RESULT
Water Supply
Dye Penetration Test of Welded Joint of Permeate
PWTP2-IN-WI-CON-8347 A Hold WAITING FOR DPT TEST RESULT
Pipe UFRO DN1000
Dye Penetration Test of Welded Joint of UF
PWTP2-IN-WI-CON-8352 Neutralization Pipe UFRO DN200 A Hold WAITING FOR DPT TEST RESULT

Dye Penetration Test of Welded Joint of DN500 Waste


PWTP2-IN-WI-CON-8533 A Hold WAITING FOR DPT TEST RESULT
Water Pipe BAF to CHEM. 1

Dye Penetration Test of Welded Joint of DN500 Waste


PWTP2-IN-WI-CON-8907 A Hold ONGOING
Water Pipe BAF to CHEM. 1
Dye Penetration Test of Welded Joint of DN150 UF
PWTP2-IN-WI-CON-8911 A Hold ONGOING
Backwash Pipe

Dye Penetration Test of Welded Joint Waste Water


PWTP2-IN-WI-CON-9016 A Hold ONGOING
Pipe DAF to CHEM 1 DN150

Dye Penetration Test of Welded Joint Permeate Pipe


PWTP2-IN-WI-CON-9046 A Hold WAITING FOR DPT TEST RESULT
DN1000 Existing BAF
Dye Penetration Test of Welded Joint Permeate Pipe
PWTP2-IN-WI-CON-9046 A Hold WAITING FOR DPT TEST RESULT
DN1000 Existing BAF

ONGOING
Dye Penetration Test of Welded Joint of Waste Water
PWTP2-IN-WI-CON-9163 DN150 DAF to CHEM1 A Resubmit
ONGOING

Dye Penetration Test of Welded Joint of DN150 UF


PWTP2-IN-WI-CON-9167 A Resubmit ONGOING
Backwash
Dye Penetration Test of Welded Joint of Waste Water
PWTP2-IN-WI-CON-9171 A Issued For Approval ONGOING
DN500 BAF to CHEM1
Dye Penetration Test of Welded Joint of DN600 UF
PWTP2-IN-WI-CON-9175 A Resubmit ONGOING
Backwash

Dye Penetration Test of Welded Joint of DN1000


PWTP2-IN-WI-CON-9213 A Hold WAITING FOR DPT TEST RESULT
Permeate Pipe

BACKFILLING

HYDROTEST
PWTP2-IN-WI-CON-8009 Backfilling of Waste Water Pipe BAF to Chem 1 DN500 C Hold

PWTP2-IN-WI-CON-8078 Backfilling of DN1100 Raw Water Supply B Hold HYDROTEST

PWTP2-IN-WI-CON-8348 Backfilling of Permeate Pipe UFRO DN1000 A Resubmit HYDROTEST

PWTP2-IN-WI-CON-8353 Backfilling of UF Neutralization Pipe UFRO DN200 A Resubmit HYDROTEST

Backfilling of DN500 Waste Water Pipe BAF to CHEM.


PWTP2-IN-WI-CON-8536 1 A Resubmit HYDROTEST

PWTP2-IN-WI-CON-8604 Backfilling of DN600 UF Backwash Pipe A Resubmit HYDROTEST

PWTP2-IN-WI-CON-8609 Backfilling of DN150 UF Backwash Pipe A Resubmit HYDROTEST

PWTP2-IN-WI-CON-8614 Backfilling of DN1000 Permeate Pipe A Resubmit HYDROTEST